1. Reviewed Agenda
2. Reviewed Council Goals through September 2004 utilizing the Goal Update document.
Items discussed:
~~~~^+own Business Task Force
Accomplishments- actions that lead to accomplishments: Council support, money in
CIP, composition of Task Force doubling in size, Tri-Met: we got their attention and
now extensive public outreach is planned.
jL4W ation
Financing Task Force was reconstituted and new members added, Street Maintenance
Fee was established, need to get Task Force together with Council, need to enhance
connectlons with METRO, ODOT and find out where do TSP & ODOT plans mesh?
Communication from ODOT still does not happen. Third highway package will focus
on freight corridors nothing for local governments (reported at Mayor's meeting).
MSTIP process looking more positive for the 2004-2012; period, need on-going
dialogue with ODOT (Matt Garrett scheduled to meet with Council on 11/9/04). Tri-
Met Is talking about re-routing #58 to serve Bonita and bus shelter needs are being
planned for.
Parks Recreation
Survey completed and Board taking information to community. Youth Forum on-
going, and discussed the possibility of tying in with TTSD on grant applications using
the Tigard Turns the Tide non-profit.
Grnwth Management
Bull Mountain was discussed, as well as timeframe for Comp Plan - November 23,
Council discussion scheduled with Jim Hendryx to bring alternatives for discussion.
Get stakeholders involved early.
What Is our Comp Plan? There is a need for an orientation for Council and citizens.
Discussed Change/Modification of plan vs. creating for ist time. What implications
does this have?
Nick: Run through options with Council first- advance prep is advised.
Page 1
Tigard City Council Strategic Planning Session
October 1, 2004
Craig: Clarify expectations up front and get definitions and parameters. CD staff
capacity to handle necessary workload needs to be reviewed. Also, UGB 63 & 64
requires attention, if Tigard plans for these areas.
Communication
Meetings with the elected bodies is going well and should be expanded as well as
expanded communications with citizens. Tigard Beyond Tomorrow is underway and
the Youth Council is going well. Youth Representation on Boards and Commissions
en discussionolvement
has increased. Would like to encourages nrbe used face Council
CAP is building a foundation which then
and improved community appearance. Neighborhood identity is an issue.
Fifth Tuesday- Discussed idea of Council and citizens meeting with no agenda for
no more than 2 hours. Issues for Council are: How to do it without over-burdening
Council members.
Also discussed how to manage Council e-mails: who responds, how quickly to
respond, respond to a-mails or focus on work program?
Discussed Planning process roles, process and expectations and how to tie to Comp
Plan Process. Annual Citizens Fair is in the works.
3. Tentative Agenda Review
October 19 r Add Skate Board Task Force. We need ns availability ty for big meeting w ill h
money, where does money come from? Rich Carls
determine when the discussion can be scheduled.
Council also reviewed having more, shorter meetings rather than fewer, longer
meetings is a goal of Council
4. Financial Review has been Craig Prosser reviewed the April 2003 document. Significant progress interest in made
have some
in many areas to review and increase fees. Council
increasing sewer and water franchise fees which would be added to rates. Further
review of this issue is needed. questioned Council discussed the issues related to Tigardd'so w afford tax rate. Council
and features
whether the community is ready to pay more services
needed to be like some other cities.
The Budget Committee will be scheduled to meet with Council in February or March,
will follow the Council Goal Setting
2005 to update the Strategic Financial Plan This
discussion and precede the budget process.
Page 2
Tigard City Council Strategic Planning Session
October 1, 2004
5. Council Direction
Nick: Physical makeup of City is a key concern of s is. par, cacific Highway
traffic
and fixing up downtown. Ash Street suggested helping 99W
Things going too slow, we need results.
Craig: Systematic approach to "finish out" streets, (upgrade farm road) Entryways to
neighborhoods are two issues.
Nick: Streetscape & lighting, public art is a need, need 2 public projects - public space
(square) Main Street & something at south end of downtown.
Craig: Major entry points - Welcome to Tigard portals should be included, Entry to
Parks, Portal signs and signs directing to the parks, lack park -Walnut Street access
is needed, discussed aggressively pursuing abandoned RR ROW caused by Commuter
Rail so City can use the area.
Tom: Identity, ambiance, make parks attractive - encourage donations and suggest
a gathering place downtown.
Sydney: Concentrate on Downtown. CWS Master Plan for Durham Treatment Plan
was discussed - citizens don't know about expansion plans. How can city prevent loss
of pond and fountains - rather than react? ` Buffer in code.
Nick - Regulate dynamic signs in the community, keep 99W from becoming 82nd
Avenue. Forest Deferrals preventing clear cutting no logging without permit.
Look at condition of existing properties, review Code Enforcement - regulations and
becoming proactive and tie to Fifth Tuesday. Concentrate on Tigard and its needs.
6. Bull Mountain
Craig- suggested resolutions be passed by Council to confirm commitments made
during the Annexation Process. The resolutions are:
• Parks SDC's - Current SDC's are not adequate, will use other money and -
reiterate phasing of taxes;
• Begin early hiring of police- 10 or more;
• Begin aggressive search for potential parkland on BM;
Recognize BM as separate district to maintain identity and expand to other
areas and Neighborhood Associations;
• Over next 5 years give 30% of CIP budget;
• Include Bull Mountain in the Comp Plan process.
Suggested we take a look at Bull Mountain voting patterns for identifying next
possible issues if the annexation measure fails. There may be areas where smaller
annexations make sense.
Page 3
Tigard City Council Strategic Planning Session
October 1, 2004
7. Council Goal Setting
Think about having a facilitated session, bonding, training. tors was -Sign. Code was addressed. Status of agreement lhrealon sidewalksdiscussed as
cau sing concehn.n
Buehner mentioned that realtors continue to place signs Meeting adjourned.
William A. Monahan, lty Manager
Attest:
4,5yo llty o igar
Date:
Page 4
Tigard City Council Strategic Planning Session
October 1, 2004
STATE OF OREGON )
County of Washington ) ss.
City of Tigard )
being first duly sworn (or affumed), by
oath (or affirmation), depose and say:
0-0 _--_L2 , /
That on _ - - .
I notified the followin people/organizations by fax of the Special Meeting o the
City Council on with a copy of the Notice of Special Meeting being hereto attached and by reference made a part
hereof, on the day of
arbara Sherman, Newsroom, Tigard Times (Fax No. 503-546-0724)
P eve Lindsley, Regal Courier, (Fax No. 503-968-7397)
Q Newsroom, The Oregonian, Metro SW (Fax No. 503-968-6061)
S nature o ~erson who Performed Notification
ed and sworn (or firmed) before me this, -day of
Subscn
Or_ewn LaQ✓ , 20_D
OFFICIAL SEAL
JANE MG GARVIN ?hatur
otary Public for Oregon
NOTARY PUBLIC-OREGON e of N
COMMISSION N0.378318
MY COMMISSION EXPIRES MAY 28, 2008
I:WDMGREERIFORMStAFFIDAVITSVIFFIDAVIT OF NOTIFICATION - SPECIAL MEETING.DOC
a
CITY OF TIGARD
NOTICE Of
SPECIAL CITY COUNCIL MEETING
Please forward to:
Barbara Sherman, Newsroom, Tigard Times (Fax No. 503-620-3433)
Regal Courier, (Fax No. 503-968-7397)
Patrick Harrington, The Oregonian, (Fax No. 503-968-6061)
Friday, October 1, 2004
1:00 P.M. 5:00 P.M.
10305 SW 87' Avenue
Tigard, Oregon, 97223
Notice is hereby given that a Strategic Planning meeting is scheduled for October 1,
2004. The meeting is scheduled from 1:00 p.m. to 5:00 p.m. at the following
location: 10305 SW 87th Avenue,` Tigard.
For further information, please contact Assistant to the City Manager, Liz Newton or Deputy
City Recorder, ]aneMcGarvin by calling 503-639-4171 or at 13125 SW Hall Boulevard,
Tigard, Oregon, 97223.
eputy City Recorder, lane McGarvin
Post: City Hall Lobby
Date of Notice: September 27, 2004
I:\adm`.cathylccakc mtg nolicesln06k spec mtg strategic planning 041001.doc9123104
City of Tigard, Oregon
Affidavit of Posting
In the Matter of the Proposed Notice of Special Meeting
STATE OF OREGON )
County of Washington ) ss.
City of Tigard )
being first duly sworn (or affirmed), by
oath (or affirmation), depose and say:
That on S ~s~u(9 c1~ at -~,00- (a.m.
I Posted inTigard City Hall, 13125 SW Hall Boulevard, Tigard, Oregon, a copy
of Notice of Special Meeting for the City Council meeting of
with a copy of said Notice
being hereto attached and by reference made a part hereof, on the day
of - 20_Q-y--
Signature of Pers n who Performed osting
Subscribed and sworn (or affirmed) before me this day of
20b .
Signature of No ary Public for Oregon
OFFICIAL SEAL
JILL M BYARS
NOTARY PUBUCOREGON
COMMISSION NO.38'IM
AY COMMISSION EXPIRES JUNE 14, 2008
I:\ADM\GREER\FORMS%AFFIDAVITSWFFIDAVITOF POSTING - SPECIAL MEETING.DOC
The public is welcome to attend this meeting and all City Council
meetings, except for Executive Sessions. Executive Sessions
are called only when the Council must discuss legal issues, labor
relations, or other such natters allowed by law.
Tigard City Council
Strategic Planning Workshop
October 1, 200t°
1'. Introduction
a. Define the goal for today
- b. What do we want to accomplish
c. What is the outcome?
2. Review of work to date
a. Recent Council Goal Setting Discussions - August 5, 2003 (see minutes,
attached)
i. Downtown area opportunities & redevelopment
ii. Economic Development
iii. Tri-Met Service
iv. Bull Mountain Annexation
v. Library site White House
vi. Transportation financing
b. City Planning Efforts
i. Budget
ii. Transportation System Finance
iii. 'Parks Master Plan
iv. Water Supply
v. Bull Mountain Annexation Study
vi. Urban Renewal
vii. Strategic Finance Plan
3. Council Discussion
a. Council Roles & Priorities
- i. Accomplishments and Achievements from past year
ii. Councilor interests and priorities
iii. How will Councilors and staff work together to accomplish these
priorities?
iv. Internal and external relationships
1. Identify key contacts to assist in accomplishing priorities
2. Identify key meetings needed to advance Council priorities
v. 2005
1. Identify key goals to focus on early in 2005
4. Next Steps
a. Additional Strategic Planning Workshops9
b. Quarterly Plan/Goal updates?
c. Coordination with other Goal setting/Planning processes and efforts.
Agenda Item No. _ *
Meeting of 9 - 9- 0
Minutes for Special City Council Meeting of August 5, 2003
Location -10305 SW 871', Tigard, OR Home of Councilor Sydney Sherwood
Mayor Jim Griffith opened the special Council meeting at 2:15 p.m. The purpose of the meeting
was to conduct a City Council Strategic Planning Discussion. Present at the meeting at
2:15 p.m. were Mayor Jim Griffith, Councilors Sydney Sherwood, Brian Moore. Craig Dirksen.
and Nick Wilson as well as City Manager Bill Monahan. Lucy, Councilor Sherwood's cat, arrived
at 3:40 p.m.
The Council first discussed Its goals for the day. Council emphasized that it was open to
identify unique ideas, identify projects to undertake, and suggest unique features for present
projects. Immediately there was a discussion of the downtown area and the opportunities
present as a result of commuter rail. Councilor Dirksen, the Council liaison to the downtown
citizen group, emphasized a need for public projects to encourage private developers to invest
in the downtown. He suggested a public plaza or square, housing for elderly needing public
transportation, and other public investment.
After much discussion, Council suggested that staff contact Jeff Tashman, a consultant on
urban renewal. Mr. Tashman will be asked to meet with the downtown task force and the City
Council possibly in September or October, 2003. The purpose of the discussion will be to talk
about the economics of the downtown area and whether or not the economics can support
Tigard's ideas for redevelopment. Mr. Tashman will be asked to discuss the Tualatin
experience and opine which elements of the Tualatin concept would conceivably work in Tigard.
He also will be asked to give some general advice on financing opportunities, in particular tax
increment financing.
Council discussed tax increment financing and recognized that a charter amendment exists
which prohibits Tigard from undertaking a tax increment financing district without first receiving
support of the voters. The charter amendment, placed in the charter in 1983, was formulated at
a time that the implications of tax increment financing were different than they are today. Mr.
Tashman will be asked to explain to the City Council how tax increment financing presently,
works.
Economic development was also discussed. Bill Monahan explained that an opportunity is
scheduled for a discussion with the Economic Development Partners, a non-profit made up of
several local jurisdictions as well as Portland Development Commission. In January the City
Council suggested that consideration of an economic development program be discussed
during 2003 as part of its Council Goals. Bill will report to the City Council on August 26 on his
recommendation regarding the opportunity to join the Partners and potentially to create the
position of Economic Development Director.
Council also discussed Td-Met service. There Is significant interest in creating inner-city bus
service in Tigard.: Bill will work with Finance Director Craig Prosser to initiate discussions with
Tri-Met to better understand the numbers presented by Tri-Met which, according to Tri-Met,
illustrate that Tigard receives more bus service than is paid for by locally generated Tri-Met tax.
In essence, Craig will be asked to perform an audit of Tri-Met similar to that performed on other
franchises in the City. Tri-Met `will be pressed to justify their numbers. Staff will also develop
strategy to investigate the feasibility of inner-city bus service. Perhaps a demonstration
program can be set up with a local company like RAZ. The City of Wilsonville has a successful
Tigard City Councl Meeting Minutes - August 5, 2003 Page 1
program, thus staff will check with Wilsonville regarding the costs of delivering an inner-city
service.
