Permit CITY OF TIGARD MASTER PERMIT
•i�, , DEVELOPMENT SERVICES PERMIT # • MST9B -0160
ul� DATE ISSUED: 07/28/98
.- 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639-4171
PARCEL: 19126DC -06500
SITE ADDRESS. ..:O9275 SW LOCUST ST
SUBDIVISION •MLP96 -0014 PP1997 -124 ZONING: R -12
BLOCK LOT •001 JURISDICTION: TIG
Remarks: New SFD
BUILDING
REISSUE: STORIES • 2 FLOOR AREAS BASEMENT...: 0 sf REQUIRED SETBACKS— REQUIRED -
CLASS OF WORK.:NEW HEIGHT • 25 FIRST • 813 sf GARAGE • 548 sf LEFT : 10 SMOKE DETECTRS: Y
TYPE OF USE...:SF FLOOR LOAD • 40 SECOND...: 899 sf FRONT • 20 PARKIN SPACES: 2
TYPE OF CONST.:SN DWELLING UNITS: 1 FINBS?ENT: 0 sf RIGHT • 5
OCCUPANCY 6RP.:R3 BDRM: 3 BATH: 3 TOTAL : 1712 sf VALUE..$: 124222 REAR : 15
PLUMBING
SINKS • 1 WATER CLOSETS.: 3 WASHING MACH..: 1 LAUNDRY TRAYS.: 0 RAIN DRAIN ft: 1w. TRAPS • 0
LAVATORIES • 4 DINERS...: 1 FLOOR DRAINS..: 0 SEWER LINE ft: 1 SF RAIN DRAIN: 1 CATCH BASINS..: 0
TUB /SHOWERS...: 2 GARBAGE DISP..: 1 WATER HEATERS.: 1 WATER LINE ft: 1'i BCKFLW PREVNTR: 1 GREASE TRAPS..: 0
OTHER FIXTURES: 0
MECHANICAL
FUEL TYPES FURN t MK ..: 1 BOIL /CMP ( 3HP: 0 VENT FANS • 4 CLOTHES DRYERS: 1
GAS FURN ) =100K ..: 0 UNIT HEATERS..: 0 HOODS • 1 OTHER UNITS...: 1
MAX INP.: 0 BTU FLOOR FURNACES: 0 VENTS • 0 WOODSTOVES : 0 GAS OUTLETS...: 1
ELECTRICAL —
— RESIDENTIAIL UNIT— — SERVICE /FEEDER— —TEMP SRVC /FEEDERS— — BRANCH CIRCUITS— — MISCELLANEA— — ADD'L INSPECTIONS -
1v SF OR LESS: 1 0 - 200 amp..: 0 0 - 200 amp..: 0 W /SVC OR FDR..: 0 PUMP /IRRIGATION: 0 PER INSPECTION: 0
EA ADD'L 500SF.: 3 201 - 400 amp..: 8 201 - 400 amp..: 0 1st W/O SVC /FDR: 0 SIGN /OUT LIN LT: 0 PER HOUR • 0
LIMITED ENERGY.: 0 401 - 600 amp..: 0 401 - 600 amp..: 0 EA ADDL BR CIR: 0 SIGNAL /PANEL...: 0 IN PLANT • 0
MANF HM /SVC /FDR: 0 601 - 1' amp.: 0 601 +amps- 1w v: 0 MINOR LABEL -10: 0
1000+ amp /volt.: 0 PLAN REVIEW SECTION --- --
Reconnect only.: 0 )=4 RES UNITS..: SVC /FDR) =225 A.: ) 600 V NOMINAL: CLS AREA /SPC OCC:
ELECTRICAL - RESTRICTED ENERGY
A. SF RESIDENTIAL B. COMMERCIAL
AUDIO 1 STEREO.: VACUUM SYSTEM..: AUDIO 1 STEREO.: FIRE ALARM • INTERCOM /PAMINS: OUTDOOR LNDSC LT:
BURGLAR ALARM..: 0TH: :: X BOILER HVAC LANDSCAPE/IRRI6: PROTECTIVE SIGNL:
GARAGE OPENER..: CLOCK • INSTRUMENTATION: PEDICAL OTHR: ..
