City Council Packet - 04/19/2005
TIGARD CITY COUNCIL
WORKSHOP MEETING
April 19, 2005
COUNCIL MEETING WILL NOT BE
TELEVISED
1:10fs\DOnna'skcpkt2
Agenda Item No. ,
For Agenda of June 14, 2005
COUNCIL MINUTES
TIGARD CITY COUNCIL MEETING
APRIL 19, 2005
1. WORKSHOP MEETING
1.1 Mayor Dirksen called the meeting to order at 6:30 p.m.
1.2 Council Present: Mayor Dirksen; Councilors Harding, Sherwood, Wilson,
and Woodruff.
1.3 Pledge of Allegiance
1.4 Council Communications & Liaison Reports: None
1.5 Call to Council and Staff for Non-Agenda Items
Mayor Dirksen said he would be attending the Prayer Breakfast on April 5 at
7 a.m. Councilors Woodruff and Wilson said they might attend as well.
2. UPDATE - COMMUNICATION/CITIZEN INVOLVEMENT
Assistant to the City Manager Newton presented the staff report on this agenda
item. Packet materials included a memorandum dated April 4, 2005, from Ms.
Newton to the Mayor and Council regarding the City's communication and citizen
involvement programs.
Ms. Newton reviewed with the Council the Focus on Tigard program. She reported
that little public comment has been received on this program; however, City
Council meetings appear to be popular. She suggested that presentations, similar
to the Focus on Tigard, could be done at City Council meetings. Features could
be edited out of the City Council meeting tapings and replayed as feature
programs.
There was discussion on the "TVTV Bulletin Board Announcements." Ms. Newton
suggested that the announcements that are made during the monthly Focus
programs could air on the TVTV Bulletin Board. In addition, she noted that
Planning Commission and Hearings Officer meetings could be aired. Councilor
Harding said she has heard the comment that the CP04B mailings are showing
more information on land use than City of Tigard publications.
City Council discussed and then agreed to the discontinuation of regular Focus
programming as was suggested by Ms. Newton. Councilor Wilson noted he would
like staff to maintain their television programming skills. In the future, video
broadcasts would be a good way to communicate with citizens on the City's
website. There was a suggestion that two- to ten-minute news stories be recorded
and aired on TVTV.
COUNCIL MINUTES -APRIL 19, 2005 page 1
Consensus of the City Council was to proceed with the staff recommendation,
beginning July 1, 2005.
There was discussion on obtaining survey information to determine what viewers
are watching. Interim City Manager Prosser noted that Councilor Harding is the
liaison to the Metropolitan Area Communications Commission (MACC) and she
might want to approach MACC about such a survey. Discussion followed about
obtaining citizen input. Mayor Dirksen suggested that highlights of other boards
and committee meetings could be aired rather than showing an entire meeting.
Ms. Newton reviewed the changes in the Cityscape newsletter, which included
announcements of various City-related meetings and a feature article each month
on a Council goal. Ms. Newton said the "Did you know" section of the Cityscape
has proven to be popular. She also noted a special section for volunteers has
been added.
Ms. Newton advised that Citycape sizes are as follows: two 12-page editions; two
4-page editions; and the remaining editions consist of eight pages. In the budget
proposal for the next fiscal year, staff recommends the Cityscape be published
every month.
Information published in the Cityscape is also posted on the City's website.
Periodically, staff investigates whether it would be cost-effective to publish
Cityscape on the website with a direct mailing to those residents who do not have
Internet access.
Ms. Newton reviewed the Community Connector program. She introduced the
following Community Connectors: Basil Christopher, Stacie Yost, and Teddi
Duling. Ms. Newton presented information on a proposed enhanced community
connectors/neighborhood program. This program could provide neighbors
information about land use, CERT training, school connections, Neighborhood
Watch, and identify Community Assessment Program liaisons (to address
neighborhood issues), clean up days, and give input on capital improvement
program projects. Two open houses were held to introduce the neighborhood
program. Attendance was somewhat disappointing; but, those who attended
indicated they liked the idea of a neighborhood-based program and the elementary
school boundaries for the neighborhood areas were a good idea.
Ms. Newton reviewed the timing for implementing the new neighborhood program.
She advised that a boundary review would be completed by the end of July.
Boundaries would be adjusted so approximately 1200-1400 people would be in
each area. The neighborhood program would not be meeting based; rather, there
would be a steering committee with liaisons identified to assist people when needs
COUNCIL MINUTES -APRIL 19, 2005 page 2
arise or if there is an issue. During discussion it was noted that each
neighborhood could have its own webpage.
Ms. Newton advised that if Council accepts the neighborhood program concepts
recommended by the Citizens for Community Involvement (CCI), a pilot program
would be initiated on July 1. Boundaries would be further refined and three or four
neighborhoods identified to work through details and to test the concept with
adjustments made as appropriate. There will be a report to the City Council at the
end of the year with the "kick off"for the new program scheduled for January 2006.
Mayor Dirksen said it appears the neighborhood program concept was on the
"right track," but said there was a lot more work to be accomplished. He
suggested that the boundaries not be fragmented.
Councilor Wilson said the concept was good and liked establishing boundaries
based on school attendance since people often already know each other. He
noted the challenge would be to overcome apathy. He suggested that a member
of each neighborhood area serve on the CCI.
Councilor Woodruff said 12 neighborhoods would be a manageable number. He
suggested polling information be gathered to determine if the boundaries drawn
seemed logical to those who reside in the areas identified.
Assistant to the City Manager Newton said she would continue to work on this
program as outlined.
Police Department Information Officer Wolf and Web Page Manager Scares
reviewed a potential program to share statistical information with the public on the
City's website. Mr. Wolf said he routinely spends a number of hours responding to
inquiries about quality of life issues/activities within neighborhoods. There is a
program that would enable people to access information from the City's website to
see what kinds of activities were occurring in their neighborhoods, such as:
burglaries, auto theft, and assault. Mr. Soares reviewed with Council two options -
one which was a "static" method to present crime data and the other option would
be interactive. The example that was shown to the Council represented the last
nine months of City data. The cost for interactive software was $10,000 with a
maintenance fee of $2000 per year.
Councilor Wilson noted he would be concerned about whether people would have
a good frame of reference as to what was occurring elsewhere when mapping
crimes for a particular neighborhood. Mr. Wolf said comparative numbers could
be incorporated to avoid misconstruing the information. It was noted that
Washington Square has shoplifting issues, which affects the crime rate not only for
that area but statistically for Tigard as a whole. Police Chief Dickinson
acknowledged that statistics are subject to interpretation. Mr. Christopher noted
COUNCIL MINUTES-APRIL 19, 2005 page 3
that these types of statistics would serve those who already reside in Tigard.
Assistant to the City Manager Newton said this would be a good tool for
Neighborhood Watch.
Interim City Manager Prosser said that if the City Council wanted to continue to
explore this program, it was not in the proposed budget.
3. JOINT MEETING - COMMITTEE FOR CITIZEN INVOLVEMENT (CCI)
CCI members present: Basil Christopher, Teddi Duling, Stacie Yost.
Community Development Director Hendryx reviewed the staff report on this
agenda item, which included a brief review of the history of Tigard's citizen
involvement program. The CCI had become inactive in recent years. In January,
the City Council adopted a resolution broadening the role of CCI and increasing
the membership to include representatives from all active City boards and
committees.
CCI's responsibilities include evaluating all City communication and public
involvement activities.
The purpose of the discussion tonight was to provide an opportunity for CCI and
Council to discuss the new Neighborhood Program and other citizen involvement
and communication topics.
CCI members were invited to share their ideas about the citizen involvement
activities. Ms. Yost said she has found it both enlightening and frustrating when
attempting to outreach to the public. She said she hoped the Neighborhood
Program would help and thought this would be a good start to improve
communication with City residents.
Ms. Duling said she supported using school boundaries to identify areas for the
Neighborhood Program.
Mayor Dirksen said he looked forward to having all members of the named and
appointed.
Councilor Sherwood noted the work to be accomplished for the Comprehensive
Plan update and it would be important for the CC[ to be involved.
Councilor Woodruff acknowledged Ms. Yost's assistance as the facilitator for the
Council's Fifth Tuesday meetings.
Councilor Harding offered some ideas about a citizen survey to find out what
citizens want including instituting performance measures and assigning a
COUNCIL MINUTES -APRIL 19, 2005 page 4
neighborhood liaison to individual Council members.
4. REVIEW - POLICIES AND PRACTICES FOR ACQUIRING PARK LAND AND
OPEN SPACES
Public Works Director Koellermeier reviewed the staff report on this agenda item.
In response to the 2005 Council Goal to identify and acquire park land and open
space, staff reviewed current City policies to determine if these policies support the
Council goal to acquire land. Staff identified the following issues for Council
discussion and direction:
a. Does the City have the authority to purchase land outside the City limits?
b. What is the City's policy/practice on purchasing land outside the City limits?
c. Is the granting of SDC credits an administrative act or a matter for Council?
d. Discussion of criteria matrix to evaluate park and open space dedications by
developers.
The staff report contained in the Council meeting packet included the City
Attorney's opinion on the above issues. The Attorney advised the City has the
authority to purchase land outside city limits. With regard to the question on SDC
credits, the Attorney opined that SDC credits are usually granted administratively
without Council approval; however, staff asked for confirmation from Council to
determine if Council desired to keep this as an administrative function.
Councilor Wilson asked if the City could purchase property with park funds and
then later, if it was determined the City wanted to buy park property elsewhere, sell
the property to buy another piece of land for a park? Interim City Manager Prosser
said this could be done under certain circumstances, depending on how the
transactions were accomplished. He cautioned that Internal Revenue Service
regulations would need to be considered. Interim City Manager Prosser noted
State law would govern how SDC dollars are to be spent.
Councilor Wilson commented on the past City policy to purchase park land only if it
was located inside city limits - this was shortsighted. As a result, no park land has
been set aside on Bull Mountain. If property is acquired by the City on Bull
Mountain, but then this area does not come into the City, he would want the option
of selling the property to purchase other park property for Tigard.
Councilor Woodruff agreed he'd like to have flexibility with regard to reselling
property. He referred to a recent discussion during a Fifth Tuesday meeting about
the Park and Recreation Advisory Board's discussions on potential park properties
and spending City money on property outside the city limits. He heard that there
was concern that all park money was going to spent on Bull Mountain and that this
was a "done deal." He said PRAB would benefit from Council direction on this
matter. He would like to be able to say that if there are equal opportunities, do we
COUNCIL MINUTES -APRIL 19, 2005 page 5
have some parameters of how the money should be spent; i.e., if there are equal
opportunities should it be said that 50 percent of the money available should go to
buying property within the City and 50 percent out of the City? If PRAB was given
that kind of direction, it would help them to know how to allocate and prioritize the
funds.
Mayor Dirksen referred to the City Council discussion during its goal setting and he
recalled City Council was amenable to considering properties regardless of
whether the property was in or out of the City. He said this was a new proposal
with regard to the request for a Council decision on a percentage of funds to be
spent in or out of the City.
Councilor Woodruff referred to criticism whereby some people were saying too
much was planned to be spent outside the City, while some others think that's
where the park land deficiency is and that's where the money should be spent. He
suggested the Council give general direction to assist PRAB as this Board
develops recommendations about how available funds should be spent if there are
opportunities to buy land both in and out of the City.
Public Works Director Koellermeier noted park property purchases are
complicated. For example, some potential park property is publicly owned (Water
District property). Acquisition of this land can be accomplished through inter-fund
loans that are repaid over time. It was possible to build a park acquisition proposal
by identifying unique funding strategies for each property.
Interim City Manager Prosser agreed with Public Works Director Koellermeier that
flexibility is needed when purchasing land, as it is not known what land will become
available at any given time. Interim City Manager Prosser said he thought he
heard Councilor Woodruff asking whether there was a general preference to serve
the existing city over and above the future city - or vice versa? Is this something
that the City Council can tell staff now, or should the City Council, as it did during
the goal setting, direct staff to consider opportunities for the entire area.
Councilor Harding suggested looking at areas that are most underserved. She
said she attended a PRAB meeting and it appeared that the Board members were
under pressure regarding where dollars should be spent. She spoke to involving
citizens and focusing on areas that are underserved. She said that coming up with
a "formula" might prove to be difficult. Park land on Bull Mountain could also
serve people who live in Tigard.
Councilor Wilson suggested the Council consider establishing principles to help
staff and the Park Board take advantage of opportunities as they arise.
Councilor Sherwood commented in support for flexibility to take advantage of
those instances when good park land property becomes available either in or out
of the City the City needs to be able to "move on it."
COUNCIL MINUTES -APRIL 19, 2005 page 6
Councilor Woodruff agreed the "principles" or "parameters" should be flexible. He
noted the Park Board needs something from the Council so they can proceed. He
said the Board is receiving criticism and, as policymakers, the Council needs to
give the Board some general direction.
Councilor Wilson suggested that the overwhelming majority of funds for park
development should be going to those who are paying to "foot the bill." However,
the City ought to look to the future as much as possible for those areas that might
become park deficient when it becomes part of Tigard. Councilor Wilson said
consideration needs to be given as to where the money is coming from. Existing
neighborhoods should not be "shorted" to fund future growth as this is what SDC
money is for. Councilor Wilson suggested the principle could be stated that:
General Fund monies are to fund purchases within the City boundary and SDC's
would be to fund growth. He noted the City has some "catch up to do" and
referred to the Parks Master Plan that shows areas that are underserved.
Mayor Dirksen said, when looking at underserved areas, property within the urban
services boundaries should also be considered. In addition, Mayor Dirksen noted
the City should take advantage of opportunities to purchase parcels that are of
some size as opposed to very small parcels. The smaller parcels he said are less
useable. Councilor Sherwood commented that the smaller parcels also become
"maintenance nightmares."
Councilor Harding suggested it might be a good idea to consider purchase options
to lock in the price on properties and maximize dollars. Interim City Manager
Prosser agreed that purchase options would be a good tool for the City to use.
Interim City Manager Prosser summarized what he had noted as Council direction:
• General Fund money should be used to support purchases within the City
boundary;
• SDC's should be used to fund growth;
• Priority to be given to park deficient areas regardless of whether the
property available for purchase is in or out of the City limits;
• Allow for opportunities to purchase larger parcels rather than small, if there
is equal opportunity.
Councilor Wilson noted the Council had not discussed buying property for later
development. He asked if there was a sense that property was getting so
expensive and disappearing so quickly that there should be some land banking?
Other Council members commented they supported land banking.
Public Works Director Koellermeier noted there are some potential properties that
are already in public ownership. The cost of acquiring these properties would be
COUNCIL MINUTES - APRIL 19, 2005 page 7
nominal, so the decision will need to be whether the City wants to develop these
parcels into parks. These parcels are all currently located within neighborhoods.
Public Works Director Koellermeier noted all these decisions will come back to the
City Council for its consideration and approval. He noted he was asking for early
direction so staff does not bring to City Council items that are not consistent with
overall policy direction.
Interim City Manager Prosser said the questions of whether or not to develop a
parcel might be dependent on whether the property is located in or out of the City
since there would also be consideration for maintenance costs once the land is
developed. Park maintenance is funded through the General Fund.
Councilor Woodruff said he thought the Council was looking primarily at
purchasing open spaces and land banking, rather than for development at this
time. Several City Council members noted their agreement.
Interim City Manager Prosser noted that direction from previous councils regarding
not purchasing property outside the boundary was a practice that was not stated
formally. Interim City Manager Prosser suggested it would be a good idea to
codify Council direction in a resolution to give staff formal direction and also
provide documentation about this direction for future Councils.
Public Works Director Koellermeier noted the third issue staff was asking for
direction from Council on was regarding SDC credits. This relates to those times
when members of the development community want to donate parcels to the City.
Sometimes this is a "pure donation" where the developer does not expect any
consideration in return, while at other times, a developer is requesting offsetting
SDC credits in lieu of cash payment (as provided by State law). Public Works
Director Koellermeier asked for clarification from City Council whether this is an
administrative function or a Council-based function? The City Attorney has
advised that this is generally considered to be an administrative task.
In response to a question from Councilor Sherwood regarding whether there was
any previous policy concerning the size or the amount of land donated, Public
Works Director Koellermeier suggested the Council discuss the fourth issue
identified by staff. This last issue before the Council this evening pertains to
developing a procedure to evaluate and deal with donated property. He said staff
has put together a "simplistic" process that identifies criteria including
• location
• size
• accessibility
• visibility
• clear title
• linkage to other properties
• a developable park parcel
COUNCIL MINUTES -APRIL 19, 2005 page 8
• utilities available
• usability
• cultural significance
• unique site (i.e., grove of trees, wetlands)
• liability issues (related to size or location)
• additional investment required (i.e., site clean up or fencing required
immediately)
• mitigation issues associated with the parcel
• compliance of parcel to the Parks System Master Plan (is it located in an
area identified as park deficient)
Public Works Director Koellermeier said the above listed items are the types of
things staff would take into consideration. If the developer is requesting an SDC
credit, he thinks the Council should be asked to make the determination, at least in
the beginning of the process. Public Works Director Koellermeier said he would
like Council to consider all offers of donations and as it becomes routine, then it
might evolve into an administrative function. During discussion on how the Council
would consider this information, Public Works Director Koellermeier said the staff
would provide a recommendation based on identified criteria.
Councilor Woodruff suggested the City publicize that the City is open to donations.
Councilor Wilson asked noted he is currently working on a project where the
developer would rather build the facilities, which also helps with their sales
resulting in a "win/win" situation for the local jurisdiction and the developer. The
problem with the project is that there are no criteria for reviewing the plans. Also,
there's a question as to whether the park facility is worth the value of the SDC
dollars that would have been collected. Councilor Wilson asked Public Works
Director Koellermeier if there is a need to develop a policy on this situation? Public
Works Director Koellermeier said as long as donation criteria are established in
such a way that the Council has the final decision, this should not be an issue.
All options should be kept open. Public Works Director Koellermeier said another
thing to keep in mind is to keep an SDC cash flow so large parcels can be
purchased rather than giving it (SDC's) all "out in credits."
Councilor Woodruff noted that if PRAB comes to the City Council for a park bond,
then the public would want to see whether the City is using the current money
wisely.
Interim City Manager Prosser said staff will develop a resolution for Council's
consideration. In the meantime, the discussion this evening provided general
direction for staff to proceed.
Council meeting recessed at 8:02 p.m.
Council meeting reconvened at 8:09 p.m.
COUNCIL MINUTES -APRIL 19, 2005 page 9
5. DISCUSSION - URBAN RENEWAL PROGRAM ELEMENTS
Community Development Director Hendryx presented the staff report. The
Council has a 2005 goal of implementing the Downtown Plan with a sub-goal of
urban renewal. The plan is to have urban renewal before the voters in May 2006.
Staff, legal counsel, and Council are doing the necessary steps to accomplish this
goal. Last week the Council approved two Requests for Proposals for consultants
to help put together an urban renewal plan and a public outreach program for the
urban renewal effort. There are some governance issues decisions that need to
be made by the Council. Community Development Director Hendryx advised he
had three points for which he was seeking City Council direction:
• Composition of the Urban Renewal Agency. (City Center Development
Agency)
• Composition of the City Center Advisory Commission
• General concurrence on a public involvement program
Community Development Director Hendryx advised he would be returning to the
City Council periodically until May 2006 as there are a number of decisions that will
need to be made by the Council.
Community Development Director Hendryx discussed with the City Council the
composition of the City Center Development Agency (CCDA). The TMC identifies
the City Council as the CCDA; however, the City Council could opt to designate
another body as the CCDA. If another body was selected by City Council,
decisions would need to be made by June 28, 2005, on who would serve on this
Agency, how members would be recruited, and the TMC would need to be
amended to reflect that City Council had decided the CCDA would be made up of
individuals other than City Council members. Community Development Director
Hendryx advised that in July the CCDA and the Planning Commission start the
process of reviewing the consultant's work on the urban renewal plan. The
Planning Commission and City Council will receive the plan for review in
October/November for final action in December. Community Development
Director Hendryx noted that while the timeframe is constrained, it is "doable."
Community Development Director Hendryx reviewed with Council the following:
Pros - Council serves as CCDA
• TMC is set up for Council to act as CCDA so there would be time
savings.
• Council would stay very involved in this process, which is also one of
the City Council goals.
COUNCIL MINUTES-APRIL 19, 2005 page 10
Pros - Council appoints another group to serve as CCDA
• Additional community involvement.
• Potential for different expertise that to be drawn from other
individuals .
Cons - Council appoints another group to serve as CCDA
• Pressures on the established timeframe.
Council discussed whether it wanted to function as the CCDA. It was pointed out
that City Council could start out as the CCDA and then decide at a later date to
establish a separate CCDA comprised of non-Council members. Interim City
Manager Prosser noted that once the City Council designates another body, it
would have less direct impact on decisions being made with regard to the urban
renewal. The benefit to retaining Council's role to serve as the CCDA is that the
Council would remain in the "driver's seat." Interim City Manager Prosser noted
there are good reasons to go either way. Councilor Sherwood also noted that
every two years the composition of the City Council could change, which would be
a good reason to appoint another body. Councilor Woodruff pointed out that the
current City Council would still be in office by the time the urban renewal was ready
to go to the voters and suggested that at a later date, the City Council could
designate a separate CCDA. Councilor Wilson agreed that because the urban
renewal is such a high priority, the Council should serve as the CCDA. Councilor
Harding noted she agreed that in the interest of time and to get the urban renewal
program launched, the City Council should serve as the CCDA. Mayor Dirksen
suggested the possibility that the City Council retain the authority as the CCDA
through the election, but state "up front" that it's the City Council's intention to
appoint another group to serve as CCDA after the election.
Downtown Task Force Chair Marr was present and noted he was comfortable with
the City Council's conversation about the concern about being able to form a
CCDA within the next 60 days. He said he appreciated the City Council's
openness to create an Agency within a short period of time. Mr. Marr advised that
this is a long-term plan that will need consistency of people serving on the agency
who have expertise in finance, development, and public relations. He noted that
the Council's responsibilities for running the City are very time-consuming. Urban
renewal represents a whole new project that has not been part of the Council's
timeframe and it will require a lot of time. Mr. Marr said he believed the CCDA
should be a separate body. He proposed that CCDA members be appointed by
Council and be accountable to the Council, serving at Council's pleasure for a term
of three- to five-years and subject to reappointment. He said the Council should
have an ongoing right of veto for any major project recommended by the CCDA.
He suggested the CCDA operate routinely with opportunity to seek out expertise,
technical assistance, and have City staff assistance to create design and
conceptual ideas. In summary, Mr. Marr said he concurs with the City Council
COUNCIL MINUTES -APRIL 19, 2005 page 11
serving initially as the CCDA and that the City Council would within a short period
of time (i.e., in the next six months) identify the CCDA and the advisory group. In
response to a question from Councilor Sherwood, Mr. Marr said he would support
forming a separate CCDA before the May 1996 election for public awareness.
Community Development Director Hendryx summarized Council consensus:
• Initially the City Council would serve as the CCDA - the proposed resolution
would indicate that the City Council might, at a future date, transfer the
CCDA responsibilities to another body.
• If the County is successful with a corridor-wide project, the resolution would
indicate that this project might be incorporated with the Downtown Plan.
In response to a question from Mr. Marr, Community Development Director
Hendryx said the ballot title would be limited to the urban renewal plan and tax
increment financing - there would not be any need to make a declaration about
the CCDA.
Councilor Wilson noted he would prefer the City Council not state there would a
CCDA formed that was separate from Council because people might be
concerned about forming another layer of government. He pointed out that it is not
known if the vote will be successful or if the City will be joining the County's effort,
which might mean a different agency would be formed. He suggested keeping the
urban renewal process simple and move ahead step by step.
Councilor Woodruff suggested the City Council start out as the CCDA and then
determine later if the CCDA responsibilities should be separated to non-Council
members. Mayor Dirksen said there should be a specific time frame for transfer to
a different agency as he thought there would be those who are concerned if the
Council is the CCDA.
Interim City Manager Prosser suggested that the CCDA formation be tied to the
Downtown Plan as it is developed.
Additional discussion was held on the timing for CCDA formation, composition,
and timing.
In response to a question from Councilor Harding, Interim City Manager Prosser
advised that in his experience it is common for the governing body of the
jurisdiction to serve as the governing body of the urban renewal agency. The
major exception is the Portland Development Commission. Under budgeting and
accounting rules, the Agency is a subset of the City, which suggests that the
governing body must have the final say. He acknowledged Mr. Marr's concern
about the need for continuity and expertise, but at this stage, Interim City Manager
Prosser would like for options to be explored rather than to set a specific course
COUNCIL MINUTES -APRIL 19, 2005 page 12
only to learn later there are other issues that need to be taken into account. If the
voters approve the urban renewal ballot measure, then whatever is set up will be in
effect for the next 20-30 years. Therefore, in order to stand the test of time,
Council will need to look carefully at the various options to determine what will
work best.
Community Development Director Hendryx said it was important to recognize that
the City Council ultimately approves the plan: projects, priorities, and tax
increment financing. The Agency makes recommendations to the City Council
even if a separate Agency is created. An advisory committee to the CCDA would
also be formed.
Mr. Marr said in his scenario he would expect that CCDA members would have
expertise and then "someone like myself"would be appointed to serve on the
citizens advisory committee.
Councilor Woodruff suggested that the decision on the CCDA be tabled until
September since the consultant would be known by then and the Council will have
the benefit of additional public input.
Mayor Dirksen said at this time the Council will serve as the CCDA. Mr. Marr said
this was agreeable to him as long as the Council keeps the "door open" to
formation of a separate agency for the long-term scenario.
Community Development Director Hendryx noted there is a City Center Advisory
Commission (CCAC) that will need to be established to advise the CCDA on the
plan, project identification, and the public outreach. CCAC is comprised of 7-12
members. Community Development Director Hendryx said the Council needs to
give direction on the makeup of this group. Should the CCAC be made up of
community members at large? Community Development Director Hendryx noted
he could ask for interested community members in the next Cityscape if the City
Council gave him direction tonight. Or, should the CCAC be made up of Planning
Commission or representation from existing board and committee members,
including the Downtown Task Force? Community Development Director Hendryx
said he believed there were benefits to having a wide group of people including
those with special interests: environmental, financial, etc. A selection process
must be set and decided upon by the Council by resolution on June 14, 2005, with
members appointed by the end of June.
In response to a question from Councilor Wilson, Community Development
Director Hendryx advised the CCAC would be involved with the development of
the urban renewal plan, project identification and public outreach. It's role would
be similar to that of the Planning Commission's charge to assist the City Council.
Interim City Manager Prosser said in his experience in Lake Oswego, the Advisory
Committee was utilized to review and make recommendations to the Board about
COUNCIL MINUTES -APRIL 19, 2005 page 13
redevelopment proposals. Community Development Director Hendryx suggested
that some members of the Downtown Task Force be considered to serve on the
CCAC.
Councilor Woodruff said he liked the idea of existing advisory groups serve on the
CCAC along with new people. He suggested membership might be comprised of
three people from the Downtown Task Force and representatives from the
Planning Commission, and then four additional people. He noted the number of
qualified applicants the City receives for vacant board and committee positions.
