Loading...
City Council Packet - 06/24/1997TIGARD CITY COUNCIL CITY OF TIGARD UQ OREGON / MEETING JUNE 24, 1997 COUNCIL MEETING WILL NOT BE TELEVISED i:~r„yo,.aa ? 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639-4171 TDD (503) 684-2772 i r i I I ■ I a , i a TIGARD CITY COUNCIL BUSINESS` MEETING JUNE 24,1997 6:30 PM TIGARD CITY HALL 13125 5W HALL BLVD TIGARD, OREGON 97223 a PUBLIC NOTICE: Anyone wishing to speak on an agenda item should sign on the appropriate sign-up sheet(s). If no sheet is available, ask to be recognized by the Mayor at the beginning of that agenda item. Visitor's Agenda items are asked to be two minutes or less. Longer matters can be set for a future Agenda by contacting either the Mayor or the City Administrator. Times noted are estimated; it is recommended that persons interested in testifying be present by 7:15 p.m. to sign in on the testimony sign-in sheet. Business agenda i items can be heard in any order after 7.30 p.m. Assistive Listening Devices are available for persons with impaired hearing and I~ should be scheduled for Council meetings by noon on the Monday prior to the Council meeting. Please call 639-4171, Ext. 309 (voice) or 684-2772 (TDD - Telecommunications Devices for the Deaf). Upon request, the City will also endeavor to arrange for the following services: • Qualified sign language interpreters for persons with speech or hearing ® impairments; and • Qualified bilingual interpreters. Since these services must be scheduled with outside service providers, it is important to allow as much lead time as possible. Please notify the City of your need by 5:00 p.m. on the Thursday preceding the meeting date at the same phone numbers as listed above: 639-4171, x309 (voice) or 684-2772 (TDD - Telecommunications Devices for the Deaf). SEE ATTACHED AGENDA COUNCIL AGENDA - JUNE 24, 1997 - PAGE 1 1111111 .3 AGENDA CITY COUNCIL MEETING - JUNE 24, 1997 i 1 6:30 P.M. • STUDY MEETING > Agenda Review > The Tigard City Council may go into Executive Session under the provisions of ORS 192.660 (1) (d), (e), e; (h) to discuss labor relations, real property transactions, current and pending litigation issues. All discussions within this session are confidential, therefore, nothing from this meeting may be disclosed by those uresent. Representatives of the news media are allowed to attend this session, but must not disclose any information discussed during this session. 7:30 P.M. 1. BUSINESS MEETING 1.1 Call to Order - City Council & Local Contract Review Board 1.2 Roll Call 1.3 Pledge of Allegiance 1.4 Council Communications/Liaison Reports 1.5 Call to Council and Staff for Non-Agenda Items 7:35 P.M. 2. VISITOR'S AGENDA (Two Minutes or Less, Please) 7:45 P.M. 3. CONSENT AGENDA: These items are considered to be routine and may be enacted in one motion without separate discussion. Anyone may request that an item be removed by motion for discussion and separate action. Motion to: 1 3.1 Approve City Council Minutes - May 27, 1997 i 3.2 Resolution Appointing Liz Newton as Deputy Recorder for the period of June 23, 1997 to July 3,1997 - Resolution ho. 97- ,.~a~~l~~ Consent Agenda - Items Removed for Separate Discussion: Any items requested to be removed from the Consent Agenda for separate discussion will be considered immediately after the Council has voted on those items which do not need discussion. COUNCIL AGENDA - JUNE 24, 1997 - PAGE 2 w 'w 7:50 p.m. I 4. Public Hearing Cancelled: National Mortgage Comprehensive Plan Z j Amendment (CPA 94-0001/ZON 94-0001) (Location: 11300 SW Bull j Mountain Road) 7:55 p.m. 5. PUBLIC HEARING -1997-98 USES OF STATE REVENUE SHARING a. Public Hearing Opened b. Declarations or Challenges C. Summation by Budget Officer d. Public Testimony: Proponents, Opponents e. Recommendation by Budget Officer f. Council Questions or Comments g. Public Hearing Closed h. Consideration by Council • RESOLUTION No. 97-QLO - A RESOLUTION CERTIFYING THE i CITY OF TIGARD PROVIDES SERVICES QUALIFYING FOR I STATE SHARED REVENUES • ORDINANCE NO. 97- 05 - AN ORDINANCE DECLARING THE CITY'S ELECTION TO RECEIVE STATE REVENUES - 8:05 p.m. . I 6. PUBLIC HEARING -1997-98 FISCAL YEAR BUDGET a. Public Hearing Opened b. Summation by Finance Director C. Public Testimony (Proponents, Opponents) d. Recommendation by Finance Director e. Council Questions or Comments f. Public Hearing Closed 3 g. Consideration by Council: Resolution No. 97-a7 8:15 p.m. g 7. FINALIZE FORMATION OF SANITARY SEWER REIMBURSEMENT DISTRICT NO.9 a. Staff Report: City Engineer - - 8:25 p.m. - 8. PUBLIC OPPORTUNITY TO COMMENT - FIVE YEAR CAPITAL IMPROVEMENT PROGRAM a. Staff Report: City Engineer b. Open Public Comment (Proponents, Opponent) C. Close Public Comment d. Council Discussion e. Council Consideration: Determine, by Council motion, the Capital Improvement Program for Fiscal Year 1997-98 q COUNCIL AGENDA - JUNE 24, 1997 - PAGE 3 I. i I 9:00 P.M. 9. PRESENTATION: PASSENGER RAIL SERVICE UPDATE Bob Post of BRW Consultants 9:30 p.m. 10. REQUEST LAND USE APPLICATION FEE WAIVER a. Report by Senior Planner Dick Bewersdorff 9:40 P.M. 11. NON-AGENDA ITEMS 9:50 P.M. 12. EXECUTIVE SESSION: The Tigard City Council will go into Executive Session under the provisions of ORS 192.660 (1) (d), (e), & (h) to discuss labor relations, real property transactions, current and pending litigation issues. As you are aware, all discussions within this session are confidential; therefore nothing from this meeting may be disclosed by those present. Representatives of the news media are allowed to attend this session, but must not disclose any information discussed during this session. ® i COUNCIL AGENDA - JUNE 24, 1997 - PAGE 4 TIGARD CITY COUNCIL MEETING MINUTES -JUNE 24, 1997 lG Agenda Item No._e. Meeting of a c~ • STUDY SESSION i > Meeting was called to order at 6:35 p.m. by Mayor Jim Nicoli > Council Present: Mayor Jim Nicoli, Councilors Paul Hunt, Brian Moore, Bob Rohlf, and Ken Scheckla. > Staff Present: City Manager Bill Monahan; Legal Counsel Pam Beery; City Engineer Gus Duenas; Finance Director Wayne Lowry; Senior Analyst/Risk Manager Loreen Mille Acct, to the City Manager Liz Newton; and Associate Planner Duane Roberts. > Feed & Seed property i y Bill Monahan, City Manager, asked what the Council wanted to do about securing the city owned property at the Feed & Seed store once the Chamber completed taking the building down. Options included opening it up as a dirt parking lot or fencing it off completely for liability reasons. He said that a paved parking lot was not in the 1997/98 budget because staff did not expect the Chamber to complete their building plan in this fiscal year. Staff did not want i to put in a parking lot not knowing what the final Chamber plan would be. _ The Council discussed the issue, favoring a "park at your own risk" lot after seeing what the land looked like with the building removed. Mayor Nicoli pointed out the need for a fence to prevent access to the railroad tracks. Mr. Monahan said that John Cook of the Chamber has told him that the Chamber did not intend to fence its portion of the property. Loreen Mills, Senior Analyst/ Risk Manager, pointed out that the liability increased if the land was in poor condition or left with hazards. Mr. Monahan said that staff would come back with a report in b July once the building was down. > Space Committee y i Mr. Monahan recommended five staff and four community people as the base committee for the Space Committee. Staff included Liz Newton, Bill Monahan, Ed Wegner, Ron Goodpaster and i Kathy Davis. Staff recommended getting two Library Board members and two Police Advisory Board members. Mr. Mon--".a . also r...,,,...mended hiring Puss Hanscn, the architect ha worked on the police expansion plans, as an ex officio advisory member because of his construction background. The cost for the committee would be $5,000 to $7,000 of the $20,000 budgeted for spacing planning in 1997/98. He suggested including Wayne Lowry as an ex officio member and Councilor Paul Hunt as a voting member. i The Council agreed by consensus to direct staff to create the committee as described and to hire Mr. Hansen as the consultant. CITY COUNCIL MEETING MINUTES - JUNE 24, 1997 - PAGE 1 1 > Lamb-Gray Property Mr. Monahan reported that the City closed on the Lamb Gray property on June 11. He said that the money has been handled per the escrow instructions. > Agenda Review Liz Ner:ton, Assistant to the City Manager, advised the Council to delete Consent Agenda Item No. 3.2 because it was dealt with last week. , I > Tigard Triangle Update Jim Hendryx, Community Development Director, presented Lloyd Lindley's work program on how to implement the Council direction from last week that staff meet with the property owners and potential builders to test the standards. It included three steps: a review of and evaluation of similar developments in Tigard, an investigation into the operational needs of big box retail, and a report summarizing the research and recommendations for Council. He mentioned a workshop involving not only potential developers and key property owners but outside experts who have done creative mixed use developments on the West Coast. He 0 estimated the cost of the program to be between $10,000 to $15,000. He said that staff could update the Council periodically on their progress. Mr. Hendryx noted the issue of who should pay for this program: the City only or in combination with the developers/property owners? The Council discussed the issue. Councilor Scheckla pointed out that the property owners would probably not want to pay for a process that yielded an unfavorable result for them. They also might conclude that paying for it meant the results should be slanted their way. He spoke for the City paying for the program. Councilor Moore spoke for asking the developers to help offset the costs since they wanted this process. Mayor Nicoli said that he was not opposed to the City paying for the whole thing, although they could ask the developers for funds. Councilor Hunt acknowledged Councilor Scheckla's point that the City would have difficulty convincing the public that the developers did not pay for things going their own way, if the results were favorable to the developers. Councilor Rohlf supported asking for financial support from the property owners. Councilor Moore said that he was confident that they would get a good decision regardless of who paid for it, and that he did not have a problem telling people so. Councilor Scheckla reiterated that the City paying for the study would gamer better public relations in the long run. Mayor Nicoli and Councilor Hunt agreed with Councilor Scheckla. The Council agreed that the staff approach was good but split on who should pay for it with three Councilors supporting City funding only (Nicoli, Scheckla, and Hunt) and two supporting financial assistance from the property owners (Moore and Rohlf). Jack Polans, 16000 SW Queen Victoria Place, King City, asked what the definition of local origin was. Mayor Nicoli suggested that Mr. Polaris meet with Mr. Hendryx at another time to discuss his question. CITY COUNCIL MEETING MINUTES - JUNE 24, 1997 - PAGE 2 t P I IJ F n > Cook Park Update Councilor Hunt reported on a meeting that he, Mayor Nicoli, Mr. Hendryx, and Mr. Wegner held regarding Cook Park as a response to the environmentalist concerns. He said that Mr. Wegner would install a four foot high fence 30 feet from the wetlands, and start planting trees for a buffer. They would use the trees being removed from the Menlor reservoir site to ! temporarily mark the parking lot. They would eventually test the parking lot as a gravel parking lot but not this year. Councilor Hunt spoke to getting a design for the bandstand/gazebo as soon as possible. He suggested getting input from Tigard music organizations on what they needed. He mentioned that Mr. Wegner would wait until fall to install sewer and irrigation lines and underground ; wiring so he could use the project as a training ground for his people. He said that an arborist would evaluate which of the trees between the Gray property and the park could be saved or taken out. Councilor Hunt mentioned that the gazebo would be on pontoons so it would float during a flood, and that the restrooms would be transportable so they could be removed during the winter or flooding. > Summer Lake Improvements Mr. Monahan referenced the memo Gus Duenas, City Engineer, prepared at his request reviewing the Summer Lake situation in light of the United Sewage Agency's (USA) report last November and staff discussions. - Mr. Duenas reported that the USA plan to improve water quality at Summer Lake was low priority and involved additional plantings and islands. Staff has contracted with a firm to test the sediment in the lake within the next two and a half weeks. This was at USA's request because the lake has never been dredged and no one knew what was at the bottom of it. He said that the City had a full range of options available to deal with the lake, from draining it for dredging and reflooding to minor improvements, but it was difficult to identify the most appropriate action without knowing what the lake contained. Mr. Duenas emphasized that staff was not prepared to discuss the possible options until the sediment test was complete. They would return to Council on July 22 with a report for discussion at that time. He said that USA recommended $354,000 worth of minor improvements at this time but due to it being Item #54 on the priority list, the improvements would probably not occur within the next five years. Councilor Moore asked for clarification on minor repairs costing $350,000. Mr. Duenas reviewed the USA proposal to create additional islands to increase shade, to plant landscape vegetation to create a defined edge, to remove non-native plants and animals, and to add appropriate habitat structure. He said that this was minor compared to the cost of dredging the pond and refilling it. In response to a question from Councilor Hunt, Mr. Duenas said that the City could use the water quality portion ($702,000) of the surface water SDCs ($2 million) to pay for the ' improvements. Mayor Nicoli pointed out that although USA would not proceed quickly with 'ITY COUNCIL MEETING MINUTES - JUNE 24, 1997 - PAGE 3 F e) o+. a i ~ I . 'D j Summer Lake improvements, the City could move forward immediately since they had the funding available. Mr. Duenas said that part of the goal of the Council was to look at the options beyond the USA proposal, and at what options the City could pay for. He reiterated that they needed the results of the sediment study before moving forward. I Councilor Rohif commented that no one had been impressed with the USA proposal. He expressed his hope that the City could take charge and steer the project towards meeting the City's goals over USA's. Mayor Nicoli opened the meeting up to public testimony. i > Van S. Camp, 12481 SW Edgewater, submitted letters from citizens unable to attend the meeting. He said that last year he researched the options available and came to the same conclusion as the City Engineer on the need for core samples to determine what was on the bottom of the lake. He contended that USA's proposal to create additional islands would turn the lake into a stream which would in turn decrease property values in the area. He pointed out that the park was used by hundreds of people in Tigard, not simply by the neighbors. He said that building the bridge had been a wise move to provide better park access. He stated that he opposed thinking of the lake as something disposable. > Howard Banta, 12580 SW Glacier Lily Circle, said that during his 1 I year residence as a park neighbor he has worked to improve and maintain the park. He mentioned that the lake was originally created as part of the Council approval of the Summer Lake planned development - north of the lake and south of Scholls Ferry. He referenced the Fanno Creek Watershed Management Plan, part of the Tualatin River improvement plan, citing its goal "to improve water quality and flood management." He agreed with Mr. Camp's analysis that the projected improvements (S-4) would turn the lake into a stream with the purpose of achieving a variety of f water quality improvements. Mr. Banta contended that the benefits possibly accruing with those improvements were unquantified. The plan did not say that making these improvements or destroying the lake would in fact make the difference that would bring the Tualatin River up to federal standards. He pointed out that the plan ignored protecting Summer Lake for its aesthetic and recreational values. He said that it was the largest body of publicly owned water in Tigard, and was beautiful at least nine months of the year. G Mr. Banta acknowledged that during the summer the lake became infested with weeds due to pliosphorous loads coming downstream from construction projects on Cooper Mountain. He pointed out that nothing has been done in the past eight years to help the lake deal with this excessive burden. He argued that the Tualatin River could meet the federal water quality standards without destroying Summer Lake. He spoke for maintaining the beauty of a large body of water surrounded by pleasant fields where children played instead of eliminating the lake to make unquantified and unknown improvements to water quality in Fanno Creek and the Tualatin River. > Bill Gucker, 12492 SW Edgewater Court, thanked the City and USA for the improvements already made that have helped with the lake edges and water quality. He said that if Summer i 1 CITY COUNCIL MEETING MINUTES -JUNE 24, 1997 -PAGE 4 i I Lake was allowed to deteriorate much further it would have to be renamed Summer Swamp. He 1 mentioned concerns of mosquitoes, declining property values, and lost City revenues. He asked for an inexpensive but reasonable solution to insure that Summer Lake continued as a beautiful lake. He invited the Councilors to a luncheon tour of the lake this summer. j > Jack Polans, 16000 SW Queen Victoria Place, King City, asked if there was the possibility of I a local health problem with mosquitoes in Summer Lake. Mr. Duenas said that they would not know the lake conditions until they completed their testing. He said that he was not aware of mosquito breeding at this time, although it was possible. > Ed Halberg, 12630 SW Glacier Lily Circle, expressed his concern that Summer Lake Park not be forgotten amid the discussions on Cook Park. He said with Council not accepting the USA proposal either, the most prudent thing to do was to complete the test and hold a discussion on July 22 as staff recommended. Mayor Nicoli commented that the City planned on planting 200-300 trees in Summer Lake Park as part of the Council goal to plant 2000 trees in Tigard by the year 2000. > Allen Hemdobler, 12910 Glacier Lily Circle, said that he has lived in the Summer Lake development since 1981. He said that the City used to treat the lake chemically every year to kill the weeds, and spoke to reinstating the practice. He mentioned other less expensive but still practical methods of eliminating the weeds: raking them and installing sterile carp to eat the weeds. ~y > Marie Collier, 12469 SW Edgewater Court, testified to the high usage of the park and its safety as a place to take children. > Lauri Portwood, 10835 SW Pathfinder Way, left her name with the staff for volunteer opportunities for Scouts. > Jean Camp, 12481 SW Edgewater Court, spoke on the intense use of the park by the community, including the schools, daycare classes, people playing a variety of sports, and 1 walkers. 1. BUSINESS MEETING • Call to Order - City Council & Local Contract Review Board Mayor Nicoli called the business meeting to order at 7:47 p.m. • Cnnne.il ('nmmnnirat;nnc/T ;n;cnn P-1, i Councilor Hunt reported on a meeting he attended on affordable housing. He mentioned the County owned affordable housing project on SW 95`h off Greenburg Road, Dove Court Apartments, noting how nice it was. • Call to Council and Staff for Non-Agenda Items Mayor Nicoli noted the deletion of Consent Agenda Item No. 3.2. CITY COUNCIL MEETING MINUTES - JUNE 24, 1997 - PAGE s 2. VISITOR'S AGENDA > Jack Polaris, 16000 SW Queen Victoria Place, King City, asked if the CIT members attended the Planning Commission meetings and what the budget cost was for the CIT program. He also asked for clarification on the City policy for drug screening of employees, both new and current. Mr. Monahan explained that the City implemented a policy of drug screening new employees as j part of compliance with the federal requirements accompanying federal dollars. The only existing employees screened for drugs were those with commercial driver's licenses, another { federal requirement. He said that Ms. Newton would get the budget cost information to Mr. Polaris. Councilor Moore explained that the Planning Commission was curious why the CITs did not attend their meetings; they had not been complaining about it. Staff confirmed that the CITs did not attend the Planning Commission meetings. > Terry Smith, 41480 SW Greenburg, noted that MLP 97-0002 has been withdrawn. He explained the neighbors' concerns that the developer intended to cut down indiscriminately the tree grove that characterized their street in order to put in more houses and to harvest the trees. He cited a Comprehensive Plan policy which stated that the City would insure that significant tree stands would remain substantially unaltered by development. He asked the Council to hold a hearing on the neighbors' findings that the tree grove was significant and worthy of protection, i and for reconsideration of the zoning of their street. Mr. Smith mentioned the unanimous agreement of the property owners on the street that the zoning was incorrect and that the tree stand was significant and deserved protection. He reiterated the importance of the tree grove to the character of their street and maintenance of property values. j Mr. Hendryx said that he would report back to Council on the correct procedures to handle the issues raised by Mr. Smith. He noted that the applicant resubmitted his proposal shortly after he withdrew it. C I Mr. Smith said that they would like to discuss possible adjustments to the tree ordinance to make sure that it offered the protection to large unique tree stands that it should offer. Mr. Monahan suggested that staff research the Code provisions on this issue, including what constituted a significant stand of trees. Mr. Smith reviewed the policies of other cities regarding significant tree groves. He said that the neighbors have done considerable work to establish the significance of this tree grove. i - Mayor Nicoll pointed out that even if they found the tree grove significant, telling a property = owner that he could not build on his property was a "takings." Mr. Smith said that they did not want to stop development completely, they just wanted the existing neighborhood taken into consideration. He mentioned that a purpose of the Comprehensive Plan was to insure that any development did not cause a process of diminution to an existing development. The neighborhood's fear was that this application did that. They only wanted mitigation and common sense applied in this situation. Mr. Hendryx said that he would research this issue with a report back to Council next week. - i CITY COUNCIL MEETING MINUTES - JUNE 24, 1997 - PAGE 6 i i j ~ 1 f r 3. CONSENT AGENDA Motion by Councilor Hunt, seconded by Councilor Moore, to adopt the Consent Agenda. Motion was approved by unanimous voice vote of Council present. (Mayor Nicoli, Councilors i Hunt, Moore, Rohlf and Scheckla voted "yes.") 3.1 Approve City Council Minutes: May 27, 1997 I. 3.2 Resolution Appointing Liz Newton as Deputy Recorder for the period of June 23, I 1997 to July 3, 1997: DELETED i 4. PUBLIC HEARING: CANCELED National Mortgage Comprehensive Plan Amendment (CPA 94-0001/ZON 94-0001) (Location: 11300 SW Bull Mountain Road) 5. PUBLIC HEARING - 1998-98 USES OF STATE REVENUE SHARING a. Mayor Nicoli read the hearing title and opened the public hearing. b. Declarations or Challenges: None I I c. Summation by Budget Officer i ' Wayne Lowry, Finance Director, explained that for the City to participate in state revenue 4 d sharing, it