Loading...
Permit ti CITY OF TIGARD' MECHANICAL PERMIT COMMUNITY DEVELOPMENT PERMIT #: MEC2006 -00589 TIGARD 13125 SW Hall Blvd., Tigard, OR 97223 503.639.4171 DATE ISSUED: 12/18/2006 PARCEL: 2 S 102AC -01101 SITE ADDRESS: 12562 SW MAIN ST ZONING: CBD SUBDIVISION: LOT: JURISDICTION: TIG Project Description: Exhaust system for Type I hood. Project Value: $9,000 CLASS OF WORK: ALT FLOOR FURN: EVAP COOLERS: TYPE OF USE: COM UNIT HEATERS: VENT FANS: OCCUPANCY GRP: B VENTS W/O APPL: VENT SYSTEMS: STORIES: BOILERS /COMPRESSORS HOODS: FUEL TYPES 0 - 3 HP: DOMES. INCIN: 3 - 15 HP: COMML. INCIN: MAX INPUT: BTU 15 - 30 HP: REPAIR UNITS: FIRE DAMPERS ?: 30 - 50 HP: GAS PRESSURE: 50 + HP: WOODSTOVES: FURN < 100K BTU: AIR HANDLING UNITS CLO DRYERS: FURN > =100K BTU: <= 10000 cfm: OTHER UNITS: • > 10000 cfm: GAS OUTLETS: Owner: FEES • BANKERS INVESTMENT Description Date Amount 16325 SW BOONES FERRY STE 200 LAKE OSWEGO, OR 97035 [MECH] Permit Fee 12/18/20( $213.50 [MECPLN] Plan Rev 12/18/20C $53.38 [TAX] 8% State Surcha 12/18/20C $17.08 Phone: 503- 636 -0388 Total $283.96 Contractor: CAMERON'S INSTALLATIONS, INC. 22170 SW MARTINAZZI TUALATIN, OR 97062 REQUIRED ITEMS AND REPORTS Contact #: PRI 503- 692 -3368 FAX 503- 691 -6880 Reg #: LIC 145983 • This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of Ore. Specialty Codes and all other applicable laws. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more than 180 days. ATTENTION: Oregon law requires you o follqw rules adopted in the Oregon Utility Notification Center. Those rules are set forth in OAR 952 - 001 -0010 through OAR 952 -101 -I 00. ou may o•tain copies of these rules or direct questions to OUNC by calling 503.246.6699 or 1.800.332.2344. g' Issued By: Permittee Signature: Call 503.639.4175 by 7:00 a.m. for inspections that business day. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. . 1 2519 a .A.v 1 0,:c.-.&, 4- . ' Mechanical Permit Application City of Tigard F �, Received `J g �� DateBy. // O` k Permit No. :MLL:4w(I/� 3 T . n 13125 SW Hall Blvd., Tigard, OR 97223 Plan Review � J Phone: 503.639.4171 Fax: 503.598.19 2 2006 De/By: / 2 / D Other Permit: Inspection Line: 503.639.4175 Re tans El Page Date Ready/By: ge2for Internet: www.tigard- or.gov CPI OF 1°IG,q�1D N , ; ,eanm.Khod:4. / � /6 Supplemental Information BUIDING Oil/Miami %/!I i �iT_li� • TYPE OF WORK f OMMERC L FEE* SCHEDULE - USE CHECKLIST ❑ New construction . ddition/alteration/replacement / Mechanical permit fees* are based on the value of the work performed. Indicate the value (rounded to the nearest dollar) of all ❑ Demolition ❑ Other: mechanical materials, equipment, labor, overhead, and profit. Value: $ q ocv ,— CATEGORY OF CONSTRUCTION • / RESIDENTIAL EQUIPMENT / SYSTEMS FEES* ❑ 1 - and 2 family dwellingCommercial/industrial ❑ Accessory building ❑ Multi family For special information use checklist. ❑ Master builder 0 Description I Qty. I Ea. I Total JOB SITE INFORMATION AND LOCATION Heating/cooling or Job site address: /a S c t y �N 5 (re qg ' Aiconditioningheat a euires site plan showing pllacemm ent) 14.00 City /State/ZIP: J t „,a CAL Ct 7 ?)-3 Furnace 100,000 BTU (ducts/vents) 14.00 ,�^ p Furnace 100,000+ BTU (duets/vents) 17.90 l . Suite/bldg. /apt. no.: I Project name: % „ e-& P, Gas heat pump 14.00 Cross street/directions to job site: Duct work 14.00 Hydronic hot water system 14.00 Residential boiler (radiator or • hydronic) 14.00 Unit heaters (fuel -type, not electric), in -wall, in -duct, suspended, etc. 10.00 Subdivision: I Lot no.: Flue /vent for any of above 10.00 Other: 10.00 Tax map/parcel no.: Other fuel appliances DESCRIPTION OF WORK Water heater J 10.00 , Gas fireplace 10.00 25 r it'4Avbr■ O 4 (j) CAM FAO. tom iv, — o d ` Flue vent for water heater or gas • } fireplace 10.00 d1 Ca/' d 1-c w, ,'.Gi • maiGL -up c>zc,r Log lighter (gas) 10.00 F -9 Wood/pellet stove 10.00 Wood fireplace/insert 10.00 ❑ PROPERTY OWNER I ❑ TENANT Chimney/liner/flue/vent 10.00 Other: 10.00 . Name: ' fliv, rie..