Councilor Wilson noted that as he reviewed the packet material, he formulated the
idea that the CCDA would be the City Council and the CCAC would be comprised
of technical people. He said there has been the citizen process of forming the
vision and now at the implementation stage, it becomes more technical. He noted
the need for a policy group and the technical group. Councilor Wilson would like to
see continued participation from members from the Downtown Task Force as
those individuals established the vision along with people who have backgrounds
in area such as real estate, development, and finance, etc.
Mayor Dirksen, in response to Councilor Wilson's comments above, said he
thought that what he was hearing from Mr. Marr was that the CCDA would report
to the Council and the CCAC would be the citizen involvement group making
recommendations to the CCDA.
Discussion followed on the makeup of the CCAC with consensus for twelve
members:
6 from the Downtown Task Force (Note: Task Force will select
those to be appointed to the CCAC)
1 from the Planning Commission (Note: Commission will select
member to be appointed to the CCAC)
1 from the Parks and Recreation Board (Note: Board will select
member to be appointed to the CCAC)
4 from citizens at large (Note: Council will use Board/Committee
member appointment process to appoint these at-large
members to the CCAC)
Later subgroups (working groups) could be formed to address and give support for
areas in finance, citizen involvement, and technical issues.
Community Development Director Hendryx advised the final area for which staff
would like City Council to provide general direction is for the public involvement
approach proposed. He reviewed the elements of public outreach and
recommended a survey be conducted in the community to determine how the
community feels about urban renewal to determine what could make this a
COUNCIL MINUTES -APRIL 19, 2005 page 14
successful campaign. Community Development Director Hendryx advised that
community dialogs has proven to be a successful way to get the word out. He
suggested that periodic open houses be held such as the recent one held for the
Downtown Plan. In addition, there will be public hearings to provide the public an
opportunity to review and comment throughout the process. Press releases and
other media events/tools will be utilized. Community Development Director
Hendryx advised he had not yet taken the public involvement proposal for the
urban renewal to CCI. He noted the critical component will be the statistically valid
community survey.
Community Development Director Hendryx advised the schedule provides that a
consultant will be selected on May 24 for the public outreach. He noted that if an
expenditure is under $50,000, it does not need to go before the Local Contract
Review Board; however, he asked whether the Council wanted involvement in
approving the contract - how does City Council want to be involved in the
consultant selection? Two consultants will be selected: one for the urban renewal
plan and one for the public outreach program. Interim City Manager Prosser said
that normally staff would publish the Request for Proposal, go through a selection
process, conduct interviews and make recommendations. If the dollar amount was
of sufficient size, it would come back before the Council (as the LCRB) for
approval of the contract. After discussion, it was determined that the Downtown
Task Force and staff would be involved in the selection of the consultants.
Councilor Sherwood indicated she would like to be involved also (Council liaison).
Council received copies of two charts, which were referred to by Community
Development Director Hendryx during his presentation on this agenda item:
1. Public Involvement and Key Dates
2. Council decisions for April 19th Council meeting
In response to a question from Councilor Sherwood there was brief discussion on
the Highway 217 urban renewal project. Community Development Director
Hendryx advised the County says it can meet the City of Tigard's schedule to
coincide with urban renewal for the Downtown Plan. Interim City Manager
Prosser said that the City Attorney indicated that if Tigard's urban renewal plan is
crafted properly, the City can maintain the option of coordinating with the Highway
217 plan. Councilor Sherwood noted the County is concerned about the viability of
the Highway 217 project if Tigard does not participate. Interim City Manager
Prosser reflected that part of the value of Tigard participating includes the
Washington Square area, which is not part of the Downtown Plan. Interim City
Manager Prosser indicated he was uncertain about the extent of the coordination
that will be required between Tigard and the County. Councilor Wilson said he
would not want the voters to have the perception they were only voting for the
urban renewal area for the Downtown and then later have the Washington Square
area be added.
COUNCIL MINUTES -APRIL 19, 2005 page 15
Community Development Director Hendryx reminded that in order to use tax
increment financing anywhere in Tigard, voters must approve this financing
method. Councilor Wilson suggested there might be one election that
encompasses urban renewal in general, create the agency, and then have multiple
listings. Or, the election might be specific; i.e., only the downtown area. Interim
City Manager Prosser said from the tenor of this discussion, it appears that the
Council is interested in maintaining the option of coordinating with the Highway
217 project. He advised he feels that staff needs to talk to the lawyers to
determine down to the detail how this option can be preserved.
Community Development Director Hendryx advised the purpose of the discussion
for this evening was to review with the Council the process as outlined in the
timelines. He noted activities will be compressed if the plan is to be on the ballot
by May 9, 2006, and he will be returning to the City Council frequently for decisions
as the City moves forward on an urban renewal process. If the Council wants to
continue to support the Highway 217 corridor project, there are a "lot of nuances
associated with that..." Community Development Director Hendryx noted by
Council's direction, staff will continue to have this option remain available with the
details of how this can be done to be "spelled out" as things get fleshed out further.
General consensus of the City Council was that the public involvement and key
dates as presented by staff was acceptable.
6. REVIEW - SOLID WASTE FRANCHISE
Public Works Director Koellermeier presented the staff report on this agenda item.
He was assisted in his presentation by Mr. Chris Bell, a consultant that the City has
retained to make decisions on solid waste issues including rate adjustments. The
purpose of tonight's discussion is to review past solid waste issues and introduce
these issues to City Council members who have not had the opportunity to deal
with solid waste issues. An outline of the overview of solid waste issues is on file
with the City Recorder and includes the following topics:
• Tigard Municipal Code - TMC Chapter 11.04 and Administrative Rules and
Service Standards
• Current System (2003 numbers used)
o Pride Disposal - serves 70% of the City
o Waste Management - serves 30% of the City
• Residential Collection
o This is where the bulk of activity takes place, with almost 11,000
accounts.
• Commercial Collection
o There are about 1,100 commercial accounts
• Drop Box Service
COUNCIL MINUTES-APRIL 19, 2005 page 16
o There are about 6,100 "pulls" per year.
• Annual Franchise Review
o In March of each year, the haulers are required to submit to Tigard a
financial report for the previous year. There is an effort to keep the
profit to the haulers between 8 and 12 percent. If the profits fall
above or below this range, the rate adjustment process is triggered.
The Council will receive this report at its next meeting and a rate
adjustment will be necessary. Staff will be returning to the City
Council to start this process in May 2005.
• Rate Setting
• Changes to the Current System
o Mr. Bell outlined the three Oregon Revised Statutes that- impact the
current and future of solid waste collection in Tigard. He reviewed
these statues which pertain to the Metropolitan Service District, solid
waste and recycling. Every ten years, Metro revises its Solid Waste
Management Plan for the region. The goal is to arrive at a recovery
rate of 64% and Metro has outlined some programs to reach this
goal.
• Getting to 64% Recovery (recycling)
• Potential Programs of Expanded Service for Increased Diversion
o Residential Services
■ Tigard is one of seven or eight jurisdictions in the Metro area
to have fully automated collection. The haulers and City staff
have discussed the idea of expanding that service to recycling
and to have a commingled stream. Glass and oil would be
handled separately, but all other materials would be collected
in a cart. Staff is still trying to decide what they will
recommend for how glass would be recycled for the Council
to consider.
■ Another idea is to possibly provide weekly yard debris
collection.
o Commercial Organic Collection (Food Waste)
■ Metro has implemented a program in Portland with some
success; however other areas in the region have not
participated in such a program.
o Commercial Outreach
■ Metro is attempting to gain more recovery in the commercial
area by expanding its business outreach, mandatory business
recycling, and a landfill ban.
o Metro Model
■ CTAP - a Community Technical Assistance Program -
individuals meet with business under the guidance of PSU
and local government. Presently, this is being administered
by Washington county.
COUNCIL MINUTES -APRIL 19, 2005 page 17
■ Write ordinance with minimum standards and enforce with
notices and fines (relate to mandatory business recycling)
• Objectives of the Tigard Solid Waste and Recycling System
o Mr. Bell noted that Interim Finance Director Imdieke is proposing a
City Recycling Coordinator to work with local business and haulers.
The haulers want to make sure this is a coordinated effort so that
promises are not made that cannot be met.
o The Coordinator would work with the existing programs and
ordinance to provide the outreach to the businesses.
o Tigard was one of the first jurisdictions to provide automated
collection services for cost savings and worker safety. The rates
have been in effect for about four years. Mr. Bell referred to costs
associated with the recycling programs. One of the key elements of
a good recycling program is education.
o Services must be easy to administer by City and haulers.
o Services must be cost effective and sustainable
o Model for the Metro region.
• Policy Direction
The following hauler representatives were present:
• Mike Jeffries - Waste Management, Inc.
• Dean Kampfer - Waste Management, Inc.
• Mike Leichner - Pride Disposal
• Cindy Leichner - Pride Disposal
Councilor Woodruff asked about the costs/benefits of recycling. The revenue from
recycling does not recover costs; the loss is borne by garbage rates. Mr. Bell noted
that recycled materials markets are returning about $70 per residential customer
per month, but the cost of collecting those materials is $4.10. With commingling of
recyclables, haulers are able to pick up materials more efficiently. Mr. Bell
confirmed that Mr. Woodruff's comment that recycling is more a social issue rather
than an economic issue.
Councilor Sherwood asked about the "landfill bans." Mr. Bell explained that this
relates to the potential policy wherein some landfills won't accept certain materials;
i.e., cardboard. He noted the difficulty in administering landfill bans.
Councilor Wilson asked about the rationale behind granting franchises to certain
haulers as opposed to letting it be market driven. He noted he understood there
were certain efficiencies for household pick up but questioned why drop box
services could not be open market. Mr. Leichner said the City controls the
franchise by setting the rates and allowing the haulers to attain a certain rate of
return. As a result, the citizens of the community are receiving a consistent
service. In an open market, there are concerns about consistency of services.
The City is collecting fees (3%) for the services the franchised haulers are
COUNCIL MINUTES -APRIL 19, 2005 page 18
providing. It is to the City's benefit to have solid waste services performed by a
regulated hauler. Councilor Wilson commented there could be other methods for
regulation. Mr. Leichner responded that there is less traffic congestion, impacts to
roads, and a higher level of service associated with a franchised collection system
as opposed to "helter skelter" solid waste collection activity. Interim City Manager
Prosser noted that some services cost more than others, therefore, costs can be
averaged out over all services. What can happen with an unregulated market, is
that companies might come in and "cherry pick" the very profitable accounts and
services, leaving other businesses and residential areas paying high rates. Interim
City Manager Prosser said that Portland used to be unregulated market. There
was continued discussion about franchises and methods to encourage recycling.
In response to a comment by Councilor Woodruff, one of the haulers explained
how areas were set by franchise agreement. Public Works Director Koellermeier
noted that the franchises are "perpetual franchise" agreements. Interim Finance
Director Imdieke explained that initially there were three franchisors in the City of
Tigard - Pride Disposal purchased Schmidt. Mr. Bell noted the City of Sandy
recently put solid waste collection out to bid assuming they could get better rates;
however, they are now paying a higher rate for the same level of service provided
by the franchised service providers. Mr. Bell said that if a jurisdiction has a good
relationship with the hauler(s), he would recommend the City continue to cultivate
that relationship. Mr. Bell said that the service the haulers have given the
community goes beyond the dollar amount on a bill.
Councilor Wilson said he can see that there are good reasons to continue with the
franchise agreement; however, he said he was skeptical about the automatic
renewal of the franchise agreements. He said he was glad to have the haulers in
Tigard, but he would not want the agreement to be taken for granted. There was
discussion about the level of services and the "extras" asked for and provided
under a variety of circumstances. Mr. Bell encouraged staff and Council members
to take a tour of the facilities and collection activities.
Councilor Harding commented on the recycling process and noted her support for
the'cart service for recycling. She commented on the recycling coordinator, which
would be expensive. She noted that there are businesses that shred confidential
papers, which are not accounted for in the recycling numbers. She also noted that
some janitorial services do not cooperate when disposing of materials prepared for
recycling. Mr. Bell acknowledged that this is an issue, especially for large
buildings. Mr. Kampfer also noted that the residential recycling (using the bins)
needs to be updated with a cart system. There was additional discussion on how
to make recycling programs more user friendly.
Mr. Bell distributed a summary report to the City Council on the direction of the
solid waste and recycling system in Tigard. Interim City Manager Prosser noted
that with the hauler reports, the City will be undergoing a rate review. He said that
COUNCIL MINUTES - APRIL 19, 2005 page 19
if the City Council wants to reevaluate services, this would be a good time to do it.
Public Works Director Koellermeier said the staff would return in May with a menu
of options along with some recommendations for City Council consideration.
Council discussed the lateness of the hour and decided to briefly review Agenda
Item No. 7. Item No. 7 will be reviewed in more detail by the Council at a special
meeting to be held on April 25, 2005, 5:30 p.m., in the second floor conference
room at the Tigard Library.
7. DISCUSSION - STRATEGIC FINANCE PLAN ISSUE PAPERS
Interim Finance Director Imdieke reviewed this agenda item. Interim City
Manager Prosser advised that the initial report was prepared by staff last fall.
Since that time, several items listed in the Strategic Finance Plan Issues have
been completed.
Council reviewed with Interim Finance Director Imdieke the list of Strategic finance
Issues to determine which items have been completed and those items that need
more discussion. Mr. Imdieke will prepare updated information for Council's
review on April 25, 2005.
8. COUNCIL LIAISON REPORTS: None
9. NON AGENDA ITEMS: None
10. EXECUTIVE SESSION: Not held.
11. ADJOURNMENT: 10:16 p.m.
Attest: Catherine Wheatley, i Record
Mayor City of Tigard
Date: aO05
COUNCIL MINUTES -APRIL 19, 2005 page 20
F ARD CITY COUNCIL
MEETING
L 19, 2005 6:30 p.m. CITY OF TIGARD
OREGON
IGARD CITY HALL
125 SW HALL BLVD
IGARD, OR 97223
PUBLIC NOTICE:
Anyone wishing to speak. on an agenda item should sign on the appropriate sign-up sheet(s).
If no sheet is available, ask to be recognized by the Mayor at the beginning of that agenda
item. Citizen Communication items are asked to be two minutes or less. Longer matters can
be set for a future Agenda by contacting either the Mayor or the City Manager.
Times noted are estimated; it is recommended that persons interested in testifying be present
by 7:15 p.m. to sign in on the testimony sign-in sheet. Business agenda items can be heard
in any order after 7:30 p.m.
Assistive Listening Devices are available for persons with impaired hearing and should be
scheduled for Council meetings by noon on the Monday prior to the Council meeting.
Please call 503-639-4171, ext. 2410 (voice) or 503-684-2772 (TDD -
Telecommunications Devices for the Deaf).
Upon request, the City will also endeavor to arrange for the following services:
• Qualified sign language interpreters for persons with speech or hearing impairments;
and
• Qualified bilingual interpreters.
Since these services must be scheduled with outside service providers, it is important to allow
as much lead time as possible. Please notify the City of your need by 5:00 p.m. on the
Thursday preceding the meeting by calling: 503-639-4171, ext. 2410 (voice) or 503-
684-2772 (TDD - Telecommunications Devices for the Deaf).
SEE ATTACHED AGENDA
COUNCIL AGENDA -APRIL 19, 2005 page 1
AGENDA
TIGARD CITY COUNCIL MEETING
6:30 PM
1. WORKSHOP MEETING
1.1 Call to Order - City Council & Local Contract Review Board
1.2 Roll Call
1.3 Pledge of Allegiance
1.4 Council Communications & Liaison Reports
1.5 Call to Council and Staff for Non-Agenda Items
6:35 PM
2. UPDATE - COMMUNICATION/CITIZEN INVOLVEMENT
• Staff Report: Administration Staff
7:05 PM
3. JOINT MEETING - COMMITTEE FOR CITIZEN INVOLVEMENT
• Staff Report: Community Development Staff
7:25 PM
4. REVIEW - POLICIES AND PRACTICES FOR ACQUIRING PARK LAND AND
OPEN SPACES
Staff Report: Public Works Staff
7:55 PM
5. DISCUSSION - URBAN RENEWAL PROGRAM ELEMENTS
• Staff Report: Community Development Staff
8:55 PM
6. REVIEW - SOLID WASTE FRANCHISE
• Staff Report: Public Works Staff
9:55 PM
7. DISCUSSION - STRATEGIC FINANCE PLAN ISSUE PAPERS
• Staff Report: Finance Staff
COUNCIL AGENDA -APRIL 19, 2005 page 2
8. COUNCIL LIAISON REPORTS
9. NON AGENDA ITEMS
10. EXECUTIVE SESSION: The Tigard City Council may go into Executive Session. If
an Executive Session is called to order, the appropriate ORS citation will be
announced identifying the applicable statute. All discussions are confidential and
those present may disclose nothing from the Session. Representatives of the news
media are allowed to attend Executive Sessions, as provided by ORS 192.660(4),
but must not disclose any information discussed. No Executive Session may be held
for the purpose of taking any final action or making any final decision. Executive
Sessions are closed to the public.
10:15 PM
11. ADJOURNMENT
I: tadmlcathy%wa12005%050419.doc
COUNCIL AGENDA -APRIL 19, 2005 page 3
AGENDA ITEM # 2
FOR AGENDA OF April 19, 2005
CITY OF TIGARD, OREGON
COUNCIL AGENDA ITEM SUMMARY
ISSUE/AGENDA TITLE UPDATE - COMMUNICATION/CITIZEN INVOLVEMENT
PREPARED BY: Liz Newton DEPT HEAD OK_ CITY MGR OK
ISSUE BEFORE THE COUNCIL
Update Council on the City's communication and Citizen Involvement Programs and offer direction on future
communication efforts and use of resources.
STAFF RECOMMENDATION
Review the attached memo from Liz Newton presenting communication achievements. Provide direction
regarding the Focus on Tigard program and clarify the purpose of the Cityscape. Also review the CCI's
recommendations on an expanded neighborhood program and provide direction on how to proceed.
INFORMATION SUMMARY
A memo is attached that summarizes the City's communication programs and outlines the CCI's recommendation
for an expanded neighborhood program. The memo includes a recommendation to consider discontinuing
production of the Focus on Tigard program and asks for clarification of the purpose for the Cityscape newsletter.
In addition, the CCI's recommendations for an enhanced neighborhood program are outlined. Members of the CCI
will attend the Council meeting to offer comments on their recommendations.
OTHER ALTERNATIVES CONSIDERED
None
VISION TASK FORCE GOAL AND ACTION COMMITTEE STRATEGY
Communication Goals
#1) Citizen Involvement opportunities will be maximized by providing educational programs on process,
assuring accessibility to information in a variety of formats, providing opportunities for input on community
issues, and establishing and maintaining a program of effective two-way communication.
Volunteerism Goals
#1) City will maximize the effectiveness of the volunteer spirit to accomplish the greatest good for our
community.
ATTACHMENT LIST
1. Memo from Liz Newton
FISCAL NOTES
No fiscal impact. c\adm\chy coonciRcouncil agenda item summaries\2005\ais for update communication -citizan involvement progr.doc4/5105
MEMORANDUM
Administration
CITY OF TIGARD
Shaping a Better Community
TO: Honorable Mayor and City Council
FROM: Liz Newton, Assistant to the City Manager
DATE: April 4, 2005
SUBJECT: Update on City's Communication and Citizen Involvement Programs
The City Council's focus for 2005 is to address three key areas. Overlaying
specific actions taken in each of these areas is a commitment to seek more community
involvement, tie actions to the Vision Task Force goals and strategies, enhance the
appearance of the City, and measure results. This memo provides an update on the
City's communication program designed to encourage citizen's involvement in
community issues.
Focus on Tigard
Over the last 6 months, Focus on Tigard topics have included the CIP process, Citizen
Involvement, the Tigard Beyond Tomorrow Goal Update, the Downtown Plan, a Parks
Update and Budgeting 101.
As noted in the October 2004 report to Council, just over 4% of the recent Tigard
Beyond Tomorrow survey identified cable programming as the most effective way to get
information about City events and issues. Currently cable programming includes Focus
on Tigard, City Council meetings and an occasional special production. The audience
for cable programming does not appear to have increased over the last 7 or 8 years.
The City does not incur additional costs to air the City Council meetings. Staff
presentations are prepared whether or not the meetings air on cable. On the other
hand, it's estimated that 25-30 hours of staff time goes into the Focus on Tigard
program. This includes time to prepare the announcements and Focus presentation
and set up and tape the show.
As you know, MACC has not renewed its contract with TVTV and beginning July 1 will
assume responsibility for cable access programming. I understand government
programming will be increased.
Now is an opportune time to reconsider how the City uses cable television as a
communication tool. Staff recommends that MACC conduct a survey to determine what
types of government programming viewers find most effective for getting information
about municipal issues. If it's determined that City Council meetings are significantly
Communication Update 4/19/05 1
"more popular" than Focus on Tigard, staff recommends that Focus be discontinued and
resources be focused on Council meetings and other public meetings and events. Staff
would investigate the possibility of editing some Council presentations to air as stand-
alone programs. The monthly Focus announcements could air on the TVTV Bulletin
Board. Staff would still have the opportunity to produce cable programming for specific
topics. In addition, Planning Commission and Hearings Officer meetings could be aired.
Communications Plan
Staff is being encouraged to incorporate communications plans into all major programs
and projects, especially the implementation of Council Goals. The Department
Communicators meet every other month to exchange ideas on effective (and
ineffective) communication tools and help monitor the overall effectiveness of the
Communication Plan. The Citywide Communication Plan serves as a "how to" for staff
on using a variety of tools effectively and will be reviewed over the next few months and
amended as appropriate.
Press Releases
During the first quarter of 2005, 80% of press releases issued were published. Press
Releases continue to be an effective communication tool for announcing meetings and
policy decisions. Text from a press release can be used in a Cityscape article, an item
in the Community Connector communication or posted on the City's website.
Community Connectors
Three new Community Connectors have been added since October. A focus of the
enhanced Community Connector program will be to ensure there is at least one
Community Connector in each neighborhood who will serve as the "information
connection" from the City to the neighborhoods.
Cityscape:
Cityscape continues to be a popular communication tool with 28% of the respondents to
the recent Tigard Beyond Tomorrow survey identifying it as the most effective way to
get information.
Proposed Enhanced Community Connector/Neighborhood Program
Background:
At their October 19, 2004 meeting, Council concurred with the basic concept to create a
neighborhood program based on geographic areas divided by common interests such
as school attendance areas, major streets, proximity to parks and commercial service
areas (minutes attached.)
As a result of the 2004 Tigard Beyond Tomorrow Vision Update process the Community
Character and Quality of Life Action Committee included an action plan item for 2005
that reads:
"Develop and implement an enhanced citizen involvement program which may
include re-invigorated neighborhood associations encouraging interactions which are
led by citizens within 12 months."
The Community for Citizen Involvement (CC[) has been discussing the expanded
neighborhood concept at their meetings a since last July. The members hosted two
open houses to get input from citizen, one in December and one in March. In addition,
Communication Update 4/19/05 2
CCI member Basil Christopher and City Planner Duane Roberts solicited input from
about 50 people at the Library on the proposed concepts on March 5.
Recommended Concept:
At their March 17 meeting, the CCI members discussed the feedback they had received
and agreed on a proposed concept for Council consideration.
The proposed neighborhood boundaries would follow elementary school district
boundaries further divided by major streets. There are six elementary schools that
serve Tigard residents. A portion of Tigard is served by the Beaverton School District.
If each area is divided in two, there would be 14 neighborhoods. Further evaluation of
each area to balance population and number of households may lead to variations.
The proposed purpose of the neighborhoods would be to provide increased
opportunities for citizens to be involved in community issues and connect with the city
and other citizens to address concerns. The program would be based on those
connections so that as issues arise in the neighborhood the connections care in place3
to address the issues.
Ideally, active neighborhoods would have at least 50% of the area covered by
Neighborhood Watch and Community Connectors. There would be at least one person
trained in the City's CERT program. One person would be identified and trained to
serve as the contact for land use issues and attend neighborhood meetings on
development applications. Someone would serve as a liaison to the schools connecting
the student needs, volunteer opportunities and resources to the neighborhood. Another
person could serve as the CAP liaison to work with the City and neighborhood to
address issues raised through the assessment program. Another could be the
neighborhood representative to the CCI.
Each neighborhood would also host at least one neighborhood clean-up or
beautification project every year with one or two at-large positions. It is envisioned that
each neighborhood would have a Steering Committee made up of the individuals that
serve in those roles identified above. The Steering Committee meetings would provide
an opportunity for all residents of the neighborhood to bring forward issues. It would
also provide an opportunity for the Steering Committee members to connect with
citizens regarding their area of responsibility.
Each active neighborhood would be required to hold at least one annual meeting with
notice provided to everyone. The annual meeting would be timed to coincide with the
City's CIP process and provide the opportunity for each neighborhood to nominate
projects for consideration. In addition, Steering Committee members would be
selected.
It is also envisioned that active neighborhoods would be eligible for grants for
neighborhood projects. The funding and grant criteria would be approved by City
Council with input from the neighborhood. Ideally, neighborhoods would be able to post
information about their activities on the City's webpage.
Communication Update 4/19/05 3
It is anticipated that the connections made through the neighborhood program would be
beneficial when addressing community issues. Members of the Steering Committees
could be assembled to provide feedback or input on a variety of topics.
Next Steps:
If the Council accepts the concept recommended by the CCI, a pilot program would be
initiated July 1. The boundaries would be further refined and 3-4 neighborhoods
identified to work through the details and "test" the concept. Adjustment would be made
as appropriate. A report would be made to the Council at the end of the year with kick-
off of the new program in January 2006.
i:XadmUiz\memostmemo to mayorcouncil-update on communication-citizen involvement.doc,$6/05
Communication Update 4/19/05 4
DRAFT di-S ri btc
Dear ;
The City of Tigard is interested in retaining the services of a graphic designer to develop
a graphic identity/branding system for the city. You are invited to submit a proposal.
Purpose:
The existing Tigard logo was not professionally designed and is now over 25 years old.
The City's stationery and other graphic material has been produced piecemeal over the
years as needed, mostly in-house.
Since Tigard's incorporation in 1961, it has grown from an ex-urban farming community
to Oregon's eleventh largest City. Both the physical landscape and demographics have
changed dramatically since the logo was first conceived. In the farming community that
most Tigard residents do not remember, families knew each other. Activities revolved
around the center of town where the high school and commercial areas were located.
As urban growth has overtaken Tigard, it has lost its identity as cities have grown
together; the commercial centers have spread along the arterials and social structures
have grown more complex and anonymous.
In 1997 the City began a visioning program called "Tigard Beyond Tomorrow".
The purpose of the program is to develop aspirations about the kind of place Tigard will
become in the future. One of the themes is to promote and protect Tigard's individual
identity and quality of life. It has become apparent that the City has a need to re-
establish an identity that has been lost and to re-brand itself as its image has been
tarnished by a congested highway strip. Tigard desires to re-build its commercial core
and to create a unique village that is vibrant and attractive. It is hoped that a new ,
core will be the impetus for revitalization of surrounding neighborhoods and create a
positive and memorable image for the entire City. This project is a first small step to
rebuild the City's image into what we believe the City can become. We would like a
modern logo with a memorable and very attractive design that represents our core
values. It should anticipate what the City will become rather than recalling the past or
reflecting the current conditions. In addition, we would like this effort to be the
beginning of a branding program that is capable of transcending the printed page. We
would like to begin with a series of entry monuments to the City. The project should
suggest forms, construction materials and a sense of style. This, and other ongoing
efforts, will begin to establish design themes for Tigard that will eventually transform the
City's image.