had to elect in a public process to receive those revenues - Ordinance No. 97-05 z;x For the City to receive the state shared revenues, it had to prove that it provided certain - services - Resolution No. 97-26. i Councilor Scheckla asked what the difference was between this year and last year's revenue sharing. Mr. Lowry said it was up a bit this year due to population growth and per capita income increases. He said that the estimates included an assumption that the state gas tax would increase this year. He stated that they saw revenue sharing as a solid and stable revenue source at this time. The money was used for general purposes in the general fund. I d. Public Testimony e. Recommendation by Budget Officer Staff recommended approval. f. Council Questions g. Mayor Nicoli closed the public hearing. h. Council Consideration Motion by Councilor Hunt, seconded by Councilor Scheckla, to adopt Ordinance No. 97-05. l CITY COUNCIL MEETING MINUTES - JUNE 24, 1997 - PAGE 7 1 - 1 1 The Acting City Recorder read the number and title of Ordinance No. 97-05. j ORDINANCE NO. 97-05 , AN ORDINANCE DECLARING THE CITY'S ELECTION TO RECEIVE STATE REVENUES Motion was approved by unanimous roll call vote of Council present. (Mayor Nicoli, Councilors Hunt, Moore, Rohlf and Scheckla voted "yes.") Motion by Councilor Hunt, seconded by Councilor Moore, to adopt Resolution No. 97- 26. . The Acting City Recorder read the number and title of Resolution No. 97-26. RESOLUTION No. 97-26 , A RESOLUTION CERTIFYING THE CITY OF TIGARD PROVIDES SERVICES QUALIFYING FOR STATE SHARED REVENUES t„ Motion was approved by unanimous voice vote of Council present. (Mayor Nicoli, Councilors Hunt, Moore, Rohlf and Scheckla voted "yes.") 6. PUBLIC HEARING - 1997-98 FISCAL YEAR BUDGET I a. Mayor Nicoli read the hearing title and opened the public hearing. b. Declarations or Challenges: None c. Summation by Finance Director , Mr. Lowry presented the 1997/98 fiscal year budget. He mentioned that it was identical to the budget approved by the Budget Committee with no adjustments. d. j Public Testimony: None e. Recommendation by Finance Director 1 Mr. Lowry recommended approval. ' f. Council Questions ` g. Mayor Nicoli closed the public hearing. f h. Council Consideration: Resolution No. 97-27 Motion by Councilor Scheckla, seconded by Councilor Hunt, to adopt Resolution No. 97-27. The Acting City Recorder read the number and title of Resolution No. 97-27. RESOLUTION NO. 97-27, A RESOLUTION OF THE CITY OF TIGARD APPROVING { THE BUDGET, MAKING APPROPRIATIONS, DECLARING THE AD VALOREM TAX CITY COUNCIL MEETING MINUTES - JUNE 24, 1997 - PAGE 8 i i AN- LEVY AND CLASSIFYING THE LEVY AS PROVIDED BY ORS 310.0602 FOR FISCAL YEAR 1997-98. ii Motion was approved by unanimous voice vote of Council present. (Mayor Nicoli, Councilors Hunt, Moore, Rohlf and Scheckla voted "yes.") 7. FINALIZE FORMATION OF SANITARY SEWER REIMBURSEMENT DISTRICT NO.9 I Mr. Duenas reported that the estimated costs for Reimbursement District No. 9 (approved by Council on April 22, 1997) have remained at $130,670.56. There was no revision to the engineer's report. He asked the Council to hold an informal public hearing on the district formation, and to approve its final formation. He explained that these actions would trigger the hookup of the sewer system on Fairhaven Way and Fairhaven Street. There were 29 residences that could hook up and much interest from homeowners in doing so. Mayor Nicoli opened the public hearing and asked for any public comment. There was none. Mr. Duenas recommended approval of the final formation of the reimbursement district. Councilor Scheckla asked about the minor problems in that area that needed to be remedied. Mr. Duenas said that staff was withholding final payment to the contractor until he finished the repair work. Mayor Nicoli closed the public hearing. Motion by Councilor Rohlf, seconded by Councilor Moore, to adopt Reimbursement District No. 9. 8. PUBLIC OPPORTUNITY TO COMMENT - FIVE YEAR CAPITAL IMPROVEMENT PROGRAM Motion was approved by unanimous voice vote of Council present. (Mayor Nicoli, Councilors Hunt, Moore, Rohlf and Scheckla voted "yes.") Mr. Duenas reviewed the CIP process that went through the CITs for public input and the Planning Commission for recommendation to Council. He reviewed the CIP projects in streets, parks, water, sanitary sewer, and storm drainage. He mentioned that the street projects had two funding sources: the gas tax and the TIF funding. He noted that they set aside $500,000 of gas tax funds for the pavement maintenance program. He asked to increase the speed hump program funding by $25,000 to provide sufficient funds for whatever traffic calming measures were implemented on North Dakota. He suggested decreasing the 79'h Ave design right of way by $25,000 to balance the books. Mr. Duenas reviewed the specific funding levels for other street projects. He mentioned that the City had to bear the full cost of the Bonita Road improvements from the railroad tracks to the Fanno Creek Bridge ($800,000 from TIF funds). He recommended the realignment of Walnut and Tiedeman over the next two years, even though it was in the County. CITY COUNCIL MEETING MINUTES - JUNE 24, 1997 - PAGE 9 a Mayor Nicoli noted that the City now had a say in the allocation of the TIF funds collected from the urban services area. Mr. Monahan pointed out that most of the TIF funds would come from Bull Mountain and spending fees collected in one area on another area would send the wrong message. He suggested discussing the situation with the County, and directing Mr. Duenas to use City funds for the Walnut Island areas but try to lessen that amount if possible using County TIF funds. I Mayor Nicoli commented that he thought that the County was at the point of being willing to do I something to address citizen complaints regarding Walnut and 12151. He suggested revisiting : the issue later. fMr. Duenas mentioned a Community Development Block Grant for $166,800 to construct the project on 91" Avenue between Greenburg Road and Lincoln Street. The City was contributing $23,200 in in kind services. The money would be available in July. Councilor Hunt asked if the City bought the property at Ross and Sattler so that the intersection could be widened. Mr. Duenas reported that they bought the right of way through there in order to do the realignment. However the actual realignment was not in this budget. He noted that the major problem at the intersection was drainage. i Councilor Scheckla asked if the school district has paid for its part of the 79`h and Durham signal. Mr. Monahan said that they requested to be billed, which staff has done. I Councilor Scheckla asked about the timing of the street closing for the Tiedeman bridge. Mr. Duenas explained that its scheduled July 15 closing was timed with the July 7 opening of Grant - Street. Councilor Rohlf asked if they were gaining or losing ground in the pavement maintenance program. Mr. Duenas said that they were gaining ground but they were not out of the woods yet. The revenues from an increased state gas tax would help greatly. However if that did not go through, they would have to scale back on that program. He said that between $100,000 to f. $200,000 worth of projects were added each year. He spoke to the importance of preventative maintenance in extending the life of a road versus the costs of pavement reconstruction. Councilor Rohlf asked if anyone applied for the joint cost program for street humps. Mr. Duenas said no. { Duane Roberts, Associate Planner, reviewed the park improvements in the CIP. He pointed f I out that it did not fully address the Cook Park improvements of $2.4 million. He explained that the first year showed budgeted projects with tentative projects listed ur uie next f bur years. He mentioned park acquisition opportunities along the Tualatin River and the property adjacent to Woodward Park that Metro purchased. He said that the original play structure at Woodward Park as been evaluated as safe for older children; the play structure listed in the CIP was a new play structure for younger children. Mr. Roberts mentioned trail acquisitions needed to complete the Tigard Street/Fowler School trail between North Dakota and Tigard Streets, and to extend the Woodward Park trail down to Grant Avenue. He noted the parks master plan authorized by Council, and the unidentified greenspaces projects using Metro regional money. CITY COUNCIL MEETING MINUTES - JUNE 24, 1997 - PAGE 1 o 1 > Lauri Portwood, 10835 SW Pathfinder Way, mentioned the excitement in the community 9 over the expansion of Woodward Park. She said that an inactive park was an invitation to vandalism and other such activities; an active park discouraged it. > John Cook, 12314 SW Millview Court, spoke in support of the expansion of Woodward Park 1 and of trails. He asked if the speed hump program was delayed last year because of Measure 47. Mr. Duenas said they received bids for the humps that staff considered too high. Now staff was looking at doing in-house the speed bumps for 1281h Locust, SW North Dakota. Money for a { new set of speed humps was included in this year's budget. Mr. Cook asked on the status of the parking lot at the feed & seed store. Mr. Monahan said that the City planned to wait until the Chamber's plans were finalized before designing the parking lot. Councilor Rohlf asked about the list of greenspace projects identified last year. Mr. Roberts said that while some had been acquired, a lot had dropped out because Council felt that the price { was too high. Staff intended to return to the CITs for input regarding the allocation of { greenspaces money. Councilor Rohlf said that last year the City lost its acquisition opportunities because the process did not move fast enough. He expressed concern that unless they changed the process, the same thing would happen this year. The Council discussed what the public input process should be on identifying greenspaces for acquisition. Councilor Moore said that while they could reduce the amount of public process, it was still important to have more public input than just the City Council. Councilor Rohlf said that he was willing to make these decisions on behalf of the public in order to move the process along fast enough to acquire greenspaces. Mr. Hendryx mentioned that this process did require a public hearing which would be just in front of the Council. Staff could expedite the process by noticing a special public hearing before I Council. Mayor Nicoli spoke to identifying the "holes" in the city parks system and addressing those issues. He said that he would like to use a different process this time but not exclude the CITs. Councilor Moore asked how long did the City have to spend the Metro greenspaces money. Mr. a Roberts said that they had until September 1998, although they could get extensions. He i explained that Tigard was about average in the region on spending the local share money. Only ~I about 20% has been used regionally. Mr. Hendryx said that staff would work to implement the Council's new direction. Motion by Councilor Moore, seconded by Councilor Hunt, for adoption of the 1997/98 Capital Improvement Program. Motion was approved by unanimous voice vote of Council present. (Mayor Nicoli, Councilors - Hunt, Moore, Rohlf and Scheckla voted "yes.") Councilor Scheckla congratulated Mr. Lowry on the award he received on behalf of the City for excellence in financial reporting. CITY COUNCIL MEETING MINUTES - JUNE 24, 1997 - PAGE 11 9. PRESENTATION: PASSENGER RAIL SERVICE UPDATE Bob Post, BRW Consultants, presented their report on the possibilities of commuter rail service as commissioned by Washington County, Beaverton, Tigard, Sherwood, Tualatin, and i j Wilsonville. He introduced Martin Paul, a team member with expertise in commuter rail operations. He mentioned that Metro, Tri-Met, and ODOT also participated in this Interurban rail study of the possible use of the existing railroad line from Wilsonville to Beaver Creek (past j Beaverton) as a commuter railline. He reviewed the differences between commuter rail and light rail. Commuter rail shared a rail line with freight trains and had stations three to five miles j apart. Light rail used specialized tracks and equipment with stations about half a mile apart. Mr. Post mentioned the reasons behind the study. These included population and employment growth in east Washington County, the decision not to pursue the western bypass, the difficulty of traversing the corridor using the existing transit system, and the desire for a lower cost solution than a highway or light rail system. Mr. Post noted the advantages of a commuter rail system on this line. The track was now under one operator (although it had two owners) which would make negotiations easier. In addition, a number of key regional employers had plants in this corridor and an interest in efficiently transporting their workers to and from work. During peak hours, travel time by train versus car would be faster. It offered an opportunity to be fairly competitive on capital costs, and it was an existing resource currently underutilized. Mr. Post explained that his firm was asked to do a "fatal flaw" analysis to determine if there was any aspect of this idea that could derail it. In addition they did a physical inventory of the line, a ridership analysis, and a legal assessment. They did not do specific design or cost estimate work. Mr. Post reviewed the station locations: Merlo north terminus, Beaverton, Washington Square, I Tigard, Tualatin, and Wilsonville south terminus. These stations also provided connections with the existing transit system. He said that the rail line was in good shape with less work needed than they typically found with rail systems. He described the operating plan they developed as a foundation for ridership projections, including 30 minute frequency during peak hours with bi- directional travel. The travel time from Wilsonville to Merlo would be 31 minutes with an average speed of 37 mph. i Mr. Post reviewed the findings and conclusions of the study: ~ . • There were no substantial engineering obstacles; This project would be at the tow end for capital costs for this type of project; The ridership estimate was for 1800 trips in the year 2000 and 2300 by 2015; • No legal or regulatory obstacles to operating a passenger rail service in the corridor were found; e The hurdles to be overcome were no different than any other new system put in place within the last five years. Mr. Post commented that though the cost was considerably less than other options, it still represented significant dollars for both capital and operating expenses. Therefore adequate funding sources would need to be identified. He pointed out that working with the railroad { CITY COUNCIL MEETING MINUTES - JUNE 24, 1997 - PAGE 12 1 meant business deals and negotiations for access to track time which was a different process [ than used with many public projects. The City would have to cover liability for the railroads, and find someone to operate the service. A final consideration was building facilities to federal and state requirements for safe operation of a rail service. Councilor Hunt asked if the service would need to be subsidized. Mr. Post said that almost all public transit operations required subsidy (40% to 50%) but that the amount of the recovery ratio was a matter of policy. He mentioned that the system could be integrated into the existing transit system or maintained separately. Councilor Scheckla asked how the tracks would be shared with the railroad Mr Post explained i I Jj 'i that normally a jurisdiction purchased windows of time for sole use of the tracks with the railroad running their freight trains other times. The railroad maintained control of dispatching. Councilor Scheckla asked how the Lake Oswego trolley differed from this proposal. Mr. Post said that the Lake Oswego trolley was an excursion or recreational trolley running on weekends and holidays. He mentioned the organizational structure and background of the line, noting that the private organization operating the trolley was finding it more difficult from a financial standpoint than originally projected. Councilor Scheckla asked who would maintain the track. Mr. Post said that would be negotiated but with a low volume operation, it made sense to leave the actual maintenance of the line to the railroad with the City sharing the costs. Councilor Rohlf asked what a reasonable time frame was for this proposal. Mr. Post said that the key issue was funding. If the funding were in place today, they possibly could move through the process in 18 months. Other projects have taken four to five years. Martin Paul commented a that a two to three year time period was a good estimate. t Councilor Rohlf asked for a ballpark cost estimate. Mr. Post said that the range for these types of projects was $4 million to $7 million per mile. Two large and unknown expenses were what it would cost to make a deal with the railroad and what the vehicles would cost. Their conclusions supported this project landing in the lower end of the cost range. 10. REQUEST LAND USE APPLICATION FEE WAIVER Mr. Hendryx presented the request from Tualatin Valley Housing Partners, Inc. to waive the fees associated with processing a Comprehensive Plan and zoning change amendment for the Hawthorne Villa Apartments. an affordable housing „r,ect• asked - - b project. He anao~ iui Council • ~i direction on how to handle the $4500 fee. Councilor Scheckla asked what was the highest fee that the Council has waived in the past. Mr. Monahan said that they waived $10,000 in fees for the Rite Center last year. Councilor Hunt said that with the potential saving of money in police work and other social costs, he had no objection to waiving the fee. Councilor Moore concurred and spoke for the Council showing its support of affordable housing through fee waivers. CITY COUNCIL MEETING MINUTES - JUNE 24, 1997 - PAGE 13 COMMUNITY NEWSPAPERS, INC. Legal P.O. BOX 370 PHONE (503) 684.0360 Notice TT 8863 BEAVERTON, OREGON 97075 Legal Notice Advertising .City of Tigard • ❑ Tearsheet Notice i. 13125 SW Hall Blvd. j •Tigard,Oregon 97223 • ❑ Duplicate Affidavit .Accounts Payable • i_ AFFIDAVIT OF PUBLICATION o• STATE OF OREGON, COUNTY OF WASHINGTON, )SS' ± i, Kathy Snyder being first duly sworn, depose and say that 1 am the Advertisingg ard-Tu Dir t hi Ti l i i l ti T g ec or, or s pr a a nc pa n clerk, of the imes a newspaper of general circulation as defined in ORS 193.010 and 193.020; published at Tigard in the aforesaid county and state; that the City Council BlcinPaa Meet inq f a printed copy of which is hereto annexed, was published in the entire issue of said newspaper for ONE successive and consecutive in the following issues: OFFICIAL SEAL JACQUELINE AR£t.LANO June 19,1997 NOTARY PUSLIC-OREGON F COMMISSION NO. 301011 MY COMMISSION EXPIRES JUNE 9. 2001 - i Subscribed and swor 'to before me thisl 9+h r1aj, f . , 1997 Notary Public for Oregon My Commission Expires: AFFIDAVIT . i The following meeting highlights are published for your information. Full agendas may be obtained from the City Recorder, 13125 S.W. Hall Boulevard, Tigard, Oregon 97223, or by calling 639-4171. CITY COUNCIL BUSINESS MEETING June 24, 1997 i' TIGARD CITY HALL-TOWN HALL 13125 S.W. HALL BOULEVARD, TIGARD, OREGON ! Study Meeting (Red Rock Creek Room) (6:30 P.M.) • Executive Session • Agenda Review Business Meeting (Town Hall) (7:30 P.M.) Public Hearings: - • 1997/98 Budget Hearing • Election to Receive State-Share Revenues P bli H C ll d i u c ear ance : ng e • National Mortgage Com rehensive Plan Amendment (CPA 94-0001/ZON 94-0001). Location: 11300 SW Bull Mountain ; Road) Public Opportunity to Comment: • Five-Year Capital Improvement Program Business • Finalize Fairhaven Sewer Reimbursement District • Presentation: Passenger Rail Service Update (Consultants from i BRW) ' TT8863 - Publish June 19, 1997. i S I COMMUNITY NEWSPAPERS, INC. P.O. BOX 370 PHONE (503) 664.0360 BEAVERTON. OREGON 97075 Legal Notice Advertising *city of Tigard ° ❑ Tearsheet Notice 13125 SW Hall Blvd. °Tigard,Oregon 97223 ° ❑ Duplicate Affidavit Legal Notice TT 8851 REC EIV ED JUN 16 1997 CITY OF TIGARD °Accounts Payble ° e• ~ AFFIDAVIT OF PUBLICATION STATE OF OREGON, )ss COUNTY OF WASHINGTON, ) 4 i KatbV Rn~rdar - being first duly sworn, depose and say that I am the Advertising Director, or his principal clerk, of theT, ga d-Ti,a 1 at i n Times a newspaper of general circulation as defined in ORS 193.010 and 193.020; published at Tigard in the aforesaid county and state;thatrthe Hearing-National Dlotaage Company a printed copy of which is hereto annexed, was published in the entire issue of said newspaper for ONE successive and consecutive in the following issues: Junel2,1997 Subscribed and sworn tbe this e,1997 OFFICIAL SEAL ROBIN A. BUROEBS 100 NOTARY PUBUC-OREGON Notary P is for Oregon COMMISSION NO. 062071 My Commission Expires: MY COMMISSION EXPIRES MAY 16, 2001 A00Kr1AVIT i I. The following will be considered by the Tigard City Council on June 24, 1997, at 7:30 P.M., at the Tigard Civic Center - Town Hall Room, 13125 SW Hall Blvd., Tigard, Oregon 9723. Both public oral and written testimony is invited. The public hearing on this matter will be conducted in accordance with the rules of Chapter 18.32 of the Tigard Municipal Code and any rules and procedures adopted by the Tigard City Council, or rules of procedure set forth in Chapter 18.30. Failure to raise an issue in person or by letter at some point prior to the close of the hearing on the request accompanied by statements or evidence sufficient to allow the Hearings Authority and all the parties to respond on the request, precludes an appeal to the Land Use Board of Appeals based on that issue, and failure to specify the criterion from the Community Development Code or Comprehensive Plan at which a comment is directed precludes an appeal based on that criterion. Further information is available at City Hall and may be obtained from the Community Develop- ment Director or City Recorder at the same location, or by calling (503) 639-4171. PUBLIC HEARING OMPRE ENSIVE PLAN AMENDMENT (CPA) 94.0001/ ZONE CHANGE (ZON) 94.0001 > NATIONAL MORTGAGE COMPANY < The property owner has requested that the city revoke a portion of its previous approval of CPA 94-0001/ZON 94-0001. The property was in the process of being sold to another owner through a sheriff's sale during this time in which National Mortgage claimed ownership of the property, which was incorrect. LOCATION: 11300 SW Bull Mountain Road; WCTM 2S110AC, Tax Lot 01100. APPLICABLE REVIEW CRITERIA: Community Development Code Chapter 18.32. ZONE: The property is currently designated R-25. The R-25 Zoning District provides sites for single-family attached and low, medium rise multiple-family residential units for medium-high density residential development. The property owner has requested that the property be re-designated General Commercial (C-G). The C-G Zoning District permits the provision of a range of major goods and services. J TT8851 -Publish June 12, 1997. i l CITY OF TIGARD, OREGON AFFIDAVIT OF POSTING In the Matter of the Proposed STATE OF OREGON ) County of Washington ) ss. City of Tigard ) I, ~D) /1 a V AV/l~/l begin first duly sworn, on oath, depose and(Aay: That I posted in the following public and conspicuous places, a copy of Ordinance Number (s) 9-7-05 which were adopted at the Council Meeting dated a y 7 copy(s) of said ordinance(s) being reto attached and by reference made a part hereof, on the _ q a b day of (mod. , 19 a' W/ 1. Tigard City Hall, 13125 SW Hall Blvd., Tigard, Oregon 2. Tigard Library, 13125 SW Hall Blvd., Tigard, Oregon 3. Tigard Water Department, 8777 SW Burnham, Tigard, Oregon Subscribed and sworn to before me this a~ day of ~1L1.0 P , 19_. f7II//~-2/rll~7Gf~ OFFICIALSEAL 156tary public for Oregon JILL ANN DRUMMOND NOTARY PUBLIC-OREGON COMMISSION NO. 058924 My Commission Expires: (Ei/lLX7~'" a~. FYPIFFS OCTOBER ER 2 28.2000 ~ ~ ~.v rnuuiccvw CITY OF TIGARD, OREGON ORDINANCE NO. 97- Gz 'AN ORDINANCE DECLARING THE CITY'S ELECTION TO RECEIVE STATE REVENUES THE CITY OF TIGARD ORDAINS AS FOLLOWS: SECTION 1: Pursuant to ORS 221.770, the City hereby elects to receive state revenues for the fiscal year 1997-98. This ordinance shall be effective 30 days after its passage by the Council, signature by the Mayor, and posting by the City Recorder. PASSED: By _Lh- dkk nftnyp vote of all council members sent after being read by number and title only, this 3pe day of !A XIA 1997. Gaz EU-wgh inn 1Jew*, city A 0 PPROVED: By Tigard City Council th' day of , 1997. s Nicoli, Mayo Approved as to form: City Attorne i Date I certify chat a public hearing before the budget committee was held ( . April 1, 1997, and a public hearing before the City Council was held on j June 24, 1997, giving citizens an o portunity to comment on the use of State Revenue Sharing. ,1A& 1 LAAA1 L-1 D t ORDINANCE No. 97- AGENDA ITEM NO. -VISITOR'S AGENDA DATE : June 24. 