Loading...
Plans . •. • . • • . • •. o • • • • • • • • • • • • • • • • • • : : RECEIVED REVIEW ED FOR • • • • • CODE CONIFLCE MAR 6 2012 • ••• • •• • • • • • ••• •• • _ ' ' ' ' ' ' ' • ' ' IFY OF TIGARD • • " " "'__ " "_" • • • • • • • • • • "I BUI DINGDIVISION LL QD. ELECTRICAL NOTE DESIGNATOR O (4) -3IDCU & (1)416CU GND X IN2.1/TC. ••d ••• • • •• •• • • ✓ • (4 )-3IOCU & (11-MU GND • • i • • • • • • • • • l` IN 2 -1/2C. x 7 I 11 Q • ©' • " E Y TENANT TENANT TENANT TENANT HOUSE��� )1( PANEL PANEL PANEL PANEL PANEL rD TB TC TA H itoilA 200A 200A 200A 200A tocA — 4 - O - 4 ✓ _...._ (4 )-3/000 & (1) -#6CU GND N �S 1 2OA -3P IN 2-1/2C. D(Plf 'Lock a \ 3P — \ O 0 _ (4 ) & (1),I6CU GND © © 200A-3P IN 2.1RC. i O 400A 4 00A (4) -3/OCU & (1)46CU GND G RATED RATED _ 3P IN 2.1RC. • • - - GND BUS 8'rSTB' DE 1600A, 208Y/120V, 3PH, 4W #310 CU 1- ' #4 Cu 'n'" COM( v ' 35,402 AIC #6 CU -- • PROVIDE GROUNDING SYSTEM PER NEC ROUTE (7) 3' CONDUITS TO 5' BEYOND BUILDING - I I I I TO BUILDING TEEL AND BOND TO COLD WATER PIP NG WITHIN 5' OF PERIMETER FOR EXTENSION TO TRANSFORMER BUILDING ENTRY. PROVIDE #6 CU BOND TO GROUND RODS AND 24 A N D PAD IN SEPARATE CONTRACT. COORDINATE CONCRETE ENCASED #4 CU GROUND ELECRODE. PROVIDE BOND REQUIREMENTS WITH PGE. BETWEEN GROUND BUS AND NEUTRAL BUS. D A B 1. POWER DISTRIBUTION ONE -LINE DIAGRAM OFFICE COPY ARC I NO SCALE 208Y/120V, 3PH, 4W, 1600A . RE -Drawn By Gene Szekely CITY OF TIGARD Supervisor # 5259S Approved • Conditionally Approved • ( Bear Electric, Inc. For only the work as described in PERMIT NO 'ELMO1. • 0 0 4$ 1 Signature See Letter to: Follow ( ): z - � Attach ( ): Date a ? - - / ,-- Job Address: • -- 4 By: Date: • • . . • • • • • . • • • • • • • • • • • • • • • • • • • • • • • • • • ••• • • • • •. • • • • • • • • • • • • •, • • • • • • • • • • • • • •• • • • • • • • • •• • • • • • • • • • •• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • ••• ••• •••• • • •• •• • • LE KEYED NOTES THIS SHEET • • • • • • • ••• ••• •• • • • • • • • 01 ROUTE VIA EXTERIOR LIGHTING CONTROL PANEL 0 PROVIDE 4'x8'x314' FIRE RATED PLYWOOD TELEPHONE TERMINAL BOARD. PROVIDE #6CU GROUND TO BUILDING GROUNDING SYSTEM. 03 PROVIDE 120V CONNECTION TO IRRIGATION CONTROL PANEL COORDINATE WITH LANDSCAPE CONTRACTOR. ® PROVIDE 24 RELAY EXTERIOR LIGHTING CONTROL PANEL WITH NORMAL AND EMERGENCY SECTIONS AND FSS-PLPKK -A, FINISH AS SELECTED BY ARCHITECT. PHOTOCELL INPUT, LCBD GR2432ENC. PROVIDE RELAY QUANTITY TO ACCOMMODATE ALL CIRCUITS INDICATED TO BE ROUTED VIA CONTROL PANEL FSS-PLPKX -XX FINISH AS SELECTED BY ARCHITECT. ® MOUNT AT +18' ABOVE INTERIOR FINISHED FLOOR HITECT. ® ROUTE (1) 2 -1/7 FEEDER AND (1)-2 -117 SPARE CONDUIT WITH PULLSTRING FROM MOP TO TENANT PANEL LOCATION. ROUTE (7) 3' CONDUITS T( ARCHITECT. VERIFY EXACT PANEL LOCATION WITH TENANT REPRESENTATIVE PRIOR TO INTMTION OF WORK PERIMETER FOR EXTENSI( PAD IN SEPARATE CONTR 0 ROUTE (2) 7 CONDUITS WITH PULLSTRING FROM EACH TENANT SPACE TO TTB FOR FUTURE COMMUNICATIONS REQUIREMENTS WITH POE CABLE BY OTHERS. ® ROUTE (1)-4 CONDUIT AND (1 )-7 CONDUIT FROM TTB TO 5' BEYOND BUILDING PERIMETER FOR TELEPHONE AND CABLE SERVICES. 