HVAC • DATA /TELE COMM.: NURSE CALLS TOTAL 1 SYSTEMS: 0
Owner: ----- Contractor: TOTAL FEES:$ 4857.01
LUNDNARK HONES LLC LINMARK HOMES LLC This permit is subject to the regulations contained in the
3381 COEUR D'ALENE ALBERT C LUNDMARK Tigard Municipal Code, State of Ore. Specialty Codes and all
WEST LINN OR 97068 3381 COEUR D'ALENE DR other applicable laws. All work will be done in accordance
WEST LINN OR 97068 with approved plans. This permit will expire if work is
Phone 1: 655-8084 Phone 1: 655-8094 not started within 180 days of issuance, or if the work is
Reg 1..: 122499 suspended for more than 180 days. ATTENTION: Oregon law
requires you to follow rules adopted by the Oregon Utility
Notification Center. Those rules are set forth in OAR 952 - 001-8010 through OAR 952- 001 -0080. You may obtain copies of these rules or
direct questions to OUNC by calling (503)246 -1987.
REQUIRED INSPECTIONS
Erosion 844 -8444 Crawl Drain /Back Electrical Rough Gas Line Insp Water Service In Building Final
Footing Insp PLM /Underfloor Framing Insp Gas Fireplace Appr /Sdwlk Insp
Foundation Insp Mechanical Insp Shear Wall Insp Insulation Insp Electrical Final
Post /Beam Struct Plumb Top Out Low Voltage Rain drain Insp Mechanical Final
Post /Beam Mechan "Kb.' . :er • Fireplace Insp Water Line Insp P1um)Final Idi 1
Issued B 4 Permittee Signature: '
+ + ++ + + + + + ++ + + + + + ++ ++++++++ + + + + + + + + ++ + + + + + + + + + + + + + + + + + + + ++ + + + + + + + + + + + + ++
Call 639 -4175 by 7 00 p.m. for an inspection needed the next business day
. A • Plan Che- : `f '1� e
CITY OF TIGARD Residential Building Permit Application Recd By MN ,
13125 SW HALL BLVD. New Construction Additions or Alterations Date Recd S - f
TIGARD, OR 97223 Single Family Detached or Attached (Duplex) Date to P.E. rk'
V 503- 639 -4171 Date to DST -3o - tV
F 503-684-7297 P rmit# S % qg O /G'�
Print or Type /no C ain 15 /
/J I ncomplete or illegible applications will not be acc pted s`''`�4*'6v�i z
Name of Project Name /41? f- r
Job ,t5r b7: �i9r2fian Architect Mailing Addres
Address S ite Address ^ /0524 577L
9 Z7 -1.4.) Loce.4...sT
Name City�, Zip Phone
Lu,v�J/f�'t4�►2G.- go 1 q7z /G 25Z-Z313
Owner Mailing Address Name
City/State Zip Phone Engineer Mailing Address
General
Name City /State Zip Phone
Contractor L. °Ai 007 412 k deities ( -LC- Describe work New fr Addition 0 Alteration 0 Repair 0
Mailing Address to be done:
Prior to permit 33g/ etaact 2 I ' /44..s✓£ Additional Description of Work: .
issuance, a copy City /State Zip Phone CeYtSr: 511t1 {„g Li
of all licenses kQj5T //NA/ 1 6..s yapV
are required if Oregon Const. Cont. Board Exp. Date PROJECT /ay Z z
expired in COT Lic.# ` VALUATION $ /aeons . --
database /22491 5/2- /'i8
Mechanical Name NEW CONSTRUCTION ONLY:
Sub- -01 Sq. Ft. House: Sq. Ft. Garage , `
Contractor Mailing Add ess f' 7/2 se / d /
Prior to permit /, 37 5'..s. N=- 4 Corner Lot YES NO Flag Lot YES NO
issuance, a copy City/State Zip Phone (check one) k (check one) k
of all licenses /b41 g 97Z4 Z- Z3S To' 3 Restricted Audio /Stereo ✓ Burglar
are required if Oregon Const. Cont. Board Exp. Date Energy System Alarm
expired in COT Lic.# /
database 2 4 1 - 4c SL 44.. /q4 Installation ✓ Garage Door t / HVAC
Plumbing Name 2 Opener Systems
Sub- D4 6 P� (check all that Other.
Contractor Mailing Address apply)
i�X 656, WII the electrical subcontractor wire for all YES NO
. restricted energy installations?
Prior to permit City/State Zip Phone Has the Subdivision Plat recorded? N/A YES NO
issuance, a copy (7/Z1,-Pint (-cal q 7OY 6s''I : Icit3
of all licenses are Orego Const. Cont. Board Exp. Date
required if Lic.# Reissue of MST #: Solar Compliance
expired in COT ! /0 6// /q18 _ (Calculation Attached)
database Plumbing Lic. # Exp. Date I hearby acknowledge that I have read this application, that the
3 / 8 / P 3 6 / 1 l �G information given is correct, that I am the owner or authorized
Name agent of the owner, and that plans submitted are in compliance
with Oregon State laws.