1997 1 (Limited to 2 minutes or less, please) Please sign on the appropriate sheet for listed agenda items. The Council wishes to hear from you on other issues not on the agenda, but asks that you first try to resolve your concerns through staff. Please contact the City Administrator prior to the start of the meeting. Thank you. r NAME, ADDRESS & PHONE TOPIC STAFF CONTACTED (oC('~~~~y~~ a p A riI S tJll 4~ S K1 ~cT C f /:2 Su, l C U z cl.~ s~ ~ 1. ~_ti ;f„ J acnxSG~ SfIJY~biu LCc~~✓ ® I:WdmljoW1sttshLdm AGENDA ITEM NO. 2 - VISITOR'S AGENDA - PAGE 2 DATE: June 24J997 1 (Limited to 2 minutes or less, please) 'Please sign on the appropriate sheet for listed agenda items. The Council wishes to hear from you on other issues not on the agenda, but asks that you first try to resolve your concerns through staff. Please contact the City Administrator prior to the start of the meeting. Thank you. NAME, ADDRESS & PHONE TOPIC STAFF CONTACTED I ~II'~ ti s w C~ s r E Xj!f ~7,Y `U 2 ~ I05 Sti~~ 2'y Z_ C~ depending on the number of person wishing to testify, the Chair of the Council may limit the amount of "time each person has to speak. We ask you to limit your oral comments to 3 - 5 minutes. The Chair may further limit time if necessary. Written comments are always appreciated by the Council to supplement oral testimony. AGENDA ITEM NO. 7 DATE: June 24, 1947 PUBLIC OPPORTUNITY TO COMMENT - FIVE YEAR CAPAITAL IMPROVEMENT PROGRAM PLEASE SIGN IN TO TESTIFY ON THE ATTACHED SHEETS ' s /GENDA ITEM NO. 7 Proponent - (Speaking In Favor) i i - 3 i i i l )Name, Address and Phone No. Address and Phone No. t )j 4 3 ~i i i • i PLEASE PRINT Oononent - (SoeakiRQ Asainst) one No. Name//, Address and Phone G l1-~ -V W lAdC i pga 6 ~ ~ ~o~ } (L U) x'72-2 3 ~U - J ~ oa Name, Address and Phone No. Name, Address and Phone No. Name, Address and Phone No. Name, Address and Phone No. Name, Address and Phone No. Name, Address and Phone No. Name, Address and Phone No. Name, Name, Address and Phone No. Name, Address and Phone No. Name, Address and Phone No. Name, Address and Phone No. Name, Address and Phone No. Name, Address and Phone No. Name, Address and Phone No. Name, Address and Phone No. --l 1 DATE: June 11, 1997 I SUBJECT: Progress in Evaluating Proposed Summerlake Improvements as Requested by i Council on November 12, 1997. . I Background - Last fall, several residents near the park expressed concerns to City staff about the appearance of the lake water. We informed the residents of the Fanno Creek Basin Management Plan planning effort by USA that was intended to improve water quality of tributary streams of Fanno Creek such as Summerlake Creek. We told them that the results of the study would be made available to them upon completion. Council also considered the issue during it's November 12, 1996, meeting. USA and City staff provided Council with an update of the progress of the plan with specific attention to Summerlake. Several options for Summerlake were discussed concluding with direction from Council that staff work with USA to further explore these options and perhaps propose additional options that the City could pursue outside of the Basin Plan. The concerns of Council and area residents that the lake be maintained as a developed park instead of being returned to a more natural condition were considered by the Basin Plan Project Committee and resulted in a final plan that recommended only a low priority project of planting native riparian plants along the lake and proposed islands. Current Efforts - As directed by Council, City staff has requested assistance from USA. In response, USA staff suggested that the next step be testing of the sediment in the lake. This is expected to provide information that will better enable USA staff to evaluate the proposed options, which Include aeration and weed and sediment removal, and hopefully suggest other options a well. A consultant to provide this testing is being selected and work is expected to be completed within tjtree weeks. The results of the testing will be provided to USA for evaluation of available options. For each option, staff expects to provide an explanation of whether or not the option is feasible. Fc options that are feasible, staff will provide rough cost estimates. The results of this evaluation wi be available to Council at its July 22, 1997 meeting; staff will be available to answer questions an receive further direction. 7 I \ENG%GJREGkPAM.SUMMERLK DOC `J H MEMORANDUM CITY OF TIGARD, OREGON TO: Bill Monahan FROM: Gus Duenaso_o_~ DATE: June 11, 1997 SUBJECT: Progress in Evaluating Proposed Summerlake Improvements as Requested by Council on November, 12, 1997. - - Background - La t r fall, several residents near the park expressed concerns to City staff about the appearance of the lake water. We informed the residents of the Fanno Creek Basin Management - Plan planning effort by USA that was intended to improve water quality of tributary streams of Fanno Creek such as Summerlake Creek. We told them that the results of the study would be made available to them upon completion. Council also considered the issue during it's November`12, 1996, meeting. USA and City staff provided Council with an update of the progress of the plan with specific attention to Summerlake. Several options for Summerlake were discussed concluding with direction from Council that staff work with USA to further explore these options and perhaps propose additional options that the City could pursue outside of the Basin Plan The concerns of Council and area residents that the lake be maintained as a developed park instead of being returned to a more natural condition were considered by the Basin Plan Project Committee and resulted in a final plan that recommended only a low priority project of planting native riparian plants along the lake and proposed islands, Current E8'orts - As directed bi Council, City staff has requested assistance from USA. In response, USA staff suggested that the next step be testing of the sediment in the lake. This is expected to provide information that will better enable USA staff to evaluate the proposed options, which include aeration and weed and sediment removal. and hopefully --agent ...t,~. wopl.ons as ell. A consultant to provide this testing is being selected and work is expected to be completed within three weeks. The results of the testing will be provided to ]JSA for evaluation of available , options. For each option, staff expects to provide an explanation of whether or not the option is feasible. For options that are feasible, staff will provide rough cost estimates. The results of this evaluation will be available to Council at its July 22, 1997 meeting; staff will be available to answer questions and receive further direction. hEMG%GREGPARK%SU MMERUCDOc YRi i _ 1 ' MEMORANDUM { CITY OF TIGARD, OREGON TO: Bill Monahan FROM: Gus Duenas * DATE: June 11, 1997 SUBJECT: Progress in Evaluating Proposed Summerlake Improvements as Requested by Council on November.IZ, 1997.. Background - Last fall, several residents hear the 'expressed concerns to City staff about the appearance of the lake water. We informed the residents of the Fanno Creek Basin Management - Plan planning effort by USA that was intended to improve water quality of tributary streams of Fanno Creek such as Summerlake Creek. We told them that the results of the study would be made available to them upon completion. ` Council also considered the issue during it's November 12, 1996, meeting. USA and City staff provided Council with an update of the progress of the plan with specific attention to Summerlake. Several options for Summerlake were discussed concluding with direction from Council that staff work with USA to further explore these options and perhaps propose additional options that the City could pursue outside of the Basin Plan The concerns of Council and area residents that the lake be maintained as a developed park instead of being returned to a more natural condition were considered by the Basin Plan Project Committee and resulted in a final plan that recommended only a low priority project of planting native riparian plants along the lake and proposed islands. Current Efforts - As directed by Council, City staff has requested assistance from USA. In response, USA staff suggested that the next step be testing of the sediment in the lake. This is expected to provide information that will better enable USA staff to evaluate the proposed options, which include aeration and weed and sediment removal, and hopefully suggest other options as well R conultant to provide this testing is being selected and work is expected to be completed within t#uee weeks. The results of the testing will be provided to ]JSA for evaluation of available options. For each option, staff expects to provide an explanation of whether or not the option is feasible. For options that are feasible, staff will provide rough cost estimates. The results of this evaluation will be available to Council at its July 22, 1997 meeting; staff will be available to answer questions and receive further direction. tWN=REGWARK%SUM MERLKDoC 5-fud,~j SM5CCy ► I In Our 42nd Year Cs/ay(Q-1 AQUACUDE ' a4 M1kX my Bulletin 1997 i A Do-It•Youself Guide for Weed, Algae, & Bug Contro F any to cry J r j W en"-~ L Hello: Welcome to the AQUACIDE COMPANY 1997 BULLETIN. You will find a variety of products offered here that many regular customers say are indispensable! If this is the first time you've seen our BULLET41, you'll be glad to know that in 42 years of business, we've served many, many tens of thousands of satisfied property owners like yourself. Aquacide Company was formed in 1956 to produce and market Aquacide Pellets. At that time a first class postage stamp cost 4C and 10 lbs. of Aquacide Pellets cost $14.95. Today a first class postage stamp costs 32c and 10 lbs. of Aquacide Pellets cost $60.95. We think you will agree that Aquacide Pellets were and still are a terrific bargain. Since that time we have grown considerably and so has our product line. The reason we have grown is simple. Our proven products get you results, are environmentally sound, and are easy to use. The products offered here will help manage your recreational lake or pond to make the most of your property's potential. Proper use of these products will restore or increase the enjoyment you receive from your property. improve alit, restore water oriented activities and increase the value of your property by controlling aquatic nuisance weeds this year. Our products are environmentally sound. Each product is registered for its specific use by the U.S. EPA. In addition, our products are certified and approved for use by state agencies. Those are good reasons to buy with confidence. All of the products offered here are easy to use. Simply follow the instructions on the container. If you have questions, please phone us. We can answer your questions and provide guidance in selecting the products you need to achieve best results. Substantial discounts are available to individuals and organizations requiring 200 lbs. or more of Aquacide Pellets. Please let us quote a reduced price for your larger order. A large inventory of material is maintained to insure quick delivery. Your order will likely be shipped the day it is received. Voice mail, FAX, and E-mail available 24 hours a day, 7 days a week. If we are unable to take your call directly, please try our voice mail. This will allow you to request information, place an order, or ask for a return call. Don't put off ordering though, summer is fast approaching. Sincerely, The Aquacide Company ■ Why COM.T al aqua6r1 k u5 ed"s? Aquatic weed infestations adversely effect fish, wildlife, hunting, fishing, boating, recreation, irrigation, and drainage. Weeds provide a breeding ground for mosquitoes, and give water an unpleasant taste. odor, and color. Heavy infestations may render an area unsuitable for fish by exhausting dissolved oxygen in the water, by blocking sunlight essential to basic food production, by restricting the movement of fish, or by rendering shallow water unsuitable for spawning. Excessive weed growth interferes with the recreational use of lakes and ponds. Access to and use of lakes and ponds for hunting and fishing is reduced. Boating, swimming, skiing, and other water oriented activities are hampered, reducing the recreational value of your property and your water resources. Heavy infestations may restrict water flow in irrigation canals or drainage ditches. Improving water quality by controlling aquatic weeds will restore balance to a body of water, increase your enjoyment, and help increase your property value. What causes weed growth? The primary factors that influence the growth of aquatic weeds are water depth, bottom type, and water clarity. These factors vary from one body of water to the next and are influenced by the surrounding watershed. As lakes age they fill with sediment rich in nutrients such as nitrogen, phosphorus, and potassium. Waters become shallower and more fertile favoring weed growth. Weather influences weed growth. Runoff from heavy rain carries nutrients into the water. Drought may lower water levels creating shallow areas suitable for heavy weed growth. Sunlight contributes to the process of photosynthesis and weed growth particularly in shallow clear waters. Human activities contribute to weed growth. Clearing of land for development and farming cause soil erosion leading to increased sedimentation. Discharges from sewage treatment plants, livestock feedlots, and leaky septic systems provide additional sources of nutrients. Hard surfaces such as roads promote runoff rather than absorption and natural filtration. For these reasons waters that would not support heavy weed growth under natural conditions may support heavy weed growth as a result of human activities. You CAN control aquatic weeds! There are several methods of aquatic weed control that you can use. Below is a brief description of each: Mechanical Cutting offers immediate short term control. Extended control can only be achieved by cutting on a continual basis. Cut weeds must be removed to prevent fragments from re-establishing or spreading to other areas. High cost and limited mobility in shallow waters prevent the use of large mechanical harvesters by individuals. Small hand operated equipment is available for use by individuals. Biological Control uses weed eating fish, animals and insects or the introduction of plant diseases. This method can be slow to produce results and often is not as effective or consistent as other methods. Still experimental. Water Draw Down especially during winter months is effective on submersed weeds. Drying out or freezing will destroy the exposed weeds. Care must be used to prevent destruction of fish and wildlife habitat. Loss of recreational use may occur. Marginal weeds may infest new areas . and become a greater problem than the original infestation of weeds. Chemical Control is currently the most commonly used, most effective, and most economical method of dealing with aquatic weed infestations. Aquatic herbicides produce faster, longer lasting results than other methods. Aquatic herbicides can be used in localized areas reducing the impact to non-target sites. The choice of aquatic herbicide depends on the weed(s) to be controlled. Best results are obtained by first identifying your weed(s) and then selecting a product or products to use. selecting a Moduct 3.) SELECT A PRODUCT: 1.) CLASSIFY THE WEED: Page 1 t provides a table showing what product See drawing below. controls what weed(s). Look up your weed(s) Emersed - Growing in shallow water with to determine which product or products to use. leaves or stems above the water. Read the product information le confirm the product Submersed - Growing in deeper water entirely will meet your needs- below the surface. 4.) QUANTITY TO ORDER: Floating - Growing unattached or rooted with Estimate the area and volume to be treated. This floating leaves. can be done by pacing the dock or pier and shore- Algae - Cellular, lower weed form. No line, measuring from a land survey, or other distinguishable stem or leaf. Scum and Chara means. Once the area is determined look at the product information for coverage and cost to are common. determine the quantity to order. 2.) DETERMINE SPECIFIC WEED(S): 5. PLACE YOUR ORDER: The following pages picture common aquatic Seepage 30. Please note all information weeds found throughout the country. Place requested. Place your order via phone, your weed in a clear glass jar with water and FAX or mail. A return envelope is enclosed compare it to the pictures. Pay careful attention for your convenience. to the leaves. (It's really EQt that difficult!) f /Emersed Floating Algae r Submersed if you are unable to identify your weed(s) consider these options: A.) Contact your local Fish and Game or County Extension Agent. B.) Contact a local College or University. C.) Talk to your neighbors. oo su•e in include leaf and stem. D.) Send us a sample. To do this. pull 'a sample of each wee Pat dry with a paper towel and place in a plastic bag. Enclose the sample, a brief note, and your return address in an envelope and forward to us. Please do not send samples packed in water - they rot, so do days nofor a t fully responhe,sample. it will turn to dust and we will be smell, and are, difficult Allow identify. unable identify t J ■ SUBMERSED WEEDS MILFOIL (Myrlophyllum): Leaves whorled in groups of four. Each leaf is divided into many thread-like leaflets extending from a central rib _ h1illoil (see feat detail). Forms tangled mats at the surface. Seed heads develop in mid to late season and may extend above the water surface. Treat _ when weeds are actively growing before flowering occurs. zy Parrot PARROT FEATHER (Mydophyllum Brasiliense) Feather Also a type of Milfoil. Leaves whorled in \ r- groups of four to six. Each leaf is divided into G• eighteen pairs of threadlike segments resembling - ~f~R'<'• • rZ a feather (see leaf detail). This species differs -~~•`4 .''d' Cr from other Milfoils b having its foliage partially - out of the water. Emersed foliage is bright green. • - COONTAIL (Ceratophyllum demersum): lam. ,tom Leaves whorled around the stem and have a serrated appearance (see leaf detail). Spacing •~j`- between leaf whorls is variable. Consequently, i> a, weeds may be long and sparse or bushy. Near the end of the stem leaves and whorls are crowded. Branches are forked repeatedly. Do not confuse with Chara. Coontail HYDRIL LA (Hydrilla verticillata)/ELODEA (Elodea canadensis): These two weeds are JI, very similar. Both have leaves whorled in - groups. Hydrilla leaves have a serrated edge. (See leaf detail for each.) Whorls of leaves are v compact Haar the growing tips. Spacing between whorls increases further down the stem v,~*k j7~y Jr BLADDERWORT(Utricularia):Finely divided leaves scattered along the stem with numerous . _ bladder like structures on leaves. Stems have of many branches and are densely leafy at the tips. Flowers yellow and rise above surface. ~ ss~ rr See page 11 for what controls what. Hydrilla Elodea 1 Drawings provided by: University of Florida V 1, IFAS Center for Aquatic i weeds. 4 i J Submersed Weeds... LEAFY PONDWEED (Potamogeton foliosus): Short grasslike leaves which measure one to d branch freely on a slender three inches long an stem. Leaves are alternately attached. Clumps of four to eight fruiting bodies attached to a center t reed stalk that rises above the h or stem by a s water surface. i Leafy Pondweed BUSHY PONDWEED (Najas minor): Leaves are narrow with tiny spines along the edges. Slightly enlarged at the base. Stems slender with frequent branching. Leaves oppositely roups of two or more at a node. or in h d \ g e , attac Leaves are densely concentrated at the tips. t ' May be confused with Chara. Chara has a strong Bushy Pondweed does not. shed r . u odor when c SAGO PONDWEED (Potamogeton peclinatus): , Leaves are stiff, narrow and threadlike. Stems ' branched with leaves alternately attached. Spreading leaves resemble a fan with an overall bushy appearance. Nutlets appear like beads ears on a A~ on a string. Tiny green flower app ith nullet5 above the water surface. spike along w HORNED POND W EED (Zannichellia palustris): Leaves are long and threadlike, oppositely ` arranged on the stem unlike other pondweeds. Seeds found at the leaf base, flattish in shape. and serrated on one side. what l . s See page 11 for what contro Bushy Pondweed Horned r Pondweed ag T Pondweed t' 7, i F Submersed Weeds LARGE-LEAF PONDWEED (Potamogeton amplifolius): Leaves both floating and submersed. Submersed leaves are large. Floating and Ia er to the stem oblon wav , :yt (1 . . g. y. p , . 