Permit 12/23/2004
Case Activity Listing 1:50:42PM
TIDEMARK Case #: SIT96 -00002
COMPUTER SYSTEMS. INC.
Assigned Done Updated
Activity Description Date 1 Date 2 Date 3 Hold Disp To By By Notes
SITA007 Application received 1/25/1996 None PASS RT 1/25/1996
BT2
SITA008 Permit Created 1/25/1996 None PASS RT 1/25/1996
BT2
SITA010 Check for prcl. 1/25/1996 None PASS RT 1/25/1996
restrict. BT2
SITA015 Plans Routed to Plans 1/25/1996 None PASS RT 1/25/1996
Examiner BT2
SITA024 Plans 1/25/1996 None PASS RT 1/25/1996
Approved/Routed to BT2
DSTs
SITB700 Erosion Control Insp None 1/25/1996
844 -8444 BT2
SITB705 Excavation Insp 1/30/1996 None PASS RB 1/30/1996
RB
SITB710 Fill Inspection 2/16/1996 None PASS RB 2/19/1996 rock boulders
RB
SITB720 Grading Insp 2/16/1996 2/16/1996 None PASS RB 12/22/1998
RB
SITB775 Engineered grading None 1/25/1996
final reprt BT2
SITB799 Final Inspection 2/16/1996 2/16/1996 None PASS RB 12/17/1998 pending- engineering submittal (was
VLN told by contractor that engineering
was ready, but not submitted yet.
Inspection request for research sent
to Hap W. 12/17/98
Page 1 of 2 CaseActivity..rpt
I
12/23/2004
Case Activity Listing
��� 1:50:42PM
TIDEMARK Case #: SIT96 -00002
COMPUTER SYSTEMS. INC.
Assigned Done Updated
Activity Description Date 1 Date 2 Date 3 Hold Disp To By By Notes
SITA070 (F) Ready to issue 1/25/1996 None PASS JDA 1/25/1996
JDA
SITA080 (F) Issue permit 1/25/1996 None PASS JSD 1/25/1996
JD
SITA180 Expired by limitation 3/23/2000 None DONE HAP 3/23/2000
AM
Page 2 of 2 CaseActivity..rpt
CITY OF TIGARD BUILDING INSPECTION NOTICE
•
Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171
Inspection:
Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk
Foundation Plbg. Underslab Mech. Rough -in Fireplace
Post/Beam Struct. Plbg. Top Out Elec. Rough -in FINAL:
Post/Beam Mech. San. Sewer Gas Line
Plbg. Underfloor Rain Drain Framing
Alarm Water Line Insulation. i f
Underflr. Insul. Shear Wall Gyp. Bd. ('ETM /
Date Requested: 2- l2-81, (a Time: AM _ PM
Address: / 3 9 2-
Builder: Per 7 7S 0,3 ( 0
THE FOLLOWING CORRECTIONS ARE REQUIRED: F / /5-0 zz-3
11P cva-Q( 3 X96 -000 z
g'''/- g'''/- 72.9 7 ��
G
•
Inspector: "7� Date: Z- Z,8 - -7,c
APPROVED DISAPPROVED v APPROVED SUBJECT TO ABOVE
_Call For Reinsp.
• CITY OF TIGARD BUILDING INSPECTION NOTICE
Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 6 -4171
Inspection: R. C-C 11 L _ I 4141—
Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk
Foundation Plbg. Underslab Mech. Rough -in Fireplace
Post/Beam Struct. Plbg. Top Out Elec. Rough -in FINAL:
Post/Beam Mech. San. Sewer Gas Line -Bldg.
Plbg. Underfloor Rain Drain Framing - Plumb.
Alarm Water Line Insulation -Mech.
Underflr. Insul. Shear Wall Gyp. Bd. - Elect.
Date Requested: 02 — 49 — R' 6, Time: AM PM
Address: 13 Z.) SL,c, Li DEN - ✓L
Builder: ,5'2 -b - 2-q S 7 Per�it /' 96 — OU O ?
FOLLOWING CORF3ECT NS ARE REQUIRED:
.44.,I -c Jti -Q, 7 ( i9-12ht / 6.r/C t .-
de ,,,„...,„4, ,.,
, , ,,,,,,,,......„
, „... d...,..,_
.� tom•. +13
Inspector: Date: "/ t (A (A Lo
QSQ PPROVED _DISAPPROVED APPROVED SUBJECT TO ABOVE
\ 4 _Call For Reinsp.
CITY OF TIGARD BUILDING INSPECTION NOTICE
a
Inspection Rec -O -Phone ) : 39 -41 5 Business Phone: 639 -4171
P (
Inspection: CSC/, V —✓` �� �`'�` -'��
Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk
Foundation Plbg. Underslab Mech. Rough -in Fireplace
Post/Beam Struct. Plbg. Top Out Elec. Rough -in FINAL:
Post/Beam Mech. San. Sewer Gas Line -Bldg.
Plbg. Underfloor Rain Drain Framing - Plumb.
Alarm Water Line Insulation -Mech.
Underflr. Insul. She Wall / Gyp. Bd. - Elect.
Date Requested: \ 0 ( 4 ' Time: AM PM
Address: 31 2 C (k�.1,," //
Builder: Permit #: ¶ 7 I T"i Le ' O0
THE FOLLOWING CORRECTIONS ARE REQUIRED:
Inspector: v
v Date: ` `) 5'J°
ROVED _DISAPPROVED APPROVED SUBJECT TO ABOVE
2 ` _Call For Reinsp.