Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
City Council Packet - 03/10/1998
AGENDA ITEM FOR AGENDA OF: March 10. 1998 CITY OF TIGARD, OREGON COUNCIL AGENDA ITEM SUMMARY ISSUE/AGENDA TITLE: Fanno Creek Bike Path Alignment PREPARED BY: Gus D./Jim H. DEPT HEAD OK 12,CL CITY MGR OK ISSUE BEFORE THE COUNCIL How should the City proceed with extending the Fanno Creek pathway to Main Street? STAFF RECOMMENDATION Staff recommends that Council direct staff to proceed with extension of the existing Fanno Creek path on the south side of the creek behind the Main Street Apartments, crossing the creek with a pedestrian bridge, and connect to Main Street via the easement on the Dolan property. INFORMATION SUMMARY The Tigard Comprehensive Plan identifies a bike path paralleling Fanno Creek between Main Street and Hall Boulevard. Segments have been constructed between Hall Blvd. and Ash Street and behind the Main Street Apartments. However, the path does not connect to Main Street. Easements from Dolan and Lee (Stash Tea) and dedication of land from Familian Northwest for the construction of the path have occurred on the north side of the creek. Stevens Marine was conditioned to dedicate land for the path but has not followed through with the required dedication.. The issue before City Council is how and where to proceed with the path construction. One option is to proceed with the path on the north side of the creek behind Stash Tea, Familian Northwest and Stevens Marine, and connect through the Dolan easement. An easement or dedication will be necessary to cross the Stevens property to construct this alignment. Another option is to extend the existing path on the south side of the creek behind the Main Street Apartments, cross the creek with a pedestrian bridge, and connect to Main Street via the easement on the Dolan property. This will require purchasing land from up to three intervening properties. OTHER ALTERNATIVES CONSIDERED Direct staff to evaluate alternative path alignments to connect the existing path behind the Main Street Apartments to Main Street. This could include acquiring an easement through the Main Street Apartments connecting to Main Street. VISION TASK FORCE GOAL AND ACTION COMMITTEE STRATEGY Tigard Beyond Tomorrow calls for improving connectivity in the CBD (Community Character and Quality of Life, goal 3, strategy 3). It also identifies improving pedestrian issues in the Town Center (Growth & Growth ManagPmenc, goal 1, strategy 2). FISCAL NOTES Construction costs, excluding land and/or easements, are approximately $75,000. Funding will come from Park SDC's. Couixil Agenda Item Summary Page 1 of I Fanno Creek Bike Path Construction Jim H. 27-Feb-98 10:53 AM .aC r. _...u,....: 1a't•-_...---.~a'i~.x....~- ~_„11~_. r_....»..>~._...--.-.-. 8.. ~....~,u''.,..1.. a~ud.._.._...+. .W:..--~. w.._Lw..~_._.._.,. ~7 .._tiw.._ ~~.~«..,y......,._......~ .<...---t-...... PATHWAY / L ;I . t r CLASS 'C AC - CA1'I` a C•+Sn\E Ilawu,AD 2w" z A" (MAIM [ LLIA ASIDCI S I I VAIN YNMLI Al NI S V ,d i Swd T' w ',AD' .w-- Sf YS :LOPE .w- 2% l,IAP1Ew0UU LANE IANE 1 / - 0' OF 0/4'-0 ' xuhc UIIO SORG ON BRDCE CWPACY A STERILIZE SUDtAdOF 1 1 125+.6 SW MAIN / ~~saafluu,lc~A~a'* 51* 0+00 , / 'D„dLR a .,al' ; s WOODEN PxUnC 'GMTiOiS ¥9®PR gtw g+ $0 EEUUIM \ fCNCE ON / ~CwiDANU' LR I:Y IV F R Q PalAwwY 1 ft[IAWhG wAU / / x4u BMA s \ \ \ Op w 0 e'+OAK e' CHNN 5!8' IRrn Roo Nur \ Sto 10+92 \ 1 e'.e2DAR Dnc 1ThiC L. wArPC uARx¢U / \ N o op \ En,l:.q 9nm,ar 1 0 )oie a'157nAWrta ` sER Ls zeol• .QA . Option 1 4 2 ~ \ / \ / ocrnpuY am IL'AU , la„ANIIDAN i AG 5C' 9f \•7OLa' ~ \ \ !Y -PIi NAx / -J6% N IRwC i.LO \ _C , ~ 4 \ EASEUENi VOU( a'UMS B OF WON AREA \ / _ _ - 6'I770AN 10'0M 'PELT[ RA R \ J1 'PCISCR La ` \ fy CASA LA META ASSOCIATES / 1. A. !d MAIN 9IREE1 APARTMENTS C- PCEe554 _ IIAPLEnUDD LANE - 5/.- .0. ROD \ \ \ / \ r-DI% W/1P CNA.ED \ lIl 'ONIxxWATER LS 976' \ \ \ \ / / 7 DOLAN k COMPANY INC. a \ \ \ I \ / / 1 1252U S 9YMAIN CSRTREET \ \ 4 \ Cusnnc Aylvnal / 9 \ EAisl detention pond \ \ ` PAIN \ C /B• W C MARKED / \ + . -6 1 - yO 'DRIW(WARR LS lM' r.=7 O \ CITY OF TIGARD CITY OF TIGARD EAN VERNILYE CP.EENWAY GREENWAY 12500 SW MAIN / 3 WEEP[ M +td'- / / \ / ~ / \\\^S\ / CHARLES AND \ \ \ Slw 4+$$ ! P/ / 1/ / AHUE WDODARD \ \ \ a -Y PAGE N. STEVENS 12490 SW MAIN . \ \ ` ST \ Opts' 3 / / SIEVENS MARINE \ I / PrnParN .onwnml \ / 91tl0 SW 9URNHAM n1 STREET \ E \ \ \ DDLAN A, COMPANY INC. : ~ 12520 SW MAIN STREET \ \ N \ \ r3 S \ • N c • \ ~P~ , I I/P' kCN LEGEND - W/RPCWARMED \ VE.4 CONTRO RIOt' 1 \ \ / j' 0+ DO c2* \ ^ "Y [uvwc AsrlPNµt\ Op kn I \ \ / / I NEW % WETLAND TEST PLOT PAM STEPHEN LEE \ SOUIHWEST PORTLAND PARTNERSHIP WETLAND FLAC BY OTHERS \ \ ' STASH TEA \ FAMILIAN NW EDGE OF PATH { \ 9110 SW BURNHAM \ 9050 SW BURNHAM EDGE UTILITY MARK p uTllrv MANHOLE - - - LOP OF DAYW 0 TREE - DECIDUOUS \ \ \ \ \ FA - - - MOHT-OF-WAY UNE 0 TREE - OOAFEROUS \ \ \ ~ ~ / / fF" C 'v\ \ PROPERTY NT LINE SIGN f POWER POLE \ \ \ ! , ~ EASEMENT LINE P t'„ - GUA44DRAI . NINLOOS I -{---c-{- FENCE UNE • FOUND MONUMENT AS NOTEO --'d EM OF WETLAYO ► CONTROL PONT (SET BY DEA) MTCH W CATCH 0A9N FANNY CREED TRAIL - SEGMENT 5 LINE - CURD UNE W/YPC WITH YELLOWY PLASTIC CAP u YANHIE T. NQUYEN 1w _ CENTERUNC Lraef/WwVA"M SW ASH STREET TO SW MAIN STREET ~ w/RPC WITH RED PLASTIC CAP LAYOUT OPTiCF9 BR/SH/REE AI. AWMINUM i~ p SI ENCNEURNO OEPARitdFNT FILE NO. 8$4 Owu NAME; STAFIT ~I,.{ tae0a WeaAe iw°w 9N\ENOYrIQWS\FA2~CCC.6\$IfE `,I 1 staftim _ -'x-" - - r _ k~ .."".,.w.-~........_..~_...,.._."iL:..,_,...~_,......~.~....._.,..i$du.m-r_.>,~..3......~i._..._..-s_,~,..>.v._....: ~~..,..w....._._...~n. .............~~.c-.a+'E'~....,...LLi.~,a<r.fw......~.u..---.. ...r...e...e. --e. ...s.,.~ _ PAII WAY r CLASS -C Ac ma;_ z CA\A IA Y1. IA ASSOCIAIl S MAIN SINII I APAkIWNIS \ / d I f Scam 1' a 37 Y16 211 SLOPE a- 918 MAIVLWOOn I ANt 1 A!I % r AA,,;: V '.I DOF 3/4--0 V7 ! - r OIIU SONG aanmNrduA CRASS - . ' f ! 11S6a S!Y MAIN - ~ COMPACT 8 SIEPoUYE 9UBGRACYE , t / / ~ v.f u+A,IC s' Ste 0a00 l PIIhA I: .S;1• . -:1 R A PotNxlay j ' //~J I # CTl4~ A~°A 1 LLLtI N PNJLL y jj UY~Nn \ St. SDI' W 7 1 rYf xhOxWnw[N 1, y / / a atauna Au nar PathacY Rf , xAU / xELL Sta 10r82 o A a 6 1 6 u)OM , 6' EH4N A,Nµ`p ; ntl tlIhAO ` J tl•.61a ti: x UAx iM4 N: N p •dlx .^f , Y , SL.. \ \ \ 1 6'OAR ® VElSEA l: 260' OpFxI1 1 2 l \Y'.q^ pN.r.a rY,m.°, °W"'~ \ n6•lsfuxmu` n..~:'sa\ y I V \ ^a Yx Mul6' NAxMI'Ap I6'N WIMONN.~ y PA N I, / .8• AK N, 'AY.C ~ `po 0 \ \~~~,F \ \ _ Y r IW OF 5/, ACN AFEA 6- AK 2o'.. 6 OAKS BANK ./w; YAh / \ tr : - " a'ta)o •PEl6ER LS CASH LA YE IA ASSOCIATES Pr[,TSf = \ " - L _ YP.atL- ® MAIN SIkFET APARTMENTS MAPLEWOOD LANE ~'vA J I \ IaV' al evJr / / 1 \ S.y' RC, ROe Y !v ~r PI % , OFix[AnRR LS 1166' \ \ I \ \ / - a a OOLAN W COMPANY INC. \ A-BOY ELECTRIC A\ \ I / 1 12520 SW MAIN STREET \ I E.1DI,Io A.P.ALT / 9 \ E.iit detention pone 6 \ ♦ I PAIII / \ e/9PC owao -naNNNA¢A LS 426- / ` (a \ \ / CITY OF TICARD CITY OF TICARD NERMILYE \ \ CREENWAY GREENWAY \ 1 / 12500 SW MAIN y 1/1• IRON A00 , \ \ y / f t Y \ \ '0CA, fMN MDL- / \ y \VI / 'i CHLES AND ) ! / \ \ \ \ ARLIEAR WDOOARO d Ste 4+52 \ ♦ 12490 SW MAIN \ _y PAGE N. STEVENS \ NS MARINE ` gtlla+ ] STEVE I' 8~ \ \ / vroG°ua w.mNmf \ / 9180 SW SURNHAM STREET \ \ { w DOLAN k COMPANY INC. \ ` y 11520 SW MAIN STREET \ \ / ®J ~ - / M ~0 ~J - \ CPC ON~Eo LEGEND OE.A C0.v AIX \ Stn D4oo \ 5• I tnl$IIxO NSNPNAIi\ \ \ aPIm 1 Y NEW N WETLAND TEST PLOT PAM \ STEPHEN EEC \ \ \ . STASH TEA \ SOUTHWEST PORTLAND PARTNERSHIP WETLAND FLAG BY OTHERS \ \ FAMILIAN NW EDGE OF PAM 9110 SW BURNHAM 9050 SW BURNHAM UTILITY METER r~ EXISTING p UTILITY UANHOLE \ \ \ F - - - - - TOP OF BANK TREE - DECIDUOUS ♦ ` / f d ♦ v / / E',, - - RIGHT-OF-WAY LINE 0 TREE - CONIFEROUS PROPERTY LINE Sim - - - - EASEUENT LINE POWER POLE ` ♦ d WARDRAL MAILBOX -Ir-A-Y- FENCE LINE s FOUND MONUMENT AS NOTED W® EDGE OF %lEnAMO ► CONTROL PONT (SET BY OEA) DITCH UNE W CATCH BASIN Aft., FAUNUNOC®R~PE®EK TRAIL bASEGMENT 5 WANT" CURB LSD W/YPC W1H YELLOW PLASTIC CAP YAMS T. SIN ASH STREET TO 337 iDIPtEF7 STREET DIeIffA*M 1 _ CENTERIUNE W/RPC WTH RED PLASTIC CAF ( LAdauv - aa'7faN a B W89/TREE LANE AI. ALUMINUM eamm aim 93 O*~ P N°- Y'F - O~ m~ ENGINEERING wl~if T FILE N0. 284 D NAME- STA N ~ 3l76pRN N+\EnD\r I e4\FAftW"$\$M L1 Al ,a mI-rpr ,i i '.I ll 3/1S~SN9~AtY7\AAS3~7N3~IN i"O•i ,r,Yavep oMaaron s,'rJm 13m" DMO rot 'ON 3NA 1,1,E Joss ~ N le qb' Awn - 3 N3tU ITY del ONItl33 W N7 C NOlldO - InDAVI i r CYnMNnrv r 3NIt 33M1/16ntl9 NB 133d1S NVW MG .01g133Ut~SA/~HGV MG d33s6vtd03H lu" 34y;M 3Nna37Nm 5 1NSW BS ^S18 tl U.6 MSSHO ON V ARatl 'd ItPoMlA a io N1 3NSYtd ff&Ve t :1 aJM 3n taia _ N&Y® clvo 6Ya a (V30 AO !x) IMOd mWNW o a VIOVA m 3003 031ON SV 1N3nnWM aNnoi • VIII 33N3A -A-,-._ \ k013WW ' wumn9 \ atsd N Dd P 3M71N3113SY3 V ftid5 3FAt AS113a'OIMI - - - - \ \ snarlm330 - 33tl1 0 31Nra m tlASI \ 31axh'Yn ultun 0 ONi1SiX3 / nYI1NbfIN MS 0906 nn7Ntln0 MS Ull6 ` tl313n A11A3n MN N IJ)Jod V31 N5Y1S ` Stl3N)0 d0 9Y13 ONY113N < NSYd m 3903 d015N3Nltlrd aNYUlA)'I53MNIn35 \ \ 33) Mnle37s o wrJ 1614 1S31 ONYU1ai M3N \ I7rWMr 0N05n7 00+0 OIS .vwN]J rJa. ®x3031 \ 0)k"YN JJW'M / / \ aan x]M •t/1 \ 1 / / / A 3 :I AN MYn MS OLSCI 9 3M ANYdn03 V NYIaO ` 137!11$ nYIINana M5 OB76 / ` IwWa.M a+.awuJ 3NIaYn SN3 3 5 \ tt SN3,31S 'N 39Vd / y Acm o+glld0 \ \ NI MS O61L1 / t \ a \ . 4-.y OINV OWM 31JAY \ / \ \ ASeo 9S \\\_\.j ONY S337rn73 \ s~ `O t \ u1NAmS'r 40~ ~ AV/P mY Nam NIVn MS D05C7 AVMN3390 ` y 311ing3, N~ auYSO 30 AID utlY3N NA) AIn ~~98 / .ete sl Yu.nwvn, ~ \ f- ! ol.utln Ja+/M yy _ ,N I \ A~ Pad uollwlrP le!•3 6 ~ IIVrWMtl ~A4fAi 133HIS NIYn NS MU 0313 AOB-V '0N3ANmdn09 IV NY130 e .Ste 0)wrnd p aor mom ,e15 ~ ` / wee w YI ~ \ ` dAM- L 3t7V1000M33dYn r%S nmyn ld 5.U31V13 YIJOSSV SY Y1131 3)x1 Y) 5 tlSVO ~ ` ` tqm .vc errra SNro,t Ino,ot , "ayUa~ - - Y3 ~ \ \ VIO - ' r Ts \ ! +NtlOf MrMt.9, / Ar]WInB 4IaN NJ atl..a. t~laltl ~jJ \ \ owo" 'A IV t "%d0 ..001 %1 rlsud. 0 ~ 4 Nto i 1 ~ ~ ~ ` /j em e u \ aNarN ]JVa - b"da A Mat':* IAJN 00. W. .Vi \ Ad01 075 llnw. / rn+ ox4tluY Aaaano ~9 /A. O4MOIW0 / / / A 401 01 yn /ry\ ' M107M'Y 1 0205 oi6 \ \ . No s rrmnn ~ j ' \ I J A0. 419d kq ed Y7~DFen " r loot sl ossild. 30Ytcan9 331ti231S $ 73Ydrw OpeO o3S alunN r]Kr+ / NIYn MS 59411 ;l { urmV7 ~sr O7A7S Olin ,y j )NY7 nn71M)IlIYIY 3dAffi $E ~ ..m.~ + .8 •RtS SiHINI),v 117711.'. NIVA z 'O°• ' MYn MS 19911 SlI VC)O SY Y111 VI Y,VJ ONonmN 3NNSINII0 W ON YO 3. SSVts .S AVSH1Vd '3 . IF Y ,wrr''^'__~"..- +-Y_-.n .F°a^aw?'p°'1'_`.1 . - ..n ._;R..' AGENDA ITEM # FOR AGENDA OF March 10, 1998 CITY OF TIGARD, OREGON COUNCIL AGENDA ITEM SUMMARY ISSUE/AGENDA TITLE Capital Improvement Program Status Update PREPARED BY: A.P. Duenas DEPT HEAD OK -CITY MGR OK 49 %V\, ISSUE BEFORE THE COUNCIL Briefing to City Council on the Capital Improvement Program accomplishments so far in FY 1997-98, and on the process for formulation of the FY 1998-99 program. STAFF RECOMMENDATION Informational briefing only. No action required. INFORMATION SUMMARY The Capital Improvement Program (CIP) for Budget Year 1997-98 included projects for city street improvements, bridge replacements, storm drainage system upgrades, pedestrian trail improvements, and water infrastructure improvements. Many of these projects have been initiated and are either completed, or are well on the way to completion. The Capital Improvement Program is updated each year, and is reviewed and approved by City Council as part of the yearly budget process. While the program lists projects for subsequent fiscal years, the projects shown are tentative and are subject to change during the formulation process for each specific budget year. The CIP, through the adoption process, therefore establishes the budget for each fiscal year and serves as a planning document to guide the infrastructure improvements over the following 6 years. During each budget year's update, the revenue estimates are adjusted, the project cost estimates are reviewed, and the program and project priorities are re-evaluated based on changes in City plans, citizen input, and additional data which may become available. Citizens can provide input via the Citizen Involvement Team meetings, or in public hearings with the Planning Commission and City Council. This status update presents a summary of the Capital Improvement Program accomplishments so far this budget year, and describes the process for formulation of next year's program. Attached is a detailed Capital Improvement Program Status Report which presents the program highlights for FY 1997-98, sets program priorities for emphasis in the formulation of the FY 1998-99 program, and describes how citizens can become involved in the CIP process from initiation till final approval by City Council. OTHER ALTERNATIVES CONSIDERED None VISION TASK FORCE GOAL AND ACTION COMMITTEE STRATEGY The annual Capital Improvement Program supports the Vision Task Force Goals Improve Traffic Safety and Improve Traffic Flow, and all the strategies under these goals. The CIP supports these goals and strategies through implementation of a comprehensive program to upgrade the street network, promote smoother traffic flow, and enhance livability in the residential neighborhoods via traffic calming efforts. FISCAL NOTES None 1Aci tywi de\sum\cipup398.doc CAPITAL IMPROVEMENT PROGRAM (Status Report) February 26, 1998 The Capital Improvement Program (CIP) for Budget Year 1997-98 included projects for city street improvements, bridge replacements, storm drainage system upgrades, pedestrian trail improvements, and water infrastructure improvements. Many of these projects have been initiated and are either completed, or are well on the way to completion. The Capital Improvement Program is updated each year, and is reviewed and approved by City Council as part of the yearly budget process. While the program lists projects for subsequent fiscal years, the projects shown are tentative and are subject to change during the formulation process for each specific budget year. The CIP, through the adoption process, therefore establishes the budget for each fiscal year and serves as a planning document to guide the infrastructure improvements over the following 6 years. During each budget year's update, the revenue estimates are adjusted, the project cost estimates are reviewed, and the program and project priorities are re-evaluated based on changes in City plans, citizen input, and additional data which may become available. Citizens can provide input via the Citizen Involvement Team meetings, or in public hearings with the Planning Commission and City Council. This status update presents a summary of the CIP program accomplishments for this budget year and describes the process for formulation of next year's program. Program Highlights in ]FY 1997-98 The following are the highlights of the Capital Improvement Program Projects accomplished in FY 1997-98. Street Projects 1997 Pavement Major Maintenance Program (PMMP): The PMMP is an annual program of corrective and preventive maintenance on all paved streets in the City. There is currently a backlog of $1,500,000 in corrective overlay, repairs, and slurry seals. Approximately $400,000 was allocated this year for preventative and corrective maintenance work. The following streets were included in this year's program: • Pavement Overlay: Approximately 6,600 lineal feet (1.2 miles) of pavement overlay was placed on: 69th Avenue, 76th Avenue, 109th Avenue, 110th Avenue, Bonita Road, Pine Street and Tigard Street. Eagle- Elsner, Inc. began construction in September and completed work in November. o Slurry Seals: A slurry seal is a preventative treatment to rejuvenate streets with minor cracks that do not require removal and replacement of the existing asphaltic concrete pavement. The previous slurry seal applications were performed approximately 5 years ago. This program is a Capital Improvement Program Status Report Pagc I of 7 key component of the PMMP and was again incorporated in the 1997-98 PMMP projects. The following streets received this preventative treatment: Mominghill Drive, Katherine Street, Wills Place, 134`h Place, 133`d Place, 134`h Terrace, Laurmont Drive, Tamera Lane, Fairhaven Way, Fairhaven Street, 13151 Avenue, 127`h Avenue, Brittany Drive, 133`d Avenue, Sheffield Circle, Shore Drive, Laurmont Court, and 69`h Avenue. Approximately 13,000 lineal feet (2.5 miles) of slurry seal was applied on these streets. Blackline, Inc., the contractor for the project, began work in September and completed most of the work by mid-October. Street Striping: This is an annual program to restripe City streets that require re- delineation for safety and proper channelization of traffic. This year's street stripm program included the following streets: 68`h Avenue, 72nd Avenue, 97`h Avenue, 115` Avenue, 12151 Avenue, 135`h Avenue, Canterbury Lane, Dartmouth Street, Grant Avenue, Murdock Street, North Dakota Street, Tiedeman Avenue, Walnut Street, and Walnut Lane. This program restripes streets with temporary striping (paint) and is normally funded by the Public Works operating budget at the $7,000 dollar level. This year's program included some permanent striping (Durastripe), and was supplemented with approximately $6,000 from the PMMP budget. The low bidder on the project was Apply-A-Line, who performed the 1996 Street Striping Project for the City. The Contractor began the work in late August, and has most of the work done. The remaining work will be completed in early 1998 as soon as weather permits. The Speed Hump Program: This program installs speed humps in minor collector and residential streets to reduce traffic speeds. The projects for this calendar year were advertised for bids in March. The lone bid on the project was rejected because of the extremely high prices submitted. Public Works agreed to train its personnel in this work and install the speed humps with in-house street crews. There were a total of 12 speed humps that needed to be installed on 128th Avenue, Locust Street, and North Dakota Street. Installation of the speed humps began in September and will be completed in early 1998 as soon as weather permits. Only one speed hump on Locust Street remains. North Dakota Traffic Calming Revisions: SW North Dakota Street is a minor collector street that has been subject to high traffic volumes and high vehicular speed over the past decade. City Council formed a task force consisting of citizens of that area, together with City staff, to examine the problem and recommend traffic calming revisions for that street. The task force reported recommended street modifications to the City Council in October 1997. Council approved the proposed modifications. The contract was awarded to Berning Construction in November 1997. Berning Construction completed most of the work during the first two weeks in January 1998. The painting of the traffic islands and installation of reflective markers was completed during the third week in February 1998. The two speed humps on this street will be installed by Public Works as soon as the weather is favorable. The requirement for proper installation is at least two days of dry, sunny weather and temperatures in the 50's or higher. Capital Improveme.-. --gram Status Report Page 2 of 7 79th and Durham Road Signalization: A signal system was deemed necessary at the intersection of 79`h Avenue and Durham Road because of high pedestrian activity. DKS and Associates designed the new traffic signal and Linnco Electric was awarded the work. The project costs are shared by the City of Tigard and the Tigard-Tualatin School District with the School District contributing $50,000 towards the $100,000+ total project cost for the signal system. Project construction began in February, and the new traffic signal was activated on June 16, 1997. Grant Avenue Bridge Replacement: This project was federally funded through the Highway Bridge Replacement and Rehabilitation Program (HBRR). OBEC Consulting Engineers was hired to design the bridge improvements and Mowat Construction was awarded the work. Construction began in March and the new bridge was opened on July 3, 1997. Tiedeman Avenue Bridge Replacement: This project was likewise federally funded through the HBRR program, and was designed and constructed together with the Grant Avenue Bridge. OBEC Consulting Engineers performed the bridge design and Mowat Construction was awarded the construction contract. Construction began in July, and the new bridge was opened on October 31, 1997. Only punch list items remain. Bonita Road Improvements: This project is split into three phases: a Phase I - Utilities relocation: Construction began on January 5, 1998, and completion is expected by mid-March 1998. Marshall Assoc. Contractors, Inc. has completed excavation and placement of necessary conduits and vaults for relocation of the overhead system underground. Boring of a steel casing was required in the area where conduits have to cross the railroad. a Phase II - Railroad Crossing and Flashing Light Signal Installations: Phase II is designed by Willamette & Pacific (W&P) Railroad, and will be constructed by the railroad using their qualified contractors. The City will reimburse the project costs. This phase replaces the rubberized railroad track crossing material with new concrete surfaces. In addition, a complete signal system will be installed, replacing the existing signals and other appurtenances at that location. ® Phase III - Street Widening: Phase III includes widening of the street to full width, and requires rights-of-way acquisition and temporary construction easements to accommodate that expansion. This is an in-house design project and is scheduled to advertise for bids in May 1998. We are in the procc ~ of acquiring the necessary rights-of-way, preparing design/construction agreements with the Railroad, obtaining Railroad permits, and finalizing the contract and bid documents. Phases II and III will be constructed simultaneously. Construction is anticipated to begin by mid-June 1998. Capital Improvement Program Status Report Page 3 of 7 WAM 91st Avenue Widening: The widening of 915` Avenue between Greenburg Road and Lincoln Street is a Community Development Block Grant (CDBG) project. The scope of work is widening of the existing street to local street standards. Curb, sidewalk, and storm drainage improvements will be included in the design. Preliminary horizontal and vertical alignments of the roadway have been determined. A 5-foot wide right-of-way strip on the east side of the street has also been identified for acquisition to accommodate the widened street. Construction is scheduled for summer of 1998. 79'h Avenue Improvements: This street is classified as minor collector road per the Comprehensive Transportation Plan Map. The project will improve the existing drainage system and widen 79u' Avenue from Durham Road to Bonita Road. The preliminary design has been completed, and the rights-of-way requirements for the widening of the street have been identified. This preliminary design was presented to the citizens of Tigard during the CIT meeting on February 5, 1998. The next step is to select an engineering consultant firm to complete the design of the project. High Tor Reservoir: A paved pathway needs to be installed for maintenance access and to direct storm water from the reservoir site to the street. We are in the process of finalizing the design. Construction will begin spring 1998. Greenburg Road/217 Overerossing Widening: This project is primarily funded via MSTIP 2 funds in the amount of $2 million, with an additional $400,000 in federal funding. The City's share of the federally funded portion is 10.275%. This project is a joint effort between Washington County and the City. ODOT designed the project and opened bids October 1997. All the bids submitted were well above the engineer's estimate for the project. The project design was revised slightly to eliminate some non-essential items, and was rebid in January 1998. The 2nd bid opening on January 22, 1998 resulted in extremely favorable bids. ODOT is now in the process of awarding the contract. Construction will begin shortly after bid award with completion projected for mid-November, 1998. Drainage Projects 110'h Avenue and Park Street Storm Drainage Project: This project was originally intended to be a street widening along Park street from Watkins to 110th Avenue. Citizens from CIT requested that the City direct the street funds to alleviate an existing drainage problem on Park Street. Most of the design work has been completed and we are in the process of obtaining a utility easement through private property for the pipe outfall. Construction is expected in mid-1998. Pinebrook Street and View Terrace Drainage Projects: These -_-wo relatively small projects are intended to upgrade the existing drainage systems and alleviate periodic flooding problems. These projects are being constructed utilizing the Drainage Major Maintenance funding provided through the 1997-98 Capital Improvement Program. The Pinebrook Street project was awarded to HPS Capital Improvement Program Status Report Page 4 of 7 11 1111111111111111=N111 111111111010111011111 Construction Inc., and the View Terrace project was awarded to Gelco Construction, both in late December. The View Terrace Project has been completed, and the Pinebrook Project is expected to be completed by the end of February 1998. Main Street Drainage Project: One of the catch basins in Main Street drains into an old, existing drainage pipe located on private property. This project disconnects the catch basin from the existing line and pipes the flow to a downstream catch basin in the street. Construction began December 16 and was completed in January 1998. Other Projects Neighborhood Sewer Extension Program: This program extends sanitary sewer service into residential neighborhoods. The City initiates and completes the sewer extensions, then recoups the total cost of design and construction via creation of a reimbursement district. As residents connect to the new sewer line, they have to pay their proportionate share of the cost of the line, plus the normal connection fee. In addition, each property owner would be responsible for redirecting the existing plumbing to the new line, and for properly closing the existing septic systems. At least 50% the property owners that can connect to the new line must approve the project for the existing sewer system to be extended into a neighborhood. The initial project under this program involved four homes on Tigard Street. The project initiated and completed in calendar year 1997 included 29 homes on Fairhaven Street and Fairhaven Way. The contractor, J.W. Underground, began in May and completed the work by July. Many of the residents have already connected to the new sewer system. Commercial Area Sewer Extension Program: City Council expressed the desire that the sewer extension program be expanded to included commercial areas. Council approved the creation of the Commercial Sewer Extension Program in November 1997. This program is similar to the Neighborhood Sewer Extension Pregram in that the City would install the new sewer extensions and laterals, but would recoup the costs through formation of a reimbursement district. No projects have been initiated under this program as of yet, but the program remains available as a future option for developers in commercial areas. Tigard Senior Center Exterior Improvements: This project was primarily funded through a Community Development Block Grant. The scope of work included paving of the rear gravel parking lot, and creation of a waist-high garden at the rear of the building. The actual work was divided into two phases. Phase I included the parking lot improvements. Eastside Paving performed the work in April. Phase II involved the landscaping improvements. S&L Landscaping completed their work in September. Because the funding through the Block Grant was insufficient to complete both projects, the 2nd phase was funded on a shared basis with the City providing 50% of the cost for those improvements. Survey projects: There were numerous survey projects completed through the calendar year. Some of the work included the following: Capital Improvement Program Status Report Page 5 of 7 • Park Expansion: Survey of property being obtained from Tualatin Country Club adjacent to and southeast of Cook Park. • Survey for future purchase of nroperty that is east of Cook Park and owned by United Sewerage Agency. • Preparation and review of legal descriptions for various properties to be purchased or given to the Parks department. • Tigard Vertical Net: Establishment of 6 additional Bench Marks with elevations and monumentation. Proposed Priority Areas For FY 1998-99 • The preventative and corrective actions necessary to preserve and extend the life of the various streets in Tigard will continue to be a high priority each fiscal year. • Street reconstruction will again be considered for those streets that are beyond normal maintenance. • The realignment and signalization of the Walnut Street/Tiedeman Avenue intersection will be a construction priority during FY 1998-99. In addition, design of key major collectors will be strongly considered for construction implementation during the next few years. • Traffic calming efforts will likewise be a continuing priority for the next fiscal year. • The City Council has indicated a strong interest in providing streetlighting in unlit areas of the City where streetlights are required to enhance pedestrian safety or to deter crime. The establishment of a program to provide such lighting will be a priority in the coming fiscal )car. • Minor repairs to the storm drainage and sanitary sewer systems will again be performed through the Storm Drainage Major Maintenance and Sanitary Sewer Repair Programs. • Bridge replacement funds will again be sought for one or more bridges in Tigard. Two bridges that are obvious candidates for replacement are Tigard Street Bridge and North Dakota Bridge near the Tiedeman Avenue intersection. • The Neighborhood Sewer Extension Program will be continued for those residents that indicate a strong interest in connecting to the City's sanitary sewer system. We have two small extensions that currently in the design process. • The Parks Program will continue with acquisition of properties for future park development. Capital Improvement Program Status Report Page 6 of 7 o Water projects for maintenance and expansion of the system will again be continued in the next fiscal year. What's Next? The formulation of the CIP projects for Budget Year 1998-99 is now in the initial stages. Citizens can provide input via the Citizen Involvement Team meetings, or in public hearings with the Planning Commission and City Council. A CIP overview will be presented at the March CIT meeting starting 7:00 p.m. on March 5, 1998 at the Tigard Senior Center. The opportunity for citizens to provide input will be at the April CIT meeting scheduled for 7:00 p.m. on April 2, 1998, again at the Tigard Senior Center. The CIP budget for FY 1998-99 is expected to go before the Planning Commission and City Council during the month of June 1998. Projects approved for next year will be funded and authorized for implementation effective July 1, 1998. As mentioned above, the opportunity for citizens of Tigard to nominate projects for consideration in the FY 1998-99 Capital Improvement Program will be provided in the April CIT meeting. For those that cannot attend the April meeting, the City will accept written comments or suggestions at any time in the process prior to approval by City Council. The final project listing will be a combination of City staff input and citizen recommendations. The proposed program will be presented to the Planning Commission in early June and to City Council during the June 23`d Business Meeting. The approved plan will be ready for implementation July 1, 1998. DAWord DocutnentsTIP Status Update to Council.doc Capital Improvement Program Status Report Page 7 of 7 8 At CX 'Olt q i s a AOL Tigard beyond Tomorrow Logo Development The logo located on the front of this report was developed by Monica Leuenberger, a Tigard High School art student, in Fall, 1996. The Vision Task Force members appreciated the symbolism of our community and the vision process captured in the T design: i G A 8 8 T $ D 88 0 The large "T" outline Tigard Beyond Tomorrow $ M Water Tualatin River & its tributaries ❑ Apple trees Our farming heritage E ❑ R Homes & buildings The people & businesses in our community Y ~ O . O ° Bridge The jturney the community takes from the present ° w Al ° to the future through the planning and D ° implementation of our vision $ ° Evergreen trees Our natural areas Hot Air Balloon Celebration of our community and recognition of the Hot Air Balloon Classic at Cook Park each June Sun Our future will be brighter when we work together to achieve the community we want in 2017. i I r Em ME on on on EM In TABLE OF CONTENTS Vision Task Force members Introduction -The Partnership Challenge .............................................................................1 The process or How does one determine the future for Tigard? 2-3 Vision Statement or What will Tigard look like in 2017? ............................................4 Areas of review .....................................................................................5 What is t'tte next step? ..........................................................................................................6 Vision Action Plan Appendix Appendix "A" - Community Profiles .........................................................A 1 - A 59 Appendix "B" - Tigard City Council Goals for 1998 B 1 Questions? Direct them to City of Tigard 13125 SW Hall Blvd. Tigard, Oregon 97223 (503) 639-4171 (phone) (503) 684-2772 (TDD) http:\\www\ci.tigard.or.us (web site) The following staff members at City of Tigard would be happy to answer your questions regarding the Tigard Beyond Tomorrow process, the contents of this report, or the on-going efforts of our community to work towards the future we have chosen. Bill Monahan, City Manager Liz Newton, Assistant to the City Manager phone (503) 639-4171 (ext. 306) phone (503) 639-4171 (ext. 308) e-mail address: bill@ci.tigard.or.us e-mail address: liz@ci.tigard.or.us Loreen Mills, Sr. Analyst/Risk Manager phone (503) 639-4171 (ext. 327) e-mail address: loreen@ci.tigard.or.us Task force Members 'Vision and direction o orhdirec on b O Without the guidance concerns, ment and to theissuesTigard with no form ' community. spent their time creating the ust vision a for our collection of community ideas, Hundreds of people vision would still be j Task Force Tigard 7s to these people for their dedication and commit Herron vision great deal of thauks Jane H community owes a Craig 11opkns have ustin Sue Kasson John Benneth Gene McA.d"'s Pat Biggs Mark Mahon Gretchen $uehner Mike Marr Sue Carder Pam Moyers Liz Clary Garry Ott Michael Collson Phil Pasteris Jim Corliss Bob Kohlf Arco DeBernardis Cadence Scherer Bruce Ellis Pat Whiting Bev Proude John Willianis Sheilah Greenlaw~°~'ink Colleen Willis Ed Halberg David HanInjond Williams (not the same Ben Hanna Manager's Office' Mr. John process and an Intern in the City of Tigard to facilitate this a gentleman who served worked with Tigard University when he p , ote of special thanks goes to g orked with the Vision Task at port aannd StVie tate City John Williams , vho served on the Task Force) ortagra Thank You, John' was ~.i the Public Administration f TrMaster anspProgr ni the survey Work- John on Dept citizens. He is now employed wit" t~reg No on as fob so so so two s 00 aim- aw NNOMMW as an on, no no lot= challenge 'the Partnership time of tremendous increases in the At this same and comet tyS A remarkable event happe . Theis also a se sense ned in the Tigard community of loss ...that sense of; otal time to take stock in the future and bout 1997. Residents, governrient more, make now a p answer questions like: pall of 1996 and thrOug and community group d be leaders the • business people, determine what shoul professionals, and Beyond be like in 20 Years? volunteered to work together to the name Tig e What should our community is problems don't become future Adopting What can we do to ensure today communitY,s they established a process that would define a their otect ip of and how can citizens help Pr vision for o identified the resources ® tomorrow's crisises? Tomorrow, then ur communlt`1'They throngh a partnersh ® Will streets be safe, natural that vision trails, and for implementing t. ns. homes and families? ate libraries, p individuals and organic e Will there be adeq eration recognizes that Tigard areas for residents to enjoy? nificant juncture. tt uality" schooling? ore efficient and effective. This unprecedented level of coopis at a sip o What is q surrounding community has eyperienced overnYnental entities we m act the character and • Will g rowth imp and the e community there hborhaods? is almost fully developed n however, ® 14ow will continued g Growth is still occurring? n1ent and the in new and established neig _ ust fast-paced growth• acit of livability codes? are more Tigard residents be members Stree and P - of 1 es today associated with red Will issu infrastructure and increase caP y o W need to preserve existing is becoming more diverse thousands of residents connecte by The community of portland• developed to the infrastructure. to the City process was a "bedroom community is "through The Tigard Beyond Tomorrow rt is just a start! as it serves as traffic in Tigard each day mall and ore. This report of the regional shopping answer these questions and mand Beyond Tomorrow A large portion believe to and from a reg uniti es. of addresses it is traffic' going Comm The people who worked on Tig work in surrounding is more than a snin This report commuting to and from that a community shared vision. are also seen in the ether by a will be working on together to society people bound tog ity The larger trends seen in American society traffic, and crime; identifies what our community DpUlation, faster than accomplish by 2017. Tigard communitycosts increasing than tition by schools, cities, special housing costs and health care rower; and more comp dollars. Resources to earning - erty eking. districts, and counties for prop ectations are she t provide services and meet resident's exp rrhe process ®r ~e the future f og d one dete~~i chance nments too important to be left to other goverwhat 110,W dies uture is Oregon, an has to decide our f the State of comm~ty heard in local step back and t and As tro,an for the future' our voiceion will we make we can the Tig agencies P1 lish so that our Dille and xoache5, taken place m rural t° is to accomp The vis and plans As the next century atPhat have a sleepy it wan malang. be used by plan ut the changes t 100 years. From d Tigard has and regional decisionToCeSs will unity as they abo from POrt1at' , ' 11th in the visioning P outside our comet comm~~ty over the P buggy le, Oregon s Of horse budrb of 36,000 Pe°p organizations inside and three hours by wide variety a busy su unity has a and a strong grown into our comni for the fi'tme based. BY ing attractions, largess. city. regional shoPP Who was involved? rocess is citizen- d soups ne1ghlwrll°ods, iC base and Tomorrow P and financial eCOn°m such as The Tigard $ eY many different PeOO , successful- The retail problems, inp strong Valley brought new open spaces. etting ut from Mill be er andIualatin Fire and loss ct and the the visioning However, change hn re ed crime, of What wiII possible, the vision City in the continue tog Years ~ How can Tualatin School Distn s with the 11 support of ested streets, cted to Tigard- ct Were partn was in fu cong Tigard is exile Distri erce the business Meanwli1e' in 10, 20, °r even b 50 livable city Rescue Chamber of commerce (the g future of our unity be like Ti and is a heal althy, our Comm ensure that g rocess. The participated by along a comm~'ty •11 happen if we do nothing' rocess ande input of ostudent backbonoeunity ard, s council P11 unity • d businesses (o econorr the c we the What Vi co in th rate . City an ct (servants of questions, "'g called Distri difficult .Ibis process, communityC,ty and Fire of this proc;:ss• address tl►ese 1996• effort that will with the the success TO help process in based vital to th is a citizen- visioning process, residents) are initiated a visioning and Tomorrow, In the unity's future, Tigard BeY Ian for our future. for out cornet achieve define and P vision lans to help help have developed a owls and acts°n p fic goals and have created sPeci that vision. so, V11 TARS Mae M a* Man received 746 responses from the Cityscape survey, 133 The process from the newspapers, and 20 from the Chamber of The first phase of the Tigard Beyond Tomorrow process began Commerce, for a total of 1,295 responses. The survey in the Fall of 1996 and concluded in the Fall of 1997. This first results are summarized in a separate doctu~:ent, the stage included the following steps: Community Survey Results, available at City Hall. e Meeting with a wide variety of groups to introduce the from concept of visioning and to listen to what was on the minds • Many service s hoanizatiore si and st dd in discussions p fbll of many different people in our community. Finding out and private issues. Every opportunity to receive input was sought ::o what topics and issues were of most concern to residents was the first step in developing our community vision; that citizens would have the ability to shape their community's future. • Comments and concerns gathered in the community discussions were the basis of the Community Survey, • Once a great deal of background information was collected from the visioning presentations and the community whiWh was distributed in October and November 1996. The curve it was time to begin the process of creating a vision survey contained over 70 questions, asking for opinions and tackling the goals and action plans. The leaders of this about everything from parks to police to schools. The effort were the members of the Vision Task Force: 35 survey also asked for people's opinions about where Tigard was headed and what changes they would make for our citizens representing many areas and interests in the future. The Survey was distributed in several ways in order community. The Task Force developed the vision for our o leas ossible. A written community from the surveys. They then set goals that to get feedback from as many pe p P would help achieve that vision. version of the survey was distributed in the City of Tigard's P ask Force newsletter Cityscape, in the Tigard Times, the King City and goa finished, Regal Courier, and in the Chamber of Commerce's • When into smaller groupssAction Committees, to develop newsletter Hotline. There was also a survey of randomly broke the action plans. The action plans are targeted to achieve chosen Tigard residents. The phone survey provided the oals for the future. statistically accurate information about our community. In g addition to 396 people interviewed by phone, the City 3 Vision Statement olr - ~ill Tigard look like in 2017? is the community and goals to be achieved by 201?. Following citizen-based Vision Task Force developed the direction for our The the responsibility each uality education. community's vision statement. community recognizes and accepts and community, are committed to citizen has in promoting and supporting 9 We, as citizens of the Tig s future in agreement with the Business owners are shaping the community oing vision process. This acts their given through this on-g Small and local business ns~bil ~ thrive. for the imp direction gi involvement and anticipation and involved and take resp process relies on citizen ommuni, s decision-makers. businesses have on the community. coordinated actions by orted by aces and natural sp supp A community value "to respect open our citizens. Many ng for features encourages access to these by is a safe, dynamic community Fund! 'and efficient public services. ortunities are available for Tigard coordinated Tents pay their share' leisure time and recreational opp services is stable and rec►p ublic services our community. protect as ether to promote and p Citizens are educated about ohow to usibility access to participate All of these elements work tog quality of life. their resp and understand Tigard's individual identity and g members of the community. variety of oppo~nlties for citizens i gall Our There are a for life-long to access education programs 4 so me WINNOMBMI:~ go Now, ,80 MWM Alreas of Igev~e~' i ,but developed direction statements for specific target area. This will each sPecitishment The six areas of on developing a direction fore he 11 find information community, eats for each target area The vision Statem 't stop with Just a es, the Teade and the timeline for accomp The Vision Task Force didn In the next several Pages, action plans eas of review. of goals, 7 - 9) each of the six ar and a listing of Life . ages include: the direction statement an Character & Qual►ty (Pages 10 -14) Community Bement ageS 15 -17) review were: & Growth ana ® Growth (pages 19 - 20) ® Public Safety " es 21- 23) Schools & Educ & Traf ..fic ((p ages 24 - 26} 0 Transportation services P ® urban &Public 1997, it is equally im While the focus o °W't to document the nt the results of the vision developed during Of this report is to document ent for the Vision Task Force. ls of the process. » were used as a general reference ~i ~ 3etai unity profiles t to our comet designed overall reader e "comet and why it is importan« the will find th ned to give cit izens an A tion of each issue area an instead, it is a Fall of 199 In Appendix 6. concerns were in These profiles provide a brief descrip reher_sive; is not intended to be CO of what Tigard residents' ,ity profiles a review The It Serves as a good place to start information in the comet picture of the six issue areas. 5 What is the next step9 into a new phase. A great deal of background information has been collected, a s are in place to accomplish the goals. The Tigard Beyond Tomorrow process is moving fan vision has been created, goals were set to help achieve that vision, and action p of Tigard and local agencies can take the will be responsible for implementing the goals. The City ° non-profit agencies, Now what? The entire community laps may require the involvement of local businesses, make Tigard's vision a lead in carrying out some of the action plans. aOth~geP Every person and organization that takes part volunteer groups, churches, or the community reality. the community on progress made the preparation of annual visioning reports, which will update u fished to report on activity and accomplishments for each calendar year. City of Tigard staff will spearhead towards the vision. These will be p citizens and other community Partners to visit the vision through community-wide times and desires of our Every few years City staff will also work with is important to ensure that Tigard Beyond Tomorrow stays on track with the changing review. This step community. 6 =MUIMEMIM an am owns 'SM MU on WS. on s~ Pill Ransom to r CHARAC Iy V,SION TARGET AREAg COMMU y OF LIFjrj G H T QU ALIrr p DIRECT 2011) will look like i w (What TiPlr ' ns have the tools to communicate effectively with Tigard citizens are involved in their community. Involvement is citizen driven and citizens community s°pp°'t, it volunteers with appropriate community-wide decision makers ou h community-wide ide coordination of volunteers. our and new imized tlir $ toward ictency and Volunteer spirit has been max . volunteer recognition. 