1. PO) 09 MOUNT ON THE INTERIOR PARAPET WALL ON ROOFTOP FOR TENANT CHRISTMAS LIGHTING. NO SCALE ® MOUNT ON ROOFTOP FOR MAINTENANCE AT MECHANICAL AREAS. ® PROVIDE 200A, 208Y/120V, 3PH, 4W, 42 CIRCUIT PANELBOARD. PROVIDE (42)- 20A -IP CIRCUIT BREAKERS. COORDINATE EXACT LOCATION WITH TENANT REPRESENTATIVE. ® ROUTE TO 20A/IP CIRCUIT BREAKER IN TENANT PANEL This form is recognized by most Building Departments in the Tri- County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. • a City of Tigard 2 Building ivision g TIGARD TRANSMITTAL LETTER , • :TO: ti D 1 .1.1L1.1 "may ',' F., DEPT: BUILDING DIVIS ' ` ., - MAR 0 6 2012 CITY OF TIGARD FROM: ' '2( t____ . Bf__,(c BUILDING DIVISION COMPANY: t2 - L.,.Tim c _ HONE: S 6-5,•.442 • Sc �3 � 7 s c RE: CLC.?< 0 6 4- ffs (Site Address) (Permit Number) `7 7 ( S \. • (Project name or sub Vision name and tot number) . ATTACHED ARE THE FOLLOWING ITEMS: ' Copies: Description: Copies: Description: Additional set(s) of plans. Revisions: • Cross section(s) and details. Wall bracing and/or lateral analysis. , Floor /roof framing. Basement and retaining walls. Beam calculations. Engineer's calculations. -Other (explain): • REMARKS: . FOR OFFICE USE ONLY Routed to Permit Technician: Date: Initials: Fees Due: ❑ Yes No Fee Description: Amount Due: $ • $ Special, - Instructions: - Reprint Permit (per PE): ❑. Yes INo ❑ Done Applicant Notified: Date: , / Initials: 1:\Building\ Forms \TransmittalLetter - Revisions.doc 02/08/2011 [Page Too Large for OCR Processing] [Page Too Large for OCR Processing] ELC-Zo I I 04 .14ge 2 ki 7o A4ve Attn: Gary Noble Please add these documents to the plan review for the Red Rock Center. Attached you will find the panel schedules as well as the fault current from PGE. Thanks Erik Beck P.S. Regarding the permit estimate. We are installing 200a feeders out of the main distribution board (per the attached drawing). The 400a disconnects are integrated with the MDP. The break down should read as follows. 1 -1600a (1000a or more) @ $552.26 5- 200a @$100.70ea = $505 29 — (added 4 for unit panels) branch ckts. - $215 Please call with any (503) 678 -1355 Thanks Gene .... . .. • •••• • . . . • • • • . . •• .•.. • • • • • •••• •• • • .... • . . •• •• • • ••.• • . • • .. . • • • • •• •• . . . . . . . • •••• • • • • . . . ._ • •..• • • • • £L C Zoll - COLfg) JUL 1. SYSTEM DEMON • PGE CO�VUl.�'�N�'S, 9480 SW Boeckman Rd. Wilsonville, OR. 97070 July 12, 2011 Steve Watkins System Design Consultants 1515 SE Water Ave: Suite 400 • Portland, OR 97214 Dear Steve: This letter will outline PGE service installation requirements for the Red Rock Center Project — Pad A located at about SW Dartmouth & SW 72 °d in Tigard, Oregon. The PGE Work Request Number for this job is WR: #624882. 1. Type of Service to be provided Overhead _Underground X 3 Phase 4 Wire 120/208 Volts 1600 Amps Capacity • . .. Fault Current 35,204 Amps 2. Conduit: The customer will be required to provide and install: • • X Schedule 40 PVC •••• • • • • •• • 7 Size: 3-inch Secondary conduits between the transformer pad aOd.t egear•.:. • • • 1 Size: 4-inch Primary conduit from VT 58 to the New 577 PGE J► 1 'and from tke • New 577 PGE Vault to the Transformer Pad •••• • • • • • •••• • •• •• Size:5- inch- 5'radius • • • • • S . 