't leaves are oval shaped. Parallel leaf veins are evident. Stems are seldom branched. Leaves r r ` .I i alternately arranged on stem. Solid. tightly packed spike of nutlets at tip of weed rises above water surface. i Large-Leaf FLOATING-LEAF PONDWEED (Potamogeton Pondweed nalans): Leaves both floating and submersed. Submersed leaves are long and narrow. Floating r leaves are oblong and slightly heart-shaped at t base. Parallel leaf veins are evident. Stems occasionally branched. Leaves are alternately f ik k d e o e sp arranged on stem. Solid tightly pac , p nutlets at tip of weed rises above water surface. CLASPING-LEAF PONDWEED(Potamogeton om richardsonii): Leaves wide and wavy with `,.r Y !t smooth edges. Broad base clasps the stem. Upper stem commonly branched and leafy. Leaves are alternately arranged on stem. Solid tightly packed spike of nutlets at tip of weed J rises above water surface. Floating-Leal CURLY-LEAF PONDWEED (Potamogeton Pondweed crispus): Leaves thin with wavy and finely serrated edges. Stems branched. Upper leaves are often crispy and appear waxy. Leaves alternately on stem. Flowers born on spikes rise above the water surface. Seepage 11 for what controls what. V . Clasping-Leal Y:II _ _4 9 Pondweed 3 1j Curly-Leal Pondweed ~I 6 F FLOATING WEEDS DUCKWEED (Lemma minor): Leaves the size be observed individually Ma y of a pencil eraser. se observation. Small root or in clusters upon clo hairs may be seen hnging down from the a No stem is distinguishable. f l ' . ea underside of the Heavy growth will blanket the surface with many T / inches of growth. Duckweed is not interconnected as is Filamentous Algae. Do not confuse Duckweed with Algae. WHITE WATER LILY (Nymphaea odorata): i • Leaves large, round and slit to the center. Underside of leaf is often purplish. Stem is below the surface. Roots are thick and fleshy, most rs are white with multiple Fl v - owe often buried in mud. rows of petals born on a single stalk at or above the surface. May be confused with Yellow Water ellow flowers and heart-shaped ve h h i y a Lilies whic leaves. Yellow Water Lilies are more difficult to control than white water lilies. eberi): h h If r WATERSHIELD (Brasenla sc l in shape with smooth edges. Leaves are ova Stem is attached to the middle of the leaf. A clear jelly-like coating covers the underside of the tems on mature weeds. A dull purple d h- s leaves an flower develops in early summer. Treat before Wafer Lily jelly-like coating develops. FALSE LOOSESTRIFE (Ludwigia palustris): Leaves both floating and submersed Oblong ear the stem. Leaves oppositely and narrow n attached to stem, most often in pairs. Stems rooted at the joints. Forms tangled mat on the surface. Seepage 11 for what controls what. False Loosestrile Water Shiold ~ 11 o~ ~ J EMERSED WEEDS WATER WILLOW (Dianthera americans): Leaves long, narrow and tapered at each end. Branched veins evident. Edges are smooth. Stems are usually unbranched with leaves oppositely attached. Flowers born on spikes. purplish in color. WATER PRIMROSE (Jussiaea uruguayensis): Leaves are lance shaped with smooth edges. Veins in leaves are evident. Sterns and leaves are hairy. Leaves are numerous and alternately attached. Flowers are bright yellow and develop at the top of the weed. BULRUSH (Scirpus spp.): Leaves may or may not be present. It present, they appear as a continuation of the stem. Stems are tall and smooth and either round or triangular in shape. A loose cluster of brownish flowers and seeds is located near the tip of the stem. CATTAIL (Typha lalifolia): Leaves are tall and flat. Stems are tall, round and unbranched. Flower is the distinctive cigar-shaped cattail which is green in early summer and turns brown and fuzzy in fall. This weed has an extensive root system. Difficult to control when well established. Multiple applications may be required to control this weed. PURPLE LOOSESTRIFE (Lythrum salicaria): Leaves slightly heart-shaped at base coming to a point at leaf tip. Leaves small and more numerous near tip. Stems rigid. four-sided and have fine hairs on them. Leaves oppositely arranged on stem usually in pairs. Flowers bright purplish on a spike closely attached to stem. SMARTWEED (Polygonum hydropiperoides): Leaves are oblong and smooth on the edges. Stems are distinctly jointed with leaves alternately arranged. The lower portion of the stem is rooted at the joints. Flowers are small and tightly clustered and are white or pink in color. Weed may be emersed in shallow water or completely submersed with only flowers visible above surface in deep water. See page 11 for what controls What. F Water Willow 1Y"; J Water Primrose ) e ~ A ~ AY t~ „Bulrush ~I Purple Loosesfrile Smamveed 8 it Emersed (Heeds... WATER PENNYWORT (Hydrocotyle): Leaves round with low rounded lobes. Attached at center to a stern. A leaf is about the size of a half dollar. Stems extend from a horizontal root in shallow water. Flowers arise in groups from smooth stems. Each individual flower has five small while petals. Ohen rooted in mud forming dense mats. SPATTERDOCK (Nupharadvena): Leaves heart shaped at base. shiny and smooth. Some leaves float but most stand above water. Flowers are solitary on a long stalk slightly above the water surface. yellow with green outer petals. Roots become very thick once the weed is well established. Multiple applications may be required to control this weed. PICKERALWEED (Pontederia cordata): Leaves are heart shaped at the base. Veins are very fine and numerous. Flowers are blue-purple and crowded on elongated terminal spikes. Each flower has six petal like parts united below into a tube. AMERICAN LOTUS (Nelumbo lutea): Floating leaves are circular with stems attached to the center of the leaves underside. Emersed leaves are also circular and depressed to the center of the upper surface. Flowers are solitary pale yellow and composed of numerous petals. The seed pod is in the flowers center with seeds embedded in its surface. WATER CHESTNUT (Traps natans): Submersed leaves threadlike far apart on the stem. Floating leaves are nearly triangular or diamond shaped toothed in the upper half on inflated stems. Flowers have four while petals. See page 11 for what controls what. r. - , e Water Chestnut K. l) Water Pennywort it t Spatterdock Pickeral ` Weed 44~J~`1 I1 American (l Lotus Emersed Weeds... REED GRASS (Phragmiles maximus): - Leaves are long and flat with parallel veins. " Stems are tall and round with alternately arranged leaves. Flower of weed is made up of spikelets with long silky hairs such that this portion of the weed may appear as a silky mass. Stout rootstocks make this weed difficult to pull out. GRASS FAMILY (Gramineae): Many kinds of grasses grow in damp places and at times are found in water. Leaves are long and slender, usually ten times as long as wide. Veins within the leaves run parallel to each other. Leaves I' are arranged alternately on the stem. Most grasses are emersed including but not limited to Giant Cutgrass, Giant Foxtail, Maiden cane, Reed Paragrass, and Sawgrass. Other grasses may Grass be submersed including Wild Rice and Manna Grass. See page 10 for what controls what. ALGAE ' CHARA (Chara vulgaris): Leaf-like structures whorled around hollow stem. Dense growth attached, but not rooted to bottom. May "carpet" _ ~~yy''q : • t large areas of a lake or pond bottom. Strong k d h h d M ' • mus y o or w en crus e . ay have a gritty i d ~ . J texture ue to m neral deposits on the surface. Do not confuse with higher weeds ! 3 . FILAMENTOUS ALGAE: Individual filaments a series of cells joined end to end that give a thread-like a earance Often r f rr d t pp . e e e o as pond scum. Forms surface "mats". Growth i b t th i b d Chara / eg ns a e ottom an r ses to the surface l i f as a bubble-filled mass. May also form fur-like ' growths on logs and rocks at the bottom. PLANKTONIC ALGAE: Microscopic growth often visible as a greenish tinge suspended in the upper few feet of water. Severe blooms may resemble pea soup and actually thicken < ! a the water. 1 Seepage 11 for what controls what. Filamentous Algae to 0 What Controls What I Aquaclge Weed>dr>eD Aquathol.Hyd 91hol Rodeo' Liquid CLIquIdP& s Cyr us 1 PeIIGIS Granular 1 Granular : Granular Granular Weedtrine-D Product Pq 15 it Pq 13 P9 77 Pg 18 Pq 14 Pq 21 Pq 1920 Pg 13 F. 19 Informal, on _ SUBMERSED Milfoll E C- C C G G Parrot Feather E G G G F G Coonlall E G G G G G Elodea'Hydrilla G G _ G E Bladderwort G G G Pondweed G E E G FLOATING Duckweed G' E E E Water Lily G F F E G Water Shield E F G G G F F ' f False G Loosestrife , EMERSED Water Willow G F G Water Primrose E F F F F Bulrush E F E i Cattail G G E F Purple G G Loosestrde Smartweed G F G G F F Water Pmnywort. G E E Splatterdock G G G E G Pickeralweed G. F Amerlcan Lotus E G G G Water chestnut G _j Reed Grass G E F /Grass . _ . ALGAE Filamentous. . G G E E Algae Planktonic G G E E Algae _ Chara G E E water less than 3 feet deep E = Excellent, G = Good, F = Fair Voice: 800-328-9350. 612.4296742 • FAX: 612-4290563 • E-mail: AC.76652.171@CompuServe.com t i Mater Use Restrictions (Days) HUMAN ANIMAL IRRIGATION • PRODUCT ACTIVE ACTVE I r ° m I c m NAME INGREDIENT INGREDIENT - E E IL a Z F- o ] O 1 N o LL Op , I V AGuacido 2a dlohlorophenoxy 175 21 0 0 21 0 21 f 21 POltela acetic acid - Aquaclear 8 bacle,ol slams N A Pellets o 0 0 0 0 0 0 Aquashade Acid blue 9. 26 02 • 0 0 0 0 0 0 Acid yellow 23 Aquashadow Acid blue 9. 100 * 0 0 0 0 0 0 Acid yellow 23 Aqualh0l Dipotassium salt 101 1 3 7 r 7 7 Granular of endolt Weedtrine-D Di at dlbromide 8.54 Liquid 14 1 0 14 14 14 14 Cide Kick 11 tl.1Ilmonene and 100.00 0 0 0 0 0 0 0 related isomers Clear-Water Aluminum sulfate. 50 50 0 0 0 0 0 0 0 _ Sodium bicarbonate Cutrine-Plus Copper 7 ethanolamme 3 0 0 0 0 0 0 0 . Granular complexes _ Cutrlne•Plus Copper 0 ,,,anolam- 9 0 0 0 0 0 0 0 . Llquld complexes Hydrothol 191 Dimethylalkylamine 11 2 7 25 1 3 7.25 725 7-25 7-25 Granular salt of endothall Rodeo isopropylam, no 535 01 0 0 0 0 0 0 _ salt of glyphosate Sonar Liquid Fluridone 41.7 01 0 0 0 30$ 30$ 30$ aqueous srrrrion _ Sonar Granular Fluridone 50 slow retoase pellet 01 0 0 0 30$ 30$ 30$ Not to be used in potable water. - 1 See label for distance allowed from potable water in take. r $ Voluntary restrictions suggested by manufacturer Useful Conversions 1 acre = 43.560 sq. h.. 1 qt. = 2 pts. 1 oz. = 2 Tablespoon 1 ppm. - 2.7 lbs.lacre h. 1 aae-f1. =1 aCr x 1 R 1 pt. = 2 cups 1 gal. = 128 ozs. 10 1 dilution - 12 ozs ./1 gal. i gal. - 4 qts. 1 cup - 8 ozs. graiNgal. = 17.1 ppm. 9:1 dilution = 13 ozs1 1 gal. S~ Aquacide Company, 1627 9th Street. P.O. Box 10748. White Bear Lake. MN 55110-0748 12 WEEDTRINE-D Liquid Broad spectrum, rapid-acting contact herbicide- WEEDTRINE-D, with diquat, is a broad contact herbicide. Ideal id-acting ra tr m For difficult to control weeds the addition of Cutrine-Plus Liquid can boost effectiveness. , , p u spec for use on small bodies of water or small weed Use of a non-ionic surfactant such as Cide- Kick II is highly recommended (see page 14) patches. Successfully controls a broad range floating, and emersed weeds in of submersed One gallon of WEEDTRINE-D covers 4,000 sq. ft. , lakes, ponds, and drainage ditches. There is a wide margin of safety with respect to fish. of submersed weeds or 8.000 to 10,000 sq. ft. of floating, emersed, or terrestrial weeds. Easy to apply. For floating, emersed or terrestrial weeds, apply with a tank sprayer (see page 24). To treat submersed weeds inject below the surface with a tank sprayer or pour into water in strips 10 feet apart. Treat heavy infestations in sections to avoid oxygen depletion. Thorough contact with weeds is necessary for best results. Water treated with WEEDTRINE-D should not be used for swimming for 1 day. Wait 14 days for irrigation, human or animal consumption (see page 12). Great on land too! Use around patios, ornamental gardens, and along fence lines. Rapidly absorbed by foliage WEEDTRINE-D begins to work immediately on contact. Wilting and loss of foliage occur quite rapidly, usually within a few days. Effective on many different weeds. WEEDTRINE-D is effective anytime live foliage is accessible. Best results occur when applied to reasonably developed foliage, but before growth becomes too dense or weeds flower. "Your Weedtrine-D Liquid and Cutrine-Plus cleared my pond, in less than two weeks we could see the fish swimming on the pond floor." S. L. B., Florida Under low light conditions WEEDTRINIE-D may be translocated to other weed parts from the point of contact. When exposed to light the herbicide is activated and kills the weed. Turbid water or mud covered foliage will reduce absorbtion and effectiveness. WEEDTRINE-D Liquid is equivalent to and a direct substitute for AQUAQUAT Liquid. WEEDT11ME-D Liquid 1 gallon (trt_a.00^t,.ft.) $ 61.95 4 x 1 gallon (treats 16,000 sq. et.) 210.00 5 gallons (treats 20,000 sq. n.) $259.95 Voice: 800-328-9350. 612-429-6742 a FAX: 612-429-0563 • E-mail: AC.76652.171@CompuServe.com 13 L_ J F RODEO Liquid Broad spectrum, root killing, systemic herbicide. RODEO, with glyphosate is a broad spectrum, root killing, systemic herbicide. Controls a broad spectrum of floating and emersed weeds in and around surface waters. Great on land too! Thorough systemic action. Applied directly to exposed foliage, RODEO is absorbed by the weed killing roots and all. Effective on weeds which have most of their foliage above water. Will not work on submersed weeds. Works on most green vegetation. Initial results occur in 2 to 4 days. Results begin with wilting and yellowing followed by full browning. Well established heavy growth will require 1 to 3 weeks to show results. Apply RODEO in mid to late season. Best results are obtained when applied to actively growing, well developed foliage. A six hour rain free pe- riod following application is required for proper herbicide absorbtion. Effective control of most green vegetation. Use 1 to 2 ounces of RODEO and a non-ionic surfactant such as Cide Kick It. Add water to make 1 gallon of solution. Apply with a tank sprayer (see page 24). Uniformly wet foliage, but not to the point of runoff. Coverage with RODEO varies depending on the type of weed treated and density of growth. Typically 100 gallons of spray solution will cover 1 acre. Well established perennial weeds may require a second treatment in 3 weeks. Water treated with RODEO has no use restrictions (see page 12). RODEO liquid 2.5 gallons (treats 2.5 to 3.2 acres) 529.95 CI®E-KICK 11 Non-Ionic Surfactant Wetting agent, activator & penetrant in one. CIDE-KICK II is a non-ionic. water soluble, biodegradable surfactant made from forestry by-products. Increases effectiveness and reduces treatment costs when used with foliar applied liquid herbicides and algaecides. Stretch your herbicide dollars. Eliminates beading resulting in a uniform sheeting action of spray solution over foliage surface. Maximum contact between spray solution and foliage is insured. Effectively penetrates the waxy coating on leaf surfaces. Improved contact and penetration result in improved control. Hiahly recommended for use with Rodeo. Weedtrine-D. and Cutrine-Plus Liquid. Use 1."L to 2 tablespoons of CIDE-KICK II per gallon of spray solution for floating, emersed or terrestrial weeds. For submersed weeds use 3 to 5 tablespoons per gallon of spray solution. Spray solutions incorporating CIDE-KICK II have no use restrictions other than those of the herbicide or algaecide with which it is used. t1ne:~I Y" N PIT: 7flPif 11 1 quart (makes up to 130 gallons)............ $18.9s 1 gallon (makes up to 520 gallons) $ 45.00 A Aquacide Company, 1627 9th Street. P.O. Box 10748, White Bear Lake, MN 551100748 14 l i F F AQUACI®E Pellets Selective root killing, systemic herbicide. AQUACIDE Pellets with 2,4-D are a selective. With growth halted the weed dies. Kills the entire root killing, systemic herbicide. Controls sub- weed roots and all. Initial effects occur in mersed, emersed, and rooted floating weeds in 7 to 10 days, indicated by brittle stems and recreational lakes and ponds. Use around curling leaf tips. Full kill will occur in 3 to 5 docks, boat hoists, swimming beaches and weeks. Once dead, weeds sink to the bottom shorelines. There is a wide margin of safety and decompose. with respect to fish. All season long. Visible effects in 7 to 10 days. AQUACIDE Pellets are effective any time Marble size AQUACIDE Pellets sink directly to susceptible weeds are actively growing. When the bottom, visibly expand over a period of several applied in spring and early summer, less material hours to a day, and stratify a layer of herbicide is required, less dead weeds occur, and a at the bottom. Herbicide is released slowly in longer weed free period will result. In northern controlled amounts. As weeds grow herbicide areas applications may begin as soon as ice is absorbed through leaves, stems, and roots. has melted and weeds begin to grow. Successful applications can be made in late "Please send me: 1-10# Can AQUACIDE summer and fall. The full effect of late season Pellets - Have used your product before and applications may not be fully evident until the am ytlq! pleased." following season. K.T. Illinois Applications to well established perennial weeds "This order must be about our 12th order of such as Cattails or Water Lilies may require a this product. It keeps working, so keep sending." second application in 3 to 5 weeks if weeds F.R., Wisconsin show signs of recovery. "Boy, am 1 a great ran of your'stuff' It does Heavy clay, mud, or silt build up may reduce just what you say! Thanks." root absorption by effectively sealing the roots. Illinois N J Early season application or more than one . application may overcome this problem. Water movement in the form of currents or bottom Herbicide absorption is quite rapid occurring in springs may wash herbicide from the treatment just a few hours under good growing conditions. site and reduce effectiveness. Once absorbed the herbicide is translocated f throughout the weed to the growing parts o \ leaves and roots. Growth at these parts is halted. Voice: bUU-326-93bU. titL-42`)-b/4L s r-A A: bid-4L`J-Ubb:S • t-mall: Au.tuunz.I l I L,.anipu~erve.uui1 17 4 ■ HOW TO ORDER BY MAIL Simply complete the order form on the reverse side of this page. Include your mailing and l f l er Pl id h i dd d ff ress or iv y. ease prov ys ca street a e erent. e a p shipping addresses if di Total all charges and enclose payment of a check, money order, or charge card information (including expiration date). We accept VISA, MASTER CARD, or DISCOVER. Please NO COD. BY PHONE or FAX Complete and date the order form for reference. Phone Numbers Voice Mail Codes Toll Free 1-800.328-9350 222 Return Call 301 Product Price List Local 1-612.429-6742 224 Free Catalog 302 Company FAX and Address FAX 1-612-429.0563 226 To Order Hours are 8:00 am to 5:00 pm Central Time. Monday through Friday. The best time to call is Noon to 5:00 pm Central Time. FAX line and voice mail available 24 hours a day. 7 days a week. To leave a voice mail message. simply press the' key then enter one of the 3 digit codes listed above. To exit simply hang up. To proceed to another mail box press ' key and the desired 3 digit number. SALES TAX • Minnesota customers please add 6.5% state sales tax. DELIVERIES Please provide a street address for all deliveries. Mail and phone orders received, and phone orders recieved by Noon Central Time are usually shipped the same day. Prices include regular shipping charges within the 48 contigious states. Delivery terms F.O.B. White Bear Lake. MN. Please add $5.00 for packages shipped to Alaska. Hawaii or Puerto Rico. Most U p V shipments are made UPS ground, RPS may be used on occasion. Shipments to Minnesota or Wisconsin will be sent SPEE DEE unless UPS is specifically requested. Orders over 1000 has. are palletized and shipped common carrier truck. Next Day or 2nd Day Air service is available. Additional charges apply. Call for quote. GOVERNMENTS, BUSINESSES, and PROPERTY OWNERS ASSOCIATIONS Open account NET 30 billings are available to Governments.Businesses and Property Owners Associations with established credit. Minimum billing of $100.00. Shipping charges will be added to NET 30 accounts. New accounts may be established by providing a bank name and two trade references. Please provide reference name, address, phone =o number. bank account number and account name. Allow 5 working days to process new accounts. Call for credit application. CUSTOMER SATISFACTION POLICY - Unopened containers may be returned for credit or refund within 30 days of receipt. Please phone for return authorization. Returned items must be shipped prepaid and are subject to • - a 15% restocking charge. Absolutely no credit will be issued for partial returns of chemical products not manufactured by AOUACIDE CO. BULLETIN MAILING LIST If your address is incorrect, or you are receiving more than one copy of this BULLETIN at the same address at the same time please send us the address(es) on your BULLETIN(S) with your instructions regarding changes, corrections. or deletions. We will give you a $5.00 + discount on a current or future order for proof of duplicates mailed in 1997 to the same address at the same time. SOMEONE YOU KNOW WHO WOULD LIKE A COPY OF OUR BULLETIN ADDRESS: CITY: STATE: ZIP: NAME: _ _ ADDRESS: CITY: STATE ZIP: AquaCide Company Call Toll Free for Credit Card Orders: While B9th ear Like M Box 5110'.0746 1-800-328-9350 PHONE: Toll Free 1 800 328 9350 Local 1 612-429-6712 B:oo am to 5:00 pm Central Time Mon - Fri FAX 1.612.429-0563 (Voice Mail at all other times.) ORDERED BY: Provide a complete mailing address including PO BOX number where appropriate. Name Address City.'State,Zip SHIP TO: We must have a street address rather than a PO Box to assure delivery. Delivery terms F.O.B. White Bear Lake, MN. Name Address City/State,Zip Z i _ i IrMETHOD OF PAYMENT il. CHECK $ AMOUNT ENCLOSED Date Ordered -I-I ~ ID1 MASTERCARD L.I --I _J I- Iv I 1J - ~LlJ VISA Expiration Dale ' I_I -I F1 I, DISCOVER Month Year i DAYTIME PHONE( SIGNATURE PAGE HOW I DESCRIPTION SIZE PRICE ! AMOUNT j NO. 'MANY! I F ITEM TOTAL' MINNESOTA customers add 6.59o sales tax. REGULAR SHIPPING (Within continental U.S. included in price.) $0.00 . SHIPPING AK.HI & PR. $5. 00 Thank you for your order! TOTAL Catalog prices guaranteed until 12/31/97 i` J it l AgUeCide Company Call Toll Free for Credit Card Orders: Whde~Boar Lake MNB 551100748 1 -800-328-9350 PHONE: Toll Free 1600-3289350 Local t-6124296742 0:00 am to 5:00 pm Central Time Mon - Fn FAX 1 612.4290563 (Voice Mail at all other times.) ORDERED BY: WhProvide ere a complete appropriate. mailing address including PO Box number Name Address CilyrState'Zip - SHIP TO: pet must d have street address rather than PO Box to assure delivery. Bear Lake, MN. Name - - Address City Slate,Zip METHOD OF PAYMENT: L- Date Ordered -1-1- AMOUNT ENCLOSED - CHECK $ -_~l.-.~~:_~-~I r--~-~ s VISA -.r l-_~---._~ _l _I- " MASTERCARD Expiration Date Month Year DISCOVER DAYTIME PHONE SIGNATURE I_ ) - • - - AMOUNT PAGE 'I HOW DESCRIPTION SIZE PRICE i I . No... MANY,... ITEM TOTAL, _1NNESOTA cult-11 add 6.59,6 sales lax REGULAR SHIPPING (Within continental U.S. A in price.) PR $5. 00 Thank you for your order! TOTAL J b r G r rY Catalog prices guaranteed until 12/31/97 _I HOW TO ORDER - BY MAIL Simply complete the order lorm on the reverse side of this page. Include your mailing and sical street address for delivery rovide a h Please it diff t i dd pping a . y p eren p resses . sh Total all charges and enclose payment of a check, money order, or charge card information (including expiration date). We accept VISA. MASTER CARD, or DISCOVER. Please NO COD. BY PHONE or FAX Complete and date the order form for reference. Phone Numbers Voice Mail Codes Toll Free 1-800.328-9350 222 Return Call 301 Product Price List Local 1-612-429.6742 224 Free Catalog 302 Company FAX and Address FAX 1-612-429.0563 226 To Order Hours are 8:00 am to 5:00 pm Central Time. Monday through Friday. The best time to call is Noon to 5:00 pm Central Time. FAX line and voice mail available 24 hours a day, 7 days a week. To leave a voice mail message. simply press the - key then enter one of the 3 digit codes listed above. To exit simply hang up. To proceed to another mail box press ' key and the desired 3 digit number. SALESTAX • Minnesota customers please add 6.5% state sales tax. DELIVERIES Please provide a street address for all deliveries. Mail and phone orders received, and phone ® orders receeved by Noon Central Time are usually shipped the same day. Prices include Whit B r F O B D li very terms . . . e ea e regular shipping charges within the 48 contagious states. Most Hawaii or Puerto Rico ed to Alaska acka es shi 00 for MN Pl a e add $5 L k MOPS . pp . p g . . a e, e s shipments are made UPS ground. RPS may be used on occasion. Shipments to Minnesota or Wisconsin will be sent SPEE DEE unless UPS is specifically requested. Orders over 1000 r lbs. are palletized and shipped common carrier truck. Next Day or 2nd Day Air service is available. Additional charges apply. Call for quote. GOVERNMENTS, BUSINESSES, and PROPERTY OWNERS ASSOCIATIONS Open account NET 30 billings are available to Governments, Businesses and Property Owners Associations with established credit. Minimum billing of $100.00. Shipping charges will be added to NET 30 accounts. New accounts may be established by providing a bank name and two trade references. Please provide reference name, address, phone number, bank account number and account name. Allow 5 working days to process new accounts. Call for credit application. CUSTOMER SATISFACTION POLICY Unopened containers may be returned for credit or refund within 30 days of receipt. Please phone for return authorization. Returned items must be shipped prepaid and are subject to a 15% restocking charge. Absolutely no credit will be issued for partial returns of chemical `%i►~- products not manufactured by AOUACIDE CO. BULLETIN MAILING LIST If your address is incorrect. or you are receiving more than one copy of this BULLETIN at the same address at the same time please send us the address(es) on your BULLETIN(S) with your instructions regarding changes, corrections, or deletions. We will give you a $5.00 discount on a current or future order for proof of duplicates mailed in 1997 to the same address at the same time- SOMEONE YOU KNOW WHO WOULD LIKE A COPY OF OUR BULLETIN NAME: - ADDRESS: CITY: STATE:.__-_____ _ ZIP: NAME:----- ADDRESS: CITY:---- STATE:-----..__---- ZIP: L. ~'-l AOUAC1®E Pellets... Environmentally sound The most comprehensive up to date peer review of all data pertaining to 2,4-D was published by the,onrnal of American College of Toxi oloav in 1992. "As tar as the scientific evidence is concerned 2.4-D should be considered safe for use in aquatic situations under label directions. 