Loading...
Correspondence City of Tigard, Oregon • 13125 SW Hall Blvd. • Tigard, OR 97223 V November 7, 2005 TIGARD Air Rite Control Berry Sevy 1623 SE 6 Ave Portland, OR 97214 RE: TWO PACKAGED MR CONDITION UNITS /DUCT - MECHANICAL SYSTEM Project Information Building Permit MEC2006 -00506 Tenant Name: Fanno Creek Brew Pub Address: 12562 SW Main The plan review was performed under the State of Oregon Mechanical Specialty Code (OMSC) 2004 edition. The submitted plans are approved subject to the following. 1. Equipment and appliances shall be installed as required by the terms of their approval, in accordance with the conditions of the listing, the manufacturer's installation instructions and this code. Manufacturer's installation instructions shall be available on the job site at the time of inspection. OMSC 304.1 2. The building or structure shall not be weakened by the installation of mechanical systems. Where floors, walls, ceilings or any other portion of the building or structure are required to be altered or replaced in the process of installing or repairing any system, the building or structure shall be left in a safe structural condition in accordance with the Building Code. The cutting, notching and boring of framing members shall comply with OMSC 302 Sections 302.3.1 through 302.5.3. 3. Smoke detectors shall be installed in return air systems with a design capacity greater than 2000 cfm. Upon activation, the smoke detector shall shut down the air distribution system. Smoke detectors shall be connected to a fire alarm system and shall activate an audible and visible alarm at a constantly attended location. OR In occupancies not required to be equipped with a fire alarm system, actuation of a smoke detector shall activate a visible and an audible signal in an approved location. OMSC 606. 4. Equipment and appliances regulated by this code requiring electrical connections shall have a positive means of disconnect in accordance with the Electrical Code. OMSC 301.7 5. Gas piping systems under 14 inches water column pressure, shall be tested at a pressure of not less than 10 pounds per square inch gage. Test pressures shall be held for not less than 15 minutes with Phone: 503.639.4171 • Fax: 503.684.7297 • www.tigard- or.gov • TTY Relay: 503.684.2772 no perceptible drop in pressure. For welded piping, and for piping carrying gas at pressures exceeding 14 inches water column (3484 Pa) pressure, the test pressure shall be at least 60 pounds per square inch for not less than 30 minutes. C406.4.1 6. Ducts shall be supported with approved hangers at intervals not exceeding 10 feet or by other approved duct support systems designed in accordance with the Building Code. Flexible and other factory -made ducts shall be supported in accordance with the manufacturer's installation instructions. OMSC 603.10 7. Metallic Ducts shall be supported in accordance with Sheet Metal & Air Conditioning Contractors National Association, Inc. (SMACNA) — Metal and Flexible. OMSC 603.4 8. Appliances shall be accessible for inspection, service, repair or replacement without removal of permanent construction. 306.1 OMSC 9. Condensate from cooling coils or evaporators shall be collected and discharged to an approved plumbing fixture or disposal area. 307.1 OMSC 10. Guards shall be provided where appliances are located within 10 feet of the roof edge or open side of a walking surface and such edge or open side is located more than 30 inches above the floor, roof or grade below. The guard shall be 42 inches above the elevated surface with an intermediate rail so as not to allow the passage of a sphere, 21 inches in diameter. 304.9 Mercury Thermostats. The State. of Oregon prohibits the installation of thermostats that contain mercury in commercial and residential buildings. "In accordance with ORS 455.355, the disposal of thermostats that contain mercury shall be in accordance with programs established by thermostat manufacturers, their representative or distributor, or by delivery to sites that will ensure that the mercury does not become part of the solid waste stream or wastewater." When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard; Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. Respec d o r z7 Val Henzel, Senior Plans Examiner •