Loading...
Plans Jan 25 06 03:12p Froelich Consulting Eng 502- 624 -9770 p.1 I. FROELICH imiAntal FRAM% CONSULTING 'Da L. ENGINEERS INC MAIN OFFICE 0 CENTRAL OREGON 0 6969 SW Hampton Street 231 SW Scalehouse Loop, Suite 101 Tigard, Oregon 97223 Bend, Oregon 97702 503.624-7005/503.624 -9770 FAX 541.383- 1828/541.383 -7696 FAX FAX COVER SHEET Date: January 25, 2006 Transmittal To: Wyatt FAX Number: 503 - 524-4403 Transmittal From: Mike Young Pages: 3 Comments: Arbor Summit — Lot 18, The Mazama, FCE #05 -T264 See the attached sheets for installation details for the HF12x18 7 /8 panel w/ bearing plate and raised foundation (Detail 7). In addition to the (2) dia. threaded bolts, the bearing plate has predrilled holes for (12)'/4'x3" HFS screws outside of the frame and (4) Wx 4 HFS screws inside of the frame. Thank You, Mike Young PLEASE CONTACT US IF THIS FACSIMILE IS ILLEGIBLE OR IF rr HAS MISSING PAGES Jan 25 06 03:12p Froas1ich Consulting Eng 50"- 624 -9770 p.2 • HARDYAFRAMES. - ACCESSORIES A MiTek Company Template Kits • Hardy Frame Template Kits (HFTK) include (1) single use Template (HFT), cop (2) ASTM A 36 all thread hold down bolts (with 1 -plate washer and 2 -nuts on the embed end of each bolt), the appropriate number of shear bolts, [1] and all washers and nuts for connecting the Panel or Brace Frame at slab - ' ea cm installations. Template Kits for Panels also include (1) Hardy Frame® Bolt = o Brace for attachment to the embed end of the hold down bolts. Template kits _- are intended for installation at a slab or curb. When ordering kits with a 7/8 inch _ _ fi_ � � r _ d iameter HD the bolt length supplied is 27 inches. When ordering kits with a = - - _ = - 1-i a = inch diameter. The bolt length supplied is 31 inches. For installations at raised foundations, the Template Kit may not be appropriate. Because there E �� ` � 2 1 = - ,ri : "" h is (typically) a floor system between the concrete or block and the bottom of - : • the Panel or Frame, the all thread hold down may not be long enough to extend = ' ; through the floor system. Also the shear bolts, which are included in the Kit, r are not needed for connecting to the Panel or Brace Frame because the shear _ transfer Is accomplished by screwing the base of the product into the rim ` F , _ member below. _. _ Bearing Plate t� The Hardy Frame Bearing Plate (HFBP) is designed for use under Panels � (only) being installed on floor systems. The Bearing Plate is a steel bar that measures 3 /a " thick x 3 -lh" wide, the length is 6" greater than the width of • the Panel being installed. The purpose of the Bearing Plate is to increase the A • bearing area below the Panel in order to distribute compression loads over a �'_= - - C larger surface area of the material below. A second purpose of the Bearing - ! Plate is to provide additional screw holes, which may be necessary for the = . shear transfer of higher loads. �! - Base Extension .. ;/ The Hardy Frame Base Extension (HFBX) is designed to provide a connection from Hardy Frame® Panels and Brace Frames to adjacent wood mudsills and ; vertical members. The product is a 3 - W x 3 - 9 /16" x 3 - W U - shape 14 - gage x� t w\ , channel that is 9" long. To install, locate the end with the "break-away tab under the bottom corner of the Panel or Frame that will have adjacent wood =± = ! ` ' s._ framing members. The HFBX may be located up to 6 - /a" beyond the edge of -• _ `, i •. t 1 1 .x 4 . -- the shear wall. The HFBX is secured in place by tightening T-� i��� i =r te: = s ; .' • • ; ' - : -'—' n the hold down bolt of the Panel or Frame. Wood members are r' h • -: ;•:.'