3. X All conduits must be installed 36 inches below final grade (or 48 inclles.belbw grade if . • minimum separations are required from Gas lines in a shared trench — consult PGE's Electho •: • Service Requirements book for details) and all elbows must be Schedule 40 with a minimum • • •. • . • radius of 36 inches; 5" elbows require 60" radius elbows. No more than 270 degrees of bends • • per run. If the run is longer than 150 feet or has 270 degrees of bends, elbows must be steel or fiberglass. PGE MUST INSPECT AND APPROVE THE CONDUIT INSTALLATION PRIOR TO BACKFILLING. Non - conductive 500 lb. test pull lines must be installed in all ducts. PGE requires that you call for a crew to standby to plumb into an existing energized vault. • Call 503 -736 -5450 at lest 2 days in advance to schedule crew. 4. Vaults •233 -PGE Specifications enclosed 446 -PGE _ Specifications enclosed 504 -PGE Specifications enclosed 577-PGE X Specifications enclosed & 57 — T- 2:— 332NS Lid 660 -PGE Specifications enclosed 4242 -PGE Specifications enclosed .. • .. . . 612 — PGE_ Specifications enclosed Please Note: For this project, the City of Tigard will be requiring that the customer install some conduit and vaults in preparation for future undergrounding off -site and for installation of service to future buildings on -site. The enclosed design sketch references these facilities. It is understood that this future infrastructure is our current best estimate of what might be needed, but does not guarantee that some changes may be required in the future as more current information is presented and/or design changes occur. In addition, we understand that any future partition of the property will include appropriate easements to cover the placement of any PGE facilities which must cross one property in order to serve another. 5. Transformer Pad Size 8' x 8' Quantity 1 - Specifications enclosed Size Quantity .- Specifications enclosed Barrier posts needed _ Yes X No — Per electrical engineer pad will be in planter area. See transformer pad specification on design sketch for size and orientation to pad. See enclosed job sheet for number of posts required and placement.. . • 6. Cabinets '''' • • •••• • • •• . • CT Cabinet Size required: 24" x 48" x 11" (minimum) Quantitx • • •:..• ' 36" x 48" x 11" (minimum) _ Quantity • • • • Installation of terminal blocks (provided by PGE) .. • •••• Installation of current transformer {provided by PGE) X • Please Note: Refer to PGE's Electric Service Requirements: Book Se c�on 11 for • • • • .. • • metering, termination, CT and pull section requirements, and.EUSI r;. • • •.. • 7. Meter Bases • •••• • • • • • 4 7- terminal meter safety sockets in the switchboard meter. panel. Please note Page ••••• 28 of PGE's Electric Service Requirements book for meter clearance requirements. • • • 2 13- terminal meter bases for 400 CT service with provisions for a test switch. 13- terminal meter base (for KVAR meter). 