Loading...
Report Fm:(503)620 -2748 ACS Testing Inc. To:McDonalds 05 (15036243681) 17:58 10123108GMT-04 Pg 02 -02 re-- 62e/d - oz /0/090 • 7409 SW Tech Center Dr. Ste. 145 Tigard, OR 97223 Ph: 503 -443 -3799 Fax: 503-620-2748 Ai SPECIAL, INSPECTION FINAL REPORT DATE: 10/27/08 RECEIVED PROJECT: IVI•Donald's OCT 2 7 2008 PERMIT #: BUP2008 -00300 ADDRESS: 1209() SW Main CITY OFTIGARD CITY: Tigard STATE: OR BUILDING DIVISION To Whom It May Concern: ACS Testing, Inc. attests that their inspectors performed special inspection(s) on a continuous and /or periodic hasis as required by the specific jurisdiction and /or IBC'. Special inspection(s) were performed for the following: Epoxy Anchors Structural Steel Based on personal observation, inspection and reports reviewed by me for the above project, • I attest on behalf of ACS that work was performed to the best of my knowledge, in accordance with approved plans, specifications, and the applicable codes and standards for this jurisdiction. i Approved by: - � '2c,.t Christina Schmidt Office Manager • BRAD YOUNG & ASSOCIATES, INC. STRUCTURAL ENGINEERING President October 16, 2008 Brad Young CE C60963 SE 54727 Chip Barrett 1320 w Herndon Avenue, Suite 101 City of Tigard Fresno, CA 93711 13125 SW Hall Blvd Tigard, Or. 97223 559.222.9600 559.222.9633 Fax Subject: McDonalds Remodel 12090 SW Main, Tigard, Or. wws¢byaengineering,com To Mr. Barrett, There are no welding requirements for the bolt attachment of the bent steel plate to the wide flange beam. Nor is there a welded connection requirement for the threaded rod attachment to the bent steel plate. Please see the attached revised detail 4/S2.1. Please feel free to call me if you have any questions. Sincerely, a. Brad Young, S.E. President 3 O 1-1 VI VI {-Ill IM.,/ 0 J C 3 1 DETAIL p ^ SCALE, I" = I' -0" i J 8" VERIFY GMU Fir-7/_ _ i ABOVE OPENING 15 / /7.;,--. i f " SOLID GROUTED. F . F J _ /J / / / yrL '/� �c►�S • N � A iii / / � ALLOW {/4" GAP ti 1Ck' ]j 5 /8 "mxb" EMBED ALL THREAD a4 (2) 1/2" 0 A307 RODS ®24" O.G. MAX. (3 ��/ BOLTS .) W/ HILTI RE _ 2" HIGH STRENGTH It ANCHORS MIN s t � � o 500 -SD EPDXY ALTERNATING � / NON - SHRINK GROUT SIDES OF THE WEB. � G� y 9 Zo� ��� M) WF BEAM SEE ( 3/4" ED EMBED v v • r r %ice / THREADED ROD 1"1/ HILTI Ifie, FRAMING PLAN FOR lac,' RE 500 -SD EPDXY < < F Y RAE ` �� MORE INFO. % / L EXPIRATION DATE4- CONTRACTOR MUST COORDINATE BENT PLATE TO b" SOILD GROUTED GMU BE HIDDEN WITHIN ARCHITECTURAL FINISHES. / WALL J C i C (E) CMU WALL /' V c (N) WF BEAM SEE f FRAMING PLAN FOR MORE INFO. i I" . I " I o r i 4 "x6 "x1 /4" fE 4 NOTE: 0 v THIS DETAIL ONLY 11 REQUIRED WHEN I I/2 CONTRACTOR USES A STEEL BEAM IN LIEU Q. Q OF CMU LINTEL O . I 5 B 4 DETAIL SCALE: I` = I -0° _ 0 DAILY FHJ.REPORT FOR PROPRIETARY ANCHORS ACS Testing, Inc. Date: Jurisdiction: --- fc\c� 7409 SW Tech Center Dr. Ste.145 J Tigard, OR 97223 Permit#: or DFS 072- 00e - O OY: Project Name: (0 1 00. ( NackS Project Address: iZ 0 q 0 max n City: -1■5 t State: Q g- ACS JOB No.: Concrete Masonry [ Continuous Periodic YES NO N/A YES NO N/A l' eviewed prior inspection reports? r r FT . RFI #(S) Epoxy Anchors? (� r � Completed work complies with specifications? f (� I A Wedge Anchors? f Installation complies with manufactures published instructions and evaluation report? I x Holes blown and brushed? I c � Report left on SITE I Holes clean and dry? FT FT Engineers Name providing RFI Previous non compliance items inspected? Engineers Firm providing RFI Approved plans available? Titen Screws p p 1) - c - INSPECTION: Foreman notified of _ nonconformance items? C �> S '` t '� CArtir kireo.i4 (IWO Concrete/Masonry Strength 4000 PSI ,, . n ff 2 3 roc1 s \'-v v e C \--v. a\ I. IPA V Hole Diameter ( 4 1 8 7 I S In. Embedment (D In. WcA1 Eval. Report # Z�ZZ Exp.Date CD 5 j 0 c �/ �d�es c ?re�em o a Anchor Type 7l E} " + 3/v " -h � 4.08,5 Product Type uik\.i 9) �\ SZr ) ACS Testing, Inc. and our employees have no authority to direct or advise contractors and subcontractors in their work. Code requires Inspector ! S , Date: r( Y , Building Official's approval prior to covering of any work requiring t r Special Inspections.