Loading...
Report 11/30/06 THU 10:46 FAX 503 670 9147 CARLSON TESTING IZI002 • Md. Off Ice &dim Offts Ow MP:. Carlson Testing, Inc. � A,5 Bad OR Ms= aWewhMC9 Mtw :apn58¢125: Mow MO 5509555 Construction Materials Testing & Inspection �� "�'�"'°° F 64 a m Special Inspection FINAL SUMMARY LETTER November 30, 2006 T0602978 City of Tigard 13125 SW Hall Blvd., Tigard, OR 97223 -8199 Attn: Building Department Re: Solid Rock Fellowship- Remodel Seismic Upgrade 10500 SW Nimbus Avenue- Tigard, OR Permit# BUP2006 -00375 Dear Sir or Madam: This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special inspection of the following item(s) per our inspection reports only: • Installation of Adhesive Anchors Structural Steel • • All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions, Our reports pertain to the material tested/inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. Neil S. Shannon - Project Manager NSS /ks • cc: BNK Construction Inc- Norman Parmeter Group Mackenzie (Seattle)- Josh McDowell • • Bear Office, Carlson Testing, Inc. 9430 4 60 N�9. RE Rd 911 Nerd OR 97223 Sake OR 97301 Brno OR 97702 Threw 1 503) 681 -N60 Mow' (3031589-1252 Phone. 044 330.9155 Far. 15031684 -0951 Far: 15031 58 9 -130 9 F 15 411 330-9163 Construction Materials Testing & Inspection Special Inspection FINAL SUMMARY LETTER. November 30, 2006 T0602978 City of Tigard 13125 SW Hall Blvd., Tigard, OR 97223 -8199 Attn: Building Department Re: Solid..RockFellowship,Remodel/ Seismic Upgrade • 10500 SW: Nimbus - Avenue- Tigard, OR Permit# BUP2006 -00375 Dear Sir or Madam: This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special inspection of the following item(s) per our inspection reports only: Installation of Adhesive Anchors Structural Steel All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. ./C_ Neil S. Shannon Project Manager NSS /ks cc: BNK Construction Inc- Norman Parmeter Group Mackenzie (Seattle)- Josh McDowell