April 16, 2010 BOLDING
•
Centex Homes
11241 Slater Avenue NE, Suite 100
Kirkland, WA 98033
Attention: Mr. Tom Brown
Report of Geotechnical Engineering Services
and Reliance Letter
Proposed Tigard Residential Development
Tigard, Oregon
GeoDesign Project: Centex -16 -01
INTRODUCTION
This report presents the results of our geotechnical engineering services for the proposed
residential development located at the southwest corner of the intersection of SW Scholls Ferry
Road and SE 135th Avenue in Tigard, Oregon. We understand the site encompasses
approximately 8.5 acres and includes 88 individual lots. The lots are currently vacant but are
developed with utilities, curbs, and paved roadways for future residential development.
GeoDesign assumed the role of geotechnical engineer of record for the project and provided
construction observation services to Integrity Development during earthwork; our involvement
began in July 2007 and continued until March 2008. A geotechnical report for the property was
completed by GeoPacific Engineering, Inc. on January 13, 2006 entitled Preliminary Geotechnical
Engineering Report, Scholls Ferry Townhomes, SW Barrows and SW Scholls Ferry Road,
Washington County, Oregon. In addition, GeoDesign previously prepared supplemental
recommendations for use in design of gravity retaining walls in a letter entitled Geotechnical
Engineering Services, The Village at Summer Creek, SW Barrows Road and SW Scholls Ferry Road,
Tigard, Oregon, datedJune 6, 2007.
The current plan is to construct residential structures on the 88 lots that have been prepared.
Foundation loads were unknown at the time of this report; we have assumed that they will be
• typical of one- to four -story, wood -frame residential structures. We further understand that some
site grading will take place to accommodate design elevations. Cuts and fills are not expected to
exceed 5 feet, respectively. A site plan showing existing improvements and our hand -auger
explorations is shown on Figure 1.
1 5575 SW Sequoia Pkwy - Suite 100 I Portland. OR 97224 100 503.968.8787 I Far 503.9683068 \
SCOPE OF SERVICES
The purpose of our work was to confirm that our previous work is in conformance with the
geotechnical engineering report and to provide supplemental recommendations for use in
• design and construction of the proposed development. Specifically, we completed the following
scope of services:
• Reviewed in -house files for existing information on subsurface conditions in the site vicinity,
prior earthwork, and the previous geotechnical report for the site.
• Visited the site and completed a visual surface reconnaissance to confirm that no additional
earthwork has been conducted since completion of the project.
• Completed eight hand augers to a maximum depth of 7 feet below ground surface (BGS).
• Prepared this report, which also serves as a reliance letter, that presents our findings and
provides updates to the conclusions and recommendations provided In the previous
geotechnical report.
SITE CONDITIONS
SURFACE CONDITIONS
We completed a visual surface reconnaissance at the site. During our visit, we observed that the
ground surface is slightly sloped down towards the south from the north. As discussed above,
the lots have been developed with associated utilities, sidewalks, curbs, retaining walls, and
asphalt -paved roadways to allow access to the lots. The lots are covered by grass, with small
patches of blackberry brush near the proposed playground area at the east portion of the
property. Areas of ponded water were observed on Lots 5, 9, 10, 35, and 30 through 32. '
While on site, we observed the cracks in the asphalt roadway on SW Coriander lane. As noted in
our field reports, the asphalt was reheated during placement using propane torches, which may
have contributed to the cracking.
•
SUBSURFACE CONDITIONS
We completed eight shallow hand -auger borings (HA -1 through HA -8) at selected locations across
the site. The approximate boring locations are shown on Figure 1.
Based on our explorations, the shallow subsurface conditions in the area generally consist of
compacted fill that is medium stiff to stiff silt with varying amounts of clay, sand, and gravel: The
fill generally ranges in thickness from 0.2 foot to 2 feet BGS. The fill was encountered in most of
the borings except for HA -5 and HA -6, which were completed near the proposed playground area
at the east portion of the property. 'A thin layer of loose gravel with silt and sand was
encountered at the surface in HA -6. Native alluvium consists of medium stiff silt with some clay
and trace organics.
In HA -2, we encountered loose sand with minor gravel and encountered refusal on concrete at
approximately 6 Inches BGS. We drilled four more borings within a 10 -foot radius of HA -2 and
encountered concrete at 3 to 6 inches BGS. The area of the sand fill over concrete appears to
extend over Lots 47 through 49. The approximate area is shown on Figure 1.