'ties o to events which move financial self-s training funding peon g s local, regional and community events. City , and commitment to downtown Tigard encourage . leadership, ownership, events la strong been residents of the point Fain Street Area display A clear direction has established for a for the comet Business owners, pro Pert SS owners, treowners, area anisd seen as a `focal went is required to development. The Main priority and new develop and is being implemented, en space is a p downtown aesthetics. open has a defined, proactive vision for community The Tigard community dedicate open areas for community use. IN III millim some *Known Tigard Beyond Tomorrow Community Charade & Quality of Life RESPONSIBLE TIKEwNE ACTION PLAINS f°AgTy' GOAL STRATEGII Admin. Staff 97198 99/00 Volunt=sm ♦ Continue with Volunteer Committee to develop foundatioed~ ;ere AdAdminmin.. Staff ff 99/00 appointment of ♦ Write job description & conduct research on effective Program will maximize the ) Consider ty Volunteer ' ♦ Develop ombudsman role (Citizen Advocate) 98/99 #1) City 1 effectiveness of the Community Admin. Staff volunteer spirit to Coordinator/Ombudsman current volunteer opportunities Admin. Staff 97 "100 e Sponsor inventory 10125/97 Admin. Staff 1/98 accomplish the greatest good 2) Enhance current volunteer "Make lonteerrim Difference Day" - program for students Admin. Staff for our community program ♦ Develop ♦ Use Cityscape to facilitate Volunteer Program Admin. Staff 97198 ♦ Solicit ideas to improve the CIT Program Admin. Staff 97198 3) Strengthen Citizen ♦ Review use of Cityscape features for CIT program involvement Team (CIT) Program Council/Admin. Staff 1997 more accessible 1998 Promote Admin. Staff l) Encourage public o Make Council meetings (stud en House for existing and new residents; p 98199 92) Citizen involvement anticipation through o Sponsor Annual ResidentsOp Admin. Staff volunteer opportunities 1/98 opportunities will be accessibility and education Admin. Staff maximized by providing ♦ Develop a Citizen handbook Admin. Staff 97198 . pilot ♦ Improve communication of Council decis local govt and its services 98!49' Expanded educational progranis On ♦ Develop community education program process, assuring access- ibility to information, providing opportunities for input and establishing and maintaining a program of 1998 effective communication CD Staff 1998 Committee CBD Comm. 98/99 ♦ Establish Central Business District (CBD) CD Staff Downtown 1 Ti ard's CBD: Be Pro- ment v. Dir., Livable Oregon) rtunities to ) g o Develop Mission State for the CBD CBD Comm. 1998 work Explore options: Outside expertise (i.e., Economic De 98/99 #1) Provide oppo CD Staff Proactively with active a ♦ Use "Core Concept" approach when developing identity/theme 10/25/47 StafffVolunteers Central Business District ♦ Develop Economic Development Plan along RR tracks pubic Wks Staff 97-00 (CBD)')usinesses and e, participate in Make a Difference Day - 10/25/97 -clean up proper f owners and citizens ♦ Plant trees of Tigard to set the course for the future of the central downtown area 8 Tigard Beyond Tomorrow Community Character & Quality of Life GOAL STRATEGY ACTION PLANS RESPONSIBLE TIMELINE PARTY 2) Tigard's CBD - Review a Review zoning code - How does it promote the mission statement CD Staff 98/99 ♦ "Court" fancily-oriented business through design criteria CD Staff 98/99 Ott)' of Tigard regulations e Explore grant programs and/or matching funds CD Staff 98 & Beyond • Become a member of Livable Oregon CD Staff 98/99 • Revise Parking Regulations in CBD CD Staff 98/99 ♦ Develop long-term strategy w/ODOT re: 99W widening & affects on CBD CD Staff 98/99 3) Tigard's CBD - Work on ♦ Develop "Gateway" (portal) improvements (i.e., "Welcome to Tigard") CD Staff 1998 strategies addressing ♦ Install special street lighting fixtures reflecting theme CD Staff 98/99 aesthetics o f a-mo Creek: Showcase this amenity; use as a connection to community CD Staff 98-03 o Install public resLwoms CD Staff 98.03 Develop connectivity plan - pedestrians/bicycles through CBD CD Staff 98/99 s Develop amenity improvement list for implementation CBD Comm. 98-03 Community Events o Create study group to propose criteria for Council's City event philosophy Council 98/99 #1) Develop overall 1) Community events - o Consider new City events to carry out Council's philosophy Admin. Staff 98/99 approach for sponsoring Develop a philosophy on City a Distinguish approaches to events that are targeted for local residents vs. those that Council 98/99 community events that event sponsorship drew regionwide establishes balance among ♦ Develop funding criteria - confront limited dollars and recent taxpayer direction Budget Comm. 98199 popular or traditional a City-sponsored events must have community-based support Budget Comm. 9&199 standing events, requests for o Evaluate events annually based on criteria established and defined by City event Admin. Staff 98/99 support of new events and philosophy limited City resources ♦ Create study group to look at other community events Admin. Staff 98/99 2) Community events - o Develop "how to" packets for event volunteers Admin. Staff 98!99 Develop an understandable, s Encourage event organizers to develop other funding resources Admin. Staff 98/99 step-by-step process to assist o Encourage events - both old and new Admin. Staff 98/99 event volunteers ♦ Evaluate City umbrella insurance policy; consider riders for sanctioned events - Risk Manoger 98/99 costs pro-rated based on magnitude of event Community Aesthetics #1) Develop strategies to 1) Community Aesthetics - o Develop a list of methods for dedication or acquisition of open space CD Staff/ 98/99 balance needs of new and Balance development and o Determine if tax incentive programs ai-e possible Finance Staff 98/99 infili development w/need to aesthetic needs o Review Development Code to balance aesthetic needs with developer needs CD Staff 98/99 o Define terms such as "open space" and "scenic view" in Development Code CD Staff 98199 provide protection of defined a Be proactive, commit to stand by the vision; risk is supported and appreciated Council 98 & Beyond aesthetic qualities valued by s Consider establishing a site design review committee for developing properties CD Staff 98/99 those who already live and a Establish aesthetically pleasing designs for roadways CD Staff 98/99 work in Tigard • Revisit sign code: enforcement and regulations CD Staff 98/99 9 SM we M M. M AM AM M. MUM M ROOM- f 1 r, t R 8 TA v►s~' Y~ ~ 1 s ~ ~~EME~T' Y a , Q o D1"C'T1ON.~ look like in 201~~ • . . fd will o tw~,at »s- • rhoods• The City ew and established neighb0 the character and livability in n while protecting °rdable housing mated of $erviceS pay ilieit share' w U is accon'n' main diverse and Recipients Csro s to . , s Urban Gro~,3oundarY congnues to°"~' rivate sector PrO a of opp°rto~t1es Tigazdurag d supports p l cit12ens ~di~,n Tigard ur comr'►~~~ and om econ°mY: ~ tegion aY►d''ake advantag enco es an ces are provided t0 imp°t pmt of o Urbasi s ouraged as an are educated about issues ~n ° s ~ enc lts citrze L°c~ and sm~l busmeS$e icip~'t ~n regional issues• ~s active Pa[ esses. The City °f Tiger making pr0c ~cipate indecision to P 10 logo Tigard Beyond Tomorrow Growth & Growth Management ~pO1YSIaLE 'rINWLINE ACTIO PARTY GOAL STRATEGY 10/97-7/98 units Current Ping 10/97-7/98 o Develop criteria for location ofaccessory City Engineer #1) Accommodate growth 1) Create irtfill, increased ♦ Evaluate infrastructure needs to accommodate infill, 10/98_1/99 densities and redevelopment re development and incr Long Range Ping while protecting the policies to allow compatible Current Ping 10/97-7198 character and livability of ♦ Consider commercial zoning Bull m m the ability for new and established areas growth accommodation of future Evaluate whether it is appropriate a new residential development on large lots acts of increased Current Ping 10197.7!98 ♦ Protect natural resource areas from the imp CD Director 10/97-7/98 growth ♦ ent that informs and educates the provide an educational elem public 10/98-7/99 Current Phtg 10!98-7/99 ♦ Address pedestrian issues in the Town Center Range Ping 2) Address the Tigard Town Consider redevelopment of existing industrial lard in the Town Long 10197-7198 Center and the areas designated ♦ Long Range Ping as Corridors in the 2040 Center ♦ Review corridor densities to determine whether densities are 10/97-7/98 Growth Plan appropriate CD Director Provide an educational element that informs and educates the public ping 10/97-7/98 acts of annexation )f some or all of the Metzger Long Range 3) Address planning and ♦ Explore the imp Long Range ping 10/97-7/98 Explore accommodation of higher densities in the Regional growth issues associated with area _7/98 the Regional Center ♦ centers effort, Long Range plug 10/97 ♦ As part of t}te Regional Center Master planning 10/97-7198 incorporate larger study area Long Range Ping ♦ Provide an educational element that informs and educates the public Long Range ping 12/97-3/98 6198 i} Adopt a p ♦ Create and implement a public information plan City Engineer 12197 Ian for the orderly Create a plan to evaluate and provide necessary ;nf astructure Pig 1297--12/98 ♦ #2) Urban services are Long Range Pig 12!98-12!99 n obtained 12197-12!98 groom boundary all citizens annexation of Walnut island ♦ proceed with annexations where waivers have bee Long Range ♦ Proceed with annexation of the remainder of Walnut Island CD Director within Tigard's urban eement with County that establishes under what om boundary and ♦ Create agr facilities recipients of services pay conditions City will accept County their share 11 DEEM ~1 Tigard Beyond Tomorrow SPONSIBL>✓ TIMELINE Growth & Growth Management ACTION PLANS PARTY GOAL 5T1ItATEGY Asst to City Mngr 1998 eted education program aimed at newcomers and e Provide targ 7198 2) Adopt criteria that outlines specific Bull Mountain areas and under what agreement with Wash County that allows full provision CD Director when e Reach agr lice service an d annexation City Engineer 1999 circumstances areas on Bull of services by City including P° Mountain will annex ® Expand abili,y to get annexation waivers for provision of sewers to Bull Mountain Asst to City Mngr 1998 Priority' create public info program MOO a lan to educate s With area west of Halreaches out to newcomers, 3) MOO p that uses CP04 e it partner, Tigard and emphasizes the Metzger residents about emphasizes benefits of joining 1999 annexation to Tigard Metzger, i.e. City Engineer retention of Metzger's identity cture to e Explore costs of providing needed infrastru 2000 storm sewer that clearly outlines CD Director Negotiate agreement with Wash County including provision their role in the provision of urban services, rban of police services Growth Long Range pig 2005 existing city boundaries with King City, the urban s Explore down to the Tualatin River for possible 4) King CitYAJ growth boundary Boundary Annexation annexation 1/98 CD Staff ® Start community dialogue on issues associated with affordable 3/98-6198 ##3)The city encourages 1) Implement a program to housing goals for affordable housing to determine council d citizens about its private educate Tigara Define community 6/98 and supports the ~portar►ce of affordable target s oafs Asst to City Mngr x/98 sector programs to + written materials that reflect the community' g ss Asst to City Mngr maintain diverse and housing prepare outreach program including Cityscape articles, pie p affordable housing a Develop aking opportunities, outreach to businesses, releases, churches, , senior centers and community based organizations CD Director 8/98-10198 ® Implement outreach program CD Director 2198 Long Range P>ng 2/98-6198 s Form study committee 2) Make incentive programs ® Committee consider waiver or reductiooft ~ reductions for available to providers of abatement for non-profits, and/or property affordable housing units ] affordable housing projects 12 Emil to go 10 so 40 IM ° 0rp0W E1.~E LE Wo as to i! Tigard Bed°~'a~agemen~ X98-fr198 000 Gr0'W* Gr°~p~rt0P1 YLpNs Long Range ping to spec Y financial incentives Long Range Ping 1198 etin 619$ STRpTRG g ittee consider tars CD Director .119g GGpL areas of the City ort issued to of study Council committee Director Mngr 8198 Study committee rep mendattons Asst to city 0 of recom 10198 Co uncil considuric 1 direction ,incentives a ping Implement co to "advertise tons Rang 8 outreach grog zoning & density ?l99 + Develop ;nclusionary Long Range Ping ;nurtum densities e affordable housing Code to require Yntnm to s Consider as tools to encou languag a utto Dev bonuses to 3199 s zoning code bonuses and for density Range Ping 3) Review City orate code zoning Long Plan o Incorp d;nclusionarY singun~ts and Comprehensive um ousing densities an k af fordable hou 10,91-1199 olicies to piovid aff as le e affordable to Lon" g Wge ping p tnnif es for enc°urag echanism oPP°r Develop a r" ixed 1019'1.7198 constructed affordable housing in m e ping housing rovide ;n public work Long gang s top shops 10197-7 t98 Identify opp ortunitie a Ping ~ ~'g affordable use areas on affordable housing t desired Long 8 q) Incorporate include discussions ,,age to refle^ Range Ping 10,9'7 7198 g Rage Ping 1'tci soh SqU de and ° in mixed use areas code tang uSe areas O housing P° licies & zoning nities in mixed ~ Lol Other Downtown' ed use areas ° *rite P° affordable housing opp° housing 9198 Range Plug ent policies an;ncentive to focus Long A Implem ousmg ratio as m~ers, 1Ot98 e Consider lobsih with policy issues Long Range Ping ousmg es to identify summit on affordable finical resoure technical 11198 i 1loldsum and rttlyprovid'mg LongRangePing en ties between City, develop community w-uP to consider 10 able housing d units 5) Streit and other wash. A Summit follow-up of afford h. County subsidi7x 1999 Wash.county, rovide Csistance for as e in number Of w~ CD staff 1999 Co unty citie housing 101 services 0 onsider incre city Mott ed inTtgazd psstto affordable allow 199` Identify distribution that identify of police available resources that chief brochures for u 13 arterly lement Develop resource held q 6)11ON1ELESS -Imp a programs aimed at p reventing commnni atidlord resourCeS education Pr°g rants to elessne be ss Develop tools t elppreventhom homelessness Provide ond.foviaorrow ~tiV~LINE NSI+gLE rfegard Managev'ent p TY 1944 brow ~h ~r pcT10N PupNS Asst to city Mngr ices that maY impact ST@.~►TEC'Y 1994 Develop resource center for sere council G®pt' a such as 1949 homelessness ergencY housing, council resources available for em info on Asst 1994 Identify rov'de to city M" 9 c Investigate vouchers otential providerslagenc'es that p emergency 1999 ~)1t0MELfS.3 - encY identify housing to regarding City 1Jingr g to distribu Asst to rov'de emet hou tools top emergency written materials ation for housing ° ~ePare w With recorded inform 1998 housing hone number w CD Director provide P development 1998 emergency housing esses as CD Director ure input is received from local busin local develop, 1999 ® pss oOtion effOr~ CD Director are developed and trapsp is included d assist local codes ing » site design e & recruit new small 1) Reta"I an a Assure thaccess 2 d fried ess access encourag businesses busEinxplore~ incentive to #4) Local are and sencomall uraged a' bus'- o nesses rtant pO of out businesses in Tigard an imp° , d economy community an 14 ..gas. so 7-GWW!*71NMNRWMW 6 VMON r/.RGEr AeFAS PUBLIC SAFETY DIRECTION STATEMENT: T (What Tigard will look like in 2017) A 8 T A g D 8 0 Y El R a 0 0 x W D Tigard is a safe place to live, play, and do business, with effient - providers. Citizens and businesses are well educated about public services; safety services coordinated b safety of themselves and their community, ses are Y Polrce, fire, and emergency m Commq and businesses take a proactive role for thearresponsrbillundarstand their role and ~atie for ty. Public Safety service providers plan for their service relive sponsibilities for the investment in the Populations that travel to and through our rY in such a way as to minimize the negative their pacts invest the regional community each day. Stable funding provides uninterrupted public safety services at t desired levels. 15 Tigard Beyond Tomorrow Public Safety GOAL STRATEGY ACTION PLANS RESPONSIBLE TIMELINE PARTY #1) The community 1) Re-energize existing • Determine status of existing Neighborhood Watch areas Chief of Police 7/98 residents, business owners, neighborhood watch areas • Recruit Volunteer Coordinator for Neighborhood Watch Program Chief of Police 5/98 and service providers will • Educational promotion for existing Watch Programs Chief of Police 7/98 - Ongoing form partnerships to • Measure effectiveness of Active Watch Programs Chief of Police 12/99 effectively enhance public srfety and emergency 2) Expand Neighborhood . Develop Watch Programs in additional or new neighborhoods Chief of Police 7/99 - Ongoing services Watch Program • Educational promotion for new Watch Program areas Chief of Police 7/99 • Measure effectiveness of active new Watch Programs Chief of Police 12/99 3) Implement Crime Pre- • Implement CPTED with Public Safety providers reviewing and commenting Chief of Police 1/98 vention Through Environ- on all land use applications received by the City mental Design (CPTED) to assist efficient and effective public safet•; response to calls for service 4) Implement Enhanced • Implement ESP program with multi-family dwelling units (apartments) within Chief of Police 1/98 - Ongoing Safety Properties Program the City (ESP) to assist safety and emergency responses to multi-family complexes 5) Conduct survey of busi- ' Develop survey tool - questionnaire Chief of Police 8/99 -11/99 • Print/fold survey Chief of Police 11/99 nesses to determine public . Send survey Finance Dir. 12/99 safety/emergency services • Review survey results Chief of Police 2/00 - 4/00 needs 6) Develop business crime • Track business calls for service. Develop data base Chief of Police 1/98 - 12/98 prevention program • Conduct info. search to find programs that work well in other communities Chief of Police 7/98 - 6/99 • Create current business calls for service report Chief of Police 6199 a Create Business Crime Prevention Focus Group Chief of Police 7/99-10/99 • Educate focus group Chief of Police 11/99 - 2/00 • Create structure and parameters of the Business Crime Prevention Program Chief of Police 2/00 - 4/00 • Implement the program Chief of Police 7/00 16 it 3' ~ I ,f~ELIi~E e end Tom®YgOw afe~' pan ire refs 1998 $'u~~~ ACTiON PUNS police Chiefs 1199 -3199 3199 -11!99 police Fife Chiefs Police Chiefs 1100_X140 search consider using police&IFwo STRA~EG~ anon and wishes to and • Conduct inform nation rogr ounciO'd?"t Comm- t f~ndi Board Mice SL Fire chiefs 8 GGAL Review inforinfo. CC: p lenient Cep 1198' 1?19 police,Fire, and detailed to imp8 - t0198 to City hief of Police 819 Review ement • G j'hP.r more alternatives how C 8 1) Manag dregarding oar velop long $pQrctetra, Emergency mechanisms by funding 6aucil(8 base Chief of police 1198 -1 of Police #2) De es to service fundmg Decision Y develop data chief ~ ndmg use nationwide • o p ulation- the lo;,a1 systelocal stable fu regionalp efficient, already m Iona! usersnoW they balance ensure safety Track calls for service from s from reg court Manag icien cl e stream determine more 9q -5199 led public venu rnun uninterrup services options eat re ities to ff 1 create e and emergency Review funding local Review SuCVeotthrrer nationwide ce eeds court could Chief of Po ice population Chiefs t gt0o determrne how 2) acts on ency dollar Tonal service enders Ce Ional al imp nd reg gtudY eat off d by g . 1i0D ' for region and emerg a rep ice create Court role police & fire safety Municipal court and reduc andM um. Vitt Chiefs public • Cervice arr current tails for se. tions, d police public safety ' detailing ed Games, funding °p Fire four d findings se Ices cepc d nts & report imes VB'dget implement report • Prepare how imp iraifte a alternatives to present ~ndiCouncilBoaC regding to • 091 _ pngoing • pecisionbY 'Emergency Mng pir.111199 1y31199 12 hours after disaster strikes pi; EmeeCge Gc`1 10% ail 12,99'-5100 {or the first define trainingbY er ency Mug 10100 V be self-su Ouse Coition emergency types, I'M • Educate citi?pmergencY Respond purpose, Dir. Eme %tuel g by 3101 DiC. 'Develop an to understanetc.) .wide • Coalition less, pir. Emergency Develop Educate ual, 'home 1y31191 1) C0 citizens to • niors, biting to in the first group (se short term g°alse out in the comCnuniar tra n gram for cy pevelop w #3) hat needs ar for next 3 yew EmergenG`1 M g The comrnun d for pro uf dprep be o an emergen . fine ularly DCr. gtg8 - 000111% fined an after Determ for coalition to reg '12 pevelop work Plan onders ency M°g 1198 U01 emergencies • n~ work Group Enierg for resp pir. Eruel Mng event oils pir encY 5199 ency ReSpd Coordinate eff Emergency Mng pevelopTigardECCintneeds an sharing experiences determine elreat life response • ine 101 for information s bated on cyercis meet to re eetings ms 2) Coordinate Tigard • Hold gular use plan onse pr0gm of resp response • Modify respo exer emergency cise 1~ • Conduct annual providers -.206 low pop 1W MW W low 91M =,man i I J1111 an so so S & EDUCATION le CI-100L V1310N TARGET AREAS 1111►►►►1111 DIRE CTION STATEMEN~~ j e in 2017) 0 8 a M (What Tigard will look lik O Y D O E ❑ a r # N MM whether or not they have children in the The public schools have stable d private schools. p promote education our ll supported through volunteers, quality public an help Tigard area residents have access togan oocd e of education and howa- can curricular programs are important and are we school system, understand the im lions. Curriculum and through state and local funding oith business and governrnent. local funding and increased partnerships w education infrastructure required by groom ""he community. assists in paying for new -to-day operations and other casts to facilitate the most efficient New development actively partner in day Public schools and governmental entities in our community delivery of services. t8 wl% : 1.1 00 orro`1V gV~ TIIYIELINE ~eend ~oYil ~pOP151 00000010 IM go 'Tigard y ~CI,p®ls EmuC3 011G~~i®~ 1 D'► ict 97198 School Year T, f Schoo School Yeas athletic and 97198 nsorshiP of clubs, 1.1 School District g7t9g school Year ST~TE~Y business off local athletic and recreation GOAL the possibility ool levels club, T: f School Disci in leading schools ort of 97198 School Yea, 41 Eeple clonal ache c p iclpation ~h~ls an s c d elements hools with supP of Tigat munity 1) Identify cote Qig~s more directly to city e ease volun supP°rtingl lncc middle schools, and City resources for d ptogtams in oath athletic p to coordinate and #1) Schools will work recreation an Tie existing Y munity Fall, 97 rovidutg oung a arinershan volunteers govertunent p s for y new Business p and other com City of Tigard ether to provide a activity PrO ' citizens classes fall, 91 t0$ ♦ teach hobby, Recruit senioc activity and recreation and cities in other local city of nitybase commud people Tied 98 am een schools ~ and city activ1 prod relationship be Lake Oswego an W for peop interiSpring recreation le Investigate the funding ments formed in of Tigard year 9119% School park and recreation districts a?,", a park young a ctivities ut forming Portland h, Communi a tax citylschool funding acid a lnendation abo 2) Investigat riding source to 0 Explore the ake a recom to fund student activities lion, orted Ashland to fund s'fasl Johce to m levy after-school educa College supP er-school sports f Citizens Task a city offering k and 3 months+ provide aft for Create a establishing the Par tarng and recreation iComr °unlt`J Schools Program pie) thtough City of Tigazd and activity Prog Establish a true well as young P School students a es for adults Tigacd.Tualatin pool interest class ment betty to the Recreation 1Dis Qct Mmental agree Tualatin lOt97 - 6198 o Create an inie,g of Tigard and d the cdies f .,f School District iOt97 - 6198 District an for recreation District properties used T: T gchool D and coordinate activities ining 10191-6198 teachers ent, et 6198 hools to help school for recruitm T.T Scbool Dish 10,97 - at each ool District Increase volu to volunteer in sc coordinator T T gch i year P funding commitment ofTi'ard oung students m City r' i Year teers to Support Se d tacement work with Y with a definite tie frame volunto SchoolDistr10t 1) Use volun dents to be involved community nal de additio older Stu T T PTO"' • parent required to and Support for all ent #2) Educational teachets+ opportunities for coops - P ent, training offer enrichm ((unities for stu dents learning Coordinate tectuitm da schedule to schools a Coot extended day °n'figard Tualatin students school facilities on will be maximized m consider using s ze the use of and remedial program 2) MOW cilities dislair-I 19 Tigard Beyond Tomorrow Schools & Education GOAL STRATEGY ACTION PLANS RESPONSIBLE TIMELINE PARTY #3) The schools and city 1) Examine the potential for o Create new City position of School Media Specialist at the Tigard Public City of Tigard 7/98 government will work city government to provide Library together to maximize some support services for o Tigard hires an Educational Activities Specialist City of Tigard 7/98 financial efficiencies and the Tigard-Tualatin School o Create I or 2 summer jobs per City department for Tigard High School City of Tigard 5/98 address funding shortfalls District students o Park and Recreation District assume responsibility for use, upkeep, staff & City of Tigard 1 year income for gyms, fields, unused class rooms o Develop paid intern positions for vocational training within the City and City of Tigard I year community 94) Government policies 1) Support policy changes o Through legislation, impose a development tax on all new construction City of Tigard Within 2 years will permit the Tigard - that will promote the (residential and commercial) for schools Tualatin School District to District's ability to provide o Provide tax incentive for land donated to schools City of Tigard 2 years o Improve cooperation between government agencies, schools, developers, and City of Tigard I year prepare for growth and adequate school facilities planners control the quality of ♦ Obtain legislative approval to pass bond/levy measures above the limits City of Tigard 4 years services it provides imposed by Measures 5, 47, and 50 students o Legislation should permit development moratoriums until all school City of Tigard 4 years infrastructure issues are resolved 2) School offc;-'s will o Explore the possibility of constructing two-story schools in the future T-T School District Within 24 months create a long range plan to o Continue to include land acquisition in future bond elections; create a 5 to 20 T-T School District Within 24 months address future growth year plan for growth and acquire properties sufficient for projected enrollment o Build smaller schools - smaller buildings that can be used and sold in the T-T School Board Within 24 months future when they are no longer needed 20 WOMIT ORrV ION G T ~r 8 C 0 ARw AREAS }i. 0. 0 CTION ST A'TF~E ON 2017) 0 w DIIR~ like i H • • . will look rd (VV hat 'T iga lOid4• to build divers dareequate e include regional resources Funding sources are , tanning i 1w traffic lion p street network that m tTa►ffic on local Tonal transp° regional es a proactive role in leg ed by a well-connected the impact of Tigard tak importation system. is is sere ~f fic reducing . Local accommodate through- and maintain our is ned to serve safely handles the traffic it desig eet arterialsand maJ°t collector streets acco o~ged Each type of str motion is enc impacts on neighborhoods. T'g~&s available• Use of alternative transp° ne1&borlioods. ordable and ative ~sportation meth°ds are ~ ,pltern 2t Tigard Beyond Tomorrow Transportation and Traffic GOAL STRATEGY ACTION PLANS RESPONSIBLE TIAREI.INE PARTY #1) Improve traffic safety 1) Discourage through- + Develop Comprehensive Traffic Calming Program - yearly implementation City Engineer 7/1/98 traffic on local streets • Implement Traffic Calming Program City Engineer Annually s Reduce posted speed City Engineer As needed e Enforce posted speed Chief of Police Continuous e Increase fines for speeding Municipal Court Annual Review Review possibility of mixed use areas near residential neighborhoods CD Director Next CDC review 2) Encourage through-traffic ♦ Widening and improvements of major collectors and arterials City Engineer CIP process - Annual on major collectors and ♦ Identify and promote use of through routes CD DirJCity Eng. 97/98 & Ongoing arterioles a Look at upgrading existing streets to major collector or arterial status CD Director 97198 e Prohibit direct access onto minor collectors CD Director 97/98 o Examine and implement ways to maximize use of existing lanes City Engineer 98/99 9 Accelerate removal of vehicles after minor accidents Chief of Police 97/98 3) Reduce actual speed on ' Strict enforcement of posted speed limits Chief of Police Continuous e Higher fines for speed violations in neighborhoods Municipal Ct Judge Annual Review neighborhood streets 0 Traffic calming measures (Implement) City Engineer 97/98 - Ongoing s Implement traffic control measures where appropriate City Engineer As warranted for safety s Controlled access to collector roads CD Director During App. Review #2) Improve traffic flow 1) Develop a program to ♦ Review all existing streets to be connected for feasibility of connection CD Dir./City Eng. 97/98 implement the s Review options for connecting existing streets w/Comprehensive Plan CD DirJCity Eng. 47/98 Comprehensive Plan • Prioritize street connections in order of importance CD DirJCity Eng. 97/98 s Develop funding strategy for City-funded street connections CD Dir./City Eng. 97/98 o Use street system study to determine desirable connection points CD DirJCity Eng. 97/98 2) Look for additional points a Identify areas of altemate routes CD DirJCity Eng. 97/98 of connectivity s Establish ROW Acquisition Program to set aside corridor connection points City Engineer ID after TSP e Amend Comprehensive Transportation Map Plan to reflect review results City Engineer 97/98 o Coordinate with other jurisdictions for connection points City Engineer 97/98 3) Identify alternate • Enhance off-street bikepath/pedestrian walkway connectivity CD Dir./City Eng. 6198 transportation modes • Determine optimum route for alternate modes CD Dir./City Eng. 6/98 e Explore formation of Tigard TMA City Mngr/Council 12/98 s Explore rail commute options Comm. Rail Task Frc 12 months more or less 22 Tigard Beyond Tomorrow 'T'ransportation and Traffic GOAL STRATEGY AMON PLANS RESPONSIBLE TIl'MELINE PARTY 4) Encourage uses of o Endorsement of increased gas tax and registration fees City Council 98199 alternate modes o Provide HOV lanes City Engineer Continuous o Reduced fares for transit users City Council Continuous o Educational campaign to increase awareness of alternate modes City Manager Continuous o Coordinate with other jurisdictions for continuity of various modes CD Dir./City Eng. 12197 - Ongoing 5) Encourage development o Participate in regional efforts to develop & promote use of alternate modes City Council & Staff Continuous of alternate modes a Require development of bikepath/pedestrian walkway connectivity CD Dir./City Council 7/98 e Review & provide connections in existing areas CD Dir./City Eng. 97/98 o Review & update existing bikepath/pedestrian walkway master plan CD Dir./City Eng. 1/99 6)Design and a Synchronization of state, county and city traffic signals City Engineer Continuous implementation of tiafftc o Reduction of two-way left turn lanes City Engineer Continuous flow enhancement o Coordination with other jurisdictions for continuity of enhanced flow City Engineer Continuous o Emphasis on street striping City Eng./PW Dir. Ongoing Increased street lighting throughout City streets City Engineer Each FY o Emphasize maintenance of areas where clear sight distance is necessary PW Dir./City Eng. Each FY o Improved signage on freeways and arterials City Engineer FY 97/98 - Ongoing #3) Identify and develop 1) Establish a task force to o Establish a task force to examine current funding sources and possible new City Council 1/98 (18 mo. action funding resources examine current and sources of funding period) Final report possible new sources of to Council 6/99 funding 2) Implement task force o Implement short-term measures City Eng./Council 7/99 e Initiate long-term measures City Eng./Council 7/99 recommendations 23 ME an MW in 4W so W W go M M woo ICES LIB ` "pH TARr,E~ AREA+ DI Acrd Wil1lookE O t (fat' i o n w ' 4 D ~ ~ou~' propert`! maces and fees Tig~d citize and lib~arieS) are provided to nitses groups, and °t ss to p~~'rec~ cte0 on app -for'serviCe bases B Other such as ed for en~ced Serve tic Urban Services are charg is paid for by 911VAh* spec 1eCeS finesses, y~rice. Citizens to serve grovA' ,jners aPs busan rese for se truce necessary is urban Services, p to access d P EXpansiorn of the i efficient delivery of a Sic urban services, an the most are educate effort to f a°ilitateuraged• Citizens are oong~ties enco 24 tFt I Tigard Beyond Tomorrow Urban & Public Services GOAL STRATEGY ACTION PLANS RESPONSIBLE TIMELINE PARTY Library #1) Library will have a stable funding 1) Provide additional library 4 Determine which library services are "basic" and which are enhanced Library BdJStaff 3/98 - 5/98 base for the provision of basic services through users fees for ♦ Select "enhanced" services that could be subject to user fees Library BdJStaff 7/98 services selected "enhanced" services. ♦ Determine which market is for additional fee-based library services Library Staff 8/98 - 9/98 'i Public education on "library fees" Library DirJStaff 4/99 - 6/99 o Establish appropriate fees and tracking process Library Bd./Dir 7/99 • Establish budget process that allocates fees for library use Lib DirJFin Dir. 9/99 - 11/99 ♦ Evaluate process for cost-effectiveness Library Dir. 7/00 - 8/00 2) Identify entrepreneurial ♦ Complete literature search regarding examples of partnerships between public Library Staff 3/98 - 4/98 means of generating support libraries and/or schools with businesses for library services ♦ Create task force to review info, ID companies within service area as potential Library Staff 7/98 partners and explore entrepreneurial concepts ♦ Public education regardiro partnerships to involve non-profit/service orgs Library Staff 898 -12/98 s Explore concept of "sponsored" collections Task Frc/Lib Dir. 1098 - 399 4 Explore concept of renting audio visual or computer equipment Task FrctLib Dir. 1098 - 3/99 Explore concept of video "rental collection" (pattern after rental book process) Task Frc/Lib Dir. 1098 - 399 ♦ Evaluate possibility of constructing library to serve public and high school Task Frc/Lib Dir. 1098 - 399 4 Evaluate possibility of sharing staff between public library and media centers Task Frc/Lib Dir. 1098 - 399 4 Develop proposal for minimum of two innovative funding options Library Dir. 399 - 6/99 3) Seek alternatives to current o Continue developing & adding partnerships until 10% of support by 2001 Library Dir. 2100 - 8/00 tax base funding mechanism 4 Develop library foundation Lib DirAib 9899 ♦ Review/evaluate models of library support Lib DirAib Staff 98/00 ?arks & Recreation #I) Create a special parks and 1- A) Develop a short term Educate partners/citizens about pilot program Munro/Kurt 1097 - 398 recreation district with the City of pilot recreation program for • Gather volunteers and staffing for pilot program Munro/Kurt 1097 - 398 Tigard spear-heading the process and school age children • Create athletic and non-athletic recreational programs Munro/Kurt 10197 - 398 maintaining membership for its • Develop training for staff and volunteers Munro/Kurt 1097 - 398 citizens • Cooperate with existing leagues and groups Munro/Kurt 1097 - 398 • Address latch key issues Munro/Kurt 1097 - 398 • Maximize use of existing facilities Munro/Kurt 1097 - 398 r Address short term funding options, grants, fees, hardship grants Mun /Kurt 10197-3198 Implement program Munro/Kurt 398 Debrief to determine success of program and whether to continue Munro/Kurt 498 - 598 25 Tigard Beyond Tomorrow Urban & public Services PONS~sL~ Ti L> ACTION PLANS PARTY SAT EGY 1198 GOAL Public Wks Dir. 1998 -1/49 point task force recreation needs 8c avail faciliti Public Wks Dir• 1998-1199 es public Wks Dir. e . Educate partners/citizens re: community 1998 -1199 1 _ g) Create a ask forc Ap regarding development of a representation for non-athletic recreational needs public Wks Dir. 1998 -1199 Develop interest and public Wks Dir. 1199-1/00 park and recreation distri ct . Assess community needs and resources public Wks Dir. community -wide partnership es 1199-1100 Develop ark facilities and propero public Wks Dir. 1199-1100 . Develop and utilize existing schoollp public Wks Du. Create a p artnership to maintain existing taxes, Pfacilitiesrivate supp, tau fees Public Wks Dir. 1/99-1100 . Address funding issues - bondllevy, Prop public Wks Dir. 199-1100 Coop with existing leagues and groups Include Sr Center & Seniors as an essential part of the District's Programs public Wks Dir. 1/98 -1101 wide artnership to educate citizens about need to protect 17.1/00 Develop community p aces public Wks Dk_ 1) Adopt educational and and preserve wetlands and open r spaces Public. Wks Dir. 1100 #2) The City educates and suppod- presentation Program for Prepare list of possible land acquisition sites avail inside & outside City public Wks Dir. 10/97 -1100 space' citizer► efforts to under- stand th_ wetlands and open e Reclaim what lands we already have 1/98-1101 public Wks Dir importance of Vlood . Address funding issues plains and how the areas are managed , Implement school educational program and protected public Wks Dir• 1998 10197 urisdictIons to participate in consortium public Wks Dir. o Persuade area j Water regional l) Form consortium of o inform water users of progress Fl) Actively partic'pa u reg neighboring jurisdictions to development of water sources and develop a regional water plant adequate, innovative funding for Willamette River water 1498-99 pW monitor mechanisms to develop those sources Dir. IGA pW Air. monitor IGA by 11199 for Tigard users while exploring local ate Engineering Finn to proceed by 3/02 surface s Design pW Dir. monitors IGA 002 Options for water reuse and 2) Develop Plans for ♦ Research and purchase/obtain plant site PW Dir• monitors IGA groundwater sources water production and supply 4 Secure easements for pipeline ♦ Construct project 9/98-9100 Public Wks Dir• Public Wks Dir. by 12/99 9/98-8/07 Educate water users in conservation methods Public Wks Dir. 3) Conservation - Reuse - ~ Explore alternative sources o to water which would not allow growth to Alternatives Develop ways to control access outgrow water supply 26 ANOM so WPM loam dom AS= 9M Mow Aml Wall low m Ulu amzrff- omm~ni~y profiles Goals appendix aid Coun 1,99 City Tig Xppevdlx. II Ii, Mimi Mom" sr~ so to Issas HIM 66 A )9 files CtDMMi nit, Pro Force. These profiles provide a brief reference document for the Vision Task a general overall picture Profiles were used as t to our community designed to give citizens an The following p and why it is impo n rather, it is of each issue area an comprehensive; were in the Fall of 1996 s description and re profiles is not intended to be Then sidents concern a d place to start a review of what Tig formation in the community of the six issue areas It serves as 900 Throughout the Community Profile You notice three dirent kinds of highlighted iformation' ~ ve lots of pieklt~' wets activi' Q ctutant oc lmsic infoon~0~ t IWOV p°ns Bch es Spo1U~ ° mn ties, may;.. " °z ``flow ofteni" oc cBatts -HO w has this infoi+nah~ "fiovr misch't" µx~:~na>Yy7 ~ These Cosmm'Inity Voices. areas wellas data flow the comtnumty surveys as some of the comments and opm10ns drat were written on the s"veys• They inusuate some of the concmns and ►deas people have about out comtnumty jlsl~l Community r ~ Character and w Quality o f Life t ~ , s> m ~o lot s A 9 1 Introduction "We should focus on building a sense of Of the 240 incorporated cities in Oregon, community through improving citizen only 23 are younger than Tigard, which was engagement." incorporated in 1961. Since incorporation in -28 year resident 1961, when the population was just over 1,000, Tigard has grown to be one of the "We have plenty of strip malls and the like. largest cities in Oregon, with a population of I'd like to see some nice redevelopment over 36,000 in 1996. However, as described downtown where I could walk with my kids. in the Introduction section of this Commu- The problem is, I don't think I can help pay nity Profile, Tigard's history goes back for resident much longer than 1961. -11 year re Tigard is a rapidly changing community. "What's this community stuff about? I grew What effects will these changes have? Will up in a small town where there actually was our area remain a `community' in the future? a community. Face it, Tigard,s a big This final section of the community profile shopping mall and there is no community." brings together some of the things that make -9 year resident up a community, such as its' people, citizen involvement, a city center, community "It sometimes gets confusing around here, events, and aesthetics, which haven't been what with school boundaries doing this, discussed in previous sections. parks and recreation boundaries elsewhere, and the water districts somewhere different. Community Voices Maybe that contributes to our not being a "Bring back the small town feeling by community." making it desirable to conduct family things -8 year resident (shopping, haircuts, doctors, restaurants) by pedestrian methods rather than driving: need "I miss my small town." bike racks, clean bike lanes, walk signals -41 year resident that operate more promptly, clear sidewalks, lots more greenways!" "T here are a few big events around here, like -12 year resident the balloon Festival, which make Tigard a nice place to live. They're fun." "Our most important priorities are bringing -6 year resident up our children in a safe protected environment, providing a constructive safe "Building a nice place is more than just environment for ourselves and our elders, new housing ...we need an urban center, a and taking care of our homeless persons." reason for people to stay in Tigard." -I8 year resident -11 year resident "Cleaning up businesses along 99 would "Tigard takes care of its seniors nicely I help-new store fronts, clearly marked think. The senior center is a nice place." driveways, trees, and so on." -S year resident -2 year resident A-1 t 1. People -Demographics The ethnic mix of our community is slowly The future of a community begins with its becoming more diverse (see Spotlight people. The size, age distribution and racial below), and now includes more non-English and ethnic composition of the population speaking households. affect the community's goals, values and Where are we going? needs. The demographic characteristics of a o Significant population growth will strain community also influence the demand for the resources to provide services. services and the allocation of government • The population of Tigard will continue expenditures. Demographics both inform to age, with noticeable increases in and influence public policy. middle age and senior citizen segments. Where are we now? • The number of households will increase More than 50% of the current population while the size of households decline. has arrived in Tigard in the last 10 years. . The percentage of households headed by This means that most residents now think of a single parent will continue to increase Tigard as a rapidly changing suburb. Fewer with many of those households living and fewer residents remember the old rural near the poverty level. Tigard. In the recent Community Survey, Issues just 9% of the respondents said that they have lived in our community for more than ~ How will the greater Tigard community 20 years. Not only have more people moved physically accommodate the increase in into the community, but the make up of population in 2015? households has changed. • What are the implications of an aging Tigard has a young population-25% of population on the type and quantity of our population is age 18 or under, and the services offered to middle aged and largest demographic group is ages 35-44. senior citizens? While Tigard was founded on logging and • How will our community continue to fill farming, it is technical and professional entry-level jobs as the population ages? workers that dominate the area today. More o What can be done in response to the than 2/3 of Tigard's households are without growing number of single-parent children. As the population ages, our largest households living near the poverty level? demographic household group will become mature working adults without children. SPOTLIGHT: The "Typical" Tigard Household and Resident • The 1990 US Census recorded 12,084 households in the City of Tigard. Of these, 67.8% were "family" households, where the members were related. The remaining 32.2% were "non-family" households • The average household size was about 2.4 persons. • Tigard's average household income was $35,554 in 1990, and the average per capita income was $20,160. The Community Survey reported a 1996 annual household income of $51,500. • In 1990, Tigard's population was 94.6% White, 2.6% Asian and Pacific Islander, 0.9% Black, 0.6% American Indian, and 1.2% other. Hispanics make up 2.4% of the population, regardless of race. • About 64% of Tigard residents are married, 20% are single, 9% separated/divorced, and 7% are widowed. Number of single parent families doubled between 1991 & 1993 and continues to grow. • The average Tigard resident was 33 years old in 1990. Respondents to the Community Survey, who were all adults, had an average age of 40 years. • 9% of Tigard's residents have a graduate or professional degree, 29% have a bachelor's or associate's degree, 27% have attended college without attaining a degree, 23% have a high school diploma, and 12% have no high school diploma. A-2 2. Civic Spirit the Library and on boards, committees, and In the recently conducted Tigard Beyond task forces. Tomorrow Community Survey, 66% of the Citizen interest in the planning process respondents favored fostering a Tigard and the formulation of community goals identity over emphasizing Tigard as part of began with the adoption of Tigard's Com- the Portland Metropolitan area. 8% of the munity Plan in July of 1971. In 1973, the respondents see a sense of community as City formed Neighborhood Planning one the most important issues facing our Organizations (NPOs) to develop channels community. When asked how important of communication between Tigard citizens community spirit is in selecting a place to and City officials to address community live, 62% of the survey respondents said it livability. was very important yet only 19% ranked After acknowledgment of the Cicy's Tigard excellent in community spirit. There comprehensive plan, the NPOs met on a were also some concerns expressed in the monthly basis to discuss primarily survey comments about Tigard's lack of development proposals being proposed community. (See community voices section within their area. In 1993, the duties of the of this chapter). NPOs were incorporated into the Citizen The challenge for Tigard is to define and Involvement Teams (CITs). The Citizen promote our community identity. The small Involvement Teams serve as broad based town