Background:
The Tigard City Council has adopted three goals for 2005. Goal #3 is "Address
Growth". One of the elements of that goal is graphic identity/branding to include
signage, a new logo and stationary.
DRAFT
• DRAFT
It's important to note that the graphic identity/branding system will direct future
decisions. Council members and staff decisions should be tied to the graphic identity/
branding system that reflects the City's primary values.
Tigard has just completed its sixth year of the 20-year Tigard Beyond Tomorrow Vision
process, working toward the community's long-term goals. In 2004 the Citizen Vision
Task Force worked with the community to update the Vision goals. Members of the
Task Force met in February to brainstorm themes and values that might be captured in
a new City logo. Those suggestions were presented to City council for review and the
list of suggestions is attached as an exhibit to this letter.
Program Elements
Successful graphic identity/branding systems for the City will:
• Represent and appeal to the whole community
• Stand the test of time, not be too trendy in design
• Transfer easily to different formats (signs, letterhead, website)
• Reflect the community's values
The graphic identity/branding system will serve as the City's corporate identity and will
be used on:
• Letterhead
• Signs
• The Website
• Informational brochures/newsletters
• Business cards
• Cable television
Project Submittals:
Project submittals shall address the following:
• A description (no more than two three typed pages) of your proposed
approach to develop a graphic identity/branding system for the City.
Please address the process you propose to identify values and key
elements; including at least one discussion with Council members.
• Samples of one to three (1-3) graphic identity/branding systems you have
developed, preferably for public non-profit entities. Include stationery
system lege;-letterhead and sign designs.
• A cost proposal to develop designs and camera-ready art for a stationery
system lege, letteFand design intent drawings for monument
signs s+gr~pregrarn. The sign program designs should include a materials
listing.
Selection Process:
The City Council will review all submissions and select finalists to make a presentation
to the full Council.
If you have questions, please contact Assistant to the City Manager, Liz Newton at 503-
718-2412.
DRAFT
► D1LAFT
All submittals must be received by 5pm Wednesday, May 4, 2005 Monday, May 1,
2005 to Joe Barrett, Purchasing Agent
City of Tigard
13125 SW Hall Blvd.
Tigard, OR 97223
lAadmVizVetterslbrsnding solicitation Ietter050401.doc4/1/05
DRAFT
AGENDA ITEM # J
FOR AGENDA OF 4/19/05
CITY OF TIGARD, OREGON
COUNCIL AGENDA ITEM SUMMARY
ISSUE/AGENDA TITLE Committee for Citizen Involvement Joint Meetin with Council
PREPARED BY: Duane Roberts DEPT HEAD OK
(TN MGR OK
*&Ji 0
ISSUE BEFORE THE COUNCIL
This Council's first annual joint meeting with the newly-formed Committee for Citizen Involvement.
STAFF RECOMMENDATION
Not applicable.
INFORMATION SUMMARY
Under the Statewide Planning Goals and Guidelines (Goal #1), all jurisdictions are required to have a
program for citizen involvement. Tigard's Comprehensive Plan identifies the Citizen Involvement Team
facilitators as the City's Committee for Citizen Involvement (CCI). The City's CCI had become inactive in
recent years. Membership consisted of only four members. In January, Council adopted a resolution both
broadening the role of the CCI and increasing membership to include representation from each of the City's
active boards and committees.
The CCI has been charged in evaluating all City communication and public involvement activities. Recent
agenda topics have included how to make the City's webpage more user-friendly, Goal 5 natural resource
protection public outreach, and the design of the newly proposed Neighborhood Program.
The CCI meets bi-monthly with its most recent meeting being held on March 17, 2005. The joint meeting
with Council is an opportunity for CCI and Council members to discuss the new Neighborhood Program and
other citizen involvement and communication topics.
OTHER ALTERNATIVES CONSIDERED
N/A
VISION TASK FORCE GOAL AND ACTION COMMITTEE STRATEGY
Community Character and Quality of Life; Communication Goals, #1- Citizen involvement opportunities
will be maximized by providing educational programs on process, assuring accessibility to information in a
variety of formats, providing opportunities for input on community issues, and establishing and maintaining a
program of effective two-way communication.
ATTACHMENT LIST
Attachment # 1: A Resolution Expanding the Membership of the Committee for Citizen
Involvement to include Representatives from the City's Active Boards and
Committees and from Future Neighborhood Organizations
FISCAL NOTES
N/A
l:\Irpln\council materials\4-19-05 CCI joint mtg.doc
CITY OF TIGARD, OREGON
RESOLUTION NO. 05- C. )
A RESOLUTION EXPANDING THE MEMBERSHIP OF THE COMMITTEE FOR CITIZEN
INVOLVEMENT TO INCLUDE REPRESENTATIVES FROM THE CITY'S ACTIVE BOARDS AND
COMMITTEES AND FROM FUTURE NEIGHBORHOOD ORGANIZATIONS
WHEREAS, citizen involvement and two-way communication with its citizens is highly important to the
City of Tigard; and
WHEREAS, State law requires the City to maintain a citizen involvement program that insures the
opportunity for citizens to be actively involved in the land use process; and
WHEREAS, the Committee for Citizen Involvement (CCI) is the City's primary public involvement body
for land use issues; and
WHEREAS, the Committee's purview has been broadened to include both land use and the broad array of
non-land use public involvement and conununication issues; and
WHEREAS, the Council in 1993 created the Citizen Involvement Teams; and
WHEREAS, the Tigard Comprehensive Plan Policy 2.1.2.c designates the Citizen Involvement Team
Facilitators as the City's Committee for Citizen Involvement; and
WHEREAS, the Citizen Involvement Teams are no long active; and .
WHEREAS, the Citizen Involvement Team facilitators are designated as the City's CCI; and
WHEREAS, of the original eleven members, the Committee currently includes only active four members;
and
WHEREAS, the City desk-es to broaden the Committee's membership to include individuals broadly
representative of the City's geographic areas and diverse interests and perspectives,
NOW, THEREFORE, BE IT RESOLVED by the Tigard City Council that:
i SECTION 1: The City of Tigard Committee for Citizen Involvement shall be expanded to include one
representative of each active board and committee.
SECTION 2: The City of Tigard Committee for Citizen Involvement can be expanded to include
representatives of future Neighborhood Organizations officially recognized as such by the
City of Tigard.
RESOLUTION NO. 05 -
Page 1
SECTION 3: This resolution is. effective immediately upon passage.
PASSED: This day of 48AJWJL~J-2005.
-4~~ e
Mayor - ity of Tigard
ATTEST:
City Recorder - City of Tigard
1.Uft%paWt VSW msolutkmAw
- ~1
RESOLUTION NO. 05
Page 2 l
AGENDA ITEM # 4
FOR AGENDA OF 4/19/05
CITY OF TIGARD, OREGON
COUNCIL AGENDA ITEM SUMMARY
ISSUE/AGENDA TITLE Review of Policies and Practices for Acquiring Park Land and Open Space.
PREPARED BY: Dan Plaza, 2590 DEPT HEAD OK 41L~_ CITY MGR OK
ISSUE BEFORE THE COUNCIL
1) Does the City have the authority to purchase land outside the City limits?
2) What is the City's policy/practice on purchasing land outside the City limits?
3) Is the granting of SDC credits an administrative act or a matter for Council?
4) Discussion of criteria matrix to evaluate park and open space dedications by developers.
STAFF RECOMMENDATION
Review the attached policy issues regarding park and open space acquisition and give direction to staff.
INFORMATION SUMMARY
In response to the 2005 Council Goal (to identify and acquire park land and open space), staff has reviewed current
policy positions of the City to ascertain if current policy supports the Council's goal to acquire land. The four above
mentioned issues were identified and staff requests discussion and direction by Council.
Attached is a copy of an opinion rendered by the City Attorney's office pertaining to the issues. Issue one, the City
Attorney opined that the City has the authority to purchase land outside the city limits.
Issue two relates to the practice of past Council's of not purchasing land outside the city limits. On this issue staff
is requesting direction from the council. Does Council want to continue the past practice of not purchasing
property outside the city limits or does the Council want to authorize staff to pursue the acquisition of park and
open space land outside the city limits, but within the UGB and/or the expansion areas?
The third issue deals with the mechanism of authorizing park SDC credits in exchange for land dedicated to the city
by developers. Again, the City Attorney opined that SDC credits are normally granted as an administrative matter
without the approval of Council. Staff wants to discuss this matter with the Council and confirm their desire to
keep this an administrative function at this time.
Lastly, staff has been in contact with several developers who currently are preparing proposals to the Public Works
Department to either directly donate land or to seek park SDC credits as compensation for the public dedication of
park land or open space. To process these requests, staff has developed a criteria matrix to evaluate these types of
proposals. If the Council concurs with the attached criteria, staff will begin processing these proposals to prepare
recommendations and present them to the Council for action.
OTHER ALTERNATIVES CONSIDERED
n/a
VISION TASK FORCE GOAL AND ACTION COMMITTEE STRATEGY
2005 Council Goal (Identify and acquire park and open space)
ATTACHMENT LIST
1) Staff Memo dated 3/29/05
2) City Attorney memo dated 3/28/05
3) Staff draft criteria matrix
FISCAL NOTES
n/a
MEMORANDUM
TO: Craig Prosser
FROM: Dennis Koellermeier
RE: COT Purchasing Land Inside or Outside the City Limits
DATE: March 29, 2005
History:
The position (practice, if you will) of past Councils has been to not purchase or develop
property outside the city limits using City funds. The City's urban services agreement
with Washington County sets forth that Tigard will be the park and recreation service
provider in areas such as unincorporated Bull Mountain.
The impact of the Council's position or practice not to purchase or develop
property outside the City limits using City funds are:
- no land has been purchased/developed on Bull Mountain
- no land has been purchased/developed in the UGB or beyond
- no land has been purchased/developed in identified areas where growth is
to occur
- COT is currently deficient in parks (26.31 acres) and open spaces (28.06 acres)
Current Situation
The Council has adopted a 2005 Council Goal aimed at "Addressing Growth" with an
objective being to "Identify and purchase parks and open space". Several questions
needed legal counsel attention and they are as follows:
1) Can the City purchase property outside the City limits, and, if so would there be any
limitations as to where the property is? For example, can it be within the UGB, or the
urban services area, or anywhere the City wishes to purchase land?
In regard to this question, Gary Firestone states:
"ORS 223.005(2) gives cities the authority to "appropriate any real property
to any public or municipal use or for the general benefit and use of the
people within or without the city." The City therefore has express statutory
authority to acquire land anywhere for public or municipal purposes. While the
City may acquire land anywhere, it is constrained by applicable land use laws,
like any other landowner."
2) What is the Council's policy/position/practice on purchasing land outside the City
limits? The Council's policy/position/practice has been to not purchase or develop
property outside the City limits using City funds.
In regard to this question, Gary Firestone's states:
"We believe that "policy" and "practice" should be distinguished. A policy
requires some action by the Council (at minimum, a statement made by a majority
of the Council members). We believe that the City has had a practice of not
acquiring land for parks outside the City, but are unaware of any policy to that
effect.
The fact that the Council has accepted a Park SDC calculation that includes
a CIP with land outside the City does not necessarily establish a policy regarding
the purchase of park lands outside the'City. Annexation of the designated parks
sites is possible, either before or at the same time as the parks acquisition.
. As we discussed, it would be appropriate to seek direction from the
Council as to whether the Council wishes acquisition of park lands outside the
City limits to proceed without regard to when the property may be annexed."
Gary Firestone was also asked the following question:
Is the grantinq of SDC credits an administrative act or a matter for Council?
In regard to this question, Gary Firestone's states:
"The code does not specify the procedures for granting credits. However,
SDC credits are normally granted as an administrative matter without the need for
Council approval. Given that the code authorizes the credits, it would be
appropriate for credits to be granted administratively, at least under most
circumstances."
RECOMMENDATIONS:
1) Present this information to Council during the upcoming April 19, 2005, Council
meeting.
2) Seek Council direction on whether or not the Council wishes to purchase land
outside the city limits.
3) Seek Council direction on whether or not they want to make final decisions re:
Granting SDC credits to developers, or do they want to leave it as an
administrative function.
RAMIS MEMORANDUM
CREW
CORRIGAN & To: Dan Plaza, Parks Director, City of Tigard
BACHRACH, LLP
From: Gary Firestone, City Attorney's Office
ATTORNEYS AT LAW Date: March 28, 2005
1727 N.W. Hoyt Street
Portland, Oregon 97209 Re: Land Purchases; SDC Credits
(503) 222-4402
Fax: (503) 243-2944
ISSUES
1. Does the City have authority to purchase land outside the City limits?
2. What is the City's policy on purchasing land outside the City limits?
3. Is the granting of SDC credits an administrative act or a matter for council?
ANSWERS
1. ORS 223.005(2) give cities the authority to "appropriate any real property to
any public or municipal use or for the general benefit and use of the people within or
without the city." The City therefore has express statutory authority to acquire land
anywhere for public or municipal purposes. While the City may acquire land anywhere,
it is constrained by applicable land use laws, like any other landowner.
2. We believe that "policy" and "practice" should be distinguished. A policy
requires some action by the Council (at a minimum a statement made by a majority of the
Council members). We believe that the City has had a practice of not acquiring land for
parks outside the City, but are unaware of any policy to that effect.
The fact that the Council has accepted a Park SDC calculation that includes a CIP
with land outside the City does not necessarily establish a policy regarding the purchase
of park lands outside the City. Annexation of the designated parks sites is possible, either
before or at the same time as the parks acquisition.
As we discussed, it would be appropriate to seek direction from the Council as to
whether the Council wishes acquisition of park lands outside the City limits to proceed
without regard to when the property may be annexed.
3. The code does not specify the procedures for granting credits. However, SDC
credits are normally granted as an administrative matter without the need for council
approval. Given that the code authorizes the credits, it would be appropriate for credits to
be granted administratively, at least under most circumstances.
Criteria to be used in determining whether the City is willing to accept land
being donated to the City by a land owner/or by a developer in lieu of SDC's
Location: Scale of 1-5 / address Scale 1(poor) to 5 (good)
Suitable Size: 1-5 / what is acreage
Accessibility: 1-5
Visibility: 1-5
Clear Title: Yes/No
Linkage: Yes/No/Describe
Able to be developed: Yes/No
Utilities: Yes/No/List
Useability: 1-5 (active park/greenway/trail/site expansion)
Cultural Significance: Yes/No/Describe
Unique Site: Trees/Wetlands/etc Yes/No/Describe
Adverse Impact on Maintenance: Yes/No/Describe
Liability, if any, of taking on the property: Yes/No/Describe
Will land be protected anyway by land use regs/etc. Yes/No/Describe
Is an initial intake City investment needed, e.g. fencing/clean-up/$$-estimate
Is the land involved in a mitigation situation, Yes/No/Describe
Does the land comply with PSMP (deficiency/park level of service standard/etc.)
PROCESS: When the City is offered a land donation the property owner must
provide the City with a letter setting forth what it is they are proposing. The
land owner must attach the following to the letter: 1) plat of the property, 2) lot
map, 3) topographic map, 4) acreage, 5) document showing clear title, 6) utilities,
7) any known uniqueness of the property (cultural/trees/wetlands/floodplain/etc.) and
8) all pertinent information/calculations related to a request for Parks SDC credit.
If donation offers are initiated within the Engineering or Community Development
Department it is essential that the Parks Division be notified immediately so
this criteria analysis can be completed and a recommendation be made to
City Council on whether they should accept the land donation or not, and if
applicable, award SDC credits.
AGENDA ITEM # 5
FOR AGENDA OF April 19, 2005
CITY OF TIGARD, OREGON
COUNCIL AGENDA ITEM SUMMARY
ISSUE/AGENDA TITLE Discuss Urban Renewal Plan Elements
PREPARED BY: Jim Hendryx DEPT HEAD OK' CITY MGR OK
U) J_
ISSUE BEFORE THE COUNCIL
Provide direction on: 1) governance of the urban renewal plan; 2) concurrence on public outreach for the urban
renewal plan; and 3) continuing support of the Hwy. 217 Corridor Revitalization Project.
STAFF RECOMMENDATION
Provide direction on how to proceed with key aspects of establishing an urban renewal effortowithin the City,
leading to an election in May, 2006.
INFORMATION SUMMARY
Council established a 2005-06 goal for completing and implementing the Downtown Improvement Plan. Urban
renewal is a tool identified to carry out this goal.
Tigard's Charter and the Tigard Municipal Code (TMC) require voter approval for urban renewal and the use of tax
increment financing. In order to meet Council's goal of placing the matter before the voters in May of 2006,
specific direction is needed.
The TMC identifies the City Council as functioning as the Urban Renewal Agency (City Center Development
Agency). Council needs to provide direction on whether they want to serve in this capacity or assign the
responsibility to some other body. The TMC also establishes a 7-12 member Advisory Commission (City Center
Advisory Commission) charged with assisting and advising the Urban Renewal Agency. Direction is needed on
the composition of the Advisory Commission and its selection process.
Public outreach will be a key component in the effort to establish an urban renewal district within the City. To this
effort, Council approved a RFP to obtain consultant services to assist in developing a public outreach program.
The citizen involvement program utilized with development of the Downtown Improvement Plan has been
effective in engaging the community. Such an approach is envisioned with the urban renewal effort. Council
direction is requested on the generalized approach for public outreach.
Washington County, Beaverton, Tigard, Tualatin Valley Fire & Rescue, and Tualatin Valley Park and Recreation
District have been evaluating the feasibility of establishing a Revitalization District (Urban Renewal District) along
the Hwy. 217 corridor, to include Downtown Tigard. Tigard's continued involvement is essential to the success of
this effort. Direction is needed on Council's support to the corridor-wide project.
OTHER ALTERNATIVES CONSIDERED
1. Delay proceeding at this time, postponing election until November, 2006 or later.
2. Participate in the Hwy. 217 Corridor Revitalization Project, potentially delaying an election on urban
renewal until after the May, 2006 election
VISION TASK FORCE GOAL AND ACTION COMMITTEE STRATEGY
Community Character and Quality of Life/Central Business District Goal #1, Provide opportunities to work
proactively with Tigard Central Business District Association (TCBDA) businesses and property owners and
citizens of Tigard to set the course for the future of the central business district.
ATTACHMENT LIST
Attachment 1: Memo to Council dated April 5, 2005 - Urban Renewal
FISCAL NOTES
Council has consented to using consultant services to prepare a public outreach program and develop an urban
renewal plan. Combined costs for these are estimated to be $80,000, which would be paid from the General
Fund.
CITY OF TIGARD
Community Development
Shaping A Better Community
MEMORANDUM
CITY OF TIGARD
TO: Mayor and City Council
FROM: Jim Hendryx
DATE: April 5, 2005
SUBJECT: Urban Renewal
Council established a 2005-06 goal of completing and implementing the Downtown Improvement
Plan. Urban renewal is a tool that was identified to carry out this goal. At its March 8, 2005 study
session, Council provided direction to proceed with requesting proposals (RFPs) from consultants
to assist with a public outreach program and development of an urban renewal plan. Council
approved, by consent, two RFPs on April 12, 2005.
Tigard's Charter and the Tigard Municipal Code (TMC) require voter approval for urban renewal
and the use of tax increment financing. In order to meet Council's goal of placing the issue before
the voters at the May, 2006 election, a compressed timeline is required.
Governance
The TMC identifies that the City Council functions as the City Center Development Agency (Urban
Renewal Agency). Council needs to decide whether they intend to function as the City Center
Development Agency. If not, direction needs to be provided to 1) amend the TMC to provide for
another structure to carry out those functions; 2) determine the composition of who would carry out
the functions of the Urban Renewal Agency, and; 3) determine the selection process for the
agency and reporting functions. Other structures and the role of governance can be considered.
The TMC identifies a City Center Advisory Commission made up of 7-12 members. The
Commission is responsible for advising the City Center Development Agency on the plan, projects
identified in the plan, and public outreach. Council must determine the makeup of the
Commission. It can be made up any number of ways, including 1) entirely of members from
throughout the community and/or stakeholders (e.g., environmental, financial, etc.); 2) combination
of citizens at large and members of the Downtown Task Force and/or Planning Commission; or 3)
any other makeup chosen by Council. Direction is needed in order to proceed with the selection
process. Council's direction will establish the procedures for recruitment and appointment and its
involvement in the process.
1ACDADMUERREE\Agenda Sum\4-19-05 Urban Renewal Plan Attachment I.doc
As noted, the size of the City Center Advisory Commission is 7-12 members, however, the TMC is
silent with regard to workgroups that can support the Commission's efforts. The Commission is
responsible for assisting and advising the City Center Development Agency. Broadening the base
of support to assist the Commission by providing for working groups would enhance the level of
citizen involvement and public outreach. Direction should be given to allow the Commission to
form working groups to support their efforts.
Public Outreach
Public outreach is a critical aspect of the effort of developing an urban renewal plan and, in
Tigard's case, voter approval. To this effort, Council approved a RFP to obtain consultant services
to assist in developing a public outreach program. The citizen involvement program utilized with
development of the Downtown Improvement Plan has been effective in engaging the community.
Such an approach is envisioned with the urban renewal effort.
Highway 217 Corridor Revitalization Project
As Council is aware, Washington County, Beaverton, Tualatin Hills Park and Recreation District,
Tualatin Valley Fire & Rescue District, and the City of Tigard have been evaluating the feasibility of
forming an urban renewal district for revitalization of the Hwy. 217 corridor from Hwy. 26, to include
Downtown Tigard. Tigard's action to proceeding with development of an urban renewal plan
focusing on the Downtown for a May, 2006 election provides some level of uncertainty to the larger
corridor revitalization project.
Council has indicated that the effort on the Downtown should proceed; however, if feasible, it
should be coordinated with the broader efforts of revitalizing the larger Hwy. 217 project. Council's
support for the larger corridor revitalization project is essential for that project to continue
regardless of the schedule for Tigard's Downtown. While Council has been individually briefed on
the Hwy. 217 Corridor Revitalization Feasibility Project, formal discussion has not occurred.
Without Tigard's involvement, especially with the Washington Square Regional Center and its
surrounding areas in Beaverton and unincorporated Washington County, this effort will most likely
be terminated. Council's support on this issue is needed for the Hwy. 217 corridor-wide
revitalization effort to continue. It will take a great deal of effort to coordinate Tigard's urban
renewal project leading to a May, 2006 election with the larger project.
Conclusion
In conclusion, to meet the critical timeline leading to a May, 2006 election on urban renewal for the
Downtown, several decisions must be made:
1. Governance
- makeup of the City Center Development Agency
- composition and selection process for the 7-12 member City Center Advisory Commission
2. Public Outreach
- generalized direction for the public involvement process
3. Highway 217 Corridor Revitalization Project
- continued support for the Hwy. 217 Corridor Revitalization Project
I:\CDADMUERREE\Agenda Sum\4-19-05 Urban Renewal Plan Attachment l.doc
Public Involvement and Key Dates.
2005 2006
April May June July Aug. Sept Oct Nov Dec Jan Feb. Mar April May
Urban Renewal Plan consultant
Council Council works on Urban Renewal Plan with
provides formalizes City Center Development Agency
direction on direct and
public member
outreach selection
elements process
City Center Advisory Committee raft plan and
Consultant s and City Development Agency recommendation forwarded
elected involvement with public process. from CCDA by 8/31
(May 24)
I I
I I
Public involvement
consultant
develops Public Community dialog meetings (20-30) to discuss the Dialogs may continue through election
Involvement Plan Urban Renewal Plan
I
I
Open house meetings
Council reviews
Public oticeby9/1
Involvement
Plan (6/28) Planning
I
Commission
I
hearings on
Urban
Renewal Plan
(1-2)
I
I
Council hearings
on Urban Ballot title must be complete
Renewal Plan Council y 2/14 for May election
Public Outreach Elements to be Included in Public (1-2) considers
Involvement Plan ballot title
(1/24)
❑ Community Survey
City support of Urban Renewal Plan limited after
❑ Community Dialogs ballot title is submitted -
❑ Open Houses Council involvement in urban renewal public 6
❑ Public Hearings (CCDA, PC, and CC) education continues ay 902006
Press Releases
❑ Other Media Election on
Urban Renewal
Plan
Council decisions for April 19t" Council meeting
April 19, 2005 May 10, 2005 May 24, 2005 June 28, 2005
Follow Tigard
Municipal Code Formally reactivate
which designates Council as
Council as the Development
Development Agency
Agency
Composition of City
Center Development OR OR
Agency (Urban Renewal
Agency) Consider another Adopt Resolution Amend TMC to Resolution
body as identifying intent to authorize Council to appointing agency
Development appoint another body assign responsibility to members
Agency and process for another body
selection of
development agency
Interview and select development
agency members
(by June 14th)
Provide direction on
the composition of
the membership
Z Resolution
7-12 members appointing Advisory
Composition of City from existing group Adopt Resolution Commission
Center Advisory or newly formed identifying process for members
Commission selection of Advisory
Commission
Members from
community wide
search or Interview and select Advisory Commission members
representatives (by June 14th)
from specific groups
o PC
o Task Force
o Park Board
o Etc.
AGENDA ITEM # 60
FOR AGENDA OF 4/19/05
CITY OF TIGARD, OREGON
COUNCIL AGENDA ITEM SUMMARY
ISSUE/AGENDA TITLE Solid Waste Program Review
PREPARED BY: Dennis Koellermeier DEPT HEAD OK 449 CITY MGR OK
ISSUE BEFORE THE COUNCIL
Information only at this time, regarding Solid Waste Program.
STAFF RECOMMENDATION
Receive informational presentation.
INFORMATION SUMMARY
Solid waste management is provided locally by Metro and the City of Tigard. Metro sets regional standards,
manages regional issues such as disposal facilities, transfer centers, etc., while Tigard is responsible for the actual
collection of solid waste, recyclables, etc.
Tigard has historically managed solid waste collection by the issuance of exclusive franchises. Tigard has local
codes that govern both the franchise process as well as company and customer responsibilities. Currently two
franchises exist: Pride Disposal, which covers about 70% of the City, and Waste Management, which covers the
remainder.
Tigard City Council is responsible for setting rates for solid waste collection. Rates were last adjusted in 2002.
Staff has commenced review of financial reports from the current haulers and it appears that a rate adjustment in
2005 will be needed.
Prior to considering rates, staff thought it appropriate to prepare and present information to Council relating to the
franchise process, rate setting methodologies, current and potential services, and an introduction to regional solid
waste issues. The City has retained the services of Chris Bell to assist staff on rate reviews and other solid waste
issues and he will assist staff in this presentation. The haulers will also be present to provide information and
answer any questions Council may have.
A presentation of annual hauler reports is scheduled for April 26 and a rate setting hearing before the Council in
late May.
OTHER ALTERNATIVES CONSIDERED
None
VISION TASK FORCE GOAL AND ACTION COMMITTEE STRATEGY
N/A
ATTACHMENT LIST
N/A
FISCAL NOTES
N/A
City of Tigard Solid Waste &
Recycling System Overview
Dennis Koellermeier
Public Works Director
And
Chris Bell
Solid Waste & Recycling Consultant
Tigard Municipal Code
it: Tigard Municipal Code (TMC) Chapter
11.04 codifies how solid waste is to be
managed.
F Administrative Rules and Service
Standards outline roles and
responsibilities of customers, City, and
haulers.