„e„ ;n 1 �d... Environmental exhaust and ventilation /� ��__`. Range hood/other kitchen Address: (� 3 S \ ,J o n �� ` �'"� -7 Sty cc) equipment 10.00 City / State/ZIP: / oc , - ,s- O -� m 0 R . 7 -s�' Clothes dryer exhaust 10.00 / ` � Single -duct exhaust (bathrooms, Phone: ( ) I Fax: ( ) toilet compartments, utility rooms) 6.80 I;i1.APPLICANT ❑ CONTACT PERSON AtticJcrawlspace fans 10.00 I //r� /� Other: 10.00 Business name: C.lsnl'If,/bn S � �G�v5 Fuel piping Contact name: 3c_0 $5.40 for first four; $1.00 for each additiona �,� f Furnace, etc. Address: .� t70 4 w f Oci Gas heat pump City / State/ZIP: `77: ..r,‘ on_ ( 7e)6, Wall/suspended/unit heater ~O Phone: ( G CC d -"Z‘" 6 C), I Fax :: (Sb3) 6, c( I — 6 e,a 0 Water heater ' Fireplace � + r ^ Fireplace E - mail: �O G C s i iNSTt2 ��Q k�C"v^S . Gb w Range CONTRACTOR Barbecue Sores -� 44 6,.., Clothes dryer (gas) Business name: Other: Address: MECHANICAL PERMIT FEES* City/ State/ZIP: Subtotal Minimum permit fee ($72.50) 2_ /150 Phone: ( ) fel/ lF ( ) Plan review (25% of permit fee) 5 3 g CCB lic.: `y sqc State surcharge (8 %of permit fee) ' TOTAL PERMIT FEE ` • This p ermit application expires if a permit is not obtained withini80 Authorized sign 1 ature: l days after it has been accepted as complete. Print name: 4I etir �s I Date: I (A_ _ .. f 06 • Fee methodology set by Tri- County Building Industry Service Board L1 Building1Pamits \MEC- PennitApp.doc 04/06/06 440.4617T(1 /02/COM/WEB) Mechanical Permit Application - City of Tigard Page 2 - Supplemental Information Commercial Fee Schedule: Total Valuation: Permit Fee: $1.00 -to $2,000.00 Minimum fee $72.50 ' $2,001.00 to $5,000.00 $72.50 for the first $2,000.00 and $2.30 for, each additional $100.00 or fraction thereof, to and including $5,000.00. $5,001.00 to $10,000.00 $141.50 for the first $5,000.00 and - $1.80 for each additional $100.00 or fraction thereof, to and including • - $10,000.00. $10,001.00 to $50,000.00 $231.50 for the first $10,000.00 and $1.35 for each additional $100.00 or fraction thereof, to and including $50,000.00. - $50,001.00 to $100,000.00 $771.50 for the first $50,000.00 and $1.25 for each additional $100.00 or fraction thereof, to and including $100,000.00. $100,000.01 and up $1,396.50 for the first $100,000.00 and $1.10 for each additional $100.00 or fraction thereof Note: All new commercial buildings require 2 sets of plans. • • • I:\ Building \Permits\MEC- PermitApp.doc 12/30/05 2 • fid0D aria Form 4a Project Name: "S4—)k.. . J a Page: SYSTEMS - GENERAL Part 1 of 6 Applicability Plans /Specs Discussion of qualifying Show compliance by including a drawing sheet, detail number, exceptions on page 4 -25 specification section and subparagraph. 1. Applicablity (Section 1317) RECEIVED this form required? .mil Form Required. Complete form if a new HVAC system is being installe. ,4,{ nj�� nts of an existing HVAC system are being replaced (I.e., equipment, controls, RiuE6Ndfk�afrtf'Ynsulation.) CITY OF TIGARD ❑ Exception. The building or part of the building qualifies for ®b1'r Od fI I n /AC code requirements. Applicable code exception is Section 1317.1. Portions of the building that qualify: Area: Exception ❑ -1 ❑ -2 ❑ -3 Area: • Exception ❑ -1 ❑ -2 ❑ -3 Area: Exception ❑ -1 ❑ -2 ❑ -3 ❑ Form Not Required. This project does not contain work required to comply with code. 2. Simple or Complex Systems (Section 1317.9 or 1317.10) Simple System. Building contains only Simple HVAC System(s). Complete this form (4a) and equipment efficiency worksheets as required. Form 4b is not required. ❑ Complex System. Project includes a Complex System. Complete this form (4a), form 4b and equipment efficiency worksheets as required. 