.- ::. "_ . - �' __ ;• \ attached by nailing through the holes provided. The HFBX may T C ' s i 4 4 -' -• - t x - :--.-- . --4 - , - - o 4 1444, "� r . i' be installed after Panls or Frames have been set, by removing MN odor .. '.:. rt . 4_r -;.. ;: r a-:. the "break -away" tab, then sliding the product under the Panel .: _ L .: • or Frame. - _.;.. = 't= _ Hardy Frame® Reducer The new Hardy Frame Reducer (HFR) allows Panels with a 1 -1/8" hold down hole to be installed on 7/8" diameter hold down bolts. The Reducer has a structural washer for a 7/8 Inch diameter bolt tack welded to a structural steel tube that has a 7/8" inside diameter and 1 -1/8" outside diameter. With the _ - . r '4 , washer end positioned upward, the Reducer Is placed over the 7/8" bolt and the structural tube Is fit into the base of the Panel, closing the gap between � r: - • the bolt and the oversized hole. Warning: Reducers do not change structural r' ° ? � � 1: properties of Hardy Frame Panels and do not permit substituting 7/8" bolts • when 11/8" is specified by the Design Professional. ``�' -' Hardy Frame° 39 - Jan 25 06 03:12p Frolk Consulting Eng 50 624-9770 P. HARDYA*IFRAMES, DETAILS ... ' A IVIITe,k Company ( DOZER OF RECORD 6 'ow= or =co a MOTO TO IMOIFY DIS POOMED TO &COPT TOO MOO. TO ACCOODIE A 0E04 10 MOM= A SPEC= CORM SPEOFIC CONN= OBL z COW FOR IR WPM RAZ 0 TOP PLATE NOTCH 1 EDGE FOR INSPECTION moomnIrun rurom■om. rII FREER ■ ABOVE PonD. 1 MEL I inziri 4.0 . 4 4 ... 3. r I . 001:11 AMCOR MAROC 'RON all E4( EOTTOd 07 Ave. NE 22 R RAZ I MTh LOW 0 OR 0111100( *WSW NW PER PM ; =CRESS 7 I I IPM71 FRAME I RE CODEREIED, BUT < IMISTURE WIDER RE0110 r7i/Irlr NOT REOURID (USE mop. mg FELT OR MAE imo.- ■ ■ol . . GAINIIMM s . 021.101.100) BOTTOM PUN 11111P1: A.B. PER MANS 11:%1311. , 0. : A 1 ;:i... 74.1ww, TO TA . 424 L o. 130.7 % lAt . - 4 ....... •• • CisCREIE iszaVHDoo) ••• . . • • F • • • • '. TOP OR ...1 " . • .. • .r MAR TM OP &i,„ . . . lar op ' 44i AMMO NW BOOR TOP 24' MAME Of EOM RAZE PME. 0302) • ' 3 - • = • - • - . . • al 21' MEL (014 ROMOTON WWI OBL NIX 6 AR REWIRED Elf OCRS 71 011 ow. mi. MUDD HUD OZPVOLT PIA on t we ALL WSW DI ono= 1 : 11 8411D01BLE WA OR HOD 001111 BOX OD PIN) 710( MECO TO Know Or ROD NMI vrwr WM PIPIE 0113111D17 OM PER PUN Fa ITA F Ted eR ILI i S. AR Fs0 / • 1\.. OWED 011.1“ PO KM HARDY FRAME PANEL INSTALLED ON FOUNDATION C HARDY FRAMEGDPANEL - DOUBLE NUT INSTALLATION BRACE RIME INSTALL/MOH EIMIAR BRACE FRAM DEBTALLA101 EDELAR i ,,,,,........,.......... ,............,■=...w.la-u.w.......ur■N DICINEER OF RECORD IS PERM= TO MOM ITO 0 OCT. RP PLATE IR 1 I DEVIL TO ACCOMODE A SPECIRC COMO mo■lomwtmono■mmow MIMMEM MMIM■M 6.11 W. IIIIMINA 2A RLLER ABOVE PANEL ; Ecovisymosactrs leii t rOYILL HFS PER SCHEDULE i L W FsR sonu TEL 11 1 • HARDY FRAME 1 ® BMOC FLAX :a a' P.4 BOTTOM PLATE k.S1 ADA= MOD ap RECOODICEM OR 4' NOT REOIRED 2 " T.O. MAT TO to. 1 (OR EQUAL) AT EA END 1 MIST TIP. I ti BLOOCINC ..,.., I pm= =au RATE Filal MX MED R.514000 4x OR Ex 'AMIAMMINNAL Aft PER KM ° Yrdir 1 0 .