Bull Mountain was discussed. The Council gave direction to staff to continue to move forward in
bringing an annexation plan to City Council in September. At the same time, staff will work with
Washington County to discuss communication opportunities to present information to the entire
community.
The White House on the library site was discussed. Council would like to make a decision In
the next several months whether the house should be preserved or removed from the site.
Coundl suggested that it would like to tour the house sometime in the next few weeks. It was
suggested that to justify preserving the house there needs to be a use, but not an office or
house. Once Council has toured the facility, a discussion of options will occur. If a decision is
made to save the house, Council suggested that others need to be involved.
As the meeting drew to a dose, Councilor Wilson suggested that the next discussion topic be
transportation. The street maintenance fee Is coming back for discussion, by Council. If funds
are freed up from the gas tax monies, Council needs to give direction on what to do with the
freed-up dollars.
The meeting concluded at 5:45 p.m.
it am A. Monahan, City Manager
Attest:
Mayo City rd
Date: ,rnn1~D,+ c~DO~
cwn~,carrwecc~
Tigard City Council Meeting Minutes August 5, 2003 Page ,2
Council Goals for 2004 DRAFT
GOAL 1- FINANCIAL STRATEGY
A. Develop and implement a sustainable long-term financial strategy for issues such as:
1. General Fund needs
2. Library
3. Transportation
4. Parks and open space
5. Washington Square regional center
6. Central Business District
7, Water system
8. Extension of urban services through annexation
FT~i>!`irc Q~4aer Update , v gY'
third quarter of calendar year 2004 Financra(Str ate issues worked on durrng this pPnod
in de:
_Prepared and presented several special analyses related to the possible annexation of Bull,-`
tItho~i~itairi _ -
~;~k~Cpnt uetl participation"of the Joint Audit of Qwest and Venzon franchise fees.
C'ontued an audit of"Nh/ Natural franchise fees in cooperation withh Salem, Portland, and
~ .s2ve al other cifr2s::;The~audit-is expected to be concluded in Ocfioher or November r,-
Council approiled a new franchise with NW Natural that Jincludes an i ncrease m thei'franchise
t the 2%
fee"rate'from;3% to 5%. NW Natural has adjusted customer billings 'to reflect
increase.
he Pares SDC study udu e;d a draft report. The public review process has begun
Began work on the.`FY°2005 10 Financial Forecast :
Conducted a quarterly nieetmg of the Budget;Commiftee, which among other Topics
rev~gwedfentialtifinanc(ahlmpacts on'Tgard.from tdvg,sfafewide ballot measures
Second Quarter Update:
The second quarter of calendar year 2004 has been very active for the City in financial matters. Issues
worked on during this period include:
o Developed and adopted the FY 2004-05 Budget,
Finalized the Five Year Financial Forecast based on that budget,
Updated City "fees and charges,
o Reviewed the Privilege Tax with the Budget Committee as a possible new revenue source,
o Prepared several special analyses related to the possible annexation of Bull Mountain,
o ' Continued participation of the Joint Audit of Qwest and Verizon franchise fees - after two years of
negotiations with Verizon, the cities' auditor was finally allowed on site to review Verizon's books, and
Verizon has committed to complete this audit before the end of the calendar year,
Initiated an audit of NW Natural franchise fees in cooperation with Salem and Portland - several
other cities are now joining this effort,
Concluded negotiation of a new franchise with NW Natural that includes an increase in the franchise
fee rate from 3% to 5%,
Initiated a study to update the City's Parks SDC,
Developed several financial analyses in support of the City's negotiations of the contractual
reimbursement from Clean Water Services in exchange for maintaining part of CWS's service area,
implemented the City's new Street Maintenance Fee and began collections,
Called the 1993 Bancroft Bonds early, saving the City $8,000 in interest costs
DRAFT
First Quarter Update: '
Goal 1 Departments have been putting together budget requests and the City Manager has been
developing his Proposed Budget in response to Council direction to budget conservatively. The Budget
will be constructed to push the need to go to voters for a local option levy out as far as possible.
Staff briefed Council in a workshop session on the drivers in the financial forecast to help answer the
question why declining General Fund balances are projected. Understanding the drivers will help to
develop appropriate responses.
Staff has continued to support the discussion of the Bull Mountain annexation by developing special
analyses as needed and responding to citizen inquiries.
GOAL 2 - TIGARD CENTRAL BUSINESS DISTRICT
A. Support the activities of the Downtown Task Force as it defines a vision for redevelopment.
B. Select a consultant to carry out the Transportation Growth Management (TGM) grant to create a
redevelopment plan based upon the recommendations of the Task Force and Council
C. Choose a financing mechanism, such as tax increment financing, for carrying out the
redevelopment plan or vision.
D. Broaden the Task Force to include citywide representations
%i rd Quarter Update
bm , l he rtaslForceis preparing for extensive community outreach through the :Community
Oialogsbg Meld from Late Sepfer,7be,~ through dcfober. The Task Farce s holding smah
group; dscuss►ons (12 15 peo41e1ao:r~ave.th"e'con~m.unityhelp"develop th~.:Tigard Downtown ,
Improvemeht:Plan.'Itls important that the entire community be involved - this is the community!s
plan.
B&B P? nt Source donated printing and paper for 2500 brochures to publicize the process.
7 askfForce has also `been meeting with 7-Wet V influence fhe Commuter Rai(afafion design and
irnplement fFie.station design"recommendations the Task Farce's Station'Design
Reco ,-Mend.dab'o s repo from (vlarc~03.
A 00
l#B .araer~et Was selected Thp City signed the IGA with ODOT The plan process began in
a" 0sa
~kAugus ,sand , 'Vbe d pleh9d June 30:
W
#C Not y f a p icable..`Fina c gmechan►sms will be addressed in the Tigard Downtown
n Plan; theTask~Force hasn't reached that part of fhe work program
#D €CarripletedMin June. (24 rpembers with a Youth,Advlsory,GouncrlyRepresenfafrve)
Second Quarter Update
Goal 2A: Council appointed an additional 12 members to the Downtown Task Force. Parametrix
was selected in June as the consultant for the Downtown redevelopment program.
Goal 2B: The IGA between ODOT and the City needs to be adopted by the Council to proceed with
the plan and work program.
Goal 2C: Not yet applicable. Financing mechanisms will be addressed in the redevelopment plan.
Goal 2D: The Council also passed a resolution on March 9 that expanded the. Task Force to reflect
Tigard's broad constituency and Downtown stakeholders. The recruitment has been
completed and the Task Force consists of 24 members.
First Quarter Update
pRAF 1 Task Goal 2A Council passed a resolution on 319104 thatraacknowl
Thee ges th on effortslso dof the
that alForcent
and commends its members for completing the work
an expanded Downtown Task Force.
ODOT finalizes
Task Force members be invited to continue serving on
Request for Proposals of work. w(rk.RFP Once seeking consultants
Goal 2B Staff is working with ODOt finalize the project's
its review, an Intergovernmental Agreement
will be completed. This groundwork will take place in the next quarter, culminating in a consultant's
selection. redevelopment plan. in the Goal 2C Not yet applicable. sed anSec mechanisms second eso utionllon Mach 9 that expanded the Task Fo ce
Goal 2D The Council also pass
to reflect Tigard's broad constituency and Downtown stakeholders. The recruitment process is now
under way.
GOAL 3 - TRANSPORTATION
A. Aggressively pursue solutions to congestion of state, county and city facilities that cross through
Tigard. Task Force.
1. Reforming the Transportation Financing
a. Explore outside funding sources task
force b. To recom oe t es and funding needs foastate andhc ty faci t es,functions
2. Identify project pr and state facilities in Tigard
a, Prioritize all project needs - city, county
b. For priority facilities which are controlled by another entity,
I . Discuss the project with the entity which has jurisdiction over the facility;
and
2; Negotiate a funding solution which could include partial city funding; and
3. Offer to improve a related city transportation problem tin exchange for the
other entity completing a need transportation
outdthel improved facity, upon projct
4. Offer to accept jurisdiction
of Understanding andedentifypand letion.
B. Continue working with Tri-Met to carry fund additional improvements w th ODOT representatives at least once n u 2004 to discuss state road
C. Council shall meet with
facilities in Tigard and the related funding needs and priorities.
Third Quarter Update
(From Cora :unity Development)
it a lied fora number of transif-oriented sidewalk Frl grants Thduringthe e proposed period.
#8. i he C y Pp
The streets invoiv include to bus stops Hall, Center,, Garrett and
help c Bate a safer and more, transit friendly
pro~ects.wi11 improve-access
community. The City and TriMet completed'a fourth ou~oX'teiy fiffee ~Chambe eo'f Commerce
regarding service and facility improvement needs. App, -
t ' Based"on the comments, received ,
business: commiftee members participated in the meeing.
in the four outreach meetings conducted so far, TriMet Bonita Road It alsof'studying .
der g
provide seven hours of service along the presently unserv nclu the feasibility of rerouting lines 62 or 92 to se rVe~Barthe use o~the p'a'rkrngf lots for bus rider
contacting.'two'churches along HWY 99W r6' ar in g
parking, TriMet and the City together are looking at bus shelter, needs within the City.:'At'.
four bus stops in Tigard that meef the shelter installation boardings per day thresholds
,present,
(35 per day) are without bus shelters
Third Quarter Update
(From Engineering)
DRAFT
ifrrograrrr~ F1(uC CJJ,V~ ,vul NF ,
of Greenburg Road improverrlentsbefween Shaa,~~e.@ar
g has heart au~tiorizedlfor deign and ng a ~F C
ar,*
.~±✓ne~nEirirnaRnnr
ot►f~n5r~notatigrl
protect 1s> o ;hP
~deman~~e ,
~r tff~.` Uee • u ~ Raa:~1,
improvemen s shat rn#y enhance the, commufer ra►t p k / ,
P !t_
sth _rat►ay{be econ~mendedsbyrifhe,Downtownlm roveme t Ptan
foaO~ Ary "r 1~h sans orfation ~rrranc► ►g"SfCafegres Tas FOrree as reconstituted b Reso utron
N X114=51
o~ Q 5 t the ounc►t meeting an Jamul = 3 004 At hat samAm in Resolution , o k,
Vs ed commnding,fhe o~igrnaME Forbe niemharsaa~nd c'or~~~leting the ^Tas~f~o~ce .
~ q f e TheLrecon~iifufed Task Forcew►Ifexp(ore potentia(xfundmg
ohe original task forc
our major street improvements.
UDR r
rk 6vith TnMet on the commuter, ra►liprolecf In additro
:oat 3~ ~jhe .City stiff continues to wo
~n flie ►nrtial stages The, $75 000 ►nclu$ded ►n the Caprfal
OM roverne,nt Plan is
ieUowntaw~ltnP,~ a. a 4
mprovPmeritProgrant for FY 2004-05 iitay~be~used to Gnstr c tfansportation r d .
15 "W, ct and pi ss biv other imfarelate ovemenfs
t~teo~~cft fxc s n~cuarr 4~, A I
a WE Z
e anal f ~t~reatr~ fcolu~~s'P # at strew, At79
o xsi► :itree acoCrJor foroy•seconda accesa f :fhe, n ed cummu#e ra ( arid-dol
►de
La ?oftheq nu ~Str of E ensloCt
► e~=sf ee, jos rn ended to evenrually~become p ~t . ~I t ?v r,M®R
t x
ch~wou a d;rWaln Street east of Hrghway 99W fi!en nor ~c Ioeg Ash -)Ire& tt0 G Peet to
cf►nz►ke[~e#
Second Quarter Update
jfrom Community Development)
Goal 313: A joint City-TriMet roundtable was held with social service and housing providers in April.
The participating agencies included Community Partners for Affordable Housing, the Good Neighbor
Shelter, the Senior Center and eight other Tigard-based organizations.` The meeting focused on how the
respective agencies' clients use transit and on transit access and coverage improvement needs. In May,
TriMet made a presentation to the Downtown Task Force. In June, TriMet presented the program to the
Planning Commission.
Second Quarter Update
(from Engineering)
Goal 3A1 The reconstitution of the Transportation Financing Strategies Task Force is scheduled for the
Council meeting on July 13, 2004. At that same meeting, a resolution commending the original Task Force
members is scheduled for Council consideration and action. The Oregon Grocery Association will be
represented in the reconstituted Task Force. Invitations were issued to the Tigard Chamber of Commerce
and Washington Square management to provide representation on the Task Force. There has been no
response from the Chamber and Jack Reardon of Washington Square said he could not serve, but would
ask for a representative from the Westside Economic Alliance. If representatives from those groups are
submitted, they could be added by amending the resolution to add those members. Once the Task Force is
reconstituted, the initial meeting can be set, possibly in late July or early August 2004.
Goal 3A2a A list of high priority projects regardless of jurisdiction was developed and presented for
Council review and discussion at the workshop meeting on February 17, 2004. This list included high priority
intersection projects along Highway 99W to move east-west traffic more effectively. A project to widen
McDonald Street at the Highway 99W intersection to provide a dedicated right-tum lane and to extend the
stacking on the left-tum lane from McDonald Street to Highway 99W is included in the Capital Improvement
Program for FY 2004-05. This project should improve east-west traffic movement while allowing motorists to
access Highway 99W more readily.
Goal 38 The amount of $75,000 was included in the Capital Improvement Program for FY 2004-05 to
allow for joint projects to be undertaken by the City and TriMet to provide pedestrian connections
DRAFT
between transit amenities such as bus stops and key acti ityth enters. Some of t Commuterhese funds Project I The
used for improvements in downtown Tigard inconjunction sidewalks at key locations in the City to provide a safe path
funding could also be used to extend existing
to school for children. rea will be
Goal 3C Anew representative to the Oregon Transportation Commission from
requested tom et with Counc Ilataa workshop
appointed this summer. This new representative will q
meeting in the fall to discuss Tigard's transportation project needs.