2 One 1 -1/2 inch metering conduits, with a non - conductive pull lines, from each current transformer enclosure to each CT rated service meter base. The conduit run must not exceed 50 feet or contain more than 270 degrees of bends. X CT Meters & 200 Amp meters will be located indoors in a PGE approved electrical room layout. Please Note: Refer to PGE's Electric Service Requirements Book Section 11 for metering, termination, CT and pull section requirements, and EUSERC references. PLEASE NOTE: THE CUSTOMER IS REQUIRED TO PROVIDE PGE A FINAL SCHEMATIC OF THE METER ROOM AND DIMENSIONS OF THE PROPOSED SERVICE EQUIPMENT. 8. Point of Termination - The point of termination and division of responsibility between the customer and PGE will be on the: Line side lugs of the meter base. Line side lugs of the terminal block. Line side lugs of the current transformers. Line side of the customer - owned extended bus in the terminal cabinet. X For service rated over 800 amperes, the customer is to provide and install an entrance compartment with adequate space and provide a bus extension into the compartment. The utility will terminate the service lateral on the bus extension. PGE WILL PROVIDE, INSTALL AND MAINTAIN X . The primary conductors. X . The transformer. X The secondary conductors. • • • • • • . • The terminal blocks: (provide only). •••• X The current transformers .. :...:' • • • X The meters. • • • ... .. •••• Sincerely, :.. .e .. •• • .... • • • •••• • • • • Lorraine Katz . • • •. • Service & Design Project Manager - • .. • Wilsonville Line Crew Center • • • Phone: (5 5704407 Fax: (503) 570 -4420 • • E Lc7_o 1 I - co Lf-g/ .. ...... . .. .. ... • . ... • • . • • . •. • •. • • . .. • .. •• • Panel TA I . Panel Schedule IPabOt t;_Rpd : Rock:Center . 120/208V 3PH 4Wire 200 AMP. . MLO Flush ::: ' CKT Description / Load Load C.B. C.B. C.B. C.B. Load Load Description / CKT No. Location • VA Type Amp Pole Phase Pole Amp Type VA Location 'No. 1 Lights 1300 20 1 A • 1 20 E : : • pate ::: 2 • 3 Spare 20 1 B 1 20 : Viafe• :: 4 • 5 Spare 20 1 C• 1 20 Spare 6 7 Spare 20 1 A 1 • 20 • Spare . 8 9 Spare 20 1 B 1 20 Spare ' 10 11 Spare . 20 1 C 1 20 _ Spare 12 13 Spare ' 20 1 A 1 20 Spare 14 . 15 Spare 20 1 B 1 20 . Spare 16 17 Spare • . 20 1 C 1 20 Spare 18 19 Spare 20 1 A 1 .20 Spare 20 21 Spare . . . ••20 1 B 1. 20 Spare 22 23 Spare - 20 1 C 1. 20 Spare . 24 25 1 A 1 , - .20 Spare .26 27 1 B 1 20 �28 29 C : - 30 31 A - '• 32 33 • - B - . 34 35 . C 36 37 . A - 38 - 39 • B 40 • 41 _ C . _ _ 42. Total Connected Load Ph A 1300 VA Total Connected Load Ph B 0 VA • Total Connected Load Ph C 0 VA Maximum Phase Connected Load 1300 VA D r a w n By Gene Szekely Total Connected Load (3X Maximum) 3900 KVA 360 Volt 10.8 Amps Supervisor # 5259S near uectric, In .. Signature ___." . Date .., .,� I • - - ./ • • •. •• • • • • • • • • • • • • • • • • • • • • • • •• • • • • . •• • • • • • • . • . • . • . • . • • • S. . • • • • • • • . Panel TB I • . .Panel Schedule IPrejeoi; Rpc1 floc k,Pente'r . - 120/208V 3PH 4Wire . , 200 AMP MLO Flush : '•• ' i : ' ; CKT Description/ Load Load C.B. C.B. - C.B. . C.B. Loat1 "Load • DeScr rb "' . CKT No. Location • VA '- Type Amp Pole Phase Pole Amp Type VA Location • No. 1 Lights 1300 20 1 A 1. 20 •: ' • :• .•. S arU'. :'. - �2 3 Spare 20 1 B 1 20 : � •• p •• • 5 Spare • 20 • 1 C • 1 20 ' "' Spare ' " 6 • 7 Spare - 20 1 A 1 20 . Spare 8 9 Spare _ 20 1 B 1 20 . • Spare . 10 11 Spare 20 1 C 1 20 . Spare 12 13 Spare . . 