2.4-D is effective. it decomposes easily, it does not accumulate in living tissue and the most up to date information indicates that 2.4-D is not a risk to human health." r Effective on many common weeds As a rule of thumb AQUACIDE Pellets will be effective on weeds that exhibit a laced or branched vein structure. AQUACIDE Pellets will usually not be effective on weeds with parallel veins (see page 11). AQUACIDE Pellets are easy to apply. Nothing to mix or spray. Simply broadcast pellets uniformly over the water surface with a fanning motion of the hand. Similar to sewing grass seed. Effective at any depth. Apply at the rate of 2.5 lbs. per 1,000 sq. ft. of lake bottom. For well established perennials use 4.0 lbs. per 1,000 sq. it. "1 used your AQUACIDE for the first time this year it did an excellent job. I'm enclosing names of two friends who need your products." J.H., Ohio "Our beach was so nice to swim when using AQUACIDE Pellets. No weeds!" J.P., Michigan Avoid churning the water in the treatment site for 72 hours following application. This will help insure maximum herbicide is available for absorption by the weeds. Water treated with AQUACIDE Pellets should not be used for drinking or irrigation for 21 days (See page 12). ACIUACIDE Pellets 10 lb. can (treats 4,000 sq. It.) 60.95 50 lb. bulk (treats 0.50 acre) 330.00 4-50 lb. bulk (treats 0.50 acre ea.) $ 316.00 ea. (Call for discount on 10 or more 50 lb. bulk.) J a'a Aquacide Company. 1627 9th Street, P.O. Box 10748, White Bear Lake. MN 55110-0748 16 r AQUATH®L Granular Selective rapid acting contact herbicide. AOUATHOL Granular with potassium endothol To apply AOUATHOL Granular, simply broad- cast the granules unilormly over the water surface is a selective. rapid-acting, contact herbicide. Controls submersed weeds in lakes and ponds. by hand or use a mechanical spreader (see Works rapidly enough to be effective in both i page 24). Heavy infestations should be treated in sections to avoid oxygen depletion. n still and moving water. There is a wide marg of safety with respect to list'. "1 am writing this note to tell you I am very AOUATHOL Granular is a convenient ready-to- pleased with your product. I am enclosing use granular product. Granules are slightly ra ix or s hi t some pictures to show you the improvement thank you." Again on the lakefront y. p o m ng smaller than cat litter. Not Begins working on contact with submersed weeds , . G. R. J., Florida to break down cell structure and inhibit protein synthesis. Without this ability the weed dies. Water treated with AOUATHOL Granular Initial results in 1 to 3 days. should not be used for irrigation, human or animal consumption for 7 days. Fish from the Full kill takes place in 1 to 2 weeks. As weeds treatment site should not be consumed for 3 days Swimming should not take place for 1 day die they drop to the bottom and decompose. (see page 12). Effective anytime live weeds can be contacted. Best results occur when applied in spring and -90 summer, less material is required and a longer - weed free period will result. Contact time with -r weeds should be at least 2 hours. Although selective, AOUATHOL Granular is effective \ on many different weeds (see page 11). Excellent Pondweed control. Recommended application rates for AOUATHOL Granular range from 0.5 to 5.0 ppm. Safe for most fish at 100 ppm or more. o -7=115 For most Pondweeds growing in lakes 2.0 to 4.0 ppm will give excellent control. This rate is equivalent to 5 to 10 lbs. per 1000 sq. ft. at an average depth of 4 ft. Adjust quantity of material up or down depending on average depth. At a 6 ft. average depth use 50% more AQUATHOL Granular or 7.5 to 15 lbs. per 1000 sq. ft. When treating an entire pond you can use 25% to 50% less , 40 Ib. pall material and still achieve excellent control. (treats 4,000 to 6,000 sq. ft.).......$ 144.95 Voice: 800-328-9350, 612-429.6742 • FAX: 612.429-0563 0 E-mail: AC,76652.171@CompuServe.com 17 HY®R®TH®L 191 Granular Selective rapid-acting, contact herbicide & algaecide. HYDROTHOL 191 Granular with alkylammine endothal is a selective. rapid-acting, contact herbicide naSd algaecide. Controls submersed weeds and algae in lakes. ponds, irrigation canals, and drainage ditches. Works rapidly enough to be effective in both still and moving water. May be harmful to fish at recommended application rates. Aquathol with a boost. The physical form. mode of action, and general usage of HYDROTHOL 191 Granular are similar to Aquathol Granular. Where fish are present application of HYDROTHOL 191 Granular at rates over 1.0 ppm should be used only for spot treatments, narrow margins, or where some fish kill is acceptable. Do not treat more than 10% of a lake or pond at one time at application rates above 1.0 ppm. When treating lakes or ponds with HYDROTHOL 191 Granular begin at the shoreline and work toward the center. Apply parallel to the shoreline. This will herd fish away from the treated area into deeper untreated portions of the lake or pond. Treat your entire pond for algae. As little as 0.2 ppm of HYDROTHOL 191 Granular will control algae when an entire pond is treated. For longer tern control or spot treatments use 0.5 to 1.5 ppm. Repeat treatment when growth reappears. For floating mats scat- ter uniformly over the surface of the mat. Weeds growing in lakes or ponds will require application of 0.5 to 2.5 ppm of HYDROTHOL 191 Granular. To compute lbs. of material to use for lakes or ponds multiply the application rate in ppm by 5. This will give the number of lbs. to use on 1,000 sq. ft. at an average depth of 4 ft. Adjust quantity of material up or down depending on average depth. Heavily infested irrigation canals or drainage ditches will require 3.0 to 5.0 ppm of HYDROTHOL 191 Granular. To compute lbs. of material to use for irrigation canals or drainage ditches use 1.25 lbs. per 1.000lin. ft., per sq. M. of cross section, per ppm. For a 2,000 ft. canal, with a cross section of 15 sq. ft., at 3 ppm use: 1.25X2.0X 15X3= 112.5 lbs. Water treated with HYDROTHOL 191 Granular should not be used for irrigation for 7 days. Human and animal consumption should be avoided for 7 to 25 days depending on the application rate. Fish from the treatment site should not be consumed for 3 days. Swimming should not take place for 1 day (sea page 12). ` r 1l-- [ r ~i HYDROTHOL 191 Granular 40 lb. pail (treats 4,000 to 16,000 sq. n.) $164.95 Aquacide Company. 1627 9th Street. P.O. Box 10748. White Bear Lake, MN 55110-0748 IS F ~1 CUTMNE-PLUS Lip Rapid acting hard water stab CUTRINE-PLUS with copper elhanolamine complexes is a rapid acting, hard water stable. contact algaecide. Controls a broad range of algae in lakes, ponds, fish hatcheries, irrigation canals, and drainage ditches. Also effective on Hydrilla, especially in combination with Weedtrine-D. Contains no corrosive sulfates. Far less corrosive and more stable than similar common algaecides. Water hardness will not reduce effectiveness. Begins to work on contact with algae. Once contact is established, CUTRINE-PLUS begins to work immediately to break down the algae's cellular structure and interrupt the ability to photosynthesize food. Controls Planktonic Algae in 24 to 48 hours, Filamentous Algae in 3 to 4 days. 'We have used two gallons of your Cutrine Plus, and the results were excellent. Thanks.' J. C. N., Texas ~u.d e. contact algaecide. CUTRINE-PLUS may be toxic to Trout or Koi if carbonate hardness of treated water is less than 50 ppm. Most surface waters exceed this limit and pose no threat. If in doubt. use the WATER HARDNESS TEST KIT on page 20. To apply determine the volume of water to be treated in acre-feet. Use 1 gallon of CUTRINE- PLUS Liquid per 1.5 acre-feet of water. Dilute with a minimum of 9 parts water. Spray uniformly over the water surface with a tank sprayer (see page 24). Allow material to rain down in coarse droplets for better surface penetration. Contact with algae will be improved by breaking apart heavy surface mats before application. Use Cide Kick II to increase penetration and contact. Treat heavy infestations in sections to avoid oxygen depletion. No water use restrictions. Water treated with CUTRINE-PLUS Liquid has no water use restrictions (see page 12). Use CUTRINE-PLUS Liquid to easily control ~r surface algae or algae growing within 3 feet of the surface. Begin application in spring as water temperature warms to 60'F and above. Early treatment when growth first appears or begins to create a nuisance will reduce the amount of CUTRINE-PLUS Liquid you will need. Early treatment will also reduce the j amount of dead growth. Pond water clear as a bell! Control will last for several weeks to several - months depending on local conditions. Several CUTRINE•PLUS Liquid applications will usually be required to maintain r R th l l t t 1 gallon rea as re-g ow season ong contro . e $ 38 50 begins to appear. Allow 1 to 2 weeks (treats 1.50 acre.feet) . between consecutive treatments. 4 X 1 gallon Heavy out of control growth may require more (treats 6.00 acre-feet) $136.50 than one appiiualiun lu ydin uuntrul. For best results, use under conditions of minimal water 2.5 gallon flow. Apply early on the morning of a calm, (treats 7.75 acre-feet) $ 96.00 sunny day. Contact time should be at least 3 hours. 5 gallon (treats 7.50 acre.feet) $172.00 Voice: 800.328-9350. 612-429.6742 • FAX: 612-429-0563 • E-mail: AC,76652.171@CompuServe.com 19 r F I CUTRINE PLUS Granular Convenient, ready to use, contact algaecide. CUTRINE-PLUS Granular is a convenient. ready to use. contact algaecide. Contains the same active ingredient as Cutrine-Plus Liquid described on the facing page. No mixing or spraying Use CUTRINE-PLUS Granular to easily control bottom algae or algae growing within 3 feet of the bottom. Cat litter size granules settle on algae and immediately begin attacking growth. Ideal for use on Chara. Makes early season spot treatment of Filamentous Algae a snap! Early treatment will help prevent the formation of heavy surface mats. "Your products (Cutrine Plus) work remarkably well! Thanks!" L. J. C., Pennsylvania For best results, use under conditions of minimum water flow. Apply early on the morning of a calm, sunny day. Contact time should be at least 3 hours. Control bottom algae all season. To apply simply broadcast granules uniformly over the water surface. Use 30 lbs. of CUTRINE- PLUS Granular per 0.50 acre. Broadcast by hand or by using a mechanical spreader (see page 24). Treat heavy infestations in sections to avoid oxygen depletion. Chara should be treated in spring and summer or when weeds are soft and supple. Mature, established Chara may became calcified in hard water and very difficult to control. A single early application will usually control Chara for an entire season. Bottom growing Filamentous Algae may require re-treatment for season long control. There is no minimum water ternperature recommended for use. Water treated with CUTRINE-PLUS Granular has no use restrictions (see page 12). _ ALE4rL~ CUTRINE-PLUS Granular 10 Ib. box (treats 7,250 sq. ft.) $ 36.00 4 X 10 Ib. box (treats 29,000 sq. ft.) 123.00 30 Ib. bag (treats 0.50 acre) $ 85.00 WATER HARDNESS TEST KIT Quick, reliable, carbonate hardness determination. The WATER HARDNESS TEST KIT provides a quick, reliable, carbonate hardness determination. Includes powder packs and titration solution for 100 tests, sample tube, mixing jar, carrying case. and complete instructions. Test your water softener too. The WATER HARDNESSTEST KIT should be used prior to Cutrine-Plus in waters containing Trout or Kot. Also great for testing tap water for hardness or your water softener. r 1~ Y 17- WATER HARDNESS TEST KIT (performs too tests) $ 35.95 ek Aquacide Company. 16279th Street. P.O. Box 10748. White Bear Lake. MN 551 1 0 0748 '0 1 ■ F F -l ®~~R AS Liquid &SRP Granular Selective root killi - ~temlc he&r ida SONAR with fluridone is a selective, root killing,er systemic herbicide. Controls weeds in fresh Ponds, lakes, reservoirs, irrigation canals, and drainage ditches. Available in both aqueous suspension and slow release granular form. Treat your entire pond. Selective control provides excellent results on many difficult to control weeds. while allowing desirable vegetation to remain. Entire ponds should be treated at one time. treat - if is necessary to a minimum of 5 acres. Treating less than 5 acres or treating arrow strips may not produce satisfactory results due to dilution. Use SONAR SRP Granular in lakes to maintain a consistent concentration and insure maximum results. Absorbed by leaves and stems directly from the water and by roots from the hydrosoil. In susceptible weeds, SONAR inhibits the ability to produce carotene. Without this ability, chlorophyll is rapidly degraded by sunlight and the weed dies. Visible effects in 7 to 10 days. Initial results show a bleaching at growing tips of the weed. Within 7 to 10 days weeds begin to turn white or pink and decay. Under optimum conditions full weed kill occurs in 30 to 90 days. Results occur slowly. SONAR will not cause oxygen depletion. For best results, apply in spring and summer during the early stages of growth. Consistent concentrations must be maintained for 7 to 10 days following application. Rapid dilution will reduce effectiveness. SONAR is selective (seepage 10). A little goes a long wayl To apply calculate the volume of water to be treated in acre-feet. Use 1 pint of SONAR AS Liquid per 2.5 acre-feet. Dilute with water and apply uniformly over the surface with a tank sprayer. Use 8 pounds or SONAR SRP Granular per 2.0 acre-feet. Simply broadcast uniformly over the surface by hand or by using a mechanical spreader (see page 24). "We've used SONAR for twelve years have seen no a and diverse environmental effects. Most of our treatments end up roviding more than twelve months of control. JO M. M., Florida Water treated with SONAR should not be used for irrigation for 30 days following treatment (see page 12). - 1 SONAR AS Liquid 1 pine (treats 0.5010 0.75 acre)............ $ 465.00 1 quart (treats 1.00 10 1.50 acres) $ 490.00 1 gallon (treats 4.00 to 6.00 acres) $1,790.00 SONAR SRP Granular 8 lb. pail (treats 0.40 to 0.60 acre)........... . $ 250.00 40 lb. pail (treats 2.00 to 3.00 acres) $1 050 0Q Voice: 800-328.9350, 612-429-6742 a FAX: 612-429-0563 0 ( E-mail: AC,76652.171 @CompuServe.com 1 r ~ AQUACLEAR Pellets Consume organic material, reduce odor, clear bottom. AQUACLEAR Pellets will consume organic material, reduce odor, and clear the bottom. Contains a blend of 8 strains of bacteria selected for the ability to consume common organic materials found in surface waters. Reduce or eliminate sulfide and methane odor. Over 400 million hungry bacteria. Each AQUACLEAR Pellet contains over 400 million hungry bacteria ready to go to work for you. Visible effects occur in 1 to 2 weeks. Full clearing requires up to 90 days depending on the extent of buildup. Result is a firmer bottom. fewer nutrients and better water quality. Use AQUACLEAR Pellets in any lake or pond. For best results apply in spring after water temperatures warm to 50 F or above. To apply, simply broadcast AQUACLEAR Pellets uniformly over the surface. Repeat weekly at 9 lbs. per 0.50 acre until desired bottom quality is achieved. Continue monthly maintenance at 9 lbs. per 1.00 acre. Water treated with AQUACLEAR Pellets has no use restrictions (see page 12). Bacteria in AQUACLEAR Pellets will consume herbicides. Do not apply at the same time. Allow 3 weeks following herbicide application before applying AQUACLEAR Pellets. ACIUACLEAR Pellets 9 lb. can (treats 0.50 to 1.00 acre) $ 36.95 45 lb. bulk (treats 2.50 to 5.00 acres) $143.95 CLEAR-MATER Powdered Alum Coagulate & settle suspended solids, strip phosphorus. CLEAR-WATER buffered alum coagulates and settles suspended solids. Quickly clears your pond. Removes phosphorus, reducing algae growth. You will notice an improvement in water clarity in as little as 24 hours. Clear up your pond water. Pour a bucket of pond water through an old T-shirt or towel. Solids passing through the cloth will be settled by CLEAR-WATER. Solids remaining on the cloth must be removed by other means. Clears turbid, cloudy water of suspended solids. CLEAR-WATER will settle suspended solids present at the time of treatment. As additional material is introduced from sources such as runoff, re-treatment will be required. CLEAR-WATER comes in two parts. Apply part A first, then part B. Do not mix parts A and B. Each part may be dissolved separately in water and sprayed over the surface. To be effective your entire pond should be treated. Water treated with CLEAR-WATER has no use restrictions (see page 12). C 1 CLEAR-WATER 40 ib. pail (treats 1.00 acre-foot) $ 69.95 A Aquacide Company. 1627 911h Street. P.O. Box 10748. White Bear Lake. MN 55110-0748 22 F 7, AQUASHA®E & AQUASHADOW Concentrated dyes filter sunlight & create sparkling blue water. AQUASHADE Liquid and AOUASHADOW Dry Pack concentrated dyes filler sunlight and create sparkling blue water. Controls submersed weeds and algae in ponds. decorative water features. and other impounded bodies of water. Filters sunlight inhibiting photosynthesis. Gives water a crisp, clear. aqua-blue color. Sparkling blue pond water. Use AQUASHADE or AOUASHADOW in spring and early summer before growth begins. Less effective control occurs when growth is within 2 feet of the surface. Shallow water weeds, algae mats and floating weeds are not affected. Chemical control or physical removal of these weeds may be required. To apply AQUASHADE pour directly into the water. To apply AOUASHADOW, toss water soluble packets into water. Dyes disperse within several hours by natural water movement. The entire pond volume should be treated. Use where there is a minimal inflow and outflow of water. Additional applications will be needed at 1 to 4 week intervals as dyes are broken down by sunlight. Use 1 gallon of AQUASHADE or 4 packets of AOUASHADOW to treat 4.00 acre-feet. Water treated with AQUASHADE or AOUASHADOW should not be used in water designated for human consumption (see page 12). AOUASHADE w 1 gallon (treats 4.00 acre-feel) $ 65.95 4 X 1 gallons (treats 16.00 acre-feet) ................$236.50 AQUASHADOW 4 packets (treats 4.00 acre.feet) $ 75.95 4 X 4 packets (treats 16.00 acre-feet) $27S.00 STARUURS'1 Aerator & Fountain Adds oxygen circulates water, improves water quality. The STARBURST will add oxygen, circulate water, and improve water quality. Made of stainless steel and high-density plastic. Floats on the surface. Continuous run 1/2 HP motor pumps 125 gallons per minute. Power center with 24 hour timer. GFI and 100 feet of under- water cable. Complete, detailed instructions. Tremendous aesthetic appeal. The STARBURST will raise oxygen levels in the water, cool surface water and circulate the entire body of water. Balances your pond and speeds up the breakdown of organic materiai. Greatly improves water quality over time. The STARBURST requires no external pumps or other fixtures. Easily installed by two people in about 1 hour. Simply float the unit into position, anchor it in place and connect to on-shore electrical service. Use 1 /2 HP per 114 acre for improving water quality. Limited 18 month manufacturers warranty (that's 2 seasons!). STARBURST Aerator & Fountain 1/2 horse power unit 1450.00 Voice: 800-328-9350. 612-429-6742 • FAX: 612-429-0563 0 E-mail: AC.76652.17l CompuServe.com '3 ~ I CONSTRUCT® Tank Sprayer High quality, general purpose, hand held. The CONSTRUCTO is a high quality, general purpose, hand field sprayer. Graduated translucent tank for easy measuring. Easy fill funnel top reduces spills. Strong steel handle, reinforced hose, and long brass wand. Uniform application, uniform control. Insures uniform results when applying liquid I products such as Weedtrine-D, Rodeo, Sonar AS Liquid or Cutrine-Plus Liquid. Place wand below surface and inject solution to treat submersed weeds. CONSTRUCTO Sprayer 4.7S gallon capacity $ 58.95 EV-N-SPRED Mechanical Spreader Commercial quality, shoulder held, hand crank. The EV-N-SPRED is a commercial quality, y shoulder held. hand crank spreader. Features a 40 lb. capacity, stainless steel spread pattern plates, 3 hole drop system, infinite flow settings, and On,Off control. Easily treat several acres. The EV-N-SPRED insures uniform results when applying granular products such as Cutrine-Plus + Granular, Aquathol Granular, Sonar SRP Granular, Hydothol 191 Granular or Clear-Water. Easily managed by two people from a boat. EV-N-SPRE® Spreader 40 pound capacity 94.95 EZ Hand Held Spreader Well designed, durable, affordable. The EZ is a well designed, durable, and affordable hand held spreader. Features a 10 lb. capacity, rust proof construction, easy flow adjustment. Easily handled by one person. Verv easv to handlo, Great for treating tight - ' areas around the dock, boat lift, or raft. Easily treat up to an acre with granular products. No EZ Spreader assembly required. to lb. capacity $ 16.95 A Aquacide Company, 1627 9th Street, P.O. Box 10748, White Bear Lake. MN 55110-0748 24 ~ J WATER WEED CUTTER* Lightweight, hand operated underwater weed cutter. The WATER WEED CUTTER is a lightweight, hand operated, underwater weed cutter. Designed for use by a single person. Two 33 inch angled stainless steel blades cut a 48 inch swath. Non-blade parts are zinc plated for corrosion resistance. Includes a sharpener, 20 feet of nylon rope, and complete instructions. Great exercise. To use the WATER WEED CUTTER, simply throw it into the weed patch. Allow a few seconds for the cutter to sink. Draw it back slowly in short jerky motions. Cut weeds pop to the surface for easy harvesting. Regular sharpening after each use makes cutting easier. Light oil applied after use will help maintain the cutter. Use anytime weeds grow large enough to be cut. The WATER WEED CUTTER is best suited to small localized weed patches. Use on heavy weeds such as cattails is not recommended. Should not be towed behind a power boat. Replace blade covers when not in use. 48 inch cutting width / X66 inch long handle 20 feet nylon rope WATER WEED CUTTER with Sharpener 134.9E ELECTRIC LAKE MOWER* Battery powered, boat mounted underwater weed cutter The LAKE MOWER is a battery powered, boat mounted, underwater weed cutter. Simple, rugged `it i design provides years of dependable service. Allaluminum and stainless steel construction. Individually replaceable boron steel cutting blades. Complete detailed instructions. Easily cuts an acre or more. The LAKE MOWER cuts a 48 inch wide swath. Upper and lower collar stops adjust depth of cut - from 1 to 4 feet. Tiller style master switch allows easy rotation of cutter head. Firmly attaches to _ - the transom, side or front of the boat. Mounting bracket allows cutter head to be rotated out of _ the water for easy cleaning. The LAKE MOWER will require a boat. a 12 volt marine battery, and 1 or 2 people to operate. U se as _ soon as weeds =r y e targe cnoug., to cut or become a nuisance. Cuts heavy weeds as easily as thinner weeds. Be kind to your neigh- bors, always remove cut weeds from the water. Limited 12 month manufacturers warranty. LAKE MOWER 1,040.00 Voice: 800-328-9350. 612-429-6742 • FAX: 612-429-0563 • E-mail: AC,76652.171@CompuServe.com 25 F BEACHCOMBER LAKE RAKE* High strength, light weight, flexible plastic teeth. The BEACHCOMBER LAKE RAKE is a high strength, light weight rake with flexible plastic teeth. Hollow, 36 inch rake bar accepts 24-8 inch bolt on teeth. Includes one piece 5-ti2 foot handle, 100 feet of polypropylene rope, 3 foam floats for surface use, and complete instructions. i 36 inches wide ; Spring action scours the 60ttom. Spring action of the flexible teeth loosens settled. compacted bottom debris for easy 1 removal. Use the BEACHCOMBER LAKE t 5-112 feet lon RAKE regularly and you will be amazed by g the improvement. t 100 feet Begin early and continue regularly. Roots will polypropylene rope be less developed. Amount of debris to be removed will be less substantial. Great for removing cut or dead weeds from the water. Use the BEACHCOMBER LAKE RAKE several ways. A two-man drag with one person at each end. Wading from shore, throwing from a dock BEACHCOMBER LAKE RAKE or pulling behind a boat. Weight the hollow $ 119 95 ' head with small stones or sand for a better . " grip on bottom crud. Replacement teeth $ 1.95 ea. !HATER WEED RAKE* Lightweight extended handle rigid aluminum teeth The WATER WEED RAKE is a lightweight, extended handle rake with rigid aluminum teeth. 