First Quarter Update
(Update from Engineering Department)
Goal The Transportation n for street improvement projects. Because parti pat on from the to
and Jack
rce
Comm
to evaluate potential sources of revenue ue ard
business community has been lacking on ts Task Force, the
beenh requested to providelgrepresen atives to serveeon the Task
Reardon of Washington Square have request
Economic Force. Jack Reardon indicated that he
was business community. ty booked, but The Chamberdhas not yeti esponded The Task
Alliance to provide someone from the bus
Force membership should be finalized in early May. resented
for Goal 3A2a A list of high priority projects regardless onuF'E lruary w117, as2 0 IThes l st included h gh priority
Council review and discussion at the workshop meeting
intersection projects along Highway 99W to move east-west traffic more effectively. o carry
out the Goal 36 The Engineering Department continued wasl ne udwith ed nnthetCap tal ImprovementsiProgramons of
Memorandum of Understanding. An amount of $75,000
for FY 2004-05 to allow for joint projects to be undertaken by the City and TriMet to provide pedestrian key
The
centers
for
fundin connections between transit amenities such
at kebloc tionsantlhe C'i yttolprovide a safe path to s schoolcou
also be used to extend existing sidewalks a y
children.
Goal 3C Matt Garrett, the Region 1 Manager from Oregon Department of Transportation (ODOT), met
. establishing
dialogue with City. Council: at its workshop. meeting onlemMarch 16, entat 2of 004. This is the first
ODOT had been pro ided
high priority step in
with ODOT that could eventually: lead to imp
earlier with the list of high priority projects, most of which involved Highway 99W intersections with City
treets. Mr. Garrett emphasized that strong support from the business community is important when it
s
comes time to select projects for implementation. his message was passed on to the Tigard Chamber of
Commerce by both Council and the City Manager.
(Update from Community Development Department)
Goal 3B A joint City-TriMet roundtable meeting
lude Community Partners for Affordable Housing,t he is
coverage meeting will
set for April 7th. The participating agencies me orga Good Neighbor Shelter, the Senior Center and eight otht r Tigo d ans t ac ess andions. The
focus on how the respective agencies clients use transi and
improvement needs. Similar o treach me eti c with the Downtown Task Force and Planning
Commission are set for May and une,
GOAL 4 - PARKS AND RECREATION Committee to:
A. Meet with the Park and Recreation Advisory
1. Discuss the vision of the Task Force and the Council related to the City need for parks
and recreation.
2. Discuss possible acquisition needs and financing for the City of Tigard as well as
unincorporated Bull Mountain.
B. ct and neighboring
3. Discuss options and interest with the Tigard Tualatin School Distri
in discu
Continue to participate
the school district's funding needs.
cities to consider
C. Meet with he Skate
the efforts of the Youth Forum. a plan of action.
D. Continue to support
DRAFT
Third Quarter Update
(~Ipdte from Public Works ®epartment)
munity parksand recreation assessment survey was conducted m August,
Goa14AQ Acom
S u Re ort was'presented to.Council and the Park and Recreation:
and;the Executive mmary p:
d .(PRAB) onSeptember21, 2004Three~hundred and eight tRe -66 o~3tb bed pae were
I e, S6,
Advisory,, Boar
suNeyed. The Council directed the PRAB to fo'C f h Counc I ton what coons should'.'be considered
,p'rocesshich will.lead to a recorrimendation 1_Y .
arks and recreation`services toifather additional put Bimput and gage public
o behalf ofp sin i
igupp' hold several community meeting g
d velop and
ort of fhe final' recommendatior)
en Space Task `Force created a BuII, Mountain
Loaf 4A2 ; The Bull Mountain Park and Op ark deye`lopment projacts for -the Bull
Park's Concept Plan w hic h sets forth land acquisition and p
ountam%area: If was presenfed.fo Counon June n2u date of the Par System Mater
th Plant
et results of the annexation favor annexation then a'
p osed updat6&SD - Methodology
will be initiated and the results will be'encompo a~ d Nov/De'c 2004, and effective January
scheduled forCouncil consideration, and app,
2005
r..r: ~r ased 53% the creation o,a
'Goal 4A3, ' The'surveyrevealed that the residenfsn sere ces~lThe survey also ,concluded that
~separate.taxing;distiict fo provide parK'and recreafio
well'overaialf (57%) favored the creation of a Recreation Division operated byahe City.:
rGoal 4B There is nothing to report on this at this time.
Goat 4C The Task Force continues meetintg the`Skate Park Task Force. Skating The
Balloon Festival donated~approximately_ $1,600 o as.
A port demonstrations are tentafively,scheduled f mine what h efrmthe pacTigard BI t'6n parking would'byif ahe.
city parking lot has tieenroped off to help deter
151000 square" foot skate park was built City f I• staff hasmet weth skate parkgmemb Ds and aer
:wP en the City Hall remode ing'is completed. Y
skate park building contractor to discuss the current dell g~i11 d for fhe ilCouncil wo kshopon ign if
A eneral skate park update is presently
necessary. g
December 21,:2004.
Third Quarter Update;
(Update from City Administration) ;
' 4D ` The youth Forum made progress during fh oprams and activi'besa'iThe bylaws of
Gpai ort p g
,organization of a community, coalition to supp -youth Y nt'to
'reprise
tha the 501(c)3 organization are being reviewed wt tep to support you h t inactive organization
to serve the coordination role for the community's
DRAFT
Second Quarter Update
(Update from Public Works Department)
Goal '4A1 A community parks and recreation assessment survey has been recommended to Council for
consideration on July 20. If Council approves the survey interviews will begin in either late July or August.
The executive summary, setting forth the findings has been scheduled for September 21.
Goal 4A2 The Bull Mountain Park and Open Space Task Force created a Bull Mountain Parks
Concept Plan which sets forth land acquisition and park development projects for the Bull Mountain area.
It was presented to Council on June 22. Council accepted the "white paper".
Goal 4A3 This question will be addressed in the upcoming community parks and recreation
assessment survey and reported in a future goal report.
Goal 4B There is nothing to report on this at this time.
Goal 4C The Task Force continues meeting on, and pursuing their fundraising efforts. The Task Force
had a booth at the Balloon Festival. They also conducted skateboarding demonstrations at the Festival.
The wood floor they skated on was donated by Dave Nicoli. Dave intends to make a sizeable donation to
the skate park if festival revenues permit it.
Goal 4D
(Update from Administration)
During the second quarter, the Youth Forum members focused on supporting building a Community
Coalition of Youth Service Providers in the community to formalize a partnership that will qualify for grant
funds to support youth programs and activities.
First Quarter Update
(Update from Public Works Department)
Goal 4A1` The first joint meeting between the City Council and the Park and Recreation Advisory
Board was held on March 9, 2004.
On April 22, 2003, the Tigard City Council re-established the Tigard Park and Recreation Advisory
Board. Within three months, seven Tigard residents were appointed by the Council to serve on the
Board. They are Shelley Richards, Jason Ashley, David Baumgarten, Scott Bernhard, Michael
Freudenthal, Darrin Marks and Carl Switzer. Two Ex-Officio members have been appointed, Barry
Albertson, to represent the Tigard-Tualatin School District, and Eileen Webb, to represent the Tigard
Planning Commission. Since being formed, the Advisory Board has toured many of Tigard's parks and
facilities. They have heard presentations about the City's' park budget, Parks Capital Improvement
Plan, and the general City of Tigard visioning process as it applies to Parks and Recreation. Additionally,
they have reviewed Master Plans for Cook Park, Bonita Park, Summerlake Park, Skate Park, and Fanno
Creek Park. They have also been briefed on the efforts of Rich Carlson's effort, along with many others,
toward creating a Tigard Skate Park for our city's youth. The Board has adopted goals and a mission
statement which reads "The Purpose of the Park and Recreation Advisory Board into advocate for park
and recreation opportunities fora growing Tigard." They have also created an e-mail address,
parkrecboard(a ci.tiaard.or.us, and the Board now has a webpage on the City's website.
Issues discussed at the first joint meeting were:
a) what has the Board learned,
b) Board goals,
c) Board interest in conducting a community assessment survey aimed at community interest in
parks and recreation programs - this project is well on its way, Council was updated on 4/12),
d) Council Goal `#4,
e) vision of the Board and Council related to the city's need for recreation (COT Recreation
Div/Dep't)-survey related,
f) possible park land acquisition needs and financing for the City of Tigard as well as
unincorporated Bull Mountain - significant work has been done on this with the Bull Mountain
Parks and Open Space Task Force-a "White Paper" will be submitted soon,
AF T
g) skate park-survey related, and
h) options and interest in creating a park and recreation district-survey related. untain Goal 4A2 The Bull Mountain Park and Open
nd Space development projects fortl he Bull Moounta in aaeaS
Concept Plan which sets for land acquisition a park between Although the plan has not been finalized, it has identfied "White Paper". The projects
nttPaarlks Sy stem Mas er _ P anOwill be
This plan will be an integral part of the roved b the Task Force, Park and
updated once the Bull Mountain Parks Concept Plan is app by
Recreation Advisory Board and the City Council. Basically, the Bull Mountain plan will become a part of
the City's Parks System Master Plan.
Goal 4A3 This question will be addressed in the upcoming community parks and recreation
assessment survey.
Goal 46 There is nothing to report on this at this time.
Goal 4C On February 10, the TCouncil met with the Skate Park Task Force in a joint meeting. The
ask Force, along with city staff and elected officials, meeting again on
results of that meeting led to the
sing Iacti itiesstructure.
public and, atelg ants rin-kind
fund February 25 at a general meeting aimed at and adultlfund rain
were identified, such as: various youth a formed donations of materials and labor, at raising to Force
raise the needed mo ey. These committees are now
raising committees to begin fund r g efforts
meeting, some more than others, to organize the fund raising campaign. The committees are:
Communication Committee
Youth Fund Raising Activities Committee
Adult Fund Raising Activities Committee
"Grants" Fund Raising Committee
Goal 4D During the first quarter, the Youth Forum focused after school on supporting tithe at Police Fow ertany Twality League's
(PAL) efforts to build a Tigard chapter and provide extend
Middle Schools.
GOAL 5 - GROWTH MANAGEMENT
A. Continue Bull Mountain annexation information preparation leading to a July 2004 Council action
on the Annexation Plan.
B. Form subcommittees and review their completed White Papers.
C. Designate a subcommittee which will review the Planed Development section of the Community
Development Code, led by the Planning Commission.
D. Develop a framework/timetable fora Comprehensive Plan update.
plane the plan and zoning for the
E. Negotiate with Washington County staff to determine
funding will prepar
UGB Areas 63 and 64, and identify the source g for the .
Third Quarter Update:
#A. City Council conducted public hearings on the Bull Mountain Ann ee ttio Plan
annexatio in July and .
-
August. Council accePted the Annexation Plan as,an a oryguide n
In August, Council moved is place
the City issue
anId territory under con ideratio orla~exation. A
separately before the voters of
majority of voters in both the City and the unincorporated territory Will need to support the.
,measure in order for annexation to occur. Streets; Planning, and
#B. Bull Mountain. subcommittees deb the e~ findings, Papers
clusf io na and recommendations to
Police. The subcommittees present
Council in June: Council accepted the White Papers. The White Papers will be used in
;determining the;delivery, of services for Bull Mountain.should annexation occur.
URAFT
ou , cfl d p 'rated a Plarned3Develu merit Coi~►mlttee' foyevafuafe pfanried clue elop~lnerYf,
H of p:
pc s ofthe'Commurtrty-DPvelepmPnt Code, Tfte committee continues to'meet;anc,,ls
py -
idgve(opfrtg a series ofracommendations to improye Tigard' planned deveiopmenr process.
( tThe Planning:Comrnission confihues to meet on°developipg-an approach' to updating the
tCoreiignsive Plan. -Their recommendations will be presented to Council before uie end of
eear F4',.-'As directed by Councii star; is awaitingthe outcome of the Bull,Mountain Annexation, vote
f ~
ib4'le•procezding further wiih'this effort. Y w. „u
Second Quarter Update
Goal B: Bull Mountain subcommittees were appointed and developed White Papers for Parks,
Streets, Planning, and Police.
Goal C: Planned Development committee members have been interviewed by Council and
appointed. Their first meeting was April 14, 2004. The committee is continuing to work on
PD programs.
Goal D: The Planning Commission continues to work on a Comprehensive Plan update program.
The objective is to finalize the Planning Commission recommendations by September for
Council review and action in the fall.
Goal E: Staff is collecting preliminary information related to the scope of concept plans for the
UGB expansion areas.
First Quarter Update
Goal 56 Bull Mountain subcommittees were appointed and are meeting to develop _a
program/scope for four areas of analysis: Parks, Streets, Planning, and Police.
Goal 5C Planned Development committee members have been interviewed by Council and
appointed. Their first meeting is scheduled for April 14'n
Goal 5D The Planning Commission continues to work on a Comprehensive Plan update program.
The objective is to finalize the Planning Commission recommendations by June for
Council review and action in summer.
Goal 5E Staff is collecting preliminary information related to the scope of concept plans for the
UGB expansion areas.
GOAL fi - COMMUNICATION
A. Increase Tigard's communication with other local officials and elected bodies through active
participation of City Council members and staff.
B. Improve and expand communication with citizens, particularly communicating successes and
future concerns._
C. Support the Tigard Beyond Tomorrow goal to maximize citizen involvement opportunities through
educational programs by implementing a citizen leadership series.