20 1 A 1 20 . _ Spare 14 . 15 Spare _ • 20 1 B" 1 20. Spare 16 17 Spare 20 . 1 C 1 20 Spare 18 19 Spare - . . 20 1 A 1 20 Spare . 20 21 Spare • 20 1 • B 1 : ' 20 Spare 22 23 Spare . : • • 20 1 C • 1 20 . Spare 24 25 1 A 1 . 20 Spare • 26 27 . .. 1 B 1 • 20 28 29 C . 30 . 31 .. • A 32 _ 33 B 34 .. 35 . C 36 37 .' A 38 39 . . B 40 41 - C . _ _ 42 . Total Connected Load Ph A 1300 VA ' - Total Connected Load Ph B 0 VA Total Connected Load Ph C 0 VA Drawn By Gene. Szekely. ' Maximum Phase Connected Load 1300 VA Supervisor # 5259 Total Connected Load (3X Maximum ) 3900 KVA 360 Volt 10.8 Amps year Electric, Inc • • . Signature. 1 Date 6/3 i • .. . .. .., •. • • • • • • • • • • • • • • • • • • • • • • • • •• •• • • • • • • • • • • ... • • • •• • • • • • • , • • • • • • • • • • • • • . • • • • • • • •• . • Panel TC • I . .:'Panel Schedule IP,. iegt; Reid 1Ft8ck•Perjter•••• • . . • 120/208V 3PH 4Wire • 200 AMP MLO Flush : • •• : • • • • • CKT Description / Load Load C.B. C.B. C.B. C.B. Load Load Description / • CKT - No. Location VA Type Amp Pole Phase Pole Amp Type VA Location No. • 1 Lights 1300 20 1 A • 1 .20 : ; : ' spar- :: 2 p I _._ •.• SPA i:• •.• 3 Spare 20 1 B 1' 20 •_ r 4 5 Spare 20 1 C 1 20 Spare 6 7 Spare 20 1 A 1 20 Spare - 8 9 Spare 20 1 . B _ 1 " 20 Spare 10 ' 11 Spare 20 1 C 1 , :20 Spare 12 13 Spare _ 20 1 • A 1 - 20 Spare 14 15 Spare 20 1 B ..1 20 Spare .16 • - 17 Spare . 20 1 C 1 20 Spare 18 19 Spare 20 1 A ' 1 • 20 • Spare .20. . . 21 Spare . • 201 1 B 1 .-- 20 Spare 22 • 23 Spare 20 1 C 1 20 Spare • 24 25 • 1 A 1 . 20 Spare 26 • . 27 1 B 1- 20 28 _ 29 : • C - 30. - 31 • A 32 33 B • - 34 35 - • . C . 36 37 • A ! . 38 39 B 40 41 C . 42 • Total Connected Load Ph A 1300 VA . • • Total Connected Load Ph B 0 VA • Total Connected Load Ph C 0 VA Drawn By Gene. Szekel - - Maximum Phase Connected Load 1300 VA Supervisor # 52595 , Total Connected Load (3X Maximum) 3900 KVA 360 Volt 10.8 Amps tsear Electric, Inc: . Signature. �. � , Date - � '� • • • .. S. • • • • •• • • • • • • • • • • • • • • • . • •. • •. • • •. •.• ... • • •• • • • • • • • • • • • • • • • • • • • • • • • • •• Panel TD I Panel Schedule IPEOje?t; RAd ck•perjter 120/208V 3PH 4Wire 200 AMP MLO Flush : .E. CKT Description / Load Load C.B. C.B. C.B. C.B. Load Load Description / CKT No. Location VA Type Amp Pole Phase Pole _ Amp Type VA Location No. 1 Lights . 1300 20 1 A 1 • , 20 - : . : : • 1ppri 2 3 Spare 20 1 B 1 20 : : 4445 : 4 .. ..- 5 Spare 20 1 C 1 20 Spare 6 7 Spare 20 1 A 1 20 _ Spare 8 9 Spare 20 1 B 1 20 Spare 10 11 Spare 20 1 C 1. 20 Spare 12 • 13 Spare 20 . 1 A 1 . 20 Spare . 14. 15 Spare v 20 _ 1 B 1 20 Spare ; 16 17 Spare 20 1 C 1 20 - Spare 18 19 Spare 20 1 • • A _ 1 20 Spare 20 21 Spare 20 1 B 1 20 Spare 22 23 Spare 20 1 C • 1 • 20 • Spare 24 25 1 A 1 20 Spare 26 27 1 B - 1 20 - 28 . 29 C 30 31 A : • 32 • 33 B V 34 35 C V V 36 37 A 38 39 B , .40 41 C •42 Total Connected Load Ph A 1300 VA . V - Total Connected Load Ph B 0 VA V • Total Connected Load Ph C 0 VA Drawn B Gene Maximum Phase Connected Load 1300 VA Y 1 Szekel`' Total Connected Load (3X Maximum) 3900 KVA 360 Volt 10.8 Amps Supervisor # 5259S ; _ Bear Electric, Inc Signature �.-31 �, Date <V / / • ' V V