Current System
2003 Annual Franchised Haulers:
Revenues: Pride Disposal and
$7,770,000 Waste Management
L Customers Served:
11, 900
Solid Waste Tons:
41,800 DISPOSAL COIVlPr~11VY
Collected - r
Recoverable Tons:
12,300 (23%) IL
!!WASTE MANAGEMENT
Residential Collection
Customers: 101800
r
U. Solid Waste Tons: 7,600
v Recycled Tons: 4,600
DOI= ~v Yard Debris Tons: 4,300
Commercial Collection
Customers: 1,100 -
h ~
Solid Waste Tons: 14,200
c Recycled Tons: 3,400
r
e'-~ zcs
Drop Box Service
Drop Box Pulls: 6,100
%lt
rf
Tons: 20, 000 f
3
Annual Franchise Review
Annual financial and operating report filed
by franchisee by March 1 for the previous
calendar year's business.
City Manager reports to City Council on
the reports and any proposed rate
adjustments.
Rate Setting
v- Operating Margin/Rate of Return Policy.
- Council policy targets an aggregate operating
margin of 10%.
F- If aggregate profit margin falls below 8%
or exceeds 12%, City Council considers
rate adjustments to the target of 10%.
(Note: Aggregate rate of return for calendar year 2003 was 10.9%)
Changes to the Current System
ORS 268 (Metropolitan Service District)
Authority over solid waste disposal powers
F ORS 459 & 459A (Solid Waste & Recycling)
Metro is responsible for the development of the regional solid
waste plan in conjunction with local jurisdictions.
Metro's Objective with the Regional Solid Waste Management Plan
~ ORS 459A.010(6)(a):
Clackamas, Multnomah and Washington counties, in aggregate, shall
achieve a recovery rate of 62 % for the calendar year 2005 and 64 % for
the calendar year 2009.
Metro Region's Recovery Rate for 2003 was 56.9%
Getting to 64% Recovery
F -t... Programs of Expanded Service
and Increased Recovery
Metro Programs
u Tigard Program
Potential Programs of Expanded
Service for Increased Diversion
y„ t PE
ti
Residential Services:,
f
Automated Cart•"'E -
Recycling
Weekly Yard Debris
1_ FI
Potential Programs of Expanded
Service for Increased Diversion
17, 7
L Commercial Organic
Collection A
(Food Waste) t
3
J
Potential Programs of Expanded
Service for Increased Diversion
L Metro Model:
Commercial Outreach
CTAP
Community Technical Assistance Program
Expanded Business Outreach administered by PSU / Grad Students
IE- Mandatory Business Recycling Write Ordinance with Minimum Standards
and enforce with notices and fines
Landfill Bans
Tigard:
Metro Model or Tigard Model City Recycling Coordinator working with
Local Business and Haulers
Coordinator would provide outreach and
enforcement of existing ordinances
Objectives of the Tigard Solid Waste
and Recycling System
E Provide high standards for solid waste service and public
responsibilities
Provide increased recycling opportunities to the public
U Services must be easy to administer by City and Haulers
u Services must be cost effective and sustainable
F_ Model for the Metro Region
Policy Direction
L What services shall
the City and the
haulers provide ~ ~
Timeline for
implementation
Program criteria:
costs, recovery, and
overall goals
Summary Report to the City Council on the direction of
the Solid Waste & Recycling System in Tigard
Members of Tigard's City Council, we are presenting you with information on
possible future programs for the Solid Waste & Recycling Collection System. We
want to present you with a summary of the possible programs. We will provide
further information to the Council to facilitate the decision. After you have had the
time to review the materials and discuss the possible changes with your
constituents, City Staff, and fellow Council Members, we will then ask for your
decision on what programs, if any, you want to implement within the City.
New and Expanded Services
Residential Service: Cart Recycling
Weekly Yard Debris
Commercial Service: Organic Collection
Expanded Education and Outreach
Landfill Bans
Mandatory Business Recycling
City Recycling Coordinator
Automated Residential Cart Recycling
Residential collection using 14 gallon bins has been the primary method utilized
throughout the Portland metropolitan region since the mid 1990's. Tigard's
current system has a weekly participation rate of approximately 67%; of the
11,100 cart customers; 7,500 placed one or more of the hauler provided 14
gallon bins out for collection. In 2003, Tigard's haulers collected approximately
4,600 tons of cardboard, paper, plastic, metal, and glass.
The primary processor of recyclable materials in Washington County, Far West
Fibers, recently upgraded their Hillsboro sorting facility to consolidate material
collection into two streams: glass in one stream and all other materials into the
second stream. This proposed program allows for the automated collection of all
materials with the exception of glass in a 60 or 90 gallon roll cart. Glass would be
either collected weekly, every other week, or monthly in the existing curbys or at
local glass depots around Tigard. Consolidating the materials in two streams
would increase the productivity of collections, reduce work related injury claims,
and increase the material collected. Costs associated with automated collection
would also increase due to the increasing prices of the collection equipment.
City of Tigard 1 of 6
Council Work Session April 19, 2005
® Solid Waste & Recycling System Memo
Pros:
1. Increased material collection (source is Oregon DEQ)
2. Increase in recovery rate and increases in volume collected
3. Increased productivity (more houses collected per hour)
4. Reduced job related injuries
5. Same truck can be utilized to collect all three streams of residential
curbside materials
6. Standardization of fleet could be reduce maintenance costs and lower the
necessary inventory of spare truck parts required for routine repairs.
Cons:
1. Increased costs for weekly collection
2. Additional cart may create space problems for some customers
3. DEQ regulations on glass collection; what to do with it?
4. Possible lower material sales revenue due to higher contamination (if not
managed and educated properly) (DEQ)
Proposal 1: Weekly collection of materials using a 60 or 90 gallon cart.
Equipment costs could push up the cost of services by $1.25 to $2.00 per
residential customer per month.
Proposal 2: Collection every other week with a 90 gallon cart. Equipment costs
would be spread over a larger customer base driving down labor time and costs
of operations due to the increase in participation and productivity. Rate impact is
estimated at no change to a reduction of $.25 per residential customer per
month.
Weekly Yard Debris Collection
Yard debris is collected with 60 gallon roll carts provided by the franchised
haulers. Collection frequency is every other week. Some residential customers
have asked to expand the service to weekly collection of yard debris. The costs
associated with the changes are approximately $1.80 per residential customer
per month. In 2003, there were approximately 320 customers (3%) who paid for
an additional yard debris roll cart. Charges for extra bundles or bags of yard
debris averaged 108 customers per week (1 in 2003.
Pros:
1. Increased level of service comparable to the City of Beaverton, City of
Lake Oswego, and Clackamas County
2. Keep more tons of yard debris out of the waste stream
Cons:
1. Most customers who need greater frequency of collection already have
additional carts (at a minimal charge).
2. Only 1 % of weekly customers put out extras for collection
City of Tigard 2 of 6
Council Work Session April 19, 2005
® Solid Waste & Recycling System Memo
3. Many customers may not fully utilize the weekly collection
4. Increased miles traveled and higher traffic in residential areas
Organic Collection
Food waste composes approximately 25% of the commercial waste stream by
weight. It is a recoverable material that can be converted into nitrogen rich
compost and soil amendment with the correct processing facility. During the last
six years, the City of Portland and Metro have been working on implementing a
commercial organic collection program similar to programs in San Francisco and
other Northern California municipalities. The program has recently started
collecting materials from commercial haulers operating in Portland. Over the last
10 weeks, food waste has been collected at Metro's Central Transfer Station, for
processing by Cedar Grove in Maple Valley, Washington. When the colleted food
reaches 10,000 tons a year (830 tons a month), Cedar Grove has committed to
building a processing facility within the Portland metropolitan area.
The members of staff at Metro, who are part of the project team to implement this
program, are optimistic that the region's haulers and businesses will achieve the
minimum 830 tons a month within the next six months. Two of the three big
grocery store chains have committed to the program as well as many local
hotels, restaurants, and food service providers.
The program has many components, but one of the most critical for the City of
Tigard is the desire of the haulers to restructure container routes to segregate dry
waste from wet waste. Pride Disposal has already implemented some of the
initial steps for segregation of wet and dry wastes. Waste Management has
committed to fully implement any program endorsed and designed by the City
The second crucial component for the successful implementation is the thorough
planning and execution by the City to ensure a successful and sustainable
program. Specific details include:
1. A rate structure that gives producers of food wastes an incentive to
participate.
2. Dedicated City staff as a central point of contact for participants and
haulers to coordinate and facilitate the initial logistics of the program.
3. A comprehensive outreach program to educate producers of the food
wastes on how to prepare the wastes for collection and control the level of
contaminants.
4. Adequate follow up and monitoring.
Pros:
1. Wet, heavy food waste is a recoverable material that can be processed
into a usable soil amendment.
City of Tigard 3 of 6
Council Work Session April 19, 2005
® Solid Waste & Recycling System Memo
2. Removing food from the waste stream increases the ability of sorting the
dry residual for increased recovery.
3. Participants in existing organic collection programs in California have
increased the diversion of other recoverable materials such as cardboard
and containers.
4. Metro has a pending budget $250,000 for grants to local jurisdictions for
the purchase of equipment for organic collection.
5. Tigard's potential yield of collected food if such a program was
implemented is approximately 1,700 tons a year (33 tons a week).
Cons:
1. An increase in rates for all container customers will have to be incurred to
implement and sustain the program.
2. City will have to fund additional outreach program (outreach by increasing
the franchise fee.
3. Some business may choose not to participate in the program.
Metro's Business Recycling
Metro is reviewing several different programs with the same objective; recover
more materials from the commercial waste stream before the materials fall into
the waste stream. Metro's current approach would be to expand its outreach
program and implement two other programs that would augment the overall
objectives. The commercial waste stream, as defined by Metro, is the
combination of container and drop box service, as well as self haul. Tigard's
share of the increased recovery is 13.6% of commercial solid waste collected, or
approximately 2,800 tons of the reported 20,700 tons both franchised haulers
collected in 2003. This figure doesn't include organic materials.
Increased Business Outreach and Education
For Fiscal Year 2004-05, Metro funded $400,000 for the Commercial Technical
Assistance Program (CTAP). Funding for this program, as well as the other
waste reduction programs sponsored by Metro, is funded through Regional
System Fee assessed on the tip fees paid by the local hauling companies
throughout the boundaries of Metro. This graduate work program is a co-
operative effort between Portland State University and local governments.
Graduate students take a term and meet with perspective businesses and assist
them by evaluating current practices, informing local businesses on the current
array of recyclable materials that are collected by the local haulers and recyclers,
proper set out of materials, and best recycling practices. The CTAP program is
part of the graduate work completed by PSU students attending the College of
Urban and Public Affairs. Tigard, which is part of the Washington County
recycling co-operative, has benefited by the CTAP program.
City of Tigard 4 of 6
Council Work Session April 19, 2005
® Solid Waste & Recycling System Memo
Metro Waste Reduction is seeking to double the funding of this program from
$400,000 a year to $800,000 in future years. Full ramp up of funding would be in
effect in 2008. Program effectiveness will be based on the following objective:
Businesses achieve an 80% improvement in their operations post CTAP
evaluation.
Eighty percent of the recommendations will be successfully implemented
after five years.
Mandatory Business Recycling
Local jurisdictions would adopt ordinances setting minimum standards for
business recycling. These standards will require the recycling of cardboard,
mixed paper and mixed containers. Implementation of requirements will be
supported by expanded funding for technical assistance, education and
enforcement as needed from Metro on a pre-determined basis (usually
population) for local jurisdictions. Target generators of these materials include
small to large business, institutions, and public agencies.
Metro would develop a model ordinance for local jurisdictions to use when
establishing the recycling laws and thus the mandatory recycling requirements.
Enforcement would include random business inspections by local government
officials. Any business disposing of "significant amounts" of recyclable materials,
defined at 10% by volume, will be subject to the following:
A warning by the enforcement officer and referral to a CTAP specialist. The
business in violation will be subject to a visit by a recycling specialist to
provide education and assistance for setting up a recycling program. The
recycling specialist will be responsible for following up with the position to
ensure a recycling program is implemented.
If a recycling program is not implemented following a 90-day period. A fine will
be issued by the enforcement officer for noncompliance.
Evaluation will be based on the following objective: More than 90 percent of
businesses will be recycling the target materials.
Landfill Bans
Metro bans landfill disposal of cardboard, paper and containers at all mixed solid
waste facilities that take waste from the Metro region (cardboard, mixed paper,
mixed containers). The ban will be phased in over a 4-year period.
Implementation of requirement will be supported by expanded funding for
technical assistance and education.
City of Tigard 5 of 6
Council Work Session April 19, 2005
® Solid Waste & Recycling System Memo
Metro would amend the Regional Solid Waste Management Plan and adopt an
ordinance to ban the landfill disposal of cardboard, mixed paper, mixed
containers (glass, plastic bottles, aluminum cans) over a 4-year period. Since
Metro has enforcement authority at solid waste facilities, warnings and fines will
be issued for non-compliance with the bans. Enforcement may include:
1. Random business inspections by local government officials
2. Transfer station load observations by Metro staff
3. Increased tipping fee penalty on haulers for introduction of recoverable
loads into the waste stream.
Tigard's Proposed Approach to Business Recycling
Finance Director, Tom Imdieke, proposed in December of 2003 a different
approach to the upcoming issues presented by Metro in the Revised Solid Waste
Management Plan. Mr. Imdieke proposed hiring a full time staff person by the
City to manage the business outreach and enforcement of existing ordinances.
The Solid Waste & Recycling coordinator, as this position has come to be known,
would be a liaison between the haulers and the business community of Tigard.
The coordinator would work closely with the haulers and local businesses to
achieve the overall goals of the Metro RSWMP. This position individual would be
permanent staff, the problem with turn over would be avoided (CTAP personnel
change each semester since this is a graduate program).
Funding for this position will come from two sources, Metro (Tigard's portion is
currently going to Washington County as part of the recycling co-op) and an
increase in franchise fees. Currently, the fee is accessed on 3% of all cash
receipts on the collection of solid waste. The percentage would increase,
depending on the funding portion covered by Metro.
This idea has the initial approval by the haulers, but as they have stated, they
want to be part of the process since this person will be directly involved with the
daily operation of their customers and their collection operations.
City of Tigard 6 of 6
Council Work Session April 19, 2005
AGENDA ITEM #
FOR AGENDA OF Aril 19 2005
I ~t v d _
CITY OF TIGARD, OREGON I eon 46
COUNCIL AGENDA ITEM SUMMARY
ISSUE/AGENDA TITLE Wor ho - Strategic Finance Plan Issue Paper(s) Discussion
PREPARED BY: Tom Imdieke DEPT HEAD OK CITY MGR OK
ISSUE BEFORE THE COUNCIL
The City prepared its first Strategic Finance Plan in 2003. The City Council now has the opportunity to update the plan and
direct staff to make any appropriate changes as determined by the Council.
STAFF RECOMMENDATION
Update the Strategic Finance Plan with the appropriate changes as determined by the City Council.
INFORMATION SUMMARY
The City prepared its first Strategic Finance Plan in 2003. It is time to update that plan to reflect current conditions and issues.
As we did in 2003, Executive Staff first brainstormed a list of issues that they feel are current or will soon be faced by the
City. Executive Staff then organized that list into rough order of priority. Finally, staff wrote brief (1 to 2 pages) issue papers
on each issue to present to Council. Those issue papers were distributed earlier to the City Council for their review.
Council may choose to include all of the attached issues in the final Strategic Finance Plan or it may drop any issues that it
feels appropriate and add any issues it feels are missing from this packet. Finally, Council will be asked to discuss the final
list of issues, to assign priorities and timelines, and to provide direction to staff on how the Council wishes staff to proceed on
these issues.
OTHER ALTERNATIVES CONSIDERED
N/A
VISION TASK FORCE GOAL AND ACTION COMMITTEE STRATEGY
The Strategic Finance Plan can act as a tool in developing strategies and funding for implementation of projects to address
goals as outline in the Vision Statement.
ATTACHMENT LIST
Copies of the draft 2005 Strategic Finance Plan Issue Papers.
FISCAL NOTES
N/A
MEMORANDUM
TO: Mayor Craig Dirksen
Tigard City Council and Councilor-Elect
FROM: Craig Prosse , finance Director
RE: Draft Strategic Finance Plan
DATE: December 14, 2004
Attached to this memo is a draft of the 2005 Strategic Finance Plan for your review and
consideration. The City prepared its first Strategic Finance Plan in 2003. It is time to
update that plan to reflect current conditions and issues.
As we did in 2003, Executive Staff first brainstormed a list of issues that they feel are
current or will soon be faced by the City. Executive Staff then organized that list into
rough order of priority. Finally, staff wrote brief (1 to 2 page) issue papers on each
issue to present to Council. The attached packet contains these issue papers.
Council will have at least two opportunities to review and discuss these issues. The first
opportunity will come on January 18 at the annual Goal-setting session. At that time,
Council may choose to bring some of the issues forward from the attached packet to be
considered as possible Council goals for 2005. The second opportunity will come at a
second meeting to discuss the Strategic Finance Plan itself. Staff is suggesting that this
second meeting occur at the Council workshop meeting of February 15, 2005.
At these meetings, Council may choose to include all of the attached issues in its Goals
or in its Strategic Finance Plan. It may also drop-any issues that it feels appropriate and
add any issues it feels are missing from this packet. _ Finally, Council will be asked to
discuss the final list of issues, to assign priorities and timelines, and to provide direction
to staff on how the Council wishes staff to proceed on these issues. Most of this
discussion will take place at the Strategic Finance Plan meeting.
The packet starts with summary tables that also serve as a Table of Contents. The
summary tables provide a one-stop look at all issues. They also contain three columns
that require particular attention by Council:
• Recommended Priority - this column shows the priority of each issue as
determined by Executive Staff. During the Council review of the Strategic
Finance Plan, Council will be asked to confirm or modify these priorities.
Priorities are listed from 1 (high) to 5 (low).
U
■ 'Council Goal Candidate? - This column identifies issue papers which Council
may want to bring forward during the annual Goal-setting session on January 18
for possible inclusion in the Council Goals for 2005.
■ Strategic Finance Plan Candidate? - This column identifies issues which Council
may want to consider in the final Strategic Finance Plan for 2005.
This packet of materials is being furnished to you today so that you have an opportunity
to review these issues prior to the Goal-setting session on January 18.
cc: Bill Monahan, City Manager
Executive Staff
Strategic Finance Plan Issues
Executive Staff Priorities
Revenue Options
Method of Council Strategic Vision
Rec. Potential Fund(s) Approval/ Goal Finance Plan Survey Page
Priori Timing Issue Impacted Amount Implementation Candidate? Candidate? Issue? Number
1 2005 CWS Split of Sanitary Unknown Negotiations with No Yes 53
sanitary and Sewer & reduction CWS
Stormwater ✓ Storm Sewer
Revenues
1 2006 Local Option General TBD Citywide Vote Yes Yes 55
Property
1 2004 Long Range General $40,000 Council resolution No No 57
Plannin Fee
(1 1 2005 Oth_eUser Fees General TBD Council resolution No Yes 59
5 1 2004 Parks SDCs Parks CIP $5.6 million Council ordinance No No 60
& resolution
i1 1 2005 ROW Fee Review Various TBD Council resolution No Yes 62
1 2005 Street Maintenance Street TBD Staff report to No No 64
Q Fee Review ✓ Maintenance Council
Fee
1 2005 Telecommunication General $325,000 to TBD No Yes 66
T-~ s Regulation $1.37 million
reduction
0~9s~ 4
Method of Council Strategic Vision
Rec. Potential Fund(s) Approval/ Goal Finance Plan Survey Page
Priori Timing Issue Impacted Amount Implementation Candidate? Candidate? Issue? Number
1 2005 to Transportation Other TBD Council ordinance Yes Yes 68
2006 Financing & resolution.
Possible citywide
vote.
1 TBD Urban Renewal Various TBD Council resolution Yes Yes 70
and Citywide vote
1 2005 Water Utility Rates Water TBD IWB approval & No Yes 72
PQe d rc~-t~ ' -a" - C Council resolution
1 2006 WCCLS Levy Gene TBD Countywide vote No Yes 74
Con- J\a-p d
t 2 2005, with MSTIP Revenue Various $3 million to County approval No Yes 76
money t $5 million
distributed Y'L1 ``S , ' Cv
in 2007 G cvur lU C
3 2005 Franchise Fee- General, $441,000 per Council ordinance No Yes 78
Water & Sewer Water, & year & resolution
rv~,svj{ )b_e sanitary
Sewer
TBD
L5 nvilege Tax -General $647,000 Council ordinance No Yes 80
01~ & resolution
2005 Telecommunications General Unknown Council ordinance No Yes 83
e istration Fee & resolution
2005 Water-Revenue Bo Water CIP $8.84 million Council resolution No Yes 85
2005 Passport Age cy General TBD Council resolution No Yes 87
V, o
Method of Council Strategic Vision
Rec. Potential Fund(s) Approval/ Goal Finance Plan Survey Page
Priori Timing Issue Impacted Amount Implementation Candidate? Candidate? Issue? Number
4 2005 Urban Growth LAAA General $250,000 to IGA with County No Yes 37
Boundary i CP - $450,000
5 2005 to New Police Facility Facilities $150,000 Citywide vote No Yes 39
2008 Xt plus
Q $10,000,000
5 2005t6 Records Prog~ram~ Various s $187,000 Budget No Yes 41
2009
5 2005 to Recreation G eral 860,000 Budget Yes Yes Yes 43
2008 Programs lc ec _ ( u
5 2007 Senior Center General $450,000 Council direction No Yes 45
CDBG Grant atch (Fa ilities) plus
F « - 450,000
a,, v,.., S rant
5 2005 Solid Waste General $156,000 Negotiation with No Yes 47
Mgt./Recycling/ 3°/0 a , n / J5 Haulers & Council
Code Enforcement (✓i t'~ " resolution
5 2005 Youth Programs General $100,000 per Council Resolution Yes Yes 49
Grant year & Budge
t
Overall 2005 Employee Benef' Various TBD Union negotiations No Yes 51
Issue osts & Council Action
r N\
Gam'" < A `1"'^ .
yl-
Ds~
C~
Method of Council Strategic Vision
Rec. Potential Fund(s) Approval/ Goal Finance Plan Survey Page
Priori Timing Issue Impacted Amount Implementation Candidate? Candidate? Issue? Number
3 2005-06 Enhanced Vppous TBD Council direction or Yes Yes Yes 19
Neighborhood e to4e, resolution
Pro ram - CAP r w
3 2005 Enhanced Training Various TBD -Council direction & No Yes 21
Budget
3 2006 or MSTIP Nee Road' $10 million to Countywide vote No Yes Yes 23
2008 ~V-5 _ $20 million (Transp.
n Improveme
nt
3 TBD rks & Open Parks HP $3.59 million Council resolution Yes No Yes 25
S aces Ac uisition G -F- pwaP b~A & citywide vote Protection
3 2005 Public Facilities Facilities, $3.41 million CIP & Budget No Yes 27
throug Capital Projects - W ter,
2010 PW, Records, anitary,
Police 91w'"' Storm
3 2005 OW Maintenance TBD $25,000 to Budget Yes Yes Yes 29
Beds 'S5"`~ 4`A ~e 2x,,4. ,$450,000
3 2005 to ater Supply Water, Water $80 million to IWB Approval & Yes Yes 31
2006 Ycource IP $90 million Council resolution
4 2005 to Centralizing City, Various $500,000 to Council direction & No Yes 33
2009 Information 1~ e _ 1,000,000 Budget
4 TBD Economic BD TBD Council direction Yes Yes Yes 35
Development e-D vLe~i
JAR
Strategic Finance Plan Issues
Executive Staff Priorities
Funding Needs
Method of Council Strategic Vision
Rec. Potential Fund(s) Approval/ Goal Finance Plan Survey Page
Priori Timing Issue Impacted Amount Implementation Candidate? Candidate? Issue? Number
1 2005 Communication General $141,500 Council direction Yes No Yes 1
L Csn they plus
1 2005 Downtown r General plus TBD Council resolution Yes Yes Yes 3
Improvements others & citywide vote
1 FY 2005- Environmental General $20,000 Council direction & Yes Yes Yes 5
06 Pro ram d fY4 Budget
1 2006 General Fund pek Gegneral $1.5 million in Council direction Yes Yes 7
Projections b On ` 1( FY 2008-09
1 2004 Increased Legal General $50,000 Council direction, No Yes 9
Costs and - + S n Budget
Annexation Issues GA Amendment
1 2004 Measure 37 G neral TBD Staff No Yes 11
implementation &
Bud et
1 2005 Value Added various TBD Council direction & Yes Yes 13
Interest S Budget
2 2005 Comprehensive. <--y) General $225,000 Council Goal & Yes Yes Yes 15
Plan Update Bud et
2 TBD Library Operationa General 05,000 Council resolution No Yes 17
Hours G and funding
Funding Needs
Communication
Issue Summary
Definition: The City uses a variety of tools and methods to inform, educate, and get
input from citizens. The goal is communication that is consistent, accurate, timely and
responsive to citizen's needs, interests and community goals. In addition, two-way
communication includes closure and feedback to ensure the information shared is
understood.
The methods the City uses to communicate with citizens include: written tools such as
Cityscape, the web page, press releases, TVTV (cable TV) productions brochures,
flyers, reports, community connectors, e-mail, displays, surveys and bill stuffers. In
most cases, the majority of the cost for these items is the staff time needed to develop
the material. Printing costs for brochures, flyers and bill stuffers is often an insignificant
part of a project cost, which may or may not be funded with general fund dollars. The
exceptions are the webpage, cable TV productions, and the Cityscape. One FTE is
dedicated to the webpage at an approximate cost of $81,500. Printing and mailing nine
issues of the Cityscape each year costs approximately $60,000, excluding staff time.
These are both funded with general fund dollars.
Another tool is cable television. The City televises two City Council meetings per month
and the monthly Focus on Tigard program. TVTV provides the crew for the City Council
meetings at no cost to the City. City employees produce/direct and appear in the Focus
program as part of regular work assignments.
Face to face communication with citizens at meetings, public hearings and over the
counter is still an important communication tool but the cost of those meetings is
assumed as part of doing business.
Revenue Required/Revenue Potential: Webpage support costs about $81,500 per
year. Nine issues of Cityscape cost $60,000 excluding staff time required to write and
publish Cityscape. All other costs are embedded in other projects and department
budgets.
Work Completed to date: The Tigard Beyond Tomorrow survey conducted in the
summer of 2004 asked respondents what the most effective means for communication
are. Mailed notices and the Cityscape were the most popular at over 28% with the
website being second at 17.5%. The newspaper was third at around 15%. In 2000 the
website was named by only 6% of the respondents.
Implementation Action Required: As a cost saving measure the City Council cut
back from twelve to nine Cityscape newsletters last budget year. Since the Cityscape
1
remains a popular communication tool, it is worth investigating less costly alternatives
that might allow additional issues to be printed at the same or less cost. In addition, the
Council should discuss the communication tools available and determine if new ones
should be added and less effective methods used less frequently.
Timing: At the Council goal setting in January, staff will have information available on
possible cost effective alternatives to expand the distribution of the Cityscape and other
communication tools. For example, it might be more cost effective to print the
Cityscape on newsprint, contract with the School District to print the newsletter, or
encourage more readers to access the Cityscape on-line to reduce postage costs.