D. Investigate the possibility of supporting the mission of the Tigard Youth Advisory Council "to
empower, improve and connect the lives of Tigard's youth" by adding a youth representative to all
City boards and committees.
E. Investigate the possibility of supporting the Tigard Beyond Tomorrow strategy to "encourage
public participation through accessibility and education with an annual citizens' fair for community
events and businesses."
Third Quarter Update:
Goa16AY During the third quarter, City Council and/or staff continued to participate with
regional ;partn'ers at the CDBG Advisory Board; WC,-LS,, CLAB, the 'IWB, M' PAC, the' Regional
VVafer,Consortium, the Senior Center Board, the Tigard Chamber of Commerce, the"Tualatin.
Basin Natural Resource Coordinating Committee and the-,Westside Economic Alliance. The
Council also met with members of the Park and_Recreation,Adyisory Board,.,the.Pie q
DRAFT
SfruciIVn;clifl, vNw n„y ,
~l 6B. F;o`cds on•Tigarcl Ov f iewla~st 3 months 4F r
'Cnee 1 9' ess~ Ideas' or efa R~" ` `p
_ ray
fh t CCU were diseds' 6c ,
~,m
Gba'u6C N.o`'progrzss was madetnathis area dung#hth(rd quarter: ;
a f~M,
J0 I "1
t;_ al GD >'outh ,4dvisoryGod'ncil;', epresentafives"a etr~ow serving on the Downtown',Taslc rAA
l,F 6 and the park and Recreation~Board
M
fGoa! 6E ~ ~ ryCih, staff participated`) he Tiaard 8las T g p p Works depaCfine t and~tli~
. ~ , ~ h t?
f dvrsoCo~rncrl and SlfatqParkaskce a ciatetlnYthe parade, _theIPb(ic ors
'°od x r
epen' showcased some e ur ment and the'Eng►nennaDepartmEnf had;asa `of
q P P Yr~,
N1, i
Capifal~provement Projects. _
Second Quarter Update
Goal 6A During the second quarter, City Council and/or staff met with regional partners at CDBD
Advisory Board, WCCLS, CLAB, the IWB, MPAC, the Regional Water Consortium, the Senior Center
Board, the Tigard Chamber of Commerce Board, WCCCA, WCCC, the Tualatin Basin Natural Resource
Coordinating Committee and the Westside Economic Alliance. The Council met with the Tualatin City
Council and the Tigard-Tualatin School District on April 5. In addition, representatives of the Regional
Economic Development Partners made a presentation to City Council on April 20. Metro Executive,
David Bragdon, met with the Council on May 18.
Goal 6B Improvement and expansion to communications efforts included the following:
Focus on Tigard- Over the last 3 months, Focus topics included the Downtown Plan, Budget 101
and Bull Mountain Annexation Plan
Website - During the last quarter, staff posted a Downtown Survey and the Tigard Beyond
Tomorrow Vision Survey. Staff is able to generate customized reports from the survey data that
is posted on-line and into the system from paper surveys that have been submitted
® Committee for Citizen Involvement (CCI) - In May, staff recommended the CCI, made up of City
of Tigard facilitators to begin regular discussions about ongoing citizen involvement efforts and
ways to expand communications with citizens.
Goal 6C Staff has collected course outlines and materials for leadership series conducted in Beaverton
and Lake Oswego. The next step is to finalize the schedule and topics for Tigard's citizen leadership
series.
Goal 61) The Planning Commission, Downtown Task Force and Park Board have requested youth
representatives.
Goal 6E Staff is working with the Tigard Blast Committee to combine the Citizens Fair with the Blast
scheduled for Saturday, September 18. Coordinator meetings are scheduled for the week of July 12.
First Quarter Update
Goal 6A During the first quarter of 2004, City Council members and/or staff met with Community
Development Block Grant Advisory Board, Washington County Cooperative Library Services,
Cooperative Library Advisory Board, Intergovernmental Water Board, Metro Policy Advisory Committee,
KAI- I
' Regional Water Consortium, Senior Center Board, Tigard Chamber of Commerce Board, Washington
County Consolidated Communications Commission, Washington County Coordinating Committee,
Tigard Festival of Balloons Planning Committee, Tualatin Basin Natural Resource Coordinating
Committee, and the Westside Economic Alliance.
Goal 6B Improvement and expansion to communication efforts included the following:
Focus on Ti and Focus on Tigard continues to be a valuable tool to inform citizens about upcoming
events, programs and projects, and educate citizens about current programs.
Over the last six months, Focus topics have included the Capital Improvement Program, Bull Mountain
annexation, water, the street maintenance fee, community events, and the volunteer program.
Beginning with the April program, the format was changed so the focus topic is presented first with
announcements closing the program.
Communication Plan - As part of the budget process, staff included a brief listing of their proposed
communication plan for each major program or project. Including this information in the budget shows
the Budget Committee, Council, and citizens how information will be disseminated on all major city
programs and projects and serves as a reminder for staff on the variety of communication tools available.
There continues to be an emphasis on developing communication plans when projects and programs are
initiated to ensure a proactive approach to communication and information sharing.
Web Site - Staff continues to add new features to the web page. Park reservations are now available
online through the city's web page. In the last six months, visits to the city's web site have increased
from 34,859 to 39,888 per month.
Cable Television-The Network Services Division has implemented an in-house civic studio training
program. City staff members are currently being trained by Chris Myers, the city's Network Services
Technician who is also trained as a Producer/Director/Camera Operator. One staff person has
completed the training.
The goal of the training program is to expand the city's cable program production capacity and maximize
the use of the civic studio.
Goal 6C A preliminary schedule has been developed for a citizen leadership series to start in
October. Topics will include government finance, land use, transportation, and citizen involvement. Staff
and guest speakers will present the material to the participants. It is expected that the program will be
limited to 25 participants.
Goal 6D The City Council has appointed Lindsey Boyce, President of the Tigard Youth Advisory
Council, as an ex officio member of the Council. Lindsey reviews the Council meeting material, asks
questions and enters the, discussion, but does not vote.
Goal 6E A tentative date, Saturday, September 25, has been set for the Citizens' Fair. Planning
for the event will begin this spring.
i1admtcity counc1Ngoals0004tcounal goals -quarter 31goal update • quarter3 goal report.doc9=04
0
Strategic Financial Plan
Report
April 8, 2003
City of Tigard
■
Table of C®ntents
Introduction 1
Background 1
Methodology 2
Next Steps in Plan
. 3
Council Priorities Summaries
Major Issues
. 5
Other Issues
. 6
Other Jurisdictions' Issues
. 7
Major Issues
Tigard Local' Option Property Tax Levy.....................................
11
Bull Mountain Annexation.........
13
New Revenue Source(s)
15
Long Term Water Supply and Water Rates...
17
Recreation' District Creation, or Annexation to THPRD...........
19
Transportation Bond
21
Parks and Open Spaces Acquisition Bond
23
Other Issues
Parks Reservations Fee
27
Room' Reservations Fees.....
29
Traffic Citation Assessment Fee
31
Non-Resident Police/Fire Service Fee
32
Franchise Fees
33
Land Use Fees
35
Urban Renewal......
36
Water Revenue Bond
38
Street Maintenance Fee
40
Mechanical Building Fees.........................................................
42
Urban Services
43
City Buildings - Maintenance, Repair, Expansion.....................
`
44
Library ,Fees............
46
Skate Park Construction
48
Other Jurisdictions' Issues
WCCLS Local Option Levy
51
Introduction
At its 2003 Goal Setting Session, the Tigard City Council identified development of a
Strategic Finance Plan as its number one goal for 2003. The Council met in a workshop
session on February 18, 2003 to consider information presented by staff on upcoming
fiscal challenges and opportunities. Based on that information, the Council identified
key priorities to be addressed over the next several years. The following report
presents the Council's priorities along with summary-level background information on
each of the issues considered by Council
Background
Over the past several years, Tigard has enjoyed a sound financial condition. Primary
operating fund balances have remained strong. Tigard has worked hard to limit growth
of expenditures and to manage existing revenue sources. Nevertheless, the long term
outlook for City finances revealed declining fund balances as revenues fail to match the
growth in expenditures. The growth in the City's primary General Fund revenue source,
property taxes, was limited by Constitutional amendment to no more than 3% per year
plus a proportional share of the value of new construction. Other key revenue sources
(such as franchise fees and business taxes) are dependent upon the economy and
have been affected by the recent` recession.
On the expenditure side, Cost of Living increases, the cost of health insurance benefits,
and increased retirement system costs for a portion of the City workforce have
increased labor costs more than 5% per year. And, like the private sector, the City has
seen its costs for oil and gas, utilities, and key services increase faster than the overall
rate of inflation. In addition, citizens expect increasing levels of service at high quality.
The City's most recent five year financial forecast revealed more sharply declining fund
balances with a"General Fund deficit occurring possibly as early as FY 2003-04. This
forecast clearly reflected recent economic conditions and price increases. Based on
this information, City administration directed all departments to remove all new
initiatives (except for the opening of the new library) from the five-year forecast. Staff
also implemented a hiring slow-down and efforts to cut discretionary spending in the
current fiscal year (FY 2002-03).; The five-year financial forecast was then re-run based
on the new information. The revised forecast projects a General Fund deficit in FY
2004-05. Under the Oregon constitution, governments are prohibited from experiencing
deficits.
Because of this outlook, Council directed the development of a long term financial
strategy.
i
I
Methodology
In dealing with any sort of financial issue, there are two basic approaches: Raise
revenues and cut expenditures. The FY 2003-04 budget process has been developed
to elicit information about how city expenditures might be reduced. This information will
be presented to the City Budget Committee as part of the FY 2003-04 Proposed
Budget, so it was not specifically addressed by Council as part of its discussions on the
Strategic Finance Plan. The Council identified priorities for the City, and gave staff
preliminary direction to start developing and researching some new or increased
revenue options, but for the most part, will not take any final action on those options
until the Budget Committee has had the opportunity to review expenditure plans.
In reviewing information presented by staff, Council first developed a list of criteria and
factors it used in evaluating issues. These criteria and factors are:
■ Existing services
® User Fees (voluntary)
Broad-based
Existing source (increase rather than new)
■ Cost of collection
■ Non-resident contributions
The Council then reviewed the list of twenty issues presented by staff. They deleted
one issue (Skate Board Park) and added one issue (Library Revenues).
Council then organized the 20 remaining issues into two categories: Major and Other.
Major issues are large issues affecting a broad range of citizens and businesses, or
which require a citywide vote for implementation. Other issues are generally narrower
in scope, or which may be implemented without a citywide vote. (One issue, Urban
Renewal, will require a citywide vote under the Tigard City Charter, but its application
affects only a to-be-defined district within the City.)
Following the identification of the two categories, Council identified three top priorities
within each category:
Major Other
Local Option Property Tax Fee Increases
Bull Mountain Annexation Urban Renewal
New Revenue Sources Water Revenue Bond
2
The following sections contain summary level information on each of the issues
considered by Council.
Next Steps in the Plea
The Strategic Finance Plan is intended to provide a road map for the City over the next
two to three years as it addresses financial issues. Not everything identified within the
Plan will be implemented. Some things not included within the Plan will be done. The
Plan does, however, provide an overall framework to use in approaching financial
'issues,'
Staff has already begun to conduct additional research and to develop issues identified
as priorities for the Council. This information will be brought to Council within the
timeframes identified for each individual issue in the following sections of this report.
In the meantime, staff is in the process of developing the City Manager's Proposed FY
2003-04 Budget. As part of this process, staff is looking at options to reduce City
spending. The Proposed Budget will be presented to the City Budget Committee on
April 28, 2003.
With all of this information in hand, the Council and the Budget Committee will
determine the appropriate mix of expenditure reductions and revenue increases to
address the City's financial challenges.
e
3
Long Term Financial Issues
Council Priorities
Major Issues
(Citywide vote required and broad impact; big issue)
Method of
Potential
Fund(s)
Approval/
Priority
Timing
Issue
Impacted
Amount
Implementation
1
2004
Tigard Local Option
General
TBD
Citywide vote
Property Tax Levy
(Revenue)
2
2004
Bull Mountain
General plus
Differing
Council
Annexation
others
impacts on
resolution,
(Revenue &
various
Citywide vote, or
Expenditure)
funds and
Bull Mountain
operations
vote
3
2004
New Revenue
General
TBD
Council
Source(s)
(Revenue)
Ordinance &
Resolution
Other
TBD
Long Term Water -
Water
$80 to $90
Council
Supply
(Expenditure)
million
Resolution
Other
TBD
Urban Services
General plus
TBD
TBD
others
(Revenue &
Expenditure)
Other
?
Recreation District
General
TBD
Citywide (or
Creation, or
(Expenditure)
larger) vote, or
Annexation to
Council initiation
Tualatin Hills Parks
of annexation
and Recreation
District
Low
2006
Transportation
Gas Tax, TIF
$25 million
Citywide vote
General Obligation
(Revenue &
Bond
Expenditure)
Low
?