long-time residents once knew is now organized forums for the identification of the 11th largest city in Oregon. Tigard the pubFc's concerns and values. The CITs citizens work, shop, and play outside the have been successful in obtaining neighbor- city as much as in the city. Tigard is clearly hood input. a part of the Portland Metropolitan Region, Citizens have also served on other City bordered on three sides by other cities, it is boards and commissions. The issues not an isolated community. Even service addressed by the Park and Recreation Board, delivery (schools, water, fire, etc.) does not Economic Development Commission, Solid follow city boundaries. Tigard citizens may Waste Advisory Board, and Transportation have different ideas about what a sense of Advisory Committee are now reviewed by community is. Does `community' center the CITs and the Planning Commission. around schools? - a downtown? - com- Citizens still serve on the Planning munity events? - citizen involvement? Commission, Budget Committee and Tigard enjoys a high level of civic Library Board. voluntarism. Volunteer opportunities are Over the years, a wide variety of citizen available through more than 80 non-profit based reports and recommendations have community service organizations, schools, been generated through special Task Forces. churches, and through the City of Tigard. The Mayor's Blue Ribbon, City Center, Community involverent has always been a Homeless, and 99W are examples of Task key aspect of City government activities. Forces made up of citizens to address critical As revenue sources are squeezed, reliance issues. Currently, the Vision Task Force, on volunteer assistance is likely to increase. Cook Park Task Force and Solid Waste Tigard has been very fortunate to have a Efficiencies Task Force are developing successful volunteer program primarily in solutions to current issues. Finally, the visioning process itself is citizen based. The work of the citizens A-3 involved is critical to keeping city decisions grounded in the values of our community, in obtaining consensus before decisions are made to avoid costly delays later, and saving the taxpayers money. Our community's image is influenced somewhat by how well neighborhoods and our primary streets system appears to the traveling public. Signage in the right-of- way and litter along sidewalks and on public lands are potential problem areas. C ty resources are not always adequate v -a~-ess the gradual deterioration of the cc:nmunity's appearance. Increased use of volunteerism, such as in the organization of an "adopt a street" or "adopt a greenway" program could be one solution. Issues • How important is community identity to Tigard citizens? Should there be a citizen-lead effort to define and promote an identity for the Tigard community? What role would the City play in this effort? • Tigard has always taken citizen involvement seriously. Is the current level of citizen involvement high enough? Are citizens truly having their voices heard? How do we ensure that 03 the recommendations of citizens are carried out? • How do we maximize the effectiveness of the volunteer spirit to accomplish the greatest good for our community? A-4 3. Tigard's Downtown density residential development, and mixed Tigard's existing downtown area, on and uses, is intended to encourage the redevelop- around Main Street, is a patchwork of office ment of the downtown area. buildings, apartments, auto repair shops, and Three downtown area buildings, all empty lots. It lacks a cohesive identity, and located on Main St., are identified in the it is difficult to access by automobile or by Washington County Natural Resources foot. Freight trains operate along two rail Inventory as being historically significant. lines that run throughout the :riddle of the They are the First Bank of Tigard Building area, sometimes disrupting traffic flow. (currently housing the Chamber of Com- Tigard's downtown has been bypassed by merce), the Schubring and Biederman "modern" commercial shopping centers as Building (now occupied by the Cyber Cafe the focal point for Tigard's shoppers and and two other tenants), and the Tigard Feed diners. and Garden Building (planned for removal In the early 1900's, the Main Street area during Spring, 1997.) developed .zs Tigard's traditional town The Metro 2040 concept identifies center. However, in 1940 an overpass for Tigard's downtown as a small Town Center Pacific Highway was built just north of intended to provide shopping and employ- Main Street, which set the stage for the ment opportunities within a local market future decline of the downtown area. area. A residential density of 40 persons per As Tigard grew rapidly, beginning in the acre (which is equivalent to downtown 1950's, many new automobile-oriented Hillsboro or Portland's Hawthorne Blvd.) is shopping complexes and strip developments envisioned. were built. During this period, development Until 2040 moves from the concept to the occurred in the Main St. area, but it was not implementation stage, it is too early to tell consistent with retaining or enhancing a whether it will truly help to improve the "downtown identity." area. Concepts and The lack of street SPOTLIGHT: regulatory changes by connectivity and Efforts in the 1980's to improve Tigard's themselves will parking in the down- downtown area. probably do little to town may be a factor In the 1980's, Tigard's City Council twice promote the private that discourages new appointed task forces to study the downtown investment required to businesses and situation and recommend steps to improve revitalize the down- customers from using the area. In both cases, ambitious plans town area. this area. were developed to fund a revitalization The Tigard Down- Where are we now? program with tax dollars: town Merchants Assn. Tigard's compre- i In 1981 an urban renewal district was was established in hensive plan has a created, but was abolished by voters in 1995. It currently separate zoning for the 1983. consists of approx- central business • In the late 1980's, a plan was formulated imately 30 business uist:ict. This zoning, which included the realignment of and property owners, which permits Burnham St., a ramp to Tigard St. from although active partici- commercial retail and 99W, an extension of Ash St., the only a is few limited membe ers office uses, high development of a public square, and only a . building rehabilitation. Voters defeated Projects carried out by this plan in 1989. A-5 the Association include the installation of Q benches, signposts, and hanging flower baskets along Main Street. Funding for these projects was assisted by $50,000 set aside for downtown by the City Council. Issues • Tigard's local economy as a whole is doing quite well while the downtown area is not keeping pace. Many residents might say Washington Square is the commercial center of Tigard. Two efforts at downtown revitalization failed at the ballot box in the 1980's. Is there a role for the City in determining what the citizens desire is for a central downtown area? • Several area cities have adopted design standards, such as planning for new development in their downtown areas. Would design standards help improve the attractiveness and urban character of Tigard's downtown area? A-6 4. Social Services and Community annually. Meals on Wheels is available for Events/Arts. those confined to their homes. A buddy Where are we now? program matches volunteers with home- Tigard has an active community life, bound residents for lunch chats on a regular , basis. ranging from community-wide events such as the Festival of Balloons to volunteer Neighborshare provides over 3,800 groups such as Loaves & Fishes. services to low income residents of Tigard. Those services include: rent and utility Many social service organizations in the assistance, energy consei Nation education, City and in the surrounding areas provide and food boxes. services or community opportunities to Tigard residents. The City helps support Another agency in Tigard whic:i provides some of these organizations, using property services to our community is Luke L:,; tax dollars from the City' f "eneral fund. Programs from this agency help individuals with severe and persistent mental illness Current policy limits total funding to one- reach their potential by providing health, half of one percent (.005%) of the City's housing, medication management, and crisis previous year's operating budget. In intervention services. 1996/97, $82,500 was allocated for these purposes. Funding requests are split into The Domestic Violence Resource Center two groups: Social Agencies and provides support and advocacy services for Community Events/ Arts. The Spotlight over 270 community residents by providing: section on this page lists the groups and the only domestic violence crisis line in activities which receive City funding: Tigard, shelter and shelter services as well The Tigard community receives as assistance with restraining orders. Community Youth Services (Teen-Parent The Rape Crisis Center serves all of Program) through Tualatin Valley Washington County. In the first month of Mental Health Center. The program SPOTLIGHT: is a prevention tool in curtailing child Arts, Events, and Social Agencies receiving funds from the abuse and family conflict/violence City of Tigard in Fiscal Year 1996/97. while addressing mental and physical Social Services health problems within the family Community Youth Services/Tualatin Valley Mental Health setting. In Tigard alone, this program Loaves & Fishes/ Tigard Senior Center will serve almost 800 clients with WCCAO/Neighborshare outpatient mental health services in Luke Dorf the next year. 80 teen parents, 120 Domestic Violence Shelter chemically dependent youth, and Rape Crisis Center almost 100 adolescents will also use Interfaith Outreach Services services of this program in Tigard Dial-A-Ride/Red Cross during the year. Tigard's Senior Center has a wide variety of programs, including Arts and Events classes, clubs, music, trips, and more. Broadway Rose Theater The Center's lunch program for Country Daze seniors serves over 40,000 meals Festival of Balloons Fourth of July Celebration Community Band Affairs of the Arts A . 7 Tigard High School Graduation Night M 1997, they saw a 75% increase in "hot" calls Issues or calls from Police Departments and • In the recent Community Survey, 74% hospitals to provide immediate support to of the respondents supported continued victims of sexual assault. financial assistance to social service Interfaith Outreach Services (IOS) programs by the City. In the face of provides shelter and services for our declining revenues and increasing comrnunities' homeless population. In workloads, how can available City 1996, iOS assisted 90% of their program resources be leveraged with others to participants to move into their own home maximize service delivery to those in and obtain full time employment. need? Several special events, which are held • Community events such as the Festival annually, and other ongoing activities serve of Balloons and the Old fashioned to bring the community together: Fourth of Jul;' grow more popular each The Tigard Festival of the Balloons is year. With Ballot Measure 47 or 50, held annually at Cook Park.. This festival, the City will see reduced general fund held in June, is expected to draw some revenue. How can these events, and 70,000 spectators for balloon rides, food, other new community events, be and entertainment. supported as they increase in size and Tigard's Old-Fashioned Fourth of July number in the face of declining City draws families to Tigard High School's revenues? stadium for a picnic, local entertainment, and fireworks. Tigard Country Daze, on the third weekend in August, wraps up Tigard's big summer events, beginning with a parade on Saturday morning. Country Daze also features food, music, and a local talent show. The Tigard Farmer's Market is open every Saturday from June through October. The market features local produce, plants, flowers, baked goods, crafts, honey, and more. The Chamber of Commerce sponsors the market, which also features music and children's entertainment. The annual Affairs of the Art Show i displays visual art from Tigard and the Metro area. The Broadway Rose Theater brings the theater to Tigard. In collaboration with Tigard High School, this group produces shows from Broadway musicals to child- ren's theater. A-8 5. Community Aesthetics area. Most commercial development is auto Community aesthetics deals with both the oriented, "strip malls" with parking in front. built and natural environment. Many com- Respondents to the community survey munities tightly regulate development to favored focusing on small-scale commercial ensure a consistent appearance (like the areas that are pedestrian-oriented 81% to western facades in Sisters, Oregon) and to 18% favoring large-scale auto-oriented protect natural resources. Tigard's develop- commercial development. With the excep- ment code does not regulate building tion of Lincoln Center, most commercial materials or style. Policies in the compre- buildings are only two stories. Development hensive plan protect wetlands and flood- in commercial areas is also regulated. The plains but offer limited protection for natural community development code addresses lot areas and views. size, set backs, landscaping, parking, build- Residential neighborhoods in Tigard are ing height, and access. Requirements vary not developed to inner-city urban densities. depending on the zoning designation so Most multi-family projects are only two standards can be different. For example, stories and the average single family lot size there are no front yard setbacks required in is 7,500 square feet. The recent community the downtown area but there are in other survey shows 78% of the respondents favor commercial zones. maintaining the current lot size for single Contrary to popular belief, there are family homes. Development regulations in actually more trees in Tigard today than in residential zones address setbacks, height, 1953 - before the majority of growth landscaping, and parking. Conditions, occurred. However, most of these are new, covenants, and restrictions (CC & Rs) smaller trees planted as a requirement of established for individual sub-divisions may new development. Many of the larger, regulate color, building, materials, roof type, mature trees have been removed to accom- parking, and storage issues. Since CC & Rs modate that development. In addition, are not consistent through out the com- privately-owned vacant land is being munity, there are inconsistencies from developed leaving open space and natural neighborhood to neighborhood. areas in short supply. 86% of the respon- The City `s municipal code includes dents to the recent survey want to encourage provisions to regulate outdoor storage, protection of open spaces; 14% want to noxious vegetation, signs, vision clearance accommodate new development. As areas, and parking of recreational and residents live on smaller lots and in more abandoned vehicles. Z nese regulations are densely populated neighborhoods, the designed to protect the health and safety of demand for public open spaces will likely residents and to set a minimum standard for increase. The City is currently working on a community appearance. Enforcement of Parks Master Plan to address the need for these regulations is generally on a complaint more open space. basis which leads to some inconsistent Tigard's varied topography presents enforcement. various scenic views that were identified in Commercial development in Tigard is the comprehensive plan.. These include the primarily along major arterials and view of the Tigard area from Little Bull collectors (like Pacific Hwy. and Scholls Mountain and Bull Mountain which include Ferry Road) and in the Washington Square a view of Mt. Hood; the view of Mt. Hood from the Hillview area; and the view of the A-9 Tigard area from the Tigard Triangle, looking to the west. The growth and development in these areas have altered these views. K Issues • Through the last community survey, citizens of Tigard stated they were interested in promoting a community identity. How should development help reflect Tigard's identity? • Vacant land is becoming scarce, demand for open space is increasing, and resources are limited. What strategies should be developed to encourage citizens and the City to work in partnership with others in our community to address this need? c i i i i i A-10 ~I 1014 t* Introduction that the Tigard area will continue to grow in igazd is a rapidly growing community the foreseeable 71ture. The regional eco- ;n a county and state that are also nomic picture bright, and people are at- rapidly growing. Since 1990, Oregon tracted to the area's mix of urban jobs and has grown by 10.2%, or almost 290,000 amenities and rural recreation. Tigard is people, and Washington County has grown within the Urban Growth Boundary (UGB), by 18.8%.* The City of Tigard's growth rate which directs the location of growth and has been about 18% during this same period. density. The UGB, set by Metro, separates About 25% of Oregon's population growth urban and urbanizable land from rural land. is due to natural increase (births minus In the next few years Tigard's growth is deaths), and 75% is from net migration. expected to taper off somewhat as most Oregon is expected to grow by about available land is developed. However, this 700,000 more people by 2012. Most of this expectation does not take into account po- growth will be in the Willamette Valley- tential annexations, Metro's 2040 plan, or the equivalent of six new Salems! in-fill and redevelopment activities. All of Tigard has grown both by these factors may mean steady or growing development and by annexa- tion. Since 1973, the City of Spotlight: Population of the City of Tigard has annexed 4,282 acres Tigard, 1960-1996 and 7,420 people. The City 40,000 now has about 36,000 people in _ 30,000 an area of over 10 square miles. As d=scribed in the intro- ' 20,000 duction to the Community Profile, growth has both posi- 10,000 tive and negative aspects for 0 the communities it affects. Ti- gard has a wide variety of 1960 1965 i970 1975 1980 1985 1990 1995 neighborhoods, regional shop- ping attractions, and a strong retail and fi- building activity in the coming years. It nancial economic base. However, change should be emphasized, however, that the ef- has also brought increased traffic conges- fects that these factors will have aze as yet, very unclear. tion, crime, and a loss of open spaces. Population growth has placed stress on our New people and new businesses will streets, education system, public services, probably change the nature of our commu- and more. Urban growth is an unpredictable nity in ways we cannot predict. However, factor which makes planning in the Metro we hope to plan for these changes in order to region quite difficult. help protect the things we value in our No one can say for sure exactly what the community today and develop the things we future will bring. However, it is expected want for the future. Oregon has long been recognized as a na- Most of the statistics in this chapter are taken from tional leader in growth management. There The City of Tigard's Tigard Database 1996, which are many goals, rules and guidelines in place lists the sources of information used. A-11 to guide development in the state. Tigard "Listen to what neighborhood planning must follow Federal, State, and regional groups have to say instead of what real- mandates as we deal with growth in this estate developers would like." area. These mandates, however, do not -27 year resident completely restrict local control-in fact, most of the broader mandates are imple- "There has only been crisis management by mented through a local comprehensive local government-no anticipation and pre- planning process. Tigard will, however, planning." have to balance its needs and goals with -18 year resident those of the region around us. This section of the Community Profile "There has been no clear plan for the com- begins with a discussion of our community's munity-seems like people thought they economy, neighborhoods, and housing in the could keep it rural by ignoring how Oregon present day. It also addresses what types of is changing." growth are expected where, what this new -10 year resident growth costs and who pays for it, and who has regulatory authority over which parts of "The increase in population has put a teITi- the process. ble burden on schools, traffic, and the overall livability of our community. If the Community Voices building of homes and apartments continues at the current rate, things will only get "Large scale development has reflected a worse... Developers should pay a premium to short term community plan and has under- the community for the burden they have put mined any unique and positive identity that upon it-they can well afford it." Tigard had in the past ...I sense that people -33 year resident are making a sincere effort to make Tigard a better place to live but the incredible growth "People are always blaming developers for that we're experiencing has overwhelmed growth-but remember, it's our own neigh- their efforts." bors that sell them all that land!" -40 year resident -12 year resident "More emphasis on retaining farms, orchards, and tr- cs." "I can't decide what's worse-congestion, -50 year resident ugly apartments, or no more trees. But really, it's all connected." "Tigard will always be a bedroom commu- -S year resident nity for Portland: not enough recreation, en- tertainment, restaurants, or ambiance to make one want to spend their leisure time here." year resident A-12 1. Planning The goal of the concept is to protect Ore- Where are we now? gon's valuable farmland from urban sprawl, and "to preserve our access to nature while Oregon has long been recognized as a na- we work to build better communities." It is tional leader in land use planning. The State designed to accommodate 720,000 addi- of Oregon has had Statewide Planning tional residents and 350,000 additional jobs Goals in effect since 1973. There are 19 in the region. goals, 13 of which apply to Tigard. The The 2040 concept calls for average new goals express the State's policies on land use and related topics, such as transportation, region-wide lot sizes of 6,650 square feet (or housing, and en- 6.5 units per acre.) ergy conservation. SPOTLIGHT: The majority of All cities in Oregon Oregon's Statewide Planning Goals Tigard's current must have compre- does not apply to the City of Tigard) single family lots hensive plans that 1. Citizen Involvement are 7,500 square are in accordance Land Use Planning feet or 5,000 with these goals. Agricultural Lands* square feet. The Furthermore, 4. Forest Lands* 2040 concept ommends arado ratio Tigard is under the 5. Open Spaces. Scenic and Historic Areas, and of 62% single jurisdiction of the Natural Resources family housing to Metropolit__i 6. Air, Water, and Land Resources Quality 38% multifamily Service District 7. Areas Subject to 14atural Disasters and Haz- housing. Tigard (Metro). Metro is a ards currently has ap- regional govern- 8. Recreational Needs proximately 65% ment serving over 9. Economic Development single family 1.1 million resi- 10. Housing housing and 35% dents in urban and 11. Public Facilities and Services multi-family suburban areas of 12. Transportation housing. Finally, Clackamas, Mult- 13. Energy Conservation the Metro 2040 nomah, and Wash- 14. Urbanization concept urges the ington Counties. 15. Willamette River Greenway redevelopment of Metro is responsi- 16. Estuarine Resources* 19,300 acres of ble for regional as- 17. Coastal Shorelands* currently devel- pects of transporta- 18. Beaches and Dunes* oped land within don and land use 19. Ocean Resources* the region. planning, regional parks and greenspaces, solid waste man- However, the 2040 concept itself does agement, and operation of the Zoo. Metro is not specify exactly when, where, or how governed by a 7-member elected council and growth may occur in the region. This plan- an executive officer. ning work will be implemented through a Regional Framework Plan and the compre- In 1994, Metro adopted the Region 2040 hensive plans of cities and counties. Growth Concept, which established a pro- posed form for growth and land develop- The Regional Framework Plan will out- ment for our region over the next 50 years. line specific changes the region and its cities and counties must make to implement our A-13 growth management policy during the next land use law related to development proj- 20 years. Metro's charter, approved in 1992, ects. requires that the Regional Framework Plan The Building Division of the Commu- be adopted by Dec. 31, 1997. nity Development Department reviews The Framework Plan will contain spe- plans, issues permits, and inspects construc- cific guidelines for land use, transportation, tion to ensure compliance with the State water quality, natural areas and parks. City Building Code, the Tigard Municipal Code, and county governments will use these and Community Development codes and guidelines to meet both regional and local ordinances. The Building Division is oper- growth management goals. ated as a dedicated fund; that is, it supports The link between the Statewide Planning itself through building permit fees, and not goals and Metro's 2040 planning is that both from the City's general fund. will be implemented through local compre- Where are we going? hensive plans. Local comprehensive plans, • According to preliminary calculations by which are required by state law, guide a the City, Tigard will be able to accom- community's land use, conservation of natu- modate the additional jobs and house- ral resources, economic development, and holds required by Metro's 2040 Growth public services. concept without changing zoning to cre- Local plans are changed through plan ate higher densities. This will mean that amendments or through periodic review. Tigard will have to be built to within Plan amendments are small, unscheduled 80% of current allowed densities w'- en adjustments to a plan: for example, changing new housing is proposed. For instance, the zoning on one property from Residential if 10 houses are allowed by zoning on a to Commercial. Periodic reviews are state- particular piece of land, the City will re- mandated broad evaluations of the entire quire at least 8 Lo,-,,;es to be built. Under plan which generally take place every four current policy, the City would allow to ten years. For example, the City updated anywhere from 1 to 10 houses on land its plan to address trees within areas contain- zoned for 10 houses. ing significant natural resources, a need • Another new requirement of 2040 is that identified in the most recent periodic review. the City allow one additional accessory Tigard, which last performed a periodic re- unit (commonly called mother-in-law view in 1993, will have to update its com- units or granny flats) to be located with prehensive plan within the next five to ten existing houses. The City currently al- years to meet the state's "periodic review" lows these units but requires that they be requirement. This update will reflect new occupied by a relative of the residents of information, current trends, and new regula- the main building. Metro requires re- tions. moving that restriction. This change The City of Tigard's Community Devel- may increase the number of accessory opment Department oversees development units in Tigard. and building in the City. The Planning Di- e The Metro 2040 plan also requires the vision is responsible for comprehensive, City to allow some housing in areas transportation, parks, and open space plan- which are not currently zoned for hous- ning. It also implements and enforces local ing. For example, zoning near Washing- A-14 a ton Square, which is called a "regional center" in the 2040 plan, does not cur- rently promote housing. Since Washing- ton Square is envisioned as a major transportation, employment, and retail hub in the future, it is seen as an appro- priate area for increased densities by Metro. The hope is that people in this area will have easier access to transit, shopping, employment, and entertain- ment, with reduced dependence on the automobile. Metro, Tigard, and Beaver- ton will be developing a plan for the Washington Square area. • The City's development code, which regulates how development occurs within the City, is currently being rewrit- ten. This work is expected to be com- pleted in 1997. The changes will incor- porate Metro's functional plan require- ments for parking, minimum density, re- source protection, and transportation connectivity. • Annexation of land outside the City's limits is temporarily uncertain. The pas- sage of Ballot Measure 47 limits the tax rate for land to be annexed without a vote of those living within the area of annexation. The City does not want to annex land unless those in the area to be annexed pay for services at the same tax rate as citizens already in the City. The City will be spending a considerable amount of effort reviewing ways to en- sure the costs of annexation are spread equitably. ' • Tigard's City Council has set as a goal for itself the development of a plan for the 'figard's downtown area, around Main Street. A-15 1XIM17 31111111111,11111 SIMI NI 101501 pill 11 11~~ 2. Land Use in Tigard • Commercial-Professional (C-P) areas Tigard's Comprehensive Plan, adopted in are those deemed most appropriate for 1983, sets the framework for land uses in the professional offices and related land City of Tigard. Tigard has five general land uses. This designation requires a use designations: Residential, Commercial, higher percentage of landscaping. Industrial, Public Institutional, and Open • The Central Business District (CBD) Space. 50% of the land within Tigard is designation allows high intensity designated for single family land use. 17% mixed uses and 40+ dwelling units per is designated multi-family use, 18% is acre in the area of Main St., south of commercial, and 15% industrial. Pacific Highway and west of Hall Residential lands are divided into Low, Boulevard. Medium, Medium-High, and High Density • The Community Commercial (CC) designations. zone is a new designation, adopted in • Low Density Residential is primarily 1993, that was established with spe- for single-family uses, 1 to 5 dwelling cific design and building size limits to units per acre. The corresponding be applied in very limited circum- zoning designations are R-1, R-2. R- stances. 3.5, and R-4.5 zones, which limit The Mixed Use Employment (MUE) minimum lot sizes from 30,000 to designation was adopted in 1996 for 7,500 square feet respectively. the Tigard Triangle area. It allows a • Medium Density Residential zoning variety of commercial, industrial, and allows both single family and small residential uses and is intended to multi-family developments. Zoning provide opportunities for redevelop- designations R-7 and R-12 allow 5,000 ment. square feet lots and up to 12 dwelling Industrial land is divided into Light and units per acre respectively. Heavy Industrial areas. • Medium-High Density Residential al- • There are two Light Industrial desig- lows from 13 to 25 dwelling units per nations, Industrial Park (I-P) and acre (R-25 zone). Light Industrial (I-Q. These areas, • High Density Residential allows from mostly near Interstate 5 and Highway 25 to more than 40 dwelling units per 217, allow for industrial manufactur- acre, in the R-25 to R-40 zones. ing, processing, assembly, packaging, There are six separate Commercial desig- as well as some office and retail use. nations. • The Heavy Industrial (I-H) designa- • Neighborhood Commercial (C-N) al- tion allows for more intensive manu- lows small commercial and personal facturing and production uses. The service activities for nearby residents. only area zoned I-H in Tigard is on • General Commercial (C-G) allows for 72nd Ave. north of Bonita Road. auto-oriented and related general retail The Public-Institutional designation and service uses primarily along major covers schools and other public facilities, roads. and the Open Space designation applies to areas designated for retention in a natural A-16 MMMM ' ' `CITY of TrGAR~ i 1 zoning ©iSin~ts , j ~ 1 1' I t , ~ l tl } ~ 1 ' 1 1 ~ 1~ Nt1Al ' t , 1 I I r I I~~, I t ~ t RESIDE coMMtiRG1Al It I 1 t I 1 ' ' US`RIAt r , `I.Iri I 11 & 1 , u tit 1 7_ r 13 1 r 1. P° J t \ ..1. \ It 1 I ~ .1► , ; ~ ! ~ 11 `111, l~l i', • , ~ r I 1 ~ 1 1 1 i~ It• ~ 1 1 t J~t t r" ~ ~ t •~,•N CIiV OF i{GARD } 111 , 1 r~ Zo„Easw hl'R 2IS+o1 state, such as floodplains and open spaces, Where are we going? and for recreation areas such as parks. • As land becomes more scarce, the Land use issues in Tigard today primarily pressure to develop previously vacant revolve around compatibility of proposed land increases. Most of our easily de- uses with surrounding uses in an area. veloped land has already been devel- Changes in land use designation can only oped, leaving land that often has occur if criteria can be shown to be met physical constraints such as steep during a public hearing process. Develop- slopes, wetlands, and floodpWns. meat of a specific parcel can only occur if . New standards adopted by the City, development standards such as setbacks, Metro, and the Unified Sewerage landscaping, utility, street, and other stan- Agency will help to protect natural dards are met. and water resources. They will, how- ever, make development projects Spotlight: Acres of Buildable Land by more complex and difficult to com- Zoning Classification, City of Tigard, 1996 plete. Vacant ® The Tigard Triangle, with its new Residential Zones Acres Mixed Use Employment zoning, will evolve into an area of mixed devel- R-1 30,000 SF minimum 3 opment that includes retail business, R-2 20,000 SF min. I offices, and housing. R-3.5 10,000 SF min. 40 R-4.5 7,500 SF min. 225 R-7 5,000 SF min. 45 R-12 12 units/acre min. 110 R-25 25 units/acre min. 83 R-40 40 units/acre min. 0 Commercial C-N Neighborhood 8 Commercial C-G General 61 Commercial CBD Central Business 4 District C-P Professional 74 Commercial Industrial I-P Industrial Park 76 I-L Light Industrial 30 I-H Heavv Industrial 1 A-18 e 0 3. Neighborhoods i middle and lower income households often QUICK FACTS face serious problems in doing so. In the Portland metropolitan area, average house- In 1990, the City of Tigard had 12,008 households. hold income increased by 50% in the years Of these, 58% were owner-occupied and 42% were 1983-1996, while housing prices increased renter-occupied. by 115% during the same period. Home The average sale price of houses in the City of Tigard ownership is thus becoming less affordable was $140,000 in June 1996, which is $66,000 more in this area. Om it was 10 years before. The housing prices listed in the Quick The average rent in this area in Fall, 1996 was $719. Facts section (above left) illustrate that most new housing in the area, whether for owners Where are we now? or renters, is designed for a fairly affluent Tigard's neighborhoods reflect a variety of segment of society. Many respondents to income ranges a,fd housing quality. The the Community Survey believe that afford- City has very new neighborhoods, such as able housing negatively impacts the charac- the Bull Mountain area, and older neighbor- ter of Tigard's neighborhoods. hoods, such as the Greenburg Road and Affordable housing is defined as rent (or Northeast Metzger areas. house payments) plus utilities not exceeding During 1986-1996, a total of 3,856 single 30% of a household's gross monthly in- family home building permits and 2,070 come. In 1994, an annual income of multifamily building permits were issued $22,000 for a one bedroom unit, $25,000 for (see Spotlight chart, bottom of page). There a two bedroom unit, and $30,000 for a three are about 507 acres of vacant land desig- bedroom unit was needed in order to live nated for residential development in Tigard. "affordably" in Washington County. Ac- cording to County Housing Services, Low and moderate income housing "anyone employed at an hourly wage of less Upper and upper-middle income house- than S 10.64 generally cannot afford housing holds generally have little difficulty finding in Washington County." the kinds of housing that they can afford, but SPOTLIGHT: Residential Building Activity in Tigard, 1979-2001 1000 8~U i ®multifamily units 700 I0 single family units 600 = 500 400 6 300 Z 200 100 0' n ri C N ? • • • • • O n oo m oN 0 r1 v1 00 C, 00 00 00 cc cc 00 00 01 01 o, c~ a r 00 a, c a. 01 C, a c~ c~ c+ c a C, c a a c~ c~ c~ a € c g o Year - - - - - - = - - N N (*=projected numbers) A-19 Tigard's median income in 1989 was 14-bed homeless shelter at the United Meth- $35,669 (see the Community Survey for odist Church in Tigard, and is currently on more discussion of this). As of 1990, an es- track to build a new 30-bed facility oa timated 8,400 Tigard residents, or 29% of Greenburg Road. the city population, lived in households with The inclement weather shelter at the Water total incomes below $28,535 (80% of me- Building was not offered in 1996-97 because dian income) and were considered low and IOS, which ran the program, decided to fo- moderate income persons. However, as of cus limited staff and financial resources on 1990 there were no geographic areas in Ti- its new facility. gard classified as low-moderate income Where are we going? (with 50% or more of the households in the -moderate range). ° Land prices will probably continue to low In 1993 a grassroots community develop- increase. As a result, low-moderate in- In corporation, Cu-nmunity Partners for come housing will be more difficult to find in this area. Affordable Housing (C'PAH), was formed to address the lack of affcrdable housing in the ° As land prices continue to increase, the Tigard/Tualatin area. This is Tigazd's first types of housing being built will change. locally based effort to create affordable Duplexes and row houses will become housing. As its first project, CPAH pro- more common. poses to acquire an 84-unit apartment com- ° The Metro 2040 Concept will result in plex in Tigard and operate it as subsidized greater amounts of infill development. housing. Infi11 occurs when large lots containing CPAH estimates that there is a deficit of one home are divided to accommodate 3,000 affordable (low-moderate income) more homes. units in the Tigard-Tualatin area, and that ° The City of Tigard will continue to have 97% of all the rental units in the city are not good neighborhoods to live in and raise affordable to very low income households. families. As home prices rise, many As of 1994, there were 3,059 households on residents will choose to make improve- the county Housing Services waiting list. ments to their homes rather than move. Most applicants for housing assistance wait from two to four years before receiving as- sistance. Homeless According to the Washington County Community Action Organization, members of families with children make up about 2!3 of homeless persons. A 1994 City-appointed Homeless Task Force concluded that the number of homeless shelter beds in eastern Washington County was "totally inade- quate." The Task Force recommended im- mediate action to facilitate the siting of an additional permanent homeless shelter. In- terfaith Outreach Services (IOS) operates a A-20 4. Local Economv commute into the City. This also means that Where are we now? 11,939-or 75%-of Tigard residents who are employed work outside of the City. Tigard's economy has been growing along with that of the larger Metropolitan Spotlight: ''igard's largest private and region since the recession lifted in the mid public employers. 1980s. In the period 1986-1996 new com- (ranked by 1996 full-time Employees) mercial and industrial development in Ti- Private: gard totaled over $290 million in 194 proj- 1. Precision Interconnect (683 employees) ects. These projects have created or will 2. Nordstrom (503) create a total of about 9,290 permanent jobs. 3. US West Direct (340) Spotlight: Employment in the Tigard area. 4. Farmer's Insurance (325) 5. Coming Clinical (318) The 1990 US census recorded 15,686 6. JC Penney Co. (300) employed Tigard residents. Some of the 7. Fred Meyer (260) major categories of employment were: 8. Costco Wholesale (251) a Retail trade (17.4% of jobs). 9. Coe Manufacturing (236) • General services (17.1%) 10. FLIR (330) Y Manufacturing (16%) Public ® Finance, insurance, real estate (11.8°.'0) 1. Tigard School District (604) o Health services (7.91/•0) 2. City of Tigard (187) O Wholesale trade (6.5%) 3. US Postal Service (120) Education (6°'0) The Spotlight chart above lists the largest Construction (5.1 emplovers in Tigard. Taken together, the 78 largest employers in Tigard (which is all of o Asriculture, forestry, or fishery (1.8%). those that employ over 50 people) employ Tigard has more financial and less major 9.837 people-about 42% of the jobs in Ti- manufacturing employment than the Wash- gard. This illustrates the balance between ington County average. A major reason for large and small business in Tigard. this is that Tigard lacks the extensive tracts According to a business census, there were of available industrial land required to at- 326 retail stores. 169 wholesale businesses, tract major industrial facilities such as com- 460 service businesses (such as hotels, auto puter manufacturing plants. The inventory repair shops, legal services, and engineers), of vacant land designated for future com- and 104 manufacturers in the City of Tigard mercial and industrial growth in Tigard is in 1992. relatively small; as of mid-1996 there were Where are we going? 147 acres of land zoned for commercial uses oThe Metro 2040 plan will result in busi- and 107 acres of land zoned as industrial still available for development in Tigard. ness and shopping opportunities being lo- cated closer to where people live. The 1990 Census identified 23,415 per- ,Washington Square will continue to be a sons working in Tigard. Of these, only 3,747 were Tigard residents. This leaves major shopping mall. However, it will evolve into a true regional center, with 19,668 persons who work in Tigard and housing nearby and good pedestrian access. A-21 MAIL Issues • City policy 6. 1.1 states: "the city shall • Tigard grows by annexation as well as provide an opportunity for a diversity of by infill. How can the City plan for fu- housing densities and residential types at ture annexations so that they do not have various prices and rent levels." How- negative impacts on our community? ever, the City is a minor player in the • The growth in Tigard-area jobs is antici- provision of affordable housing, com- patd to be in the service industry. pared to federal, state, county, and local Salaries in the service industry are not non-profit agencies. Should the City do keeping pace with housing costs, espe- more to help promote affordable and cially in the Tigard area where housing homeless housing? costs have traditionally been above the • 29% of Tigard's residents live in low regional average. What role, if any, and moderate income households. Can should the City have in addressing this Tigard have more affordable housing issue? while still maintaining the basic charac- • It is estimated that 58% of the people ter of its neighborhoods? What can the who work in Tigard are employed by community do to address affordable businesses that have under 50 employ- housing issues? ees. Local and small businesses are an • Metro's 2040 Growth Concept encour- important part of our community and our ages site and building designs that utilize economy. What can the community do smaller lots for single family housing. to retain and assist these businesses? However, Tigard is already quite close to meeting these standards (see p. 3). How can we iirYlsment the 2040 plan while protecting the character of new and es- tablished neighborhoods? • How can we ensure that there is effective public involvement in land use decision- making? A-22 P AOL ■r I'Mom Introduction by 15% from 1995 to 1996. Total calls for Safety is one of the most important police response rose from 40,180 in 1995 to components of quality communities. A5,403 in 1996, a 13% increase. In the last The threat of crime can turn even the five years, Tigard's population has increased best community into an unpleasant place to by over 15%, but crime rates are increasing live. In the last 30 years, Tigard has changed faster than population (see Spotlight, below). from a small town to a denser urban setting. Public safety providers in our community This has meant higher crime rates, increased are responsible for more than just the 36,000 population, and more traffic-each providing people who live in Tigard. The following a definite challenge to public safety. examples illustrate the pressure that Tigard's Keeping communities safe is perhaps the large working. shopping, and commuting most basic function of government. Tigard's populations place on our community's re- public safety agencies have grown along with sources: the city in the last 30 years. We now have in o The Washington Square Mall had an av- place an integrated public safety network erage daily population of over 50,000 in which provides specialized response to a 1996, and about 25% of Tigard's crimes were wide variety of emergency situations. committed on mall property. Police services are handled by the Tigard m Each day, approximately 50,000 vehicles Police Department, while fire and rescue pass through Tigard on Pacific Highway, and services are performed by Tualatin Valley over 100,000 vehicles use Highway 217. Fire & Rescue (TVF&R). The City's Public Together these two state-controlled highways Works Director is responsible for emergency accounted for 42% of the Tigard's 1,715 re- management response in the City of Tigard. ported accidents in 1996. Washington County coordinates regional As we plan for the future, it will be valu- emergency response. able to keep in mind the impacts that Tigard's As the City and surrounding areas continue regional attractions and highways have on to grow, so will the demand for public safety our public safety services. services. Bucking national and statewide trends of decline, reported crime in Tigard increased by 51% in the past five years and Spotlight: Population compared with reported Crime and Activities in B'igardJ992-11936' % Change, 1992 1993 1994 1993 1996 1995-1996 Tigard population 31,265 32,145 33,730 35,002 36,083 +3%:. homicide 0 3 0 0 1 +100% rape 11 3 5 5 7 +40% drug violations 49 42 52 86 '77 -100/0 motor vehicle theft 145 138 160 205 205 0 assaults 198 164 249 256 197 =23'A burglary 357 274 321 290 378 -+-301. fraud/forgery 188 214 186 324 444 +37p/o vandalism 592 586 587 544 578 +6% reported accidents 635 604 816 1,250 1<,715: +37% theft 1,710 1,801 1,850 2,13.1 2,419 +1 3Vo arrests 1,673 1,695 1,811 1,953 2;487 '1270/6 A-23 Introduction (cont.) "If I could change anything, I would In 1994, Tigard voters approved a new tax eliminate crime, especially among kids- base which would have added 15 new police pot, drugs, alcohol, tobacco. That would officers,.,ver 5 years. However, cutbacks in take care of a lot of our problems, espe- anticipation of Ballot Measure 47, the prop- cially as our kids grow up and take their erty tax limitation, have put a hold on hiring place in society. It's a big problem and I these additional officers. Tualatin Valley Fire & Rescue is preparing for a loss of up to one- have no solution." quarter of its revenue. - 39-year resident These budget cutbacks will place extra stress on Tigard's public safety system. As stated before, public safety is a critical part of the "When we first moved to Tigard 24 years livability of our community. Finding creative ago we didn't have to worry about crime, and effective solution, to our public safety gangs, or traffic. We were more relaxed. problems will be an important task in the up- We're not relaxed anymore!" coming years. This chapter of the Community Profile de- - 24-year resident scribes how police, fire, rescue, and emer- gency management services are provided to the community. It also contains discussions of "Crack down on bike thefts somehow, current activities and trends, and some of the someway. Maybe we could have a issues facing our community. Citywide bike registration day. Too many kids around town are having their bikes stolen." - 4-year resident of Tigard Community Voices "How about better night time lighting to " deter crime and more police involvement I wish I didn't have to have alarms in in the drug traffic that occurs near my car and my house. It's just not a nice schools?" way to live'`' - 18-year resident - 6 year resident "We need to make sure that gang activity is constantly monitored. Luckily we have an excellent Police Department to do this." - 18-year resident A-24 Police Services Where are we now? 1. Policing strategies The Tigard Police Department provides a Spotlight: The Tigard Police Depart- full range of law enforcement services includ- ment's involvement with Tigard's youth ing traffic enforcement, criminal investiga- tions, and code enforcement. Juvenile Veer Court The Tigard Police have adopted a commu- This program offers a chance for first-time nity policing strategy and run a wide variety of young offenders to avoid the serious implica- programs which expand the role of citizens in lions associated with formal entry into the making their community safer. These pro- criminal justice system. The juvenile goes grams include: through a "court" hearing that is judged by a jury of the offender's peers, which includes e Neighborhood Watch, a citizen program in former offenders. The sentences often include which residents take a greater responsibility restitution, community service, and service as for patrolling their neighborhoods and report- a juror in the future. If the juvenile complies ing suspicious activities. with the sentence, all records of the infraction • The Block Home Program, another citizen are destroyed. Otherwise, they are referred to program, in which advertised "safe" houses the criminal justice system for prosecution. are made available for kids to go to when they The following programs are currently sus- need help. pended due to budget cutbacks: e Neighborhood Patrol, a police program of D.A.R.E. randomly patrolling neighborhoods. (Drug Abuse Resistance Education) o Citizen's Police Academy, an eight week, Since January 1990, over 4,000 Tigard stu- semi-annual program that increases under- standing between citizens and the Police De- dents have received D.A.R.E. training at Ti- partment. The academy makes it easier for gazd Middle Schools. This program, which is citizens and Police to work together to resolve partially funded by community and business neighborhood problems. donations, informs students about the risks of drugs These citizen-oriented programs are effec- and teaches them how to make intelli- tive ways of enhancing public safety while gent choices. reducing police costs. G.R.E.A.T. (Gang Resistance Education and Training) This program, directed at middle school stu- 2. Personnel and duties The Police Department has two types of dents, is designed to give juveniles the tools to make better sworn police officers and civilian per- choices in life. In Tigard, it brgan in 1996 at Fowler Middle School, and was sonnel. Sworn officers, who are authorized to slated to expand to Twality MS this year. Be- carry firearms, make up 50 out of 62 current fore this program was suspended, about 600 Police Department employees. The majority Tigard students were scheduled to go through of sworn officers are assigned to patrol duties, tte 9 week D.A.R.E. training in the 1996/97 with the rest assigned to investigations and school year. administration. At any one time there are a minimum of three Police patrol tears on the streets of Tigard. A-25 0 Police (cont.) 3. Funding Civilian police personnel currently includes The 1996-97 budget for the Tigard Police tern support staff and two community service Department is just over $5.1 million. 