3. Equipment Performance (Section 1317.5) ❑ No New HVAC Equipment. The building plans do not call for new electrical HVAC equipment, combustion heating equipment, or heat - operated cooling equipment. *Complies. All new HVAC equipment have efficiencies not less than those required by code. The following equipment efficiency worksheets are attached: ¥-4a ❑ -4b ❑ -4c ❑ -4d ❑ -4e ❑ -4f ❑ -4g ❑ -4h ❑ -4i ❑ -4j 4. Duct Insulation and Sealing (Sections 1317.7 1361317.8) ❑ No Ducts. The building plans and specifications do not call for new HVAC ducts or plenums. Complies. The plans and specifications call for all air - handling ducts and plenums to be insulated • and sealed as required by Sections 1317.7 &1317.8. 5. Distribution Transformers (Section 1316.1) IA No Distribution Transformers. The plans /specs do not call for new distribution transformers. U Complies. All new distribution transformers comply with efficiency, testing, and labeling requirements of Section 1316.1.1. ❑ Exception. The project qualifies for an exception per Section 1316.1.1, Exceptiion: ❑ -1 U-2 U-3 U-4 U-5 U-6 U-7 U-8 U-9 ❑ -10 ❑ -11 U-12 U-13 U-14 Attach relevant documentation for appropriate exception. The plans /specs show compliance in the following locations: f a 4 -1 April 2005 Compliance with OSSC, effective 01/01/05 A p • Form 4a Project Name: f.ra u- i X J iLt Page: Z SYSTEMS - GENERAL Part 2 of 6 6. HVAC Controls (Section 1317.4) 6.1 System Thermostat /Zone Controls (Section 1317.4.1) lit Complies. All new HVAC systems include at least one temperature control device responding to temperatures within the zones. ❑ Exception. HVAC system qualifies for an exception from zone control requirements. The applicable code exception is Section 1317.4.2, Exception ❑ -1 ❑ -2 Portions of the building that qualify: C1�11 ED Cv The plans /specs show compliance in the following locations:, 6 — n r'.1 2 0 20 6.2 Off -hour Controls - Auto Setback or Shutdown (Section 1317.4 g1� TIGARD jiti Complies. Systems must have at least one of the following features: C1� L. Y D NG D IVISION ❑ Control Setback Complies. Each system is equipped with automatic control capabl % f reducing energy through control setback during periods of non -use or alternate use of spaces ❑ Equipment Shutdown Complies. Each system is equipped with controls capable of reducing energy use through automatic shutdown during periods of non -use or alternate use of spaces. ❑ HVAC systems with equipment shutdown are equipped with at least one of the following: Programmable controls (1317.4.3.1 (1)) ❑ Occupant sensor (1317.4.3.1 (2)) ❑ Interlocked to a security system (1317.4.3.1 (3)) ❑ Manually activated timers with 2 -hour operation max (1317.4.3.1 (4)) ❑ Exception. The building qualifies for an exception to the requirement for automatic setback or shutdown controls. The applicable code exception is Section 1317.4.3 Exception ❑ -1 ❑ -2 The plans /specs show compliance in the following locations: 6.3 Control Capabilities (Sec. 1317.4.2.1) *Complies. Zone thermostats are capable of being set to the temperatures described in Sec. 1317.4.2.1. Where used to control both heating and cooling, zone controls shall be capable of providing a temperature range or deadband of at least 5 degrees F within which the supply of heating and cooling energy to the zone is shut off or reduced to a minimum. ❑ Exception. The building qualifies for an exception to the deadband requirements. The applicable code exception is Section 1317.4.2.1 Exception ❑ -1 ❑ -2 Portions of the building that qualify: The plans /specs show compliance in the following locations: 6.4 Optimum Start Controls (Section 1317.4.3.2) Complies. Separate HVAC systems have controls capable of varying start-up time of system to just meet temperature set point at time of occupancy. ❑ Exception. HVAC systems have a design supply air capacity not exceeding 10,000 cfm. The plans /specs show compliance in the following locations: 6.5 Heat Pump Controls (Section 1317.4.4) .No Heat Pump. The plans /specs do not call for a new heat pump ❑ Complies. All new heat pumps equipped with supplementary heaters are controlled to minimize the use of supplemental heat as defined in Section 1317.4.4. `% . The plans /specs show compliance in the following locations: Vi 4 -2 April 2005 Compliance with OSSC, effective 01/01/05 Form 4a Project Name: '"�,�� �«�,,��r Page: SYSTEMS - GENERAL Part 3 of 6 7. Economizer Cooling (Section 1317.3) ❑ No Cooling. The building plans do not call for a new fan system with mechanical cooling. Complies. Each new fan system has an air economizer capable of modulating outside -air and return -air dampers to provide up to 100 percent of the design supply air as outside air. ❑ Exception At least one new fan system qualifies for an exception. The applicable code exception is Section 1317.3, Exception ❑ -1 ❑ -2 ❑ -3 ❑ -4 ❑ -5 ❑ -6 If Exception 3 is selected complete the following: (a) Total cooling capacity of exempt units (Btu /hr) (b) Total installed building cooling capacity (Btu /hr) ❑ Complies. Sum of exempt units rated at less than 54,000 Btu /hr is <240,000 or a/b < 0.10 (10% of total building cooling capacity). Unit Identifier of exempt units: The plans /specs show compliance in the following locations: 8. Economizer Pressure Relief & Integration (Section 1317.3.1 and 1317.3.2) ❑ No Economizers Required. Project does not contain a new fan system requiring economizers. Overpressurization Complies. The drawings specifically identify a pressure relief mechanism for each fan system that will relieve the extra air introduced by the economizer. ❑ Integration Complies. Economizer is capable of providing partial cooling even when additional mechanical cooling is required to meet the remainder of the cooling load. ❑ Exception. The applicable exception is Section 1317.3.2, Exception ❑ -1 ❑ -2 The plans /specs show compliance in the following locations: 9. Hot Gas Bypass (Section 1317.5) No Hot Gas Bypass ❑ Complies. See allowable amount of hot gas bypass as a percentage of total cooling capacity in table below. Unit ID Rated Cooling Capacity Hot Gas Bypass Capacity Allowable Hot Gas Bypass Rated Cooling Capacity Max Hot Gas Bypass <240,000 Btu /hr 50% >240,000 Btu /hr 25% ❑ Exception. Unitary packaged system with cooling capacity no greater than 90,000 Btu /h 4 -3 April 2005 Compliance with OSSC, effective 01/01/05 Form 4a Project Name: -W-G17-s e.,►VE.s—tivArL,.r4 Page: 1 '} SYSTEMS - GENERAL Part 4 of 6 10. Shutoff Dampers (1317.4.3.3) ❑ Not Required. Shutoff dampers are not required on this project. Complies. Each outdoor air supply & exhaust system shall be equipped with motorized dampers ❑ Exception. The building qualifies for an exception to the motorized damper requirement. The applic -able code exception is Section 1317.4.3.3 Exception ❑ -1 ❑ -2 ❑ -3 ❑ -4 Li -5 The plans /specs show compliance in the following locations: 10.1. Shutoff Damper Controls (Section 1317.4.3.3.1) Complies. Outdoor air supply and exhaust systems shall be provided dampers that automatically shut when systems or spaces served are not in use or during building warm -up, cooldown, or setback. ❑ Complies. Stair and shaft vents are capable of being automatically closed during normal building operation and interlocked to open as required by fire and