Parks and Open
Parks CIP,
TBD
Citywide vote
Spaces Acquisition &
General
Construction General
(Revenue &
Obligation Bond
Expenditure)
5
Long Term Financial Issues
Council Priorities
Other Issues
(More limited impact, or implemented by Council action)
Priority
Potential
Fund(s)
Method of
Timing
Issue
Impacted
Amount
Approval/
Implementation
1
2003
Parks Reservations
General
To Be
Council
Fee Increase
(Revenue)
Determined
Resolution
(TBD)
1
2003
Room Reservations
General
TBD
Council
Fee
(Revenue)
Resolution
1
2003
Traffic Citation
General
$10/citation
Council
Assessment Fee
(Revenue)
$67,000 per
Resolution
year
1
2003
Non-Resident
General
TBD
Council
Police/Fire Service
(Revenue)
Resolution
Fee
1 '
2003
Franchise Fee
General
$720,000 to
Council
Increases
(Revenue)
$989,000
Resolution
per ear
1
2003
Land Use Fee
General
TBD
Council
Increase
(Revenue)
Resolution
2
2005
Urban Renewal
Several
TBD
Citywide vote
(Revenue)
3
Summer
Water Revenue
Water
$8.84 to
Council
2003
Bond
(Revenue)
$20.84
Resolution
million
Other
2003
Street Maintenance
Gas Tax
$1.6 million
Council
Fee -
(Revenue)
per year
Ordinance &
Resolution
Other
2003
Mechanical Building
Building
TBD
Council
Fees
(Revenue)
Resolution
Other
TBD
City Buildings -
General
$990,000
City Budget
Maintenance,
(Expenditure)
Repair, and
Expansion
Other
TBD
Library Revenues
General
TBD
Council
(Revenue)
Ordinance &
Resolution,
WCCLS Contract
Long Term Financial Issues
Other Jurisdictions
Potential
Method of
Timing
Issue
Amount
Approval
Implementation
May 2004
WCCLS Operating Levy
$50 million over 5
Countywide vote
years
26¢ per $1,000
2003
PERS Increases
Employer rates
state
projected to triple (or
more)
January
Failure of Measure 28
TBD
State
2003
2003
Tri-Met Payroll Tax
Unknown
Tri-Met
L
Strategic
Major Issues
_ 9
Tigard Local Option Property Tax Levy
Issue Summary
Definition: A Local Option Property Tax Levy is allowed under the Oregon Constitution
(Measure 50) to increase the local property tax rate to pay for needed services. It
cannot exceed a period longer than 5 years, after which, it must be re-approved by
voters. It can be used for any purpose (i.e. General Fund support) or it can be
dedicated to specific services (i.e. Library, Parks, Police, etc.)
Revenue Required/Revenue Potential: It is not yet known how much the City would
require from a Local Option Property Tax Levy. That is dependent upon what
combination (if any) of additional revenues or cuts in expenditures the Council wishes to
pursue. A tax rate of 27¢1$1,000 of assessed valuation will raise $1,000,000 per year.
Work Completed to date: No work on a Local Option Property Tax Levy has been
done to date. Departments have preliminarily forecasted funding needs, but those
forecasts have not yet been reviewed by the Budget Committee.
Implementation Action Required: A Local Option Property Tax Levy must be
approved by Council and placed on the ballot for approval by Tigard voters. It may only
be voted on at one of the following elections
1. May, subject to double-majority requirement
2. November of an odd-numbered year, subject to double majority requirement
3. November of even numbered year, subject to simple majority.
Timing: If a Local Option Levy is approved by voters in May 2004, the first revenues
would be received by the City in November 2004. If the Levy is approved by voters in
November 2004, the first revenues would be received by the City on November 2005.
Advantages:
® Broad based revenue source
Easily understandable (traditional funding source, familiar to voters)
Stable
If approved as a rate per $1,000, it will grow with growth in assessed values
Well-established collection mechanism in place
Disadvantages:
Short term solution - it expires after 5 years, and then must be renewed by
voters
Oregon voters have been limiting property taxes for the last 10 years. Tigard
voters may not choose to increase their property taxes.
® Competition on the ballot from other jurisdictions` requesting voters to approve
funding measures
11
Competition and confusion with WCCLS measure likely to be on the ballot in
2004
Recommendation: Continue to research and explore options with the goal of placing
this issue before voters in May or November 2004.
Council Priority/Discussion: Major Issue -1
It will be important to coordinate this levy with other measures on the ballot, particularly
the potential WCCLS Local Option Levy.
Bull Mountain Annexation
Issue Summary
Definition: Annexation of approximately 1,400 acres and 7,300 residents in the Bull
Mountain area to the southwest of Tigard.
Revenue Required/Revenue Potential: As of November 2001, General Fund
Operating costs to serve the Bull Mountain area were estimated at $2.2 million per year.
General Fund operating revenues were estimated at $3.8 million per year, so the area
would more than pay for operating costs. Several capital funds, however, were
projected to experience significant deficits in providing needed capital improvements to
the area: Gas Tax -`($345,000), Traffic Impact Fee - ($7.6 million), and Parks CIP
$18.3 million).
Staff is currently reviewing this previous analysis to refine and update this information.
Work Completed to date: This annexation has received extensive review by staff and
public discussion. Staff prepared a preliminary annexation report which identified
potential operating and "capital costs and revenues. Staff is currently updating that
study. Council has discussed this annexation on several occasions. In addition, the
City has conducted two open houses in the Bull Mountain area to solicit residents'
issues and concerns.
Implementation Action Required: State law allows several methods for
accomplishing an annexation:
1. Double Majority - petition from and majority of residents with a majority of the
land value of the area. Annexation would be approved by the City Council.
2. Vote of the subject area - a vote of all residents in the affected area, with a
majority deciding the question.
3.Vote of the subject area and the City, with a majority deciding the question.
Timing: The timing of further discussion of this issue is not yet determined. Timing of
the annexation itself is critical. If the annexation becomes effective after March, the City
will be responsible for providing services for up to a year and a half before residents
start paying for those services.
Advantages:
Improved services to residents of the Bull Mountain area, including police patrol,
road maintenance, and other city services. Revenues are projected to more than
cover the cost of those services.
Residents' obtain a voice in the governing and direction of the City of Tigard.
Residents of the Bull Mountain area would start paying for those services that
they currently use, including parks, library, and arterial roads outside of the area.
13
Disadvantages:
e The City of Tigard would assume responsibility for major capital needs of the
area, primarily parks and roads. Revenues will not cover the costs of these
facilities.
• Strong resident opposition could create hard feelings which could jeopardize
other City initiatives:
Recommendation:
o Continue working with residents and Washington County to analyze the benefits
and costs of annexation.
• _ Update the annexation study to refine cost, revenue and service needs analyses.
Work to educate Bull Mountain and City residents of the issues surrounding
annexation of this area.
Council Priority/Discussion: Major Issue - 2
14
New Revenue Source(s)
Issue Summary
Definition: There are many potential sources of revenue used to varying degrees by
other jurisdictions within Oregon and nationally. It may be to the City's advantage to
consider one or more of these sources to supplement other General Fund revenues. A
partial list of potential sources includes such items as:
■ Construction Excise Tax
■ Local Gas Tax
■ Local Hotel/Motel Tax
■ Local Sales Tax
■ Off-Street Parking Tax
■ Payroll Tax
Renter Service Fee
■ Utility Account Tax
Revenue Required/Revenue Potential: Revenue potential of various options has not
been determined. Potential candidates (if any) need to be identified before revenue
potentials can be researched.
Work Completed to date: None
Implementation Action Required: Most of these types of revenue sources could be
implemented by Council action. They would all be subject to referral, and some are
more likely to generate interest in referral than others.
Timing: Generally speaking, development of anew revenue source is quite time
consuming. In addition to the time required to research identified options and to
structure a proposal, it is also generally advisable to develop an extensive public
involvement process, which can also be time consuming. Most likely the earliest a new
revenue proposal could be brought to Council would be in late 2004.
Advantages: Advantages of new revenue source will vary by the specific source
developed. In general, however, new revenue sources will help to diversify the City's
revenue base. This will help to insulate the City from fluctuations in the economyan- d
will spread the burden of paying for City services. If constructed properly, new
revenues can also increase equity within the City's revenue structure.
Disadvantages: New revenue sources are rarely popular. Specific sources may
generate high levels of opposition form specific interest groups. This opposition could
affect other City initiatives
15
If the source chosen is entirely new, there may not be a readily available collection
mechanism. If it is necessary to set up a revenue collection mechanism, administration
of the new revenue source could be expensive.
Recommendation: Direct staff to identify a preliminary list of potential revenue sources
and to research issues related to those sources. Schedule a Council (or Budget
Committee) workshop to present the results of that preliminary research. Make a
determination following this workshop session whether or not to proceed with any new
revenue sources.
Council Priority/Discussion Major Issue - 3
Explore options and potential for a local Beer and Wine Tax.
Long Term Water Supply and Water Rates
Issue Summary
Definition: Tigard's vision document and Council goals both identify securing a long
term water supply as an essential objective of the City.
Revenue Required/Revenue Potential: Tigard is currently participating in two efforts
to secure its long term water supply: the regionalization of the Bull Run system with a
collection of approximately 12 agencies, and joining the Joint Water Commission (JWC)
and expanding the Scoggins Dam / Henry Hagg Lake complex.
The Bull Run regionalization proposal has developed a range of ownership models and
scenarios that all hinge on the City of Portland regionalizing its water supply system and
establishing a sale price. This option will cost the City of Tigard between $67 and $88
million dollars over the next 20 years.
The JWC proposal hinges on the ability to secure permits and approvals to modify
Scoggins Dam. The JWC proposal would cost the City of Tigard between $91 and $93
million dollars over the next 40 years.
In summary, Tigard could be faced with making financial commitments with costs that
best current estimates average approximately $80 to $90 million dollars over the next
20 to 40 year period. Both of these projects are consistent with and addressed
specifically in the City's visioning documents. To help put these numbers in
perspective, a $5 dollar per month increase in each monthly water bill in the Tigard
Water Service area would raise approximately $1 million dollars annually.
Work Completed to date:
The City has completed two phases of study on the Bull Run regional process and is
awaiting the City of Portland's determination of its interest and a sale price. The JWC'
project is proceeding through feasibility and environmental impact, and it will be
approximately two years until staff can confidently say the project will move ahead.
Implementation Action Required:
The Intergovernmental Water Board will initially produce a recommendation to the City
Council. Following that, the City Council will need to indicate its approval. The cost of
the preferred option will be paid for by issuance of Water Revenue bonds, repaid over a
20 to 30 year period. Council would approve issuance of the Water Revenue Bonds by
ordinance.
Timing:
Staff is currently beginning the negotiation process with the JWC staff to allow for a
limited partnership arrangement for Tigard, hopefully as early as FY 2003/04. This "first
17
increment" of investment could cost up to $12 million dollars. Decisions by Portland on
sale price and continuing the regionalization decision are currently on hold, and
Portland's schedule is unknown. The next major decision for the Scoggins Dam project
is approximately two years away.
Advantages:
The advantages of securing a permanent supply source are many: control, financial
stability, adequate future supply, and quality control top the list.
Disadvantages:
Cost. Because the Tigard Water Service Area is so late in securing its source the costs
are high, and Tigard will not have the benefit of time to spread costs over a long period.
Recommendation:
Staff will continue to update Council on options and costs, with a future
recommendation to authorize issuance of one or more water revenue bond to purchase
some portion of future supply as options finalize.
Council Priority/Discussion: Major Issue - Other
18
Recreation District Creation, or
Annexation to Tualatin Hills Parks and Recreation District
Issue Summary
Definition: Creation of a new Recreation District to service the Tigard/Tualatin area, or
requesting annexation of this area to the Tualatin Hills Parks and Recreation District
(THPRD). Such an action would be designed to improve parks and recreation services
to area residents and to provide services not currently available. This issue, if
implemented could help to address the Skate park Construction issue and the Parks
and Open Spaces Bond issue, listed separately in this report.
Revenue Required/Revenue Potential: To be determined
Work Completed to date: Two years ago, a proposal was placed before area voters to
create and fund the Atfalati Recreation District. The proposal was rejected by voters.
No further action has been taken. Area residents have begun discussing this option
again.
Implementation Action Required: For creation of a new district, cities in the proposed
area would have to pass resolutions of support, followed by action by the Washington
County Commission to place the proposal on the ballot. An approving vote by residents
of the proposed district would be required.
For annexation to THPRD, it is not yet known what initiating action would be required.
Presumably either cities within the area tote annexed and citizens could petition the
THPRD Board for annexation.
Timing: Unknown. Discussions in the community are at a very preliminary stage.
Advantages: Creation of a new special district would provide additional parks and
recreation opportunities to area residents if the measure also creates a sufficient
funding base (presumably through a new permanent property tax rate for the new
district.) Annexation to THPRD would accomplish the same end, by extending
THPRD's existing tax rate to the newly annexed area. THPRD's permanent operating
tax rate is $1.3073 per $1,000 of assessed valuation.
Disadvantages:
■ Either option will increase property taxes to area residents
Creation of a new district will multiply the number of overlapping jurisdictions,
which could cause some confusion among residents and coordination issues
between jurisdictions.
Annexation to THPRD could also cause some confusion among residents and
coordination issues between jurisdictions.
19
Recommendation: Take no action at this time. Monitor developments to see how this
issue develops.
Council priority/Discussion: Major Issue - Other
The city will likely not be the major player on this issue. It appears to b If t ising t movehrou
togh
the School District discussions concerning closure of the hoof pools.
create a new special district gels, however, the City will have to pass a resolution stating
its position. If the City passes a resolution of support, this issue may impact the City's
ability to achieve other priorities.
I
20
Transportation Bond
Issue Summary
Definition: A Transportation Bond is a funding mechanism whereby a local jurisdiction
can sell bonds to perform transportation-related improvements. It requires a Citywide
vote and the repayment of the bonds over a typical 10 or 20 year period would come
from an increase in the local property tax rate.