36 inches wide Single piece 36 inch head with 36-3 inch teeth. Includes two-piece extension handle adjustable from 6 to 10 feet, 20 feet of nylon rope, foam float for surface use, and complete instructions. The WATER WEED RAKE is best suited to sandy Clean up after storms. \IongTo e bottom areas. Digs out buried stones, sticks, and other beach debris. Great for beach clean up following storms. use the WATER WEED RAKE, throw it from the shoreline or dock while holding the rope and then draw back or use it without the rope while wading. ■ In cases where physical removal of aquatic weeds Is underttaken lurlgel telln curlcrul will be achieved herbicide application. WATER WEED RAKE 134.95 For best results herbicides should be applied after the water clears and the bottom settles. A Aquacide Company, 1627 9th Street, P.O. Box 10748, White Bear Lake, MN 55110-0748 26 MOSQUITO BEATER Granular, area wide outdoor mosquito & fly repellent. MOSQUITO BEATER is a granular, area wide. outdoor mosquito and fly repellent. Controls mosquitoes and black flies in gardens, around patios, greens, nursery displays, cemeteries, and tennis courts. Almost any outdoor area. Drive mosquitoes away for days. MOSQUITO BEATER is a convenient, ready to use granular product. Begins working within an hour of application. Vapors from the granules drive mosquitoes and flies from still air areas. One treatment is usually effective for 2 days and may last for up to 8 days. Will not harm flowers, shrubs, lawns or soil, or stain tile, cement or stone floors. Great for parties. Contains no poison. May be used in areas where children and pets play. Keep un-applied material away from children and pets. To apply MOSQUITO BEATER, simply broad- cast granules from the convenient applicator canister, or scatter by hand from drum. MOSQUITO BEATER 4 canisters (treats 20,000 sq. ft.) $ 48.95 35 Ib. drum (treats 100,000 sq. ft.) $113.95 MOSQUITO BRIQUETS Floating, long lasting, B.t.i. mosquito larvicide. MOSQUITO BRIQUETS are a floating, long lasting, B.t.i. mosquito larvacide. Controls mos- quito larvae in old tires, rain barrels, streams, ponds, ditches. woodland pools, gutters. and flower pots. Any area where standing water is present. Before they develop into biting adults. Use MOSQUITO BRIQUETS anytime during the mosquito season. Apply directly to standing water or in areas where standing water will develop. May be staked or tied in place with string. Unused portions which dry out will start working again when they become wet. Unused portions remain active indefinitely. To apply MOSQUITO BRIQUETS, simply toss them into mosquito breeding areas. Because they float active material is released at the surface and gradually settles to the bottom. Larvae feed on this material and are killed before they develop into biting adults. Re-application should be made every 30 days. One briquet will cover 100 square feet. Partial briquets can be applied to smaller areas. ~4 . MOSQUITO BRIQUETS 20 each (treats 2,000 sq. ft.) $ 33.95 5 x 20 each (treats 10,000 sq. n.) $149.50 Voice: 800-328-9350. 612-429.6742 a FAX: 612-429-0563 OE-mail: AC.76652.171@CompuServe.com 2 7, -I r AQUAGEST Powder Non-corrosive,- non-toxic, bacterial waste degrader. AQUAGEST Powder is a non-corrosive. non-toxic, bacterial waste degrader. The bacteria in AQUAGEST Powder have been tested and selected for the ability to consume common household organic waste. Breaks down and liquefies fats, grease, and paper products. Slow, steady, continual action. Bacteria work slowly but surely. Several hours may be required to free slow moving drains. Several days or weeks may be required to improve a slow moving septic systems. Use AQUAGEST Powder anywhere an increase in the rate of natural decay and reduction of odors is desired. Reduce solids accumulation. Plumbing and septic systems will benefit from regular use of AQUAGEST Powder. Increases drain field percolation, liquefies tat and grease, clears pipes. traps, and joints of built up waste. One scoop in each drain every other week will keep them clean, free flowing. and odor free. Other uses include outdoor toilets, motor homes, trailers, boats, and compost piles. The effectiveness of AQUAGEST Powder increases with temperatures up to 120 F. Above 120 F. AQUAGEST Powder is not effective. No appreciable activity can be expected below 40 F. To use AQUAGEST Powder simply apply directly from the container with the scoop provided. For faster action presoak with water for 30 minutes and apply. For slow septic tanks use 1/2 pound for each 500 gallons of septic tank capacity. Repeat weekly for a total of 4 weeks. Continue every other month to maintain system. The ingredients in AQUAGEST Powder are safe for household use and will not harm plumbing or fixtures. 1tu~eolr;s`r °f AQUAGEST Powder 5 Ib. can (treats 5,000 gallons) $ 44.95 25 Ib. drum (treats 25,000 gallons) ................$184.95 "In mid February'95 I wrote to AQUACIDE Co. and requested an unusually large number °liust wanted to thank AQUACIDE Company for all your help. My pond has never looked of AQUACIDE Co. BULLETINS be sent to me. I have used your products for years better. It also has never been easier to care f Y and feel truly at ease recommending AQUACIDE Co.'s environmentally- or. our professional stall has been wonderful and patient in helping me to id if friendly products to everyone and to all the ent y my problem weeds and suggesting the proper product.' lake /pond associations in Massachusetts. I hope that AQUACIDE Co. benefits greatly S.L.B., Florida from orders placed by new customers. lam sure they will be pleased with your terdfic productsl° W.L.T., Massachusetts Ck Aquacide Company. 1627 9th Street. P.O. Box 10748. White Bear Lake. MN 55110-0748 28 L CI: WIII these products harm fish? A: No. There is a wide margin of safety with respect to fish and wildlife when these products are used according to label instructions. Read Cutrine-Plus and Hydrothol 191 Granular labels carefully regarding fish cautions. Fish are generally at greatest risk from oxygen depletion resulting from decay of dead vegetation. CI: When should I apply aquatic herbicides? A: As a general rule, these products should be applied when weeds are actively growing. Controlling aquatic weeds usually requires more effort as the season progresses and weeds become well established. As weeds mature, growth slows and systemic herbicides become less efficient. Mature weeds may hinder access to the treatment site and when treatment is done, a greater amount of dead vegetation will result. O: Which product works the best? A: Each product works best in different situations. The best product for a given weed depends on several factors; the type of weed, time of year, area and depth to be treated and the intended water uses. Contact our representatives for help in determining the best product for your situation. CI: Now long will a treatment last? A: The length of control will depend on the product used, weed treated and local conditions. Systemic herbicides will provide longer term results than contact herbicides. Slow growing weeds will take longer to re-develop than rapidly growing weeds. Treating an entire body of water will provide longer term control than treating a small section of a larger body of water. C: Why both granular and liquid products? A: Granular products are used to control bottom growing or rooted weeds and algae. Liquid products are used to control weeds and algae which are at or near the surface or have easily accessible foliage. O: Is mud a problem? A: The effectiveness of chemical control is reduced in muddy or turbid waters. Liquid herbicides are not absorbed well by mud covered foliage. Heavy clay, silt or mud will reduce the effectiveness of granular or pelletized herbicides. Aquaclear Pellets and Clear- Water will help solve these problems. CI: Do I need a permit? A: Control of weeds in state protected waters often requires a permit. Consult your State Fish and Game Agency before beginning any control operations. CI: What are syrtamic and contact herbicides? A: Systemic herbicides are absorbed by weeds, move throughout the weed and kill the entire weed including roots. Success- ful systemic treatments require consistent presence of herbicide for absorption and longer periods of time to work. Most circumstances require only one treatment per season. Contact herbicides kill only those parts of the weed with which they are brought into contact. Once contact is established, contact herbicides begin to work quickly and require less time to show results. More than one treatment may be necessary for season long control. O: Can I treat my entire pond? A: Best results are achieved by treating an entire pond. This reduces the likelihood that untreated areas will encroach on treated areas. Treatment of an entire pond should be done in sections. Treat one third to one half at a time and allow seven to ten days between treatments. This will reduce the possibility of fish suffocation due to oxygen depletion from decomposition of dead weeds. This is of greatest concern when using rapid-acting contact herbicides and algaecides on well developed weed beds and algae mats. Q: What water temperature is best? A: Generally chemicals will be more highly activated and effective at warmer temperatures. Warm temperatures also help insure active weed growth which is necessary for best results. A specific temperature is recommended for use it will be specified on the product label. O: Don't fish need weeds to produce oxygen? A: Weeds do produce oxygen, but not nearly as much as is stirred into the water from the atmoshere. Heavy surface mats of vegetation may even reduce the oxygen available to fish by sealing the surface. Cl: How can 1 contact Aquacide Company? A: You can reach us at: Voice: 800-328-9350, 612-429-6742 FAX: 612-429-0563 E-mail: AC,76652.171@CompuServe.com Voice: 800-328-9350, 612.429.6742 0 FAX: 612-429-0563 0 E-mail: AC,76652.171 @CompuServe.com 29 7. BY MAIL Simply complete the order form in the center of this catalog or make your own. Include both your mailing and shipping addresses if different. Please provide a physical street address for delivery. Total all charges and enclose payment of a check, money order, or charge card information (including expiration date). We can accept VISA, MASTER CARD, or DISCOVER. Please NO COD. BY PHONE, FAX, or E-MAIL Please complete the order form and date it for your reference. Phone Numbers Voice Mail Codes - Toll Free 1.800-328.9350 222 Return Call 301 Product Price List Local 1-612-429-6742 224 Free Catalog 302 Company FAX and Address FAX 1.612-429.0563 226 To Order E-mail AC,76652.171@Compuserve.com Hours are 8:00 am to 5:00 pm Central Time, Monday through Friday. The best time to call is Noon to 5:00 pm Central Time. FAX line and voice mail available 24 hours a day, 7 days a week. To leave a voice mail message, simply press the ' key then enter one of the 3 digit erodes listed above. To exit simply hang up. To proceed to another mail box press the • key and desired 3 digit code. SALES TAX Minnesota customers please add 6.5% state sales tax. DELIVERIES Please provide a street address for all deliveries. Mail and phone orders received by Noon Central Time are usually shipped the same day. Prices include regular shipping charges within the 48 contiguous states. Delivery terms F.O.B. White Bear Lake, MN. Please add $5.00 per package shipped to Alaska. Hawaii or Puerto Rico. Most shipments are made UPS ground, RPS may be used on occasion . Shipments to Minnesota or Wisconsin will be sent SPEE DEE unless UPS is specifically requested. Orders over 1.000 lbs. are palletized and shipped common carrier truck. Next Day or 2nd Day Air service is available on most products. Additional charges apply. Call for a quote. GOVERNMENTS, BUSINESSES, and PROPERTY OWNERS ASSOCIATIONS Open account NET 30 billings are available to Governments. Businesses, and Property Owners Associations with established credit. Minimum billing of $100.00. Shipping will be added to all NET 30 accounts. New accounts may be established by providing a bank name and two trade references. Please provide reference name, address, phone number, bank account number, and account name. Please allow 5 working days to process new accounts. Call for credit application. - CUSTOMER SATISFACTION POLICY Unopened containers may be returned for credit or refund within 30 days of receipt. Please phone - for return authorization. Returned items must be shipped prepaid and are subject to a 15% restocking charge. Absolutely no credit will be issued for partial returns of chemical products not manufactured by AOUACIDE CO. BULLETIN MAILING LIST If your address is incorrect, or you are receiving more than one copy of this BULLETIN at the same address at the same time please send us the address(es) on your BULLETIN(S) with your instructions regarding changes, corrections. or deletions. We will give you a $5.00 discount on a current or future order for proof of duplicates mailed in 1997 to the same.address_at the samot Ime, Ode - Aquacide Pellets 15-16 Eouioment....... Pn ~~-~a Nyuaciear Pellets 22 . Hydrothol 191 Granular..... - 18 Aquagest Powder 28 Mosquito Beater . 27 Aquashade!Aquashadow 23 Mosquito Briquets 27 Aquathol Granular 17 Rodeo . 14 Cide Kick ll 14 Sonar 21 Clear Water 22 Weedirine-D 13 Cutrine Plus 19-20 6% Aquacide Company, 1627 91h Street, P.O. Box 10748• White Bear Lake, MN 551100748 30 m L any 016e3 PIeB N _ 65 v PH EN131 J8110 40 sm 1 J a~ Z a N J CL z a v o {q W ~ d ~dfvA~ m in v a w z - ~ L G % G U - J 4 _ J r Q~ A W - fL JURJ _ - m¢N 0 -ir -Z ❑ U x ro rI W W - r x G ij n r r e a P'Ij - mJru- J.TriF- - r T O - ~ d = a, AGENDA ITEM # r For Agenda of June 24, 1997 CITY OF TIGARD, OREGON COUNCIL AGENDA ITEM SUMMARY ISSUE/AGENDA TITLE State Revenue Sharing and State Shared Revenues PREPARED BY: Wayne LowryDEPT HEAD OK I: CITY ADMIN OK wt G^L- _ ISSUE B F R THE O TN 1 Shall the City Council approve an Ordinance declaring the City's election to receive state revenues and shall the Tigard City Council approve a resolution certifying that it provides certain services making it eligible to receive state shared revenues. STAFF RECOMMENDATION Staff recommends the approval of the attached ordinance and resolution. INFORMATION SUMMARY State Revenue Sharing The City has estimated the receipt of $175,000 of state revenue sharing in the 1997/98 budget. Such funds are JJ vailable from the state for those cities that meet the requirements. The requirements include a public hearing J efore the budget committee and a public hearing before the City Council. The hearing before the budget ( committee was held April 1, 1997. Approval of the attached ordinance will meet the states requirement for the City's election to receive these revenues. State Shared Revenues The City has estimated the receipt of the following state shared revenues in 1997/98: Cigarette Tax $ 94,248 1 Liquor Tax $ 265,914 j State Gas Tax $1,907,000 The state requires the City to certify its eligibility to receive these revenues by stating that it provides more than j four of the services listed in ORS 221.760. The City does provide a sufficient number of required services and is t"eref rc eligible for such revenues. Approval of the attached resolution will meet the state requirement of certification. OTHER ALTERNATIVES CONSIDERED Remove these revenues from the budget. FISCAL NOTES Approval of the ordinance and resolution secures $535,162 of revenue in the general fund and $1,907,000 in the date gas tax fund. AGENDA ITEM # ( D For Agenda of June 24, 1997 CITY OF TIGARD, OREGON COUNCIL AGENDA ITEM SUMMARY ISSUE/AGENDA TITLE 1997/98 Budgei Adoption PREPARED BY: Wayne DEPT HEAD OK J)7V"- CITY ADMIN OK r'~ ISSi E BEFORE THE COUNCIL Local budget law requires that a budget for the ensuing fiscal year be adopted prior to July 1 by the governing body, after approval by the budget committee and after a public hearing has been held before the City Council. Staff recommends approval of the Resolution which includes the Budget Committee recommendations. INFORMATION SUMMARY The City of Tigard budget committee reviewed the 1997/98 proposed budget as submitted by the Budget Officer. The Budget Committee completed their review on May 23, 1997 with approval of the budget proposal as amended by the committee in the total amount of $40,375,702. The committee's changes to the proposed budget are 0 flected in Exhibit "A" of the attached resolution. The resolution to adopt the budget includes references to the OPEU and the TPOA labor agreements which stipulate cost of living adjustments effective July 1, 1997. The resolution also establishes the cost of living adjustment for non represented employees at 3% effective July 1, 1997. Local budget law gives the governing body the authority to make certain changes to the budget committee recommendation prior to adoption of the budget. The Council may adjust budget resources up or down and may increase or decrease expenditures. Increases in expenditures are limited to 10% of the published total in each fund. j No adjustments by the City Council prior to adoption are recommended. n-rTJVD AT TFIJNIATIVES CONS!nPT?PII If the Council wishes to adopt the budget as recommended by the budget committee with no changes, the attached resolution should be approved. FISCAL NOTES The budget as approved by the budget committee provides appropriations of $40,375,702. The recommendation includes the levy of property taxes in the amount of $8,544,147. Measure 50 is expected to reduce property tax collections by an estimated $1,400,000. . s CITY COUNCIL ISSUE/AGENDA TITLE Finalize formatioi PREPARED BY: _Greg Berry DEPT IS U Finalize the formation of Reimbursement Dist i STAF Approve, by motion, the final formation of Re Engineer's Report. INFC ouncil approved the formation of the Districl the improvements has been completed. The unchanged from the expected cost in the Engit Report are proposed. 1 This requested approval will permit connectioi OTHER AL Direct that the Engineer's Report be modified. T his liruject is funded by the Neighborhood Sc j ! 1 i:icitc%vidc\sumVd9-ccss'.doc AGENDA ITEM # / FOR AGENDA OF June 24. 1997 TIGARD, OREGON ENDA ITEM SUMMARY Sanitary Se er Reimbursement District No. 9 w ,D OK a W'``1---CITY MGR OK Lt nA~~ =ORE THE COUNCIL No. 9 'e COMMENDATION C ursement District No. 9 without modification to the f I ATION SUMMARY Resolution 97-15 on April 22, 1997. Since then, construction i1 cost of the project is $130,670.56. This amount is s Report. Consequently, no revisions to the Engineer's the sewer and payment of the reimbursement fee. :NATIVES CONSIDERED L. ;CAL NOTES Extension Program in the 1996 - `97 budget year. AGENDA ITEM 9 (3 FOR AGENDA OF June 24. 1997 ISSUE/AGENDA TITLE PREPARED BY: A.P. D CITY OF TIGARD, OREGON COUNCIL AGENDA ITEM SUMMARY Pz~ DEPT HEAD OK A.P. Dumas CITY MGR OK ISSUE BEFORE THE COUNCIL Adoption of the 1997-98 Capital Improvement Program and approval of the 1997-98 projects. STAFF RECOMMENDATION Staff recommends that the City Council, by motion, adopt the 1997-98 Capital Improvement Program as proposed in Appendices A through E of the attached memorandum dated June 12, 1997. INFORMATION SUMMARY ~ttached is a memorandum outlining the 1997-98 Capital Improvement Program. This memorandum presents ' to recommended projects for 1997-98 and a tentative list of projects for the following six years. The 1997-98 i Capital Improvement Program was submitted to Planning Commission on May 22, 1997. At its meeting on June 2, 1997, Planning Commission recommended approval of the proposed program without modifications. The I i only modification to the document approved by Planning Commission was a minor adjustment in one of the budgeted project amounts to conform to the Finance Director's most recent CIP funding projections for next I fiscal year. OTHER ALTERNATIVES CONSIDERED Adopt the proposed Capital Improvement Program with modifications. FISCAL NOTES i The 1997-98 CIP project amounts are based on the Finance Director's CIP funding projections for Fiscal Year 1997-98. The approved budget numbers are included with the attached memotandum as Appendix 1. 1 I. ICITYWID&SUM197-99CIP. DOC 1 V MEMORANDUM CITY OF TIGARD, OREGON TO: City Council y rF ' FROM: Agustin P. Duenas, P.E. City Engineer DATE: June 12, 1997 SUBJECT: 1997-98 Capital Improvement Program This document presents the proposed 1997-98 Capital Improvement Program (CIP) for review and approval. The Planning Commission approved the 1997-98 CIP with no modifications during its meeting of June 2, 1997. Background The long-term Capital Improvement Program, initially adopted by the City Council on August 23, 1994, identified projects for the 1994-95 CIP Program and proposed a list of projects for the next 6-year period. The Capital Improvement Program includes improvements to the streets, storm drainage, sanitary sewer, water and parks systems. The street, storm drainage, and sanitary 10 sewer CIP's are managed by the Engineering Department. The Water System CIP is managed by the Public Works Department, and the Parks CIP is managed jointly by the Planning and Engineering Departments. The Capital Improvement Program is updated each year, and is reviewed and approved by the City Council. The CIP formulation is separate from the yearly operating budget process but is approved on the same fiscal year basis as the operating budget. While the program lists projects for subsequent fiscal years, the projects shown are tentative and are subject to change during the formulation process for each specific budget year. The CIP, through the adoption process, therefore establishes the budget for each fiscal year and serves as a planning document to guide the infrastructure improvements over the following 6 years. During each budget year's update, the revenue estimates are adjusted, the project cost estimates are reviewed. and the program and project priorities are re-evaluated based on changes in City plans, citizen input, and additional data which may become available. The 1996-97 CIP listed a 6-year program; the 1997-98 CIP returns to the 7-year period originally established in 1994. Process - The Capital Improvement Program update process begins with citizen involvement through the Citizen Involvement Teams. An overview of the CIP process is presented to the CIT's, usually early in the calendar year so that the entire process can be completed and the annual CIP budget 111 ~ _ _ _ Memorandum to City Council 1997-98 Capital Improvement Program Page 2 submitted to and approved by City Council prior to the beginning of the next fiscal year (July 1). This overview was presented during the March CIT meetings this year. The joint CIT meeting in April provided the CIT members with the opportunity to provide input into the process and to nominate projects for evaluation and possible inclusion into the program. The Planning Commission review typically provides another opportunity for public comment on the proposed plan. After review by the Planning Commission, the plan with subsequent modifications, if any, is submitted, with Commission recommendation, to the City Council for review and approval. Council may make additional modifications to the plan during its review and approval process. The approved plan would be the approved Capital Improvement Program for the next fiscal year. The following summarizes the program update for the 1997-98 budget year. Any changes to the program since Planning Commission approval have been in revisions to the budgeted amounts based on updated funding projections from the Director of Finance (See Appendix 1). It is important to note that each funding source has restrictions on the types of projects that can be constructed. Projects cannot be moved from one finding source to another. Committed projects are those projects that have been previously approved for 96/97 funding, but have not been completed as of June 30, 1997. The specific lists of projects are contained in the appendices associated with each of the program areas. 