smoke detection systems. The plans /specs show compliance in the following locations: 10.2. Motorized Damper Leakage (1317.4.3.3.2) igiComplies. Motorized outdoor air supply and exhaust air dampers have a maximum leakage rate of 4 cfm /ft2 at 1.0 in w.g. when tested in accordance with AMCA Standard 500 -1998. ❑ Exception. Packaged HVAC equipment may have maximum leakage rate of 20 cfm /ft at 1.0 in w.g. when tested in accordance with AMCA Standard 500 -1998. The plans /specs show compliance in the following locations: 11. Piping Insulation (Section 1314) allo New Piping. The building plans and specifications do not call for new piping serving a heating or cooling system or part of a circulating service water heating system. ,o''>, Complies. Complies. All new piping serving a heating or cooling system or part of a circulating service _ water heating system complies with the requirements of the Code, Section 1314.1. IL N , Exception. New piping qualifies for exception: Section 1314.1, Exception ❑ -1 ❑ -2 12. Occupancy iii(Complies. Mechanical ventilation systems provide the required amount of ventilation specified in Chapter 4 of the Oregon Mechanical Specialty Code. ❑ Complies. Natural ventilation systems provide required amount of ventilation as certified by a reg- istered architect or engineer as specified by Section 1203.4.1, Exception. Attach worksheet The plans /specs show compliance in the following locations: The plans /specs show compliance on the following pages: 4-4 April 2005 Compliance with OSSC, effective 01/01/05 • Form 4a Project Name:l'$a.ola,. �rnJy�7.�i�w°✓` � Page: SYSTEMS - GENERAL Part 5 of 6 13. High Occupancy Ventilation (Section 1317.2.2) 1 Complies. HVAC systems with ventilation air capacities of 1,500 CFM or greater that serve areas having an average occupant load of 20 square feet per person or less from Table 1004.1.2 have a means to automatically reduce outside air intake. Identify applicable systems: Plans /specs indicate where equipment (i.e. carbon dioxide sensor) and sequence is specified: ❑ Exception. HVAC systems are equipped with an energy recovery device with at least 50% recovery effectiveness. ❑ No High Occupancy Systems. Project does not contain an HVAC system as described above. 14. Exhaust Air Heat Recovery (Section 1318.3) *Not Regulated. HVAC system does not have: 1) design supply air cap. of >10,000 cfm, and 2) min. outside air supply >70 %, and 3) at least 1 exhaust fan rated at 75% of min outside air ❑ Complies. Heat recovery system increases outside air temperature by 20 °F (Climte Zone 1) or 30 °F (Zone 2) and has provision to provide bypass during air economizer mode. ❑ Exception. An HVAC system qualifies for an exception to this requirement. Applicable exception from Section 1318.3 Exception ❑ -1 ❑ -2 ❑ -3 ❑ -4 ❑ -5 ❑ -6 ❑ -7 The plans /specs show compliance in the following locations: _15. Large Volume Fan Systems (Section 1318.4.2.4) ,,Not Regulated. The building plans or specifications do not call for fan systems over 15,000 CFM that serve a single zone and function for the purpose of temperature control. ❑ Complies. Fan systems are equipped with variable frequency drive or two speed motor to reduce airflow as required by Section 1318.4.2.3. The plans /specs show compliance in the following locations: 16. Variable Speed Drives (Section 1317.10.3.1) Not Regulated. The building plans or specifications do not call for fan and pump motors 10 horsepower and greater that serve variable -flow air or liquid systems. ❑ Complies. All fan and pump motors 10 hp and greater which serve variable -flow air or liquid systems are controlled by a variable -speed drive. ❑ Exception. The building qualifies for an exception to the variable -speed drive