Revenue Required/Revenue Potential: Approximately $25 million is the revenue
needed to address some of the key transportation-related improvements needed to
improve local circulation in the City. The increase in the tax rate needed to support this
amount would be dependent on the interest rate, on the City's assessed value, and on
the length of the bond issue period. A bond issue for $25 million at an assumed interest
rate of 4.75% over a 10 year period would be 90¢ per $1,000 of assessed value. At a
20-year period with an interest rate of 4.50%, the rate would be 55¢ per $1,000 of
assessed value. Hence, the expected range in election year 2006 would be between
50¢ and $1.00 per $1,000 of assessed value for a bond issue in the amount of $25
million:
Work Completed to date: A Council-appointed Transportation Bond Task Force.
selected a list of transportation, safety, sidewalk, andpedestrian/bikepath projects to
meet the City's goals of improving traffic safety, improving traffic flow, and enhancing
pedestrian and bike transportation. Council approved the proposed list of projects and
submitted a Proposed Transportation Bond in the amount of $16 million as Ballot
Measure 34-20 in the November 7, 2000 general election. The proposed bond issue did
not pass. The need to address the major transportation improvement needs of the City
has grown even more urgent since then. In January 2002, Council adopted the Tigard
Transportation System Plan. This plan provides an extensive list of projects necessary
to accommodate current and future traffic. It provides the basis for project selection for a
future transportation bond issue.
Implementation Action Required: A Citywide vote of approval is needed for a bond
issue. This requires simple majority in a general election, but requires a double majority
in any other election.
Timing: The earliest that a bond issue could be submitted is in the 2006 general
election. This is in recognition of the other ballot issues that need to be submitted in the
2004 election year.
Advantages: The reasons for proposing a Transportation Bond are as follows:
Accelerates the design and construction of major transportation projects to
increase capacity and enhance traffic flow. Some of these improvements are
needed now to address current traffic problems.
21
• Improves traffic and pedestrian safety through intersection improvements and
separation of various modes of travel (bike lanes and sidewalks) as part of the
improvements.
Disadvantages: The drawbacks to the Transportation Bond are:
• It requires a vote of the citizens to increase their property tax. The voters have
not shown an inclination to favor such an increase.
• Competition on the ballot from other jurisdictions may work against passage.
• May conflict with other City initiatives, depending upon what happens in election
year 2004.
Recommendation:
The recommendation is that the City plan for a Transportation Bond issue in the amount
of $25 million to be submitted to the voters in election year 2006. This would require
creation of a committee or task force to select projects that voters would deem as
essential. It would also require a concerted effort by the City, City Council, and the
community to conduct a public awareness campaign to convince the voters to approve
the bond issue.
Council Priority/Discussion: Major Issue - Low
This issue was assigned a low priority primarily because it is not expected to be ready
to go to the voters until 2006.
22
Parks and Open Spaces Acquisition Bond
Issue Summary
Definition: A Parks and Open Spaces Acquisition Bond is allowed under Oregon
Statutes. General Obligation bonds require a citywide vote, and if approved, authorize a
special debt service property tax levy. The City could also issue other types of bonds,
which do not require voter approval, but would have to identify a source of revenue to
be pledged to annual debt service payments. The City currently does not have such a
source of revenue.
In 1999 the City adopted a 10-year Park System Master Plan. This Park System Master
Plan was the result of a comprehensive, collaborative effort between the citizens of
Tigard, Tigard staff, and consultants. Tigard's Park System Master Plan is a
comprehensive needs assessment and long range plan for meeting the community's
parks and recreation needs over a ten-year period. The plan identifies many projects
totaling over $21,000,000. The plan examines the impacts of the community's growing
demand for services, the effects of related planning efforts, the implications of
demographic changes, and the contributions made by the park system in providing relief
from high density urban development. Further, the plan sets forth a Capital
Improvement Program (CIP) which functions as a framework plan or tentative list of
projects for a ten-year period. The CIP is reviewed and updated annually to reflect the
changing needs of the community and changes in available funding for financing park
capital projects. Decisions regarding the actual expenditure of funds for individual park
capital projects are incorporated into the City's annual budget process.
Revenue Required/Revenue Potential: The revenue required to accomplish the
projects identified for the next 5-years (FY 03-04 thru FY 07-08) is approximately
$4,000,000. SDC generated revenue, based on recent actuals, are down over the last
few years (approximately $350K per year). As long as the economy remains as it is, it
is projected that SDC funds will continue to remain flat during the next few years. A
successful park and open space bond measure would provide the necessary revenues
to acquire and development parks. A tax rate of 270 per $1,000 of assessed valuation
will raise $1,000,000 toward annual debt service.
Work Completed to date: loo work on a Parks and Open Spaces Bond Measure has
been done to date.
Implementation Action Required: A bond measure must be approved by Council and
placed on the ballot for approval by Tigard residents.
Timing: To be determined
23
Advantages:
A bond measure would provide the funds necessary to supplement SDC
funds for the acquisition and development of parks and open spaces
® Easily understandable (known funding source, familiar to voters)
Disadvantages:
® Tigard residents have been asked to increase taxes on several occasions
over the past several years. Specifically, the successful passage of the new
Library Bond and the School District Bond.
® Although additional bond funds would be advantageous, the projections show
limited funding for parks operations and maintenance. The City may not be
able to adequately maintain new facilities.
Recommendation: Do not consider a bond measure until the City is able to fund
operating costs.
Council Priority/discussion: Major Issue - Other
The Council expressed several concems about this issue: It may conflict with the City's
number 1 priority -gaining voter approval for a Local Option Levy, the City does not
currently have sufficient funds to maintain and operate the parks it already has, and it is
not clear how this issue would relate to the possible creation of a new parks and
recreation district.
24
1 t
ra k Finance 1
Issues
Other 25
Parks Reservations Fees
Issue Summary
Definition: Resident and Non-Resident fees and charges for the use of park facilities,
primarily shelter rentals, have been in effective for many years. The City currently
charges non-resident's double the resident fee. Although funds derived from fees and
charges'are nominal, they help defray maintenance costs.
Revenue Potential: It is possible to increase the amount of revenue derived from fees
and charges, thereby recovering a larger proportion of the cost of taking reservations
and providing services to groups.
Current Park Reservation Fees
Application Fee $10.00
Covered Picnic Area Rental
Tigard Based Rental Rate
Groups up to 50 $6.00/hour
51 to 100 $8.00/hour
101 to 150 $15.00/hour
151 to 200 $20.001hour
201 to 250 $25.001hour
Non-Tigard Based Rental Rate
Groups up to 50 $12.00/hour
51 to 100 $16.00/hour
101 to 150 $30.001hour
151 to 200 $40.00/hour
201 to 250 $50.00/hour
Soccer/Ballfields
Tigard Based Rental Rate $4.00/hour
Non-Tigard Based Rental
Rate $8.00/hour
Work Completed to dater A study of local area 2002 fees and charges has been
completed. Public Works staff is currently preparing a recommendation to increase fees
and charges. A substantial fee increase will be necessary if the City is to have fees and
charges comparable to surrounding jurisdictions.
Implementation Action Required: Increased fees and charges must be approved by
City Council
Timing: It anticipated that a recommendation to increase fees and charges will be
made during the budget approval process.
27
Advantages:
Increased revenues will help to defray increasing maintenance costs
Tigard fees will be more in-line with neighboring jurisdictions.
Disadvantages:
Even though a substantial rate increase may be approved, the yield will
remain nominal
Residents will not like increase
Recommendation: Continue with analysis and make recommendation that puts
Tigard's fees more in-line with neighboring jurisdictions.
Council Priority/Discussion: Other Issues -1
28
Room Reservation Fees
Issue Summary
Definition:
Room rental fees are currently charged for using the Tigard Senior Center and in limited
circumstances the Town Hall and Water Auditorium. A fee could be charged to users
for use of all City rooms.
Revenue Required/Revenue Potential:
At this time, the revenue potential is unknown. Room use fees will be set at a rate that
covers the cost of staff time, utilities, and wear on the facilities.
With the completion of the new Library there will be additional revenue potential through
that complex. In addition to the community room, there are two rooms within the Library
that may be made available for renting during the Library's business hours.
Also, the proposed re-model configuration for the current Library building allows for two
meeting rooms that could be rented by the public during non-business hours.
Current Meeting Room Reservation Fees & Deposits
Cleaning Deposit (Non-Senior Center)
Groups of 80 or less $150.00
Groups of more than 80 $250.00
Cleaning Deposit (Senior Center)
Groups of 80 or less - no food/bev $50.00
Groups of 80 or less -food/bev $150.00
Groups of more than 80 - no food/bev $100.00
Groups of more than 80 - food/bev $250.00
Red Rock Creek Conference Room
Class 1 and 2 $0.00
Class 3 $10.00/hr
Class 4 $15.00/hr
Richard M. Brown Auditorium
Class 1 and 2 $0.00
Class 3 $30.00/hr
Class 4 $35.00/hr
Senior Center Activity Room
Class 1 and 2 $0.00
Class 3 $10.00/hr
Class 4; $20.00/hr
Class 5: $25.00/hr
29
Senior Center Classroom or Craft Room $0.00
Class 1 and 2 $5.0 .00
Class 3
Class 4 $10.00/hr
Class 5 $15.00/hr
Town Hall $0.00
Class 1 and 2
Class 3 $20.001hr
Class 4 $25.00/hr
Water Lobby Conference Room
Class 1 and 2 $0.00
$10.0 .00
Class 3
Class 4 $15.001hr
Work Completed to date:
No significant work has been done to date.
Implementation Action Required:
Room use fees are part of the City's Room Use Policy which was adopted by City
Council. Policy changes, including the classification of room users and room rental
fees, will need to be approved by City Council.
Timing:
Present the changes to the Room Use Policy to City Council by the end of May. If City
Council approves the changes to the Room Use Policy, the changes in classification
and fee amounts will become effective for reservations made from July 1, 2003 forward.
Advantages:
® The City will recover a larger portion of the cost of operating the program.
® It is a benefit-related fee. In other words, only those who use the rooms will incur
the cost.
® The City will be providing citizen's with a low cost alternative for their personal
room use.
Disadvantages:
Current room users will perceive the fee as a reduction in services. This will be
especially true of non-profit groups.
Recommendation:
Proceed with updating the City's Room Use Policy.
Council Priority/Discussion: Other Issues -I
30
Traffic Citation Assessment Fee
Issue Summary
Definition: A Traffic Citation Assessment Fee is an additional al chviolation. arge
Tlevied his on all lis in
persons who plead or are found guilty of committing a charge
addition to any fine or assessment levied by the municipal court.
Revenue Required/Revenue Potential: The current base fine for a traffic violation is
$50. In addition, the court collects additional charges for the Oregon Court System
(unitary assessment) and Washington County. These additional costs total $49. The
total to the offender is therefore $99. (A portion of this may be waived by the judge.) A
Traffic Citation Assessment Fee would be $10 per ticket, raising the total cost to the
offender to $109.
Based on 6,700 citations issued per year, this charge would raise $67,000.
Work completed to date: Information on a similar charge imposed by the City of.
Milwaukie has been collected. Tigard's charge could be modeled on the City of
Milwaukie ordinance. icipal Implementation Action Required: Council would would the shave unadd this
Code to create authority for the assessment. The Council
charge to the Master Fee Resolution.
Timing: To be determined. This charge could be implemented by June 2003.
Advantages;
• The charge would help pay for police programs, including traffic enforcement,
training, education, and community programs.
• The charge is targeted to those who generate costs in the Police department
through violation of traffic codes.
Disadvantages:
• The addition of this charge would raise total costs charged to traffic offenders to
an amount greater than the base fine ($59 vs. $50)
• Unless otherwise specified in Code, the municipal judge could waive this charge,
thereby reducing collections
Recommendation, Consider adopting a Traffic Citation Assessment Fee by June
2003.
CouncH Prforhy/Dtscussion: Other Issues 1
31
Non-Resident Police/Fire Service Fee
Issue Summary
Definition: A Non-Resident Police/Fire Service Fee is a special fee charged to non-
City, adult residents each time they receive service from the City. This type of fee is
charged by several fire departments, including the City of McMinnville, for a variety of
services, including traffic accidents.
Revenue Required/Revenue Potential: To be determined
Work Completed to date: None. Some minimal research has been done by the
Police Department, but no in depth work has been done.
Implementation Action Required: Council would adopt an'ordinance authorizing a
fee and would then adopt a resolution amending the City's Master Fee Resolution
Timing: The Police Department reports that it could have research completed in about
one month. Following that, Council could adopt this fee by June 2003.
Advantages:
® Non-residents would pay for services they receive that they do not currently pay
for through payment of taxes or other means.
■ This would help off-set Tigard taxpayers' costs for providing services to major
regional attractors, such as Washington Square and Highway 99.
■ Money raised would help pay for services in the Police Department which might
otherwise have to be scaled back.
Disadvantages:
■ Collection could be difficult since, by definition, all payers would be out-of-town
residents.
® Other communities could feel that the reciprocity. by which they provide services
to Tigard residents while they are in other communities may be compromised.
Recommendation: Continue to research this proposal, with particular emphasis on the
collection mechanism. Prepare a report for Council consideration within the next two
months.
Council Priority/Discussion: Other Issues - 1
Although this item was ranked as a #1 priority with the Other Issues category, along
with other new fees and fee increases, Council expressed concern that this would be a
difficult fee to collect. Staff was directed to research this issue further, but it may be
dropped from further consideration.
32
Franchise Fees
Issue Summary
Definition: The City charges private utility companies a fee for use of public rights-of-
way to string their wires, or lay pipes and conduit. The fee is calculated as a
percentage of the utility's gross revenues collected within the City of Tigard. State law
limits the maximum fess and taxes to no more than 5% for gas and electric and 7% for
telecommunications. The City currently charges
5%eThelectric e City doles not charge is water
utility 3%, and telecommunications companies
and sewer utilities any fee, though many cities do.