If the Council provides direction on other communication priorities at the goal setting
session, staff will investigate cost effective alternatives to include in the proposed
budget.
Advantages:
■ Using a variety of communication tools helps to ensure citizens have access to
information and decision makers.
■ The information gained in the recent Tigard Beyond Tomorrow vision survey can
be used as a starting point to evaluate the effectiveness of the communication
tools currently in use. °
Disadvantages:
■ The costs for producing communication tools are generally paid for with General
Fund dollars, and costs such as printing and postage continue to increase.
Recommendation: Gather information on alternatives that would reduce or maintain
the cost of producing various communication tools as information for Council's January
goal setting.
Council Priority/Discussion:
2
Funding Needs
Downtown Improvements
Issue Summary
Definition: The Tigard community is going through an effort to shape the future of
Tigard's downtown. Over the next several months the Downtown Improvement Task
Force will develop, with the input of the entire community, the future direction for the
downtown. The resulting plan will identify development patterns and capital
improvements that are needed. How will these improvements be paid for? One option
that will be considered by the Task Force and ultimately Council will be the creation of
an urban renewal district to generate dedicated revenues to pay for needed
improvements Downtown Tigard. The Tigard Charter currently prohibits any renewal
districts without an approving vote of the people.
Revenue Required/Revenue Potential: To be determined. The Downtown
Improvement Plan, which is scheduled for completion in June 2005, will identify needs
and revenues.
Work Completed to date: The Downtown Task Force. was appointed by Council in
2004. The City was awarded a Transportation and Growth Management Grant
($129,000) to complete the Downtown Improvement Plan by June 2005. The project is
on schedule.
Implementation Action Required: Adoption of Downtown Improvement Plan. City
Charter prohibits the formation of any urban renewal district without an affirmative
citywide vote. Council could refer one of two measures to the people:
1. An amendment of City Charter to remove the requirement for a citywide vote, or
2. Approval of one or more urban renewal districts.
Timing: 2005 to 2006
Advantages:
■ The Downtown Improvement Plan will set the standard for the future of the
downtown.
■ Creation of a dedicated funding source that increases with growth in assessed
values in the urban renewal district and that can be used to pay for needed
improvements.
• Public improvements paid for by urban renewal or other methods will spur private
investment that will further increase values in the district, and will accommodate
job and housing growth.
■ Once the urban renewal plan is accomplished and all costs are paid for, the
assessed value is returned to the general tax roles and helps pay for citywide
services.
3
Disadvantages:
■ Urban renewal "locks up" growth in assessed values during the life of the urban
renewal plan, thereby limiting growth in tax revenues for all overlapping taxing
jurisdictions.
• Urban renewal mechanics are complicated and difficult to explain to the public in
an election setting.
■ Creation of an urban renewal district requires the active support of major property
owners within the proposed district.
Recommendation:
■ Complete the Downtown Improvement Plan by June 2005.
■ Explore urban renewal as an option to implement the Downtown Improvement
Plan.
■ Work with property owners in the Tigard Central Business District to assess the
level of interest and support for urban renewal.
■ Develop a proposed timeline for resolution of this question.
Council Priority/Discussion:
4
Funding Needs
Environmental Program
Issue Summary
Definition: Much of what the City of Tigard provides as services and public processes
revolve around environmental issues. The Visioning process, public comment, and
mandated land use public hearings consistently encourage a higher level of
environmental sensitivity, preservation of natural resources, and increased efforts by the
City in this area. City issues as diverse as land use regulations, public purchasing,
public property maintenance protocols, and volunteer projects all have a common
thread of good environmental practices impacting them, and are an area where the City
can improve in the delivery of service and public support. There is a clear expectation
from the public that the City, as an organization, improve its environmental stewardship.
Revenue required/Revenue potential: Unknown at this time. It is currently believed
that much of the work the City is doing could be modified or reorganized at a low cost to
improve environmental sensitivity. The City will probably need to add some level of
technical expertise in staff or consultant support to supplement current capabilities. For
financial planning purposes, a combination of existing expenses being re-organized and
an additional $20,000 annually for environmental technical expertise is suggested. The
$20,000 would pay for a pilot program, with the design of a larger program, if needed, to
be based on the results of the initial effort. Ultimately, funding may be necessary for
capital costs such as sensitive land purchases, rehabilitation activities on
environmentally damaged public lands, conservation easements, etc.
Work Completed to date: This concept has been discussed by senior staff but no
action has been proposed or taken.
Implementation Action Required: Implementation would be accomplished by a
combination of Council direction, staff action, and budget implementation. A citywide .
vote to support a funding measure may develop from this project.
Timing: Implementing changes to existing programs and developing new program
focus and structure could be accomplished in a six month period. Program aspects
requiring budget approval could be developed as a part of the FY 2005-06 budget
process and accomplished after July 1, 2005
Advantages:
■ Higher rate of protection for natural resources
• Higher rate of environmental awareness affecting City issues.
■ Development of policy and regulation consistent with public expectations.
■ More public support
■ Less controversy and criticism
5
Disadvantages:
■ Potential for increased cost
Recommendation: The Council should consider this proposal, and if supportive, direct
staff to further develop the concept and an action plan for implementation.
Council Priority/Discussion:
6
Funding Needs
General Fund Projections
Issue Summary
Definition: Every year, prior to beginning its annual budget process, the City develops
a five-year forecast of revenues and expenditures for all major City funds. For the past
several years, the forecast has shown a declining General Fund ending fund balance.
This trend is the result of limited revenue growth, increased costs, and greater demand
for public services. In the FY 2004-09 forecast, the General Fund balance was
projected to go negative in FY 2007-08.
The preliminary forecast for FY 2005-10 has just been completed. It continues to show
a downward trend in General Fund balances. The date of the potential deficit has been
pushed out to FY 2008-09.
The City has been working for a number of years to address this downward trend in
General Fund balances.
Revenue Required/Revenue Potential: The FY 2005-10 preliminary forecast shows
that the General Fund balance could go negative by as much as $1.5 million dollars in
FY 2008-09. Under the Oregon Constitution and laws, governmental agencies are
prohibited from deficit spending, so corrective action must be taken to limit expenditures
or increase revenues.
Work Completed to date: The City has been preparing a five-year financial forecast
every year since the 1980s. The most recent forecast will be presented to Council at its
Goal Setting Session on January 18, 2005.
In 2003, the City Council adopted its first Strategic Finance Plan, which has guided City
actions since that time.
Implementation Action Required: Council direction.
Timing: The updated Strategic Finance Plan will be presented to Council on January
18, 2005. Implementation of the Plan will occur over several years.
Advantages:
■ The Finance Plan allows the City to forecast projected needs and to develop
proactive strategies to guide its financial future.
Disadvantages:
■ None
7
Recommendation: Review, modify and adopt the 2005 Strategic Finance Plan to
provide guidance to staff on future financial issues. Present and discuss the Strategic
Finance Plan with the City's Budget Committee as part of the FY 2005-06 Bud\get
process.
Council Priority/Discussion:
8
Funding Needs
Increased Legal Costs and Annexation Issues
Issue Summary
Definition: Annexation concerns in Tigard have created significant public comment. In
particular, the residents of unincorporated Bull Mountain opposed and through the ballot
box, rejected annexation to Tigard. The need to address the annexation question will
not fade away. The City is shifting to a parcel-by-parcel approach to annexation, based
on property owner petition, non-remonstrance agreements, and traditional annexation
methods. The City will need to do a significant amount of work in planning for these
annexations, and will also need to revise and update intergovernmental agreements
relating to urban services. This effort will require significant legal assistance.
Tigard's legal service budget is already tight, due to day to day activities. In addition,
the recent passage of Measure 37 created additional legal challenges with related
costs.
Revenue Required/Revenue Potential: To adequately provide legal representation at
a variety of levels, approximately $50,000 is needed for 2005. The legal services funds
could go to:
■ Working with Washington County's Council to review, and if necessary, prepare
revisions to urban services agreements;
■ Prepare findings and assist with staff reports for annexation land use decisions;
■ Defend annexation land use decisions at LUBA and the Court of Appeals;
■ Review the status of consent agreements and non-remonstrance agreements as
they are used by Tigard and Washington County, and prepare any necessary
revisions;
■ Assess the legality of existing consent and non-remonstrance agreements which
apply to the unincorporated area, and determine the legality of transferring
consent and non-remonstrance agreements from the County to City;
■ Defend challenges to Tigard's urban service agreements with Washington
County;
■ Defend Tigard's position that a public facilities strategy is not warranted in
unincorporated Washington County.
There are no revenues associated with this issue other than the General Fund dollars
which'could come after annexation of properties. These revenues would be collected
well after the legal expenses are incurred.
Work Completed to date: The City Attorney worked on the annexation plan and the
decisions made by Council in 2004, regarding annexation. No work has begun to
address the issues noted above.
9
Implementation Action Required: Council needs to hold a policy discussion about
annexation and the courses of action available. Based on that, a strategy can be
developed.
Timing: Expenditure of funds related to annexation could begin as soon as an appeal
is filed of any annexation decision.
Advantages:
• There is an advantage to a proactive approach, to update up the urban services
agreement and process.
Disadvantages:
• To be in a response mode only, the City would be defending against challenges
without solidifying the City's position.
Recommendation: Discuss with Council a strategy for utilizing legal resources to
proactively defend our entity agreements with Washington County.
Council Priority/Discussion:
10
u .
Funding Needs
Measure 37
Issue Summary
Definition: The voters of the state adopted Ballot Measure 37 in the November 2004
.election. This measure added new sections to ORS Chapter 197, which provide that
local governments may pay compensation to property owners for reductions in property
values, or may waive restrictions as an alternative of payment resulting from land use
regulations that restrict uses of the property. Some property owners may believe that
existing or future land use regulations as applied to their property both restrict use of the
property and reduce the fair market value of the property and consequently may bring
claims under Measure 37. Ballot Measure 37 explicitly allows local governments to
develop procedures for assessing claims made under Measure 37.
Revenue Required/Revenue Potential: Unknown at this point. No funding source is
provided to recover costs of processing Measure 37 claims, nor are there funds
identifies to pay any settlement of claims. In adopting the ordinance to implement
Measure 37 claims procedures, the Council has discussed the possibility of requiring a
deposit against claims processing costs which could be refundable in whole or in part.
Work Completed to date: Working in conjunction with the City Attorney's office, an
ordinance has been drafted and adopted to address Measure 37 claims. The Tigard
Municipal Code has been amended by repealing the existing Chapter 1.20 and
replacing it with a new Chapter 1.20.
Implementation Action Required: The Tigard Municipal Code has been amended by
repealing the existing Chapter 1.20 and replacing it with a new Chapter 1.20. Staff is
currently developing administrative procedures to accept and process claims. Once a .
claim is filed, the City has 180 days to approve or deny the claim. If the claim is
approved, the City may choose to compensate the property owner for lost value or may
choose to waive the regulation in question.
Timing: December 2, 2004.
Advantages:
■ Property owners may request compensation for reductions in property values, or
may waive restrictions as an alternative to payment resulting from land use
regulations that restrict uses of the property.
■ Some property owners may believe that existing or future land use regulations as
applied to their property both restrict use of the property and reduce the fair
market value of the property and consequently may bring claims under Measure
37.
11
Disadvantages:
■ May create additional costs for the City in processing and paying claims without
providing a source of funds.
■ May create land uses within zones that are inconsistent with existing regulations
or land use patterns.
■ Measure 37 is an unfunded mandate.
Recommendation: Monitor impacts from Measure 37 and report to State Legislature.
Council Priority/Discussion:
12
Funding Needs
Value-Added Enhancements
Issue Summary
Definition: At their planning session in October, the City Council expressed interest in
taking a "value-added" approach to City services. Under this approach, the City would
look for the "little bit extra" that can be done to make City services and projects better
and that which help to create more livable and user-friendly community. Some value-
added can be done at minimal cost simply by re-directing staff efforts. Some will require
more attention and in some cases can add costs to projects and services.
The Executive Staff has brain-stormed a list of ideas, which is attached to this issue
paper. Those that can be done at no cost or minimal cost will be done. Those that will
require additional resources to accomplish will be discussed as part of the FY 2005-06
Budget process.
Revenue Required/Revenue Potential: To be determined.
Work Completed to date: A brain-storm list of ideas has been developed.
Implementation Action Required: Some items on the list can be implemented by staff
with no further direction. Other items may require additional resources, changes in
procedures, or negotiation with outside parties.
Timing: Value-added ideas can be implemented immediately.
Advantages:
■ Implements a stronger customer service and community livability approach to
City services.
■ Improves the character and quality of the community.
■ Improves citizen perception of Tigard as a place to live, work, and play.
■ Addresses some long-standing citizen issues.
■ May spur corresponding value-added approaches by citizens and businesses in
maintenance of their own property and provision of their own services.
Disadvantages:
■ In some cases, will add to the cost of City services and projects.
■ . May garner some citizen criticism for focusing on "nice-to-have" items rather than
on "essentials."
■ May increase expectations of service levels, which could lead to additional
requests for service.
13
Recommendation: Review the attached Value-Added Brain-Storm list to identify items
to be implemented immediately.
Council Priority/Discussion:
14
Funding Needs
Comprehensive Plan Update
Issue Summary
Definition: Tigard's Comprehensive Plan was first drafted in 1982, with periodic
revisions to speck chapters to maintain consistency with Statewide Planning Goals.
The Comprehensive Plan is the community's plan: it allows citizens of Tigard to make
choices on how land development and redevelopment should occur, and how it will be
managed. From 1982, when the Plan was first created, to 2003, Tigard's population
grew from 17,700 to 44,000. In the last several years, the City has been engaged in
several major planning projects, ranging from the Washington Square Regional Center
Implementation Program, Transportation System Plan, natural resource and green
spaces/natural resource management, Bull Mountain annexation, commuter
rail/downtown redevelopment, Hwy 217 corridor planning, UGB expansion, and
affordable housing. With these long term planning projects and the changes in the
community, there is a need to take a look at the overall growth management approach
to reflect the community's goals in a broader. context.
Revenue Required/Revenue Potential: Consultant costs - as much as $75,000 per
year for up to three years. The extent of consultant use will be determined by the role
staff plays in the program and the level of detail and citizen involvement directed by
Council.
Work Completed to date: Between December 2002 and April 2004, the Planning
Commission held five work sessions on the Comprehensive Plan Update work program.
During this time, the Planning Commission reviewed the main elements of the plan
update. The meetings resulted in the Planning Commission's preliminary
recommendations for the Comprehensive Plan Update work program.
One of the key issues in undertaking the Comprehensive Plan update is the allocation
of staff resources. The major effort that is currently underway is the Downtown
Improvement Plan. The Downtown Improvement Plan must be completed by June
2005 to meet federal grant requirements.
Implementation Action Required: Council adoption of a Goal during 2005 to initiate
updating the Comprehensive Plan over the next 2 - 3 years. Staff will work with
consultants and citizen task forces to gather input and develop recommendations.
Council will adopt a new Comprehensive plan following this process. Updating the
Comprehensive Plan to address key policy issues and community involvement will take
two to three years. Implementation of the updated Plan could take another year.
Council will have to formally amend the Comprehensive Plan and adopt implementing
ordinances.
15
Timing: Establish Task Force in the Spring of 2005 and initiate update to be completed
by 2008.
Advantages:
■ The Current Comprehensive Plan is out of date and needs'to be updated.
■ Changing needs of the community can be reflected in the plan update.
■ The Plan update coincides with efforts by the Parks and Recreation Advisory
Board and the Downtown Task Force efforts.
■ Infrastructure needs could be tied to bonds and urban renewal initiatives by the
Parks and Recreation Advisory Board and the Downtown Task Force.
• A Comprehensive Plan update can address Vision Task Force Goals.
Disadvantages:
• No funding source identified
■ Staff resources will. be limited to update. No other initiatives can be started while
this project is underway.
Recommendation: Council's goal setting session is scheduled for January. The
Comprehensive Plan update is an important goal that should be considered during goal
setting. Goal setting could be used to begin consideration of a series of questions
related to the Plan update, including the study area for the update, who should lead the
update, public participation, time and resources committed to the update. These issues
can be further discussed with the Planning Commission in February. The work session
with the Planning Commission is tentatively scheduled for February15, 2005. That will
be the opportunity for Council and the Commission to finalize the approach for the
update of the Comprehensive Plan. The purpose of this agenda item is to start the
discussion on the approach and scope of the program.
Council Priority/Discussion:
16
Funding Needs
Library Operational Hours
Issue Summary
Definition: A basic measure of library services available to the public is the number of
hours per week that a library is open. In FY 2001-02, the Tigard Library was open 69
hours per week. Since that time, funding for library operations from the Washington
County Cooperative Library Service (WCCLS) has been steadily cut back. In addition,
the Tigard community authorized the building of a substantially larger facility with
accompanying increases in operational costs. At the time of the bond measure, there
was much discussion as part of the campaign about the need to authorize a countywide
local option levy to help cover the increased operating costs of the new building.
Voters have twice failed to pass a WCCLS local option property tax levy. City funding
for the library has increased, but not enough to maintain the historical level of open
hours. Thanks to temporary funding made available by Curtis Tigard and his late sister,
Grace T. Houghton, the library has been open 54 hours per week during its first three
months of operation. The 54 open hours have been maintained longer than anticipated
due to savings from vacant positions, but hours will need to be reduced by the end of
December. Once this temporary funding has been expended, it will either be necessary
to find additional funding or to reduce library open hours below the current 54 hour level.
Revenue Required/Revenue Potential: The additional revenue required to maintain
the 54 open hours for the remainder of the fiscal year would be approximately $52,000.
The revenue required over the next five fiscal years would be approximately $105,000
per year (in 2004 dollars) more than the base budget.
Work Completed to date: A countywide levy for libraryoperational funding was placed
before the voters in November 2002 and again in May 2004. Each time the levy was
unsuccessful. In addition, staff has worked very hard with WCCLS member libraries to
review and modify the formula used by WCCLS to distribute funds to members. Some
changes were made, but not to the full extent advocated by Tigard.
Currently, the Library Board is examining the open hours question. At the October 12,
2004 City Council meeting, the Library Board discussed with the Council the
dilemma/challenges facing the library in terms of operational hours. The Library Board
will meet again with Council in January 2005 to further discuss available options.
Implementation Action Required: Both short-term and long-term resolutions to open
hours questions need to be explored. The long-term resolution to this issue is a stable
funding source, for example, a local option levy for the City of Tigard or a local option
WCCLS levy.
17
Timing: Temporary funding for the current 54 open hour level will shortly be expended.
Without increased funding to maintain the current hours, open hours will need to be
reduced in January.
Advantages:
■ Increases access to programs, books, resources and other library services.
■ Introduces more people to services of new library, thereby increasing library use.
■ Promotes goodwill in the community.
■ Provides a gathering place and destination point for residents of all ages.
Disadvantages:
■ Competition with other General Fund needs
■ Confusion for the public regarding the resources used to maintain open hours vs.
funding used to build the new building
■ The number of open hours is part of the formula used to distribute WCCLS
funding. A further reduction of open hours could reduce future WCCLS funding
for the City of Tigard.
Recommendation:
■ Provide additional funding to the library in order to maintain 54 open hours to the
public for the remainder of FY 2004-05.
■ Develop additional revenue support to restore Sunday open hours in FY 2005-
06.
■ Develop a method to incrementally restore library open hours to the historical
level of 69 hours.
• Continue to explore a future local option levy for the City of Tigard.
■ Strongly support a future WCCLS levy.
Council Priority/Discussion:
18
Funding Needs
Enhanced Neighborhood Program/Community
Assessment Program
Issue Summary
Definition: The City Council has expressed an interest in expanding the Community
Connector/Community Assessment Program (CAP) to create a neighborhood-based
program that will give citizens and business owners opportunities to work as partners
with the City to enhance the community's quality of life. The program would be
designed to facilitate citizen involvement in the Community Emergency Response Team
(CERT) program, Neighborhood Watch, land use and development issues, the Capital
Improvement Program, neighborhood beautification, traffic and pedestrian safety and
other activities.
Revenue Required/Revenue Potential: To be determined. Revenue required for this
program will cover staff costs for developing and implementing the program structure
and for neighborhood grants - should Council choose to authorize grant opportunities.
The program activities (CERT, Neighborhood Watch, land use neighborhood meetings,
etc.) are already incorporated into various department work programs and should not
necessitate much in additional funds. There are no revenue sources identified for this
program although the availability of grant funds will be explored.
Work Completed to date: The City Council discussed the concept at the October 19,
2004 workshop meeting and agreed that staff should work with the Committee for
Citizen Involvement (CCI) to develop the concept further.
The CCI has discussed the concept at three meetings and the members are
enthusiastic about moving forward. The CCI is gathering input from the community
about how to define the neighborhood areas and how the program might be structured.
Implementation Action Required: The CCI will review the. input from a December 7,
2004 community meeting and develop a recommendation for Council consideration in
April 2005.
Timing: Moving forward in the development and implementation of the program in
winter and early spring will facilitate inclusion of any program costs in the FY 2005-06
budget.
Advantages:
■ Provide an organized way for citizens to get more involved in existing programs.
■ Identify new ways for citizens to participate as partners with the City.
■ Enhance the community quality of life.
19
Disadvantages:
■ No stable revenue source identified for any costs that may be associated with the
program.
Recommendation:
Proceed with the development of the program and recommendation to Council on an
implementation plan.
Council Priority/Discussion:
20
Funding Needs
Enhanced Training
Issue Summary
Definition: Since FY1999-2000, the approximate total funds allocated citywide for the
education and training of all City employees has decreased 28%. During this same time
period, the total number of City of Tigard employees has increased by 5% (2.2% within
the General Fund). The current funding is inadequate to provide specialized and
professional development training and education of a caliber needed to maintain quality
service delivery, improve efficiencies, incorporate innovation, maintain competencies,
and retain high quality employees. The American Society of Training and Development
reports that organizations with above average training and development budgets
outperform competitors and achieve a higher total shareholder return.
Revenue Required/Revenue Potential: To be determined.
Work Completed to date: Departments prepare Training Plans annually at the same
time they develop their budget requests. These plans, however, reflect the recent levels
of funding rather than actual needs.
Implementation Action Required:
■ Discussion by the Budget Committee during consideration of the FY 2005-06
Budget.
■ Development of departmental Training Plans that reflect actual needs as well as
anticipated funding levels
■ Development of departmental training budgets that enhance training
opportunities.
■ Development of a coordinated approach to assure best use of training dollars.
Timing: This issue could be addressed as early as FY 2005 06 or at such other time as
determined by the Budget Committee. During 2005, City Administration will work with
all departments to formulate a philosophy of planning for, using, and reporting on the
use of training dollars.
Advantages:
■ Enhanced job skills and knowledge, better job performance
■ Improved team and organizational performance
■ Addresses retraining and retooling needs
■ Improved morale
■ Better trained staff reduce errors and misjudgments that can lead to litigation and
dissatisfied customers
■ Improved service delivery
■ Increased efficiencies through better trained staff
21
• Ability of the City to attract higher quality candidates for employment
■ Greater opportunities for internal staff to prepare for promotional opportunities
■ Support of the City's Succession Planning efforts to prepare internal candidates
for future leadership roles
Disadvantages:
■ Positive results not sufficiently quantifiable or measurable for some
• Training viewed as "extra" or "luxury" expenditures
■ Citizens are more critical of most public sector expenditure related to staffing and
training.
Recommendation:
Adequate funding for staff training should be restored based on department needs,
justification, and relevance of the enhanced training/education to improved services,
efficiency, job performance, and professional development.
Departments should prepare training proposals aimed at creating a smarter workforce
by improving job knowledge/skills and work performance, increasing service delivery
and operational efficiencies, and enhancing career development where appropriate.
Council Priority/Discussion:
22
Funding Needs
MSTIP Needs
Issue Summary
Definition: The County Major Streets Transportation Improvement Program (MSTIP)
has been highly successful since its inception. MSTIP 3 projects are almost all initiated
or completed, MSTIP 3b (the interim program) is already underway, and the MSTIP
Transportation Capital Program (using the permanent portion of the serial levy for
MSTIP) covering the six-year period from 2007 through 2012 is in the initial stages of
being developed. The transportation-related needs countywide far outstrip the funding
sources available through the existing MSTIP program. A new program (most likely
called MSTIP 4) will be needed to address some of the high-priority projects in both the
County and the cities and continue the success of the program for the next decade.
That program will have to be submitted to the voters for approval.
Revenue Required/Revenue Potential: The City of Tigard would most likely receive a
proportionate share of a future MSTIP 4. The MSTIP program has traditionally looked at
geographic equity as one of the goals in the distribution of funding. The program
typically focuses on collectors and arterials identified in the County Transportation Plan
and does not normally include state facilities. There have been exceptions, with the Hall
Boulevard/99W intersection improvement project being the prime example. Based on
MSTIP 3, Tigard can expect several projects within the City to be included with an
aggregate amount of $10 to $20 million.
Work Completed to date: The Washington County Board of Commissioners has
begun a public outreach effort to make known the multitude of transportation-related
needs countywide. This includes major transportation projects in the cities and within
the unincorporated County. The goal of this public outreach is to determine what, if
anything, the residents of the County are willing to pay to implement some of these
highly important projects. The Transportation Capital' Program will provide from $3 to $5
million dollars to fund a project within the City jurisdiction. The effort to see what the
voters would desire to fund beyond that should be in full swing by mid-year 2005.
Implementation Action Required: An MSTIP 4 would require a countywide vote for
implementation. A ballot measure could come at any May or November election, but
has the best chance for passage in a general election (November of an even numbered
year) where the double majority requirement is not in effect.
Timing: An MSTIP 4 measure would most likely go before the voters in 2006 at the
earliest. The next option would most likely be 2008.
23
Advantages:
■ A new MSTIP 4 program to address major projects countywide would continue
the success of the MSTIP program and allow the County and the cities in the
County to move forward with significant improvements to the countywide system.
■ The City of Tigard can implement some high-priority projects through this
program. Projects within the City could improve intra-city circulation and provide
facilities to accommodate alternate modes of transportation.
Disadvantages:
■ The voters have indicated that they have limitations on what they can afford,
regardless of the existing needs. The MSTIP program may face the same
challenges faced by bond measures in any election year.
■ Funding through MSTIP for countywide. projects may contribute to the perception
that the County is meeting its needs through its own resources and does not
need additional help. Funding through the. state or federal government may be
diverted to other counties because of that perception.
Recommendation: The City should participate actively in the County's public outreach
process and remain engaged through the formulation of a future MSTIP 4. The City
should also be prepared to submit projects for consideration that enhance intra-city
circulation and are clearly identified as having a high priority with the voters in the City.
Council Priority/Discussion:
24
Funding Needs
Parks & Open Space Acquisition.
Issue Summary
Definition: The City can issue bonds to finance Parks and Open Spaces purchases.
General Obligation bonds require a citywide vote to authorize a special debt service
property tax levy. The City could also issue other types of bonds, which do not require
voter approval, but would have to identify a source of revenue to be pledged to annual
debt service payments. The City currently does not have such a source of revenue.