requirement. Portions of the building that qualify: Applicable code exception is Section 1317.10.3.1, Exception The plans/specs show compliance in the following locations: v 17. Service Water Heating (Sec. 1315) No New Water Heating. The building plans and specifications do not call for new water heaters, hot water storage tanks or service hot water distribution systems. ❑ Complies. All new water heaters, hot water storage tanks or service hot water distribution systems comply with the requirements of the Section 1315. • ❑ Exception. The applicable code exception is Section: Exception: '4,4' Portions of the building that qualify: The plans/specs show compliance in the following locations: 4 -5 April 2005 Compliance with OSSC. effective 01/01/05 • Form 4a Project Name:1' K:i,.2S L�w1�J I Page: Cp SYSTEMS - GENERAL Part 6 of 6 18. Swimming Pools, Spas and Hot Tubs (Section 1315.5) 14 No New Pools. The building plans and specifications do not call for new, swimming pools, spas or hot tubs. ❑ On /Off Controls Complies. Spa and hot tub heaters are equipped with a readily accessible ON /OFF switch as required by Section 1315.5.1. ❑ Ventilation Controls Complies. Pool ventilation system is controlled based on humidity. ❑ Cover Complies. All heated pools, hot tubs and spas are equipped with a cover. ❑ Heat Recovery Complies. Pools, Spas, and hot tubs, over 200 ft utilize recovered heat as required by Section 1315.5.3. ❑ Exception. Heat recovery is not necessary as pool is heated by renewable energy or waste heat recovery sources capable of providing at least 70 percent of the heating energy required over an operating season. Fume Hoods (Section 1317.2.1.) No Fume Hoods. The building plans do not call for fume hood systems that have a total exhaust rate greater than 15,000 cfm. ❑ Complies. Fume hood systems have at least one of the following features: ❑ Variable air volume hood exhaust and room supply systems capable of reducing exhaust and makeup air volume to 50% or less of design values. ❑ Direct makeup (auxiliary) air supply equal to at least 75% of the exhaust rate, heated no • warmer than 2° F below room set point, cooled no cooler than 3° F above room set point, no humidification added, and no simultaneous heating and cooling used for • dehumidification control. ❑ Heat recovery systems to precondition makeup air from fume hood exhaust in accordance with 1318.3 - Exhaust Air Energy Recovery, without using any exception. The plans /specs show compliance in the following locations: 2Q. Parking Garage Ventilation (Section 1317.2.3) No Enclosed Garages. The building plans and specifications do not call for enclosed Group S -2 parking garages with a ventilation exhaust rate greater than 30,000 CFM. ❑ Complies. The plans and specifications call for carbon monoxide sensing devices as required by Section 1317.2.3. ❑ Exception. Open parking garages. 2 Kitchen Hoods (Section 1317.11) in Not Regulated. The plans /specs do not call for any new kitchen hoods with exhaust capacity greater than 5,000 cfm each. ❑ Complies. All new kitchen hoods with a total exhaust capacity greater than 5,000 cfm have at least 50 percent of the required makeup air; (a) unheated or heated to no more than 60 °F; and (b) • uncooled or evaporatively cooled. � ' The plans /specs show compliance in the following locations: 22. Outside Heating Systems (Section 1317.12) ❑ No Outside Heating Systems. The plans /specs do not call for new permanently installed heating . ystems outside the building. C omplies. All new permanently installed outside heating systems are radiant gas fired systems controlled by an occupancy sensor or timer switch as required by Section 1317.12. 