Revenue Required/Revenue Potential: Raising
would raise approximately $720,000 per
fees to 5% (the same as telecommunications)
year for the General Fund. Raising telecommunication franchise fees from 5% to 7%
would raise approximately $134,000. Charging a 5% franchise fee to the City's water
utility would raise approximately $135,000 per year.
Work Completed to date: No work has been done on this issue to date.
Implementation Action Required: Council resolution or ordinance.
Timing: The Northwest Natural Gas franchise agreement and many
telecommunications franchise agreements require 180 days notice before any increase
in the franchise fee:
Advantages:
Builds off an existing collection that is in place and well established
Broad based - it affects 'a wide variety of payers (though utility bills)
■ Relatively stable revenue source
Electric and natural gas utility rates have recently been lowered (following large
increases last year). This will minimize impact on utility customers.
o Increasing gas and electric franchise fees to 5% would achieve equity among the
private utilities.
Disadvantages:
■ Increased fees will be passed on to utility customers, thereby increasing their
bills
Understate law, the incremental increase suggested would be itemized on `
customer bills
o Telecommunications companies are challenging local franchise authority
nationally and in Oregon. Increasing franchise fees could add to this push.
Recommendation:
® Consider raising gas and electric franchise fees to 5%
33
Do not increase telecommunications franchise fees. Maintain those at 5% to
achieve equity among the private utilities
e Explore options for charging a franchise fee of no more than 5% on public utilities
(water and sewer.) If options are feasible; consider instituting water and sewer
franchise fees.
Council Priority/Discussion: Other Issues -1
Land Use Fees
Issue Summary
Definition: The City charges applicants for land use actions a variety of fees to recover
costs associated with those applications. Fees were last increased in 2002, but that fee
increase did not include any costs incurred by Engineering and Public Works in
reviewing and processing applications. Support for Long Range Planning activities
directly relating to development activity was also not recognized. Revisions to land use
and building fees are necessary to capture costs associated with processing of land use
applications.
Revenue Required/Revenue Potential: To be determined. This issue will be studied
to develop a fee structure that will include recovery of costs for time worked by
Engineering, Public Works, and Long Range Planning, in addition to time worked by
Current Planning. The total revenue potential cannot be accurately determined until
that study takes place.
Work Completed to date: Limited work has occurred to date. Time tracking
procedures will be in place shortly.
Implementation Action Required: Council approval
Timing: Revised fees could be acted upon by Council by July 2003
Advantages:
Development pays proportionate share of direct and indirect costs associated
with processing land use and building applications.
o General Fund support of development activities would be reduced.
Disadvantages:
Land use fees increase.
Development-related fees could be higher in Tigard than in surrounding
jurisdictions.
Development-related fees supporting Long Range Planning activities are not
common.
Recommendation:
m Proceed with analysis; include time tracking to determine costs.
Develop a fee proposal to present to Council by July 2003
Council Priority/Discussion: Other Issues -1
35
Urban Renewal
Issue Summary
Definition: Creation of one or more urban renewal districts to generate dedicated
revenues to pay for needed improvements in the Washington Square Regional Center,
Downtown Tigard, and/or Commuter Rail Line. The Tigard Charter currently prohibits
any renewal districts without an approving vote of the people.
Revenue Required/Revenue Potential: To be determined. The Washington Square
regional Center Plan identifies substantial improvements needed in that area, with costs
to match. These costs can only be partially covered by existing revenues and fund
sources.
Work Completed to date: Council has received three informational briefings of the
mechanics of urban renewal and urban renewal financing.
Council has approved the Washington Square Regional Center Plan and the
Washington Square Regional Center financing plan, which identify needed
improvements and potential costs.
Washington County is actively pursuing funding for the Commuter Rail Line and is
exploring urban renewal as a means of providing funding for a portion of the
improvements required, particularly in the area of Commuter Line Stations, of which
Tigard will have two.
The Central Business District has discussed plans for needed improvements, but to
date, not central vision or plan has emerged.
Implementation Action Required: City Charter prohibits the formation of any urban
renewal district without an affirmative citywide vote. `Council could refer one of two
measures to the people:
1. An amendment of City Charter to remove the requirement for a citywide vote, or
2. Approval of one or more urban renewal districts.
Timing: To be determined
Advantages:
Creation of a dedicated funding source, that grows with growth in assessed
values in the urban renewal district, that can be used to pay for needed
improvements.
Public improvements paid for by urban renewal will spur private investment that
will further increase values in the district, and will accommodate job and housing ,
growth
36
e Once the urban renewal plan is accomplished and all costs are paid for, the
assessed value is returned to the general tax roles and help pay for citywide
service.
Disadvantages:
e Urban renewal "locks up" growth in assessed values during the life of the urban
renewal plan, thereby limiting growth in tax revenues for all overlapping taxing
jurisdictions.
Urban renewal mechanics are complicated and difficult to explain to the public in
an election setting.
e Creation of an urban renewal district requires the active support of major property
owners within the proposed district.
Recommendation:
a Continue to explore urban renewal as an option for Tigard
® Work with property owners in the Washington Square Regional Center and the
Tigard Central Business district, and with Washington County to assess the level
of interest and support for urban renewal.
e Develop a proposed timeline for resolution of this question.
Council Priority/Discussion: Other Issues - 2
Council recognized that this issue will require a citywide vote, either to form the
district(s) or to remove the charter requirement for a citywide vote to remove the charter
provision. This was placed in the Other Issues Category because it will primarily affect
those areas chosen for inclusion within an urban renewal district, should one be formed.
If the decision is made to attempt to amend the City charter to remove the provision
requiring a citywide vote to form a district, this issue will proceed in a two-step process
(charter amendment, then formation of one or more districts).
37
Water Revenue Bond
Issue Summary
Definition: A water revenue bond is a type of bond backed by future water revenues
(as compared to a general obligation bond which pledges property taxes as repayment).
Tigard is considering this type of bond to finance capital improvements and possibly the
up front or "buy in "costs the City would incur to secure a long term water supply.
Revenue Required/Revenue Potential: The City will be considering the use of water
revenue bonds to finance all or a portion of the upcoming water reservoir/pump
station/transmission piping project package, named the 550 ft Service Zone Water
Supply System Improvements. This group of projects is currently estimated to cost
$8.84 million dollars.
In addition to the above, the City has been invited to enter into negotiations to become a
partner in the Joint Water Commission (JWC). The City hopes to negotiate an
ownership percentage that would allow the City to obtain up to 4 million gallons per day
(MGD), and to allow the costs to Tigard to be paid over time as a component of water
purchase costs. The JWC could require this to be a cash arrangement. Staff anticipates
completing this negotiation by April, 2003. Buy in costs could range from $2 to $3 per
gallon. Assuming the most expensive, where the City would be successful in obtaining
4MGD at a cost of $3 per gallon and the current JWC owners demanded cash, Tigard
would need to raise an additional $12 million dollars via revenue bonds.
In summary, Tigard could be looking to issue up to $20 million dollars of revenue bonds
within the next two years. Both of these projects are consistent with and addressed
specifically in the City's visioning documents.
Work Completed to date: The City has currently done two things in anticipation of
these expenses: the Council passed a resolution that sets water rates for the next three
fiscal years, and the City has retained a consultant to develop a water financial planning
and rate model to better evaluate out options and scenarios. This rate model also will
be important in the issuance of water revenue bonds.
Implementation Action Required: The Intergovernmental Water Board will initially
produce a recommendation to the City Council. Following that, the City Council may
authorize the issuance of revenue bonds by ordinance.
'riming: Staff work will begin soon, with the actual issuance of the bonds anticipated
late in 2003 or early 2004
Advantages: Revenue bonds are excellent funding mechanisms for utility capital
improvements for three reasons: (1) they do not compete with other public funding
38
based on general revenues and they do not require voter approval, (2) they extend the
concept of "cost of service" principles where a user of a utility pays their proportional
share of the cost to provide that specific service, and (3) they spread the cost of an
improvement to future users of that improvement (intergenerational equity). Revenue
bond repayment periods are generally also shorter than the useful life of the project they
j fund. In addition the current costs of borrowing money are very favorable.
Disadvantages: Not using bonding of some type puts our utilities into the business
model of pay cash as you go which is not viable where such large amounts of capital
are needed. In addition, revenue bonds carry have a higher interest rate than general
obligation bonds, because their repayment is based on the financial stability of the
system and not on an unlimited power to tax.
Recommendation: Staff will continue to update Council on options and costs, with a
future recommendation probably being to authorize issuance of one or more water
revenue bond issuances.
Council Priority/Discussion: Other Issues 3
39
Street Maintenance Fee
Issue Summary
Definition: The Street Maintenance Fee is a monthly fee based on use of the
transportation system, and is typically based on trip generation rates. The fee would be
charged to each household and business in the City and would be collected through the
City's regular monthly sewer and water bill. The intent is to have the users of the road
system share the costs of the corrective and preventative maintenance needed to keep
the street system operating at an adequate level. The revenue received through the fee
would be dedicated to maintenance of the street system.
Revenue Required/Revenue Potential: Approximately $1,605,000 is needed for the
following: $800,000 for street maintenance, $445,000 for street light and traffic signal
system energy and maintenance costs, $270,000 for rights-of-way maintenance on
collectors and arterials, and $90,000 for sidewalk maintenance on collectors and
arterials. The proposed charge for single family residential structures is $2.54 per
month, and for multi-family units $1.76 per month per unit.
Work Completed to dater The implementation of this fee was recommended to the
City Council over a year and a half ago by the City's Transportation Financing
Strategies Task Force, a citizen task force formed to evaluate and recommend to
Council feasible alternative funding sources for street maintenance and street
expansion needs.` The Task Force conducted an extensive public process to enhance
citizen awareness of the need for the proposed fee and to receive input from citizens
and businesses. The proposed fee has been discussed with Council several times and
is again scheduled for further Council discussion at the March 18, 2003 workshop
meeting. Council direction on the possibility of adoption will be requested at that
meeting.
Implementation Action Required: Council has the authority to establish the Street
Maintenance fee. The proposed fee would be adopted by ordinance and the rates to be
charged would be established by resolution.
Timing: If Council does approve implementation, the effective date for the fee would be
set several months after Council adoption of the ordinance and resolution. This would
give the City of Tigard staff sufficient time to setup the fund and do the necessary work
to ensure that the amounts can be incorporated on the utility bills without a glitch in the
billing process.
Advantages: The following are the reasons for adopting the fee:
Would provide a new, stable source of revenue for street system maintenance.
40
• The gas tax revenues are not restricted to maintenance, but can be used for a
wide variety of needed street improvements. However, these funds have been
used primarily for maintenance because of the large maintenance backlog and
the inadequacy of the current gas tax rate to address anything beyond that. The
proposed Street Maintenance Fee would supplement the gas tax and would be
used in the maintenance of the street system. This would allow use of some gas
tax revenues to address reconstruction, installation of crucial pedestrian
connections, and other street improvement needs.
• Would allow the City to establish a long-term plan to address the $4 million
backlog in street maintenance needs.
• Early adoption of the fee could establish that new revenue source before the
state legislature proposes any preemptive action directed against implementation
of street utility fees.
Disadvantages: The following are the drawbacks to adoption of the fee:
• The fee would have residential land uses pay 28% of the total amount with the
rest coming from non-residential land uses. Some businesses oppose it because
of its heavy charges to the commercial sector.
Some opponents are labeling the fee as a tax. Depending upon how the fee is
structured, it could be construed as a tax.
• The Oregon Grocery Industry Association has threatened to take legal action to
stop implementation of the fee.
• It could be referred to the voters through the initiative process.
• The implementation of the fee could interfere with other City initiatives, such as a
possible operating levy and a transportation bond issue.
Recommendation:
The recommendation is that City Council adopt the fee and direct implementation. This
would raise new revenue for urgently needed maintenance of the street system. Many
cities have either taken action or are seriously contemplating initiation of a similar fee.
Future legislative action could affect the fee adoption, if delayed.
Council PrioritylDiscussion: Other Issues - Other
The Council position on this issue has not yet been decided. Some members have
expressed strong support. Some members have expressed strong reservations,
particularly about the timing of this issue. Council will hold further discussions on this
issue.
41
Mechanical Building Fees
Issue Summary
Definition: Mechanical Building fee increase to recover costs. Fees for building and
plumbing are not proposed for increase. These fee increases will not affect the General
Fund.
Revenue Required/Revenue Potential: Unknown at this point. Mechanical fees are
budgeted in the Building Fund. Overall, the Building Fund is in good condition due to
cost recovery of the other specialty fees for other trades (building, plumbing, etc.), but
fees from the other trades are subsidizing the mechanical trades. Policy established by
state law discourages (but does not prohibit) subsidies between the trades.
Work Completed to date: All building fees were increased in 1999 and 2000 after 20
or more years of no increases. These increases were accomplished following a building
study and several public hearings. No work has been done since 2000 on any building
fee increases:
Implementation Action Required: Adoption of resolution establishing revised fees
following a public review process mandated by state law.
Timing: Fee increase should be coordinated with yearly fee updates in June 2003.
Advantages:
• Mechanical permit fees will be made current and will pay for the cost of providing
service.
e A mechanical fee increase will decrease the subsidy from other building specialty
trades for the cost of mechanical inspections and plans checks.
Disadvantages:
• Any increase will increase costs for builders and remodelers and could be
passed on the purchasers of new and remodeled buildings.
• The building industry has traditionally opposed Tigard building fee increases.
Recommendation: Proceed with fee study and consider increasing fees by dune 2003.
Council Priority/Discussion: Other Issues - Other
42
Urban Services
Issue Summary
Definition: Services for areas outside existing City limits, but within the City's urban
services boundary (other than Bull Mountain). This includes the areas to the south and
west of Bull Mountain soon to be brought into the urban growth boundary.