Electrical 'b 40g E /rt t 0 4 6.45r. . Sign a of wn r/A Date
Sub- Maili(ig Address - [t- e (O l c 1
Contractor j0,3 22..oi Contact Person Name Phone #
City/State Zip Phone .IZ e.... 0.....) 4 100Y
Prior to permit FOR OFFICE USE ON LY:
issuance, a copy (.v i 40104 g07D .. -75-8-5- Pla ' . t izt n , a . _ , c F Map/TL#: `,�l
of all licenses are Oregon Const. Cont. Board Exp. Date / • .51 o'er - v�sc
required if Lic.# Se backs:�� Zone: f Solar w/U
expired in COT /.2'7.5 3 2' / 7- 00 G� /
database Electrical Lic. # Exp. Date !• 7
ErO�eey Oroyal: rtf Planning pproval: TIF:
I:SFREM.DOC (DST) 4/97
•
• Solar Balance Point Standard Worksheet
Address q2-7 - 5'c v
Box A calculations: North -South dimension for the lot. Box A:
This dimension is determined by finding the midpoint of the North lot line and drawing
an intersecting line perpendicular to that point.
First, determine which property line is the North lot line. The North lot line is the line
with the smallest angle from a line drawn east -west and intersecting the northern most
point of the lot.
•
45°
*
1
RN 4 N OT ERN
N North -South
Dimension for Lot:
Measure the distance from the midpoint of the North lot line to the South lot line along
the described line. z 3-- feet
72. N
NORTH -SOUTH DIMENSION
Box B calculations: Shade point height for your residence. Box B:
1. Determine whether measurements will be based on the peak or eave of your Which describes
structure. The orientation of the ridge is also important. your residence?
1 a: If the roof line runs North - South, measurements will f (circle one)
be based on the peak of the roof. 01:300
11111 IJIIII
NORM ■110. 1B 1C
1 b: If the roof line runs East -West and the roof pitch is
less than 5/12, measurements will be based on the
S n 17 Soo RteA
eave.
SHADE PRIM EA'E
1 c: If the roof line runs East -West and the roof pitch is
5/12 or steeper, measurements will be based on the o v2o
peak. SHOE SORTS RIDGE
Box B. continued Box B:
2. Measure change in elevation from front property line to finished floor elevation. If
the lot slopes up from the front lot line to the foundation, the figure is positive. If ( 3 ft 3
the lot slopes down from the front lot line to the foundation, the figure is negative.
+ 29 ft 3/
3. Measure distance from finished floor elevation to the affected peak/eave.
4. If the roof line runs North - South, deduct three feet. If the roof line runs East -West, - • 3 ft " 3
deduct nothing.
5. Subtract one foot for each foot of difference in elevation from the front property
line to the rear property line, if the lot slopes up from the front to the rear. If the
lot has no slope or slopes up from the rear to the front, deduct nothing. - O ft
6. Total figure for box B: 27 z ft 3 r1
Box C. Distance to the shade reduction line. Box C:
1. Measure the distance from the North property line to the foundation near the to ft
affected peak/eave.
2. Measure the distance from the foundation to the affected peak or eave. + 30 ft 0
3. Total figure for box C: 3 (o ft
it is most useful to draw a vertical line to represent the appropriate figure found in box "A" and a horizontal line to represent the
appropriate figure found in box "C ". The intersection of the vertical and horizontal lines determines the value found in box "D ". The value
in box "D" should be compared to the value in box "8 "; if the value in box "8" is less than or equal to the value found in box "0", then
the building is in compliance with the solar balance code. If you have any questions, please contact us at 639 -4171, x304 or at the •
Community Development Counter.
MAXIMUM PERMITTED SHADE POINT HEIGHT (In Feet) I
Distance to North -south lot dimension (in feet) 3 /
shade 100+ 95 90 85 80 75 k 0 65 60 55 50 45 40 q'
reduction line
from northern '
Jot line (in feet)
70 40 40 40 41 42 43 4'
65 38 38 38 39 40 41 42 43
60 36 36 36 37 38 39 4 41 42
55 34 34 34 35 36 37 3 39 40 41
50 32 32 32 33 34 35 3 37 38 39 40
45 30 30 30 31 32 33 ., 34 35 36 37 38 39
40 28 28 28 29 30 31 12 33 34 35 36 37 38
3 26 26 26 27 28 29 0 31 32 33 34 35 36
30 24 24 24 25 26 27 8 29 30 31 32 33 34
25 22 22 22 23 24 25 6 27 28 29 30 31 32
20 20 20 20 21 22 23 4 25 26 27 28 29 30
15 18 18 18 19 20 21 2 23 24 25 26 27 28
10 16 16 16 17 18 19 0 21 22 23 24 25 26
5 14 14 14 15 16 17 8 19 20 21 22 23 24
`
I Box D. Maximum allowed shade point height 30 feet I
h : \docs \nancv\ventu ra\solar.chp
Revised 2/26/96
09/13/1999 Activities for Case #: M ST98 -00160
10:06:01 AM
•
Assigned - Hold Updated
Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes
MSTA005 Application received 04/20/1998 DRA PASS JSD 04/22/1998.