4 -6 April 2005 Compliance with OSSC, effective 01/01/05 • Worksheet 4a Project Name:{ lE..2. - ►V.s'r Page: UNITARY AIR CONDITIONER - AIR COOLED Equipment (a) (b) (c) (d) (e) Cooling Seasonal or Compliance Discussion of equipment Equip. ID Model Designation Capacity Steady State Part Load Schedule (A -E) ratings and equipment definitions on page 4 -19. Ado- I G.4ZZ.i. «_Z 11.000 td ). l /A 10,1 Acv -Z G4, 212...... 1 V � t,D00 ‘a,i N/A. X0.1 Required Indicate source of information Document- ❑ ARI Unitary Directory, Section AC, page: ation D ARI Applied Products directory, Section ULE, page: X Product data (Attach data furnished by the equipment supplier, I.e., "cut sheets ") Code Required Cooling Capacity (btu /hr) Minimum Rating Compliance Seasonal or Efficiencies Schedule . Equipment Type Over But not over - Steady State Part Load 0 65,000 na 9.7 SEER Single Package Without a 65,000 135,000 10.3 EER n/a This schedule of equip- A Heating Section or With Electric 135,000 240,000 9.7 EER n/a ment efficiencies was Resistance Heat 240,000 760,000 9.5 EER 9.7 IPLV reformatted from code, 760,000 - 9.2 EER 9.4 IPLV Table 13 -L. 0 65,000 na 10 SEER Split System Without a Heating 65,000 135,000 10.3 EER n/a B Section or With Electric 135,000 240,000 9.7 EER n/a Resistance Heat 240,000 760,000 9.5 EER 9.5 IPLV 760,000 - 9.2 EER 9.2 IPLV 0 65,000 na 9.7 SEER Single Package With a Heating 65,000 135,000 10.1 EER n/a C Section Other Than Electric 135,000 240,000 9.5 EER n/a Resistance 240,000 760,000 9.3 EER 9.5 IPLV ' 760,000 - 9.0 EER 9.2 IPLV 0 65,000 na 10 SEER Split System With a Heating 65,000 135,000 10.1 EER n/a 40,0-4, D Section Other Than Electric 135,000 240,000 9.5 EER n/a ' "" :t., Resistance 240,000 760,000 9.3 EER 9.7 IPLV ?v R . 760,000 - 9.0 EER 9.4 IPLV E _ Condensing Unit Only 135,000 - 10.1 EER 11.2 IPLV 4 -11 Compliance with OSSC, effective 01/01/05 CITY OF TIGARD BUILDING DIVISION - PERMIT #: MEC2006 -00589 13125 SW Hall Blvd., Tigard, OR 97223 DATE ISSUED: 12/18/2006 Phone: (503) 639 -4171 At Inspection Requests (24 Hrs.): (503) 639 -4175 tit INSPECTION WORKSHEET FOR DATE: 4/23/2007 TIME: 7:00AM PAGE: 65 SITE ADDRESS: 12562 SW MAIN ST CLASS OF WORK: SUBDIVISION: LOT #: TYPE OF USE: PROJECT NAME: MAX'S FANNO CREEK BREW PUB DESCRIPTION: Exhaust system for Type I hood. Project Value: $9,000 OWNER: BANKERS INVESTMENT, PHONE #: 503- 636 -0388 CONTRACTOR: CAMERON'S INSTALLATIONS, INC. PHONE #: 503-692-3368 Inspection Request Scheduled For: Date: 4/23/2007 Pour Time: Code # Inspection Description Confirm # Contact # Message 640 Exhaust hood 046915 -01 503- 407 -1051 N Corrections /Comments /Instructions: , lia Willi TA PASS 111P'ARTIAL APPROVAL ❑ CANCEL ❑ NO ACCESS ❑ FAIL % v' LL FOR INSPECTION ❑ ADDITIO AL FEES ASSESSED 4. Inspector: _ _ Date: 4 23 d 7 Phone #: (503) 718- ZCy I , • CITY,. OF : TIGARD BUILDING DIVISION PERMIT #: MEG200&.00589 13125 SW Hall Blvd., Tigard, OR 97223 D ATE ISSUED: 12//8/2006 Phone: (503) 639 -4171 At j Il1° Inspection Requests (24 Hrs.): (503) 639 -4175 ' _.. • INSPECTION WORKSHEET FOR DATE: 1/23/2007 TIME: 7 :02AM PAGE: 59 SITE ADDRESS: 12562 SW MAIN ST CLASS OF WORK: SUBDIVISION: LOT #: TYPE OF USE: PROJECT NAME: MAX'S FANNO CREEK BREW PUB DESCRIPTION: Exhaust system for Type I hood. Project Value: $9,000 OWNER: BANKERS INVESTMENT, PHONE #: 503 - 636 -0388 CONTRACTOR: CAMERON'S INSTALLATIONS, INC. PHONE #: 503.692-3368 Inspection Request Scheduled For: Date: 1/23/2007 Pour Time: Code # Inspection Description Confirm # Contact # Message 625 Duct work 042382 -01 503- 407 -1051 N ' OD Corrections /Comments /Instructions: so 21 . 4- — i .. t `'l I ` • I I ! ‘ V i ' 6 di f r SS ❑ PARTIAL APPROVAL ❑ CANCEL ❑ NO ACCESS ❑ FAIL A CALL FOR INSPECTION ❑ ADDITI AL FE S ASSESSED , -A Inspector: drOkily /� �z p I Date: (/_3' #: (503) 718 - �'� 1