Revenue Required/Revenue Potential: Unknown at this point.
Work Completed to date: No work has been completed to date on this issue.
Implementation Action Required: At some point, the City will be required to provide
public "services to areas outside the existing City limits but within the City's urban
services boundary. This will not occur until after those areas are annexed. No work to
identify those potential costs and revenues has been done to date. Public Facilities and
Service Plans are needed to assess existing and future needs.
Timing: To be determined. Considerable resources will be necessary to complete
necessary studies.
Advantages: ,
® Improved services to residents of the urban services area, including police patrol,
road' maintenance, and other city services.
® Residents obtain a voice in the governing and direction of the City of Tigard.
® Residents of the urban services area would start paying for those services that
they currently use, including parks, library, and arterial roads outside of the area.
Disadvantages:
® The City of Tigard would assume responsibility for capital needs of the areas.
These needs could be substantial.
® Resident opposition could create hard feelings which could jeopardize other City
initiatives.
Recommendation:
® Conduct a preliminary, high-level survey to attempt to define major service issues
within these areas. '
• Identify logical areas of opportunity /need.
® Prepare a preliminary timeline for additional work, consistent with existing staff
resources and workload.
Council PrioritylDisoussion: Other Issues - Other
43
City Buildings - Maintenance, Repair, Expansion
Issue Summary
Definition: The City owns and operates several buildings, including City Hall, the
old Library, the Police Department, the Niche, the Senior Center, the Public Works
Building and annex, and Canterbury Water facility. In addition, the City operates the
Water Building, which is owned by the Tigard Water District. The City does not have
a dedicated source of funding to provide for the maintenance, repair or expansion of
these facilities. The City has traditionally set aside General Funds in anticipation of
future building needs.
Revenue Required/Revenue Potential:
Projects identified to date include:
• FY03/04 Projects
o HVAC Replacement Project for the Senior Center - $50,000
o Seismic Upgrade Project for the Police Dept.- $40,000
o Access Control for Water Building Facility & Canterbury Water Facility
security - $90,000
o Space Planning for the Water Building - $30,000
o Construction Drawings & Construction Administration for Old Library/City
Hall Remodel - $136,050
o Office Renovations Old Library/City Hall - $500,000
• FY04/05 Projects
o ` Office Renovations Old Library/City Hall - $600,000
• FY05/06 Projects
o ` Water Building Renovations - $500,000
• FY06/07 Projects
o Senior Center Seismic Upgrade - $45,000
In addition to identified projects, there is a need for contingency funds for needs that
may arise during the planning period.
The total cost of remodeling and upgrading the old library and City Hall for new uses is
estimated to cost $1.16 million. The City currently has a set aside of $1 million for this
project.
No set aside exists for other identified needs.
Work Completed to date: A seismic study of city facilities was performed in 2000 to
identify the seismic upgrade needs of the facilities. A consultant was hired this fiscal
44
year to identify current and future space needs for the City and to provide a layout of the
space usage of the old library and the City Hall based on those needs. This study is
near completion.
Implementation Action Required: Projects will be identified and approved in the
City's Capital Improvement Plan. Annual funding is provided through approval of the
City Budget.
Timing: It is anticipated that the projects identified will be implemented according to the
budget approval of the fiscal years indicated if necessary funding is available.
Advantages:
e Provides for greater security of facilities
e Meets the long term growth needs of the City
Provides for a safe and effective work environment for staff and the public
e ' Improved use of facilities to provide better customer service
Provides for more meeting rooms for public use
Disadvantages:
® No dedicated funding source. Capital funding need must compete with operating
funding needs.
o Delaying projects would result in increased cost of projects and increased safety
and or security risks
Recommendation:
® Develop a capital plan for all City facilities, including identifying renewal and
replacement and upgrade needs.
Develop a policies and a plan for funding renewal and replacement needs during
the annual budget process.
Present recommendations to the City Budget Committee and the City Council for
'
their review and approval.
Council Priority/Discussion: Other Issues Other
45
Library Revenues
Issue Summary
Definition: Several potential sources of revenue have been used to varying degrees by
other public libraries within Oregon and nationally. If the City wishes to explore other
revenue sources to supplement General Fund revenues, a partial list of potential
sources could include:
• Increase existing fine structure
• Potential Coffee Bar-New Library
• Review current level of existing fees
• Develop new or increased fees for some services
• Investigate charging a fee for circulation of specific items within the collection
• Work with other libraries in the County cooperative to revise the funding formula
to more accurately reflect how libraries are used.
Revenue Required/Revenue Potential: Revenue potential of various options has not
been determined. Potential candidates (if any) should be identified before focusing
research on specific revenue potentials.
Work Completed to Date: Preliminary research has been conducted on increasing the
existing fine structure. All members of Washington County Cooperative Library
Services must agree to an increase in the fine structure in order for that increase to be
implemented. Some other potential revenue items must also be reviewed within the
- context of the existing contractual agreement between the City of Tigard and
Washington County for providing library services.
The City has completed a preliminary analysis and development of an RFP for the
selection of a coffee bar vendor. The coffee bar for the new library may draw people to
visit the library and provide an enhanced overall experience for the public. Further
research would be required to determine how much revenue the coffee operation may
generate for the City. More people visiting the library and borrowing materials will help
to generate additional revenue from WCCLS as the current formula is heavily
dependent upon the level of circulation of library materials.
Tigard Library has been involved in extensive discussions regarding revisions of the
Washington County Cooperative Library Service (WCCLS) funding formula to better
reflect the changing ways in which libraries are used. The current formula generates
$1,224,500 for the Tigard Library in FY 2002-03. This level of funding is expected to
drop approximately $150,000 next fiscal year due to the loss of the WCCLS Local
Option Levy last November. The current funding formula is heavily dependent upon
circulation increases. To the extent that circulation at any one library increases at a
lower rate than the average for the system as a whole, that library loses funding. This
46
has happened to the Tigard Library over the past few years. The current formula does
not recognize the population served, nor does it recognize the amount of taxes that
service population pays to WCCLS. The City is continuing efforts to revise the funding
formula.
A member of the City Council has also suggested exploring fees for borrowing a portion
of the collection, such as videos and DVDs. Such a fee is feasible, but it would counter
the historical mission of public libraries to provide free materials to the public. It may
also lower circulation, which would, in turn, lower funding from WCCLS.
Implementation Action Required: Some types of revenue sources would need to be
implemented by agreement with WCCLS. Others could be implemented by Council
action.
Timing: The time required to implement new or increased fees and charges at the
Library is unknown. It would vary by type of fee or charge. Discussions with WCCLS
member libraries would likely take time. In addition, a total new fee, such as a video
rental fee, would most likely require an extensive public involvement/review process.
Most likely, the earliest a new revenue proposal could be brought to Council would be in
late 2003.
Advantages: New revenue sources could help diversify the City's revenue base. This
might help to insulate the City from fluctuations in the economy and will spread the
burden of paying for City services.
Disadvantages: The WCCLS contract guarantees free access to collections for
everyone in the County in accordance with the nation's historic commitment to public
libraries. Charging fees for library materials and services could have a number of
negative impacts. The increase in library use has been attributed partly to the
recession as an alternative for people to look for new jobs and provide educational
opportunities for their families in these tight economic times.
Specific sources may generate high levels of opposition from library users. This
opposition could affect other City initiatives, as well as a possible effort to pass the
countywide library levy in 2004.< Directly, it may affect the positive community support
for the new library. If the source chosen is entirely new, there may not be a readily
available collection mechanism.
Recommendations:
Continue to work to revise the WCCLS funding formula to obtain a more
equitable` distribution of funds.
o Research` potential revenue generation` from coffee bar in new library.
0 Work with other WCCLS libraries on a possible library fine increase.
Review revenue options to identify possible new sources.
Council Priority/Discussion: Other Issues -'Other
47
Skate Park Construction
Issue Summary
Definition: A local Skate Park Task Force recommended to Council that the City
provide funding for the design of a potential skate park facility in Tigard. The council
approved up to $20,000 to design a facility. The design was approved by Council on
November 26, 2002. The design can be built in three phases (15K, 20K & 25K square
feet). Currently the Task Force has not been able to find a site for the skate park.
Locations at a City park and on School District property have run into strong opposition
due primarily because of locations close to neighboring homes. Further, fundraising
efforts have not gotten off the ground, having been delayed by the inability to secure a
site location.
Revenue Required/Revenue Potential: The following revenues are required for
construction of a skate park in Tigard.
® 15K sq. ft. $642,000, fundraising = $392,000 and $250,000 funding source
undetermined at this time (auxiliary costs such as parking, infrastructure,
street improvements, restrooms, etc.)
® 20K sq. ft. $769,000, fundraising = $519,000 and $250,000 - funding source
undetermined
0 25K sq. ft. $877,000, fundraising = $627,000 and $250,000 - funding source
undetermined
Potential revenues for the construction of the Skate Park and auxiliary costs are 1)
dependent on any fundraising efforts by the Task Force, and 2) making a determination
as to who will pay for the auxiliary costs `estimated at $250,000. With the economy
being what it is right now, and into the foreseeable future as well, it will undoubtedly be
a daunting task for the Task Force to raise anywhere from $392,000 to $877,000.
Further, operational funds are decreasing significantly, making it difficult, if not
impossible, to keep up with the expanding maintenance workload. New facilities would
only exacerbate this condition.
Work Completed to date: A skate park design has been approved by Council. A
comprehensive site location process continues. Fundraising has not begun.
Implementation Action Required: If a site is secured, Council, along with the Task
Force leadership must decide how the $250,000 in auxiliary costs, construction drawing
and specifications, etc. will be funded. Construction drawings and specifications must
be completed. Either the Task Force or the City will seek bids for the construction of the
skate park. This also must be determined.
48
Timing: Two major processes remain incomplete at the present time. Securing a site
has proven as daunting a task as is a fundraising campaign in the current economy.
Reductions in funding for operational costs to adequately cover current and upcoming
increases in maintenance, services, and capital outlay, create a heavy burden on the
existing staff to handle the parks division workload.
Advantages:
e, Building a skate park now would be well received by the kids in Tigard.
Building now would, more than likely, cost less than building in the future.
Disadvantages:
a A huge fundraising campaign would be difficult in any economic condition.
However, during current economic conditions, the Task Force's fundraising
process will not only daunting, but probably unattainable at the present time.
e A site has not been secured.
At the present time, and in the foreseeable future, increased operational
funds are not available to cover the additional workload created by a new
facility of this magnitude.
Recommendation:
1) Continue looking for a location for the skate park.
2) Before the City contribute funds (if Council decides to do so) to the construction of
the Skate Park, the following issues must be resolved:
® A site must be secured
e Economic conditions must improve
e A decision must be made regarding who will be responsible for the auxiliary
costs associated with the construction of the skate park
e Long term funding for Parks operations, and maintenance must be secured
A successful fundraising campaign must be completed or be well-on-its-way
Council Priority/Discussion: Other Issues - Delete
Council directed to delete this item from further consideration as a financial issue. If the
skateboard park is to proceed, it will need to be funded entirely by donations and fund
raising. No City money will be used to construct the park.
49
F
Issues
Jurisdictions' Other
.50
WCCLS Local Option Levy
Issue Summary
Definition: A countywide Local Option Property Tax Levy for library services is allowed
under the Oregon Constitution (Measure 50) to increase the local property tax rate for
needed services. It cannot exceed a period longer than 5 years, after which it must be
re-approved by voters. Funding from a countywide levy would be distributed to all
member libraries through a formula based on circulation and a variety of other factors.
Revenue Required/Revenue Potential: It is projected that the tax rate of this levy will
be approximately 26¢/$1,000 of assessed valuation. This will raise approximately
$10,000,000 per year.
Work Completed to Date: A countywide levy for library operational funding was placed
before voters in November 2002. The measure failed by approximately 600 votes. A
Needs Analysis for the levy was completed in 2002, as was a phone survey. A citizens'
group was formed in 2002 to provide information to Washington County voters
concerning the benefits of the levy. Significant background information has been
compiled concerning this issue.
Tigard has been actively working with WCCLS staff and other member libraries to revise
and update the existing funding distribution formula.
Implementation Action Required: A WCCLS Local Option Property Tax Levy must be
approved by the County Board of Commissioners and placed on the ballot for approval
by Washington County voters. It may only be voted o at one of the following elections:
1. May, subject to double-majority requirement
2. November of an odd-numbered year, subject to double-majority requirement,
3. November of an even-numbered year, subject to simple majority.
Timing: If the WCCLS Local Option Levy is approved by county voters in May 2004,
the first revenues would be received by the County in November 2004. If the Levy is
approved by the voters in November 2004, the first revenues would be received by the
County in November 2005.
Advantages:
Easily understandable-will be used to restore cuts to library service countywide.
® Well-established collection mechanism in place
Broad-based revenue source
Historically,` Washington County voters have `supported library levies
51
Disadvantages.
• Short-term solution--it expires after 5 years, and then must be renewed by the
voters
e Competition on the ballot from other jurisdictions requesting voters to approve
funding measures
e Competition and confusion with the Tigard local option levy likely to be on the
ballot in 2004
e Washington County voters have been reluctant to vote for tax levies in the recent
past. 'Successful passage may be related to factors outside government control
Recommendation:
Continue to research and explore options to create stable library revenue
sources.
e Support the information campaign about the WCCLS levy if it is placed before
voters in May or November 2004.
e _Continue to work with Washington County and other WCCLS libraries to
develop an equitable formula for distribution of WCCLS revenues.
Council Priority/Discussion: The Council discussed this issue, its importance for the
finding' of the library, and the importance of coordinating this issue with other City
initiatives. The Council took no position on this issue at this time.