In 1999, the City adopted a 10-year Park System Master Plan. This Park System
Master Plan was the result of a comprehensive, collaborative effort between the citizens
of Tigard, Tigard staff, and consultants. Tigard's Park System Master Plan is a
comprehensive needs assessment and long range plan for meeting the community's
parks and recreation needs over a ten-year period. The Plan identifies many projects
totaling over $21,000,000. The Plan examines the impacts of the community's growing
demand for services, the effects of related planning efforts, the implications of
demographic changes, and the contributions made by the park system in providing relief
from high density urban development. Further, the Plan sets forth a Capital
Improvement Program (CIP) which functions as a framework plan or tentative list of
projects for a ten-year period. The CIP is reviewed and updated annually to reflect the
changing needs of the community and changes in available funding for financing park
capital projects. Decisions regarding the actual expenditure of funds for individual park
capital projects are incorporated into the City's annual budget process.
In 2004, the City's Parks and Recreation Advisory Board (PRAB) conducted a survey to
gauge public interest and willingness to financially support a range of parks and
recreation issues. Currently there is support for both additional parks land, as well as
additional open space acquisitions. Acquiring additional open space land ranked the
most popular project in the survey with 49% of the respondents stating they. would
financially support it.
The current, proposed 5-year parks CIP (FY 05-06 - FY 09-10) totals $4,235,929.
Currently, there are limited funds available for non-SDC eligible projects. Also, there are
times when the combination of SDC funds and grant funds do not entirely fund a
project. In these cases, projects may not be able to be accomplished because of the
limited non-SDC funds. Approximately $400,000 in non-SDC eligible projects is
currently unfunded unless the City appropriates General Fund revenue to these projects
(Northview Park, Jack Park, Summerlake Park, Englewood Park, and Fanno Creek
Park).
Revenue Required/Revenue Potential: The revenue required to accomplish the open
space and greenway purchases identified for the next 5-years (FY 04-05 thru FY 08-09)
25
is approximately $6.1 million. SDC generated revenue, based on recent changes to the
SDC rates are anticipated to be $7.9 million over the same five year period. The new
Parks SDC methodology adopts a ratio of 41 % SDC and 59% non-SDC revenue for
purchase of open space and greenway properties. Thus the non-SDC component, if
met by a potential bond sale, would need to be $3.59 million to accomplish the five year
plan. A general obligation bond sale of $4 million financed over 10 years would require
a property tax levy of approximately $0.13 per $1,000 of assessed valuation to pay
annual debt service.
Work Completed to date: The PRAB has conducted the survey, and discussed
implementation plans. It is anticipated that the PRAB will return to the Council with an
action plan including this issue early in 2005. In addition a group a citizens has
approached Council and suggested this issue be put on the ballot.
Implementation Action Required: A general obligation bond measure must be
approved by Council and placed on the ballot for approval by Tigard residents.
Timing: To be determined
Advantages:
■ A bond measure would provide the funds necessary to supplement SDC
funds for the acquisition and development of parks and open spaces
■ Easily understandable (known funding source, familiar to voters)
■ A bond measure would provide the funds necessary to pay for those projects
. which are non-SDC eligible.
Disadvantages:
■ Tigard residents have been asked to increase taxes on several occasions
over the past several years. Specifically, the successful passage of the new
Library Bond and the School District Bond.
■ Although additional bond funds would be advantageous, the projections show
limited funding for parks operations and maintenance. The City may not be
able to adequately maintain new facilities.
Recommendation: Accept the recommendations of the PRAB, due in early 2005. It is
anticipated that this recommendation will suggest a bond sale for land acquisition. Open
space purchases can be made with minor impacts to the operating budget, whereas
park development costs and subsequent additional operational costs will impact the.
annual budget.
Council Priority/Discussion:
26
Funding Needs
Public Facilities: Public Works, Records, Police
Issue Summary
Definition: The City owns and operates several buildings, including City Hall, the
Permit Center, the Police Department, the Library, the Niche, the Senior Center, the
Public Works Administration Building and annex, and Canterbury Water facility. In
addition, the City operates the Water Building, which is owned by the Tigard Water
District. The City does not have a dedicated source of funding to provide for the
maintenance, repair or expansion of these facilities. The City has traditionally set
aside General Funds in anticipation of future building needs.
The City has recently addressed capital needs of the Library and City operations in
City Hall and the Permit Center. It is prudent, however, to start building renewal and
replacement reserves for these facilities. In addition, the City may have an
opportunity through the remodel of the current Public Works Building after Public
Works moves to the Water Building to address records and police evidence storage
needs through the use of this building. Finally, there will be a need within the next
five to ten years to address space and facility needs of the Police Department (last
addressed in 1999.)
Revenue Required/Revenue Potential:
Projects identified to date include:
• FY05-06 Projects
o Water Building Renovations - $800,000
o PD Underground Storage Tank Upgrade - $20,000
o Police & records Storage Remodel - $149,425
o Senior Center Seismic Upgrade Design - $20,000
• FY06-07 Projects
o Miscellaneous City Facility Projects - $200,000
• FY 07-08 Projects
o Miscellaneous City Facility Projects - $200,000
o Senior Center Remodel - $950,000
o Senior Center Seismic Upgrade- $100,000
o RFID Technology (Library) - $750,000
• FY 08-09 Projects
o Miscellaneous City Facility Projects - $200,000
o Demolition of Surplus PW Facilities - $200,000
• FY 09-10 Projects
o None listed at this time
27
In addition to identified projects, there is a need for contingency funds for needs that
may arise during the planning period.
General use facilities and facilities used by General Fund departments (City Hall, Police
Department, Permit Center, and Library) are generally supported by General Fund
transfers to the Facility Fund. The major exception to this rule is for new construction of
major facilities such as the Library. Where appropriate, the City transfers money from
enterprise funds or dedicated sources (such as Water, Sanitary Sewer, Buildings) to
pay for space needs of staff supporting those operations.
Work Completed to date: A seismic study of city facilities was performed in 2000 to
identify the seismic upgrade needs of City facilities. A consultant is currently identifying
current and future space needs for the Public Works Department. This work will result in
recommending and designing needed improvements to the Water Building and
assessing the need for future uses of the Ash St. sites currently used by Public Works.
Implementation Action Required: Projects will be identified and approved in the
City's Capital Improvement Plan. Annual funding is provided through approval of the
City Budget.
Timing: It is anticipated that the projects identified will be implemented according to the
budget approval of the fiscal years indicated if necessary funding is available.
Advantages:
■ Provides for greater security of facilities
■ Meets the long term growth needs of the City
■ Provides for a safe and effective work environment for staff and the public
• Improved use of facilities to provide better customer service
■ Provides for more meeting rooms for public use
Disadvantages:
■ No dedicated funding source. Capital funding need must compete with
operating funding needs.
■ Delaying projects would result in increased cost of projects and increased
safety and or security risks
Recommendation:
■ Develop a capital plan for all City facilities, including identifying renewal and
replacement and upgrade needs.
■ Develop policies and a plan for funding renewal and replacement needs during
the annual budget process. This may include specific identification of a reserve
amounts within the Facility Fund for specific City facilities.
■ Present recommendations to the Budget Committee and the City Council for
their review and approval.
Council Priority/Discussion:
28
Funding Needs
ROW (Rights-of-Way) Maintenance Needs
Issue Summary
Definition: Rights-of-way (ROW) maintenance includes landscape and general
maintenance activities for those areas between the pavement or sidewalk areas (where
they exist) and the street rights-of-way line. Current City ordinances place the
responsibility for this maintenance on the adjacent property owner. The City Council has
been approached by several property owners over the last few years requesting that the
city adopt maintenance responsibility for certain rights-of-way. This is typically on
arterials or collectors where the homes have frontage on an interior street system, but
back up to a major street with a wall blocking access to the strip of land needing
maintenance. Durham Road is a prime example of this dilemma. The discussion is
currently focused on the City assuming responsibility of ROW maintenance on such
arterials and collectors.
Revenue Required/Revenue Potential: Depending on the level of service adopted,
costs could range from $25,000 to $450,000 annually.
Work Completed to date: The City Council has directed staff to provide a proposal to
enhance the current level of service in the FY 05-06 budget process. The
Transportation Financing Strategies Task Force has the added mission of evaluating
potential new funding sources that could be established to provide a stable source of
funding for ROW Maintenance. The Task Force will be meeting with City Council in
early 2005 to receive direction in this regard.
Implementation Action Required: Action on this item will be through the annual
budget adoption process. The establishment of new funding sources for this effort would
greatly enhance its adoption into the City's annual budget.
Timing: Initial action on this item will be during the FY 05-06 budget adoption process.
Advantages:
■ Beautify the city and entry points;
■ Removes unsightly areas;
Property owners would be happy.
Disadvantages:
■ Cost: spends already limited maintenance dollars on an aesthetic issue;
■ Potential for conflict - some property owners fulfilling their responsibility and
others not.
29
Recommendation: Council should continue to study this issue through the FY 05-06
budget adoption process.
Council Priority/Discussion:
0
30
Funding Needs
Water Supply Source
Issue Summary
Definition: Tigard's Vision document and Council Goals both identify securing a long
term water supply as an essential objective of the City. In the 2004 Vision update
process, this goal has been refined to include two additional directions, one being to
accomplish this goal by 2007 and secondly, to secure an equity position in a source.
Tigard is currently participating in three efforts to secure its long term water supply:
securing a new long term contract to purchase water from the City of Portland, joining
the Joint Water Commission (JWC) and expanding the Scoggins Dam / Henry Hagg
Lake complex, and continued study of the Willamette Treatment plant.
The Portland option, which would be a long term water sales contract, will not satisfy the
Vision goal of obtaining an equity position in a water supply. The City of Portland is only
interested in a long term water sales agreement, not in sharing equity in the source. A
draftcontract will be available for review in early 2005. This alternative will not provide
substantial savings to water costs for Tigard citizens.
The JWC proposal hinges on the ability to secure permits and approvals to modify
Scoggins Dam. The JWC proposal would cost the City of Tigard between $91 and $93
million dollars over the next 40 years.
The Willamette option includes continued monitoring of the technical performance of the
treatment plant located in Wilsonville. In addition, this option will include the decision to
request voter approval to pursue this source. Current economic analysis continues to
suggest that the Willamette option is the least costly alternative for the citizens of
Tigard.
Only two of these projects are consistent with and addressed specifically in the City's
visioning documents.
Revenue Required/Revenue Potential: Tigard could be faced with making financial
commitments with costs that best current estimates average to be approximately $80 to
$90 million dollars over the next 20 to 40 years. To help put these numbers in
perspective, a $5 dollar per month increase in each monthly water bill in the Tigard
Water Service area would raise approximately $1 million dollars annually.
Work Completed to date: Staff has been involved in a joint contract negotiation effort
with Portland and eight other wholesale customers over the last year. This contract will
be available for public review early in 2005.
31
In 2004, the City of Tigard has also become a member of the Joint Water Commission,
which will provide the City with the ability to pursue equity ownership in future capacity
improvement projects the JWC undertakes.
Staff continues to monitor the performance of the Willamette treatment plant, as well as
participate in the efforts of the Willamette River Water Coalilition, (WRWC), an
organization to which Tigard belongs. The WRWC is currently undertaking a public
education project targeting member populations about current information relating to
water quality issues affecting the Willamette.
Implementation Action Required: The Intergovernmental Water Board will initially
produce a recommendation to the City Council. Following that, the City Council will
need to indicate its approval. If the City elects to sign a long term supply contract with
Portland, the cost of this decision will be borne completely by water rate payers. If the
City decides to pursue the JWC or Willamette options, a substantial portion of the
capital costs can be assigned to SDC revenues. This will allow for lower water bills. In
both of these scenarios, capital costs would be financed by revenue bonds. Council
would approve issuance of the Water Revenue Bonds by resolution.
Timing: The City will be able to begin the review of the potential Portland contract early
in 2005. The City's current contract with Portland expires in 2007. Neighboring cities
and water districts are also discussing the possibility of a vote on the Willamette issue.
This vote could happen as soon as November, 2005. Decisions to commit major capital
in the JWC will need to be made in 2006.
Advantages: The advantages of securing a permanent supply source are many:
control, financial stability, adequate future supply, and quality control top the list.
Disadvantages: Cost. Because the Tigard Water Service Area is so.late in securing
its source the costs are high, and Tigard will not have the benefit of time to spread costs
over a long period.
Recommendation: Staff should continue to update Council on options and costs, with
a future recommendation to authorize issuance of one or more water revenue bond to
purchase some portion of future supply as options finalize.
Council Priority/Discussion:
32
Funding Needs
Centralizing City Information
Issue Summary
Definition: The City, like many organizations, maintains a variety of computer systems
that rely on a variety of databases. The primary computer systems are Hanson (public
works information and data), Tidemark (planning and engineering information and data),
and Springbrook (finance and utility billing information and data). In addition to the "big
three" systems, the City also has a variety of smaller systems such as FullCourt
(municipal court information and data) and in-house databases. Most, if not all, of these
systems require overlapping data and yet they do not talk to one another and data
cannot be shared or easily transferred.
Organizations have discovered that organization-wide single-provider systems, systems
that can access unified databases, or systems that can share separate databases
provide greater organizational efficiency, reduce duplication of data and effort, and
increase data accuracy. All of these benefits also reduce costs or limit future cost
• increases.
The City has been considering different options for improved management of its
databases and computer systems. At this time, the City is considering retaining existing
computer systems, but modifying and standardizing aspects of those systems to
facilitate sharing of information. The first phase of this project would require hiring a
consulting team to interview staff, analyze the current system, analyze future
information needs of the City, and develop an implementation plan and cost for the
project.
Revenue Required/Revenue Potential: Full implementation of a sharing protocol
could cost as much as $500,000 to $1,000,000.
Work Completed to date: The City has discussed this project internally and with the
City's Budget Committee in FY 2004-05. The City has also been making annual
contributions to a Computer Systems reserve in the Central Services Fund since 2000.
By the end of FY 2004-05 (assuming no budgetary transfers) this reserve will hold
$900,000.
Implementation Action Required: Hire a consultant to begin phase one of this project
to define City needs and options and to develop final recommendations for improved
database management.
Timing: The planning phase should start in FY 2005-06. It would be a three to four
year project. Funding will be the major factor on the timing of completing this project.
33
Advantages:
One centralized and standardized location of city information for unified access
by staff and citizens.
■ All current city system would stay in place and continue to serve each
department as it has in the past.
■ Any new system would easily integrate into the centralized collection point.
■ Having information in one location would enable staff and citizens to combine
and analyze all information in an easy to use format.
Disadvantages:
■ Implementation cost would be high, but once implemented on-going cost would
be minimal.
Recommendation: Fund money for the first phase of this project.
Council Priority/Discussion:
34
V
Funding Needs
Economic Development
Issue Summary
Definition: The economy in Oregon has been a major focus of concern over the last
few years. Several cities in the Portland Metropolitan area have economic development
programs, and some of those cities have had notable successes in attracting
businesses.
The City's Visioning program has identified the need for an economic development
program. The Downtown Task Force has also targeted economic development as
being essential to the success of the downtown.
Economic development programs in cities can take a variety of forms. A common form
is urban renewal. This report contains a separate issue paper on urban renewal. Other
forms of economic development activity include economic improvement districts,
business recruiting, business assistance, tax abatements, and various other incentive
programs.
The City of Tigard is currently researching possible use of urban renewal in the
downtown area and/or Washington Square. Washington County is considering
formation of an urban renewal district along the commuter rail line.
Three years ago, Tigard and downtown business interests attempted to form an
Economic Improvement District/Business Improvement District in the downtown area.
That effort failed due to insufficient support by downtown property owners.
Revenue Required/Revenue Potential: Unknown. Until a specific economic
development program is identified it is not possible to determine potential costs or
funding sources.
Work Completed to Date: The City has joined the Regional Partners for Economic
Development and the Westside Economic Alliance. The Visioning Task Force has
identified the need for establishing an economic development program as part of its
2004 update. The Downtown Task Force has identified the need for an economic
development program for the downtown. Council has received updates from the
regional Partners for Economic Development.
Implementation Action Required: Council discussion and direction on the preferred
form of an economic development program.
Timing: To be determined.
35
Advantages:
■ Improved business climate in Tigard.
■ Greater employment opportunities in Tigard.
■ Increased business development which adds to the City's assessed valuation
and property tax revenues.
■ To the extent that economic development brings new businesses to Tigard, this
may create opportunities to address redevelopment and infrastructure needs in
specific areas.
Disadvantages:
■ Economic development growth, if not handled properly, could lead to increased
population growth that worsens congestion and aggravates citizens' concerns
over density and traffic:
Recommendation:
■ Schedule a discussion at a Council workshop'to discuss the pros and cons of
economic development programs and the form(s) of efforts that work best for
Tigard.
■ Work with business and commercial/industrial property owners in the City to
assess the level of interest in and support for a City economic development
program.
Council Priority/Discussion:
36
Funding Needs
Urban Growth Boundary
Issue Summary
Definition: Metro expanded the Urban Growth Boundary west of Tigard by adding
planning areas 63 & 64. Since these two areas are adjacent to Tigard's Urban Services
area on Bull Mountain, Tigard has been identified as being the logical provider of urban
services for these two areas.
Prior to completing the Urban Growth Boundary expansion to bring these two areas
inside the boundary, it is necessary to develop concept plans for the two areas.
Concept plans must address the statewide planning goals and guidelines as well as
Metro's Functional Plan criteria. The concept plans could be developed by Washington
County because these areas lie within the unincorporated area, or they could be
developed by Tigard as the logical provider of urban services.
Concept planning is a time-consuming and expensive process. Regardless of which
jurisdiction is determined to develop the plans, a major issue will be how to pay the
costs of the plan development. Costs could either be paid out of general revenues of
the jurisdiction, fees could be developed and charged to land-owners and developers,
or a reimbursement district in some form could be developed to assess property
owners. It is not yet know how long it would take to develop the concept plans
Revenue Required/Revenue Potential: $250,000 - $400,000
Work Completed to Date: Council has discussed preliminary approach to addressing
planning and urbanization needs.
Implementation Action Required: The City and the County need to meet to
determine which jurisdiction will be responsible for development of the concept plans.
Once that is determined, the City and County will need to develop an Intergovernmental
Agreement to guide the development of the plans. Ultimately, the City and County will
need to amend the Urban Services Agreement between the City and the County to
formally designate Tigard as the ultimate service provider for these areas. Once the
responsibility for the development of the concept plan is assigned, the two jurisdictions
will need to agree on a way to pay the costs of plan development. Is a fee-based
approach is chosen, Washington County will need to adopt the fee because the area is
outside the City limits.
Timing: To be determined. If the City is designated as the lead planning agency it will
be necessary to determine the best project approach. The City is planning to update its
Comprehensive Plan. If this update were to include an update of the Comprehensive
37
Plan for Bull Mountain, it would be most effective to include the development of these
concept plans into the larger project. It is not yet known, however, whether the City's
Comprehensive Plan update project will include unincorporated Bull Mountain.
Advantages:
■ The City is the logical long term service provider to these areas.
■ The City would be able to shape the future growth of these areas in a manner
that serves not only the planning areas but the larger community as well.
■ Effort could be cost-neutral if the proper funding mechanism is chosen.
Disadvantages:
■ Will require extensive staff resources to complete.
■ Annexation will ultimately be required to serve the area.
• Could lead to illogical City limits boundary until remainder of Bull Mountain
annexed.
Recommendation: Initiate discussions with the Washington County Board of
Commissioners on the best approach to address the future urbanization of these two
areas.
Council Priority/Discussion:
38
Funding Needs
New Police Facility
Issue Summary
Definition: If growth in Police staffing trends continues over the next several years, the
City will have a need to build a new or expanded Police facility.
The current Police facility was expanded in 1999, adding 3,000 square feet of space. At
that time, the expanded facility was projected to be sufficient for police Department
needs until 2007 to 2009. Since FY 1999-00, the City has added four positions to the
Police Department. The Department recently moved its traffic unit and community
service officers into one of the modular buildings behind City Hall to create more work
space within its main offices. In addition, the department rents_three off-site storage
units for records and evidence storage.
In the current financial forecast, the department is projecting the need for 18 to 24 new
positions by 2010. The Department currently has 76 authorized positions. If projections
are accurate, by 2010, the department will have 94 to 100 authorized positions.
The City is also developing a Downtown Plan at this time. This Plan will lay out a vision
for the redevelopment of the downtown area of Tigard. This Plan may create an
opportunity to explore the creation of a joint Police/Fire facility within the civic center
portion of the redevelopment area. Such a combined facility would not only create a
substantial public investment within the redevelopment area, but it could also provide
the opportunity for greater cooperation and coordination between police and fire
operations.
If a new facility is built, police would vacate the space they currently occupy. It is not yet
clear what uses might be made of this facility, though it is possible that the City will
develop needs for additional office space in the future.
Revenue Required/Revenue Potential: The cost of a new facility cannot be
determined until the facility and possible location have been identified. Initial space
planning could cost as much as $150,000 and would have to be paid out of the City's
General Fund.
Construction of a new facility would most likely be paid for by a General Obligation Bond
authorized by voters. It might also be possible to use tax increment funding if an urban
renewal area is created in the downtown area, but funding from this source would be
limited in the early years of an urban renewal district.
Work Completed to date: None on a new police facility.
39
The Downtown Plan is currently being developed.
Implementation Action Required: Funds for a space and facility plan will need to be
provided to develop a proposal that identifies costs and design. If the City chooses to
seek General Obligation Bond approval from voters, Council would need to refer a
measure for an election. Such a measure would be subject to the double-majority
provisions of the Oregon Constitution. It may only be voted on at one of the following
elections:
1. May, subject to double-majority requirement
2. November of an odd-numbered year, subject to double majority requirement
3. November of even numbered year, subject to simple majority.
Timing: The department projects the need for a new facility soon after 2008.
Advantages:
■ Provision of adequate work space for public safety personnel.
■ Reduction of funds currently spent on rental space.
■ Possible enhanced coordination between police and fire operations.
■ Potential contribution to Downtown redevelopment efforts.
Disadvantages:
■ Cost.
■ Need to ask voters for additional property tax revenues to support bonds.
■ Need to develop alternative use for existing police facility.
Recommendation: Council should discuss this issue during consideration of the Five
Year Capital Improvement Plan (CIP) and the.FY 2005-06 budget process. If there is
interest in proceeding, staff should be directed to develop a more complete timeline,
including a recommendation for start of a space and facility plan.
Council Priority/Discussion:
40
Funding Needs
Records Program
Issue Summary
Definition: The City's records management program supports City departments,
compliance with public records law, and the Vision Task Force communication goal by
providing easy and efficient access to city records.
Public records include all print, electronic (including e-mail), audio (including voice mail),
and video records. Under Oregon Law and Administrative Rules, all records are
assigned retention periods. These periods range from zero time to permanent.
Records staff work with departments to ensure that they comply with Public.Records
laws, gather records for long-term storage, retrieve records from storage as needed,
microfilm permanent records, and destroy records that have passed their assigned
retention period. City records are stored at the Water Department's Canterbury Yard
and rented storage space. The City pays $28,260 per year for rented storage space for
general City and Police records.
In addition to managing public records, Records Program staff also responds to
requests from the public for City records. Often these requests include potential
litigation. It is crucial that these requests be handled promptly and professionally.
Finally, Records staff also engages a number of special projects throughout the year.
Most importantly, Records staff needs to work with other City staff to train them on
Public Records requirements and compliance with law and proper treatment of public
records. Handling of electronic records in particular requires ongoing attention and
training, due in part to the transitory nature of the media. Another special project that is
currently underway is the building of a Measure 37 database of land use-related
ordinances and resolutions from the incorporation of the City in 1961, and scanning
these documents into a PDF format so that they are easily retrievable by staff and the
public. This database will contain over 1,000 ordinances and resolutions.
As City budgets have tightened over the past several years, Records program staffing
has been reduced. The City Records Program is now operating at a minimal level.
The City is rapidly approaching the point at which it will need to address storage needs
because available space is filing up. Options include rental of additional storage space,
conversion of an existing City building into a Records Center, and implementation of
new records technology, such as optical scanning.
Revenue Required/Revenue Potential: The additional costs associated with the
records program include:
41
■ Renovating the Public Works building for storage, approximately $150,000. (This
estimate is based on the square footage costs of the remodeling of.City Hall.
Actual costs could be higher if structural strengthening of the building is required,
which is likely),
■ Adding .5 FTE, $26,650, and
■ Software upgrades $10,500.
Work Completed to date: The building renovation and software upgrades have been
included in the financial forecast. Additional consideration is being given to the timing of
adding a .5 FTE to assist in the records program.
Implementation Action Required: Approval of the building renovation and software
upgrades through the budget process.
Timing: Any items approved in the budget will be acted on after July 2005.
■ The building renovation priority and timing will be determined by the CIP process.
■ The Clerk's Index software installation could take place in the first quarter of the
2005-06 fiscal year. The upgrade to ImageFlow would be in 2008-09 fiscal year.
Advantages:
■ By remodeling the Public Works operations facility, Police and City records will
be able to store records and evidence in one location consequently reducing
overall operating costs and working more efficiently.
■ The electronic document management system will increase the ease of
searching for records and reduce retrieval times. The system is accessible for
managing scanned images and electronic documents.
■ The .5 FTE will be assigned project work. Types of projects include: updating
training on e-mail, computer use, and records policy; creating a catalog for the
contents of financial reports; coordinating storage and cataloging of City
photographs; and update the City's records manual.
■ Reduction of legal exposure resulting form the loss or unavailability of City
records or the retention of Records beyond their expiration date.
Disadvantages:
■ Limited availability of funding.
Recommendation:
■ Approve capital funds for renovating the current Public Works operation's
building to accommodate storage of City records and Police evidence in FY
2005-06.
■ Add staffing as funding allows.
■ Purchase Clerk's Index electronic document management system software
module in FY 2005-06.
■ Purchase Clerk's Index Image Flow upgrade in FY 2008-09.
Council Priority/Discussion:
42
Funding Needs
Recreation Programs
Issue Summary
Definition: The City's Vision Document "Tigard Beyond Tomorrow", the Park and
Recreation Advisory Board (PRAB), and the recently conducted Parks and Recreation
Needs Assessment Survey results continue to stress the need for the City to provide
recreation programs in Tigard. Provider options considered ranged from joining the
Tualatin Hills Park and Recreation District, creating a city Recreation Division, or
creating a new local park and recreation district to serve Tigard.
The survey revealed that 57% of respondents favored creating a Recreation Division,
and when asked a follow up question 48% were willing to pay for it. In addition, 52% of
the respondents were willing to pay for the construction of a Community Recreation
Center to provide additional recreational opportunities such as children's programs,
classes, summer playground program, camps, special events, middle school programs,
teen programs, performing arts, and adult programs such as sports leagues and
classes.
The PRAB's top priority is the creation of a City Recreation Division to offer recreation
programs, and the construction of a Community Recreation Center.
Revenue Required/Revenue Potential: Ultimately, an in-house program provided by
the City of Tigard could cost upwards of $860,000 for personnel, materials and supplies,
and capital outlay. The City could move towards a full program by adding services over
time. Initial offerings may be eligible for grant funding.
A Community Recreation Center could cost up to $6.75 million. Operating costs for a
Center are unknown until a facility is designed.
Work Completed to date: The PRAB has conducted a survey to assess the public's
willingness to provide financial support for the provision of recreation programs.
Approximately 57% of respondents favored the creation of a City Recreation Division,
with 48% of the respondents further stating they were willing to pay for it. As an interim
step Staff will propose granting small recreation grants in the upcoming FY 05-06
budget.
Implementation Action Required: Council direction and Budget appropriation.