99.9% officers (CSOs). The CSOs have dual re- of this money comes from the city's general sponsibilities: in addition to taking minor fund, which is largely derived from local criminal calls and traffic accident reports, they property taxes. Almost half of Tigard's gen- also handles City code enforcement. The CSOs eral fund is spent on Police services (see chart, work very closely with the Planning and En- below). gineering Departments to enforce code vio- lations related to business licenses and regu- City of Tigard General Fund Expenditures, lations, health and safety issues, building and 199611997 Fiscal Fear construction violations, streets and sidewalk problems, zoning issues and vehicle and Adminis- Other traffic complaints. Some of the most com- tration 7% mon code enforcement issues are tree re- 14% Police moval violations, open storage of debris, Development 47% abandoned vehicles, and visual clearance 13% problems. Maintenance Library In addition to paid staff, the Police De- 7% 1 r partment maintains the Police Officer Re- serve. This group of well trained sworn vol- unteers (currently 10) assist the Police De- The City of Tigard anticipates a loss of up to partment in many ways, inOuding answering 20% of its general fund revenues in the calls, providing security at crintc scenes, and 1997/98 fiscal year when Measure 47's tax transporting prisoners. They also coorlinate limitations take effect. The state legislature the City's annual food and toy drive for needy will need to make several key decisions about families. the implementation of the measure before the Five police staff positions are currently fro- details get any clearer. The City of Tigard, zen vacant as a result of the effects of Ballot however, is cutting budgets in the remainder Measure 47. The following table provides a of this year in order to save money for summary of Police Department staff and the 1997/98. effects of this hi.;ng eezc. Tigard Police DeRaartment Staff Budgeted Currently Frozen in 1996-97 filled vacant Sworn officers Patrol 41 39 2 Investigations 11 10 1 Crime Prevention 1 0 1 Administration 1 1 0 Civilian Support staff 10 9 1 CSOs 2 2 0 Total 66 61 S A-26 WINE Police (cont.) Where are we going? • The Tigard Police Department works • Crime rates in Tigard have risen quickly closely with the Washington County in the last few years (see Spotlight, p. 1). Sheriff's Office, the Oregon State Po- For example, while Tigard's population lice, and the Police Departments of Lake grew about 3% from 1995 to 1996, the Oswego, Tualatin, and King City. There theft rate climbed 13%. At the same are agreements with neighboring cities time the traffic accident rate climbed to provide response in emergencies if the 37%. This trend may continue in the "home" jurisdiction. cannot respond future. quickly enough. Agreements such as these may become more important as • It is estimated that 300 single family police department resources are stretched thinner. units and 600 multiple family units will be built in Tigard in 1997. At Tigard's current average of 2.3 people per house- hold, this building activity translates to over 2,000 more people in Tigard by the end of 1997. The Oregon state average is 1.5 Police Officers per 1,000 resi- dents.. Based on this standard, Tigard would need to add 3 new officers in 1997 (in addition to filling the five cur- rent vacancies) just to stay even with population growth. off A - 27 Police (cont.) Issues • Tigard's communities may be safer than • Police programs face cutbacks from the statistics presented in the chart on page Measure 47's property tax limitations, due 1 at first suggest. As discussed on page 1, to their heavy reliance on property tax up to 25% of the crime in Tigard occurs at funding. At the same time, our commu- Washington Square, and almost one-half nity continues to grow. What is the best of traffic accidents occur on state- way to provide effective police services controlled arterials through Tigard. Is with decreased resources and significantly there a need to refocus policing strategies increased demands for service? or funding sources in light of this infor- • Community crime prevention and public mation? Are there any ways to acquire education are important components of re- funding from the regional or statewide ducing crime in a community. What is the populations that are behind these trends? best way to continue to provide these pro- • More than 40% o: the traffic incidents that grams in the current economic environ- the Tigard Polic(; Department responds to ment? are on state-con aolled roads such as Pa- • School Resource Officers provide many cific Highway (99W) and Highway 217. services to Tigard schools and students. The Oregon State Police have stated that The program is threatened with elimina- they are unable to provide police services tion by funding reductions. Therefore, if on these roads within the city limits of Ti- we want to continue these programs we gard, Beaverton, and other metro-area ju- will need to find new funding sources. risdictions. Should the state play a larger What role should the School District play role in policing these roads? If so, what in funding this program? role should they play and how cen Tigard • Gangs have been and are a threat to the bring it about? • The Police Department responded to 2,541 community. A police officer position as- signed to gangs has been eliminated be- residential and commercial security alarms cause of the lack of funding. What should in 1996, a 13% increase over 1995. Ap- be done to address the gang issue? proximately 99/0 of these were false alarms. Each alarm requires multiple re- public What is the community's responsibility for sponse, taking 10-30 minutes of each offi- public safety and crime prevention? Have cer s time. Is there a better way to deal I community policing programs been effec- with security alarms? tive ways to strengthen public safety? Can citizens help continue some of the pro- grams being eliminated or cut back? A-28 2. Fire & Rescue Services Issues Where are we now? • Are our communities safe enough from the Tualatin Valley Fire and Rescue (TVF&R) risk of fire and adequately protected by is an independent regional government district emergency rescue services? If not, what created in 1989, covering northeast Washing- needs to change? ton County, northwest Clackamas County, and + Traffic and transportation improvement the western edge of Multnomah County. It is activities impact emergency services. For the basic emergency response provider in this example, neighborhood speed humps slow area, providing response to fires, fire alarms, down emergency vehicles, as does traffic hazardous material spills, rescue situations, congestion. We need to keep the emer- medical emergencies, and more. gency services providers active in discus- In 1995, TVF&R answered more than 3,300 sions on traffic issues. calls from Station 221 in Tigard (one of 21 • Tualatin Valley Fire and Rescue, just like stations). This includes fire engine, rescue, every other local govemment, is preparing and volunteer squad responses. The majority for the impacts of Measure 47. Can their of the responses (over 2,000) were medical budget be cut without negatively impact- calls, ranging from automobile accidents to ing emergency service provision? If not, cardiac arrests to drug overdoses. can we live with decreased levels of emer- TVF&R also conducts fire prevention edu- gency services or will we need to find al- cation in schools, businesses, and private temative funding sources? homes; maintains a regional training facility o Our area continues to grow and require for emergency response; and runs a Chaplain more public safety services. How can our program providing counseling and immediate community find long-term, stable funding financial help for emergency victims. It helps sources to ensure uninterrupted services at maintain and distribute smoke detectors. the levels we require? TVF&R works closely with other governmen- tal agencies and with the emergency services of neighboring jurisdictions to provide opti- gp®gOjght• TVF&R Station 227 mum service. Responses, 1992-1995 TVF&R operates on a property tax levy of 2500 $1.52 per $1,000 assessed value. This rate has o a 2000 declined several times recently as a growing 0 n1500 ®engine area of coverage allows increased efficiency. 9 c 1000 The effects that Measure 47 will have on z e: 500 o rescue TVF&R's budget is uncertain; for now there is 0 ovolunteer a hiring freeze, and the agency is preparing for 1992 1993 1994 1995 the loss of up to one-fourth of its budget. (note: rescue 221 was out of service for 5 months in 1995) A-29 gip 3. Emergency Management Services Where are we now? An.Emergenzy.is.define in national standards as "any Each city in Washington County is re- hurricane, tornado, flood,, high water, wind: driven water, sponsible for its own Emergency Man- tidal wave, tsunami, earthquake, volcanic eruption,`land agement service provision. The Office of slide, drt ught,Tliirie, explosion, or other catastrophe which Consolid rted Emergency Management of requires emergency assistance to save.lives and::protect Washington County provides County- public easlth and safety, or to avert or lessen the threat:of wide coordination of Emergency Man- major disaster,`? agement. The City of Tigard is respon- sible for planning for and responding to emer- equipment, personnel, procedures, and commu- gencies and hazards which threaten our com- nications in a common organizational structure. munity. This allows better management of resources to The City of Tigard Public Works Director effectively respond to an emergency not only in handles the day-to-day responsibilities for Tigard, but in all parts of Washington County. emergency management programs, training, It is important to know our history, vulner- preparedness, response, recovery, and coordina- ability, and probability for these incidents when tion with other districts. He works closely with planning for emergency response. The Spotlight the Police Department and other staff and volun- chart below shows information on a few emer- teers to plan for and train for emergency re- gency situations. sponse. Tigard's City Hall and the Water Building are The City of Tigard has hazard plans in place equipped with generators that can be used in an for the following types of incidents severe emergency. The Water Building is the City's weather, haz- , potl glut: `Assessments sif 7~igairc's; mergency!Risk ardous materials Type of Eine eta xatiap➢es:: Tigard's Vulneyr- Probability,af incidents, utility Abrlrtv::to event event: in Tigard. failures, earth- Floodeb:'.`9b, Jan. `97' High High quakes, volcanic E q e Minor recently in. High Moderate eruptions, this floods, civil dis area orders and ter- Hazardous Materials Spills on freeways Moderate High rail lines rorism, transpor- tation and Indus- Volcano Mt. St. Helens,.. Moderate Moderate May 1980 trial incidents, primary Emergency Operations Center for city- fire, nuclear attack, and public health epidemics. Most recently, these plans have been used in wide emergencies. severe weather and flood situations. They are also used to educate people and plan for future emergencies. All jurisdictions within Washington County have made the commitment to train their staff and volunteers to use the same command struc- ture so that when there is an emergency, all par- ticipants will understand the process. This process is called the Incident Command System (ICS), and it helps to combine all facilities, A-3o Emergency services (cont.) Issues • Several Metro-area cities have full-time • There is a need to better educate citizens in staff positions for emergency manage- the community about how they can be ment. Does Tigard need to consider this prepared for emergencies and what they or other ways to place more emphasis on should do in case of an emergency. We emergency management? also need a broader group of volunteers who can be called on in emergencies. How can these needs be fulfilled? 0 With limited funding available for emer- gency planning, response, and recovery, how can the City ensure adequate plans are in place and have been practiced suffi- ciently to be effective in emergency situa- tions? A-31 OMNI ® Q - O ~ _t on rds go t Introduction Other families choose to educate their S chooss and education are an impor- children at home. Tigard has an active tant part of any community. The homeschooling community, with 178 chil- education of children helps them to dren being educated at home. become informed, productive members of Many families in our area use day care society. In this way education is an in- programs, which enable parer 's to work vestment in the future of our community. increased hours while still providing a For adults, education can continue long good environment for their children. after high school, and can contribute to There are at least 15 child care providers continued happiness and growth through- in Tigard, such as the Northwest Montes- as. out life. Tigard's citizens take advantage sori School, the Learning Tree Day of a wide variety of educational opportu- School, LaPetite Academy, and Kid's nities, both in Tigard and in the broader Kampus Metro region. Portland Community College's Sylvania The Tigard-Tualatin School District is campus, located just northeast of Tigard, is the largest education provider in our com- a valuable resource for our community. munity. It has about 10,800 elementary, PCC offers a full schedule of classes in middle, and high school students enrolled more than sixty disciplines. The mix of in 14 schools. Approximately 915 Tigard university transfer courses, professional children attend Beaverton schools. The technical programs, and college success Beaverton Schooi District is the third larg- skills courses attracts more than 12,000 est in Oregon, with almost 29,000 students studeru,~ per quarter. enrolled in 41 schools. Tigard's adults are also able to take advantage Spotlight: Tigard-Tualatin School of many other colleges and universities around the Portland Metro District Enrollment History region, including Reed C^!h~ge, Port- 12,000 land State University, Lewis & Clark 10,000 College, the Oregon Graduate Insti- 8,000 tute, and the Oregon College of Art 6 6,000 and Craft. 4,000 There are several professional 2,000 schools in Tigard, including Execu- 0 train and Phagan's Tigard Beauty 1969 1979 Year 1989 1999 School. ~ 1•.„ Several organizations in our com- There are several private schools in Ti- munity provide community education pro- gard, including St. Anthony's Parcchial grams, including the Tigard Senior Center. School, Gaarde Christian School, and the The Senior Center hosts a variety of PCC "Westgate Christian School. A total of ap- classes, such as Spanish, Yoga, Calligra- pmximately 720 students, from grades K- phy, Painting, and Birdwatching. The 12, are ez'-oiled in these schools. Tuitions senior center also has 38 volunteers who teach English as a Second Language range from S 1,630 to $2,730 per year at classes. The senior center is the site of r + 3 these schools, depending on age. '~1~ F~ 3 2 r,r' , several community group meetings, in- cluding the Stamp Club and the Garden "Have Tigard children go to Tigard Club. schools. I think it's horrible that we The Tigard Public Library, discussed in have to send our children to Beaverton the Urban and Public Services chapter, schools. You all want us to be a com- offers some community education pro- munity, but how can that happen with grams, such as computer training and fi- our kids going to schools in nancial planning. Literature-based pro- Beaverton. grams are offered for children beginning at -37 year resident the age of two. These programs set the "I'm not sure what this CIM and CAM stage for developing reading skills. are. Can't schools just teach my kids to "Summer reading" for children and teens read and write well?" keep reading abilities high through sum- -.i year resident mer months. Adult literacy tutors provide regular classes, using the Library's special- "The schools are chronically ized "learn-to-read" collection. The Li- underfunded these days. Don't people brary's computers are open to use by the want their kids to get as good an public for research on databases and the education as they got themselves?" Internet. -39 year resident The variety of programs described in this "I keep hearing the schools complain section attests to the value that our com- about big class sizes, but I don't think munity places on education. All of our that has anything to do with good educational providers play an important education." role in the future of our community by of- -1 year resident fering a variety of educational experiences to residents. The Schools and Education "I'm concerned about my son's safety at chapter of the Community Profile focuses school, but is there really much danger on the Tigard-Tualatin School District, but here or is it mostly in the schools in it is important to remember that this is Portland?" only one part of Tigard's education net- -8 year resident work. "Why are t' a school Safety Community Voices programs n1w7ys Cv. first things that "Our schools can't handle the number get cut? ArenIt :he as important as liceping th -Costeo paridug'ot szre?" r c• children coming inta the area daze to ,ear r.-sident a building. Bmild nev/ schools at t;!e de- ZA velopet-s' expenst.. Leave taxes, lode: ~ ,.M, ~s- lo9~th get a good r fi:^n=sir citiTeaa and tax the sxsrr ~ ^,lii::.a iAt Ta?raral Rlgla.:9,'ust keep Y buil}:rigs more." up, ~?.3tYi' aSai3Cye' 7 ---J!? .year resident Z year resident slur schools Bann t aana' e ter ,tai "I tbirak school sport teems reakly bring J i t h o u t i:ew scoU 'C+ef, 0f fl,,r!ali,Ig...`9 We ids! T s.,•d togetbes° numc:taan::s. Is it sia•:ze -r f t need snore recrr.atir►rllial fu.rali es for that W& Liz ve to pay to he cia 'era kid s."- 'year resident nc~v?:~_.-~l4 year resident y A-33 • ~f:F '~.G rST 77 7 C` Jm t r r~'~~ , ' r r 1 ,qr T ! ! !11 ~y;44ryyJ.. ro11 "~s,' n~IUl~w,l,(y// y/Qf Y 7r; {f~ry^rf'yr 5~{ a /~a !(yf r~ i~}/, !l/ n 7 ~N(\'a'Y!![+lll~~+..erkr.+~h,•~f!`br~ ✓.7AJe.'er~~/G~~m±~.7~: dc.lii.n ' ~/I .A6!/.'i;°::l Experiences in Career Education (CE2) Tigard-Tualatin School District program. Other businesses have formed The Tigard-Tualatin School District was partnerships with individual schools, pro- founded in 1969 by the unification of five viding employee volunteers and/or school smaller school districts. In addition to Ti- supplies and equipment for educational gard and Tualatin, it includes Durham, programs. Metzger, King City, and Bull Mountain. High School students have access to a Where are we now? variety of electives at the high school level The Tigard-Tualatin school district is the including oceanography, computer graph- eleventh largest in Oregon and the sixth ics, Japanese, and Calculus III. Bond largest in the Portland Metro area. It in- measures approved in 1995 and 1996 al- cludes two high schools, three middle lowed the district to wire all of its class- schools, nine elementary schools, a swim rooms to computer networks, and connect center, and an alternative education pro- all schools to the Internet. Schools are gram. There are 3,136 high school stu- currently purchasing computers in order to dents, 2,557 middle school students, and provide a ratio of one computer per five 5,095 elementary students enrolled in the students. district in the 1996/97 school year. The District offers a variety of profes- The Tigard-Tualatin community gives a sional and technical classes, including great deal of support to its schools. In child care services anti hospitality/ tour- ton more than 3,500 community mem- ism. Tigard-Tualatin is the only school bers volunteered a total of almost 119,000 district in Oregon to offer the International hours in district classrooms. Volunteers Baccalaureate (IB) Program at both high averaged over 33 schools. IB is a challenging program for Spotlight: Who volunteers total hours of time highly motivated students in which stu- in Tigard-Tualatin Schools? each. Volunteers dents complete a rigorous curriculum, are ° include parents tested against students from around the Parents 91.4 /o serving on school world, and are measured according to in- Senior Citizens 4.7% site councils, ternational standards. Community Members 2.3% senior citizens High School students can participate in who volunteer extracurricular activities such as drama, Students 1.6% weekly to help choir, band, Future Business Leaders of students read, businesspeople who share America, speech and debate, yearbook, their knowledge with high school econom- and newspaper. About half of high school ics classes, community members who are, students also participate in comc< tit,~,e r "lunch buddies" with elementary school athletics. Since Ballot ivieasu7e 5 was students true a v;eel., and mu ;h more. passed in 1993, students na.~ ps.,;d .°:100 1. About 86% of the volunteered ti rile was fees to participate in ,;hoof sports i ro- scent in ir?stnwtional and classxo:oin set- OR tines, ,,P h i4%, spent on ad,, isory slid or- grams. ~L ff The disLict after:; a!wrnati~cc edurat;o.. ganizatioc.1i f mcdons. programs at fife l.sz Ccntm/ A adenly, Ivione then 100 local businesses provide ~ EcLated i.rt the t+s'%{ 1';urhaz?;. ran-site vao;k expeiience for Tigard- bi.ilc;irlg. These prc3gt zTtis generally cffep r. Tualatin students through the Community smaller class slycs, indavidua. ized instr ac 34 tion, work experience opportunities, and Tualatin High even earned a perfect score flexible hours. Students can complete or on the SAT college aptitude test in 1996!) make up h;gh school credits, prepare for Graduates are regularly admitted to the the GED high school equivalency test, or nation's top colleges an universities. 68% take evening school courses. They are re- of Tigard High students and 75% of Tu- quired to be free of alcohol and drugs. alatin High students attend college directly The academy's alternative programs have after graduation. been successful at helping students at risk Oregon's Education Reform Act will of dropping out. change many aspects of traditional educa- Spotlight: Drop-out Rates tion. Beginning in 1999, high school sophomores throughout Oregon will earn 1994-95 1995-96 Certificates of Initial Mastery (CL). To Tigard High 7.2% 7.43% earn the CIM, students must pass state- wide tests and present satisfactory work Tualatin High 7.64% 5.60% samples. Beginning in 2001, high school Tig.-Tual. SD Avg. 7.42% 6.59% seniors will have the option of earning Beaverton SD Avg. 8.8% Certificates of Advanced Mastery (CAM). The CAM is based on even higher stan- State Avg. 7.23% dards of learning and will include a two- Traditional middle school programs al- year focus in a career area. low students to explore many different Tigard-Tualatin students will continue to subjects and try out new skills. In recent earn traditional high school diplomas as years, however, middle school programs well. have been cut extensively due to budget District Schools have begun many pro- cutbacks. The District's middle schools grams to prepare for the initiation of the no longer offer the variety of programs CIM and CAM programs, including: ti _-t were available before Measure 5 was implemented. An after school activity v Focusing on improving test scores by program-funded partially by a grant from annually reporting each school's the Washington County Commission for statewide test results and requiring Children and Families-attracts more than each school to set goals for improve- 500 middle school students per session. ment. Local day care services provide after Y Working towards meeting the second school programs at elementary school language requirement by offering after sites. Participating families pay fees for school Spanish classes for teachers. this service. Washington County Com- a Joining other Washington County munity Action offers a Head Start pre- school districts and corporate partners school program for low income families at to support the Capital Center altema- Phil Lewis Elementary. tive school program. This program Student Achievement provides "hands-on" work experience District students regularly score above in the areas of health, business man- state and national averages on achieve- an a nt, engineering, and manufactur- ment and aptitude tests. (One student at g technology. ' A-35 ,A • Collecting work samples in individual School District Staffing portfolios for students in all grades, and transferring those portfolios to the The Spotlight chart below contains a next school level as students move breakdown of Tigard-Tualatin School throughout the school system. District Staff. It also illustrates the changes in these numbers since Measure 5 o Introducing the Tigernet program, was implemented. The data shows that in which gives students experience repair- the last 3 years, staffing has not kept pace ing computers and computer networks. with the growth in student population. ® Joining other Washington County In the last year, the Tigard-Tualatin school districts to create an alternative School District has been home to the Na- middle school to provide an additional tional High School Teacher of the Year, option for students who aren't succeed- the Oregon Superintendent of the Year, ing in schools. and OMSI/OPB Science Teacher Award Student Achievement-Where are we Winner, and a Walt Disney American going? Teacher Award Winner. • The District is updating its School Improvement Plan; it will focus Spotlight: Tigard-Tualatin School Staffing on student achievement. Oregon 1992-93* 1996-97 % Change will soon be raising the standards Student 9,600 10,800 +12.5% for success on statewide tests. Enrollment • The success of alternative educa- General Fund $56.6 $56.3 -0.53% tion programs at the 21 st Century Budget million million Academy has led the District to consider formalizing them by Teachers 588.3 588.6 +0.05% turning the school into a third high Classified Staff 291.8 282.9 -3.05% school in the future. (Secretaries, 6 The District is considering pilot- Custodians, etc.) ing the "Success for All" program Administrators 40 33.75 -15.63% at one or two elementary schools. (Principals, Asst. This program provides a written Principals, etc.) curriculum and specifies certain * 1992-93 was the last year before full implementation teaching methods which have of Measure 5 budget cutbacks proven ef'ective in other locations. The program costs $50,000 to imple- ment and requires an additional staff member at each school to coordinate it. A-36 Growth In January 1997, the School District Since 1977, enrollment in the Tigard- completed a boundary change process de- Tualatin School District has nearly dou- signed to equalize enrollment among bled, from 5,660 students to 10,800 stu- schools and provide room for projected dents today. In the past 10 years, the growth. The relief will be short-lived, School District has opened Tualatin High, however, because by the year 2000 ele- Hazelbrook Middle School, a new ex- mentary enrollments are projected to again pended Durham Elementary, and has built reach capacity levels. additions to Bridgeport Elementary, Where are we going? Woodward Elementary, and Tigard High o Construction will begin soon on an to accommodate the rapid growth in our eight classroom addition and expan- area. In the fall of 1997, the new Deer sion to the gym to accommodate Creek Elementary School will open on growth at Tigard High. Bull Mountain. The opening of Deer Creek Elementary Construction will begin later this year at Tualatin High on a swim will help relieve overcrowding at the Mary center and performing arts center. Woodward and Bridgeport Elementary Schools. Both of these schools have ex- • The District is looking for future ceeded their capacities for two years and elementary and middle school sites. have had to turn away new students. The scarcity of available land and Many of the district's schools are at or high prices have made it difficult to near maximum capacity, as the Spotlight find appropriate sites. About $3 chart below shows. million from the 1996 bond measure has been set aside for this purpose. New schools cannot be constructed without a new bond measure. Spotlight: Tigard-Tualatin Schools. and Enrollments School Date Capacity 1996-97 Proj.1997-98 constructed enrollment enrollment Tigard High 1953 1500+additions 1,639 1,745 Tualatin High 1992 1500 1,497 1,607 Fowler MS 1974 900 892 848 Hazelbrook MS 1992 800+portables 832 802 Twality MS 1960 900 833 926 Bridgeport 1982 600+portables 697 669 Byrom ? 979 600+portables 652 543 Ch::ri%s F. T;ga,•d 1945 595 616 553 Dee. CAerk 1997 600 - 518 1989 600 577 591 N !.r~: = - 1965 550 423 558 N3j.1 Lewis 1951 600 264 closed Telnp?eta 1965 550+portables 582 600 o fu_-Jati . 1939 600 577 531 'Vo-. ward 1979 600+portables 707 560 A-37 CAVA Funding school districts across the state equal The Tigard-Tualatin School District's amounts of funding per student). This ap- general fund budget fell from $56.4, mil- proach gives additional money to under- lion in 1992-93 to $50 million in 1993-94, funded school districts and takes it away due to Measure 5. Since then, the school from traditionally well-funded districts district has been "flat-funded," with such as Tigard-Tualatin. budgets rising only in proportion to in- In 1996 and 1997, voters approved bond creases in school enrollment. The 1996/97 measures for the School District. These budget-$56.3 million-is $300,000 less bonds have provided funding for comput- than it was in 1992-93. The district re- ers; roof, plumbing, and heating repairs; ceives most of its revenue from the State's and safety and security improvements. School Support Fund and local property These repairs would have had to come taxes (see Spotlight chart, below). The from the district's general fund budget if Tigard-Tualatin School District's local the bonds had not been approved. Meas- property tax rate is $4.72/$1,000. ure 47 may not allow bond measures to include these hinds of projects in the future. Tigard-Tualatin School District General Fund State School Revenue Sources, 1996-97 The District is actively pursuing support Fund grants and alternative funding sari, sources. In 1996/97, more than $200,000 in grants are providing staff training in science, technology, LOCOa axa Fees/ aoio reading, mathematics, and writing. Other Grants also partially fund middle 6% school after-school activities, pro- grams for "at risk" students, drug The District's voters have been strong and alcohol prevention programs, and sex- supporters of tax measures to fund ual abstinence programs. schools. In the last 20 years, only three The District is pursuing partnerships Tigard-Tualatin school tax measures have with community athletic organizations to failed. Measures 5 and 47 override local help cover the cost of repair and mainte- opinion about tax measures to some de- nance of athletic fields and facilities. gree, however. Since Measure 5 was ap- proved in 1993, school budgets have Community members and local businesses largely been determined by the State Leg- are donating money to build a covered islature. The legislature has favored stadium at Tualatin High School. equalization of school funding (giving Recently the School District signed long Spotlight: Tigard-Tualatin School District 5-Year Funding History 1992-93 1993-94 1994-95 1995-96 1996-97 1997-98 All (estimated) Revenue Per $4,850 $4,520 $4,520 $4,542 $4,508 $4,506 Student The "equalization" formula in the Legislature would drop the district's revenues to $4,340 per student. A-3 a term lease agreements to locate cellular telephone towers on school sites. These leases will provide $1,500 per month. Funding-Where are we going? • The future of funding for the Tigard- Tualatin School District is unclear. The Measure 47 rewrite, which will be on the May 20 ballot, may clear up some school funding issues. • The District is looking at the possibil- ity of leasing the Phil Lewis Elemen- tary property after that school closes this year. This could provide money to pay for facility repairs and mainte- nance that have been provided by bond measures until now. • The district will continue to seek out alternative funding sources such as grants, partnerships, and donations. i A-39 ® Issues The maintenance and repair of public The issues listed here affect not only the school infrastructure helps prevent Tigard-Tualatin School District, but the more expensive capital projects in the Beaverton School District and other edu- future and improves the learning envi- cation providers as well. ronment for students. Measure 47 clouds the funding picture for these • New growth in our area means in- expenditures. Does a new stable creased demands on the public school funding source need to be identified? system. Schools in both the Tigard- Sports, drama, choir, and other extra- Tualatin and Beaverton School Dis- o tricts are at or near capacity. How curricular activities help to keep some "at-risk" students in school, and are should our community address the im- important to many other students. pacts of new growth on our public However, these programs are often schools? among the first to suffer in times of 4 Oregon's Educational Reform Act will budget cutbacks. As seen in the change many aspects of education. Community Survey, extracurricular The community survey indicates that activities are given low priority by the many people in the community are un- community at large. How should familiar with the requirements of this schools balance these concerns? Are act and wish the school district to fo- there any new ways to continue provid- cus on "the basics" and diploma ing extracurricular programs? achievement. How can these concerns Local businesses have been active be balanced by the District? . partners in the education of our chil- e As discussed above, Middle School dren, as described above. Oregon's programs have experienced many cut- Educational Reform Act emphasizes backs since Measure 5 was passed. this relationship. What can be done to What priorities should be set for mid- strengthen the ties between business dle school education? What opportu- and education? nities exist to assist middle school education in our community? • What role should schools play in parks and recreation in the Tigard area? e As our area grows, there will be a need for new school sites and school build- ings. Does the development process need to be better linked with long-term school planning? How can the district acquire suitable sites for new schools? How will funding be found to build and operate these schools? A-40 mom tion t4P T and gaff C Amp e Moll Introduction • Washington County has jurisdiction over igard has long been a convenient many roads in the Tigard area, including place to live, with good shopping and Greenburg, Oleson, Scholl's Ferry, Wal- easy access to regional attractions nut, Bull Mountain, Beef Bend, and all such as the coast, the mountains, wine of the roads in the Walnut Island area. country, and downtown Portland. However, While these State and County roads are many residents now feel that increased traf- within or bordering Tigard's city limits, the fic is threatening the convenience of life City has no control over their improvement. here. In the Visioning process survey, over For example, many people are concerned 50% of all respondents listed traffic and about traffic signal timing on Pacific High- transportation issues as "the most important way. The timing of these lights is controlled issues facing our community." by the Oregon Department of Transporta- Rapid resider_tial and commercial growth tion, not the City of Tigard. Tigard residents in the Tigard area has caused a dramatic rise must work through the appropriate State or in the amount of traffic on our streets. Since County processes to get any changes made 1970, traffic has increased 145% on some on State or County roads. sections of Pacific Highway, over 200% on Many people hope tl:at alternatives to the Hail Boulevard, and over 150% on many automobile, such as walking, bicycling, local Tigard streets (see Spotlights, below mass transit, and carpooling, can help ease and on page three). our traffic problems. Suburban areas such as Tigard, however, which have low densi- Spotlight• ties and large distances between destina- Daily traffic on Bonita Road, east of flail tions, tend to have difficulties getting people 12,000 10 676 to use alternative transportation. As long as 0 10,000 _ automobiles remain relatively inexpensive to Mill 8,000 operate, they will probably remain the 6,000 6,093 domnant mode of travel in the suburbs. r d 4,000 2,000 2,767 3,73s So, there are no easy solutions to Tigard's F°- 0 1,693 traffic problems. Transportation projects, 1970 1975 1980 1985 1990 1995 whether road improvements, bikepaths, mass transit systems, or signals (to name a few) are all expensive, and are becoming Tigard's traffic situation is complicated by more difficult to finance in these times of the fact that many streets are under the ju- tightening government budgets. risdiction of Washington County or the State Most people agree, however, that traffic of Oregon and are not subject to local deci- and transportation issues have a major im- sion-making. These streets include some of pact on the quality of life in our community, the busiest in Tigard: ranging from the convenience of getting to • The Oregon Department of Transporta- work quickly to the safety of children on tion owns and manages Pacific Highway neighborhood streets. Easing our traffic (99W),1-5, Highway 217, Hall Boule- problems may be the most urgent issue we vard, and portions of Durham and face in Tigard. Boones Ferry roads. A-41 Community Voices "We have to realize that Tigard does "Traffic is my biggest conce-n: 99W not stand alone; we are a thorough- is a nightmare on the weekends." fare for Sherwood residents and -2 year resident Lake Oswego residents going to Beaverton and vice-versa." "We are doing very little to deal with -5 year resident traffic-and there will be more!" -27 year resident "Our biggest problem is traffic. I have to leave early to get anywhere!" "Build the Westside bypass to relieve -3 year resident Tigard traffic of those coming from the south going west-217 and 99 are "City planners and the Commission a mess, and keep me from have never considered the impact of shopping downtown." new growth on things like traffic. -25 year resident Just once I'd like to have them look around before taking all those "If the lights worked better, traffic develope- dollars." could be improved on Greenburg -15 year resident Road near Washington Square." -10 year resident QUICK FACTS: "If traffic is not allowed to move on a There are."123 miles of streets within Tigard city timed control basis instead of using limits;'.1:I`55 miles are asphalt and the remainder pressure pads it will get a lot worse..." are gravel or concrete. -6 year resident There:.are.7 miles of asphalt bike/pedestrian paths in the City, of Tigard. "There are too many dangerous 4- All City: streets are swept clean six times per year way stops like Tigard-Tiedeman, by a contractor, at a cost of $55,000 per year. 121 S`-Walnut, Walnut-Tiedeman...We Sidewalks, and the planting strips between side,. . need more bike paths to get bikes off walks and the road, are the responsibility of the busy streets." adjacent;:property owner, not the City. r -23 year resident All portholes are repaired within 2 working days of notice, and all stop signs are replaced within 24:. "I don't believe the traffic problem hours. can be solved." The St-eefmaintenance division uses some 270 -9 year resident tons of asphalt a year. "Do away with bike paths. Very few people use them." -35 year resident A -42 Where are we now? Tigard has seen dramatic increases in traf- Streets fic on its main arterials in recent years (see Tigard's streets are divided into Spotlight, below). four major categories: arterials, major Spo#ligits collectors, minor collectors, and local streets. Each is designed to serve a 'Tot'D,sdWTrxfc Volumes on State..and county .A,rterials in Tigard, 1985-1995 certain purpose within Tigard's street network. Problems typically arise Street'(and loc tion' 1985 1990 1995 % Change,., when streets are used for purposes of traffic count) .1985-1995 that they are not meant for. I-~ 76,500 10800 ..133,900- +57% • Arterials are meant primarily to (at H*y. 217):_ channel through trips between Hwy. 217 68800 92,600' :100;100. +69% communities in the metropolitan (NW of Hwy.: region. Tigard's arterials are 99W 31,900 38,506 47j300:.. +65% almost all state or county- {SW of:lvlaFn St.} controlled highways: Pacific Highway, Interstate 5, Highway Scholis Ferry Rd. 23,400 35,000 37,300 +63% 217, Hall Boulevard, Durham (SW of Hwy. 217) Road, Upper Boones Ferry Hall Blvd. 9,900 12,100 15,00 +66% Road, and Scholl's Ferry Rood. (N. Of Bonita Rd.) • Major collectors, including Beef Bend The increase in arterial traffic is due to Rd. Bonita Rd., Gaarde St., Greenburg T both commercial and residential growth in Rd., Hunziker St., Tiedeman Ave., 72nd Tigard and surrounding areas. Tigard's ar- Ave., and 121st Ave., are meant to col- terials are main regional corridors, and so lect and move traffic from neighbor- traffic on these roads increases along with hoods to the arterial streets. They also regional growth, rather than just along with ,provide connections to major activity Tigard's residential growth. Tigard also c-;nters in Tigard, ?nd should provide contains a number of regional attractions, bike and pedestrian options as well. such as Washington Square, Costco, and the • Minor collecL`ors, including Ash Ave., Tigard Cinemas. These attractions provide Commercial St., Fonner St., Johnson great benefits for the City and its residents St., Park St., Pfaffle St., Summerfield but they also create increased demand on our Dr., 92nd Ave., and 115th Ave., should transportation system. provide efficient traffic circulation Congestion on Tigard's arterials and major within neighborhoods and channel traf- collectors causes many people to cut through to the major collectors and arterials. neighborhood streets. Ironically, many They should also provide for pedestrian neighborhood streets in Tigard are dead and bicycle travel. ends, which forces local traffic in these areas o All other streets are classified as local to use arterials and collectors even for short streets. Their primary purpose is pro- trips, further increasing congestion. viding access to homes and providing Thus, a situation has developed in which interconnectedness within neighbor- there is too much through traffic on Tigard's hoods. local streets and too much neighborhood traffic on its through streets. A-43 Neighborhood Traffic kins Avenue. Reaction among residents was Neighborhood residents are often con- mostly positive, traffic speeds were reduced, cerned about the volume and speed of traffic and police and fire personnel reported that on local streets. The City has begun a their response times were not significantly Speed Hump Program to help solve some reduced. After observing this positive re- neighborhood traffic problems. Speed sult, the City Council intends to continue the humps, wide versions of the traditional Speed Hump Program. Three installations speed bump, are designed to be difficult to will be built in the summer of 1997. drive over at speeds greater than 25 mph, but Speed limits, a concern to many in our not to impede slow auto traffic, bicyclists, or community, are controlled by the State pedestrians. Speed humps and ether traffic Speed Board. This board has jurisdiction calming devices such as traffic islands are over all speed limits in the state. Local meant to reduce neighborhood speeds and communities can work with this board to discourage through traffic from cutting change speed limits. For example, City through neighborhoods. residents worked with the state to get the The City Council has budgeted $45,000 in speed limit lowered from 45 to 40 mph on FY 1996/97 for the Speed Hump Program. Hall Blvd. after the South CIT decided that Funding for this program comes from the speeding on Hall was a problem. Tigard's Gas Tax Fund, a dedicated fund Traffic signals are another common con- that receives revenues from the State gas cern to Tigard residents. There are many tax. In 1995 the City of Tigard, with the as- busy foar way stops in Tigard that may need sistance of CITs, the Traffic Calming Task to be upgraded to traffic signals. This work Force, and individual requests, compiled a costs approximately $100,000 per intersec- list of 45 possible locations for speed hump tion. As discussed above, traffic signals and installations. These 45 installations would timing on state-controlled streets such as contain approximately 175 individual Pacific Highway are managed by the Oregon humps, which cost between $2,000 and Department of Transportation. $2,500 each. Since there are limited funds Traffic Enforcement and safety available, the City uses an adopted set of There were 1,715 reported traffic accidents criteria to prioritize these neighborhood in Tigard in 1996, a 37% jump from the year projects. The criteria include traffic speeds, before. 