1997-98 CAPITAL IMPROVEMENT PROGRAM STREET SYSTEM PROGRAM The following are the street projects proposed for 1997-98. A complete listing of the projects and the full 7-year program is attached as Appendix A. Recommended Streets (Gas Tax) Projects I The vas tax revenue can be used for upgrading the collector and local streets within Tigard, without restriction. However, this revenue is limited and is not sufficient to fund all the street improvement needs of the City. The total State Gas Tax amount shown for the 97/98 fiscal year is based on current budgetary projections, which anticipate additional revenue in the coming years. If the actual revenues fall short of the anticipated amounts, the projects will be scaled back to conform to the actual funds received. There were numerous major street projects implemented during FY 1996-97, which expended practically all the gas tax funds available for that fiscal j year. There are only a few projects that require carry over funding, and those projects are at or 1 nearing completion as of June 30, 1997. I: i i i 4 r~ Memorandum to City Council 1997-98 Capital Improvement Program Page 3 The following is a brief description of the projects recommended for Gas Tax Funding next year: i • Committed Projects: These are projects that have been already committed and are nearing completion. As mentioned previously, most of the gas tax projects for FY 1996-97 were implemented during FY 96-97. The Pavement Major Maintenance Program included overlays of 135th Avenue, paving of gravel streets such as Alfred Street and 74th Avenue, overlay of Cascade Boulevard, and digouts on Greenburg Road and Tiedeman Avenue. Other major projects included reconstruction of both ends of Main Street, and Commercial j Street, and the traffic signalization of 79th Avenue/Durham I Road intersection. The carry over obligations into the new fiscal year are for the 79th Avenue/Durham Road Signal, the 79th Avenue preliminary design, and the Speed Hump Program Project. • Pavement Major 1faintenance Program (PMA4P) - This is a program of corrective and preventative maintenance on all the paved streets in Tigard. It addresses those streets that can still benefit from corrective or preventative action. Those streets that cannot be rejuvenated through this program are eligible for reconstruction. There is currently a backlog of $1,500,000 in corrective overlays, repairs, and slurry seals. The pavement overlay and repair backlog alone is close to $1,300,000. Streets that are candidates for slurry seals likewise are a priority for { preventative treatment. Projects for this program will be drawn from the Pavement Overlay Backlog list (Appendix G), and from evaluation of those streets that need slurry seals to extend the pavement life expectancy. This program category has been increased from the 1996-97 CIP amount in an attempt to more rapidly reduce the current backlog. • The Speed Hump Program -This program provides funding for installation of speed humps on streets that have clearly demonstrated the need for installation of these traffic calming devices. The program for 1996-97 included 128th Avenue, the section of North Dakota Street between 115th and 121st Avenue, and a section of Locust Street. The program for FY 1997-98 will include $45,000 in City-funded projects plus $ 30,000 $ 500,000 $ 60,000 i I i i Memorandum to City Council 1997-98 Capital Improvement Program Page 4 $15,000 on a 50-50 cost sharing basis with residents who wish to participate in the program. - • Traffic Studies - This program will complete the Transportation $ 50,000 System Plan by reviewing the various studies already performed and consolidating them for future implementation. In addition, the funds under this program will be used to assist in the development of comprehensive public street plans. } 1-" • Pedestrian Improvements - Grant Avenue: This project will $ 30,000 provide a pedestrian path along Grant Avenue connecting the existing walkway along Park Street with School Street and providing pedestrian access to C.F. Tigard Elementary School. { The initial proposed pedestrian walkway project was Park Street from Watkins Street to 110th Avenue. However, public input during the CIT joint meeting for projects is that the drainage problem needs to be resolved, and a pedestrian pathway would be undesirable since it would encourage I speeding on this street. The drainage project for Park Street is included under the Storm Drainage Program. , • 791h Avenue - Design and Rights of Way: The initial design of $ 137,900 this project has been performed inhouse by City Engineering staff. This project will provide funding for selection of an i engineering consultant firm to complete the design of the entire street from Durham Road to Bonita Road. The scope of the project will include examination of the rights-of-way requirements for the project, both for street expansion and storm drainage. It will also identify the funding requirements for rights-of-way, storm drainage and street improvements, and initiate the rights-of-way acquisition to the extent that finding allows. Recommended Traffic Impact Fee (TIF) Projects TIF Funding can be used only for highway and transit capital improvements which provide additional capacity to major transportation systems. This funding is limited to major collector i and arterial streets, and 50% must be spent on arterial streets. A major portion of these funds are I being held in reserve until our transportation planning is completed. The Tigard Triangle area will need major improvements to develop streets to arterial and major collector standards. In f j Memorandum to City Council 1997-98 Capital Improvement Program Page 5 addition, as the Walnut Island area is annexed, TIF funding will be required to improve 121st Avenue, Gaarde Street and Walnut Street. The TIF reserve is currently large, and will grow even larger in the out years as shown in Appendix A. This increase in the reserve will most likely not occur as major projects are initiated and implemented once the transportation plan is completed. Significant drawdowns of the reserve amounts are expected in the next several years. j The TIF-funded projects that are proposed for the next CIP Budget Year are as follows: • Green burg RoncUMapleleaj Interseclinra: This project is $ 50,000 Federally funded, and the City's share of the project cost is r 10.275%. The improvements to this intersection are necessary for additional capacity and safety. The project is being C combined with a MSTIP 2-funded project to widen the Greenburg/217 Overpass and improve Greenburg Road past the Washington Square Drive intersection. This project was included in the FY 1996-97 CIP Budget, but funds were not expended since the design of the project is still being performed by ODOT. The project design is expected to be completed by September 1997, and advertisement for bids is expected to follow shortly afterwards. • Bonita Road from the Railroad "Tracks to the Famro Creek $ 800,000 Bridge: This project completes the segment of Bonita Road 3 (between Hall Boulevard and 72nd Avenue) that has not been improved. It includes widening of the roadway to provide walkways on both sides and upgrades the at-grade railroad crossing on Bonita Road. This project was originally deferred because there was a strong possibility that the two existing tracks would be consolidated into one. Since it is now apparent that this consolidation will not occur, there is no need to delay i i implementation of this project. The project includes land acquisition to accommodate the widening, design and ; construction of concrete railroad crossin&s at the two railroad tracks, installation of a complete highway grade crossing signal system on the widened street, and underground installation of overhead utilities in that portion of road. 1 • Wahrrd Street/Tiedenran Avenue Intersection Realignment and $ 80,000 Signalization (Design): This project is to design the realignment of the existing WalnuUTiedeman/Fonner Street t t 1 , 1 Memorandum to City Council 1997-98 Capital Improvement Program i Page G 1 intersection to correct a dog-leg configuration. It would include the approaches on each street and signalization of the realigned intersection to provide efficient traffic flow-. Property on the southwest comer of the intersection was acquired on a 50-50 shared cost basis with Washington County to accommodate the realignment. Although this portion of Walnut Street is in the County, the project is necessary to correct a serious existing traffic problem in the heart of the City. Community Development Block Grant (CDBG) Projects C r A segment of 91st Avenue has been approved for CDBG funding effective July 1, 1997. The project encompasses that segment of 91 st Avenue between Greenburg Road and Lincoln Street. The existing street is substandard in width and is in poor condition. Sidewalks, streetlights and storm drainage facilities are substandard or lacking. These conditions create a safety problem for the many children walking to and from the school bus stop located at the intersection of 91st Avenue and Greenburg Road. The scope of this project is widening of the existing street to standard width and construction of sidewalks, curbs, streetlights and storm drainage improvements. Sidewalk construction will include handicapped access ramps. The improved f ili i i i ac t es w ll enhance pedestrian and vehicular safety. The total project cost is $190,000, with $166,800 in CDBG funding and $23,200 in City funding and in-kind contribution. PARKS SYSTEM PROGRAM I r Attached as Appendix B is the parks component of the city's seven-year CIP, which begins July 1997. The plan is an update of the six-year CIP put together in 1996. i i Revenue sources for park CIP's are varied and include Park System Development Charges (SDC's), local and regional share Greenspaces bond measure funds, park levy funds, and donated funds. The donated funds include a recent $100,0000 park bequest from a former Tigard resident and a pr9posed monetary and in-kind contribution from local youth sports leagues toward the cost of acquiring land and improving Cook Park. The Tualatin River pedestrian bridge is a potential opportunity for joint action with the City of Tualatin and Washington County. 1 Unfortunately, among the eight projects authorized for funding in 1996-97, only one was , completed. This lone project was the acquisition of the three-acre Fern Street Greenspace. Two d projects, the North Dakota/Tigard trail connection and Cook Park Expansion, were delayed and ' are included as committed projects in the 1997-98 list. Two projects, the Bond Street and Cook ( Park Greens ace ac uisitio d d ` p q ns, were roppe because the purchase prices were not within the i v J Memorandum to City Council 1997-98 Capital Improvement Program page 7 established budgets for the projects. One project, the Bull Mountain Road Greenspace acquison, was abandoned due to the prior sale of the land for development. Lastly, one project, the Englewood-Fanno Creek park connection, was abandoned because the owners of the land targeted for acquisition were unwilling to sell to the city. New projects in the proposed plan include several greenway trail segments. The Cook Park/railroad tracks trail is a segment of the Tualatin River main stem trail. The Cook Park/85th Avenue trail is an off shoot of this main stem trail. The Hall/Bonita Road trail and the Bonita/Durham Road trail are segments of the Fanno Creek main stem trail. Several offshoots to this main stem trail are identified. These include two Bonita/Durham neighborhood connections, two Hall/Bonita Road neighborhood connections, and the Woodard Park/Walnut Street trail connection. Information on the alignments and costs of these trail segments was provided by the recently completed Fanno Creek Trail Study. It is important to note that the construction costs of these connecting trails reflect the cost of a hard surface trail. Where conditions permit, these estimated costs may be reduced by the replacement of hard surface by a crushed rock surface. The unidentified local and regional Greenspace projects primarily include the acquisition of right-of-way for the various trail segments. The only parks project nominated during the CIT review period was the replacement of the older play structure in Woodard Park. In response to this request, funding for this project has been added to the 1997-98 project list. i 3 J i t f l f! 1 V A major unknown in putting together the parks CIP is the extent, timing, and cost of the Cook Park expansion. A park master plan with cost estimates is scheduled for completion in mid-1997. For present purposes, estimated amounts have been included in the parks CIP to reserve funds for this project. As indicated in the CIP Overview section, 1998-2003 year projects are only a tentative list. In regard to this, the updating of the city parks master plan is scheduled to occur in 1997. The updating work program will look at the long range needs of the community, identify future park sites, establish priorities for development, and recommend funding strategies to implement the plan. Ample opportunities will be available for citizen involvement as the parks plan is developed. Beginning in 1998, revisions to the parks CIP priorities will be developed within the framework of this new parks plan. SANITARY SEWER SYSTEM PROGRAM The sanitary sewer funding has funding sources that are reserved for maintenance repairs on currently unknown projects, capacity upgrades as recommended from the USA Master Plan, and for the Neighborhood Sewer Extension Program. The unrestricted portion of the Sanitary Sewer Memorandum to City Council 1997-98 Capital Improvement Program Page 8 I Fund can be used for repair and maintenance projects Citywide and for extension of the existing system to unsewered areas. The detailed project listing for 1997-98 and the fill 7-year program is 1 attached as Appendix C. i The two projects that are proposed at this time for the Sanitary Sewer Funding are as follows: • Neighborhood Setiver Extension Program: This program has $ 500,000 been successfully implemented in the 1996-97 CIP Budget Year. A sewer extension project on Tigard Street was completed in the fall of 1996, and the Fairhaven Sewer Extension Project is currently in the final stages of construction. We propose to budget for this program on a continuing basis each Fiscal Year. There are several areas that have expressed interest in participating in the program for next year, and we anticipate that at least one or two will materialize during the year. • Sanitary Sewer Major ji'faintenance Program: This program $ 40,000 was established at $30,000 midway through FY 1996-97. These funds would be used to contract out sewer repair projects that are beyond the repair capabilities of the Public Works Department. This program is expected to be a continuing program in future years. STORM DRAINAGE SYSTEM PROGRAM The storm drainage funding has the same mix of sources as the sanitary sewer fund. The funding is generally reserved for currently unknown small projects that come up during the year. Funding from the new SDC's must be used on projects designated on the USA Master Plan. The detailed project listing is attached as Appendix D. The projects currently proposed for CIP Budget Year 1997-98 are as follows: • Storm Drainage Major Maintenance Program: This program $ 40,000 addresses minor storm drainage problems requiring more than normal maintenance effort. These problems would be resolved through preparation of project bid packages that would go through the bid process for construction by licensed construction contractors. The program was established in previous years, but was not initially funded in FY 1996-97. The program was re-established in mid-FY 1996-97 in the amount of $40,000 to resolve minor drainage problems i throughout the City. One project was bid out and completed to date with several others pending design and implementation. This program is proposed to continue at the same funding level for CIP Budget Year 1997-98, and for the years beyond that. • Park Street Drainage: This project would provide an underground drainage system to resolve the serious drainage problems on Park Street between Watkins Street and I IOth Avenue. The project for Park Street initially was for a pedestrian walkway. Citizen input through the CIP formulation process resulted in cancellation of the pedestrian aspect of the project and initiation of a storm drainage project for that segment of street. • 118th CT Erosion Control Project: This project would extend the erosion control measures recently installed on the creek downstream of 118th CT. The project would extend the improvements further downstream to alleviate the heavy erosion on the sideslopes and stream bed, and to protect the sanitary sewer line which lies immediately adjacent to the t stream bed. $ 95,000 $ 30,000 i WATER SYSTEM PROGRAM The Water System Projects and funding are decided by the Maintenance Services Department, with the approval of the Intergovernmental Water Board. The list of water system projects is attached as Appendix E. OTHER DOCUMENTS Other relevant documents are attached as follows: • Appendix F: 1996-97 Capital Improvement Program • Appendix G: Pavement Overlay Backlog Capital Improvement Program Update dated jVfcry 1, 1997 ,Vemoranduni from Finance Director dared June 2, 1997 transmitting approved budget numbers STREET SYSTEM PROGRAM Major Maintenance 1 APPENDIX A PROJECT TIF GAS TAX OTHER FUNDING Committed Projects 79th/Durham traffic signal 5,000 79th Ave. preliminary design 5,000 Speed Hump Program 20,000 TOTAL Committed Projects 30,000 FY 1997-98 Committed Projects 30,000 TIF Transit reserve 70,000 TIF reserve 2,500,000 Pavement Major Maintenance 500,000 Speed Hump Program 60,000 Ped. Improvements - Grant Ave. 30,000 Traffic Studies 50,000 Bonita Road - RR Tracks to Bridge 800,000 Greenburg/Mapleleaf intersection 50,000 Walnut Street/Tledeman Avenue 80,000 Intersection & Approaches (Design for Realignment and Signalization) 79th Avenue (Design and R/W) 137,900 91st Avenue Improvements from 190,000 (166,800 CDBG Greenburg Road to Lincoln Street funds, 23,200 City funds) Totals for FY 1997-98 3,500,000 807,900 190,000 FY 1998-99 TIF transit reserve 54,000 TIF reserve 2,706,000 Pavement Major Maintenance 300,000 Pedestrian improvements 50,000 Speed Hump Program 45,000 Burnham/Main Signal 40,000 80,000 North Dakota Bridge Replacement 105,000 (design & r/w) Walnut/Tiedeman Int. Construction 800,000 79th Avenue (R/W and Construction) LID and Storm Drain Funds Totals for FY 1998-99 3,600,000 580,000 FY 1999-2000 TIF transit reserve 45,000 TIF reserve 3,755,000 P avement Ma 300,000 CAPITAL IMPROVEMENT PROGRAM i i i i PROJECT TIF GAS TAX OTHER FUNDING Pedestrian improvements 50,000 Speed Hump Program 45,000 North Dakota Bridge Replacement 195,000 Totals for FY 1999-00 3,800,000 590,000 FY 2000-01 TIF transit reserve 35,000 TIF reserve 4,815,000 Pavement Major Maintenance 300,000 Pedestrian improvements 50,000 Speed Hump Program 45,000 North Dakota Bridge Replacement 155,000 295,000 (Water Quantity) Hall/Hunziker/Scoffins (design) 50,000 Totals for FY 2000-01 4,850,000 600,000 FY 2001-02 TIF transit reserve 40,000 fIF reserve 5,860,000 Pavement Major Maintenance 300,000 Pedestrian improvements 50,000 Speed Hump Program 45,000 Hal l/Hunziker/Scoff ins 216,000 Totals for FY 2001-02 5,900,000 611,000 FY 2002-03 TIF transit reserve 40,000 "fIF reserve 6,920,000 Pavement Major Maintenance 300,000 Pedestrian improvements 50,000 Speed Hump Program 45,000 Hall/Hunziker/Scoffins 227,000 Totals for FY 2002-03 6,960,000 622,000 FY 2003-2004 TIF transit reserve 40,000 TIF reserve 7,960,000 Pavement Major Maintenance 300,000 Pedestrian improvements 50,000 Speed Hump Program 45,000 Hall/Hunziker/Scof(ins 238,000 Totals for FY 2003-2004 8,000,000 633,000 - YARKS SYSTEM PRO GRAM PROJECTS METRO TIGARD PARK PARK SUC DONATIC- GRNSP GRNSP LEVY FY 1997-98 i. Cook Park expansion 500,000 100,000 2. Tual River prop acquistion 45,000 3. Woodard Park expansion 200,000 4. Woodard Park Play Structure 60,000 s. N. Dakota/Tigard St trail 17,000 33,000 6. Tigard St/Fowler Sch trail 125,000 2. Fowler Sch/Woodard Pk trail 42,000 8. Woodard Pk/Grant Ave trail 50,000 25,000 55,000 9. Ash Ave/ Fanno Creek trail 30,000 io. Parks Master Plan 42,000 i i. Unidentified Grp acquitions 550,000 285,000 Totals for FY 1997-98 645,000 310,000 17,000 1,087,000 100,000 FY 1998-99 12. Cook Park expansion 350,000 13. Woodard Park improvements 30,000 14. Grant Ave/Main St trail 20,000 20,000 15. Fanno Creek park trail lighting 40,000 16. Englewood Pk basketball court 15,000 17. Unidentified Grp acquisitions 500,000 323,000 Totals for FY 1997-98 520,000 323,000 455,000 FY 1999-00 C 18. ook Pk/85th Ave trail const 100,000 19. Cook Park/RR tracks trail const 80,000 2o. Hall/Bonita Rd trail const 236,000 Total for FY 1999-00 416,000 FY 2000-01 B i 21. on ta Rd/Durham trail 415,000 Total for FY 2000-01 415,000 FY 2001-02 T l 22. ua R/85th Ave trail const W d 120,000 23. oo ard Pk/Walnut St trail W d 105 000 24. oo ard Pk/Johnson St trail C 50,000 25. anterbury neighbor park 100,000 Total for FY 2001-02 375,000 FY 2002-03 B i 2s. on ta/Durham neigh trails 26 G b 125,000 reen urg neighborhood park 350 000 Total for F22002-03 , 475,000 CAPITAL IMPROVEMENT PROGRAM APPENDIX B PARKS SYSTEM PROGRAM OJECTS METRO GRNSP TIGARD GRNSP PARK LEVY PARK SDC DONATION FY 2003-04 27. Fanno Creek Park Improvemts 325,000 28. Tualatin River Ped Bridge 100,000 Total for FY 2003-04 425,000 0 I I j 1.1ENGIGUMIP97.98TARKSCIP.DOC I ? -CAPITAL IMPROVEMENT PROGRAM I APPENDIX B ~l l ~i Park CI P Map APPENDIX B SANITARY SEWER SYSTEM PROGRAM I UNRESTRICTED OLD SDC NEW SDC FY 1997-98 Sanitary Sewer Major Maintenance 40,000 Reserve for capacity upgrades 380,000 Neighborhood Sewer Extension Program 500,000 Totals for FY 1997-98 540,000 52,800 380,000 FY 1998-99 Major maintenance 40,000 Reserve for capacity upgrades 760,000 Neighborhood Sewer Extension Program 400,000 Totals for FY 1998-99 440,000 52,800 760,000 FY 1999-2000 Major maintenance 40,000 Reserve for capacity upgrade 1,140,000 Neighborhood Sewer Extension Program 400,000 Totals for FY 1999-2000 440,000 52,800 1,140,000 FY 2000-01 Major maintenance 40,000 Reserve for capacity upgrades 1,520,000 Neighborhood Sewer Extension Program 300,000 Totals for FY 2000-01 340,000 52,800 1,520.000 FY 2001-02 Major maintenance 40,000 Reserve for capacity upgrades 1,900,000 Neighborhood Sewer Extension Program 200,000 Totals for FY 2001-02 240,000 52.800 1 900,000 FY 2002-03 Major maintenance 40,000 Reserve for capacity upgrades 2,280,000 Neighborhood Sewer Extension Program 200,000 Totals for FY 2002-03 240,000 52,800 2,280 0 00 . FY 2003-04 Major maintenance 40,000 Reserve for capacity upgrades 2,660,000 Neighborhood Sewer Extension Program 200,000 cua cun7 na s Totals for FY 2003-04 240,000 52,800 2,660,000 . A.sF.wUR110C CAPITAL IMPROVEMENT PROGRAM j APPENDIX C i 4i I 1 F ,f 1 STORM DRAINAGE SYSTEM PROGRAM UNRESTRICTED OLD SDC NEW SDC FY 1997-98 Storm Drainage Major Maintenance 40,000 118th CT. Erosion Control 30,000 Park Street Drainage 95,000 Reserve for USA master plan 702,000 Totals for FY 1997-98 165,000 702,000 FY 1998-99 Reserve for USA master plan 809,000 -Storm Drainage Major Maintenance 40,000 Totals for FY 1998-99 40,000 809,000 FY 1999-2000 Reserve for USA master plan 916,000 Storm Drainage Major Maintenance 40,000 Totals for FY 1999-2000 40,000 916,000 FY 2000-01 Reserve for USA master plan 1,023,000 Storm Drainage Major Maintenance 40,000 Totals for FY 2000-01 40,000 1,023,000 FY 2001-02 Reserve for USA master plan 1,130,000 Storm Drainage Major Maintenance 40,000 Totals for FY 2001-02 40,000 1,130,000 FY 2002-03 Reserve for USA master plan 1,237,000 Storm Drainage Major Maintenance 40,000 Totals forFY2002-113 40,000 1,237,000 FY 2003-04 Reserve for USA master plan 1,344,000 Storm Drainage Major Maintenance 40,000 Totals for FY 2003-04 '97-Qfl1STCFWrIP fl!)f 40,000 1,344,000 ® I CAPITAL IMPROVEMENT PROGRAM APPENDIX D WATER SYSTEM PROGRAM PROJECT DESCRIPTION WATER FUND FY 1997-98 • Construction of 3.5 million gallon reservoir at Menlor 3,800,000 site. Reservoir to have an overflow elevation of 410 feet. Total cost $3,800,000. $2,800,000 to be paid by current SDC fund, $700,000 from the reservoir reserve fund and $300,000 from the water fund. • Install 1,450 feet of 12-inch transmission main on SW 116,000 North Dakota between 115th and 121 st Avenue. This will complete a 12-inch loop to SW Scholls Ferry Road. • Install 1,500 feet of 4-inch water main on SW Scoffins Street. This is to replace an aging 4-inch cast iron water 36,000 main that has had increased maintenance this past year. • Install 170 feet of 8-inch water main on SW 113th Avenue, south of SW Durham Road. This is a water main 8,500 replacement due to a road failure. Total for FY 1997-98 3,960,500 FY 1998-99 • Install 5,600 feet of 24-inch transmission main along SW 672,000 Walnut Street from 121st & Fonner to SW 135th Avenue. • Install 1,350 feet of 12-inch distribution main on SW 150th Avenue from Bull Mountain Road to Hawks Ridge, 98,000 phase 1 (Bull Mountain system). • Construction of Pressure Reducing Station on Bull Mountain (Bull Mountain system). 