Funding could come from the General Fund, the Council could place a measure before
the voters to approve a local tax levy, or Council could place the establishment of a park
and recreation district before voters. A bond measure would be necessary to construct
a $6.75 million Community Recreation Center.
43
Timing: Timing is dependent upon Council direction and available funding.
Advantages:
■ Delivery of a service being requested by the public and the PRAB.
• More activities for local youth.
• Greater community focus and identity.
Disadvantages:
■ Additional cost to the General Fund.
Recommendation: Approve the concept of funding limited recreational grants as an
interim step and await the upcoming Park and Recreation Advisory Board's future
recommendation on the provision of recreation programs in the City of Tigard.
Council Priority/Discussion:
44
Funding Needs
Senior Center CDBG Grant Match
Issue Summary
Definition: The Tigard Senior Center Building is owned by the City with the senior
services (meals, classes, programs and activities) being provided by contract with
Loaves and Fishes. The building was originally built with CDBG monies and upgraded
once again through CDBG monies. The City provides ongoing building maintenance
services, however, there is no dedicated funding source to enlarge the building and
update the kitchen equipment to meet the growing service demands of today as well as
the coming of age of the baby boomer population. Tigard currently has the highest
population of 60+ and 75+ seniors of any area in the County. Nationwide we see a
trend of life expectancy increasing from the average of 77 years of age in 2000 to 82 as
the average age in 2050. Tigard's population of 65 and older is over 10% today with the
baby boomers making up another 22% of our population base. The need to expand
and upgrade the building is here today and will grow exponentially in the next ten years.
Revenue Required/Revenue Potential: Based on the encouragement of City Council
in November 2003 to prepare the building for the current and coming needs of the aging
population in Tigard, Loaves and Fishes and the City approached the Community
Development Block Grant program and applied for a $450,000 grant in 2004. This grant
application was accepted and the City and Loaves and Fishes have five years to
prepare the project plans and drawings and present these to CDBG for final approval.
The CDBG funding program requires a full match from the jurisdiction obtaining the
grant; thus the City with assistance from Loaves and Fishes must provide $450,000 in
cash and in-kind services as a match. In addition, operating costs (electrical, gas,
water, etc.) will increase, causing the need for a larger contribution of City resources.
Work Completed to date: The City has successfully applied for CDBG funding and the
project must be completed within the next five years (no later than FY 2008-09) or the
grant approval will lapse. Loaves and Fishes have met with their Site Committee, an
architect and the local Senior Center staff to begin providing general parameters for the
project. The first priority for the expansion is to provide meals and address social
isolation for the community's seniors, both at the Center and in the home. The second
priority is to continue the significant multi-cultural outreach to seniors and their families
to create a sense of community and to teach English as a Second Language to
enhance the quality of life for Tigard's growing multi-cultural population.
Implementation Action Required: The City staff and Loaves and Fishes will:
■ Finalize space and equipment needs for the Senior Center;
■ Provide effective dialog opportunities with the community to garner input on the
project priorities and outcomes;
45
■ Develop project construction plans and specs that are adequate for both the City
and Loaves and Fishes needs;
■ Obtain City Council approval to submit the project plans to CDBG for funding;
■ Obtain City Council approval for budget funding of the grant match; and
■ Build the project.
Timing: The CDBG grant must be applied for and the construction completed within
the next five years. The plan is to apply for the final grant approval for the 07-08 fiscal
year.
Advantages:
■ Provides larger and updated meal and program space for Tigard's senior and
multi-cultural services.
■ Maintains services which can be provided at the existing facility while the °
targeted population continues to grow.
■ Provides meal processing which will remain safe and sanitary as the size of the
service increases.
Disadvantages:
Delayed expansion will reduce the services provided to seniors and multi-cultural
outreach in our community at a time when both of these populations are growing
in Tigard.
No dedicated fund source.
Recommendation: In order to provide services to meet the growing aging population
needs, providing a match for CDBG funding appears to be the best option available with
the City's funds being matched.
Council Priority/Discussion:
46
Funding Needs
Solid Waste Management/Recycling/Code Enforcement
Issue Summary
Definition: The City's Vision Task Force recently updated a goal in the area of growth
and growth management. The updated goal states that "growth will be managed to
protect the character and livability of established areas, protect the natural environment
and provide open space throughout the community."
Solid waste management plays a critical role in not only maintaining the livability of City
neighborhoods but protecting the natural environment as well. Making sure that our
neighborhoods are free from debris and garbage generated from households and
businesses is a very important part of this. In addition, increasing the recycling of
materials from the waste stream is and will continue to be a critical part of protecting our
natural environment and reaching this region's goal of 62% waste recovery by 2005.
The level of effort that is currently possible is limited because of lack of resources and
staffing. An expanded effort that would include greater visibility, program development,
expanded efforts in local public education, and pilot projects that could enhance solid
waste management and recycling throughout the City.
The Solid Waste and Recycling program is currently the responsibility of the City's
Financial Operations Manager who also has responsibility for the management of utility
billing, payroll, general ledger, purchasing, budgeting, and financial forecasting. The
City has a Code Enforcement Officer, but her time is committed to responding to citizen
complaints and land use type of code enforcement issues and she does not currently
deal with solid waste issues.
Revenue Required/Revenue Potential: The franchise fee'on solid waste is currently
at 3% of gross revenues. This generates approximately $234,000 to the City's General
Fund or $78,000 for every 1 Many of the surrounding jurisdictions have a higher
franchise fee assessed on solid waste and, in some cases, those additional revenues
are dedicated to sustaining livability and solid waste management in their community.
The City of Beaverton is an example where this has happened. An increase in the
franchise fee to 5% would produce an additional $156,000 per year.
Work Completed to date: None
Implementation Action Required: Identification of additional resources needed to
address solid waste enforcement needs, solid waste management and recycling needs
and revise solid waste collection and disposal fees, if necessary, as part of the rate
review process. Also, work with the two City franchised haulers on gaining their support
for this effort.
47
Timing: Spring -Summer 2005
Advantages:
■ Enhanced neighborhood livability and code enforcement.
■ Improved recycling in Tigard.
■ Better management and stewardship of the area's natural environment.
Disadvantages:
■ Raising the franchise fee could increase the amount charged by local haulers for
the collection and disposal of solid waste.
Recommendation: Consider increasing the franchise fee on solid waste with the
increased revenue being dedicated to solid waste management, including recycling and
code enforcement. Begin working with the City's two solid waste haulers for support
and concurrence with this expanded program.
Council Priority/Discussion:
48
Funding Needs
Youth Programs
Issue Summary
Definition: Youth Forum - This group of adults representing the City, Tigard-Tualatin
School District, Youth Service/Program providers, businesses, the faith community and
Youth Advisory Council has been meeting since February 2004 to facilitate expanding
programs and activities for youth in the community.
Youth Advisory Council: This group of middle and high school students has been
meeting bi-monthly since June 2003. Their mission is to "empower, involve and
connect the lives of Tigard's youth." The City program is based on the Search Institute
Assets concept. The Search Institute is an organization based in Minnesota which has
developed a list of 40 assets necessary to the success of youth. In support'of the
Search Institutes Assets, the Youth Council plans and coordinates a wide range of
activities and events to involve Tigard's youth. In addition,'they are charged with
providing support to other youth activities such as the Skate Park Task Force, and
serving as a communication connection for the youth in the community.
Revenue Required/Revenue Potential: Currently a few hours of staff time each
month is required for the Youth Forum to support the monthly meetings. Some staff
support is also required to support the Youth Advisory Council meetings and chaperone
activities/events. Staff time is currently incorporated into work assignments.
The Federal Drug Free Communities Program offers a grant - $100,000 each year for 5
years - to support youth activities and programs that provide positive alternatives to
drug and alcohol use. Tigard-Tualatin School District and City staff are working with the
Youth Forum to apply for the grant in March 2005. If successful, the funds could be
used in part to support the Youth Forum and Youth Advisory Council activities.
Work Completed to date: Tigard Turns the Tide is an existing 501c3 non-profit that
exists primarily to sponsor the Alcohol Free Grad Night Party. The Youth Forum group
has been working with the Tigard Turns the Tide Board members to revise their bylaws
to reflect a community partnership whose purpose would expand to provide positive
programs and activities for youth.
Implementation Action Required: Once the Tigard Turns the Tide Bylaws are
completed (scheduled for December), the Youth Forum and Tigard Turns the Tide
groups will merge into one non-profit entity called Tigard Turns the Tide. That group will
submit the request in March for the Drug Free Communities Grant.
49
Timing: If the grant request is awarded, funds will be available for the 2005-06 fiscal
year.
Advantages:
■ New source of funds for youth programs
■ Multi-year funding
Disadvantages:
■ Short term. Only for five years although under the current program application
could be made for the next 5 year cycle.
Recommendation:
Submit the request of the Drug Free Community Grant in March 2005. _
Council Priority/Discussion:
50
Funding Needs
Employee Benefits (Insurance)
Issue Summary
Definition: Over the last few years, no issue has polarized employers and employees
more than health care. The City of Tigard has gone to arbitration twice in three years
over the issues of health insurance. Rising costs have necessitated that the City require
workers to shoulder an ever-escalating portion of the costs, as have most other
agencies and businesses. A Kaiser Family Foundation survey shows that monthly
premiums for employer-sponsored health insurance rose 13.9% over a recent twelve
month period - the third consecutive year of double digit increases and the highest
premium spike since 1990. The City is committed to offering high quality health care,
and has also implemented plan changes, increased deductibles and co-payments, and
offered health screenings to address issues. It is a problem that isn't going to.disappear
anytime soon, and the City needs to adequately fund health insurance while at the
same time continue to explore cost efficiencies.
Revenue Required/Revenue Potential: The City experienced a 16% increase this last
plan year to its Blue Cross Blue Shield coverage and a 11 % increase for Kaiser
insurance. It is anticipated that double digit increases are here to stay for the long term,
and the next plan year may see national trends of 20-23% adjustments. Budgeting
should take this into account.
Work Completed to date: The City has worked extensively with its Health Plan
Committee to review and assess options relative to health insurance for its workers.
Human Resources has brought in experts in the health insurance field for consultation,
worked with regional human resource representatives, and expended a growing amount
of staff time and resources with the City's insurance representatives (CCIS) to insure
that the most cost effective options are utilized.
Implementation Action Required: Impact or interest based bargaining will be
necessary in some cases with existing labor units depending on next plan year
increases, and Council action will be needed to set the terms for non-represented
personnel.
Timing: New rates for the City of Tigard for the plan year starting August 2005 will not
be known until April/May of 2005. If rates exceed re-opener clauses in existing labor
contracts, negotiations will begin at that time.
51
Advantages:
■ Adequate funding for health insurance will enable the City to maintain a
competitive, equitable position as it relates to health benefits in 2005-2006
■ Better opportunities to attract and retain staff
■ More positive level of morale
■ Competitiveness with other public sector employers
■ Funding meets requirements of labor contracts as specified by contribution
agreements.
Disadvantages:
■ If there is inadequate funding and premiums become too high for workers to
bear, some employees may drop out of insurance coverage altogether. When
healthy employees drop out, the resulting adverse selection (leaving employees
with greater health issues) brings even higher premiums. Employees without
health insurance can face financial ruin, resulting in even more sicker employees
working for the City.
■ Inadequate funding will bring additional labor strife, decreased morale
• Workers will feel a greater pinch in their pocketbooks
■ Tigard may fall behind in comparability to other regional public sector
organizations in terms of contributions and benefits
■ Recruitment and retention may be negatively effected
■ Potential violations of previously agreed upon insurance contribution rates in
collective bargaining agreements.
Recommendation: The City should continue to explore options to control health care
costs while continuing to provide adequate levels of insurance for employees.
Council Priority/Discussion:
52
Revenue Options
Clean Water Services Split of Sanitary and Stormwater
Revenues
Issue Summary
Definition: Under an Intergovernmental Agreement (IGA) with Clean Water Services
(CWS), not only are specific service provider responsibilities outlined with regard to the
maintenance and operation of the sanitary and stormwater systems, but the process for
establishing service rates as well as connection fees are also outlined. Revenues are
shared between CWS and cities based on formulas. Tigard sanitary revenues are
deposited in the Sanitary Sewer Fund, which has a very healthy fund balance. Storm
sewer revenues are placed in the Storm Sewer Fund which has a much smaller fund
balance.
Rates for both sanitary and stormwater are established by resolution each year by the
Board of Directors of CWS (the Washington County Commission). At that time, CWS
also certifies what portion of the service rates and/or connection fees are retained by
the cities which participate in the IGAs. A few years ago, CWS obtained authority to
establish a revenue bond component of the revenue apportionment between the cities
and CWS. CWS has established a revenue bond debt service component of the rate.
This has, in effect, reduced the cities' portion of total service charges.
In addition to the changes to the revenue split resulting from debt service rate
component, CWS has begun discussions with participating cities on changing the basic
methodology for apportioning revenues between CWS and the cities. Initial discussions
have steered towards establishing a cost-based method of revenue apportionment. In
other words, revenues would be split based upon size of systems maintained and
serviced by each individual city versus a set percentage split of revenues.
Revenue Required/Revenue Potential: Unknown at this time. The City could
possibly see reduced sanitary and stormwater revenues it retains.
Work Completed to date: CWS has established a review committee made up of
finance staff from the cities and CWS staff.
Implementation Action Required: Staff will brief Council as the direction of the review
becomes clear. Ultimately, any changes to the IGA will require approval of both the
CWS Board of Directors and the City Council.
Timing: Discussions will continue over the next year or two.
53
Advantages:
■ A revised cost-sharing formula could relate more directly to services provided.
Disadvantages:
■ Tigard may lose revenues to the Sanitary Sewer and Storm Sewer Funds.
Recommendation:
■ The City needs to maintain an active presence in all CWS discussions regarding
any proposed changes in methodology of revenue apportionment. '
■ Staff should periodically brief Council on the status of rate sharing directions.
■ 'Public Works and Engineering staff should review sanitary sewer plans to
determine if projected fund balances are sufficient to meet anticipated needs or if
excess revenues are anticipated.
Council Priority/Discussion:
54
Revenue Options
Tigard Local Option Property Tax Levy
Issue Summary
Definition: A Local Option Property Tax Levy is allowed under the Oregon. Constitution
(Measure 50) to increase the local property tax rate to pay for needed services. it
cannot exceed a period longer than 5 years, after which, it must be re-approved by
voters. It can be used for any purpose (i.e. General Fund support) or it can be
dedicated to specific services (i.e. Library, Parks, Police, etc.)
Revenue Required/Revenue Potential: It is not yet known how much the City would
require from a Local Option Property Tax Levy. That is dependent upon what
combination (if any) of additional revenues or cuts in expenditures the Council wishes to
pursue. A tax rate of 26¢/$1,000 of assessed valuation will raise just over $1,000,000
per year.
Work Completed to date: No work on a Local Option Property Tax Levy has been
done to date. Departments have preliminarily forecasted funding needs for the five-year
period from 2005 to 2010, but those forecasts have not yet been finalized nor reviewed
by the Budget Committee.
Implementation Action Required: A Local Option Property Tax Levy must be
approved by Council and placed on the ballot for approval by Tigard voters. It may only
be voted on at one of the following elections:
4. May, subject to double-majority requirement
5. November of an odd-numbered year, subject to double majority requirement
6. November of even numbered year, subject to simple majority.
Timing: If a Local Option Levy is approved by voters in May 2006, the first revenues
would be received by the City in November 2006. If the. Levy is approved by voters in
November 2006, the first revenues would be received by the City in November 2007.
Advantages:
■ Broad based revenue source
■ Easily understandable (traditional funding source, familiar to voters)
■ Stable
■ If approved as a rate per $1,000, it will grow with growth in assessed values
■ Well-established collection mechanism in place
Disadvantages:
• Short term solution - it expires after 5 years, and then must be renewed by
voters.
55
• Oregon voters have been limiting property taxes for the last 15 years. Tigard
voters may not choose to increase their property taxes.
■ Competition on the ballot from other jurisdictions requesting voters to approve
funding measures.
■ Competition and confusion with WCCLS measure likely to be on the ballot in
.2006.
■ Most property tax measures on the ballot in November 2004 were not approved
by voters - including the county public safety levy.
Recommendation: Continue to research and explore options with the goal of placing
this issue before voters.
Council Priority/Discussion:
56
Revenue Options
Long Range Planning Fees
Issue Summary
Definition: In July 2003; Council discussed the potential of instituting an application fee
that would support long range planning activities. The City lacks resources to entirely
fund this sort of project within the time frame the community expects. The fee would
help offset the cost of completing specialized planning studies or projects.
Long range planning studies vary in the amount of complexity and costs associated with
any particular study or project. Where staff expertise exists and scheduling allows, City
staff is assigned to complete particular projects. Other studies and projects require
additional resources due to the complexity or intensity of the project or study.
Revenue Required/Revenue Potential: At its May 18, 2004 Council worksession,
Council directed staff to proceed with developing a long range planning fee that would
be in addition to existing planning fees. Basically, a "surcharge" would be paid at the
time of submittal of specific land use applications.
The proposed long range planning fee is anticipated to generate approximately $40,000
per year. Given the fact that the fees are based on permit activity, the actual revenue
would fluctuate from year to year. The goal is to have the resources to complete such
long range planning projects as the City determines are necessary through the
budgetary process.
Work Completed to date: Council is scheduled to take action on the proposed fee
increase on December 14, 2004
Implementation Action Required: Council approval.
Timing: December 2004..
Advantages:
■ Development pays for the costs of completing long range planning studies.
■ General Fund support of long range planning activities would be reduced.
Disadvantages:
■ Land use fees increase.
■ Development-related fees could be higher in Tigard than in surrounding
jurisdictions.
■ Development-related fees supporting Long Range Planning activities are not
common.
57
Recommendation:
Council Priority/Discussion:
58
Revenue Options
Other User Fees
Issue Summary
Definition: The City of Tigard charges a variety of fees for specific services. Council
has directed that whenever possible, users should pay directly for those specific
services they use so that the general tax payer does not have to pay for services he or
she does not use. The City has centralized all user fees into the Master Fee resolution.
City Code requires that all fees be reviewed annually. The Master Fee resolution is
updated in June of each year.
Revenue Required/Revenue Potential: At this time, the revenue potential is
unknown. Over the past two to three years, the City has been aggressively reviewing
and updating all fees and charges to ensure that they are current. Fees may need to be
adjusted to keep them current, but it is unlikely that any large increases will be
necessary. The revenue potential from this item is therefore likely to be small.
Work Completed to date: The Master Fee resolution was last reviewed in June of
2004. The resolution was updated at that time. There have been a couple of small
adjustments since then.
Implementation Action Required: Adoption of a new resolution by Council.
Timing: June 2005
Advantages:
■ The City maintains cost recovery ratios.
■ Only those who use the services covered by individual fees incur the cost.
■ Small, annual increases are easier for citizens to incorporate into their personal
financial planning rather than larger increases occurring at multi-year intervals.
Disadvantages:
• Citizens may feel that they are being "nickled-and-dimed."
• Annual fee adjustments may contribute to the perception that government is
always asking for more money.
Recommendation: Keep City fees current through annual reviews and small
adjustments as justified by costs.
Council Priority/Discussion:
59
Revenue Options
Parks SDC
Issue Summary
Definition: Systems Development Charges (SDCs) are the fees that developers pay to
cities and counties to offset the impacts of their project on the community. By definition,
SDC revenues can only be spent on capacity increasing capital improvements. SDCs
cannot be used to mitigate existing deficiencies capital systems.
Tigard has been collecting Parks SDCs for many years, and this revenue is the primary
funding source for the Parks capital improvement program. The City of Tigard Parks
SDC methodology and fee schedule was updated in 2004 to reflect changes instate law
and to increase cost recovery. The anticipated effective date of this update is January
1, 2005.
Revenue Required/Revenue Potential: Under the old methodology (prior to Jan 1,
2005) the City anticipated collecting $2.3 million in Parks SDCs over the next five years.
Under the new methodology the City anticipates collecting $7.9 million over the same
time period. The new methodology also specifies projects upon which SDC revenues
can be spent, and to what extent SDC revenues can be used.
Work Completed to date: City has completed the legally mandated process and on
December 14, 2004 the Council will consider adopting a new methodology and rate
schedule effective January 1, 2005.
Implementation Action Required: Council adoption following public notice and
hearing.
Timing: December 14, 2004, effective January 1, 2005
Advantages:
■ Increase of $5.6 million in revenues over the next five years.
■ A logical and defensible methodology.
■ New development will pay an appropriate share to maintain the existing parks to
population ratio.
Disadvantages:
■ The increase does not address the funding of non-SDC eligible projects.
Currently, the City has only limited funds to support non-SDC eligible projects.
Recommendation: Council should approve the new Parks SDC study and fee
schedule.
60
council Priority/oiscussion:
0
Revenue Options
Rights-of-Way (ROW) Fee Review
Issue Summary
Definition: A Rights-of-Way Management Study finalized in May 2003 concluded that
the City was not recouping all of its direct and indirect costs associated with the
management of the use of the rights-of-way. In addition, not all users of the rights-of-
way obtain permits, and franchise utilities with blanket permits are not required to pay
permit fees. The refusal of certain franchise utilities to renew their franchise agreements
requires that an adequate fee structure be in place to ensure that all direct and indirect
costs are recouped. Furthermore; studies have shown that the damage done to streets
as a result of utility cuts are much more extensive than previously thought and should
be factored into the permit and fee process.
The City needs to focus attention on management of rights-of-way and review of fees
charged to ensure that direct and indirect costs are recouped to the maximum extent
feasible. This review also needs to consider whether permits and fees from in-house
utilities such as water, wastewater, and storm water should also be required.
Revenue Required/Revenue Potential: The fee review has the potential to
significantly increase revenue, especially if franchise and in-house utilities pay fees as
part of the permit process.
Work Completed to date: As a result of the Rights-of-Way Management Study
recommendations, Council created a ROW Administrator position to review the fee
structure among other duties. The recruitment to fill this position is underway and should
be completed by January 2005. It is anticipated that the person selected to fill this
position would review the current procedures, make recommendations for changes, and
oversee implementation of approved changes. Much of the work is anticipated to occur
during calendar year 2005.
Implementation Action Required: Some of the changes may require Council action
through resolution or ordinance. The Telecommunications ordinance is currently being
reviewed to broaden its application to include all utilities. Some of the changes resulting
from this review may be incorporated through amendments to that ordinance.
Timing: The ROW fee review will be performed during calendar year 2005. Changes to
the fee structure to recoup direct and indirect costs could be implemented as soon as
possible during this review process.
Advantages:
62
■ Revising the fee structure to recoup direct and indirect costs would ensure that
the City's costs are recovered and that the long-term damage to streets is
addressed as part of that review.
■ The fee review is timely in that those franchise utilities that do not renew their
agreements can be managed just like any other applicant for permits and be
charged what is required to compensate the City for its direct and indirect costs.
New revenue from in-house utility fees charged to dedicated funds can better
balance the City's fiscal situation.
■ Charging fees to all utilities, whether in-house or not, is more equitable than the
current practice.
Disadvantages:
■ The City's Water, Sanitary Sewer, and Storm Sewer funds would have to expend
more for fees that are not currently charged.
■ Rates for City utilities may have to be increased to help pay for the additional
permit costs, which could raise concerns among Tigard citizens.
Recommendation:. The ROW fees should be reviewed with the intent of recouping
direct and indirect costs to the maximum extent feasible, and the in-house utilities'
rights-of-way activities should be subject to the permit process with full fees charged as
part of that process.
Council Priority/Discussion:
63
Revenue Options
Street Maintenance Fee Review
Issue Summary
Definition: The Street Maintenance Fee was established by Ordinance No.03-10 as a
new source of revenue to meet street maintenance requirements. The rates, set by
Resolution No 04-12, were established based on a 5-year corrective and preventative
maintenance plan for addressing the City's $4 million street maintenance backlog and
ensuring timely maintenance of the street infrastructure.
Ordinance No. 03-10 requires the Finance Director to review the revenue after the first
full year following implementation to determine if the revenue is meeting the projected
amount. In addition, the ordinance requires the program to be reviewed after three
years and the rates re-established based on the average annual cost of an updated five
year maintenance plan. Adjustments to the fee would be made at that time taking into
consideration overruns, underruns, and any additional funds for street maintenance
received from the State through legislation.
Revenue Required/Revenue Potential: The rates were set to generate approximately
$800,000 annually.
Work Completed to date: The fee collections began April 2004. A review of the
revenue collected will be performed after April 2005. There is an opportunity at that
time to establish a new rate based on an updated five year maintenance plan.
Implementation Action Required: The Finance Director will report his findings to City
Council. No other action is required at that time, unless adjustment of the rates is
deemed necessary. Any adjustment to the rates would have to be performed by
Council resolution.
Timing: The Finance Director will review the revenue received after April 2005 and
report the findings to City Council. Any adjustment to the rates, if determined by Council
to be desirable or necessary, would be after that report. A three-year review will occur
in 2007.
Advantages:
■ Provides an opportunity to possibly lower the rates if the revenues are on target
and the receipts from the State through legislation are factored in.
■ Would be a positive sign to the residents of Tigard that the City is keeping the
fees charged as low as possible.
Disadvantages:
64
• The streets were last rated in 1999 and should be re-rated before the five-year
maintenance plan is updated. There would be no opportunity to update the street
information if the rates are to be revised by mid-2005.
Recommendation: That the rates be adjusted only if the revenues are not reaching
the projected amounts. Adjustment of the rates after the three-year period stated in the
ordinance would allow for the pavement management information to be updated and the
costs for the projects averaged out over a longer period before rate adjustments are
contemplated.
Council Priority/Discussion:
65
Revenue Options
Telecommunications Regulation
Issue Summary
Definition: The City of Tigard, like most cities in the US, regulates access of
telecommunications companies and other private utilities to public rights of way through
franchise agreements and City Code provisions. The telecommunications industry has
changed dramatically over the past 15 to 20 years, with the break-up of Ma Bell, the
deregulation of the Baby Bells, the advent of cellular technology, and the advent of new
technology such as Voice-Over-Internet- Providers (VoIP). Some of the new providers
are subject to right of way regulation and some are not. The telecommunications
industry in general, and traditional telecommunications providers (Qwest and Verizon) in
particular, have been resisting (and in some cases, actively challenging) local authority
to regulate access to public rights of way. In June 2001, Qwest brought suit against the
City of Portland. This suit is working its way through the federal court system. If Qwest
is successful in its suit, Tigard could lose future franchise fees paid by
telecommunications companies, and may also be required to pay back franchise fees
collected for a specified period of time.
Revenue Required/Revenue Potential: Tigard collects about $325,000 per year in
telecommunications franchise fees. Since July 1, 2001 though June 30, 2005, the City
will collect about $1.37 million.
Work Completed to date: City staff have been actively monitoring Qwest vs Portland.
In addition, the City of Tigard is on the steering committee of a joint audit of Qwest and
Verizon franchise fees conducted by 70 Oregon cities. Finally, staff is reviewing the
City's Telecommunications Code for possible changes to broaden its application to all
franchised utilities and to ensure compliance with current interpretations of the federal
Telecommunications Act of 1996.
Implementation Action Required: It is not yet clear what actions the City of Tigard
may need to take. It will need to maintain close coordination with the League of Oregon
Cities, other Oregon cities, state legislators, and the Oregon congressional delegation
as these issues are brought up in various forums.