42% of these accidents took place volumes, accident rates, pedestrian use, and on Highway 99 or Highway 217. The Ti- the type of traffic that uses the street in gard Police Department currently has three question. officers who handle traffic patrol for the The projects that receive highest priority City. This number has not changed inxx yrs. are eligible for 100% City funding. Neigh- Street lights are of concern to many citi- borhoods with lower priority projects may zens apply for 50% funding grants from the City and pay the other 50% themselves. Neigh- borhoods may also elect to pay 100% of the As discussed in the introduction, many of costs themselves if their project meets Tigard's busiest streets are controlled by the minimum criteria. The project must be State of Oregon or Washington County. Ti- constructed to City standards. gard officials have close working relation- In 1995, speed humps were constructed on ships with these jurisdictions, and the City 78th Avenue, Springwood Drive., and Wat- continues to work cooperatively to address A-44 traffic and transportation issues in a regional on the automobile by requiring larger em- context. This work includes carrying out I ployers to reduce the number of their em- joint transportation studies and searching ployees who commute alone in an automo- together for creative funding sources. bile. Collaborative efforts are important be- Alternative Transportation cause Tigard is a part of the greater Portland The City currently operates under the as- metropolitan area and our transportation sumption that the automobile will be the problems are directly connected to those of dominant mode of transportation for the near the !anger region. Approximately 50,000 future. About 80% of Tigard residents now vehicles per day pass through Tigard on Pa- commute to work by auto as single occu- cific Highway, and over 100,000 vehicles a pants. However, "alternative" transportation day use Highway 217. methods, such as biking, walking, mass transit, carpooling, and trip reduction are generally seen as a necessary part of a com- Many of Tigard's local streets plete transportation program, and they may take on increased importance in the future are dead ends, forcing neighbor- when energy availability changes. hood traffic to use larger streets Historically, alternative methods of trans- and making local pedestrian and portation have not been very effective in bicycle travel more difficult. suburban regions such as Tigard. Suburban areas that have developed with low densities and large distances between destinations are more suited to automobile transportation Tigard must look at regional patterns of than anything else. Many people believe growth and development when discussing its that alternative transportation options will transportation problems and must continue need to be accompanied by changes in de- to work with outside agencies such as velopment type and increases in density in ODOT and Metro. Additionally, Tigard will order to be fully effective. have to work within the bounds of state mandates such as the Transportation Rule and the Employee Commuting Options Rule Connecting dead end streets in its planning process. The Transportation Rule is the legal ex- with pathways, as was done in the pression of Oregon's Statewide Planning Genesis development, helps pedes- Goal #12. Its purpose is to reduce reliance trians and bicyclists bu* not auto- on the automobile and "to assure that the mobile traffic. planned transportation system supports a pattern of travel and land use in urban areas which will avoid the air pollution, traffic, and livability problems faced by other areas Alternative transportation methods tend to of the country." be more important for youth, the elderly, the Similarly, the Employee Commuting Op- handicapped, and low-income residents, tions Rule (ECO rule), an Oregon Adminis- who may not be able to operate or afford trative Rule, is intended to reduce reliance automobiles. These populations need to be A - 45 kept in mind when planning and designing $580,000 on street maintenance programs in alternative transportation facilities. 1996/97. Tigard has a plan to connect many bike- Many Tigard streets and intersections have ways and sidewalks, but it is still far from been significantly improved in recent years. complete. Sidewalks are required in new . Recently improved streets include: Dur- residential and commercial development, but ham, Greenburg, Bonita, McDonald, in older areas they are generally not present, Bull Mountain, Main, Commercial, especially in residential areas. It costs ap- 121 st, and Gaarde. proximately $500-600 per foot to add side- o Recently improved intersections include: walks and bike lanes to existing streets. Durham/72nd, Durham/92nd, Tri-Met offers good bus service to down- 72nd/Bonita, Bonita/Hall, McDon- town Portland but is less effective at provid- ald/Hall, and Burnham/Hall. ing connectivity around and between subur- The City typically only funds improve- ban areas such as Tigard, Beaverton, and ments for arterials and collector streets. Lo- Lake Oswego. Currently, there are three bus cal street improvements are usually funded routes that serve the Pacific highway corri- by Local Improvement Districts (LIDs). dor to downtown, and two lines that... Ti- gard employers pay a .6176% payroll tax to for improvements by taxes on everyone in Tri-Met to support mass transit programs. the affected area. In 1996, there were xxx Funding for the p: oposed light rail exten- LIDs in the city. sion-which would have had some of the Improvement of bridges is funded largely same problems with connectivity that cur- through the State's Bridge Replacement rent bus service has-was not approved by Program. The City pays only 10% of these voters in the November ")96 election. costs. Bridges on Tiedeman St. and Grant There is a Greyhound Bus station located St. are scheduled to be replaced this year, next to the transit center on Commercial and more will need to be done in the future. Street. Street maintenance The City's Street Maintenance Division is responsible for the maintenance and repair of all streets and asphalt bike/pedestrian paths within City limits, with the exception of roads owned by the County or State. The main emphasis of street maintenance is crack sealing, patching (including potholes), street marking, sign maintenance, and catch basin clearing. Other programs include maintaining roadside stormwater ditches, keeping right-of-ways clear of brush and debris, and keeping sight lines free of ob- structions. The City will spend over A-46 ® Where are we going? • Pacific Highway is the subject of several The City's Speed Hump Program is ex- regional planning efforts, such as the pected to continue at current levels of 99W Task Force. funding. Other traffic calming measures, • State and regional rules will continue to such as islands, will also be considered. affect Tigard's streets. For example, Y The City will work towards completing state rules require that streets be de- its plan of interconnecting pathways, signed -Lo increase "connectivity." The many of which are located in greenways Metro 2040 plan includes new street de- along creeks. Developers are required to sign standards that are intended to pro- include this plan into the design of new mote increased density. developments. The City will purchase • Washington County's Major Street greenways and construct paths as fund- Traffic Improvement Program (MSTIP), ing permits. approved by voters in 1995, is being cut • There is a Metro study underway for a from $130.2 million to $20 million as a inter-city passenger rail line using exist- result of Measure 47. MSTIP is meant ing railroad tracks. Tigard's two main to pay for a variety traffic improvement railroad lines are currently used exclu- projects in the County, including two in sively for freight transport. Tigard. The cuts in this program will • Tri-met has recently launched Transit have immediate impacts or. Tigard-for Choices for Livability, a process that will example, the improvement of Walnut plan transit expansion over the next 10 Street between 121st and 135th has been removed from the construction list. years. The plan is particularly aimed at improving, transit service in suburban • A multi jurisdictional task force has rec- communities. The plan began with a fo- ommended a plan to improve the Inter- cus on Hillsboro, Gresham, Beaverton, state 5-IIighway 217 intersection. and Oregon City, but its findings will Funding is being sought to implement apply to other suburbs as well. the plan. O The Urban Service Agreement with Washington County means that Tigard may be taking on responsibilities for street maintenance in unincorporated ar- eas of Washington County near the City, such as Bull Mountain. A-47 Issues • Tigard's traffic and transportation sys- e Tigard faces continued growth, which tems are closely linked with those of the will be accompanied by increased traffic. larger Portland metropolitan region. Making this area's transportation infra- How will the City address the demands structure able to meet the demands of put on its transportation system by re- growth is one of Tigard's biggest chal- gional populations? What will be the lenges for the future. What is the con- City's role in regional transportation nection between land use and transpor- planning? tation? Can new developments be built • What are the most important priorities with a smaller impact on traffic? How for maintenance of the City's transporta- can traffic congestion be reduced assum- tion infrastructure? ing limited funding and continued • Growth in our area has created difficult growth of the City? traffic problems. How can we ensure • As described above, Tigard's main arte- that adequate staffing and funding exist rials are not under the jurisdiction of the to keep our streets up to the quality they City. However, in the recent Commu- need to be? nity Survey, 76% of respondents favored • As stated above, more than 40% of the projects to improve congestion on major traffic incidents that the Tigard police arterials over funding neighborhood Deportment responds to are on state- traffic issues. How should the City bal- controlled roads such as Pacific High- ancc these concerns? What transporta- way (99W) and Highway 217. The Ore- tion projects should be given funding gon State Police have stated that they are priority in tight financial times? unable to provide police services on • One of Tigard's most pressing traffic these roads within the city limits of Ti- problems is its collector streets, such as gard, Beaverton, and other metro-area Bonita, Hampton, Pfaffle, 121St, and jurisdictions. Should the state play a Hunziker. Deficiencies on these streets larger role in policing these roads? If so, forces increased use r,. main arterials for what role should they play and how can local traffic, which contributes to con- Tigard bring it about? How should Ti- gestion. What can be done to keep local Bard Police prioritize their traffic patrol traffic on neighborhood streets and duties? through traffic on main arterials? • Can alternative transvortation, such as mass transit, walking, carpooling, and biking, help reduce traffc congestion? If so, what steps can be taken to encour- age their increased use? A-48 I 'i~ } r ~ 'I ~ ~ p F h i~~ i ® of 1 Introduction the machines needed, the City found it was Rp s idents of modem communities ex- less expensive to contract out this service, ect a wide variety of urban and which has been done since 1991. ublic services to be provided. Another way of reducing costs is through Some, such as police, sewer, water, utilities, the us, of volunteers. The Tigard Public and street maintenance, are simply necessi- Library, for instance, has approximately 200 ties of life. Others, such as the public li- regular volunteers, who donate over 12,000 brary, parks, and recreation are amenities hours of time annually. If this work was that improve our quality of life. done by City staff, it would cost the City This section of the vision profile discusses more than $126,000 per year. many public services and how they are pro- Many public services are :acing cutbacks vided to area residents. Some services are due to Ballot Measure 47, which limits local covered in other sections of the Community government property tax revenues. The City Profile (police in the public safety section, of Tigard, for example, is preparing for hir- schools in the schools and educatioii section, ing free:!2s, service cutbacks, and other cost- etc.) This section of the profile covers those saving measures in anticipation of the loss services that do not fit conveniently in to of up to 20% of its general fund revenues other categories: water, sewer, utilities, when Measure 47 takes effect. Measure 47 property mcnagement, parks, recreation, and will affect all agencies that rely on property library. tax revenues, including the City of Tigard, Many urban and public services in our the Tigard-Tualatin School District, and community are provided directly by the City Tualatin Valley Fire & Rescue. of Tigard, including water, library, parks, Measure 47 may also impact Tigard's Jr- and open space. The City also provides ban Service Agreements. For example, Ti- services to some people outside of city lim- gard recently signed an agreement with its. For example, since 1994 the City has Washington County to provide services such provided water service to the residents of as building inspection, planning, engineer- Durham, King City, and the unincorporated ing, and street maintenance to unincorpo- areas of Bull Mountain and Walnut Island rated areas of the County. At this point, it is through an intergovernmental agreement. not known how the revenue limitations im- Other services are provided by single- posed by Measure 47 will impact this purpose special districts, such as the Unified agreement. Sewerage Agency (USA), which works with It is still unclear what the exact effects of the City of Tigard to provide sanitary and Measure 47 will be. Our community will storm sewer services, and Tualatin Valley have to pay close attention to this debate, Fire & Rescue (TVF&R), which provides and we may need to find new ways to fire response and emergency rescue services. maintain desired service levels. This will be Historically, the City has sought cost ef- one of the main challenges of the Tigard fective alternatives to direct service prov- Beyond 'fomorow process. ision. For example, at one time, the City owned and maintained its own street sweep- ers. After analyzing the costs associated with purchasing, operating, and maintaining A-49 Community Voices "Utility bills rise all the time. We pay separately for so many things (water, "Complete the greenway from Bea- sewer, lighting) that I think cur taxes verton to Cook Park! Also, how should be paying for." about a teenage community center on -7 year resident Main Street?" -7 year resident "The majority refuses to consider in- creases in taxes to maintain current "We should join the Tualatin Hills levels of services, and the result is Parks and Rec.•eation District or form contentiousness and impasses." a similar organization to be funded by -I1 year resident taxes and user fees." -17 year resident "I like this questionnaire. When I lived in Portland, nobody ever asked "Government has been demanding me for my opinion in written form." more and more-we used to do things -20 year resident as a community but now government hires and hires to do it for us (not "Get a City Council that listens to the doing a very good job of it either.)" Supreme Court!" -30 year resident -26 year resident "Utilities need to be buried under- "The Library is a great resource for ground on 99!" the City, I use it all the time and so do -19 year resident my kids." -S year resident "We used to live in the county but were annexed by the city without a "I think it's a big problem that if say. Benefits we have received as a Measure 47 passes, Tigard won't be result: more taxes, more fees, no able to keep funding its City services street drainage or other improve- even if we want to. Let's keep local ments, etc. control over our taxes!" -20 year resident -6 year resident A-50 1. Drinking Water Where are we now? Where are we going? The City of Tigard manages and operates Tigard is currently working on a water the Tigard Water Service Area, which pro- supply plan that is estimated to be sufficient vides drinking water for King City, Durham, for a population of 56,000. The population the unincorporated areas of Bull Mountain currently served is about 38,000 but is an- a' and Walnut Island, and two-thirds of the ticipated to reach 60,000 by 2015. The City City of Tigard. Water service to the north- is participating in regional discussions with east part of Tigard is provided by the Tu- the goal of developing additional water alatin Valley Water District. sources. The Intergovernmental Water Board Future water sources for the Tigard area (1);VB) was established in 1994 to make rec- will likely include the Bull Run watershed, ommendations to the Tigard City Council combined with an increased emphasis on and staff about water service issues. The water conservation efforts. IWB has five members, representing the CK FAC i'S. cities of Tigard, Durham, and King City, the unincorporated areas, and one "citizen-at- Tigard's water comes from::three main sources: the: large." The IWB looks at rate structures, Bull Run watershed (62"/ Ahe Clackamas l7iver rules and regulations, long range water (31Q~o), and three City wells (7 o). . supplies, and variances to Water System ~ Water is stored in I2 reservoirs with a combined Rules and Regulations in special cases. total, of 21, million. gallons storage capacity: 7 7 Customers of the Tigard Water Service The average 1996 water use:.was 5.67 million Area pay $1.32 per hundred cubic feet of gallons per day (mgd),.with a peak:use of 13 mgd water used. Revenues from these charges on summer days and other fees are expected to total over $3.8 Our curient system has a capacity of 19.2 ` ingd. million in the 199697 fiscal year. This money is placed in the Water Enterprise Issues Fund, which is used to purchase water and • As our population grows, Tigard will pay for water system maintenance activities. need new water sources and new infra- Funds for the improvement of the reservoir structure such as reservoirs and water system are provided by System Develop- lines. What water sources will be used ment Charges (SDCs). These charges are and how will new infrastructure be paid assessed by the City on new development for? projects. Water SDCs are expected to bring e If the Urban Growth Boundary expands, in more than $414,000 in the 1996/97 fiscal how will infrastructure be paid for in ar- year. The Water SDC fund will stand at eas of new development? over $2.8 million at the end of the year. A e The State and Federzl governments may large part of this fund will be spent on a new impose stricter regulations on drinking 3.5 million gallon reservoir near Scholls water supplies. The City needs to stay Ferry Road. up to date in these areas-how will these improvements be paid for? A-51 2. Sanitary and Storm Sewer Service QUICK FACTS: .'Vhere are we now? The City. maintains 124 miles of sanitary sewer lines, Sanitary and storm sewer services are 75 inilea.:of stortri sewer lines, and 6;400 manholes and provided by the City of Tigard and the catct!basxnsi Urified Sewerage Agency of Washington City- med sanitary sewer lines from .6":to 21" in:di- . County (USA). USA is a special district in ; ameter are inspected by a remote TV apparatus every . Washington County that provides sewer 10:years and cleaned every 3=5 years. treatment at regional water treatment Storm sewer mains.are. inspected on an 8-year cycle: and: plants, one of which is located in Tigard, cleaned on a 4-year cycle: . tear the Tualatin River. This plant turns sewage into water v:,hich meets federal and The'Ctty Inspects and cleans some 27,040 feet of sarii- state guidelines for discharge back into riv- mTY ands#orm sewer mains every year. ers or use in irrigation. The Tigard- Tualatin School District, the Summerfeld Issues aid King City Golf Courses and the City of • Tigard's sewer system is aging, and Tigard, among others, use this treated water some parts of the system are at or over for watering plants and lawns. capacity. The system will need signifi- The City of Tigard is responsible for cant capital improvements in the future, maintenance of the sanitary and storm sewer especially as a greater population creates collection systems within city limits, includ- more demands. How will increased Be- ing construction and maintenance of all mand be met and new infrastructure be funded? sewer lines 21 inches in diameter and smaller. USA maintains sanitary sewer • The unincorporated Walnut Island area main lines larger than 21 inches. has many failing septic systems. How Billing services are performed by USA will these systems be replaced? What under contract to the City of Tigard. The role, if any, will the City of Tigard play in City receives 20% of sanitary sewer con- this process? nection charges, 21.4% of sanitary sewer • The City needs to acquire and maintain service charges, and 75% of storm water easements (to access sanitary sewer sys- management fees charged by USA. In the tems, swales, and gullies) from newly de- 1996/97 fiscal year, sanitary sewer revenue veloped properties. How will this be ad- is projected to total $1.51 million, and storm dressed? sewer revenue almost $700,000. The City • Large amounts of run-off from other ju- places this revenue into dedicated funds. risdictions impact Tigard's storm sewer 2 These funds are used only for sewer mainte- system. How does this affect our system, _z nance work and capital improvements, such labor costs, and budget? What can be as the construction of new sewer main lines. done to offset the costs? The Sanitary Sewer Fund is projected to • King City and Durham may ask the City contain just over $2 million at the end of the of Tigard to provide the operation and ° 1996/97 fiscal year, while the Storm Sewer maintenance of their storm systems. Is it 3 Fund will have around $47,000. in the City's interest to take on these re- sponsibilities? I A-52 3. Other utilities Where are we now? 2. Changes in technology may make fran- The citizens of Tigard are served by a va- chise fees less significant. For example, riety of public utilities for basic services, cellular phone providers do not pay fran- which include electricity, natural gas, tele- chise fees to local governments because phone, cable TV, and solid waste and recy- they do not use any local right of ways. cling hauling. The City charges a franchise 3. Utilities have recently grown more ag- fee to all providers for the use of public gressive in challenging the right of gov- right-of-ways. errments to charge franchise fees, de- Franchise fees are an important source of scribing These fees as an indirect tax on revenue for the City of Tigard because they consumers. In Oregon, a bill has been are not dedicated funds and can be allotted advanced in the legislature (SB 2060) by the City Council and Budget Committee which would replace franchise fees with to general fund expenditures (such as police a "Public Rights of Way Privilege Tax" and library services). In the 1996/97 fiscal to be placed on consumer's utility bills. year, the City will receive over $1.6 million Franchise fees are likely to be a continu- in franchise fees-almost 11 % of the City's ing topic of discussion in upcoming general fund revenues. years. Where are we going? All of these trends could potentially reduce City franchise fee rever_»e. Ti.is is a rapidly Franchise fee revenues have increased developing area which may have a dramatic steadily as the City has grown. However, impact on the City's General Fund in the there are a number of issues on the horizon future which could impact the City's relationship Issue with utility providers: ® If franchise fees decline in the future 1. Deregulaiion of the telecommunications what will the effect be on City services? and power industries, which is happen- Will new sources of funding need to be ing at the Federal level, may reduce the ability of cities to charge franchise fees. found? Spotlight: Details of Franchise Agreements, with Tigard Utility Providers Estimated Year Length: of Service Comnany Terms 1996/97 contract contract revenue signed Electricity FGE 3.5% of gross $8301000 1993: 20 years. Telephone GTE 5% of gross $280,000 1993 10 years US West 5% of gross .$30,000 1997 10 years Natural Gas NW Natural Gas 3% of gross $22500: :1993 10~ years Solid Waste Miller's, Pride, 3% of gross $200,000 revolving 7 years. . Schmidt's Cable TV TCI 2.5% of gross* $98,000 - *note: The Metropolitan Area Communication Commission (MACC) administers cable TV services in the Port- land Metro area. TCI pays MACC 5% of its gross revenues; half of this is passed on to member cities. A-53 4. Library Where are we now? Citizen input is provided by the Library The Tigard Public Library provides free Board, five citizens appointed by the City guided access to information in all media Council. The board makes recommenda- formats as well as recreational and educa- tions to the Council about service levels and tional materials for all ages. community needs that may be met through the Public Library. In addition to serving on The Library is a resource to small busi- the Board, citizens may participate in setting Hess, offering information on management, Library priorities through the strategic marketing, financial issues, incorporation, planning process, which takes place every and more. Furthermore, the Library works three years. with K-12 public and private schools to provide resource materials that enhance cur- QUICK l"ACTS riculum and enable students to complete =:t, 47,000 citizens reside in:the Tigard Public. homework projects. The Library also works Library's service area. closely with our homeschooling community. 30,000 of these individuals, or 64%, held The Tigard Public Library is part of a 13 library cards. member cooperative system funded by a levy that is administered by the Washington i The library' ss foun.ded;:in .1963. The first County Cooperative Library Services de- staff person w~,s a retired librarian who partment (WCCLS). WCCLS funds are served as a volilnteer. Today the library;, has made available to member libraries in two =a staff of 24: and more than 200 volunteers; ways: Therewas an 89% increase in library visa 1. Direct reimbursement for each item cir- tors from 1993 46.1996 and circulationin culated. The Library receives a certain creased 20:5°lo in that ime.. amount of money from WCCLS for each The Library, circulates more'than half a mil- item checked out ($1.55 per item in lion'items each year:Since the average item 1996). Thus, the higher circulation is, costs $25; citizens check out. about $ l 2.5 the more money the library :eceives. million worth of materials a year. This funding system is designed to en- Where are we going? courage "customer-oriented collections." The Tigard Public Library will receive Libraries are becoming more computer- $937,666 in reimbursement funds during ized. The Internet and CD-ROM's are this fiscal year. making more information available io 2. Access to shared County-wide services. everyone. The Tigard Public Library is P,: `v'CCLS levy dollars provide many offering many more training classes than ever before, and demand continues to central zed services, including the auto- ' grow. mated catalog system. Tigard's "share" . Grant funds exist at the local, state, and of these services is valued at $220,603 in 1996/97. federal level to assist libraries to upgrade 70% of the library's operating budget their computer access, and provide comes from the WCCLS levy, and 30%- training. The Tigard Public Library will rom the City's work to obtain and utilize these kinds of $389,713 in FY 1996/97-f e- -,ral fund. grants. g• A-54 1111111011 Library (continued) • Along with every other general fund • While books remain the most frequently program, the Tigard Public Library is circulated library format, the popularity facing service cutbacks due to Measure of electronic formats such as video and 47. However, the library's reimburse- audio tapes is growing (see Spotlight, ments from WCCLS are based on circu- below). Each of these formats has their lation figures. Thus, if reductions in the place in the library, and each has differ- library's general fund budget force a re- ent requirements for selection, process- duction of library hours, for example, the ing, and display space. library could experience reduced circu- lation and receive less mone,, fiom WCCLS in the future. What can be done Issues to minimize the impact of this effect? ® 70% of the Tigard Public Library's • There is an increasing demand on the revenues come from the WCCLS levy, library for more services, more media, de- which comes up for renewal every three and longer hours. How can these yeazs. If this levy were no longer in ef- mands be met, given tight financial fect, the Library would lose $937,669 in budgets? direct revenues plus an estimated • $220,603 in central service functions. There are many book retailers in the Ti- . Should Tigard work on identifying more gard area. Are there any opportunities long-term or stable funding sources? If for partnering projects between the pub- so, what could be done? lic library and these vendors that could help save the library money? • All library sponsored programs and • At what point would there be a need to services are offered to the public free of charge. Would it ever be appropriate to provide a second library facility some- charge for some services in order to off- where in Tigard? Where would this fa- set costs? cility be located and how would it be funded? A-55 5. Parks, Open Space, and Recreation corridors for the use of these funds. The Where are we now? City : ,Ls purchased 3 acres on Fern Street and is looking at several other sites. Currently, there are 237 acres of land set aside for public use and enjoyment of nature Over the years, citizens have donated within the City of Tigard, including 129 property and cash to the City. For example, acres of developed recreation sites and 114 the original 36 acres of Cook Park were do- acres of greenways and other preservation- nated by a local family. In 1995 the City oriented sites. This equates to about 6.6 received $100,000 for parks as a provision acres of public park and natural area per in a will. 1,000 residents. To compare this with Ore- In the past, dedications have been the pri- gon cities of similar size, the City of Albany mary means of acquiring greenways. The (population 35,550), has about 10 acres of City's approach to the dedication of green- park and natural area per 1,000 residents, way was recently altered by the US Supreme and the City of Lake Oswego (population Court's decision in the Dolan case. New 35,000) has about 13.1 acres per 1,000 rt_i- rules have altered the City's authority to re- dents. quire greenway donations as a condition of Many school sites also serve neighborhood development. park needs. Tigard's two middle schools Funding for park operations and mainte- and one high school have recreational facili- nance is drawn from the City's general fund ties, such as jogging tracks, tennis courts, and park reservation fees. The reservation and a swim center. fees range from $6 to $50 an hour and cover Funding only a small portion of the costs of provid- ing group reservation areas. Tigard-based Historically, the City has relied upon a non-profit sports organizations are the pri- variety of funding sources for the revenue it mary users of City sports fields. The City needs to acquire land and develop park fa- does not currently charge these groups for cilities. These sources include the park sys- use of the fields. tem development charge (SDC), levies, The City's Grounds Division maintains grants, and donations. The most consistent source of funding is the SDC, which is paid City-owned parks and greenspaces, as well by developers and is used solely for land as water retention ponds, building grounds, acquisition and development. The SDC was and reservoir facilities. Funding for these adjusted in late 1994 and generates ap- property management services, $449,380 in proximately $400,000 annually. fiscal year 1996/97, comes from the City's General Fund. In 1989, Tigard voters passed a $1.75 mil- Recreation programs lion five-year park levy. These funds were spent on improvements to the park system At present, neither the City nor the Tigard- and the development of pathways. The 1995 Tualatin School District provide community Metro regional greenspaces bond measure recreational services. Both entities allow provided $758,000 in local share funds to their facilities to be used for recreational and Tigard. By law, these funds may only be leisure programs offered by local commu- spent on natural areas and related acquisi- nity sports leagues and other non-profit or- tions and improvements. The City Council ganizations. Tigard is the largest city in identified four natural areas and two trail Oregon that does not have a tax-supported A-56 1 recreation program. The Tualatin Hills Park overall park system and action plan. The and Recreation District borders the Tigard plan calls for new and upgraded parks fa- area to the north and offers a wide range of cilities and establishment of a greenway trail recreation opportunities. Tigard residents, along the length of Fanno Creek inside the although eligible to participate in these pro- City. About 20% of the greenway is now in grams, must pay an extra fee to do so. Rec- public ownership. The Tigard Comprehen- reation opportunities in our area became sive Plan gives priority to the acquisition more sparse in 1988 when PCC discontinued and development of community level parks children's programs. rather than smaller neighborhood parks. The The Tigard Public Library provided a rationale for this policy is that a larger park small-scale community recreation program is less expensive to maintain than a series of for eight years until 1996. This program smaller scattered parks of equal total acre- included a range of recreation and leisure age. programs, such as toddler gymnastics and Parks planning is overseen by the Citizen bus trips to the coast. Most of the programs Involvement Teams and the Planning were aimed at young children and seniors, Commission. The exact role of the CITs and an estimated 1,000 to 1,500 people par- and the Commission in park planning has ticipated each year. Between 1994 and not been fully resolved. 1996, the program was provided by a non- Vandalism profit organization called "Recreation Park vandalism, mostly graffiti causes up Round-Up." The decision was made not to to $1,000 of damage per year to City park renew this organization's contract in 1996. facilities. Few vandals are apprehended. There is a variety of non-profit sports pro- The City designs new parks facilities to be grams in Tigard, such as Babe Ruth league, as vandal-resistant as possible. Some years Little League, Oregon Junior baseball, adult ago, citizen patrols aimed at preventing this and youth basketball programs, youth foot- and other types of criminal activities were ball, and youth soccer programs. in addi- initiated at Cook and Summerlake Parks. tion, there are several recreation-oriented Also, there was once a night watchman at businesses in Tigard, such as the Westside Cook Park. Tigard Police report that these Dance and Gymnastics Academy and Paint- were effective programs; however, declining ball Station. Costco recently opened volunteer interest and the amount of police Sportsnation, a 140,000 square foot recrea- resources required for volunteer training tion center, just south of Tigard. There are contributed to the end of these programs. three private health clubs located inside the City. Trees and Forests Tigard's forest resources wore identified On at least two occasions, citizen groups by have looked at the possibility of renovating citywide and Bull Mountain area studies in 1994 and 1995, respectively. The studies existing buildings for use as community evaluated and ranked forest areas based on centers, but neither group went beyond the ecological principles. The inventories iden- discussion stage. tified priority sites for public acquisition of Parks Planning open space. Three privately owned sites The current City park master plan was were targeted for acquisition in the City's completed in 1988 and contains a proposed A-57 capital improvement program, including one 3. A park system master plan to help direct near Cook Park and one along Fanno Creek. the development of Tigard's community rec- In 1995, a citizen committee recom- reation resources is scheduled to be com- mended an ordinance to regulate tree re- pleted this year through the collaborative ~I moval which was later adopted by City efforts of a professional park planning con- Council. This program requires permits on sultant, city staff, the CITs, and the larger sensitive lands to prevent erosion and main- community. tain water quality. For developing proper- 4. A County technical study, which will ties, tree removal plans are required, and evaluate various options for providing park there are incentives for preserving trees. and recreation service in Tigard's urban The program also includes a prohibition on services area. commercial forestry. Issues The City has encouraged conservation a In the recent community survey, many groups, schools, and service organizations to people mentioned a need for more parks participate in tree planting and natural areas and recreation facilities in Tigard. 91% rehabilitation programs by providing finan- of respondents rated parks and recreation cial and technical assistance. For instance, services as "very important" or the City contributed funds to the Friends of "somewhat important" in choosing a Fanno Creek for tree planting activities community to live in. Is there a need for along that stream corridor, and provided additional trails, sports fields, play- technical and grant-writing assistance to the grounds, picnic facilities, and green- Fowler School tree planting project. ways? If so, where could facilities be located? Where are we going? a Tigard's neighboring unincorporated There are several park planning efforts areas are developing without parks currently underway in Tigard. These in- because the county does not provide clude: park services. If any of these areas are 1. A City Council-initiated study of com- annexed to Tigard, the City will face munity needs and opportunities for expand- additional park shortages. How should ing Cook Park, the City's most popular park. this be incorporated into park and rec- The City formed a task force comprised of reation planning? elected officials, staff, citizens, and represen- ® Should more emphasis be placed on tatives of youth sports organizations to con- smaller neighborhood parks? If so, duct the study. The task force has prepared where should these parks be located and a preliminary plan and is holding a public how will they be funded? open house in April to receive feedback on Y Special parks and recreation districts this plan. (such as the Tualatin Hills Parks and 2. The Fanno Creek Trail Study, a project Recreation District) have proven effec- currently underway to map the route of a tive in other areas. Could a special dis- recreational trail along Fanno Creek. When trict help our area provide better parks completed, this study will be the guiding and recreation services? Should the City document for developing trails along the become a recreation provider? creek. A-58 Issues (continued) 6. Building and Fleet Management • Is there a need for the Parks and Recrea- Where are we now? tion Advisory Board to be reestablished The City of Tigard's building and fleet to better address community park needs divisions are responsible for maintenance and issues? and repair of City-owned buildings, vehi- • Should citizen patrols be reestablished tc cles, and equipment. The building division help prevent vandalism and other crimi- oversees 15 buildings and facilities includ- nal activities in city parks? If so, how ing City Hall, the Water Building, the John can we ensure continued volunteer inter- Tigard House, the Senior Center, the Li- est and funding for police department brary, and the restrooms at Cook and Sum- assistance? merlake parks. Most of these services are • Community organizations have been ef- contracted out to janitorial companies. The fective for special park projects, such as Fleet Division maintains City vehicles and the cleanup at 103rd and Murdock. equipment, ranging from police squad cars Should more be done to encourage this to power tools. kind of community action? The combined operating budget of these • All park playgrounds need to be brought two divisions is $341,947 in 1996/97. up to meet the standards of the Ameri- About two-thirds of this money comes from cans With Disabilities Act (ADA). This the City's general fund, with the rest coming work includes improving access to rest- from other funds. rooms and ball fields and is expected to cost about $75,000. How will this work Issues be funded? • City buildings will require higher levels • Flood plain areas present good oppor- of maintenance as they age. Several tunnies for all types of recreation from City buildings already need major capi- team sports to wildlife watching. How- tal improvements (especially new roofs). ever, when sports fields are located on Where will the funds for these projects flood plains they can suffer a great deal from? of damage when floods do occur. For come ® example, the February 1995 flood Will there be a need in the future for the caused over $21,000 in damage to the City to consider new office facilities? ballfields at Cook Park. Is there any way to minimize or eliminate this hazard? • Our parks are increasingly being used as "multiple-use" areas: for special events, as open space for wildlife and people, and for sports. What is the right balance between these uses? A-59 mom APPENDIX f6.B'?. Coli a is for 19 Tigard Ci Council adopted goals for 1998. All goals specifically address issues raised during the vision process. The Council is The Tigard City with the community to make this a better place to committed to following up on the Tigard Beyond Tomorrow results and working live, work, and play. e annual re rts, there will be reports of not only what the Tigard City Council has accomplished over the year, but reports In futur po from the other partners in this process. NMI ® 4W Tigard CRY Council Gals -1998 ~ to anticipate and contribute through an effective VOLUNTEER PROGRAM. A. Maximize opportunities for citizens p in g to the year 2010. the City's commitment top PARK FACILITIES AND RECREATION programm B. Identify romote that result in IMpR®~MENTS TO in specific activities the City can under take or p C. Identify, schedule and participate and other areas. 99W balanced with community • interests. ANNEXATION PROGRAM on four distinct areas; Walnut Island, Bull Mountain, Metzger, D. Define the CITY'S OF THE DOWNTOWN in cooperation with merchants and the E. As the lead agency, define the course for the FUTURE community, and specific actions that can be taken toward desired results. F. Obtain a LONG-TERM WATER supply solution. PROTECT AND ENHANCE THE COMMUNITY'S AESTHETIC QUALITIES G. Provide tools and implement programs that the 2000 balanced with development - such as planting 2000 trees by year H. Encourage and support private sector programs TO MAINTAIN DIVERSE AND AFFORDABLE HOUSING AND PROTECT TIGARD'S OLDER HOUSING STOCK. to serve riders within Tigard and from Tigard to other suburban I. Promote BETTER PUBLIC TRANSPORTATION communities management, funding and J. Develop a pREHENSIVE PUBLIC FACILITIES PLAN that includes construction, maintenance for streets, sewers, sidewalks and street lights. B-1 i Wad= i Tigard U cil owls 1998 rE A. Maximize opportunities for citizens to participate and contribute through an effective VOLUNTEER PROGRAM. B. Identify the City's commitment top PARK FACILITIES AND RECREATION programming to the year 2010. i f C. Identify, schedule and participate in specific activities the City can under take or promote that result in EUPROVEMENTS TO 99W balanced with community interests. D. Define the CITY'S ANNEXATION PROGRAM on four distinct areas; Walnut Island, Bull Mountain, Metzger, and other areas. ° E. As the lead agency, define the course for the FUTURE OF THE DOWNTOWN in cooperation with merchants and the community, and specific actions that can be taken toward desired results. f P. Obtain a LONG-TERM WATER supply solution. j G. Provide tools and implement programs that PROTECT AND ENHANCE THE COMMUNITY'S AESTHETIC QUALITIES balanced with development such as planting 2000 trees by the year 2000. H. Encourage and support private sector programs TO MAINTAIN DIVERSE AND AFFORDABLE HOUSING AND k ,id PROTECT TIG 'S OLDER HOUSING STOCK. E 1. Promote BETTER PUBLIC TRANSPORTATION to serve riders within Tigard and from Tigard to other suburban k ' communities F J. Develop a COMPREHENSIVE, PUBLIC FACILITIES PLAN that includes construction, management, funding, and maintenance for streets, sewers, sidewalks and street lights. i Oag 3 y - -,1. 7'77- r o i •{s' « st a l "1 - ~ M14r g"= } s - ~ 71 , I ` C a : r~,~>}( 1 ~ 4 I J SFe 1 k ~ k.k. _°'tf J J €r ~ a ~ r 1 t•, r t i I - t F' i-? 7 t r . AA -4 All g #d 9 4 f k F 6¢~. 