Loading...
Permit 12/23/2004 Case Activity Listing 1:50:42PM TIDEMARK Case #: SIT96 -00002 COMPUTER SYSTEMS. INC. Assigned Done Updated Activity Description Date 1 Date 2 Date 3 Hold Disp To By By Notes SITA007 Application received 1/25/1996 None PASS RT 1/25/1996 BT2 SITA008 Permit Created 1/25/1996 None PASS RT 1/25/1996 BT2 SITA010 Check for prcl. 1/25/1996 None PASS RT 1/25/1996 restrict. BT2 SITA015 Plans Routed to Plans 1/25/1996 None PASS RT 1/25/1996 Examiner BT2 SITA024 Plans 1/25/1996 None PASS RT 1/25/1996 Approved/Routed to BT2 DSTs SITB700 Erosion Control Insp None 1/25/1996 844 -8444 BT2 SITB705 Excavation Insp 1/30/1996 None PASS RB 1/30/1996 RB SITB710 Fill Inspection 2/16/1996 None PASS RB 2/19/1996 rock boulders RB SITB720 Grading Insp 2/16/1996 2/16/1996 None PASS RB 12/22/1998 RB SITB775 Engineered grading None 1/25/1996 final reprt BT2 SITB799 Final Inspection 2/16/1996 2/16/1996 None PASS RB 12/17/1998 pending- engineering submittal (was VLN told by contractor that engineering was ready, but not submitted yet. Inspection request for research sent to Hap W. 12/17/98 Page 1 of 2 CaseActivity..rpt I 12/23/2004 Case Activity Listing ��� 1:50:42PM TIDEMARK Case #: SIT96 -00002 COMPUTER SYSTEMS. INC. Assigned Done Updated Activity Description Date 1 Date 2 Date 3 Hold Disp To By By Notes SITA070 (F) Ready to issue 1/25/1996 None PASS JDA 1/25/1996 JDA SITA080 (F) Issue permit 1/25/1996 None PASS JSD 1/25/1996 JD SITA180 Expired by limitation 3/23/2000 None DONE HAP 3/23/2000 AM Page 2 of 2 CaseActivity..rpt CITY OF TIGARD BUILDING INSPECTION NOTICE • Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171 Inspection: Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk Foundation Plbg. Underslab Mech. Rough -in Fireplace Post/Beam Struct. Plbg. Top Out Elec. Rough -in FINAL: Post/Beam Mech. San. Sewer Gas Line Plbg. Underfloor Rain Drain Framing Alarm Water Line Insulation. i f Underflr. Insul. Shear Wall Gyp. Bd. ('ETM / Date Requested: 2- l2-81, (a Time: AM _ PM Address: / 3 9 2- Builder: Per 7 7S 0,3 ( 0 THE FOLLOWING CORRECTIONS ARE REQUIRED: F / /5-0 zz-3 11P cva-Q( 3 X96 -000 z g'''/- g'''/- 72.9 7 �� G • Inspector: "7� Date: Z- Z,8 - -7,c APPROVED DISAPPROVED v APPROVED SUBJECT TO ABOVE _Call For Reinsp. • CITY OF TIGARD BUILDING INSPECTION NOTICE Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 6 -4171 Inspection: R. C-C 11 L _ I 4141— Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk Foundation Plbg. Underslab Mech. Rough -in Fireplace Post/Beam Struct. Plbg. Top Out Elec. Rough -in FINAL: Post/Beam Mech. San. Sewer Gas Line -Bldg. Plbg. Underfloor Rain Drain Framing - Plumb. Alarm Water Line Insulation -Mech. Underflr. Insul. Shear Wall Gyp. Bd. - Elect. Date Requested: 02 — 49 — R' 6, Time: AM PM Address: 13 Z.) SL,c, Li DEN - ✓L Builder: ,5'2 -b - 2-q S 7 Per�it /' 96 — OU O ? FOLLOWING CORF3ECT NS ARE REQUIRED: .44.,I -c Jti -Q, 7 ( i9-12ht / 6.r/C t .- de ,,,„...,„4, ,., , , ,,,,,,,,......„ , „... d...,..,_ .� tom•. +13 Inspector: Date: "/ t (A (A Lo QSQ PPROVED _DISAPPROVED APPROVED SUBJECT TO ABOVE \ 4 _Call For Reinsp. CITY OF TIGARD BUILDING INSPECTION NOTICE a Inspection Rec -O -Phone ) : 39 -41 5 Business Phone: 639 -4171 P ( Inspection: CSC/, V —✓` �� �`'�` -'�� Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk Foundation Plbg. Underslab Mech. Rough -in Fireplace Post/Beam Struct. Plbg. Top Out Elec. Rough -in FINAL: Post/Beam Mech. San. Sewer Gas Line -Bldg. Plbg. Underfloor Rain Drain Framing - Plumb. Alarm Water Line Insulation -Mech. Underflr. Insul. She Wall / Gyp. Bd. - Elect. Date Requested: \ 0 ( 4 ' Time: AM PM Address: 31 2 C (k�.1,," // Builder: Permit #: ¶ 7 I T"i Le ' O0 THE FOLLOWING CORRECTIONS ARE REQUIRED: Inspector: v v Date: ` `) 5'J° ROVED _DISAPPROVED APPROVED SUBJECT TO ABOVE 2 ` _Call For Reinsp.