. G EO DESIGN= 2 Centex -16- 01:041610
•
Based on our explorations, the average depth of stripping in lightly vegetated areas will be
approximately 1 to 2 inches. Stripping activities should be completed as recommended in the
previous geotechnical report.
CONCLUSIONS AND RECOMMENDATIONS -
In general, we anticipate that the geotechnical recommendations provided in the previous
geotechnical report are still applicable to the site with the exception of the additional 1 to
2 inches of stripping anticipated at the site and our revised shallow foundation
recommendations.
WET WEATHER/WET SOIL GRADING
The silty soils at the site are easily disturbed during the wet season and when they are moist. If
not carefully executed, site preparation, utility trench work, and roadway excavation can create
extensive soft areas and significant subgrade repair costs can result. If construction is planned
when the surficial soils are wet or may become wet, the construction methods and schedule
should be carefully considered with respect to protecting the subgrade to reduce the need to
over- excavate disturbed or softened soil. The project budget should reflect the
recommendations below if construction is planned during wet weather or when the surficial soils
are wet.
If construction occurs when silty, wet soils are present, site preparation activities may need to be
accomplished using track - mounted excavating equipment that loads removed material into
trucks supported on granular haul roads. The thickness of the granular material for haul roads
and staging areas will depend on the amount and type of construction traffic. Generally, a 12- to
18 -inch -thick mat of imported granular material is sufficient for light staging areas and the basic
building pad but is generally not expected to be adequate to support heavy equipment or truck
traffic. The granular mat for haul roads and areas with repeated heavy construction traffic
typically needs to be increased to between 18 to 24 inches. The actual thickness of haul roads
and staging areas should be based on the contractor's approach to site development and the
amount and type of construction traffic. The imported granular material should be placed in one
lift over the prepared, undisturbed subgrade and compacted using a smooth -drum, non - vibratory
roller. In addition, a geotextile fabric may be required as a barrier between the subgrade and
imported granular material in areas of repeated construction traffic.
The imported granular material should be pit- or quarry-run rock, crushed rock, or crushed gravel
and sand and should meet the requirements set forth in the 2008 Oregon Standard Specifications
for Construction (OSSC) 00330.14 (Selected Granular Backfill) and OSSC 00330.15 (Selected Stone
Backfill). The placement of the imported granular fill should be done in conformance with the
specifications provided in OSSC 00331 (Subgrade Stabilization). The geotextile should meet the
specifications provided in OSSC 02320.20 (Geotextile Property Values) for soil separation. The
geotextile should be installed in conformance•with the specifications provided in OSSC 00350
(Geosynthetic Installation) material should be fairly well - graded between coarse and fine material
and have less than 5 percent by dry weight passing the U.S. Standard No. 200 Sieve.
G Et) DESIGNV 3 Centex -16- 01:041610
•
FOUNDATION SUPPORT
Dimensions and Capacities
Continuous footings for stud bearing walls should be at least 15 inches wide. The bottom of
exterior footings should be at least 18 Inches below the lowest adjacent exterior grade. The
bottom of interior footings should be established at least 12 inches below grade.
Footings bearing on subgrade prepared as recommended above should be sized based on an
allowable bearing pressure of 2,500 pounds per square foot. This Is a net bearing pressure; the
weight of the footing and overlying backfill can be ignored in calculating footing sizes. The
recommended allowable bearing pressure applies to the total of dead plus long -term live loads
and can be increased by one -third for short -term loads (such as those resulting from wind or
seismic forces).
Based on our analysis and experience with similar soils, total post - construction settlement should
be less than 1 inch, with differential settlement of less than 'A inch over a 50 -foot span.
Resistance to Sliding
Lateral loads on footings can be resisted by passive earth pressure on the sides of the structures •
and by friction on the base of the footings. Our analysis indicates that the available passive earth
pressure for footings confined by on -site soils and structural fills is 350 pounds per cubic foot,
modeled as an equivalent fluid pressure. Adjacent concrete slabs, pavements, or the upper
12 -inch depth of adjacent, unpaved areas should not be considered when calculating passive
resistance. In addition, in order to rely upon passive resistance, a minimum of 10 feet of
horizontal clearance must exist between the face of the footings and adjacent down slopes.