3 rgig Man- JOR, s s ~ E u i -t 1 t 3~, a 121 y "r. Ss -y ' Actr r 2 ry E" yS _ pm~ W r y x4 ~r~~`x'c.7•~ x y .da .m as - _ _ . I + F lz?., ~ ~ F~ -'a T3 `w ytl t Tf ? y } Sr A i ~ t 1 M1 ' ~ TIGARD EYoND TQ{,NxoRRow Lk)Go EVFMFNEM I I, i The logo located on the front of this report was developed by Monica lguenberger, = a 1 igard High School art student; in Fall, 1996. The Vision Task Force members ' appreciated the symbolism of our community and the vision process captured in the design: `y The large "T" outline Tigard Beyond Tomormw Water Tualatin River and its tributaries Apple trees Our farming heritage 14, Homes and buildings The people and businesses in our rontrrtunliy Bridge The journey ihe.community takes from the Present to the future through the planning end implementa- tion of our vision Evergreen trees Qur natural areas Hot Air Balloon Celebration of our community and recognition of the Hot Air Balloon Classic at Cook Part, each June Sun Our future will be brighter when we bvork together 1 to achieve the community v:te grant in 201 i _ u.. ,s~l`"~'; x- a»,k=* ap:r" "a, a +x"A+a;.~a^;e^rruaaasc°n.r ;''-.-*"rn~ r& 3e, ;'`~:`~Ya,+~u~~,.~'~3~.~,=tt'.~;sYS~;~rd'+`S~"~"~"' ~'~;''.taa~,,"I'r3 ~.'~°r~:,.~v P'" J ..3 •t -:a!" ra ,e.~ °"..i~"'s~7~trrx.~*F?~F~~r'~xlmkxr.a,~''=wa•9- ~p ~ tr c; 1 ° - - - - - - ,.-:ma,+c- :-m°; sa^•-_ " -~t+s-s~~~tn's~,^.,=~"°mfcv ..,4-,oa.,~ ' ~I.+~ans z_.... .in{•. ,......xt.__. .:~.>^r_ r.> R._,..vP::isr. .!7~.e,.~. ..tiw, .,::m _.-::.......paY. .ue... a.h ' A!}d.._iv..'a..,.aras_.!~.• gym..': -16x" ....._...r - 1., I 1~ ~ l r TEII PARINMSMP CH a , A remarkable event happened in the Tigard community in the Fall of 1996 The process and throughout 1997. Residents, government professionals, business people, The Tigard Beyond Tomorrow process began in the Fall of 1996 and included and community group leaders volunteered to work together to determine the following steps: 1 what should be the community's future. Adopting the name `Tigard Beyond a Meeting with a wide variety of ginu to iittmduce ilia cancet ofvisionarg and to to listen Tomorrow, 'they established a process that would define a vision for our what was on the rronds of many decent people in our comity j community They then identified the resources for im lementin that vision p g Comments and concerns gathered in the community discussions were the basis of C ' through a partnership of individuals and organizations. the Community Survey which was distributed in October and November 1996. The r survey contained over 70 questions, asking for opinions about everything from parks j This unprecedented level of cooperation recognizes that Tigard and the to police to schools The survey also asked for people's oppinions about where Tggand "i surrounding community is at a significant juncture. It is almost fully level was headed and what changes they would make for our futu.e In addition to 396 oiled. The community has experienced fast-paced growth. Growth is still people interviewed by phone, the City received 746 responses from the Cityscape E survey 133 from the newspapers, and 20 from the Chamber of Commerce, far a total k w ` occurring, however, there are more issues today associated with redevelop- of 1,295 responses The surveyresults are summarized in a separate document, the G ment and the need to preserve existing infrastructure and increase capacity Community Survey Results available at City Hall. of the infrastructure. The community is becoming more diverse as it serves a once a great deal of background information was collected from the visioning i presentations and the community survey, it was time to begin the process of creating s as a 'bedroom community to the City of Portland. A large portion of the I T! traffic in Tigard each day is "through traffic" going to and from a regional m a vision and embers of the vision the Force: 35 e e zens representing many areas andinterest" F i ! shopping mail and commuting to and from work in surrounding communities. in the community The Task Force developed the vision for our community from the l surveys. They then set goals that would help achieve that vision. y ® When the vision and goals were finished, the Task Force broke into smaller groups E p~ Action Committees to develop the action plans The action Plans are Yargeted to y Our future is inn t to be ~ to chance achieve the goals for the future. f As Metro, the State of Oregon, and other governments and agencies plan for ' the futurq, our community has to decide what it wants to accomplish so that ' our voice will be heard in local and regional decision-making. The vision and i plans we make in the visioning process will be used by people and organize tions inside and outside our community as they plan for the future. i The larger trends seen in American society are also seen in the Tigard HAT IS TT'HE NAT SfEP? nl E community: increasing population, traffic, and crime; housing costs and r health care costs increasing faster than earning power; and more competi. The Tgard Beyond Tomorrow process is moving into a new phase. A great tion by schools, cities, special districts, and counties for property tax dollars. deal of background information has been collected, a vision has been Resources to provide services and meet resident' expectations are shrink- created, goals were set to help achieve that vision, and action plans are in ing. At this same time of tremendous increases there is also a sense of place to accomplish the goals. I loss-..that sense of family and community. These trends, and more make now I a pivotal time to take stock in the future and answer questions like: Now what? The entire community will be responsible for implementing the ! goals. The City of Tigard and local agencies can take the lead in carrying What should our community be like in 20 years? out some of the action plans. Other plans may require the involvement of e What can we do to ensure today's problems don't become tomorrow's crisises? local businesses, non-profit agencies, volunteer groups, churches, or the j 19 Will streets be safe and how can citizens help protect their homes and families? community at large. Every person and organization that takes part will f I ® Will there be adequate libraries, parks, trails, and natural areas for residents to enjoy? k v make Tigard's vision a-seality 0 What is "quality" schooling? t City of Tigard staff will spearhead the preparation of annual visioning Will governmental entities be more efficient and effective? reports, which will update the community on progress made towards the e How will continued growth impact the character and livability in now and established vision. These will be published to report on activity and accomplishments neighborhoods? 0 Will Tigard residents be members of a community - or just thousands of residents for each calendar year. 0*. connected by streets and zip codes? Every few years City staff will also work with citizens and other community-. J ; ® What will happen if we do nothing? partners to visit the vision through community-wide nevievd This step is r The FIgardBolond Tomorrow process was developed to answer these ques important to ensure that Tgard Beyond Tomorrow stays on track with the i r j tions and more. This report is just a start! The people who worked on Bgard changing times and desires of our community 80w7d Tomorrow believe that a community is more than a sum of addresses - ` it is people bound together by a shared vision. This report identifies what our community will be working on together to accomplish by 2017. r l is 1 s 'Who was iinvo ? H"s i1 TIC w? 1 i The Bgard Beyond Tomorrow process is citizen-based. By getting input from I as many different people and groups as possibly the vision will be stronger and more successful. The Tigard-Tualatin School District and the Tualatin The Vision Task Force didn't stop with just developing a direction for the overall Valley Fire & Rescue District were partners with the City in the visioning community but developed direction statements for Bach of six areas of review process. The Chamber of Commerce was in full support of the process and The six areas of focus are: participated by representing the business community The input of our ® Community Character and Quality of Life students (the future of our community) and businesses (our economic ® Growth and Growth Management backbone) along with the City and Fire District (servants of the community Q Public Safety 1 residents) aye vital to the success of this process. 0 Schools and Education j ® Transportation and Traffic ® Urban and Public Services This summary report gives citizens the direction statements, goals, staat@ i j gies, and action plans for each target area. . - _ . 7,1 y r The direction statements for each target area describe what the Tigard t community aspires to in the year 2017. The goals are priorities in each , ON 3 target area that the community will focus on. The strategies are specifi: l fl,,_ items aimed at achieving the goals. The action plans are the steps necessary r 1 to implement the strategies. For purposes of this report, only action plan i 6 r items slated to begin or for completion in 1998 are noted. Since our Tr and t I' ? j Beyond Tomorrows vision is a community-wide effort, take a minute to review x ? the target areas and decide how and where you would like to get involved - k` participating on a committeR offering your services as a volunteer or t monitoring our progress, together we can achieve our community's vision. _t 1 3 ~m i ' y ' 8 i S ~ t! _I s~f R,9 1 I ~ I I+ ` VISION STAMU iLl'I' OR V[SION TARS WHAT . TkGAIOUK UKE Id 2017? ~ The citizen-based Vision Task Force developed the direction for our 7 community and goals to be achieved by 2017. Following is the community's vision statement. I ft as citizens of the Tigard community are committed to shaping the j community's future in agreement with the direction given through this on- going vision process. This process .olies on citizen involvement and :td Urban and participation and coordinated actions by the community's decision-makers Public Services Tigard is a safe, dynamic community supported by coordinated and efficient public services. Funding for services is stable and recipients pay their share. I Citizens are educated about how to access public services and understand ~``'~5 Communit their responsibility to participate as members of the community y Character and I Tyre are a variety of opportunities for citizens of all ages to access education, programs for life-long learning, Our community recognizes and accepts the h = ` Quality of Lift; M = responsibility each citizen has in promoting and supporting quality education. Small and local businesses thrive. Business owners are involved and take responsibility for the impacts their businesses have on the community' g s A community value 'to respect open spaces and natural features' encour- ages access to these by our citizens. Many leisure time and recreational L opportunities are available for our community h ?Aria ` } All of these elements work together to promote and protect Tiigard's individual identity and quality of life. a i 01 srAimm-, w: ^ (wHAT 'lTl~4lo via III I 2®17y Tigard is a safe place to live, play, and do business, with efficient public safety services coordinated by police, fire, and emergency management providers . Citizens and businesses are wall educated about public safety services; Tigard's citizens understand their role and responsibilities for the safety of themselves and their community, and businesses take a proactive role for their responsibility in protecting their investment in the community. Public Safety r l service providers plan for their service delivery in such a way as to minimize the negative impacts of the regional populations that travel to and through our community each day Stable funding provides uninterrupted public safety services at desired levels. " 4) 6lte ty t t' oo stipg rstgborFaod ®vatcn areas Determine status of existing rdaigbbotfiood Hlatch areas ' ,7198 ® R ruit Winteor Coordinator. for.Neigliborfsood if h Program l98 F t servir : Educatianer promotion for existi~sQ watch Programs : %718 Qregoesig and, wd! 2f pid ff (vetch Program partrmr slopes t4 ,il s ° of Cnme Pis ttion TfaraW Esi+rirot #isl Qssigst inippl giant CPTEQ Wth Public Safety provides s aasv tt9tt : l o#Iact Ey" C 313) hs ass:st ofFl&i t: vffecUve p sl~s safety corrur ti,ag osc a8 land use applications b~ the ty 9 ptilrlsc tea td calls far aet~ e , Y 41 grit En t tr it Safety Pr s Prt rs i P► to assist ea lmplemant ESP program it ri iltifasridy dwe sng nits lap€nt t 8)fit i i sa i y re r t to rrs fanvly ci ments) within this Gity T l Garr ct Sun#, of true 83to determine public safety( i, rgey &ei'vlcas Heads 8) Qavsbip bush eeime pr€venfion pta~rtvri . Track business calls for service. ffeveEop data brio (fill 121b8 a . Conduct into search to find programme that work well in other 7198 619 t i ? communities ,2) ' Develop long 1) fle~ioa Pobcer~ aisd Emergency Mznagesnaisf sonice Conduct information saateb X998 I term, stable funding mechanisms already in use natroowide funding sources j to ensure ' 21 Review funding options fior tagienal impacts, on local public . s Track calk for service from regional population • daualop data bass 1198 12(98 [ affsciant, safety and emergency services ® Reiv ci sit strips from reel issues of d loi~E system 8198-10198 { j unsnturniptad a Survey other nationwide conmzunit; s to determine how they 1198- 12199 j" j public safety balance local dollars and regionsl service needs and emergency o Municipal Court Study to determine how court could create niom 7198 - 6199 services efficient public safety service and reduce repeat offenders 1 #3) The community 1) Develop community-wide program to train citizens to be self- e Educate citizens to be self-sufficient for the first 72 hours after " 12197 = Qngoing is trained and sufficient for the first 72 hours after an emergency event disaster strikes ' emergenc es 2) Coordinate Tigard emergency response providers ® . Develop Tigard Emergency Response Work Group for.responders to 12131137 E l { ! regularly meet to determine joint needs and coordinate efforts ® Hald regular meetings for information sharing 9198 Ongoing ® Modify response plans based on exercisaireal life response 1198 j experiences 1~ f`€ -j i 1 j k µh ~r . Y , I yr ' + 1 n5p C . z r~ r F l 1 sn 1~~: f iI ; f r V , ! 1 6 i ')J c. i ~lr cr'~ ! sE :I • I i.._,..:...-,..~.. mod.-.. _...,...~J_ -..~e_':.-ter.:`-.._.w..... 1 . . ~ • _ 1~{ l DMECnON SIIAI"FAUM: (WHAT TTGARD WILL LOOK LKE iN201 l7 E Tigard citizens are involved in their community Involvement is citizen driven and citizens have the tools to communicate effectively with community-wide I decision makers. ` !Volunteer spirit has been maximized through community-wide coordination of volunteers. Our community supports its volunteers with appropriate training and j volunteer recognition. Tigard encourages local, regional and community events. City funding priorities go to events which move toward financial self-sufficiency and new community wide events. ' Business owners, property owners, and residents of the Main Street Area display strong leadership, ownership, and commitment to downtown development. The Main Street area is seen as a "focal point" for the community A clear direction has been estabiished for a pedestrian-friendly downtown and is being implemented. The Tigard community has a defined, proactive vision for community aesthetics. Open space is a priority and new development is required to dedicate open areas for community use r IBM PI.AW COAL STRATES #1► City will maximize the effectiveness 11. Consider appouitme it of Community Continue With Volunteer Committee to develop foundationzf I of the.volunteer spirit to accomplish Wum'eor CoordinatorlOmbudsman needs(opp's, a i the greatest good for our i community 2) Enhance current volantaar proprem ® Inventory"current volunteer a portunities t Sponsor Make a Difference ay 10125197. x 307 1 Use Cityscape to facilitate Volunteer Pr®gram 31. Streit then Citizen Involvement Team (CIT) m Solicit ideas to improve the CIT program U7i99 lf features far CIT. program Pam n Review use of Cityscape 2710 rogr y ,1 = l #2) Citizen involvement oppo tunities 1` 'Encourage public participation through. ® Make Council meetings (study meetings) more accessible 137 ; will be maximized by p-ririding accessibility and education ® Sponsor Annual Residents Open House for existing and new 39B8 t educational pro~rams'an process, residents; promote volunteer opportunities assuring accessibility to information, Develop a Citizen handbook SBd99 1 providinjapportunities for input Improve communication of Cduncil decisions 119/1 and esta lisping and main }lining a program of effective communicauuu #3) Provide opportunities to work 1) Tigard's CBD: Be Pro active ® Establish Central Business District (CBD) CoTmttee "/938 proactive y with Central Business a Develop Mission Statement for the CBD 1998 District (CBD) businesses and ® Explore options: Outside expertise (i.e. Economic Bev Din, DBI ropecty owners and citizens of Livable ONo n) Tigard to set the course for the ® Use "Coroncept" ap roach when developing Identity/ilseme 11398 m area Develop Economic Deveoppment Plan 09199 future of the central downtown ® Partiespate in /flake a Difference Day • 10125197 • clean tip 1O125197 j along RR tracks 0 Plant trees g7 fRD r 2) -T+gnrd's CBD - Review City of Tigard ® Review zoning code - How does it promote the mission statement 981 I j regulations "Court" family-oriented business through design criteria 9B199 Expiere grant programs and/or matching funds - o8 gu 981 1 ® Become a mamber of Girable Oro an ® Revise Parking Regulation: in CBD 98193 ® Develop Zangg-term strategy w1OBOT re: 99w widening and 98199 - affects on C80 3) Tigard's CBD - work on strategies address- m Develop "Gateway" (portal) improvements (i.e. Wcome to Tgard") 1998 ~ I ing aesthetics a Install special street lighting fixtures reflecting theme 98199 i fanno Creek: Showcase this amenity; use as a connection 98.03: 11 _ j to community Install public restrooms 98.03 Develop connectivity plan • pedestrianslbicycles through CBD 98199 j b Develop amenity improvement list for implementation 98.03 { #4) Develop overall approach for 1) Community events • Develop a philosophy ® Create study ggreup to propose criteria for Council stated City Befog y sponsoring community events that on City event sponsorship event pphilosophy establishes balance among popular 0 Consider now City events to carry out Council's philosophy 58199 at traditional standing events, O Distinguish approaches to %,2nts that are tarneted for local 98199 i requests for support of new events residents vs. those that draw regiomvide and limited laity resources ® Develop funding criteria - confront limited $ and recent 98199 taxpayer direction a City-sponsored events must have community-based support 98199 ® Evaluate events innually based on criteria established and 98199 - defined by City-Event Philosophy 2) Community events • Develop an 12 Gieate study group to look at other community events 98199 r s._1 understandable, step-by-step ® Develop "how to packets for event volunteers 98199 process to assist event volunteefs ® Encourage event organizers to develop other funding resources 98199 + 0 Encourage events -Toth old and new Befog I t a Evaluate City umbrella insurance polconsider riders for 98199 sanctioned edents/costs prorated based on magnitude of event i j #5) Develop strategies to balance needs 1) Community Aesthetics - Balance Develop a list cf methods for dedication or acquisition 98139 of now and inf ill development twineed development and aesthetic needs of open space - =lo e rotection of defined a Determine if tax incentive programs are possible 98199 c ualities valued by those a Review Bev Code to balance aesthetic needs with 981,99 who alrea y livelwork in Tigard developer needs Wine terms such as "open space" and 'scenic view' in 98199 . 1 Development Cede f ® Be proactiv4 commit to stand by the vision; risk is supported 98 8r Beyond C and appreciated k's Consider establishing a site design review comm for 98199 ri~F 'p 3.;$,}'< { - t c A€{ developing pro pertleS r Establish aesthetically pleasing designs for roadways 98199 ® Revisit sign code: enforcement and regulations ggfgo fit' ; f ~t. 71, I ~ ~ 7 i c_.f a`',i 77 A.~.4YEnO1V ST W_ ENT. c6Y .iYAA ''aEi "S Vt'HAJL., 1JWK ' I iN 2®1 k , I ~ Tigard continues to grove Growth is accommodated while protecting the character and livability in new and established neighborhoods. The City encouragesf I " and supports private sector programs to maintain diverse and affordable housing. R " j Urban services are provided to all citizens within Tigard's Urban Growth Boundary. Recipients of services pay their share. Local and small businesses are encouraged as an important part of our community and our economy, i The City of Tigard is an active participant in regional issues. Its citizens are educated about issues in our region and take advantage of opportunities to participate in decision-making processes. l I SUL #1?. "Ac a c®tntnodate roertfr tivhilo . d Q " 0 „treats nflll,~n asadtEeasotiedaed'redovalop :-Liveloecntortafair location of accessoryunitg_ E 718 protecting the character"and inert" licios:to,al8o compatible arcommad _ •m Evaluate infrastructure heads to accoimmodate, infx~, redivelap?rant livability of now and established lion of fufuro ~r tith and increased _densitios... areas Consider coremercial inning oil 130 Mountain 101, 71 ~ , Evaluate tw!wthouit its;appropriate to maintain the ability_ far raw t0f877Cd residential developssmant on la a lets Protect natural resource areas ram the impacts of increased groiA 161117~d ; Provide an educational element that informs and educates the public 7iPr97n7w~ E s 2i Address the Tlgand "fain Center and the areas Address pedestrian issues in the Town Center 10j ~i89 daslgnstt tie Corridors in the 2040 Gm VIim Plea ; Consider redevelopirant of existing industrial land in the Tawn iirtar 1 98 P Review car idor densities to determine whather densities are approlmato 1919T 7198 Provide an educational element that informs and educates the public 1019741P 3) Addross platissFng'and growth issa~os assovi;tpd " Explore the i ~tpe is of annexation of some or all of the A~etzger area ' 1 7i7'J9 _ ` k } wtth the Regioitel Cantor Explore accommodation of higher densities in the Regional canters ad17.7', As part of the Regional Center Master Planning effort, incarporate : #{i 7 7t9$,.y larger study area Pravida an educational element that informs €id educates that p1 11c % 7 A #2} Urban services are prceided to t) 44 o ! a plan for fibs ardin mnttaxatumakaf ® Creato and'intpSar pant a public infanaiEt'son plan 12JS7 3t98 ' all citizens within Tgand°s urban .yalnut (eland ip Create a plan to evaluate and provide necessary infrasimctme 12197.6198, ' growth boundary and recipients (P Proceed with annexations where waivers have been obtained 7,'87;1 of services pry their sharp 0" Proceed with annexation of the remainder of Walnut Island 32198-121: Create agree;rientwth County that establishes under what =ditiairs 12197-1213 City will accept County facilities ' i 2) not critrria that outlines when and under Provide targeted ad. program aimed at newcomers and sp v c dull 19911, what circumstances areas on Bull MountalliMountain areas will annex Reach apreament with Wash Cnty that allows full provision of sarviros 71M:= by. City including police service and annexation . r Expand ability to got annex. waivers for provision of satrars %o Bull 11338; Mountain 1 Tt~ 3) Adopt a plan to educate Metzger residents ~ With area west of Hall as prioriq create public info prolimm that uses 1899 about annexation to Tigard CP04 as a partner, reaches out to newcomers, ammphasizes benefits of r joining Tigard and emphasizes the retention of Metzgor's identity ' 4) King CitylUrban Growth Boundary Annexation t~ #3) The City encourages and 1) implement a program to educate Tigard citizens ® Start community dialogue on issues associated with affordable housing 1188 i f suppo is private sector about the importance of affordable housing 0 Define community goals for affordable housing to determine target 3193,61ras programs to maintain diverse 0 Prepare written materials that reflect the community's gaols 61981 and affaidable housing ® Develop outreach program including Giiyscapa : nicleS press releases, 7198 y speaking opp's outreach to businesses, churches, senior centers and ;R community based organizations Implement outreach program 8198.10198 a 2) Make incentive programs available to providers a form study committee 2198 of cffordable housing units ® Committee consider waiver or reduction cif SDCS tax abatement for ran 2195 SI98 profits, andlor proparty tax reductions fair affordable housing projects Committee consider targeting financial incentives,u specific areas 2198-8198 i i of the City 1 a Study committee report issued to City Council 61,98d Yi 1 ® Council consideration of recomrr~en4ations of study committee 7198 v ® Implement Council direction 7198 e Develop outreach program to 'advertise- incentives 8158 ' 3) Review City's zaninq code and Comprehensive a Consider minimum densities, inclusionary zoning & density bonuses as 10198 Plan policies to provide maximum opportunities tools to encourage affordable housing k i i for affordable housing f f ti~ ' i 4! Incorporate affordable housin policies into a Identify opportunities to provide affordable housing in mixed one areas' 10197-71x13 ~ I study of Downtown, Wash Sqg , rather mixed a Include discussions on affordable housing in public wkshops in mixed 10197-71S8 use areas use areas ;r a Write policies and zoning code language to reflect desired affordable 10197-7;28 housing opportunities in nixed use areas r i i ® Implement olicies 7108 a Consider i4slhousing ratio as an incentive to focus housing ' 107 7i~? ,i 5! Strengthen ties between City Wash Cntg and a Hold summit on affordable housing with policy makers, develop fi198 amber wash Cnty cities to jointly provide community 9- ....ruical resources t0 identify issues ;I + affordable housing services ® Summit iollow•up to consider jointly providing technical assistance for 1h11'S developers of at fordable housing , e Consider increase in number of Wash Cnty subsidized units al{aii6ed in Tigard 11198 ' i 6) HOMELESS - Implement programs aimed at E s preventing homelessness 7) HOMELESS - Investigate tools to provide emergency housing #4) Local and small businesses are 1) Retain and assist local businesses • ;1 encouraged as an important part of our commwvty and economy e Cd lir o 3 ~'ITOI`T STATFAff . (WHAT nG&M WIII. MOK E iN2 1 Tigard area residents have access to good quality public and private schools. Residents of our community, whether or not they hw a children in the school system, understeald the importance of education and how they can help promote education of our community The public schools have stable funding through state and local funding options. Curriculum and extra-curricular programs are important and are well supported through volunteers, local funding, and in creased partneships with business and government. New development assists in paying for now education infrastructure required by growth in the community I' Public scheol;i and governmental entities in our community actively partner in day-to-day operAtions and other costs to facirdate the most efficient del-wry of servi= S' I t : is l =OR PLANS % fit) Sehstrtls and City t) Identify c ty s ftrr ' Explore than bzlrty of local bmanis spa of c &i" b a t will war sup grfall p tiding reciee~ott a, . recreational actssrties~at All school ks~s togr !ter to' ails a aoottvrr{ pro for young ppopla Increase volunteer participation in leap cIA- atPdatic acrd ~ and a)m r --rv tchao c srnrnity aaod middle school high schools recreation activity Ta ousting youth athletic programs more dirtly to scliech wtstf c 75 1l rasa for I 'J Pzopla y Recruit sorar citizens partnerships, and arbor comity vtears to eoordiisc€a tcact1If hobby activity and recreation classes 2!. Investigate a fax supported funding )rivostigate the funding relationship bete. schools and cities in ail pt°k g7 source to provide after•achoo! sports and recreation districts ;i and activity programs for students a Explore the city/school funding agrnts formed take D p end to 117 fund student athletics and activities Create a Citizens Tesk rirce to make a recommarrtlatron about f0*2 a park am ~p recreation district or establishing a city levy to fund student activities ~ Establish a true Community Schools Program (offering aftor-Schaal ed restio1, 97198 S ' War i` j interest classes for adults as till as young people) tli ough the Park and _ Recreation District r - ® Create an intasrgsrirerrrmsntalagmart batwa~i the Tigaid-Tualatin School, 3 + ~ District and the cities of Tigard acl Tualatin to devslopPr€construct = properties used for recreation 411 d'21 Educational o Porto 1) Use volunteers to support teachers ® Increase volunteerism in schools to help teachers and coordinate activift _ 19107 Cia nitios for Stu ants in provide additional learning opportum- a Soak funding for volunteer coordinator at each school for rocniftment, t - • and 10167 50 Tr®ard-Tualatin ties for students lacement Schools will be ® Use older students to work with young students tD197- StfgB maximized ® Coops - parent required to be involved with a definite time frome commitmam 10107 - SM l ® Coordinate recruitment, training and support for all cammunity volunteers i Per j ' 2) Maximize the use of district facilities a Consider using school facilities on extended day schedule to offer enrichment and 1 I I ` { remedial programs + ti 13) The schools and city t) Examine the potential for city 0 Create now Ci4y position of School Media Specialist at the Tigard Public library - 7198 govarnment will work government to provide same ® Tigard hires an Educational Activities Specialist 7188 together to maximize support services, for the Tigard 0 Create 1 or 2 summer jobs per City department for Tigard High School students 5198 financial efficiencies Tualatin School District ® Park and Recreation District assume responsibility for use, upkeep, staff and 1 year i ' ? and address funding income for gym fields, unused class rooms. shortfalls ® Develop pa-sd intern positions for vocational training within the City and eamrrnrnity 1 year { ii4) Government policies 1) Support policy changes that will 0 -Through legislation, impose a development tax on all new construction (residential within 2 years t will permit the promote the District s ability to : and commercial) for schools i Tigard • Tualatin provide adequate school facilities ® Provide tax incentive for land donated to schools 2 years School District to ® Improve cooperation between government agencies, shoots, davakipem and planners 1 year prepare for growth ® Obtain legislative ap roval to pass bondilevy measures above the limits imposed by 4 years and control the Measures 5, 47, ana~50 quality of services 0 legislation should permit development moratoriums until all school infrastructure 4 years it provides students issues are resolved 2) School officials will create a long ® Explore the possibility of constructing two-story schools in the future VAthin 24 months range plan to address future growth ® Continue to include land acquisition in future bond elections; create a 5 to 20 year Within 24 months plan for growth and acquire properties sufficient for projected enrollment ® Build smaller schools - smaller buildings that can be used and sold in the future (thin 24 months when they are no longer needed i f i f Cs. ryry 'r c c' I 1~1 I l it . A f ~ I •I T-' ITI Z~J r i., d yr-c D MOO STATEMENT: ( ASTK E iN 2017) E ' 1 Tigard takes a proactive role in regional transportation planning. Funding sources are diverse, include regional resources and are adequate to build and mvintairi ow transportation system. Each type of street safely handles the traffic it is Oesigned to serve. Local traffic is served by a well-connected street network that minimizes traffic impacts on neighborhoods. Tiigard's arterials and major collector streets accommodate through-traffic reducing the impact of regional traffic on local neighborhoods. Alternative transportation methods are affordable and available. Use of alternative transportation is encouraged. MEG ON PLANS #1# prove, 14 Dssco rag .tnrou~ -traffic on locals. sus , t{e`sdlrig Cn pr h sva Traffd Co{anIng grogram yoarfy 0rrsp{e t t€on 711 f$6",:" x traffic safety lritplement,TrafFic Mrang Program 1 , 6e6co posted d t Esttaroi$ pus"'Ad speed Cta {ncresso f xo~ for spaedmg . Rob Wpo"ibility:of fluxed ease areas near residgit;oa rioigbborfioods rfMt f:C' t 2) : Encourage through traffic on major collectors 6g Cg and hie royair its of agar, cW;1ectars artet ale f;IP WWWd a ttl arterials Identify`and promnte use of through routes 97100 iv reek at apgresCarg existing streets to rosier colQactos or anal states , 9TJ98 ® Prohibit i irect access onto rrenor co tors 97198 e Exondro and irnpl n wogs to maxim tias =I of existing lures 980 ® Accelerato-fAmoval of vaifiicles after minor acccldarits 27198 3j fle a actual s on neighborhood streets Strict: enforcement of posted spend IM' Coe rs . (D Highr alas for speed Molations m neighboritaods. ftavi { Traffic cahirir~g ~m~easures (hririont) • 87198 fliigstig Impl itt tm c control measure: where appmp`iate As WmWited for safm i ® Controt3ad access to collector roads _ Dratg App Rol: " #2) Improve 1) Davalop a program to implement the 0 Rmiie?i all existing stroats to be connected far feasibility of cormiction .61198 traffic flora Comprehansiva Plan.; . 0 . Review options for connecting existing streets wJCornpreha:osivo plan 97198, . Prioritiza street connactions.in order of €naportonce . 07198 i -Develop funding strategy for City funded street connections 07136 21 ,rook for additional points of connectivity, use street system study to determine desirable connection point- 97198. ! i identify areas of alternate routes 97195 II e+ . r ROW Acquisition I'mareni to set aside corridor c& action points 10 aftu T&P Amend Comprehensive Transportation [Asp Plan to reflect review results 97198 ® -Coordinate with other jurisdictions for connection points 97198 3) Identify alternate transportation modes 0 Enhance off-street bikepathlpedestdon walkway connectivity 6198 a Determine optimum route for alternate modes 6198 F ® Explore formation of Tigard TMA 12198 ® Explore rail commute options- 12 months more or less i 4) Encourage uses of alternate modes a Endorsement of increased gas tax and registration fees 98199 ® Provide HOV lanes Continuous ; ® Reduced fares for transit users Continuous ® Educational campaign to increase awareness of alternate modes Continuous 1, s 5) Encourage development of Alternate Modes ® Coordinate with other jurisdictions for continuity of various modes 12197 - Ongoing Participate in regional ao is to developp & promote use of Alternate Modes Continuous " « j ® Require development of 6ikepathlpedestnan walkway connectivity 7198 Review and provide connections m existing areas 97198 ® Review and update existing bikepathlpedestrian walkway master plan 1199 ' j 6) Design and Implementation of Traffic ® Synchronization of state, county and city traffic signals Continuous Flow Enhancement a Reduction of two-way left turn lanes Continuous Coordination with other jurisdictions for continuity of enhanced flow Continuous 0 Emphasis on street striping Ongoin ® Increased street righting throughout City streets Each FY , ® Emphasize maintenance of areas where clear sight distance is necessary Each FY e Improved signage on freeways and arterials FY 97198 - Ongoing 1 #3) Identify and 1) Establish a task force to examine current a Establish a task force to examine current funding sources and possible 1198 (18 me. action G drop and possible now sources of funding new sources of funding period) Final report to Council 6199 l " funding 1 resources 2) Implement task force recommendations " Ze, t Y i 1 I ~i FFFF 9 r 1 I P r K ;i 1 ] + z. . ' 4 t z i I I' " J)a ~1 J , iii -rmrre .r i t~a'i,b;a ' • '~lCfl C 9 i,!F; - - - - - E DIREC'ri ON Sr : (WHAM' nGARD VJU LOOK LIKE iN 2®1` { k i . Basic Urban Services (such as access to parks, recreational opportunities and libraries) are provided to -Tigard citizens through property taxes and fees for i service. Citizens are charged for enhanced services on a cost-for-service basis. Expansion of the infrastructure necessary to serve growth is paid for by growth. In an effort to facilitate the most efficient delivery of basic urban services, partnerships with businesses, special interest groups, and other communities are encouraged. Citizens are educated about basic urban services, and how to access and preserve the services. GOAD ST C6Y EaBI PLANS #1) libsaty will have a stable 1) Provide additional library services, ® Detarmine which library services are "basic" and which are enhanced 31106 j fuaditrg bass for the through users fees for selected Select 'enhanced' services that could be sub##'aect to user.feas 7 an of basic sarvocos °e~bNQs . services at Determine which market is for additional fee based library services Bfft3.8 Basic services are defined ® Nblic education on library fees' 499 - by the Oregon library' a Establish appropriate fees and tracking praCoss ?lam Association) ® Establish budget process that allocates for library use 901 121 ® Evaluate process for cost-offactiv 7 t ; k 2). Identify ontreprentairial moans of a Complete literature search retarding examples of partnerships luetm un ptdu~ 30-1 fit ling support for library services libraries and/or schools witi Businesses Create task force to mvin info, 10 companies within service a as patenfaal, 71118' . partners and explore entrepreneurial concepts Public education regarding partnerships to invoke non pro6tlserefar ergs 8139.1 "h er Explore concept of sponsored" collections 11193-31 , l Explore concept of renting audio visual or computes =tall mt 10193'. Explore concept of video rental coflaction' (patter after rental book proem) RIM - 31® Evaluato possibility of constructing library to serve pubec and high school W11; ~w Evaluate possibility of 0,aring staff between public library and media r e€tters -3M9 ' 3) Seek g main ti gn sin current tax base #2) Create a special parks and 1) Develop a short term pilot racrobtion ® Educate partnerslciti ens about pilot program 'tA197, 3188 3 recreation district with the program for school age children ® Gather volunteers and staFmq for pilotprogrram TIBI97. SM City of Tigard s ad mading ® Create athletic and non-athletic recreational program 10107-31'98 - the process and maintaining ® Develua training for Ftaff and volunteers 10197 - 3198 hip for its citizens ® Cooperate with existing laagues and groups "'197-31811- 0 Address latch key issues 111/97-3108 ® Maximize use of existia facilities /01117.3198 ® Address short term funding options, grants fps„ hardship grants 10197 - 30 j 0 Im foment pimgrare 3183 0 Debrief to determine success of program and whether to continue 4108 - SMS - 'i 1 2) Create a task forme regarding develop- 0 A point task force lies - ment of a park and recreation district ~ Educate partners/citizons re: community recreation needs wid avail facilities 1998-1199 1 Develop interest and representation for nonathletic recreational raaods lfF.9s ° 1199 Assess community needs and resources 19.98-1199 ® Develop community wide partnership 1998 -1/99 ® Dovelop and utilize exsting schaal/park facilities and properties 1199 -1100 Create a partnership to maintain existing facilities 1199.1100 Address funding issues - bondllevp prop taxes private supp, grants fens 1199.1100 Co-op with existing leagues and groups 1199-1100 Include Sr Center and seniors as an essential part of the Districfs programs ttoo -103 #3) The City educates and 1) Adopt educational and presentation 9 Develop community wide partnership to educate citizens about need to 1198 -1101 supports citizen efforts to program for wetlands and open spaces protect and preserve wetlands and open spaces understand the importance a Prepare list of possible land acquisition sites avail inside and outside City 10197-1100 of flood-plains and hove the ® Reclaim what lands we already have 1100 areas are managed and ® Address funding issues 10197-1100 ' protected m Implement school educational program 1 /98 -1101 #4) Actively participate in t) Form consortium of neighboring 0 Persuade area jurisdictions to participate in consortium 1993 regional devetopmr:nt of jurisdictions to develop a regional water ® Inform water users of progress 10198 water sources and adequate, plant for Willamette River water innovative funding mecha- nisms to develop those 2) Develop plans for-surface water ® Designate Engineering Firm to proceed 1998.99 sources for Tigard etsars production and supply while exploring local options for water reuse and 3) Conservation - Reuse - Alternatives ® Educate water users in conservation methods 9190.8/00 groundwater sources ® Develop ways to control access to water which would not allow growth to 9198 - 8107 outgrow water supply { min 'S ONO? Direct them to... r _J Li of Tigard 13125 SW Hall blvd. 'j Tigard, Oregon 97223 r. i (503) 639-4171 (phone) • (503) 084-2772 (TDD) http:\\Www\ci.tigard.or.us (web site) y N The following staff members at City of Tigard would be happy to answer your questions regarding the Tigard Beyond Tomorrow process, the contents of this report, nr the ongoing ` t R efforts of our community to work towards the future we have chosen. E k., Bill Monahan, City Manager Liz Newton, Assistant to the City Manager {fix a phone (503) 639 4171(ext.306)` phone (503) 639.4171(ext. 308) a e-mail address: bill@ci.tigard.or.us email address: liz@ci.tigard.orus, Loreen Mills, Sr. Analyst/Risk Manager; phone (503) 639.4171(ext. 327) is e-mail address: loreen@ci.tigard.orus t f, 1 4 1 r ~ Since I am unable to attend the hearing March I Oh, my request and concern, would to have an "expert" do a proper analysis and Mr. DeHarpport to comply with any earth adjustments along the indicated "drainage" area to preserve landscape and to avoid any possible side hill deterioration to all the properties along this area. And obviously, have your planning department review the report prior to final approval of this project. Thank you for your concern, diligence, protection of the existing neighborhood. If you wish to contact me directly, my voice mail is (503) 938-2829 or office (503) 636-1054 ext 127. 1 will a out of town from Tuesday Mar. I O'h afternoon until, Sunday night Mar 15''. Since y, Paul De- an ' 14104 SW 121" Ave Tigard, OR 97224 CITY OF TIGARD Community (Development S6apingA Better Community PUBLIC HEARING NOTICE NOTICE IS HEREBY GIVEN THAT THE TIGARD CITY COUNCIL AT A MEETING ON TUESDAY, MARCH 10. 1998 AT 7:30 P.M., IN THE TOWN HALL OF THE TIGARD CIVIC CENTER, 13125 SW HALL BOULEVARD, TIGARD, OREGON 97223 TO CONSIDER THE FOLLOWING APPLICATION: FILE NO: ZONE CHANGE ANNEXATION (ZCA) 98-0004 FILE TITLE: GAARDE STREET J OLSEN HEIGHTS SUBDIVISION ANNEXATION APPLICANT: Dale DeHarpport OWNERS: Robert and Kay Norin; FOUR D CONSTRUCTION Janice Justice; P.O. Box 1577 Ron and Wilma Lambert; and Beaverton, OR 97075 Four D Construction. iEQUEST > The applicant is requesting to annex 6.14 acres into the City of Tigard and change the zoning from County R-5 to City of Tigard R-4.5. LOCATION: 11910, 11920 and 11900 SW Gaarde Street; WCTM 2S110BA, Tax Lots 02100, 02200 and 02300 and WCTM 2S110BB, Tax Lots 00100, 00300 and 00400. APPLICABLE REVIEW ;RITERIA: Community Development Code Chapter 18.136 and Tigard Comprehensive Plan Policies 2.1.1, 10.1.1, 10. 1.2 and 10.1.3. ZONE: The current zoning is County R-5; the proposed zone change is City of Tigard R-4.5. THE PUBLIC HEARING ON THIS MATTER WILL BE CONDUCTED IN ACCOR=DANCE WITH THE RULES OF CHAPTER °.32 OF THE COMMUNITY DEVELOPMENT CODE AND RULES OF PROCEDURE= ADOPTED BY TI iE TIGARD CITY COUNCIL AND AVAILABLE AT CITY HALL, OR RULES OF PROCEDURE SET FORTH IN CHAPTER 18.30. ASSISTIVE LISTENING DEVICES ARE AVAILABLE FOR PERSONS WITH IMPAIRED HEARING. THE CITY WILL ALSO NDEAVOR TO ARRANGE FOR QUALIFIED SIGN LANGUAGE INTERPRETERS AND QUALIFIED BILINGUAL ITERPRETERS UPON REQUEST. PLEASE CALL (503) 639-4171, EXT. 320 (VOICE) OR (503) 684-2772 (TDD - 'ELECOMMUNICATIONS DEVICES FOR THE DEAF) NO LESS THAN ONE WEEK PRIOR TO THE HEARING TO MAKE .-ARRANGEMENTS. ANYONE WISHING TO PRESENT WRITTEN TESTIMONY ON THIS PROPOSED ACTION MAY DO SO IN WRITING PRIOR TO OR AT THE PUBLIC HEARING. ORAL TESTIMONY MAY BE PRESENTED AT THE PUBLIC HEARING. AT THE PUBLIC HEARING, THE CITY COUNCIL WILL RECEIVE A STAFF REPORT PRESENTATION FROM THE CITY PLANNER, OPEN THE PUBLIC HEARING, AND INVITE BOTH ORAL AND WRITTEN TESTIMONY. THE CITY COUNCIL MAY CONTINUE THE PUBLIC HEARING TO ANOTHER MEETING TO OBTAIN ADDITIONAL INFORMATION, OR CLOSE THE PUBLIC HEARING AND TAKE ACTION ON THE APPLICATION. ZCA 99.0004 GAARDE STREET / OLSEN HEIGHTS SUBDIVISION ANNEXATION PROPOSAL/REQUEST FOR COMMENTS IF A PERSON SUBMITS EVIDENCE IN SUPPORT TO THE APPLICATION AFTER FEBRUARY 18. 1998, ANY PARTY IS ENTITLED TO REQUEST A CONTINUANCE OF THE HEARING. IF THERE IS NO CONTINUANCE GRANTED A-rTH.E HEARING, ANY PARTICIPANT IN THE HEARING MAY REQUEST THAT THE RECORD REMAIN OPEN FOR AT'LEAS r SEVEN (7) DAYS AFTER THE HEARING. A REQUEST THAT THE RECORD REMAIN OPEN CAN BE MADE ONLY AT THE FIRST EVIDENTIARY HEARING (ORS 197.763(6). INCLUDED IN THIS NOTICE IS A LIST OF APPROVAL CRITERIA APPLICABLE TO THE REQUEST FROM THE TIGARD COMMUNITY DEVELOPMENT CODE AND THE TIGARD COMPREHENSIVE PLAN. APPROVAL OR DISAPPROVAL OF THE REQUEST BY THE CITY COUNCIL WILL BE BASED UPON THESE CRITERIA AND THESE CRITERIA ONLY. AT THE HEARING IT IS IMPORTANT THAT COMMENTS RELATING TO THE REQUEST PERTAIN SPECIFICALLY TO THE APPLICABLE CRITERIA LISTED. FAILURE TO RAISE AN ISSUE IN PERSON OR BY LETTER AT SOME POINT PRIOR TO THE CLOSE OF THE HEARING ON THE REQUEST ACCOMPANIED BY STATEMENTS OR EVIDENCE SUFFICIENT TO ALLOW THE HEARINGS AUTHORITY AND ALL PARTIES TO RESPOND PRECLUDES AN APPEAL, AND FAILURE TO SPECIFY THE CRITERION FROM THE COMMUNITY DEVELOPMENT CODE OR COMPREHENSIVE PLAN AT WHICH A COMMENT IS DIRECTED PRECLUDES AN APPEAL TO THE LAND USE BOARD OF APPEALS BASED ON THAT ISSUE. ALL DOCUMENTS AND APPLICABLE CRITERIA IN THE ABOVE-NOTED FILE ARE AVAILABLE FOR INSPECTION AT NO COST OR COPIES CAN BE OBTAINED FOR TWENTY-FIVE CENTS (25C) PER PAGE, OR THE C UPRENT RATE CHARGED FOR COPIES AT THE TIME OF THE REQUEST. AT LEAST SEVEN (7) DAYS PRIOR TO THE HEARING, A COPY OF THE STAFF REPORT WILL BE AVAILABLE FOR INSPECTION AT NO COST, OR A COPY CAN BE OBTAINED FOR TWENTY-FIVE CENTS (25C) PER PAGE, OR THE CURRENT FATE CHARGED FOR COPIES AT THE TIME OF THE REQUEST. FOR FURTHER INFORMATION PLEASE CONTACT THE CITY RECORDER OR STAFF PLANNER JULIA POWELL HAJDU AT (503) 639-4171, TIGARD CITY HALL, 13125 SW HALL BOULEVARD, TIGARD, OREGON 97223. r -Ew SW GAARDE ST ECT ❑ - -~L « A C IS -E -L ZCA 98.0004 OAARDE STREET / OLSEN HEIGHTS SUBDIVISION ANNEXATION PROPOSAL/REQUEST FOR COMMENTS AGENDA ITEM # FOR AGENDA OF 03/10/98 CITY OF TIGARD, OREGON COUNCIL AGENDA ITEM SUMMARY ISSUE/AGENDA TITLE Tigard Beyond Tomorrow - Recognition of the Community's Vision for 2017 PREPARED BY: Mills/Newton , EPT HEAD OK =-Cl-TY MGR OK ~ ISSUE BEFORE THE COUNCIL Confirm the Council's recognition of Tigard Beyond Tomorrow as a process to be used to achieve the Community's vision for 2017. STAFF RECOMMENDATION Adopt the attached resolution. INFORMATION SUMMARY Tigard Beyond Tomorrow is the process that has been used to capture the desires of our community for the future of Tigard. Attached is the full report and a resolution. When adopted, the resolution statea that Council will address elements of the vision in their annual goal setting process, and provide leadership to establish and maintain partnerships throughout the community to accomplish our envisioned future. OTHER ALTERNATIVES CONSIDERED None VISION TASK FORCE GOAL AND ACTION COMMITTEE STRATEGY The Tigard Beyond Tomorrow document, attached, make the following statement: "We, as citizens of the Tigard community, are committed to shaping the community's future in agreement with the direction given through this on-going vision process. This process relies on citizen involvement and participation and coordinated actions by the community's decision-makers." FISCAL NOTES Fiscal impacts of implementing each specific strategy or action plan is not known at this time. Items addressed in the Tigard Beyond Tomorrow document will have financial and staffing requirements from all of the partners; citizens, businesses, City of Tigard, Tualatin Valley Fire & Rescue, Tigard/Tualatin Schools, Tigard Chamber of Commerce, and others who join our community in the future. loreen/h:/docs/vision/cc98sum.doc Agenda Item No. J MEMORANDUM Meeting ofL-3-11z)4 CITY OF TIGARD, OREGON TO: Honorable Mayor and City Council FROM: Bill Monahan, City Manager DATE: February 2,1998 SUBJECT: COUNCIL CALENDAR, March - May 1998 Regularly scheduled Council meetings are marked with an asterisk If generally OK, we can proceed and make specific adjustments in the Monthly Council Calendars. March 3 Tues Joint Meeting with Tualatin Valley Fire & Rescue (6:30 p.m.) Regional Training Facility - Sherwood *10 Tues Council Meeting (6:30 p.m.) Study Session - Business Meeting * 17 Tues Council Workshop Meeting - (6:30 p.m.) * 24 Tues Council Meeting - (6:30 p.m.) Study Session - Business Meeting April 7 Tues Joint Meeting - Planning Commission (6:30 p.m.) Commun.''y Development Code Revision Review * 14 Tues Council Meeting - (6:30 p.m.) Study Session - Business Meeting * 21 Tues Council Workshop Meeting - (6:30 p.m.) 23 Thurs Volunteer Recognition Banquet (5:45 p.m.) Tigard High School - Commons Area * 28 Tues Council Meeting - (6:30 p.m.) Study Session - Business Meeting May *12 Tues Council Meeting (6:30 p.m.) Study Session - Business Meeting; * 19 Tues Council Workshop Meeting - (6:30 p.m.) 25 Mon Memorial Day - City Offices Closed * 26 Tues Council Meeting - (6:30 p.m.) Study Session - Business Meeting i:\adm\cathy\councit\cccal.doc AGENDA ITEM # . 