Loading...
Report 12 /Z1) /ZUUU iz:w ras • -- / S 7 oZcrC, 5- 070 2--e 1 �L� 01 f ,ZeT 70 OxaQ� Tuv Of:t "14 b\-)11) Engineering, D sign & Construction Consulting December 29, 2005 . Mr. Monty Mooney Alan Mascord Design Associates 1305 NW 18 Portland, OR 97209 Subject: 22122B- Ridgecrest Project Lot 6 Hilisbire Crest Tigard, OR 97223 Dear Monty, I have reviewed the shear wall located at the back of the closet, next to the stairs at the main floor of the plan. Calculations indicate that the use of a 36x36 access through the panel requires a P1 -6 nailing schedule with a PHD -2 at each end of the panel. Please note that the original call out was for a P1 -6 panel and PHD -2's, thus it is acceptable to place an access opening through the shear wall. Please instruct the contractor to provide solid horizontal blocking, each side, at the top of the access opening. Use a CS -16 strap continuous over the opening to the blocking on each side. If you have any other questions please contact my office anytime. Sincerely, � E �ED PROF / . The SESSA Corporation et' (c° /04 • p f 10gWPE • r Vincent A. Sessa, P.E. O moon 0 President � c, ' y p �, 4 v lsir A _ S� EXPIRi=S :06/30/06 I 1300 SW 7th Street, Suite #104 • Renton, Washington 98055 (425) 277 -7557 • Fax (425) 277 -7559 • www.sessacorp.com