For footings in contact with the on -site native material, a coefficient of friction equal to 0.30 may
be used when calculating resistance to sliding._ This value should be increased to 0.40 for
crushed rock or imported granular fill.
Foundation Drains
Foundation drains should be considered on the outside of the perimeter footings of all buildings
and routed to a suitable discharge because of the potential for shallow groundwater. The
foundation drains should consist of 4 -inch- diameter, perforated drainpipe embedded in a
minimum 2- foot -wide zone of drain rock. Drain rock should consist of angular, granular material
with a maximum particle size of 2 inches and should meet OSSC 00430.11 (Granular Drain
Backfill Material). The material should be free of roots, organic matter, and other unsuitable
materials; have less than 2 percent by dry weight passing the U.S. Standard No. 200 Sieve
(washed analysis); and have at least at least two mechanically fractured faces. Drain rock should
be wrapped in a geotextile fabric that meets the specifications provided in OSSC 00350
(Geosynthetic Installation) and OSSC 02320 (Geosynthetics) for drainage geotextiles.
CONSTRUCTION CONSIDERATIONS
All footing and floor subgrades should be evaluated by the project geotechnical engineer or their
representative to confirm suitable bearing conditions. Observations should also confirm that all
GEODESIGIW 4 Centex -16. 01:041610
loose or soft material, organics, unsuitable fill, prior topsoil zones, and softened subgrades (if
present) have been removed. Localized deepening of footing excavations may be required to
penetrate deleterious materials.
If footing excavations are conducted during wet weather conditions, we recommend that a
minimum of 3 inches of granular material be placed and compacted until well -keyed at the base
of the excavations. The granular material reduces subgrade disturbance during placement of •
forms and reinforcement and provides clean conditions for the reinforcing steel.
♦♦
We appreciate the opportunity to be of continued service to you. Please call if you have questions
concerning this report or if we can provide additional services.
Sincerely,
GeoDesign, Inc.
./ PROOF
Viola C. Lai, P.E., G.E.
/r 4 9
Project Engineer
� • REG!
Brett A. Shipton, P.E, C.E. %IT A _Se kk
Principal Engineer
EXPIRES :h •2af 0
VCL•SAS:kt
Attachments
Two copies submitted
Document ID: Centex - 16.01 -041610- geolr.doc
O 2010 GeoDesign, Inc All rights reserved.
G EO DESIG N? 5 Centex -16- 01:041610
•
•
FIGURES
J
v.9nN N. W.I. I Mm Date 4,16!2010 165;19 W0 •
Rs Kum M9ee0eUK VI! eyeEMOlCemeACtottal6 \CwY- 1641V10mn DJACeso.16O16P01 a.0 I U9m¢ ACM 1
u
1
I I 1 I rJ
I ' ;, /. arwt
, ... %
•
I , 11 ''--..:,........... ' an , . 1.1111 -..,./...../ /././ . . ''z'. - r r
14411N. ./ N„,.
� d 'I a1 // 4 e T7 74 Y'i� ,i ,, ! i / ® o r & tip . .. 407. ," :......., ), 444., :
12
SLT50 / '' 1 ,v-..'°P 1 • j ' 44 :' /
44 ' '
. / , J Ij! � b 4 .3 , j
j • % i .. . .,, i .,' .41t 7 ./ ...;
:,-.* , • -w
A , .. ,, ,,-.„„,-- 7 ,„ .. ..,..... At
} i .A.q‘ ,or: \ • t = I
________ , I N : ...... , 4,- . 4140 / f
s.�:w q b� '4 � -
F v. � f
.� 61 .i �\\\�
D -� o t� tf ` 5' 11„ a �\\� 11111111
i 4 . t ' t.; A v
N , r \
• !..........7., 0 0 la r / g 1 e."..11. BD ! ` /i --:
1 — nip "
r1 1n
OZ , \ DAL
\ - O
.P S i. B
0 F2 en Ci f
- o
fi
o I 9Te •
0 Sc
S —o
m
0
m
t -
G EODESIGNS CDIr .1601 SITE PLAN
tun vl..r p.0�M -W m0
lw IV ,.UI APRIL 7010 PROPOSED ncnao OR
DEVELOPMENT FIGURE t
em 101!19.161 Y 5111iY0Y
Z
W
V "