Permit f-• T T [- I I r r D L
" CITY OF TIGARD P E R M. , IS #UEDo /i8 /9G 0i21321
C016MUNITY DEVELOPMENT DEPARTMENT
13125 SW Hall Blvd. Tigard, Oregon 97223.8199 (503) 639 -4171 PARCEL: 191 36DB --0260 3
SITE ADDRESS...: 11612 SW PACIFIC HWY
SUBDIVISION ZONING: C -G .
DLOCK • LOT
TYPE OF WORK: NEW PAVING? Y RESO. NO. :
EXCV VOLUME: 0 cy GRADING? - Y VALUE...$: 545325
FILL VOLUME: 0 cy LANDSCAPING? • Y
ENG FILL? • N SITE PREP? Y
- SOILS RPT READ ?: N STORM DRAINS ?...: Y
IMPERV SURFACE: 89847 s f
Remarks: 210 space Tr -Met Park & Ride facility and detention pond with catch
basins and clean out for surface water control.
Owner: ------------ - - -- _ -_ -__ ____ - - - -- - - - - -- - - FEES - -- - ..._. --
TRI -MET (KIM KNOX) type amount by date recpt
710 NE HOLLADAY PLCK $ 1006.20 JSD 08/16/95 95- 269408
PRMT $ 1348.00 JMH 03/15/96 06-- 277058
PORTLAND OR 97232 5PCT $ 77.40 JMH 03/15/96 96- 277058
Phone #: 239-6716 EROS $ 120.00 JMH 03/15/96 96- 277058
ERPC $ 39.00 JMH 03/15/96 96-277058
Contractor : -- ---- .--- ..------ - -ERPC $ 39.00 JMH 03/15/96 96-277058
WESTECH CONSTRUCTION INC SWM $ 2371.96 JMH 03/1E/96 96- 2770E8
16016 SE DIVISION #166
PORTLAND OR 97236 ----- --
Phone +t: 666 -6590 $ 5201.56 TOTAL
Reg #.. . 099833
--------- REQUIRED INSPECTIONS - --
This permit is issued subject to the regulations contained in the Erosion Control
Tigard Municipal Code, State of Ore. Specialty Codes and all other Excavation Insp
applicable laws. Ail work will be done in accordance with Fill Inspection
approved plans. This permit will expire if work is not started Grading Insp
within 180 days of issuance, or- if work is suspended for more Strm Drain Insp
than 180 days. Strm Drain Insp
San Sewer Insp —
Misc. Inspection
41 /
Reinforced caner
—
Pe Signat - - /, — Structur ^al mason
J j. / Engineered gradi
Issued By: �K.a..6 4A A.. filtrA . Fi nal Inspection _
Call for inspection -- 639 -4175
Ii'
1 0
Commercial Building Permit Application
'City of Tigard
13125 SW Hall Blvd.. .7 v, v U• r A J e 14 / p 9 7(17
Tigard, OR 97223
(503) 639 -4171 91"1 ( JJ7 4A-7 di / 1 / t»'
Tigard Cinemas Access Roadwa F9. .6( I/7 . (/ G 4(
Jobsite Address: Pacific Hwy .
Tr Office Use Only
Tenant: Suite #
Valuation: $545,325.00 Planck/Rec #
Permit #' c il 7 95- c- 30
caner: Tri -Met Attn: Kim Knox 1 �j 3 ���- OF-6,
A dress: 710 NE Holladay 7232
7 3�
Approvals Required.
J
Por O R 9 n .i � :. 9 ( �J ,7
Planiiin S
9
Phone: (503) 239-6716 Engineering.: cba s ". 60.04
,,, / I I-' e Other . . . .
Contractor: To be determined F �j iv
f �5,
1 � ` � (9 No 7 (E(? /zAN(r. w ,
Address: "A1,21). v ( u ti a r 1 N d' 9,, y 7
Type of const:
Occupancy class:
Phone:
Sprinklered? Yes No
Contractor's License #
(attach copy of current Oregon license) Sq. ft. of project:
Contact name & phone: Story (1st, 2nd, etc.)
Proposed use:
Architect/Engineer: Pam Weldeman, PE Kampe Assoc.
Previous use:
0V Address: 209 Kruse Park Building
3990 SW Collins Way Note: Plumbing & mechanical plans
Lake Oswego OR 97035 must be submitted at time of
building permit application.
Phone: (503) 635 -6291
JOB DESCRIPTION: 210 -space Tri -Met Park & Ride facility
-
3 I - 67r6
Applicant Signa ure & Phone number
'
lt� ( i 7 / (
Received by: Date Received:
AUG 0
.
Permit # Account Description Amount Amt. Pd. - Bal. Due. /
1 x - 0 030 Bldg. Permit (BUILD) iS v� `'°— / 5 k-�� v
Plumb. Permit (PLUMB)
Mech. Permit (MECH)
7 ?m �o Uy ✓
State Tax (TAX) 7-7. 3 0 - 1) 7 ?