- II Mir P ia I I I M DO r RIII PITT DO Of 6041 • (RECOLimpaxle TREATED SRL PLATE " ...,:. !I 4Viorio AM IT/CUT • . I • • 1 1 -- • ____ a , . ... TOP OF RWEADDI I soft 4 MR o • .I • • • : , ammo's lox= 3 SOI Sr PAPC. PLY) ,:•.• ' : ' . : F0 . . 3 • FOJWATIOI OES101 010001 R ( MIC BT OTHERS /.' 110611.0E ORRER RECOONZIOND USE =TOP ITS FE.? OR FEL COMM) i fal• OR 1 V two . •: — . _ • elf 0111/16 • 11174aphr RAZ TACK etiffirear 17 RIXI OWED CUM PER PUN 11 12, 18 OR 24" li ...• 2 L4 Iii to • : 0451-4e HciE .0101:04 Or RECORD 0 1 • , RO ECM MEO TO HOMY THIS SO /10:0110011E A ME SPEC= COOT= HARDY FRA® SCARING PLATO, 5 / 4 x 3 410'.. 24 ll ".. O So i ir FOR 12" MDT FRPRE.RIDEL 2r FOR M HMV IMWEOPNEL 3Er go so HMO mamma HARDY FRAME INSTALLED ON RAISED FOUNDATION 0 HARDY FRALLEIDPANEL AT RAISED FLOOR HEAD-OUT CD WITH MARINO PLATE 0 WOOD FRAME FLOOR Hardy Frame® 43 Feb 15 06 01:15p Froelich Consulting Eng 5r"- 624 -9770 p.1 M C70 3 g erl e f ROELICH CONSULTING ENGINEERS INC MAIN,OFFICE ❑ CENTRAL OREGON ❑ 6969 SW Hampton Street 231 SW Scalehouse Loop, Suite 101 Tigard, Oregon; 97223 Bend, Oregon 97702 50,3.624-7005/503.624-9770 FAX 541.383- 1828/541.383 -7696 FAX IAX. COVER SHEET pate: February 15, 2006 Transmittal To: Wyatt FAX Number: 503 - 524 -4403 Transmittal From: Mike Young Pages: "3 Comments: Arbor Summit — Lot 18, The Mazama, FCE #05 -T264 See attached sheets for blocking detail around hole in shearwall. Thank You, Mike Young PLEASE CONTACT US IF THIS FACSIMILE IS LEGIBLE OR IF IT HAS MISSING PAGES • 41:15p Froelich Consulting Eng 503 , 24 -9770 p.2 z= a 8 ' v i wit y �- g ti < 0 g g� i N x �w Q d5 h 12 2 m E =iz , L his H ii 1 agl di I CrD IP g 1 II 1 tri 0 4 11 lir 1 tai hi I iiS T = i 0 _ 1 1 6 1 1 0 � I' 1 $ Y 6 �� �t34 '� � ! � E S� ie I 4 E 9 g d = I . ff Y �� I $+ ti i i bpi i 11 i� NI 0 i i °N o i aE a g ! 2 1 :a�° l_ i 0 b i i i e i l d ! ! Q i Y Y ! Y 3 9 R p Y`„i gii i i � ��Y� M•� WIr di }ii 1s q � ` ! I'' 1 bll 1 i 99 Oi li ` Pi 9 13 10 a II nil WI L ' i i !II J h ! O ; V k ilig_11 lo i g j Ith1 i 1 1 1 1 ild ism i E!!�°f �!!! :K Pi I B 8 2 2 lii a III 1"111111"11i 1 billhlig I N i E 1 p lh ill 0 1 ID 4D it CD a ,OD WWII! ' 1 1 1 11 1 ° fi �.i � ; m. M O � r 1 r • ` ° � 1 aD ; aD i i f „ . I \f 1i ° ; a '',,,i);-, - 4- "”' '''', ! II .. , ' ° l a) • L , 3 11 i h 1 r It 4 5 9 J ' o 4D 3 OIL .g e lk li ' ®� - 1D • a ` r aD 4 a ; 1 11'; I.. r ' UT c_-- Q . ,i, __„ , FQ I_. D CI 9 ° � Q �_ O IL7 b b b b b j i '0° e it t %) - 11 w tk.41ir � 1 0 i p t ' , v • S • hilk } iiiiiiii gl 4i qr. Q 1 O i _ o� ■■C 0000000 'el: 16p Froelich Consulting Eng 50 S24 -9770 p.3 O 6969 SW Hampton _ _4 CLIENT: • PAGE / � ? Tigard, Oregon 97443 j FAX 503.624.9770 PROJECT: SUCH 503.624.7005 i1SULTING 0 231 SW ouse Loop • Suite 101 PROJECT NUMBER: Bend, Oregon regon 97704 J INEERS,INC FAX 541.383.7696 OATE: 541.383.1848 II BY ■ I I I; _ ! I a i • • 0 • Zx BLuc.kINl� ,, i I' 'o / V Y 0 Q_ _0.1 v - _u o 0 o u i .:LI..'-\\\I I Et C € M lip Rtitztirfp,L, I F/Dtit N'A'll. �3� -a 1 Si STUD A _13t/ 13(-004 (AA" '� �� i 561443*t.uwA SC I-1. 113 FFoc.G / M.i ,u G,EN 3W a, S Nr42,.�4c.� .s....................... Sc-H, i • 1 .I