Loading...
Correspondence ! 'G NOI r, 11 1 , ,, . .‘ Ar . 1 � CINEEat`G' ` L PACIFIC NORTHWEST T INC. ORTHWEST ENGINEERING, May 23, 2006 City of Tigard 13125 SW Hall Blvd. Tigard, OR. 97223 RECEIVFn Attn.: Mark VanDomelen MAY 2 5 2006 Re.: Masterpiece Construction Permit #MST2006 -00074 CITY OF T hjA ' j 9687 SW Mountainview Ln. BUILDING DT VISION Dear Mark, I have reviewed you list of corrections for the above named project and the following are . the responses to each of your items: 1.) Ruppell Home Design has corrected this schedule to show the Oregon requirements. 2.) The calculations now have a copy of the corrected cover sheet with the Oregon Engineer Stamp. 3.) The call -out for the 3 "X sill plate on the structural sheets now matches that on the engineering packet. 4.) Rueppell Home Design has revised the reactions for the trusses to show that in the truss packet. 5.) The spacing of the A. Bolts now on the structural sheets matches that shown in the Engineering Packet. 6.) Note A of the shear -wall schedule and the general Engineering notes now match as per the A. Bolts. See sheet 17R/18 of the Engineering Packet. If you have any questions please feel free in calling me. Thank You, ���� PROF � � �\ 3 k lings � �" P.E. , 1 • 6 President • r • • OR io ,\ C: \WOR ODARREMDARRENO38.DOC cb S. ELU\ EXP. 12 -31 -07 4242 Silver Falls Dr. N., Silverton, OR. 97381 ph # (503) 873 -3184 fax # (503) 873 -3907 P.E. # 13,676 April 24, 2006 Allen Danforth Masterpiece construction 13849 SW Mistletoe Dr Tigard, OR 97223 RE: New single family residence Project Information • Building Permit: MST2006 -00074 Construction Type: VN Address: 9687 SW Mountainview Ln. Occupancy Type: R-3 Area: 2980 sq. ft. Stories: 2 The plan review was performed' under the State of Oregon Structural Specialty Code (OSSC) 2004 edition; the State of Oregon Oregon Residential Specialty Code ORSC) 2005 edition and the Tualatin Valley Fire & Rescue Ordinance 99 -01 (TVFR99 -01) 1999 edition. The submitted plans have been reviewed and the following information is required prior to issuance of the permit. 1. The insulation schedule shown on the plans do not meet the Oregon Residential Specialty code (ORSC) R values. 2. Plans and calculations have State of Washington engineering stamp. 3. The call out for "3X" sill plates on some shear walls as shown on sheet S2 do not match the callouts shown in the calc. package. 4. The truss reactions shown on the plans do not match the reactions shown in the truss engineering. 5. "A" bolt spacing shown on the foundation plan do not match the call out in the lateral engineering notes section of sheet S 1. 6. Note A of the shear wall schedule contradicts the "A bolt" note of the lateral engineering notes. When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of • Tigard in tracking and processing the documents. Respectfully, Mark VanDomelen, Plans Examiner •