Bldg:
Plumb:
Mech:
/(7 2v
Plan Check (PLANCK) 1,004.58 / 0 I . Sc2 1 O- V
Bldg:
Plumb:
Mech:
Sewer Connection (SWUSA)
Sewer Inspection (SWINSP)
Parks Dev Charge (PKSDC)
Residential TIF (TIF -R) ..4A___-__ e e
C �
Mass Transit TIF (TIF -MT) /JVA' -- e� '� r'�" a'" / W
Commercial TIF (TIF -C)
Industrial TIF (TIF -I)
Institutional TIF (TIF -IS)
Office TIF (TIF -O)
Water Quality (WQUAL) 01//14 --
Water Quantity (WQUANT) 3 7/ 9 c' 2-72/ g .--
Fire Life Safety (FLS)
Erosion Cntrl Permit (ERPRMT) 120.00 — /2 1 ( y V
Erosion Planck/USA (ERPLAN) 7 9 7 y ✓
Erosion Planck/COT (EROSN) 7 9 ' 79' -
- -92± TOTALS: C�� ' 2 ., � ` / /
2OI ,5 (0 r( � 1 '� 9
1
CITY OF TIGARD BUILDING INSPECTION NOTICE
Inspection Line: 639 -4175 Business Phone: 639 -4171
Footing Rain Drain Cover /Service FINAL:
Foundation amp, Ceiling - Plumb.
Post/Beam Mech. Shear /Sheath Framing -Mech.
PIbg.Und /FIr /Slab Plbg. Top Out Insulation - Elect.
Post/Beam Struct. Mech. Rough -in Gyp. Bd. -Bldg.
San. Sewer Gas Line Appr /Sdwlk Reins.
Other:
Date: /3 I it A.M P.M. _ Entry:
/
Address: / / /
Tenant: Ste: MST:
BUP:
Con /Own: —. 766 `c3 O p ' 41(1 MEC:
PLM:
ELC:
THE FOLLOWING CORRECTIONS ARE REQUIRED: ELR:
i 515 o °c
Inspector Date.
_APPROVED _ DISAPPROVED /CALL FOR REINSP. CF CO
CITY OF TIGARD BUILDING INSPECTION NOTICE
Inspection Line: 639 -4175 Business Phone: 639 -4171
Footing Rain Drain Cover /Service FINAL:
Foundation Water Line Ceiling - Plumb.
Post/Beam Mech. Shear /Sheath Framing -Mech.
PIbg.Und /Flr /Slab Plbg. Top Out Insulation - Elect.
Post/Bea Struct. Mech. Rough -in Gyp. Bd. -Bldg.
. ewer Gas Line Appr /Sdwlk Reins.
Other:
Date: 5 I Co A. P.I�I. } Entry:
Address: Z �' �.� ►_ i
Tenant: Ste: MST:
BUP:
Con /Own: - 2 4 l2 ' 3 $ (14 MEC:
PLM:
ELC:
THE FOLLOWING CORRECTIONS ARE REQUIRED: ELR:
C'Te,/ £ .?' (C6 0L --.0V S
/ Inspecto • /. Date: 7 /7C
PPROVED DISAPPROVED /CALL FOR REINSP. CF CO
10 . r .
y 2 Ci i2)74¢s 2-----
CITY OF TIGARD BUILDING INSPECTION NOTICE
Inspection Line: 639 -4175 Business Phone: 639 -4171
Footing Rain Drain Cover /Service
Foundation Water Line Ceiling - Plumb.
Post/Beam Mech. Shear /Sheath Framing -Mech.
PIbg.Und /FIr /Slab Plbg. Top Out Insulation - Elect.
Post/Beam Struct. Mech. Rough -in Gyp. Bd. -Bldg.
San. Sewer Gas Line Appr /Sdwlk Reins.
Other: j Z/L -- Q4A)
Date: 1 3/ — 1 7k A.M. P .M. Entry:
I dyes Si 1.)
Ie l 1
` . 4 v ,c
-—L Ste: U MST:
BUP:
Con /Own) Z ,A7P MEC:
�'J PLM: ELC:
THE FOLLOWINGCORRRCTI N �4RE REQUIRED: ELR:
C / . ....../ /
Inspector: (!9 Date: i ( .. / 1 . % _
P L .. " APPROVED _ DISAPPROVED /CALL FOR REINSP. CF CO (
TJL— )'flet
CITY OF TIGARD BUILDING INSPECTION NOTICE
Inspection Line: 639 -4175 Business Phone: 639 -4171
Footing Rhin Drai Cover /Service FINAL:
Foundation Water Line Ceiling - Plumb.
Post/Beam Mech. Shear /Sheath Framing -Mech.
PIbg.Und /Flr /Slab Plbg. Top Out Insulation - Elect.
Post/Beam Struct. Mech. Rough -in Gyp. Bd. -Bldg.
San. Sewer Gas Line Appr /Sdwlk Reins.
Other: .Q
Date: ',31D-1
, J -7 19 (n A.M. P.M. Entry:
Address: . - _ _ >I
Tenant: Ste MST:
Fe./ BUP:
Con /Own: 0 �o - 3 O MEC:
PLM:
ELC:
THE FOLLOWING CORRECTIONS ARE REQUIRED: ELR:
" sre y Z
o u T // /o c
Inspector: ((..I:../ Date: V?
erVED _ DISAPPROVED /CALL FOR REINSP. CF CO