Timing: This issue has been developing since 2001 and is continuing. It is likely.that it
will take several years for this issue to reach conclusion.
Recommendation: The City should continue to actively monitor this issue as it
develops. In addition, the City Council should make its concerns known to state
legislators and the Oregon Congressional delegation.
66
Council Priority/Discussion:
67
Revenue Options
Transportation Financing
Issue Summary
Definition: One of the Council Goals for calendar year 2004 is to aggressively pursue
solutions to congestion on state, county and City facilities that lie within the City limits.
Many of the projects needed to improve circulation within the City are under state or
county jurisdiction. The Council goal is to pursue implementation of these projects
regardless of jurisdiction. A list of high priority projects was presented to Council at its
meeting on March 16, 2004. Many of the projects involve intersections on Highway
99W. In addition, there was a long list of projects considered for the Transportation
Bond measure in the year 2000. Although the bond measure failed, the transportation
improvement needs remain. Additional sources of funding must be developed to
address some of the more urgent transportation projects to alleviate congestion, provide
better intra-city traffic circulation, provide facilities for alternative modes of
transportation, and accommodate the current and future traffic volumes.
Revenue Required/Revenue Potential: To be determined. The Transportation
Financing Strategies Task Force was reconstituted to evaluate new potential funding
sources that could be established to address high-priority transportation projects. In
early 2005, the Task Force will meet with Council to discuss potential projects and .
receive direction on the high-priority projects that need new funding sources for
implementation. The intent is to focus the efforts of the Task Force on the areas that
Council deem as highly important and better match the proposed funding with the
appropriate projects.
Work Completed to date: The Task Force has met three times and will continue
meeting regularly to discuss potential funding sources. The Task Force will meet with
City Council in early 2005 after Council goal setting has been completed. The intent is
for Council to provide direction on the high-priority projects that need to be matched with
funding sources for implementation.
Implementation Action Required: The Task Force will report to City Council
periodically on the progress of the Task Force effort. Any proposed new funding
sources will be discussed with City Council at a workshop session. New funding
sources classified as fees or non-property tax may require an ordinance and resolution.
A bond measure to accelerate implementation of numerous projects would require a
public process for development of a list and a vote of approval by the Tigard citizens.
Timing: The Task Force will evaluate new funding sources with the intention of making
an initial recommendation to Council by mid-2005 at the earliest. A bond measure, if
proposed, would most likely be scheduled for the general election in 2006 at the
earliest.
68
Advantages:
■ New funding sources would address high-priority projects that need to be
constructed to meet current and future traffic volumes.
■ Sidewalk improvements and rights-of-way maintenance can be programmed
annually once funding sources are identified. The sidewalk projects can enhance
safe access to schools and transit stops from the residential neighborhoods.
Rights-of-way maintenance on collectors and arterials can spruce up the City's
image and minimize the fire hazards by keeping brush cut during the summer
months.
Disadvantages:
■ The voters have indicated that they have limitations on what they can afford,
regardless of the existing needs. Any bond measure would face stiff competition
in just about any scheduled election.
■ Adding a new fee or tax in these or any other economic times is not going to be
popular and may be referred to the voters for approval.
Recommendation: That the Task Force receive direction from Council, continue to
evaluate potential new funding sources for recommendation to Council, and make
periodic reports to Council on Task Force progress.
Council Priority/Discussion:
69
Revenue Options
Urban Renewal
Issue Summary
Definition: Creation of one or more urban renewal districts to generate dedicated
revenues to pay for needed improvements in the Washington Square Regional Center, .
Downtown Tigard, and/or Commuter Rail Line. The Tigard Charter currently prohibits
any renewal districts without an approving vote of the people.
Revenue Required/Revenue Potential: To be determined. The Washington Square
Regional Center Plan identifies substantial improvements needed in that area, with
costs to match. These costs can only be partially covered by existing revenues and
fund sources. The Downtown Plan is still in the development stage so public
improvements needed to support the plan are unknown at this time.
Work Completed to date: Council has received three informational briefings on the
mechanics of urban renewal and urban renewal financing.
Council has approved the Washington Square Regional Center Plan and the
Washington Square Regional Center implementation study, which identify needed
improvements and potential costs.
Washington County is actively pursuing funding for the Commuter Rail Line and is
exploring urban renewal as a means of providing funding for a portion of the
improvements identified in the Regional Center Plan, particularly in the area of
commuter rail stations, of which Tigard will have two.
The Downtown Task Force has been meeting with interested parties and stakeholders
to develop a vision for the downtown. A concept plan is under development and will be
considered by Council in June 2005. Once the plan is adopted implementation will take
another 12 to 24 months to complete. Urban renewal is a potential funding tool to
implement the Plan.
Implementation Action Required: City Charter prohibits the formation of any urban
renewal district without an affirmative citywide vote. Council could refer one of two
measures to the people:
3. An amendment of City Charter to remove the requirement for a citywide vote, or
4. Approval of one or more urban renewal districts.
Timing: To be determined
70
Advantages:
• Creation of a dedicated funding source that grows with growth in assessed
values in the urban renewal district and that can be used to pay for needed
improvements.
■ Public improvements paid for by urban renewal will spur private investment that
will further increase values in the district, and will accommodate job and housing
growth
■ Once the urban renewal plan is accomplished and all costs are paid for, the
assessed value is returned to the general tax roles and help pay for citywide
service.
Disadvantages:
■ Urban renewal "locks up" growth in assessed values during the life of the urban
renewal plan, thereby limiting growth in tax revenues for all overlapping taxing
jurisdictions.
■ Urban renewal mechanics are complicated and difficult to explain to the public in
an election setting.
■ Creation of an urban renewal district requires the active support of major property
owners within the proposed district.
Recommendation:
■ Continue to explore urban renewal as an option for Tigard
• Work with property owners in the Washington Square Regional Center and the
Downtown Task Force, and with Washington County to assess the level of
interest and support for urban renewal.
■ Develop a proposed timeline for resolution of this question.
Council Priority/Discussion:
71
Revenue Options
Water Utility Rates
Issue Summary
Definition: The Water Fund is an enterprise fund, which by definition used in
accounting principles and guidelines, operates as a business enterprise. In the case of
the City's Water Fund, the primary source of revenue is water sales. The City operates
the fund on the financial principle that the costs associated with the delivery of water
shall be borne by the user. Thus, water rates become the mechanism through which
the revenue to operate the water system is derived. Tigard uses a rate-making financial
model to evaluate future costs, both operational and capital, and design water rates to
accommodate these costs. The City Council last reviewed rates in 2000, when a 3-year
rate plan was approved. It is anticipated a new rate plan will need to be approved in
2005.
Revenue Required/Revenue Potential: Revenues generated by water sales are
anticipated to be $6 million dollars in FY 04-05. This number can be impacted by
weather; cool wet summers reduce water sales thus affecting rates.
Work Completed to date: The water rate model is updated annually as the budget is
approved.
Implementation Action Required: Water rates are set by resolution of the City
Council. It is anticipated that the IWB will forward a recommendation to the City Council
and that the City Council could approve any water rate changes as a part of the master
rates and charges resolution adopted annually in June. Water rates are generally
effective October 1 through September 30tH
Timing: Staff will be preparing a water rate recommendation to be presented to the
Intergovernmental Water Board (IWB) in the Spring of 2005.
Advantages:
■ Maintains relationship between rates paid by the customer and actual costs;
■ Avoids large rate increases by dealing with. changes in smaller increments;
■ Facilitates good credit rating for the City when debt instruments are sold;
■ Keeps water issues in the ratepayers minds.
Disadvantages:
■ Rate increases are rarely popular and increase costs to citizens.
72
Recommendation: Accept the recommendation from the IWB when presented and
consider adoption of any new rate schedule as a part of the annual rates and charges
review in June of 2005.
Council Priority/Discussion:
73
. Re venue Options
WCCLS Local Option Levy
Issue Summary
Definition: WCCLS Levy: A Countywide Local Option Property Tax Levy for library
services is allowed under the Oregon Constitution (Measure 50) to increase the local
property tax rate for needed services. It cannot exceed a period longer than 5 years,
after which, it must be re-approved by voters.
Revenue Required/Revenue Potential: It is projected that the tax rate of this levy will.
be approximately .26/$1,000 of assessed valuation. This would raise approximately.
$9,500,000 per year. Tigard's share of this amount will be determined according to the
WCCLS funding formula.
Work Completed to date: A countywide levy for library operational funding was placed
before voters in November of 2002 and again in May 2004. The measure failed in 2002
by approximately 600 votes and failed in 2004 for lack of a double majority. A needs
analysis for the levy was completed in 2002, as was a phone survey. A citizens group
was formed in 2002 and again in 2004 to provide information to the voters of
Washington County concerning the benefits of the levy. Significant background
information has been compiled concerning this issue.
Implementation Action Required: A WCCLS Local Option Property Tax Levy must be
approved by the County Board of Commissioners and placed on the ballot for approval
by Washington County voters. It may only be voted on at one of the following elections:
1. May of any year, subject to double-majority requirement
2. November of an odd-numbered year, subject to double-majority requirement
3. November of an even numbered year (general election), subject to simple
majority.
Timing: If the WCCLS Local Option Levy is approved by county voters in May 2006,
the first revenues would be received by the County in November 2006. If the Levy is
approved by the voters in November 2006, the first revenues would be received by the
County in November 2007.
Advantages:
■ Easily understandable
■ Will restore cuts to library service countywide.
■ Well-established collection mechanism in place
■ Broad-based revenue source
Disadvantages:
74
■ Short term solution-it expires after 5 years, and then must be renewed by the
voters
■ Competition on the ballot from other jurisdictions requesting voters to approve
funding measures
■ Competition and confusion with a Tigard local option levy if it is on the same
ballot
■ Most property tax measures on the ballot in November 2004 were not approved
by voters - including the county public safety levy
Recommendation: Continue to research and explore options with the goal of
supporting this issue when it is placed before voters in May or November 2006.
Council Priority/Discussion:
75
Revenue Options
MSTIP Funding
Issue Summary
Definition: Measure 50 rolled Washington County's serial levy for the Major Streets
Transportation Improvement Program (MSTIP) into the County's permanent property
tax rate. The County Board of Commissioners is considering adoption of a six-year
program (2007 through 2012) of transportation projects using the MSTIP portion of the
County's permanent property tax rate. The projects to be selected to be part of this
MSTIP Transportation Capital Program must improve collectors and arterials identified
in the County's transportation plan. Geographic equity would be a consideration in the
project selection. Through this program, the City has the opportunity to submit priority
City projects that qualify for implementation using MSTIP dollars.
Revenue Required/Revenue Potential: The County estimates approximately $23
million net annual revenue resulting in approximately $140 million over the six-year
period. The target allocation for the City out of this six-year total is $5,287,000.
However, because the inflation factor is estimated as twice the amount of interest
earned, the actual amount available in the out years of the program is anticipated to be
significantly less than in the first year of implementation. The issues are still being
worked out, but the funding that could be available for projects that benefit the City
would range between $3 and $5 million depending upon the schedule for
implementation.
Work Completed to date: Through Resolution No. 04-82, City Council approved three
projects to be submitted for consideration as part of the County's Transportation Capital
Program. Because the timing for implementation of the projects is highly uncertain at
this point, only one or two of the projects may actually receive sufficient funding for
implementation. In addition, the County staff has indicated that they want to handle
projects from beginning to end. Tigard and other cities want to initiate design and rights-
of-way acquisition but need construction dollars for implementation. This issue needs to
be resolved.
Discussions will continue during the next month or two on resolving these issues.
Implementation Action Required: The Washington County Coordinating Committee
consisting of city and County elected officials would recommend a list of projects for
adoption by the County Board of Commissioners. The project list and the sequence of
implementation adopted.by the Board would commit the available dollars for that six-
year program.
Timing: The County's Transportation Advisory Committee will be meeting during the
next two months to resolve the various issues and submit a recommendation to the
76
County Coordinating Committee. The Coordinating Committee will likewise be
discussing the program with the intention of submitting a recommendation to the County
Board early in 2005. The program dollars will be for the six-year period beginning in
2007 and ending in 2012.
Advantages:
■ Provides an opportunity for the City to have one or more high-priority projects
constructed using MSTIP dollars.
■ Commitment of the MSTIP portion of the County's permanent property tax rate to
a long-term program would set the stage for a large future MSTIP 4 program to
address some of the major transportation needs within the cities and
unincorporated Washington County.
Disadvantages:
■ If the projects are limited to those that are not yet programmed for
implementation, some of the significant projects of current interest would not be
eligible for consideration.
■ The six-year period begins in 2007. Some projects may not be scheduled until
late in that period. Some of the projects in Tigard cannot wait that long for
implementation.
■ The City would not have control over the project details once the County adopts
the project for implementation. Although City input would be considered, the
County would have the final say on the project-related decisions.
Recommendation: There is no real downside to this situation. The MSTIP portion of
the County's permanent property tax rate provides an opportunity for the City to have
one or more significant projects funded and implemented through the County's
Transportation Capital Program. Staff recommends that the City participate actively in
this process, in cooperation with the staff from other cities and the County, to reach a
consensus on the project list and on the scheduling for implementation.
Council Priority/Discussion:
77
Revenue Options
Franchise Fees - Water and Sewer
Issue Summary
Definition: The City charges private utility companies a fee for use of public rights-of-
way to string their wires, or lay pipes and conduit. The fee is calculated as a
percentage of the utility's gross revenues collected within the City of Tigard. The City
currently charges the electric utility 3.5%, the natural gas utility 5%, and
telecommunications companies 5%. The City does not charge its water and sewer
utilities any fee, though many cities do.
Franchise fees for private utilities cannot be raised outside of the franchise agreement.
The franchises with PGE and Qwest do not provide for any mechanism to increase the
franchise fee during the life of the agreements. Verizon does not have a current
franchise agreement and has declined to negotiate a new agreement pending decision
of the Qwest vs. Portland case challenging local franchise authority. If the City wished
to pursue increased fees for private utilities with a current agreement, it would need to
adopt a privilege tax, which is discussed in another paper. The City could institute
franchise fees on its own public utilities at any time.
Revenue Required/Revenue Potential: Charging the City's in-house utility operations
a franchise fee would raise the following amounts for the General Fund:
Water $307,000
-Sanitary Sewer $77,800
Storm Sewer 56 200
Total $441,000
The additional charges to the water utility could be recovered through a water rate
increase. Rates for sanitary sewer and storm sewer are set by CWS and revenues are
shared back to the City. Rates would not be increased to recover this cost, and so a
franchise fee would reduce revenues to fund sanitary and storm sewer operations.
Work Completed to date: Staff have surveyed other cities to see how many charge
franchise fees to their own utilities. No other work has been done on water or sewer
franchise fees.
Implementation Action Required: Council resolution or ordinance.
Timing: To be determined. If the decision is made to charge water operations a
franchise fee, this should be coordinated with the annual water rate review currently
underway.
78
Advantages:
■ Builds off an existing collection that is in place and well established
■ Broad based - it affects a wide variety of payers (though utility bills)
■ Relatively stable revenue source
Disadvantages:
■ Increased fees will be passed on to water utility customers in the form of a rate
increase, thereby increasing their bills
Recommendation:
■ Explore options for charging a franchise fee of no more than 5% on public utilities
(water, sanitary sewer, and storm sewer.) If options are feasible, consider
instituting water and sewer franchise fees.
Council Priority/Discussion:
79
Revenue Options
Privilege Tax
Issue Summary
Definition: Oregon Revised Statutes allow cities to adopt and levy a "Privilege Tax" on
utilities. This is a tax on the gross revenues of electric or natural gas utilities or on local
exchange access revenues of "incumbent local exchange carriers, ILECs" (in Tigard's
case, this means Qwest and Verizon) for the "privilege" of using public rights of way for
the delivery of their services.
A privilege tax and a franchise fee are very similar. The only real difference is that a
franchise fee is dependent upon the existence of a formal agreement (a franchise)
between the utility and the City. Privilege tax rates are also limited by state .statute;
franchise fee rates are not (though some utilities would argue otherwise.)
A privilege tax could be structured in a variety of ways. The method that has been
considered by staff establishes the privilege tax and then makes provision for a credit
for the amount of franchise fee paid (if any). This establishes the back-up authority of
the privilege tax, but only collects an incremental amount over and above the existing
franchise fee. If the franchise is not renewed for any reason, then the full amount of the
privilege tax would be collected. Tigard has two telecommunications companies with
expired franchises: Verizon and Electric Lightwave. Both companies have declined to
negotiate new franchises, but are continuing to make franchise fee payments as if their
expired franchises were still in effect.
Privilege taxes are calculated based on the total gross revenues of electric and natural
gas utilities and competitive local exchange carriers telecommunications companies
generated within a local jurisdiction and are limited by State law to no more than 5%.
State law limits privilege taxes on ILEC telecommunications companies to no more than
7% of local exchange access revenues only. (revenues from the majority of services -
such as call waiting, call forwarding, long distance, internet access, etc. - are excluded
form the revenue base. Cable television is franchised
80
Franchise rates for franchised utilities are:
Electric & Natural Gas Telecommunications
PGE 3.5% of gross Qwest 5.0% of local
revenues exchange access
Northwest 5.0% of gross Verizon 5.0% of local
Natural revenues exchange access
Cypress 5.0% of gross
Communications revenues
Electric 5.0% of gross
Li htwave revenues
IDT Corp. 5.0% of gross
revenues
MCI WorldCom 5.0% of gross
revenues
Metro Media 5.0% of gross
Fiber Network revenues
New Access 5.0% of gross
Communications revenues
OnFiber 5.0% of gross
Communications revenues
Time-Warner 5.0% of gross
Telecom revenues
XO 5.0% of gross
Communications revenues
Revenue Required/Revenue Potential: If a privilege taxis adopted at the levels
authorized in State law and it is structured to be net of franchise fees paid, it would
generate the following revenue amounts:
PGE $550,000
Northwest Natural $0
Qwest $5,400
Verizon $92,500
CLECs $0
Total $647,900
Work Completed to date: An issue paper was presented to the Tigard Budget
Committee in May 2004. The Budget Committee's response was mixed. There was
little enthusiasm for this tax, but there was also a willingness to keep it on the table for
discussion.
Implementation Action Required: A privilege tax could be adopted by ordinance.
81
Timing: There is no specific timeline for this issue. It could be considered at any time
that the Council feels appropriate.
From a process standpoint, if Council indicated a willingness to move ahead with this
revenue source, it would be necessary to draft an ordinance. From that point, it would
be advisable to circulate the ordinance to all franchisees and any other utilities affected
by the proposal for review and comment. Council would need to hold at least one public
hearing on the proposal. It could take several months to go through this process.
Advantages:
■ The tax would produce a significant amount of revenue that would be available to
the General Fund.
■ The tax is broad based. °
■ The tax is not overly dependent upon economic activity and will help to diversify
the City's revenue sources.
■ The tax is not dependent upon the existence of a franchise agreement and
protects the revenue stream should a franchisee not renew its agreement and
continue to operate in Tigard.
■ The telecommunications industry is aggressively challenging local government
rights to regulate and control their rights of way nationally. Franchise fees could
be severely curtailed or eliminated by legislative or congressional action.
Disadvantages:
■ A privilege tax in excess of current franchise fees will be passed on to utility
customers, thereby increasing their bills
■ Under state law, the incremental increase would be itemized on customer bills
■ Telecommunications companies are challenging local franchise authority
nationally and in Oregon. Adopting a privilege tax could add to this push.
Recommendation: Proceed with development of a privilege tax proposal.
Council Priority/Discussion:
82
Revenue Options
Telecommunications Registration Fee
Issue Summary
Definition: A telecommunications registration fee is an annual fee charged to
telecommunications companies operating within a city.
The two traditional methods of obtaining revenues from telecommunications companies
to support city operations and rights of way are franchise fees and privilege taxes.
Franchise fees are based on a franchise agreement between the city and the company.
Privilege taxes are imposed unilaterally based on the city's taxing authority. Other than
their underlying authority, franchise fees and privilege taxes are calculated and operate
in much the same way.
Under state law, franchise fees and privilege taxes for "incumbent local exchange
carriers" (ILECs - basically Qwest and Verizon) can only be levied on local exchange
access (basically, dial tone charges). By state law, all other revenues (including
revenues from charges such as call waiting, call forwarding, long distance, etc.) are
excluded from the revenue base used to calculate franchise fee and privilege taxes.
(By contrast, franchise fees and privilege taxes for electric and natural gas utilities are
based on total revenues.)
The traditional method of assessing fees/levying taxes on telecommunication carriers
has several problems:
1. The limited revenue base (local exchange access vs. total revenues) as
compared to other utilities using the public rights of way.
2. The growth of competitors to ILECs has heightened concerns about the different
methodology on calculating franchise fees (local exchange access vs. total
revenues.)
3. The growth of cellular service, which is not franchised by the City, is taking
customers away from traditional telephone service..
4. The entry of non-traditional telecommunications providers into local markets has
created a situation in which it is difficult to keep track of which providers are
operating within a city.
The City of Eugene addressed these problems by adopting a 2% telecommunications
registration fee on non-franchised services. This registration fee was challenged in
court, but ultimately upheld. Other cities in Oregon are now looking at adopting
telecommunications registration fees.
83
In addition, the City of Portland has recently explored the possibility of imposing a tax on
cellular phone companies. Reaction to this proposal has been mixed, but negative over
all. The cellular telecommunications companies are strongly opposed.
Revenue Required/Revenue Potential: Unknown. Because telecommunications
franchise fees are based on only a small portion of traditional telecommunications
providers' total revenues, it is difficult to determine the total revenue potential for Tigard.
Work Completed to date: None
Implementation Action Required: This would require an amendment to the Tigard
Municipal Code to establish the fee, and then an amendment to the Master Fee
Resolution.
Timing: It would take 4. or 5 months to develop this proposal and to take it through the
public review process. Cities anticipate that telecommunications companies will be
actively lobbying the legislature to pre-empt local telecommunications registration fees.
Advantages:
■ This fee could produce a significant amount of revenue for the City.
■ This fee would tend to level the playing field between telecommunications
providers in terms of. the fees paid to the City.
■ This fee would equalize the treatment of all utilities with facilities in the public
rights of way.
■ Registration and payment of a fee would provide the City with valuable
information about telecommunications providers operating within the City.
■ Adoption of a registration fee would help to protect the City should
telecommunications companies successively lobby the legislature to further limit
or eliminate local franchise fees or privilege taxes.
Disadvantages:
■ This proposal would generate strong opposition from telecommunications
providers.
■ This proposal may increase chances that the legislature would act to. pre-empt
authority for local telecommunications registration fees.
■ Telecommunications providers may pass this charge on to customers as a
separate line item on the customers' bills and thereby increase costs to local
customers.
Recommendation: Several other cities are actively considering a telecommunications
registration fee, and the legislature will convene in January. The City should monitor
statewide activity on this issue to see if other cities are successful. The City should
make a determination sometime in the summer of 2005 whether or not to proceed with
this proposal.
Council Priority/Discussion:
84
Revenue Options
Water Revenue Bond
Issue Summary
Definition: A water revenue bond is a type of bond backed by future water revenues
(as compared to a general obligation bond which pledges property taxes as repayment).
Tigard is considering this type of bond to finance capital improvements and possibly the
up-front or "buy in" costs the City would incur to secure a long term water supply.
Tigard's Water operation is currently debt free.
The City will be considering the use of water revenue bonds to finance all or a portion of
the upcoming water reservoir/pump station/transmission piping project package, named
the 550 ft. Service Zone Water Supply System Improvements.
The City is also considering obtaining an equity position in a water source. While the
source and cost have yet to be determined, financing this project is anticipated to be by
revenue bonds. This is consistent with the concept that users should pay their
proportional share of projects. Use of a bond that is collected based on property value
can produce situations of inequity between property owners, and should be avoided for
this reason.
In summary, Tigard could be looking to issue revenue bonds within the next two years.
Future decisions on a water source could necessitate multiple revenue bond sales.
Both of these projects are consistent with, and addressed specifically, in the City's
visioning documents.
Revenue Required/Revenue Potential: The 550 ft. Service Zone projects are
currently estimated to cost $8.84 million dollars. The buy-in cost of a new source of
water is unknown and will depend upon the source selected and negotiations with the
holders of those water rights.
Work Completed to date: The City has currently done two things in anticipation of
these expenses: the Council has kept water rates current for the last three fiscal years,
and the City has retained a consultant to develop a water financial planning and rate
model to better evaluate options and scenarios. This rate model will also be important
in the issuance of water revenue bonds.
Implementation Action Required: The Intergovernmental Water Board will initially
produce a recommendation to the City Council. Following that, the City Council may
authorize the issuance of revenue bonds by resolution.
Timing: Bond could be issued as early as 2005.
85
Advantages:
• Revenue bonds are excellent funding mechanisms for utility capital
improvements for three reasons:
• They do not compete with other public funding based on general revenues
and they do not require voter approval,
• They extend the concept of "cost of service" principles in which a user of a
utility pays a proportional share of the cost to provide that specific service,
and
• They spread the cost of an improvement to future users of that
improvement (intergenerational equity).
■ Revenue bond repayment periods are generally also shorter than the useful life
of the project they fund.
■ Current costs of borrowing money are very favorable.
Disadvantages:
• Not using bonding of some type puts City utilities into the business model of pay
cash as you go which is not viable where such large amounts of capital are
needed.
■ Revenue bonds carry a higher interest rate than general obligation bonds,
because their repayment is based on the financial stability of the system and not
on an unlimited power to tax.
Recommendation: Staff will continue to update Council on options and costs, with a
future. recommendation probably being to authorize issuance of one or more water
revenue bond issuances.
Council Priority/Discussion:
86
Revenue Options
Passport Application Acceptance
Issue Summary
Definition: The City of Tigard can become a passport application acceptance agency.
Some surrounding cities, such as the City of Beaverton, provide this as a customer
service to citizens. Finance staff would accept the application at the City Hall front
counter and forward the application to the U.S. Department of State for actual issuance.
The City of Beaverton reports that it receives over 5,000 applications per year. The City
of Beaverton also has established limited hours of operation (12:30 p.m. until 4:00 p.m.)
in order to more effectively manage the program and still provide good customer
service. Limited hours are also being considered for implementation in Tigard's case as
well.
Revenue Required/Revenue Potential: The application fee is $30 and is levied in
addition to the $55 passport fee. The passport agency retains the application fee as
reimbursement for providing the service. As envisioned, no additional staffing needs
are anticipated unless the number of applications received and processed would
generate more than enough revenue to warrant some part-time assistance. The City of
Beaverton has estimated passport revenues to their City will be over $160,000 in 'FY
2004-05.
Work Completed to date: Preliminary review of the passport acceptance program has
been completed and initial plans, if the program is approved, call for implementation by
July, 2005.
Implementation Action Required: Update of the fee schedule to include the fee for
accepting passport applications and staff training.
Timing: Implement by July, 2005 or sooner.
Advantages:
■ A passport application acceptance agency in Tigard will be a benefit to citizens.
■ Tigard residents as well as other individuals visiting City Hall will have this as an
additional customer service provided by the City.
■ This function would produce additional revenue at minimal cost.
Disadvantages:
■ None
87
Recommendation: Continue to investigate the possibility of the City of Tigard
becoming a passport application agency once the Finance Department has moved into
the remodeled City Hall. Target July, 2005 or sooner for implementation.
v' Council Priority/Discussion:
88