3 FOR AGENDA OF I 1 DI4 $ CITY OF TIGARD, OREGON COUNCIL AGENDA ITEM SUIVINIARY ISSUE/AGENDA TITLE Amendments to Personal Services Agreement - City Attorney PREPARED BY: Tim Ramis (Summary cw) DEPT HEAD OK _ TY MGR OK ISSUE BEFORE THE COUNCIL Consider amendments to the Personal Services Agreement between the City and the firm of O'Donnell, Ramis, Crew, Corrigan & Bachrach. STAFF RECOMMENDATION Approve addendum as submitted. INFORMATION SUMMARY The Tigard City Council entered into a formal agreement with O'Donnell, Ramis, Crew, Corrigan and Bachrach, LLP, to provide City Attorney Services to the City of Tigard on December 9, 1997. Since that time, there have been changes in staffing at the firm. The attached amendment updates the personal services contract to reflect that Timothy V. Ramis named in the "contractor" language and is the lead attorney. OTHER ALTERNATIVES CONSIDERED None. VISION TASK FORCE GOAL AND ACTION COMMITTEE STRATEGY N/A FISCAL NOTES N/A CI' F TI D► March 11, 1998 OREGON Timothy V. Ramis O'Donnell, Ramis, Crew, Corrigan, & Bachrach, LLP 1727 NW Hoyt Street Portland, OR 97209 RE: Amendment to Personal Services Agreement. Dear Tim: Please find enclosed an original Amendment to the Personal Services Contract between the City and your firm. This Amendment was approved at the March 10, 1998 City Council Meeting. Sincerely, ge4-~ Jessica Gomez City Administration Enclosure i\adm\jessica\amend.doc 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639-4171 TDD (503) 684-2772 AMENDMENT CITY OF TIGARD, OREGON PERSONAL SERVICES CONTRACT This constitutes an amend: -::nt to that AGREEMENT made and entered into on the 9' day of December, 1997 by and between the CITY OF TIGARD, a municipal corporation of the State of Oregon, hereinafter called CITY, and O'Donnell, Ramis, Crew, Corrigan and Bachrach, LLP, hereinafter called CONTRACTOR. Section 10. is revised to substitute the following language "CONTRACTOR: Timothy V. Ramis O'Donnell Ramis Crew Corrigan & Bachrach, LLP 1727 NW Hoyt Street Portland, OR 97209" Signature Block is revised to substitute the following language: "CONTRACTOR By: , Timothy V. Ramis Date: " Exhibit A, Scope of Services, Section A is revised to substitute the following language: "A. CONTRACTOR will be responsible for CITY lega; representation as authorized by the City Council and/or City Manager. Authorization to perform specific tasks will come from the Mayor, City Council, City Manager or other persons directly authorized by the Mayor, City Council or the City Manager. Timothy V. Ramis will act as lead attorney. Timothy V. Ra_:vs is referred to herein as the "City Attorney." Page 1 - PERSONAL SERVICES CONTRACT AMENDMENT 01111101 milli IN WITNESS WHEREOF, CITY has caused this Amendment to Agreement to be executed by its duly authorized undersigned officer and ONTRACTOR has executed this Amendment to Agreement on the date written belo CITY OF ARD By: Mayor Da By: ity Manager Date: CONTRACTOR By: Timothy V. Ramis Date: f (J tvr/tigard/council/psaasmend(2/ 17/9RXsrb) Page 2 - PERSONAL SERVICES CONTRACT AMENDMENT O'DONNELL RAMIS CREW CORRIGAN & BACHRACH, LLP ATTORNEYS AT LAW o FM, 1727 N.W. Hoyt Street Portland, Oregon 97209 TELEPHONE: (503)222-4402 F E 8 ji3 FAX: (503) 243-2944 U DATE: February 17, 1998 TO: William A. Monahan, City Manager City of Tigard FROM: Timothy V. Ramis RE: Amendment to Personal Services Agreement Enclosed please find two original Amendments to the Personal Services Agreement between the City and the firm. Once executed by the City, please return them to this office for my signature. I will return a fully executed copy to you for your records. /srb Enclosures tvr/tigard/counciYmonahan.mrn3 iiiiiiiii'llillol r AGENDA ITEM # ° FOR AGENDA OF 3/10/98 CITY OF TIGARD, OREGON COUNCIL AGENDA ITEM SUMMARY ISSUE/AGENDA TITLE Resolution in support of the I-5/Hwy 217 road project PREP,kRED BY: Laurie N. DEPT HEAD OK #X- CITY MGR OK ISSUE BEFORE THE COUNCIL To vote for a resolution demonstrating Tigard's support for the I-5/11wy 217 road project to the Oregon Congressional delegation STAFF RECOMMENDATION Staff recommends that City Council vote in support of the subject resolution, informing the Oregon Congressional delegation that Tigard supports the I-5/Hwy 217 road project INFORMATION SUMMARY The City of Lake Oswego and other jurisdictions in Washington County and Clackamas County are showing their support for the I-5/Hwy 217 road project to ensure that it receives the necessary funding for construction. This resolution will be forwarded to our U. S. Representatives. OTHER ALTERNATIVES C( NSIDERED The Council could vote to deny the resolution VISION TASK FORCE GOAL AND ACTION COMMITTEE STRATEGY Not applicable FISCAL NOTES Not applicable i %citywidelanM%i-5217.d0c 03/06/1938 10:08 503-624-0641 TVEDC PAGE 02 tit,>n;lrr~t• ~ ~c)r,lt>n '•1'~iti1 C:tl-1 Blur:enalt_ Tt UATIN VALLEY j=ebr;;ary 23 1998 The Honorable Ron VVyden US Senator 259 Russell Senate Office Building Washington, D.C. 20510 tat~rd of Dirccc a-. c'=:-T Dear Senator Wyden: :'yam l_'~i=~ The Tualatin Valley Economic Development Corporations (TVEDC) i ransportation Committee is writing to urge you to support full funding for the 1-5 @ Highway 217/Kruse Way Interchange Transportation Project, Phase I and II. i.mt. ~.~a:ad~'ue:•r. This project is the top transportation priority for TVEDC and the region. It has been in planning stages since the early 1990's and Phase I implementation is expected to begin next year. TVEDC believes this project is paramount in relieving congestion in Washington and Clackamas County. It will provide for efficient freeway to freeway movement of vehicular traffic and provide access t7) and from the adjacent commercial/industrial areas in Tigard and Lake Cswngo. - = in a recent meeting with the Orecon Department of Transportation, TVEDC learned that funding constraints that initially divided the project into two phases, further diminish"ad Phase I's impact. Phase II needs to be implemented for this project to solve the congestion issues as quickly as possible and to reduce the total overall cost for the project. We urge you to support funding to speed Phase II construction for the 1-5 Highway 107 /Kruse Way Interchange Transportation Project. L Sincerely, Bill Buckley - - TVEDC Transporation Committee Chairman r. Cc: Senator Torn Hartung Representative Ken Strobeck Senator Eileen Outub ;representative Chuck Carpenter Senator Jeannette Hamby Representative Ryan Decken Senator Randy Miller Representative Torn Brian Representative Charles Starr Representative Richard Devlin Representative Jim Hill Representative Ron Adams 10O,) SAV. 11;i::>u~ :fix r:iuc, Suitc C33 • TiLard, Orcoon 9 AGENDA ITEM # FOR AGENDA OF N CITY OF TIGARD, OREGON a LA ~ 6 COUNCIL AGENDA ITEM SUMMARY 3 I I 0 I$ ISSUE/AGENDA TITLE Private Streets PREPARED BY: Will D'Andrea DEPT HEAD OK / ITY MGR OK ISSUE BEFORE THE COUNCIL Should the City allow private streets and who shall be responsible for the maintenance of private streets. STAFF RECOMMENDATION 1. Maintain the current policy with the understanding that the City is not interested in taking over the responsibility for maintenance of these streets in the future. 2. Require the developer of all private streets to install street lights. 3. All maintenance issues and costs for the private street design (streets, storm, lights) will remain the responsibility of the developer or future homeowners association. INFORMATION SUMMARY In the past, the City Council has looked at the issue of private streets and issues related to maintenance of private streets. Recently, an issue of street lights on private streets was brought before the Council. This memo is designed to address the issues surrounding private streets in order to facilitate the Council coming to some resolution as to the City policy regarding private streets. OTHER ALTERNATIVES CONSIDERED Take no action at this time. VISION TASK FORCE GOAL AND ACTION COMMITTEE STRATEGY Not applicable. FISCAL NOTES Not applicable. i Acurplan\wi I I\prstrme.sum CITY OF TIGARD Community Development Shaping A Better Community MEMORANDUM CITY OF TIGARD TO: Jim Hendryx FROM: Will D'Andrea DATE: February 12, 1998 SUBJECT: Private Streets CURRENT POLICY AND PURPOSE The City of Tigard Community Development Code (CDC) allows the creation of private streets. Private streets are allowed outright to serve up to six lots or are required to be approved through the Planned Development process to serve greater than six lots. The City allows private streets for a number of reasons including: • land division on small sites that create less than six lots where a 20-foot paved shared driveway is adequate to provide access; • to facilitate infill development; • to allow a diversity of housing type (townhouses); • where public streets are not needed or are precluded from future extension; • to allow certain housing types that may be better suited for private streets (townhouses); and • to help fill a market niche for different types of living arrangements. The private street design allows a proposed development to trade-off access width and other public standards in order to allow a greater number of lots than would otherwise be feasible given the improvements at public standards. The recorded plat will identify that the street is private and that maintenance is the responsibility of the homeowners. In most cases, the design of the private street and subdivision improvements are clearly different from public street and subdivision improvements. Page 1 of 5 CURRENT STANDARDS THE FOLLOWING COMMUNITY DEVELOPMENT CODE SECTIONS PERTAIN TO PRIVATE STREETS: Planned Development. Section 18.80.010.A. - Purpose. The purposes of the planned development overlay zone are to: • provide a means for creating planned environments through the application of flexible standards which allow for the application of new techniques and new technology in community development which will result in a superior living arrangement; • facilitate the efficient use of land; • promote an economic arrangement of land use, buildings, circulation systems, open space, and ululates; • preserve to the greatest extent possible the existing landscape features and amenities through the use of a planning procedure that can relate the type and design of a development to a particular site; and • encourage development that recognizes the relationship between buildings, their use, open space, and accessways and thereby maximizes the opportunities for innovative and diversified living environments. Street and Utility Improvement Standards. Section 18.164.030.5 - Private Streets. • Design standards for private streets shall be established by the City Engineer; and • The City shall require legal assurances for the continued maintenance or private streets such as a bonded maintenance agreement; and the creation of a homeowners association. • Private streets serving more than six dwelling units are permitted only within planned developments, mobile home parks, and multi-family residential developments. Planned Development. Section 18.80.080.A.4.c.(ii). A minimum front yard setback of 8 feet is required for arty garage opening for an attached single-family dwelling facing a private street as long as the required off-street parking spaces are provided. Access, Egress, & Circulation. Section 18.108.070.A - Minimum Requirements: Residential Use. Vehicular access and egress for single-family, duplex, or attached single-family dwelling units on individual lots, residential use, shall not be less than the following: 3-6 d.u./lots minimum access width 25' with minimum pavement width 20'. Land Division. Section 18.162.050.C. - Lot Frontage (Special provisions for lots created through partition process). Each lot created through the partition process shall front a public right-of-way by at least 15 feet or have a legally recorded minimum 15-foot-wide access easement. Street and Utility Improvement Standards. Section 18.164.030.X - Street Light Standards. Street lights shall be installed in accordance with regulations adopted by the City's direction. Page 2 of 5 UNWRITTEN POLICIES Street Lights. Prior to 1997, street lights were required on all private streets. Street lights were required to address the issue of public safety and lighting in residential areas. Beginning in 1997, the City recommends that lights be installed but the developer has a choice whether lights will be installed. Wiring, powering, and metering of private street lights shall be separate from the public system and shall be paid for by the developer or homeowners. The developer has the option of installing street lights but if street lights are installed they shall be metered seperately. Storm Drainage. Prior to 1997, the City would allow public storm drainage systems in private streets (public utility easement) built to public standards. Water quality and detention ponds within subdivisions would become public after the 3 year maintenance period and City acceptance of the pond. Beginning in 1997, any storm drainage system in private streets is a private system to be maintained by the property owners, including water quality and detention ponds. The private system does not have to be designed to public standards but must comply with the minimum requirements of the Uniform Plumbing Code (UPC). Since the system only serves runoff from private streets and is not designed to public standards, the City will not accept responsibility of the system in the future. Street Widths. The access section of the code allows up to 6 dwelling units/lots to be served by a minimum access width of 25 feet with a minimum pavement width of 20 feet. The Code is relatively silent on the minimum street standards for streets serving greater than 6 lots. The only other reference to private streets is code section 18.164.030.S (Private Streets) which states that design standards for private streets shall be established by the City Engineer. The City does not have a standard that determines when a 24 foot or 28 foot street is required, such as a certain number of lots in the subdivision. Currently, the developer chooses the width of the street based on the desire to provide on-street parking. A 24 foot width will not allow on-street parking while a 28 foot width will allow parking on one side. Addressing and Signing. We allow naming and signinr of all private streets. Private street signs are blue in color to distinguish them from public streets. The City makes and installs private street signs to ensure consistency in appearance and installation. Addresses are assigned from the private street by the City. Street Maintenance. There is a written policy. Private Streets are required to be owned and maintained by the developer or the future homeowners that abut the private street. The developer is required to provide maintenance assurance as mentioned previously (Community Development Code Section 18.164.030.S). ISSUES Street Lights. The Engineering Division has a policy that allows the developer to decide whether or not street lights will be provided. The Planning Division would recommend that street lighting be installed for public safety reasons. Not requiring the installation of street lights raises issues of public safety. Requiring installation raises Page 3 of 5 issues of the lighting bills not being paid. Homeowners may claim that they did not know they had to pay for the lights, nor is there a functioning homeowner's association to collect and distribute the funds, nor can the homeowners afford the payments. Storm Drainage. Issues with policy prior to 1997 include: The City did not maintain or sweep the private streets, so the City experienced higher costs associated with additional maintenance needed for catch basins and storm lines that would not likely have been needed if the streets were better maintained. Issues with the policy beginning in 1997 include: The City still has no assurance that homeowners will maintain the streets. The homeowners (not the City) will experience higher maintenance costs for cleaning catch basins and storm lines. The issues are the same, however, the full maintenance and associated costs are the sole responsibility of the homeowners, not the City. Street Widths. Since there are no standards for street widths, widths are determined on a site by site evaluation. There are no standards or guidelines to determine the number of lots, in excess of 6 lots, that can adequately be served by a 20-foot pavement section within a 25-foot access width. For example, can a seven or eight lot subdivision be served with a 20-foot pavement section or shall it be served with a 24-foot section with no parking allowed? Currently, the developer makes the decision as to the proposed width of the street, in part, based upon the desire to provide on-street parking. The City does receive complaints about parking in no parking areas, however, the City does not enforce :he no parking provision since it is a private street. The developer is typically making a trade-off by reducing the street width to accommodate more lots. Street Maintenance. Private property owners may claim that they were not aware that they were moving onto a private street, never mind the fact that they are responsible for maintaining them. There is no guarantee that a homeowner's association (if there was one even formed) will stay active to collect and distribute money for maintenance. Property owners may claim that they cannot afford to pay for maintenance. The City does not provide sanding service for private street. OPTIONS ® No longer allow private streets. Partitions and subdivisions creating less than 6 lots would be affected by this policy. Small parcels looking to create a subdivision may be impacted because the property may not have the area to accommodate a public street and still create the number of lots allowed by the underlying zone. Requiring public streets for all subdivisions would force property owners to cooperate with adjoining properties and will perhaps necessitate the assembling of several parcels in order to properly subdivide the land. A property owner may complain that the City is not allowing them to develop their land. However, the City would be merely limiting the extent of the development options and the property owner may not be able to develop their individual parcel to the maximum density allowed. Staff does not believe that this would not be considered a takings case, as the property owner would still have full use of their land in its present state. They would always have the other option of applying for a lesser development that would meet the City standards for streets or driveways. Page 4 of 5 • Selectively allow private streets. Currently, private streets are allowed outright to serve less than 6 lots or may be created for subdivisions serving greater than 6 lots if approved through the Planned Development process. Private streets are requested when the need for a public street and public street extensions are not needed or are precluded due to existing development patterns, to accommodate a level of density not otherwise achievable with public streets, or to develop a diversified living arrangement (townhouses). The challenge here is for Staff to know when to draw the line. Under what circumstances should a private street be allowed? Staff discussed this question and determined that it would truly have to be assessed on a site-by-site basis. For instance, if there is a situation where the topography of the land makes it impossible or impractical to meet public street design standards, and there is no identified need for a public street through the site (ie, to provide further access to an adjacent property or to complete a public street connection), then the City could potentially allow a private street. However, if the need for a public street is evident, the City would potentially need to allow a variance to the public street design standards. In other cases where the developer may lose lots in order to meet the public street standards, the City may decide to not allow the variance. We would have to balance that decision with Metro's requirement for 80 percent density in developments. The bottom line is that the City would need to be willing to tell a developer that the property can not be developed to the desired density. RECOMMENDATION • Maintain the current policy with the understanding that the developer is choosing private streets standards to avoid other public standards and that the City is, therefore, not interested in taking over the responsibility for maintenance of these streets in the future. When the decision is made to allow private street standards, the City is making the decision to allow private individuals to assume the responsibility for the private design. • Require the developer of all private streets to install street lights. If, at a future date, the homeowners make a decision that they no longer want street lights, the homeowners may make a decision to discontinue operation of those lights. • All maintenance issues and costs for the private street design (streets, storm, lights) will remain the responsibility of the developer or future homeowners association. The City will accept responsibility for maintenance of water, sanitary sewer lines, and the street name signs. I:\CURPLN\WILL\PRIVSTR.MEM Page 5 of 5 March 9, 1998 - 11:22 a.m. 0 L"~ b Mr. Monahan, my name is Jackie Lang and I live over near Tigard High School, and I've read the article in the paper this morning about the Waverly Estates issue with the private streets and the streetlights. Unfortunately I'm unable to attend the meeting Tuesday night of the City Council, but for it's worth, I wanted to just offer my citizen's opinion. I feel very strongly that it is that neighborhood's responsibility and that developer's responsibility to resolve this issue. The burden when buying a house is on the future homeowner to understand the terms of his contract and other conditions that are related to living in that area. It is not the taxpayer's problem, but those people didn't figure that out, and often those people are paying less for a home than you would pay on a public street. I think that a look at development of cost analysis or sales analysis in other developments would reflect that. Or maybe the developer made more money; I don't know, but I know that it often costs less to develop in those areas when the developer is not held to the standards involving public streets. The idea that this particular developer, Kenneth Waymire, feels he is indebted or he has been burdened because he didn't know who would pay the light bill is I find that ludicrous. The developers they are more burdened than anyone in those kinds of arrangements, and if he didn't apparently he assumed that the City would come in and take over those payments for those guys, and that's absurd, and it is his responsibility, his attorney's responsibility, to research every aspect of those kinds of issues and their long-term management. And he didn't do it; it's his problem; he should pay for it from here to eternity as far as I'm concerned. I will leave my number; I don't need a call back, but I will need my number it is 598-7956. Thank you for listening to me, and good luck with this issue. \jh 1: 1admVAA3109&14. doc 03;10/98 18:10 $503 526 2538 TV FIRE K4RSHAL 00011003 3l Id C?9 TUALATIN VALLEY FIRE & RESCUE FIRE PREVENTION 4755 S.W. Griffith Drive . P.O. box 4755. Beaverton, OR 97076. (503) 52&2469. FAX 526-2538 March 10, 1998 Jim Hendryx Community Development Director City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Dear Jim: The fire code places, at least in part, the responsibility for fire department access roadways with the fire marshal of a given fire service jurisdiction. The fire code "spells out" a number of required design specifications that must be met before a roadway can be approved as e. fire access roadway (see attached information). The fire code does not specify whether or not these fire access roadways have to be public or private roadways. The fire code does require that the fire access roadways be maintained to at least the standards set forth in the code. On occasion, these requirements have been troublesome to enforce. The best example that comes to mind is "No Parking" fire lane signs, or more to the point, the lack of these signs on a narrow, private fire access roadway. It has been very difficult for the fire district and other jurisdictions in the past to get these signs installed, especially after the subdivision has been completed. Without these signs a more "hazardous" condition must exist before cars that are blocking the required fire access roadway can be removed, therefore, routine maintenance of the 20 foot minimum access road width becomes difficult for the fire district. The sign example is just an illustration and should only be considered in the same context as the other design specifications in the code that must also be maintained- To my knowledge, private fire access roadways while occasionally difficult to maintain, have not, as yet, been a large problem for the fire district. If you have other questions or need additional information please contact me at 526- 2469. Sincerely, l ~ Jerry L. Renfro, DFM Plans Examiner JR/jn "Werkinf" Smoke Detectors Savc Lives AGENDA ITEM (D FOR AGENDA OF: March 10. 1998!7:30 PM CITY OF TIGARD, OREGON COUNCIL AGENDA ITEM SUMMARY ISSUE/AGENDA TITLE Zone Change Annexation ZCA 98-0004-Gaarde Street/Olsen Heights Annexation PREPARED BY: Julia Powell Haiduk DEPT HEAD OK ITY MGR OK 74 ISSUE BEFORE THE COUNCIL Should the Tigard City Council forward to the Portland Metropolitan Area Local Government Boundary Commission a request to initiate annexation of six (6) parcels consisting of 6.14 acres located at 11900, 11910 and 11920 SW Gaarde Street, south of SW Gaarde Street, east of 121st Avenue and west of SW 118th Avenue? STAFF RECOMMENDATION Adopt the attached Resolution and forward the request for annexation to the Boundary Commission and adopt the attached Ordinance to assign Comprehensive Plan and Zoning Designations to the subject properties in conformance with the City of Tigard Comprehensive Plan. INFORMATION SUMMARY The proposed annexation consists of territory comprised of six (6) tax lots totaling 6.14 acres which is contiguous to the City of Tigard. The property is currently developed with single-family residences on three (3) lots and there are three (3) vacant lots. Tax lots 00300 and 00400 on WCTM 2S 110BB and Tax Lot 02100 on WCTM 2S 110BA received approval for a 14 lot subdivision (SUB 97-0005) with the condition that the property be annexed into the City of Tigard. The owners of the additional properties in this proposal wish to join the annexation. Attached is a Resolution initiating annexation and an Ordinance to change the Comprehensive Plan and Zoning Designation from Washington County R-5 to City of Tigard Low Density Residential, R-4.5. OTHER ALTERNATIVES CONSIDERED 1. Deny the request, or 2. The City Council may chose to annex two (2) additional parcels, using the double majority process, in order to create a more uniform boundary. The two (2) parcels recommended for consideration are south of SW Gaarde Street, on either side of the site proposed for annexation (WCTM 2S110BB, tax lot 00200 and 2S 110BA, tax lot 02000.) If the Council decides to do this, staff recommends continuing the hearing until the next meeting so that appropriate notice may be given to the affected property owners. VISION TASK FORCE GOAL AND ACTION COMMITTEE STRATEGY This request is consistent with Growth & Management "Goal 2." FISCAL NOTES Since the subject territory is within the City of Tigard's Active Planning Area, the City is responsible for paying the Boundary Commission application fee of $895 by City Council Resolution. COUNCIL AGENDA ITEM SUMMARY i:\citywide\sum\zca98.04.sum Pagc I of 1 Julia P H 26-Feb-98 9:20 AM Agenda Item: Wearing Date: March 10. 1998 7:30 PM 'i F ..REP OT ~'0 T OB O d COUNCIL WY OF HARD FOR THE CITY OF TIRD, OREGON D ~ty SECTION I. APPLICATION SUMMARY CASE: FILE NAME: GAARDE STREET/OLSON HEIGHTS ANNEXATION Zone Change Annexation (ZCA) 98-0004 PROPOSAL: To annex six (6) tax lots consisting of 6.14 acres of un-incorporated Washington County land into the City of Tigard and to change the comprehensive plan and zoning designations from Washington County R-5 to City of Tigard Low Density Residential; R-4.5. APPLICANT: Dale DeHarpport OWNER: Robert and Kay Norin; Four D Construction Janice Justice; P.O. Box 1577 Ron and Wilma Lambert, and Beaverton, OR 97075 Four D Construction CURRENT ZONING DESIGNATION: Washington County R-5. RECOMMENDED ZONING DESIGNATION: It is recommended that the City of Tigard zoning designation of R-4.5 be designated upon annexation. The City's R-4.5 zone most closely conforms to the County Designation of R-5 while implementing the City's Comprehensive Plan Designation of Low Density Residential. LOCATION: 11900,11910 and 11920 SW Gaarde Street; WCTM 2S110BA, Tax Lots 02100, 02200 and 02300; and WCTM 2S110BB, Tax Lots 00100, 00300 and 00400. APPLICABLE REVIEW CRITERIA: Tigard Comprehensive Plan Policies 2.1.1, 10.1.1, 10.1.2 and 10.1.3; and Tigard Community Development Code Chapters 18.136 and 18.138. SECTION II. STAFF RECOMMENDATION Staff recommends that the Council find that the proposed annexation will not adversely affect the health, safety and welfare of the City. Therefore, staff recommends APPROVAL of the annexation by adoption of the attached Resolution and Ordinance. STAFF REPORT TO THE CITY COUNCIL PAGE 1 OF 4 ZCA 98-0004 - GAARDE STREET/OLSON HEIGHTS ANNEXATION 3/10/98 PUBLIC HEARING SECTION III. BACKGROUND INFORMATION Site History: The property is currently developed with a combination of vacant properties and single- family residences. The property owner of tax lots 00300, 00400 and 02100 obtained Subdivision approval (SUB 97-0005) to create a 14 lot subdivision. The approval of the subdivision had several conditions, one (1) of which was to annex into the City of Tigard and hook-up to city sewer. The additional property owners included in the annexation request are surrounding property owners who desired to be included in the annexation proposal. As part of the subdivision proposal, additional applications were submitted including: Planned Development, Zone Change to Planned Development Overlay, Variance, Lot Line Adjustments and Sensitive Lands Review. No development cases prior to the subdivision application were found to have been filed with the City of Tigard. Vicinity Information: The area to be annexed is 6.14 acres on the south side of SW Gaarde Street. The existing city boundary runs along the southern, eastern and western boundary line of the site. The site and the property directly to the north are within Tigard's Urban Growth Boundary but outside of the Tigard city limits. Site Information and Proposal Description: The site is bordered to the south, east and west by property inside of the city limits. The property to the south is zoned R-2, the property to the west is zoned R-3.5, and the property to the east is zoned R-4.5. The property is bordered on the north by land that is outside of the Tigard city limits but inside Tigard's Urban Growth Boundary. The proposal is to annex into the City of Tigard in order to comply with conditions of approval required by SUB 97-0005 to obtain urban services for the lots annexing that were not part of the subdivision. The applicant has requested that the 6.14 acre site be annexed into the City of Tigard by means of the double-majority method. Representing the owners of more than half of the land (100%) and a majority of the registered electors (100%) of the area proposed to be annexed, the applicant has initiated this action through the written consent of the property owners. SECTION IV. APPLICABLE REVIEW CRITERIA AND FINDINGS The relevant criteria in this case are Tigard Comprehensive Plan Policies 2.1.1, 10.1.1, 10.1.2, and 10.1.3; and Tigard Community Development Code Chapters 18.136 and 18.138. Staff has determined that the proposal is consistent with the relevant portions of the Comprehensive Plan based on the following findings: Policy 2.1.1: This Policy requires an ongoing citizen involvement program and is satisfied because the Central CIT and surrounding property owners have been notified of the hearing and public notice of the hearing has been published in a newspaper of general circulation. STAFF REPORT TO THE CITY COUNCIL PAGE 2 OF 4 ZCA 98-0004 - GAARDE STREET/OLSON HEIGHTS ANNEXATION 3110/98 PUBLIC HEARING Policy 10.1.1: This Policy requires adequate service capacity delivery to annexed parcels and is satisfied because the City of Tigard Police, Engineering and Water Departments, USA and Tualatin Valley Fire & Rescue (TVF&R), have all reviewed the annexation request and have offered no objections. The staff report and decision for SUB 97-0005 indicates that adequate services are available, or will be available upon satisfying conditions of subdivision approval, and may be extended to accommodate the affected property. Policy 10.1.2: This Policy pertains to boundary criteria for annexations and is satisfied. The property is surrounded on all sides excluding the north, by property that is inside the Tigard city limits. The annexation, therefore, will reduce an existing "island" of un-incorporated territory. The Police Department has been notified of this request and has no objections. The affected land is located within the City's Urban Planning Area and is contiguous to the city boundary. Adequate services are also available to accommodate the properties. Staff has determined that the proposal is consistent with the relevant portions of the Community Development Code based on the following findings: Section 18.136.030: This Section addresses approval standards for annexation proposals and is satisfied because: Adequate facilities and services are available, or will be available upon satisfying conditions of approval, and have sufficient capacity to serve the affected site as determined in the decision and staff report for SUB 97-0005. The applicable Comprehensive Plan Policies and Code provisions have been reviewed and satisfied as previously indicated in this report. The City of Tigard zoning designation of R-4.5 most closely conforms to the County designation of R-5 while implementing the City's Comprehensive Plan designation of Low Density Residential. This also satisfies Comprehensive Plan Policy 10.1.3. The determination that the affected property is an established area is based on the standards set forth in Chapter 18.138 of the Tigard Community Development Code and OAR 660-007-0005. Section 18.138: This Section provides standards for the classification of annexed land and is satisfied because the affected property meets the definition of an established area and shall be designated as such. STAFF REPORT TO THE CITY COUNCIL. PAGE 3 OF 4 ZCA 98-0004 - GAARDE STREET/OLSON HEIGHTS ANNEXATION 3110/98 PUBLIC HEARING SECTION V. OTHER STAFF COMMENTS The City of Tigard Engineering, Public Works, Police and Water Departments have all reviewed this proposal and have offered no comments or objections. The Tigard Police requested that Staff contact the property owners directly north of the site to ask if they wanted to join the annexation. Staff has contacted these property owners and has sent the necessary forms in the event they wish to modify the annexation. If they chose to annex and if Council supports their annexation requests, the Resolution and Ordinance may be amended to include these additional lots. SECTION VI, AGENCY COMMENTS The Metro Area Boundary Commission, Tualatin Valley Fire and Rescue District, Tualatin Valley Water District, PGE, NW Natural Gas, US West Communications, GTE, and Washington County have had the opportunity to review the proposal and have offered no objections. EASED ON THE FINDINGS INDICATED ABOVE, PLANNING STAFF RECOMMENDS APPROVAL OF ZONE CHANGE ANNEXATION (ZCA) 97-0004 - GAARDE STREET/OLSON HEIGHTS ANNEXATION. February 25, 1998 PREPAR BY: Julia Powei ajduk DATE Associate Planner ✓ -6, February 25, 1998 -QA- APPROVED BY: Richard Bew r'6 orff DATE Planning Manager is\curplnVulia\annex\zca98-04.dec STAFF REPORT TO THE CITY COUNCIL PAGE 4 OF 4 ZCA 98-0004 - GAARDE STREET/OLSON HEIGHTS ANNEXATION 3/10/98 PUBLIC HEARING ygenda Item No. 5f' e ' an r. -F4ating of 3I19 I"lg MEMORANDUM CITY OF TIGARD, OREGON TO: Bill Monahan, City Manager FROM: Cathy Wheatley, City Recorder DATE: March 3, 1998 SUBJECT: Council/Staff Liaison Appointments Bill, here is what I have noted as the current City Council/Staff Liaison appointments: Budget Committee All Council Members Community Development Block Grant Advisory Board: Elected Official - Ken Scheckla Staff Representative - Duane Roberts Cooperative Library Advisory Board Primary - Melinda Sisson Alternate - Bill Monahan Community Development Code Steering Committee Brian Moore Growth Management Caucus Brian Moore Staff. Nadine Smith I-5/217 Steering Committee Jim Nicoli/Bill Monahan Intergovernmental Water Board: Primary - Paul Hunt Alternate - Bob Rohlf Housing Code Task Force Ken Scheckla Staff. David Scott Mayor's Appointments Advisory Committee Bob Rohlf (Jan-June `98) Ken Scheckla (July-Dec. `98) Metropolitan Area Communications Commission Primwy - Ken Scheckla Alternate - Liz Newton 99W Task Force Brian Moore Senior Center Liz Newton Tigard Chamber of Commerce - Ex Officio Board Member Cathy Wheatley Tigard Chamber of Commerce - Business Advocacy Cormnittee Liz Newton Washington County Consolidated Communications Board Primary - Bob Rohlf Alternate - Bill Monahan Washington County Coordinating Committee Primary - Jim Nicoli Alternate - Gus Duenas Western Bypass Steering Committee Primary - Jim Nicoli Alternate - Bill Monahan Willamette Water Supply Agency Primary - Paul Hunt Alternate - Bob Rohlf Staff Rep. - Ed Wegner Regional appointments selected by other jurisdictions include MPAC and JPACT; Tigard has no appointees at this time. is \adm\c achy\counc it\appcs. doc Agenda item No.= McOng of 311'D)P% O s PROCLAMATION City of Tigard School-to-Careers Month I WHEREAS: March, 1998 has been designated as School-to-Careers Month j i by the American Vocational Association; and WHEREAS: profound economic and technological changes in our society r are being rapidly reflected in the structure and nature of work, thereby } placing new and additional responsibilities on our educational system; and WHEREAS: a well-educated work force is essential to the productivity of business and industry and to its success in the international marketplace; and S I WHEREAS: school-to-careers education is committed to helping students make a successful transition from school to employment or to further j, education that will prepare them for employment; and WHEREAS: School-to-careers education gives high school students the academic, technical, intellectual and personal skills that well-rounded . workers should possess; and A +ti'` e WHEREAS: programs offered in postsecondary education institutions offer individuals lifelong opportunities to learn new skills, which provide them with career choices and personal satisfaction; and WHEREAS: school-to-career education involves educators and the business * community in cooperative partnerships that stimulate the local economy and ~j that of the entire nation by preparing workers for a wide range of careers with strong employment prospects. NOW THEREFORE BE IT RESOLVED THAT 1, Mayor Jim Nicoli, of the City of Tigard, Oregon, do hereby proclaim March 1998, as School-to-Careers Month and urge all citizens to become familiar with the services and benefits offered through school-to-careers education in this community and support and participate in these programs to enhance their individual career skills and productivity. Dated this m day of (zz 1998. IN WITNESS WHEREOF, I have hereunto s my hand and caused the al or the City of Tigard to be affixed. ' i Nicoli, Mayor ity of Tigard Attest: 4 "_/.7C Lr •4 itr ! ; tiCE.C CT(y Recorder ■ March 11, 1998 CITY OF TIGARD OREGON H.J. March, Program Manager Office of Community Development 155 N. First Avenue, Suite 170, MS 7 Hillsboro, OR 97124 RE: National Community Development Week, April 6-12,1998. Dear Mr. March: Thank you for inviting the City of Tigard to participate in the observance of National Community Development Week. Mayor Nicoli has proclaimed April 6 - April 12, 1998 as National Community Development Week in the City of Tigard. I have enclosed our proclamation in observance of National Community Development Week. We will post a proclamation in Tigard's Town Hall Lobby during the week of April 6 - April 12, i 998. Sincerely, Jessica Gomez City Administration Enclosure f\admljcssica\natdcvwk. doc 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639-4171 TDD (503) 684-2772 Agenda Item No. Meeting of 31 i0~ Q`6 MOCLAMATION National Community Development Week April 6 - 12, 1993 WHEREAS, the COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG) PROGRAM has operated since 1975 to provide local governments with the resources required to meet the needs of persons of low and moderate Income: and WHEREAS, Community Development Block Grant funds are used by a vast number of cities. counties and neighborhood-based nonproet organizations throughout the Nation to address pressing neighborhood and human service needs: and WHEREAS, the City of Tigard. Oregon and other local governments have clearly demonstrated the capacity to administer and customize the CDBG program to identify and resolve pressing local problems, such as affordable housing, neighborhood and human service needs, job creation and retention, and physical redevelopment: and WHEREAS, the week of April 6 - 12. 1998 has been reserved for recognition and appreciation of the COMMUNITY DEVELOPMENT BLOCK GRANT PROGRAM. NOW THEREFORE BE R RESOLVED THAT I. Mayor Jim Nicoll, of the City of Tigard. Oregon, do hereby proclaim the week of April 6 - 12, 1998 as )VA770)VAL COMMUNffYDEMOPMEM WEEK In Tigard. Oregon and call upon ail citizens of our city to join in recognizing the COMMUNITY DEVELOPMENT BLOCK GRANT PROGRAM and the Importance it serves to our community. Dated this day of .1998. IN WITNESS WHEREOF. 1 have hereunto set my hand and caused the Seal of the City of Tigard to be affixed. Jim Nicoll. Mayor City of Tigard Attest: City Recorder Agenda Item No.