MSTA008 Permit Created • 04/22/1998 JSD PASS JSD 04/22/1998
MSTA010 Check for prcl. restrict. • 04/22/1998 JSD PASS • JSD 04/22/1998 Left msg w /Kit 04/21 10am re
need for part plat. S/W Bert at
1028am on 04/22 re need for 5
revised site plans reflecting
actual dimensions of the
• . property. Revised plans
received after 1 pm on 04/22.
jsd While.this may qualify for
SDC credits, it appears a
previous MST was created on
• another lot which may take the
credits. jsd
MSTA012 Plans routed to Plans Examiner 04/22/1998 JSD PASS JSD 04/22/1998
•
MSTA026 Plans approved by Pln Examiner 04/30/1998 RT PASS BT2 04/30/1998
MSTA030 Reviewed plans routed to DSTS 04/30/1998 RT PASS BT2 04/30/1998
MSTA032 DST Post - Review Completed 05/01/1998 GEO DONE GEO 05/01/1998
MSTA155 Development conditions met JSD 04/22/1998
MSTA700 Erosion 844 -8444 JSD 04/22/1998
MSTA705 Footing Insp 08/03/1998 KS FAIL J *H 08/03/1998 See foundation
MSTA706 Foundation Insp 08/03/1998 KS FAIL J'H 08/03/1998 Needs initial USA erosion
control approval posted. Need
reference point at front, for front
•
• set -back requirements.
MSTA710 Post/Beam Structural • 09/22/1998 RC FAIL J'H 09/22/1998 Unable to inspect, no approved
• plans at site.
MSTA711 Post/Beam Mechanical 09/22/1998 RC PASS J*H 09/22/1998
MSTA713 Crawl Drain /Backwater valve 11/10/1998 RB FAIL RB 11/10/1998 Already decked. Unable to
view!
MSTA717 PLM /Underfloor 09/23/1998 DD FAIL J'H 09/25/1998 1. CO provided, however, no
underfloor access provided.
Unable to verify Co 20 -feet from
• crawl space access. 2. NW
building pop -out does not have
waterlines secured at rim joist.
3. Plans on site are not the
• . approved set. Water Service,
• Sanitary Sewer & Rain Drains
• not installed at this inspection.
•
•
Page 1 of 6
CITY OF TIGARD BUILDING INSPECTION DIVISION MST GlB -0I
24 -Hour Inspection Line: 639 -4175 Business Line: 639 -4171
Date Requested q BUP AM PM BLD
Location �S LOCLVir Suite C �� / MEC
Contact Person r�/vl Ph (O.SJ �0U"! PLM
Contractor Ph SWR
(10[ED Tenant/Owner ELC
Retaining Wall ELR
Footing Access:
Foundation 3 O S FPS
Ftg Drain SGN
Crawl Drain Inspection Notes:
Slab SIT
Post & Beam
Ext Sheath /Shear
Int Sheath/Shear ,
Framing f�'' f A.14L fS o Si , L) Tye"( . (A-PO
Insulation
Drywall Nailing
Firewall
Fire Sprinkler �� 11111rON/ l i r "-% • C4J L.L. _ 1.1 •
Fire Alarm
Susp'd Ceiling � Gti.LT 1W/All
Roof k1C AC 1 k 614
D1
Misc:
(T o PART FAIL l0 1Z- lt.4_ -
P ' BING
Post & Beam
Under Slab
Top Out
Water Service
Sanitary Sewer
Rain Drains
Final
PASS T FAIL
ANICQV
Post & Beam
Rough In
Gas Line
Smoke Dampers
Fi
ASS PART FAIL
E TRICAL
Service
Rough In
UG /Slab
Low Voltage
Fire Alarm
Final
PASS PART FAIL
SITE
Backfill /Grading
Sanitary Sewer
Storm Drain [ ] Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd
Catch Basin
Fire Supply Line 1, [ ] Please call for reinspection RE: [ ] Unable to inspect - no access
ADA
Approach/Sidewalk � —
Other Date — 3 Inspector Ext
Final
PASS PART FAIL DO NOT REMOVE this inspection record from the job site.