Loading...
Correspondence • P II O J E N T RECEIVED win DEC 20 2011 " ED oiaeoioo aoo aesioo ( _ dl CITY OF TIGARD 763 Susquehanna Avenue BUILDING DIVISION CIT OF Franklin Lakes, NJ 07417 ? IGARD Tele: 201.848.9060 BUIL DING D Fax: 201.848.9881 www.wjcainc.com 12/15/11 Attn: Dan Nelson Senior Plans Examiner dann(c�tigard- or.qov RE: TENANT IMPROVEMENT Project Information Building Permit: BUP2011 -00247 Construction Type: 2 -B Address: 9459 SW Washington Sq. Occupancy Type: M Area: 5405 Sq. Ft. Stories: 1 Name: Footlocker Sprinklers: Yes Mr. Nelson, Below is an itemized letter stating the conditions noted in your letter, dated 12/2/2011, regarding the tenant improvement project at Footlocker located at 9459 SW Washington Square. Please see responses to each condition below, and refer to attached calculations and construction drawings. 1) Construction requirements for suspended ceiling systems are found in the Oregon Building Codes Division website under Statewide Code Interpretations date 4/20/2007. (See interpretations {structural} at www.bcd.oregon.gov) See sheet S1.1 detail G. As prepared by Joseph Lewis, P.E. 2) Provide calculations and construction details (including seismic bracing details for non - full- height partitions) for all walls. Note: The roof structure may be approximately 30' -0" above the finished floor. OSSC 106.1 Refer to structural calculations dated 12/12/11. As prepared by Joseph Lewis, P.E. 3) Please provide calculations and construction details for the soffits and storefront construction. Every structure, and portion thereof, including non - structural components that are permanently attached to structure and their supports and attachments, shall be designed and constructed to resist the effects of earthquake motions in accordance with ASCE 7 as modified by Section 1613.7. The seismic design category for a structure is permitted to be determined in accordance with Section 1613 or ASCE 7. OSSC 1613.1. Refer to structural calculations dated 12/12/11, and revised details B/S1.1 and E /S1.2. As prepared by Joseph Lewis, P.E. • 4) Please submit plans and calculations for steel storage racks that comply with the design requirements of ASCE 7 (15.5.3). Refer to shelving calculations dated 12/12/11, and sheet S1.0. As prepared by Joseph Lewis, P.E. 5) Please provide a permit valuation based on the total work being performed. Permit valuations shall include total value of work, including materials and labor, for which the permit is being issued, such as electrical, gas, mechanical, plumbing equipment, flooring, ceilings and any fixture attached to the building. If, in the opinion of the building official, the valuation is underestimated on the application, the permit shall be denied, unless the applicant can show detailed estimates to meet the approval of the building official. Final building permit valuation shall be set by the building official. Final permit valuation will be submitted upon selection of the General Contractor. • Sincerely, Lino Picinic Project Manager (201) 848 -9060 ex. 21 Ipicinic @wjcainc.com • January 11, 2012 RE: TENANT IMPROVEMENT Project Information Building Permit: BUP2011 -00247 Construction Type: 2 -B Address: 9459 SW Washington Sq. Occupancy Type: M Area: 5405 Sq. Ft. Stories: 1 Name: Footlocker Sprinklers: Yes The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 2010 edition; 2010 Oregon Fire Code. Please respond to conditions below. 1) Please provide a permit valuation based on the total work being performed. Permit valuations shall include total value of work, including materials and labor, for which the permit is being issued, such as electrical, gas, mechanical, plumbing equipment, flooring, ceilings and any fixture attached to the building. If, in the opinion of the building official, the valuation is underestimated on the application, the permit shall be denied, unless the applicant can show detailed estimates to meet the approval of the building official. Final building permit valuation shall be set by the building official. This will be required prior to the plans being approved. When responding, provide an itemized letter stating in what way each numbered issue has been addressed in the revision. When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. Respectfully, Dan Nelson Senior Plans Examiner (503) 718 -2436 Bann @tigard- or.gov °a December 2, 2011 TIGARD RE: TENANT IMPROVEMENT City of Tigard Project Information Building Permit: BUP2011 -00247 Construction. Type: 2 -B Address: 9459 SW Washington Sq. Occupancy Type: M Area: 5405 Sq. Ft. Stories: 1 • Name: Footlocker Sprinklers: Yes • The plan review was performed under the State of Oregon Structural Specialty Code • (OSSC) 2007 edition; 2007 Oregon Fire Code. Please respond to conditions below. 1) Construction requirements for suspended ceiling systems are found in the Oregon Building Codes Division website under Statewide Code • Interpretations dated 4/20/2007. (see interpretations {structural} at • www.bcd.oregon.gov) 2) Provide calculations and construction details (including seismic bracing details for non full height partitions) for all walls. Note: The roof structure may be approximately 30' above the finished floor. OSSC 106.1. 3) Please provide calculations and construction details for the soffits and storefront construction. Every structure, and portion thereof, including non structural components that are permanently attached to structures and their supports and attachments, shall be designed and constructed to resist the effects of earthquake motions in accordance with ASCE 7 as modified by Section 1613.7. The seismic design category for a structure is permitted to be determined in accordance with Section 1613 or ASCE 7. OSSC 1613.1 4) Please submit plans and calculations for steel storage racks that comply with the design requirements of ASCE7 (15.5.3). 5) Please provide a permit valuation based on the total work being performed. Permit valuations shall include total value of work, including materials and labor, for which the permit is being issued, such as electrical, gas, mechanical, plumbing equipment, flooring, ceilings . and any fixture attached to the building. If, in the opinion of the building official, the valuation is underestimated on the application, the permit shall be denied, unless the applicant can show detailed estimates to meet the approval of the building official. Final building permit valuation shall be set by the building official. When responding, provide an itemized letter stating in what way each numbered issue has been addressed in the revision. When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.639.4171 TTY Relay: 503.684.2772 • www.tigard- or.gov Respectfully, 40' A T. Y■)E7-- - rie 32 d Dan Nelson Senior Plans Examiner (503) 718 -2436 dann @tigard - or.gov December 29, 2011 RE: TENANT IMPROVEMENT Project Information Building Permit: BUP2011 -00247 Construction Type: 2 -B Address: 9459 SW Washington Sq. Occupancy Type: M Area: 5405 Sq. Ft. Stories: 1 Name: Footlocker Sprinklers: Yes The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 2007 edition; 2007 Oregon Fire Code. Please respond to conditions below. 1) Provide calculations and construction details (including seismic bracing details for non full height partitions) for all walls. Note: The roof structure may be approximately 30' above the finished floor. OSSC 106.1 On the revisions you're your engineer has prepared it does not include the length of the 45deg kickers used to support none full height walls which could be as long as 30ft. and bracing for them. 2) Please provide a permit valuation based on the total work being performed. Permit valuations shall include total value of work, including materials and labor, for which the permit is being issued, such as electrical, gas, mechanical, plumbing equipment, flooring, ceilings and any fixture attached to the building. If, in the opinion of the building official, the valuation is underestimated on the application, the permit shall be denied, unless the applicant can show detailed estimates to meet the approval of the building official. Final building permit valuation shall be set by the building official. This will be required prior to the plans being approved. When responding, provide an itemized letter stating in what way each numbered issue has been addressed in the revision. When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. Respectfully, Dan Nelson Senior Plans Examiner (503) 718 -2436 dann @tigard- or.gov