-~ MEMORANDUM Meeting of 3 11 JL)e? CITY OF TIGARD, OREGON TO: Honorable Mayor and City Council FROM: Cathy Wheatley, City Recorder DATE: March 3, 1998 SUBJECT: Tobacco Free Coalition of Washington County Attached is some information describing the goal of the Tobacco Free Coalition of Washington County. A representative from this organization will be at the March 10, 1998 Council meeting asking for support for their efforts to reduce sales of tobacco to minors. The program consists of rewarding clerks who refuse to sell tobacco to minors with gift certificates, thank you letters and positive public recognition. is\adm\cathy\council\tobcomem.doc rob berton construction IT 503-625-7109 17112/19/98 U 10:38 AM 62/3 we ioaacco tree c:oaiition of wasnington Vounzy wouia 11Ke your support for a project to help keep Washington County youth healthy. WHAT... The goal of the project is to reduce sales of tobacco to minors in Washington County. The campaign uses positive reinforcement to encourage clerks to ask voting people to show ID on tobacco purchases. The Coalition will recruit and train youth volunteers to visit stores and other tobacco outlets and attempt to buy tobacco products. Clerks whc refuse to sell tobacco to minors will be rewarded with gift certificates, thank you letters on behalf of the commu- nity, and positive public recognition. WHO... The Tobacco Free Coalition of Washington County WHY... The positive reinforcement model to reduce sales of tobacco to minors was proven to work in research conducted by Oregon Research Institute. As part of a study called Project SizTeen, ORI tested this model in eight small Oregon communities. The plan has four steps: 1) Mobilizing Community Support 2) Merchant Education 3) Reward and Reminder Visits to stores where clerks get rewards for refusing to sell tobacco to youth under 18 and reminders of the law when they were willing to sell, and 4) Nfedia Publicity. Across the eight communities, the proportion of stores willing to sell tobacco to minors dropped from about 579/c to about 22`f, as a result of this campaign. HOW CAN I HELP?... The Coalition would like your endorsement for the campaign. Community support is essential to the projects suc- cess. We are working now to gather signatures on a Proclamation, which will be used to publicize the campaign through various media. A draft of the proclamation is attached. If you and/or your organization are willing to lend your name(s) in supporl of the campaign, please sign below: You may fax back to me at 503-625-7109 or Call me at 625-1595. "13y my signature, I agree to have my name and my organization's name published as an endorsement of the Tohacco Free Coalition of Washington County campaign to reduce sales of tobacco to minors." Signature Date Printed `'arse tganizatiun Name rob barton construction 1T 503-625-7109 CW2/19/98 O 10:39 AM D 3/3 To The Tigard Community ERS: The use of tobacco is an unhealthy and potentially deadly choice for the youth of our community; -It is illegal in the state of Oregon for youth under the age of 18 to use or purchase tobacco ptuduas in any form & it nis also illegal for anyone to provide or sell tobacco pmducts to anyone trader the age of 18: The undersigned, support and encourage the merchants selling tobacco in our community to display signs detail ing the legal age of purchase and to ALWAYS ASK FOR THE I D OF EVERY YOUNG PERSON attempting to buy tobacco who looks age 26 or younger. -Also support and encourage the youth in our community to beTOBACCO FREE. Our efforts, we hope to join other communities who have lowered the number of youth addicted to nicotine by limiting their ability to purchase tobacco. Tobacco Free Coalition of Was hincton Co unty 4AWP In fJ Tr.JP41 PC Fnr TrC.1" 7 FPPP WY117 Tigard Council Tentative Agenda od 03/17/98-WkshpBsns 3/24/98-Business 4/7/98- Due: Special Meeting 4/14/98-Business 3/5 Due: 3/12 04/21/98-Workshop Due: 3/26 Due: 4/2 ° h Business Meeting Study Session Due: 4/9 E Joint Meeting with the Study Session m o Utility Billing Issues Planning Commission - CO C Pub. Works - Parks Staffing ~c Tigard Development Code Discussion 'Cr 7~ Rewrite Consent Agenda Trees 2000 Resolution Consent Agenda R&F: Memo from Wayne re: Solid Waste Haulers' Ann. Rept. Workshop Topics Business Meeting Joint Meeting: Library Board Public Hearing: Fir Loop Ease- Business Meeting at 6:30- Workshop Topics p.m. ment Vacation WWS - Wilsonville Status Personnel Rules Discussion Business SWETF: Council Direction Joint Meeting: School Board Meeting from final Report Results Dartmouth LID Public Hear. Park Master Plan Update (cliwith School Dist.) Publc Drinking Ordinance at 7:30 p.m. CPAH - 2nd Tax Abatement Noise Ord. Amendment - (Noise Levels - 7.40.170) Depending on the number of person wishing to testify, the Chair of the Council may limit the amount of time each person has to speak. We ask you to limit your oral comments to 3 - 5 minutes. The Chair may further limit time if necessary. Written comments are always appreciated by the Council to supplement oral testimony. ND9ITiEM NO. `f a DATE: March.14,-1998°~` a 11 - PUBLIC HEARING (QUASI-JUDICIAL) - OLSEN HEIGHTS/GAARDE STREET ANNEXATION - ZCA 97-0004 A request to annex 6.14 acres into the City of Tigard and change the zoning from County R-5 to City of Tigard R4.5. Location: 11900, 11910 and 11920 SW Gaarde Street; WCTM 2S110BA, Tax Lots 02100, 02200 and 02300; and WCTM 2S110BB, Tax Lots 00100, 90300 and 00400. Applicable Review Criteria: Tigard Comprehensive Plan Policies 2.1.1, 10.1.1, 10.1.2 and 10.1.3; and Community Development Code Chapter 18.136 and 18.138. PLEASE SIGN IN TO TESTIFY ON THE ATTACHED SHEETS AGENDA ITEM NO. 6 PLEASE PRINT Pro vent - (S In Favor) Opponent - (S ainst) Name, Address and Phone No. Name, Address and Phone No. Name, Address and Phone No. Name, Address and Phone No. Name, Address and Phone No. Name, Address and Phone No. Name, Address and Phone No. Name, Address and Phone No. Name, Address and Phone No. Name, Address and Phone No. Name, Address and Phone No. Name, Address and Phone No. Name, Address and Phone No. Name, Address and Phone No. Name, Address and Phone No. Name, Address and Phone No. Name, Address and Phone No. Name, Address and Phone No. Proponent (Speaking in Favor) Opponent (S eakin Against) Name, Address and Phone No. Name, Address and Phone No. Naive, Address and Phone No. Name, Address and Phone No. Name, Address and Phone No. Name, Address and Phone No. Name, Address and Phone No. Name, Address and Phone P?o. Name, Address and Phone No. Name, Address and Phone No. Name, Address and Phone No. Name, Address and Phone No. Name, Address and Phone No. Name, Address and Phone No. Name, Address and Phone No. Name, Address and Phone No. Name, Address and Phone No. Name, Address and Phone No. is\adm~ o\testify.doc A _ !Aw ITEAA~MO. 3 i/6S!`~' v~- 1®l DtDA_- j T.f..:. March 10, "19983 _ (Limited to 2 minutes or less, please) Please sign on the appropriate sheet for listed agenda items. The Council wishes to hear from you on other issues not on the agenda, but asks that you first try to resolve your concerns through staff. Please contact the City Manager prior to the start of the meeting. Thank you. STAFF CONTACTED NAME, ADDRESS & PHONE TOPIC 1:\adm\ o\vlsltsht.doc AGENDA ITEM NO. 3 - VISITOR°S AGENDA - PAGE 2 DATE: March 10, 1998 (Limited to 2 minutes or less, please) Please sign on the appropriate sheet for listed agenda items. The Council wishes to hear from you on other issues not on the agenda, but asks that you first try to resolve your concerns through staff. Please contact the City Manager prior to the start of the meeting. Thank you. STAFF CONTACTED NAME, ADDRESS & PHONE TOPIC i Aadm\jo\visitsht.doc CITY OF TIGARD, OREGON AFFIDAVIT OF POSTING In the Matter of the Proposed STATE OF OREGON ) County of Washington ) ss. City of Tigard ) I, 2L]sa~ begin first duly sworn, on oath, depose and say: That I post in the following public and conspicuous places, a copy of Ordinance Number (s) % which were adopted at the Council Meeting dated ; copy(s) of said ordinance(s) being hereto attached and by reference made a part hereof, on the day of .1 Y \ , 19 A% . 1. Tigard City Hall, 13125 SW Hall Blvd., Tigard, Oregon 2. Tigard Library, 13125 SW Hall Blvd., Tigard, Oregon 3. Tigard Water Department, 8777 SW Burnham, Tigard, Oregon Subscribed and sworn to before me this _ day of Vy\a' \ , 19 at $ OFFICIAL SEAL M JO ANN HAYES Notary Publi r Oregon 1, = t~,l NOTARY PUBLIC-OREGON "xii% COMMISSION NO. 042148 + _ ar, _xt'IRES MAY 05,19s~ My Commission Expires: w\g::&4 5 I q 15 IAadm\jo\affpost.doc CITY OF TIGARD, OREGON 0 ORDINANCE NO.98-0`7 AN ORDINANCE ADOP'T'ING FINDINGS AND CONCLUSIONS TO APPROVE A ZONE CHANGE (ZONE CHANGE ANNEXATION (ZCA) 98-0004 - GAARDE STREET/OLSON HEIGHTS ANNEXATION) AND DECLARING AN EFFECTIVE DATE WHEREAS, the Tigard City Council held a public hearing on March 10, 1998 to consider a zoning designation for six (6) tax lots located at 11900, 11910 and 11920 SW Gaarde Street, south of SW Gaarde Street, east of 121st Avenue and west of SW 118th Avenue; and WHEREAS, on March 10, 1998 the Tig,;ird City Council approved a Resolution to forward the proposed annexation to the Portland Metropolitan Area Local Government Boundary Commission; and WHEREAS, the zoning district designation recommended by Planning Staff, as set forth in the attached staff report and in Section 1 below, is that which most closely approximates the Washington County land use designation of R-5 while implementing the City of Tigard's existing Comprehensive Plan Designation of Low Density Residential, R-4.5. NOW, THEREFORE, THE CITY OF TIGARD ORDAINS AS FOLLOWS: SECTION 1: Upon annexation, the affected properties shall be designated as follows: Tax Map/Lot Numbers 2S 110BA, Tax Lots 02100, 02200 and 02300 2S 110BB, Tax Lots 00100, 00300 and 00400 Current Comprehensive Plan Designation New Comprehensive Plan Designation Wash. Co. R-5 Low Density Residential Current Zoning New Zoning Wash. Co. R-5 Tigard R-4.5 SECTION 2: This ordinance shall be effective 30 days after its passage by the Council, signature by the Mayor and posting by the City Recorder. PASSED: By LAY)CLt'ltMOLLS vote of all Council members present after beir.- read by number and title only, this I Olt-" day of _ CL 1- 1998. Catherine Wheatley, City Reco APPROVED: By Tigard City Council this d f , 1998. Nicoli, Mayor A rove3 as to form) (76 V City Att9mey 3 /o - Date ORDINANCE No. 98- iAcitywidebrd\=a98-04.ord Page I of I Julia P H 25-Rb,-98 9:30 AM COMMUNITY NEWSPAPERS, INC. Legal TT 9055 P.O. BOX 370 PHONE (503) 684-0360 Notice BEAVERTON, OREGON 97075 Legal Notice Advertising *City of Tigard a ❑ Tearsheet Notice 13125 SW Hall Blvd. •Tigard,Oregon 97223 ° ❑ Duplicate Affidavit •Accounts Payable AFFIDAVIT OF PUBLICATION STATE OF OREGON, ) COUNTY OF WASHINGTON, )ss. I, Kathy gnyder being first duly sworn, depose and say that I am the Advertising Director, or his principal clerk, of theTi garc3-Tiia 1 at i n Tames a newspaper of general circulation as defined in ORS 193.010 and 193.020; published at Tigard in the aforesaid county and state; that the Tidard City Council a printed copy of which is hereto annexed, was published in the entire issue of said newspaper for ONE successive and consecutive in the following issues: March 5,1998 sZ Subscribed and sworn bef a rr this5t3 day. -of. March, 1998 OFFICIAL SEAL otary Public for Oregon ROBIN A. BURGESS t NOTARY PUBLIC-OREGON My Commission Expires: COMMISSION NO. 062071 MY COMMISSION EXPIRES MAY 16, 2001 AFFIDAVIT - The following meeting highlights are published for your information. Full agendas may be obtained from the City Recorder, 13125 S.W. Hall Boulevard, Tigard, Oregon 97223, or by calling 639-4171. TIGARD CITY COUNCIL AND LOCAL CONTRACT REVIEW BOARD MEETING March 10, 1998 - 6:30 P.M. TIGARD CITY HALL - TOWN HALL 13125 SW HALL BOULEVARD, TIGARD, OREGON o Proclamations: National Community Development Week School to Careers Month Tobacco Free Coalition - Washington County Youth e Policy Review: i:ivate Streets, Private Street Lights (continuted from 2/24) • Considm, Adoption: Visioning Program Results 9 Capital Improvement Program: Where we are and how citizens can give input. a Public Hearing: Annexatioi,: ZCA 98-0004 Olsen Heights/Gaarde Street - 6.14 acres (6 tax lots) and to designate zoning as City of Tigard Lbw Density Residential, R-4.5 - 11900, 11910 and 11920 SW Gaarde Street. a Update: Parks 1Vlaster Plan Executive Session TT9055 - Publish March 5, 1998. COMMUNITY NEWSPAPERS, INC. Legal P.O. BOX 370 PHONE (503) 684-0360 Notice TT 9 0 4 9 BEAVERTON, OREGON 97075 Legal Notice Advertising *City of Tigard • ❑ Tearsheet Notice 13125 SW Hall Blvd. •Tigard,Oregon 97223 • ❑ Duplicate Affidavit *Accounts Payable • AFFIDAVIT OF PUBLICATION STATE OF OREGON, ) COUNTY OF WASHINGTON, )ss' I, Kathy Snyder being first duly sworn, depose and say that I am the Advertising Director, or his principal clerk, of theTigard-Tual at; n Times a newspaper of general circulation as defined in ORS 193.010 and 193.020; published at Tigard in the aforesaid county and state; that the ZCA Gaarde/Olsen Heights Suh- a printed copy of which is hereto annexed, was published in the entire issue of said newspaper for ONE successive and consecutive in the following issues: February 26,1998 Subscribed and sworn to before me thig26th day of Februar 1998 OFFICIAL SEAL ROSIN A. BURGESS Note ublic for Oregon *COMMISSION NOTARY PUBLIC-OREGON NO. 062071 My Commission Expires: MY COMMISSION EXPIRES MAY 16, 2001 AFFIDAVIT The following will be considered by the Tigard City Council on MARCH 10,1' 98 at 7:30 P.M., at the Tigard Civic Center - Town Hall Room, 13125 SW Hall Blvd., Tigard, Oregon 97223. Both public oral and written testimony is invited. The public hearing on this matter will be con- ducted in accordance with the rules of Chapter 18.32 of the Tigard Municipal Code and any rules and procedures adopted by the Tigard City Council, or rules of procedure set forth in Chapter 18.30. Failure to raise an issue in person or by letter at some point prior to the close of the hearing on the request accompanied by statements or evidence sufficient to allow the Hearings Authority and all the parties to respond on the request, precludes an appeal to the Land Use Board of Appeals based on that issue, and failure to specify the criterion from the Community Development Code or Comprehensive Plan at which a comment is directed precludes an appeal based on that criterion. Further information is available at City Hall and may be obtained from the Community Develop- ment Director or City Recorder at the same location, or by calling (503) 639-4171. PUBLIC HEARING: ZONE CHANGE ANNEXATION [ZCA] 95-0004 > GAARDE STREET/OLSEN HEIGHTS SUBDIVISION ANNEXATION < REQUEST: The applicant is requesting to annex 6.14 acres into the City of Tigard and change the zoning from County R-5 to City of Tigard R-4.5. LOCATIONS: 11910, 11920 and 11900 SW Gaarde Street; WCTM 2S 110BA, Tax Lots 02100, 02200 and 02300 and WCTM 2S i l OBB, Tax Lots 00100, 00300 and 00400. ZONE: The current zoning is Washington County R-5; the proposed zone change is City of Tigard R-4.5. AP- PLICABLE REVIEW CRITERIA: Community Development Code Chapter 18.136 and Tigard Comprehensive Plan Policies 2.1.1, 10.1.1, 10. 1.2 and 10.1.3. fsL < H TT9049 - Publish February 26, 1998. Agendas Item No Meeting of TIGARD CITY COUNCIL MEETING MINUTES - MARCH 10, 1998 • STUDY SESSION > Meeting was called to order at 6:36 p.m. by Mayor Jim Nicoll > Council Present: Mayor Jim Nicoli, Councilors Paul Hunt, Brian Moore, Bob Rohlf and Ken Scheckla. > Staff Present: City Manager Bill Monahan; City Engineer Gus Duenas; Community Development Director Jim Hendryx; Administrative Analyst/Risk Manager Loreen Mills; Asst. to the City Manager Liz Newton; Brian Rager, Engineering Dept; City Attorney Tim Ramis; Public Works Director Ed Wegner; and City Recorder Catherine Wheatley. > Agenda Review Bill Monahan, City Manager, reported that staff was working with the School District to create warning signage for school zones. Police Chief Ron Goodpaster reported that they have begun issuing tickets at the High School in compliance with the new state law that doubled traffic fines in school zones. > EXECUTIVE SESSION The Tigard City Council went into Executive Session at 6:45 p.m. under the provisions of ORS 192.660 (1) (d), (e), & (h) to discuss labor relations, real property transactions, current and pending litigation issues. > Mayor Nicoll reconvened the study session at 7:25 p.m. > Private Streets Mayor Nicoli stated that he would like to clarify for the citizens that the City would never take back a private street, no matter how many homes it served. He spoke to leaving open the option for private streets, given the odd sections of land left for development in the city. He said that he did not like building private streets to look like public streets. Jim Hendryx, Community Development Director, mentioned that staff developed recommendations for private-street options as directed by Council at the last meeting. > Mayor Nicoll adjourned the study session at 7:25 p.m. i. BUSINESS MEETING • Call to Order - City Council & Local Contract Review Board Mayor Nicoli called the business meeting to order at 7:34 p.m. Two Boy Scouts led the Pledge of Allegiance. Mayor Nicoli thanked them and gave them each a lapel pin. • Council Communications/Liaison Reports Councilor Hunt reported that the excellent staff presentation at the Water Consortium meeting (by Kevin Hanway of Tualatin Water District) resulted in the Consortium confirming by motion that the investigation of the Willamette River was in compliance with the Water Consortium agreement. Councilor Rohlf asked if Portland was taking a strong stand against investigating the Willamette River. Councilor Hunt explained that Portland feared losing business if other communities found their own water supply. He pointed out that in the future, given Portland's growth rate, it would not necessarily be able to continue to supply communities like Tigard from its surplus water. He spoke to the importance of Tigard getting its own water supply to offset that probability. Ed Wegner, Public Works Director, concurred with Councilor Hunt's evaluation. MIN11111 01,11 111111111 • Call to Council and Staff for Non-Agenda Items: None 2. PROCLAMATIONS: 2.1 Proclaim March as School-to-Careers Month 2.2 Proclaim the Week of April 6-12 as National Community Development Week 2.3 Tobacco-Free Coalition of Washington County Mayor Nicoli read the proclamation titles. Rebecca Barton, Tobacco-Free Coalition of Washington County, reviewed the Reward and Reminder campaign that Pacific Research Institute was conducting for Washington County to reward store clerks who asked for identification from minors trying to buy cigarettes and to remind those who did not that they should ask for identification. She thanked the Council for the signatures they provided for the proclamation that would be presented as a reward (in addition to a gift certificate) to those clerks enforcing the law. Councilor Scheckla commented that simply giving the clerks who did not ask for identification a letter of reminder did not enforce the law. Ms. Barton concurred. She stated that the state would do a follow up campaign in the summer to cite clerks who did not ask for identification. Councilor Scheckla suggested including gas stations that sold cigarettes in a campaign to eliminate tobacco. 3. VISITOR'S AGENDA: None 4. CONSENT AGENDA Motion by Councilor Rohlf, seconded by Councilor Hunt, to approve the Consent Agenda. Motion was approved by unanimous voice vote of Council present. (Mayor Nicoli, Councilors Hunt, Moore, Rohlf and Scheckla voted "yes.") 4.1 Approve Council Minutes: February 10, 1998 4.2 Receive and File: a. Tentative Agenda b. Council Calendar 4.3 Approve City Attorney Agreement Amendments 4.4 Support the 1-5/217 Project - Resolution No. 98-18 5. DISCUSSION ON POLICY ALLOWING PRIVATE STREETS AND RESPONSIBILITY FOR MAINTENANCE OF PRIVATE STREETS. (Continued from the 2-24-98 City Council Meeting) Staff Report Brian Rager, Engineering Department, reviewed the two positions taken by the Council at the last meeting: to continue to allow private streets in the current manner, or to eliminate private streets completely. Using a slide presentation, he presented the compromise positions developed by staff. Mr. Rager explained that the first option was to continue to allow private streets in single-family developments of six or less lots as an outright use, and to continue to allow them in planned developments for more than six lots. He pointed out the additional provision of new private street design standards to distinguish a private street visually from a public street. Mr. Rager said that staff would also work with the City Attorney's office to develop appropriate language in the Conditions, Covenants, and Restrictions (CC&Rs) for subdivisions that would speak to the maintenance of private streets by the property owners. Staff would investigate a process to record a lien against private properties, should the owners not maintain the streets in a condition suitable for emergency vehicle use. The last two provisions were to establish a notice method to more clearly reflect private streets in title reports, and to change the street sign design to include "private street" in addition to the street name. Mr. Rager stated that the second option allowed private streets for single-family detached projects of six or less lots or for multi-family projects but not for subdivisions with six or more lots. This option also included new private street design standards, appropriate CC&R language, and a lien process. Mr. Rager said that Option 3 eliminated private streets altogether. He recommended Option 1. He presented a series of slides to illustrate private streets currently existing in Tigard. Councilor Moore spoke in support of Option 1 as addressing his concerns to continue to allow private streets but to distinguish them visually from public streets. Councilor Hunt stated that he did not support Option 1 because it allowed private streets in subdivisions with more than six lots. He said that he favored Option 3 at this time, commenting that he did not think that the whole city should suffer so that a developer would not lose a couple of lots. Councilor Moore said that he saw private streets as a "necessary evil" in order to allow development of odd shaped and sized properties. He cautioned against overreacting to the one request to take back a private street. He mentioned that attached multi-family housing needed private streets. Councilor Scheckla stated that he did not think that private streets were safe in emergency situations. He cited the information they heard at the meeting with the Fire District last week regarding the impossibility of an emergency vehicle getting through on a private street with cars parked on both sides of the road. He supported eliminating private streets entirely. Counciior Moore expressed concern that the City not insert itself when citizens should be responsible for maintaining the clearances and no parking zones. Councilor Scheckla reiterated his opposition based on safety concerns. He pointed out that the developers knew when they signed off on the conditions imposed on their development what was expected, and they negotiated for narrower streets in order to get more units on the property. He held that if the City eliminated private streets, the developers would find some way to get around the restriction and still get their money back. Councilor Moore suggested asking the Fire District how often they have had problems with private streets in accessing a home. He said that he has never heard of a problem. Councilor Rohlf expressed his appreciation for the staff work in providing options for the Council. He commented that eliminating private streets might resolve some of the crowding and density issues he heard about from citizens through the visioning process. He said that his major concern with private streets was the lack of notice to property owners purchasing the homes, and their surprise to learn that they were on a private street. He pointed out that the private streets in Tigard were relatively new. He was concerned that 30 to 40 years in the future, they would run into problems with them. Councilor Rohlf said that he could understand allowing private streets on smaller acreage to get the density or the lands might not develop at all. He stated that he had less of a problem with private streets on multi-family properties because it was obviously private property. He said that the alternatives for giving notice and mandating future maintenance answered some of his concerns. Councilor Rohlf said that he had a problem with private streets in large planned developments. He stated that he would not support substandard private streets because cars parked on narrow streets blocked access. He pointed out that without sidewalks, pedestrians walked those streets in peril. He said private streets should not look like public streets. Mayor Nicoli supported Option 1 as best addressing his concerns regarding notification and other issues. He said that he could support Option 2 with some modifications. Councilor Moore mentioned developing a "skinny street" ordinance to allow streets with a sidewalk on only one side. Councilor Hunt said that he could support private streets for multi-family projects but reiterated his opposition to private streets for single-family detached homes. Councilor Scheckla noted the staff report comment that the City did not enforce the no parking signs on private streets. Councilor Rohlf argued that private streets simply made it more convenient for developers to develop at the expense of the future taxpayer. He held that the homes were not cheaper because a developer did not have to pay for a standard street. Councilor Hunt concurred. Mr. Hendryx reported that he spoke with the Fire District regarding Councilor Scheckla's issue. Mayor Nicoli commented that the Fire District told the Council that they have already started purchasing new engines with tighter turning radiuses so they could work the smaller and narrower streets. Mr. Hendryx read the letter he received from the Fire Marshall's office, in which the difficulties that the Fire District had with narrow streets as fire access roadways were reviewed. However these difficulties have not yet been a large problem for the district. The Council discussed modifications of Option 1 that might lead to consensus. Councilor Rohlf concurred with taking out private streets for six or more detached homes. Councilor Hunt said that he would not support Bullet #2 of Option 1. He suggested giving a private street a different name to further distinguish it from the public street. Councilor Moore suggested modifying Bullet #2 to require that planned developments go through the variance process to get a private street for six or more lots. Neittier Councilor Hunt nor Scheckla supported that suggestion. Mr. Hendryx advised the Council that staff did not "notice" this meeting because the issue started in a work session. However if the Council directed changes to current policy, then the matter must go through the public hearing process. David DeHarport, 14985 SW Ruby Street, Beaverton, commented that Mr. Hendryx's information regarding the public hearing process answered his concern that the development community be allowed input into this process. He asked if the City was signatory to an agreement to follow the Washington County private street standards. Staff indicated no. Mr. DeHarport suggested developing consistent standards throughout the region. He asked the Council to look at the County private street standards as they might apply to Tigard. Pat Phillips, Fanno Creek Court, reported that the homeowners in the Colony Creek Estates had been surprised four years ago to discover that they had a private street and more recently that they had a private sewer line. She said that they had a strong homeowners association that collected dues to pay for the street maintenance. She spoke to developers making it clear to the purchasers that they were on a private street and what that meant. She commented that they had to make special arrangements with Pride Disposal to get their garbage picked up because Pride did not go down private streets. Motion by Councilor Hunt, to adopt Option #1 with the change that private streets would not be allowed for single unattached homes, and that the same general name would not be allowed for the private street. Mr. Rager commented that the emergency and postal services preferred that the north-south streets remain as numbered streets. The Council discussed the differences between Options 1 and 2. Mr. Hendryx mentioned that Options 1 and 2 were basically the same, with Option 2 prohibiting private streets for single family detached homes of six or more lots. Tim Ramis, City Attorney, pointed out that the Council motion should be for the preparation of an ordinance that would then go through the usual process. The Council agreed by consensus to direct staff to bring back an option reflecting the Council discussion along with an ordinance. Mr. Rager mentioned the staff recommendation to require developers to install street lights on private streets with the maintenance and energy costs borne by the developer or the homeowners. He pointed out that the homeowners could ask PGE to turn off the lights if they did not want to pay for them. He mentioned private storm drainage also. Councilor Moore spoke to strongly suggesting the installation of street lights on private streets but not requiring them. Councilor Hunt pointed out that the City was undertaking a program to install street lights in unlit areas, and spoke to requiring street lights on private streets for safety reasons. Councilor Moore expressed concern at the city maintaining street lights on private streets. Mr. Rager clarified that the homeowners association would be responsible for maintaining the lights, not the City. Mayor Nicoli suggested putting this policy in resolution form to back up staffs interpretation. Councilor Scheckla asked for clarification on the holding pond issue. Mr. Rager reviewed the current policy in which the City approved the design and construction of public water quality and detention facilities, and then took over their maintenance after three years. He noted the staff proposal that private streets with detention ponds be maintained by the developer and the homeowners similarly to the maintenance of private streets. Staff would require a maintenance plan in advance and language in the CC&Rs to notify private property owners of their obligation to maintain the pond. Councilor Scheckla asked how the City could enforce maintenance of ponds on private streets. Mr. Rager noted the recent situation in Shadow Hills where the homeowners have asked the City to consider taking over the maintenance of this 20 year old private detention pond. He said that while staff has not yet made a recommendation, they have advised the homeowners how to bring the pond back up to standard. Mayor Nicoli suggested discussing the private detention pond issue separately from the private streets issue, since water quality facilities involved USA. Mr. Monahan explained that he and Mr. Wegner have been talking to USA about creating a county-wide district responsible for maintaining these ponds. Mr. Wegner commented that there were over 20 private detention ponds in the area for which the City did not have responsibility. He said that staff has only advised homeowners associations on how to maintain ponds, though they have promised three associations that they would devise a policy and procedures on upgrading privately owned ponds. Councilor Hunt withdrew his motion. Mayor Nicoli noted that staff would take direction to proceed to the Planning Commission with an ordinance and options. 6. PUBLIC HEARING (QUASI-JUDICIAL): OLSEN HEIGHTS/GAARDE STREET ANNEXATION - ZCA 97-0004 A request to annex 6.14 acres into the City of Tigard and change the zoning from County R-5 to City of Tigard R-4.5. Location: 11900, 11910, and 11920 SW Gaarde Street; WCTM 251106A, Tax Lots 02100, 02200, and 02300; and WCTM 2S110BB, Tax Lots 00100, 00300, and 00400. Applicable Review Criteria: Tigard Comprehensive Plan Policies 2.1.1, 10.1.1, 10.1.2 and 10.1.3; and Community Development Code Chapter 18.136 and 18.138. a. Mayor Nicoll opened the public hearing. b. Declarations or Challenges: None c. Staff Report Mr. Hendryx reviewed the specifics of this annexation of 6.14 acres off Gaarde Road involving six separate pieces of property whose owners have applied for a 14 lot subdivision. He mentioned that additional owners in the area wished to join the annexation but have not yet submitted a development proposal. He noted the zone designation change from County R-5 to City R-4.5. He stated that they received no negative comments from agency reviews and that suitable public facilities would be available to serve the subdivision. Mr. Hendryx explained that they could not use the double majority method of annexation in this instance because of the number of voters residing on the property. He said that staff could contact the residents who did not participate if the Council so desired. He mentioned a letter received from Paul Dean raising drainage issues along a property line. Those issues were not pertinent to the annexation request and would be addressed during subdivision review. d. Public Testimony: None e. Council Questions: None f. Mayor Nicoli closed public hearing. g. Staff Recommendation Mr. Hendryx recommended approval with the subsequent rezoning and land use designations. g. Council Deliberation: Ordinance No. 98-07 Resolution No. 98-19 Motion by Councilor Hunt, seconded by Councilor Scheckla, for the adoption of Ordinance No. 98-07. The City Recorder read the number and title of the ordinance. ORDINANCE NO. 98-07, AN ORDINANCE ADOPTING FINDINGS AND CONCLUSIONS TO APPROVE A ZONE CHANGE ANNEXATION (ZCA 98-0004) GAARDE STREET, OLSEN HEIGHTS ANNEXATION AND DECLARING AN EFFECTIVE DATE. Motion was approved by unanimous roll call vote of Council present. (Mayor Nicoli, Councilors Hunt, Moore, Rohlf and Scheckla voted "yes.") Motion by Councilor Hunt, seconded by Councilor Rohlf, for the adoption of Resolution No. 98-19. The City Recorder read the number and title of the resolution. RESOLUTION NO. 98-19, A RESOLUTION INITIATING ANNEXATION OF TERRITORY REFERRED TO AS ZONE CHANGE ANNEXATION (ZCA 98-0004) GAARDE STREET, OLSEN HEIGHTS ANNEXATION INTO THE CITY OF TIGARD AS DESCRIBED IN THE ATTACHED EXHIBIT A AND FURTHER ILLUSTRATED IN EXHIBIT B. Motion was approved by unanimous voice vote of Council present. (Mayor Nicoli, Councilors Hunt, Moore, Rohif and Scheckla voted "yes.") 7. CONFIRM AND RECOGNIZE TIGARD BEYOND TOMORROW AS A PROCESS TO BE USED TO ACHIEVE THE COMMUNITY'S VISION FOR 2017 Liz Newton, Assistant to the City Manager, noted the two documents given to Council, the summary sent to citizens, and the more detailed report used by staff at the City, the School District, and the Fire District to implement the vision. She reviewed how citizens could use the summary document to check the City's progress in implementing the vision. Ms. Newton noted four activities currently underway that were suggested by the visioning document. These included hiring a Volunteer Coordinator, working with the City Library Director and the School District to coordinate library activities, working with the Chamber Business Advocacy Committee to involve downtown businesses and property owners in a review of the downtown area, and offering a pilot recreation program at Fowler Junior High during spring break. Loreen Mills, Administrative Analyst/Risk Manager, presented the resolution in which the Council confirmed their recognition of the Tigard Beyond Tomorrow process as the process to be used to achieve the community's vision for 2017. She mentioned the partnerships with the school and fire districts in carrying out the strategies and goals as outlined through the process. She noted the Council's commitment to provide leadership and maintain these partnerships to make the community what they wanted it to be in the future. b. Council Consideration: Resolution No. 98-20 Councilor Rohif commented that he was very proud of the work that the staff and community did on the visioning process. Motion by Councilor Rohlf, seconded by Councilor Hunt, to adopt Resolution No. 98-20. The City Recorder read the number and title of the resolution. RESOLUTION NO. 98-20, A RESOLUTION OF THE TIGARD CITY COUNCIL RECOGNIZING TIGARD BEYOND TOMORROW AS THE COMMUNITY'S VISION FOR THE YEAR 2017, AND COMMITTING TO ADDRESS VISION ELEMENTS IN COUNCIL'S GOAL SETTING PROCESS AND PROVIDE LEADERSHIP TO ESTABLISH AND MAINTAIN PARTNERSHIPS THROUGHOUT THE COMMUNITY TO ACCOMPLISH OUR ENVISIONED FUTURE. Motion was approved by unanimous voice vote of Council present. (Mayor Nicoll, Councilors Hunt, Moore, Rohlf and Scheckla voted "yes.") 8. DISCUSSION FANNO CREEK BIKEPATH Mr. Hendryx indicated on a map the existing route of the northern section of the Fanno Creek bikepath on the south side of the creek from Hall to Ash Street. He asked for direction on whether staff should build the segment on the north side of the creek behind the operations center up to Main Street (Option 1) or build an extension along the south side (Option 2). He mentioned the rights-of-way and easements already acquired and the sections yet to be acquired. He recommended Option 2, observing that the state and federal agencies preferred building on the south side because of the impacts to wetlands by a path on the north side. Mr. Hendryx reported the cost estimate for Option 1 as $347,000 and for Option 2 as $257,000. He confirmed to Councilor Hunt that Option 2 did require a pedestrian bridge (for which there was funding in the CIP). He said that the Ash Creek path would be constructed at the same time, whichever option Council chose (estimated cost $28,000). He confirmed to Councilor Moore that the cost estimate for Option 2 did not include the cost of acquiring additional rights-of-way. Councilor Moore supported Option 2. Councilor Rohlf suggested that staff return to Council if the land costs involved in Option 2 were significant. The Council agreed by consensus to direct staff to proceed with Option 2. 9. UPDATE ON CAPITAL IMPROVEMENT PROGRAM STATUS Gus Duenas, City Engineer, mentioned the capital improvement program procedures and program areas. Using a series of slides, he reviewed the specific projects completed so far this year. Tigard Street and SW 110th Avenue were among the 1.2 miles of pavement overlays done and the Morning Hill area was among the 2.5 miles of slurry seal completed. He mentioned the Tiedeman and Grant Avenue bridges completed through the highway bridge rehabilitation and replacement program, and the Winterlake bridge funded through TIF funds. Mr. Duenas reviewed the speed humps installed on SW 128th Avenue from Walnut to Winterlake Drive and on S%lJ North Dakota. He noted the four way stop at Burnham and Main, the SW 130th Avenue improvements at Hawkesbeard to Scholls Ferry (TIF funding), and the signalization of the SW 79th and Durham intersection for pedestrian safety. He explained the three phases of the Bonita Road project. Mr. Duenas noted the Greenburg Road/217 overcrossing crossing widening funded through MSTIP 2 and federal funds. It would be completed by November. He mentioned the Tigard Senior Center parking lot and waist high garden built with Community Development Block Grant and City matching funds. He pointed out the SW North Dakota traffic calming measures. Mr. Duenas commented that the Fairhaven Street and Fairhaven Way sewer extension project was particularly successful, and that the roads were slurry sealed afterwards. He mentioned the Main Street drainage project to redirect the sewer flow from a private line to the public system. He noted the construction of the Menlor 3.5 gallon reservoir tank. Mr. Duenas reviewed the priorities for the next fiscal year. Staff would continue with preventative and corrective pavement maintenance, reconstruction and realignment of major streets, and the traffic calming program (including a comprehensive Public Facilities plan for the streets system). They would also implement the street lighting program and the commercial sewer extension program. Mr. Duenas noted the five pathways under consideration. He explained that they would bid out the Fanno Creek pathway and the pathway connection between Tigard Street and North Dakota as a package for completion this year while the other three would take a back seat to these top priorities. Mr. Duenas mentioned the design for the realignment of the Wain ut/Tiedeman/Fonner intersection into a four legged intersection. He said that staff has taken the SW 79th Avenue realignment design to the CITs for public input and found much concern over how it would be funded. He suggested possibly a combination of LID and City funding. Mr. Duenas reported that staff asked the County to break down the Walnut/121St Avenue intersection in the MSTIP 3 program into three phases so it would get a higher priority. He confirmed to Mayor Nicoli that they could accelerate this project by the City fronting the money out of the TIF funds. The County would then reimburse the City out of the MSTIP 3 funds as they were collected. Councilor Scheckla asked if the County would reimburse the full amount. Mayor Nicoli said that the County would reimburse the full amount but was looking in addition at the interest beyond full reimbursement as requested by Tualatin. Mr. Duenas suggested that the City prepare to run Gaarde Street out past SW 121St to Walnut by doing the preliminary engineering and design. He mentioned that. DKS Engineering was doing a traffic study for the City as part of the transportation system update, which would give them needed information. He mentioned options either to "T" a local street into Walnut or to "T" Walnut into Gaarde and let Gaarde be the main street. He supported the second option because of the residences lining both sides of Walnut back to Tiedeman. Mr. Duenas noted the consultant's work in developing solutions on restoring Summerlake. Mr., Duenas reviewed upcoming projects. He mentioned the Fanno Creek pathway, and rebuilding two bridges that, while structurally sound, could not handle water quantity and flooded. Councilor Rohlf expressed concern at spending money on the North Dakota bridge before the redesign for North Dakota and Tiedeman was completed. Mr. Duenas concurred. He explained that there was no good solution to the North Dakota/Tiedeman intersection dilemma but they would try to make the best of a bad situation. Mr. Duenas mentioned an upcoming meeting with Matrix to discuss the Hall and Sattler intersection improvements, possible signalization, and realignment of Ross Road for a four legged intersection. Councilor Scheckla asked why this was a higher priority than improving 79th and Bonita, noting traffic patterns in the area. Mr. Duenas said that improving this intersection would likely improve the traffic patterns in the area. Councilor Moore mentioned the trees overhanging Hall just down from the Sattler intersection that obscured the sitelines for oncoming traffic. Mr. Duenas mentioned the SW 91St Avenue improvements funded by a Community Development Block Grant. Councilor Scheckla suggested putting in street lights at the same time. Mr. Duenas said that staff would look into that. Mr. Duenas said that they would use the same public process they used last year to get citizen input, as they thought that it had worked well. He mentioned June 23 as the tentative date for the CIP on the Council'Q agenda. Councilor Hunt asked for the status on the traffic signal at SW 121St and Scholls Ferry. Mr. Duenas reported that they were working with the County on it. The County has told the City to get a consultant's analysis on what improvements were necessary to install a left hand turn lane that would not conflict with oncoming traffic. Staff intended to have DKS Engineering do that, and present it to the County for their review. He commented that the Council policy of annexing the Walnut Island would help with the situation on 121St because the City would then have control of the road instead of the County. 10. NON AGENDA ITEMS: None 11. EXECUTIVE SESSION The Tigard City Council went into Executive Session at 9:30 p.m. under the provisions of ORS 192.660 (1) (d), (3), & (h) to discuss labor relations, real property transactions, current and panding litigation issues. 12. ADJOURNMENT: 9:30 p.m. l Attest* Catherine Wheatley, City Recorder or, City of igard Date: 44J I L4 IC( q 1 ADM\CATHY\CCM\980310.DOC CITY OF TIGARD OREGON TIGAR CITY COUNCIL MEETING MARCH 1O® 1998 COUNCIL MEETING ILL E TELEVISE i:%adm%jokccpkt1.doc ' 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639-4171 TDD (503) 684-2772 Revised 3/5/98 CITY OF TIGARD MY. .0 'IX > PUBLIC NOTICE: Anyone wishing to speak on an agenda item should sign on the appropriate sign-up sheet(s). If no shoot is available, ask to be recognized by the Mayor at the beginning of that agenda item. Visitor's Agenda items are asked to be two minutes or less. Longer matters can be set for a future Agenda by contacting either the Mayor or the City Manager. Times noted are estimated; it is recommended that persons interested in testifying be present by 7:15 p.m. to sign in on the testimony sign-in sheet. Business agenda items can be heard in any order after 7:30 p.m. Assistive Listening Devices are available for persons with impaired hearing and should be scheduled for Council meetings by noon on the Monday prior to the Council meeting. Please call 639-4171, Ext. 309 (voice) or 684-2772 (TDD - Telecommunications Devices for the Deaf). Upon request, the City will also endeavor to arrange for the following services: • Qualified sign language interpreters for persons with speech or hearing impairments; and • Qualified bilingual interpreters. Since these services must be scheduled with outside service providers, it is important to allow as much lead time as possible. Please notify the City of your need by 5:00 p.m. on the Thursday preceding the meeting date at the same phone numbers as listed above: 639-4171, x309 (voice) or 684-2772 (TDD - Telecommunications Devices for the Deaf). SEE ATTACHED AGENDA a COUNCIL AGENDA - MARCH 10, 1998 - PAGE 1 AGENDA TIGARD CITY COUNCIL BUSINESS MEETING MARCH 10, 1996 - 6:30 PM 6:30 PM • STUDY SESSION > Visioning Project Review/Discussion > Receive: Memorandum Outlining Current Council/Staff Liaison Appointments > Discuss: Greenspaces > EXECUTIVE SESSION: The Tigard City Council will go into Executive Session under the provisions of ORS 192.660 (1) (d), (e), & (h) to discuss labor relations, real property transactions, current and pending litigation issues. As you are aware, all discussions within this session are confidential; therefore nothing from this meeting may be disclosed by those present. Representatives of the news media are allowed to attend this session, but must not disclose any information discussed during this session. 7:30 PM 1. BUSINESS MEETING 1.1 Call to Order - City Council & Local Contract Review Board 1.2 Roll Cali 1.3 Pledge of Allegiance 1.4 Council Communications/Liaison Reports 1.5 Call to Council and Staff for Non-Agenda Items 7:35 PM 2. PROCLAMATIONS: 2.1 Proclaim March as School-to-Careers Month 2.2 Proclaim the Week of April 6-12 as National Community Develoment Week 2.3 Tobacco-Free Coalition of Washington County 7:45 PM 3. VISITOR'S AGENDA (Two Minutes or Less, Please) COUNCIL AGENDA - MARCH 10, 1998 - PAGE 2 7:65 PM 4. CONSENT AGENDA: These items are considered to be routine and may be enacted in one motion without separate discussion. Anyone may request that an item be removed by motion for discussion and separate action. Motion to: 4.1 Approve City Council Meeting Minutes: February 10, 1998 4.2 Receive and File: a. Tentative Agenda b. Council Calendar 4.3 Approve Amendments to Personal Services Agreement-City Attorney • Consent Agenda - Items Removed for Separate Discussion: Any items requested to be removed from the Consent Agenda for separate discussion will be considered immediately after the Council has voted on those items which do not need discussion. 8:00 PM 5. DISCUSSION ON POLICY ALLOWING PRIVATE STREETS AND RESPONSIBILITY FOR MAINTENANCE OF PRIVATE STREETS. (Continued from the 2-24-98 City Council Meeting). • Staff Report: Community Development Department • Council Discussion • Council Consideration: Motion to approve or disapprove the policy recommendation proposed. 8:20 PM 6. PUBLIC HEARING (QUASI-JUDICIAL) - OLSEN HEIGHTS/GAARDE STREET ANNEXATION - ZCA 97-0004 A request to annex 6.14 acres into the City of Tigard and change the zoning from County R-5 to City of Tigard R-4.5. Location: 11900, 11910 and 11920 SW Gaarde Street; WCTM 2S110BA, Tax Lots 02100, 02200 and 02300; and WCTM 2S110BB, Tax Lots 00100, 00300 and 00400. Applicable Review Criteria: Tigard Comprehensive Plan Policies 2.1.1, 10.1.1, 10.1.2 and 10.1.3; and Community Development Code Chapter 18.136 and 18.138. a. Open Public Hearing b. Declarations or Challenges C. Staff Report: Community Development Department d. Public Testimony (Applicant, Proponents, Opponents, Rebuttal) e. Council Questions f. Close Public Hearing g. Staff Recommendation h. Council Consideration: Ordinance No. 97- Resolution No. 97- COUNCIL AGENDA - MARCH 10, 1998 - PAGE 3 8:30 PM 7. CONFIRM AND RECOGNIZE TIGARD BEYOND TOMORROW AS A PROCESS TO BE USED TO ACHIEVE THE COMMUNITY'S VISION FOR 2017 a. Staff Report: Assistant to City Manager and Administrative AnalystlRisk b. Council Discussion C. Consider Resolution No. 98- 8:50 PM 8. DISCUSS FANNO CREEK BIKEPATH a. Staff Report: City Engineer and Community Development Director 9:10 PM 9. UDPATE ON CAPITAL IMPROVEMENT PROGRAM STATUS a. Staff Report: City Engineer 9:30 PM 10. NON-AGENDA ITEMS 9:40 PM 11. EXECUTIVE SESSION: The Tigard City Council will go into Executive Session under the provisions of ORS 192.660 (1) (d), (e), & (h) to discuss labor relations, real property transactions, current and pending litigation issues. As you are aware, all discussions within this session are confidential; therefore nothing from this meeting may be disclosed by those present. Representatives of the news media are allowed to attend this session, but must not disclose any information discussed during this session. 10:00 PM 12. ADJOURNMENT i:ladm\cathy\cca\9803310.doc COUNCIL AGENDA - MARCH 10, 1998 - PAGE 4