20,000 Total for FY 1998-99 790,000 i CAPITAL IMPROVEMENT PROGRAM f APPENDIX E i r WATER SYSTEM PROGRAM PROJECT DESCRIPTION WATER FUND FY 1999-2000 • Install 1,350 feet of 12-inch distribution main on SW 98,000 150th Avenue from Bull Mountain Road to Hawks Ridge, phase 2 (Bull Mountain system). End of project. • Install 4,000 feet of 24-inch transmission main on SW 680,000 Greenburg Road, from Hwy 217 to Bradley Corner. This would include a bore under Hwy 217 ($100,000) and a PRV station and new meter vault ($100,000). • Install 4,400 feet of 16-inch transmission main from SW 425,000 135th Avenue and Walnut to Scholls Ferry Road. • Reserve fund for a reservoir with an overflow elevation of 111,000 550 feet on the northern flank of Bull Mountain (Bull Mountain system). Total for FY 1999-2000 1,314,000 FY 2000-01 • Construction of a 1-million gallon reservoir on the 1,300,000 northern flank of Bull Mountain with an overflow elevation of 550 feet. Also included is a pumping station ($120,000) to transfer water from the 410 zone to the new reservoir. This is within the Bull Mountain system. • Install 2,800 feet of 24-inch transmission main on SW 340,000 Beef Bend Road from SW 131st Avenue to SW King Arthur. This is to be completed during the County project funded by MSTIP 3. The County pr sect widens Beef Bend road from two lanes to three, adds retaining walls, sidewalks, storm drainage improvements and vertical and horizontal realignment. The County postponed this project during 1997 due to Measure 47. Total for FY 2000-01 1,640,000 ® CAPITAL IMPROVEMENT PROGRAM APPENDIX E ! ,07) WATER SYSTEM PROGRAM j PROJECT DESCRIPTION WATER FUND FY 2001-02 • Install 3,200 feet of 16-inch transmission main on SW 315,000 Beef Bend Road from SW 146th Avenue to SW 150th Avenue north to future reservoir (410 zone). • Install 3,800 feet of 24-inch transmission main on SW 570,000 Beef Bend Road from SW King Authur to Bull Mountain Road and 99W. This is the second of a three phase project to increase water transmission to the south side of Bull Mountain. Total for FY 2001-02 885,000 FY 2002-03 • Install 1,900 feet of 24-inch transmission main from SW 300,000 Bull Mountain Road to SW Gaarde Street. This completes the new 24-inch loop project from SW 131 st Avenue on Beef Bend Road to SW Gaarde Street. • Install 3,300 feet of 12-inch water main on SW 121st 248,000 Avenue from SW Walnut Street to SW North Dakota. This area was identified as needing additional reinforcement from medium sized transmission facilities. • Reserve fund for a reservoir with an overflow elevation of 410 or 550 feet, depending upon growth, on the southern 252,000 flank of Bull Mountain. Total for FY 2002-03 800,000 FY 2003-04 • Install 1,900 feet of 12-inch water main on 99W from SW 270,000 Canterbury Lane to SW Beef Bend Road. This water main will reinforce transmission facilities to the south end of our service area. This cost includes a rock allowance. Page E-3 i WATER SYSTEM PROGRAM PROJECT DESCRIPTION WATER FUND • install 1,620 feet of 12-inch water main on SW Scholls Ferry Road from SW 135th Avenue to emergency access to apartment complex on SW Scholls Ferry. This will complete a circulation loop for this area. • Reserve fund for a reservoir with an overflow elevation of 410 or 550 feet, depending upon growth, on the southern flank of Bull Mountain. Total for FY 2003-04 I:TNGIGUS~ W ASYCIRDOC CAPITAL IMPROVEMENT PROGRAM APPENDIX E 410,000 1997-98 Capital Improvement Program APPENDIX F 1996-97 Capital Improvement Program 10 MEMORANDUM CITY OF TIGARD, OREGON TO: City Council /1 FROM: Gary Alfson ball ~~J,J DATE: June 11, 1996 SUBJECT: Capital Improvement Program Update Background I The six year Capital Improvement Program is up for its annual review. The Capital Improvement Program includes improvements to the streets, storm drainage, sanitary sewer, water, and parks systems. The street, storm drainage, and sanitary sewer Capital Improvement Program is managed by the Engineering Department. The Water Capital Improvement Program is managed by the j Public Works Department and the Parks Capital Improvement Program is managed jointly by the 1 Planning and Engineering Departments. Planning Commission approved the proposed Capital Improvement program at their June 3rd meeting. i c Last years prediction for the 96/97 budget was conservative. The tentative list of projects showed some programs reduced or eliminated and the project list was short. Th e actual budget for 96/97 is greater than projected in 95/96, therefore maintenance programs need to be restored and additional 1 projects included. Appendix A is the staff recommendation for the updated Capital Improvement 3 Program for 1996/97 through 2001/02. Appendix B is a copy of the last Capital Improvement Program. Process An introduction to the Capital Improvement Program update process was given to a joint Citizen Involvement Team meeting in March. An overview was discussed and the citizens were requested to bring their nominations for projects to their next Citizen Involvement Team meeting in April. Their nominations were added to the previous' projects backlog and to other nominations from citizens and staff. A great deal of interest was generated this year for speed humps. Last year there was interest in a pedestrian program. The complete list to date is shown in Appendix C. The projects have been grouped into categories of the different types of projects to better organize the list. I , MEMO - City Council - CIP UPDATE PAGE 1 of 5 The City Council meeting is another opportunity for public input. After public testimony the Council is requested to adopt the proposed update or to adopt with modifications specified. Staff will be available at the meeting to provide additional information as necessary. U12date SUmmarV Each account shows committed projects at the beginning of 96/97. These are projects previously approved fo- 95/96 funding but have not been completed as of June 30th, 1996. It is also important to note that each funding source has restrictions on what type of projects can be constructed. Projects cannot be moved from one funding source to another. All projects are placed into funding sources with ample funding if possible. Recommended Streets Gas Tax Pro'ei cts ' - The following is a brief description of projects recommended for the 96/97 Capital Improvement Program. • Pavement Major Maintenance Program This is a program of corrective and preventative maintenance on all the paved streets in Tigard. Typically $300,000 has been the amount budgeted for the past several years. We currently have a backlog of $1,500.000 in corrective overlays, repairs, and slurry seals. We need to maintain as much of the typical budgeted amount as possible in order to reduce the backlog. The goal is to become more preventative and less corrective in our maintenance which will eventually reduce the budget demand for the future. We are catching up with the corrective measures but they are a major portion of the backlog. • Main Street Reconstruction (Scoffins to 99W) The center portion of Main Street was reconstructed last year and this would complete the northeast end of the street. The pavement condition is poor and reconstruction of the street and storm drainage system is necessary. The storm drainage improvements would be funded from the storm drain new SDC fund. $ 30,000 • Main Street Reconstruction (Fanno Creek to 99M This would complete the southwest end of Main Street. The pavement condition is poor and reconstruction of the street and storm drainage system is necessary. MEMO - City Council - CIP UPDATE PAGE 2 of 5 The storm drainage improvements would be funded from the storm drain new SDC fund. $ 40,000 Commercial Street Reconstruction (Main to Hall) $ 200,000 The pavement is in poor condition and the street lacks a continuous curb and sidewalk. The Downtown Merchants Association has expressed an interest in improving Commercial Street, even at the expense of deleting one of the Main Street projects (Fanno Creek to 99W). Portions of the pavement have recently been reconstructed and are in good condition. This project would be similar to the Main Street project and is proposed to be constructed at the same time. The storm drainage improvements would be improved with funds from the storm drainage new SDC fund.$ 30,000 1 • Speed Hump Program $ 45,000 Installation of speed humps on three streets last year have been effective in reducing speeds and have received a favorable response from the neighborhoods. There has been an increased interest in speed humps from the Citizen Involvement Teams, the Traffic Calming Task Force and individuals. Last year we budget $30,000. The proposed _ budget is a two part program. The highest ranking projects are funded 100% with $30,000. Other speed hump projects ' with high neighborhood interest but do not rank as high are eligible for 50% funding with $15,000. The neighborhood would be required to fund the remaining 50%. This would take care of the highest ranking streets in the next 3 to 4 years. • Alfred Street and 74th Avenue Paving $ 65,000 Currently gravel roads, Alfred Street and 74th Avenue are proposed for paving to reduce the cost to maintain the gravel streets. Maintenance Services need to grade the roadway several times a year to keep the gravel surface smooth. This - - paving would reduce their annual maintenance costs. - - Recommended Street TIF Projects TIF funding is limited to major collector and arterial streets and 50% must be spent on arterial streets. A portion of these funds are being held in reserve until our transportation planning is completed. The triangle area has a large potential for improvements to arterial streets. Also, as the Walnut area is annexed, TIF funding will be necessary to improve 121st Avenue, Gaarde Street, and Walnut Street. MEMO - City Council - CIP UPDATE PAGE 3 of 5 • Greenburg Road R/W $ 200,000 The Hall Greenburg Scholls Traffic Study identified the need to widen Greenburg Road north of Washington Square in the near future. Additional right of way is needed for this widening which is adjacent to the Cemetery. • Greenburg/Mapleleaf Intersection $ 50,000 The improvements to this intersection are necessary for additional capacity and safety. This project was also identified in the Hall Greenburg Scholls traffic study. The project is being combined with an ODOT project to improve the Greenburg/217 overpass and offramp and has received Federal funding. The City's share of the project cost is 10.275%. Attached is the initial draft for a plan for the parks component of the city's five-year CIP, which begins 7/96. The plan is an update of the seven-year CIP put together in 1995. The new plan reflects major revisions to revenue estimates and changes in project priorities. The revenue revisions include increased park SDC funding generated by a new fee structure adopted in February 1996 and a City entitlement of $758,000 in Metro Greenspaces bond measure funds. A list of Greenspaces-funded projects was adopted by Council in April 1996. Among other things, the parks CIP keynotes how Greenspaces links up with the other components of the parks CIP. To highlight the proposed changes in project priorities, a copy of the seven-year parks CIP adopted in 1995 is attached. Among the projects authorized for funding in 1995-96, two were completed (the Terrace Trail pathway and the Summerlake Park fencing projects), two were placed on hold (The N. Dakota-Tigard and the Englewood-Fanno Creek trail connections) and are included as committed projects in the 1996-97 list, and one was abandoned. The abandoned project was the 74th Avenue natural area park, which was dropped at Council's direction because the purchase price was not within the established budget for the project. As for future years, the "new community park" project identified in last year's parks CIP for funding over multiple years has been deleted. -this is because the proposed acquisition of a 12-acre parcel on Bull Mountain as part of the Greenspaces program appears to fulfill the need this project was intended to meet. Another change is that the project previously identified as the Woodard- Main park connection has been redefined to include funding solely for land acquisition for this trail segment and for a trail segment along Fanno Creek from Hall Boulevard to Durham Road. This was done to leverage Metro Regional Greenspace funding potentially available for land acquisition within these areas. New projects in the proposed plan include the five natural area and [railway land acquisitions funded by Metro Greenspaces pass through funds, the proposed expansion of Cook Park, and new MEMO - City Council - CIP UPDATE PAGE 4 of 5 1 1 neighborhood parks in the Greenberg and Canterberry areas. As indicated, the Greenspaces projects were approved by Council in April 1996. The Greenberg and Canterberry neighborhood parks were added to provide park services in areas identified as park deficient in the Tigard Park Plan. The Canterberry Park is proposed to be developed on the five-acre water district property. Land acquisition would be needed to accommodate a park serving the Greenburg area. A major unknown in putting together the parks CIP is the extent, timing, and cost of the Cook Park Expansion. A master plan with cost estimates is scheduled to be completed later this year. For present purposes, estimated amounts have been included in the parks CIP to reserve funds for this project. The park system funding is proceeding through a separate process to determine projects for the next several years. This is due to the Metro funding and the new Parks SDC funds. j Sanitary Sewed I The sanitary sewer funding has three funding sources with the least amount of flexibility. The f j funding is reserved for maintenance repairs on currently unknown projects, capacity upgrades as recommended from the USA report and for the Neighborhood Sewer Extension Program. No projects have been proposed at this time for the sanitary sewer fluids. Storm Drainage Funding The storm drainage funding has the same mix of sources as the sanitary sewer fund.. The funding I ` - ~ is generally reserved for currently unknown small projects that come up during the year. Funding f h SDC' aJ rom t e new s must be used on projects designated on the USA Master Plan which has yet to be completed. • 111 th Place Storm Drain This is a project carried over from last year. • I I8th/Terrace Trails Drainageway The heavy rains and development upstream of the creek located northwest of 118th Avenue and Gaarde Street has _ caused substantial erosion of the creek bed. The erosion is causing the embankment adjacent to the homes on 118th Avenue to slough off. This project will stabilize the erosion by slowing the flow of the creek. Water Svctem Fundin2 i The water system funding is determined by the Maintenance Services Department with the approval of the Intergovernmental Water Board. CQJC,oar rXCrP-PC-%I Dpi U MEMO - City Council - CIP UPDATE PAGE 5 of 5 j R STREET,PR0I~ECTS e.I.P PROJECT TIF GAS TAX OTHER FUNDING Committed Projects Transportation Study 23,000 99W Study (16,000) TIF transit reserve 349,000 109th Avenue South of Naeve 110,000 79th/Durham traffic signal 43,289 School Dist. 79th Ave. preliminary design 10,000 130th Avenue Scholls to Hawks 300,000 Beard 30th/Winterlake bridge. 575,000 ajor Maintenance -t ~23,000 Bull Mountain Road S,1f00 Bonita Road 25,000 \Burnham Street 10,000 TOTAL Committed Projects 1,379,000 96,239 FY 1996-97 Committed Projects 1,379,000 96-)89 TIF Transit reserve 89,000 fajor maintenance 223,711 Alfred St .paving 30,000 74th Ave. paving (Bonita to 35,000 Durham) Main St. pavement reconstruction 260,000 Storm Drain 70,000 Commercial Street reconstruction 200,000 Storm Drain 30,000 (Scoff-ms to 99W and Fanno Creek to 99W) 79th Ave @ Durham Traffic Signal 39 98A 6,000 Speed H'u lp Program 45,000 Walnut/riedeman riw 75.000 Greenburg Road rhv 200,000 Greenbur&N- lapleleaf intersection 50,000 TIF reserve 457,000 Totals for FY 1996-97 2,300,000 396,000 CAPITAL. INIPROVEN[ENT PROGRAM APPF.NtDTX A i j. i i t I , a i I 1 F f ....<STREET `Y.E2f}JEG' ~'.I.F. i i i i r 1 k~ 1 PROJECT TIF GAS TAX OTHER FUNDING FY 1997-98 TIF transit reserve 70,000 Major maintenance 300,000 79th Avenue 107,000 LID Ped. improvements - Park/Watkins 160,000 Speed Hump Program 45,000 Traffic Study 30,000 North Dakota Bridge 158,000 Bonita Road RR to Bridge 400,000 TIF reserve 341,933 TOTALS FOR FY 1997-98 811,933 300,000 FY 1998-99 TIF transit reserve 54,000 Major Maintenance 300,000 Pedestrian improvements 50,000 Speed Hump Program 45,000 Burnham/Main Signal 40,000 80,000 North Dakota bridge replacement 1.18,084 (design & rhv) TIF reserve 533.675 Totals for FY 1993-99 632,675 578,084 FY 1999-3000 TIF transit reserve 45,000 Major maintenance 300.000 Pedestrian improvements 50.000 Speed Hump Program 45,000 North Dakota bridge replacement 239,135 TIF reserve 432.509 Totals for FY 1999-00 I 527,509 589,135 CAPITAL IMPROVEMENT PROGRAM l STREET PRaJEC I S C Y.P I PROJECT TIF GAS TAX OTHER FUNDING 00-01 F transit reserve 35,000 Major maintenance 300,000 Pedestrian improvements 50,000 Speed Hump Program 45,000 North Dakota bridge replacement 200,000 HalUHunziker/Scoffms (design) 50,023 TIF reserve 373,135 Totals for FY 2000-01 408,135 600,023 FY 2001-02 TIF transit reserve 40,000 TIF reserve 373,541 Major maintenance 300,000 Pedestrian improvements 50,000 Speed Hump Program 45,000 HalVHunziker/Scolfins 260,714 Totals for F Y 2001-02 413,541 610,714 j CAPITAL IMPROVEbIENT PROGRA vi i APPENDIX A IiI . . I - r r PARKS C I P 1 i i I a 1 1 I l PROJECTS GREENSPACES PARK LEVY SDC FY 1996-97 N. Dakotarrigard trail connection 17,000 33,000 Englewood-Fanno Creek park connection 100,000 Cook Park expansion 390,000 Fem St., Greenspace 125,000 Cook Park Greenspace 46,000 Bond St. Greenspace 118,000 Bull Nit Rd Greenspace 293,000 Fanno Ck trail (land acquisition) 176.000 200,000 Total for FY 1996-97 758,000 17,000 723,000 FY 1997-98 Cook Park expansion 250,000 Fanno Creek trail (land acquisition) 200,000 Ash Ave - Fanno Creek path connection 30,000 Total for FY 1997-98 480,000 FY 1998-99 Englewood Park basketball court 15,000 Fanno Creek park trail lighting 40,000 Cook Park expansion 250,000 Fanno Creek path construction 100,000 Total for FY 1998-99 405,000 FY 1999-2000 Cook Park expansion 150,000 Fanno Creek path construction 100,000 Total for 1999-2000 _ 250,000 FY 2000-01 Fanno Creek trail construction 120,000 Canterberrv neighbor park (imp&fac) 100,000 Total for 2000-01 I 220,000 FY 2001-02 Fanno Creek trail construction 100,000 Greenberg neighbor park (land acq) 120.000 Total for 2001-02 220,000 CAPITAL IMPROVEbIENT PROGRAM r SAM.'ARY SEWER C1 P r I i j J ~ i i i i I I I UNRESTRICTED OLD SDC NEW SDC FY 1996-97 Neighborhood sewer en program 514,609 Major maintenance 30,000 Reserve for capacity upgrades 349,000 544,609 118,734 349,000 FY 1997-98 Major maintenance 30,000 Reserve for capacity upgrades 278,000 Neighborhood sewer ext. prog. 94,216 124216 278,000 FY 1998-99 Major maintenance 30,000 Reserve for capacity upgrades 225,000 Neighborhood sewer ext. prog. 99,269 129,269 225,000 FY 1999-2000 Major maintenance 30,000 Reserve for capacity upgrade 187,000 Neighborhood sewer ext. prog. 103,920 133,920 187,000 FY 2000-01 Major maintenance 30.000 Reserve capacity upgrades 142,000 Neighborhood sewer ext. prog. 109.775 13",'76 1" nnn FY x001-02 Major maintenance 30,000 Reserve capacity upgrades 100,000 Neighborhood sewer ext. prog. 160.197 190,197 100,000 Page 5 :r j STORM DRAINAGE C Z.Y UNRESTRICTED OLD SDC NEW SDC FY 1996-97 I 1 Ith Place storm drain 2,000 118dv7errace Trails Drainageway 9,000 plain and Commercial Streets 100,000 Reserve for USA master plan 37,997 146,997 FY 1997-98 Reserve for USA master plan 108,155 108,155 FY 1998-99 Reserve for USA master plan 78 534 78.534 FY 1999-2000 Reserve for USA master plan 61,493 61,493 FY 2000-01 Reserve for USA master plan 43,311 43,311 FY 2000-01 Reserve for USA master plan 43,895 43,895 Page 6 APPENDIX A :..WATER SYSTEM C.I.P PROJECTS WATER FUND FY 1996-97 Land and Improvements to begin construction of 3.5 million gallon 300,000 reservoir at the Menlor site. Reservoir to have an overflow elevation of 410 feet (410 zone). 50% existing 50% future. Land and Improvements to begin construction of 3.5 million gallon 90,000 reservoir at the Menlor site. Reservoir to have an overflow elevation of 410 feet (410 zone). 50% existing 50% future. Install 1,450 feet of 12-inch distribution main on SW 130th Avenue 14,400 between Winterlake and Hawks Beard (410 zone). 80% existing 20% future. Install 900 feet of 8-inch distribution main on SW 130th Avenue north 36,000 of Hawks Beard to Scholls Ferry Road (410 zone). 100% future. Construction of Pressure Relief Valve station in Bull Mountain 20,000 Meadows subdivision (Bull Mountain System). 30% existing 20% future. Construction of Pressure Reducing Station on Bull Mountain (Bull 20,000 Mountain system). 100% future. Upgrade pumps at High Tor il I to provide additional capacity (Bull 13,000 Mountain system) 10% existine 90% future. TOTAL FOR FY 1996-97 585,400 FY 1997-98 Construction of 3.5 million gallon reservoir at ivlenlor site. Reservoir to 260,000 have an overflow elevation of 410 feet. Total cost 52,960,000. 52.000,000 to be paid by current SDC fund and 5700,000 from the reservoir reserve fund. 50116 existing 50% future. Install 5,600 feet of 24-inch transmission main along SW Walnut Street 672,000 from 121st & Former to SW 135th Avenue (410 zone). 20% existing 30% future. Total for FY 1997-98 I 932.000 FY 1998-99 Install 4.000 feet of 24-inch transmission main on SW Greenbw Road v3l 000 g , from Hwy 217 to Bradlev Corner. This would include a bore under , H,-vv 317 ($100,000) and a PRV station and new meter vault (5100,000). This is within the 410 zone. '_0%existine 30% future. Install 1.350 feet of 12-inch distribution main on SW 150th Avenue 81.000 from Bull Mountain Road to Hawks Ridge, phase I (Bull Mountain system). 40% existing 60% future. Construction of Pressure Reducing Station on Bull Mountain (Bull 20,000 Mountain system). 100°./o future. Total for FY 1998-99 I 731,000 CAPITAL IMPROVEMENT PROGRAhI APPENDIX A i i , i' i l 9 PROJECTS WATER FUND FY 1999-2000 Install 1,350 feet of 12-inch distribution main on SW 150th Avenue fivnt Bull Mountain Road to Hawks Ridge, phase 2 (Bull Mountain system). End of project. 40% existing 60% future. Install 4,400 feet of 16-inch transmission main from SW 135th Avenue and Walnut to Scholls Ferry Road (410 zone). 100% future. Install 3,200 feet of 16-inch transmission main on SW Beef Bend road from SW 146th Avenue to SW 150th Avenue north to future reservoir (410 zone). 100% future. Reserve fund for a reservoir with either an overflow elevation of 550 feet or 470 feet on the northern flank of Bull Mountain (Bull Mountain system). 80% existing 20% future. Total for FY 1999-00 FY 2000-2001 Construction of 1 million gallon reservoir on the northern flank of Bull Mountain with an overflow elevation of 470 or 550 feet. Also included is a pumping station ($120.000) to transfer water from the 410 zone to the new reservoir. This is within the Bull Mountain system. 30% existing 20% future. Total for-2000-01 u CAPITAL. IMPROVEMENT PROGRAM APPENDLY A CITY OFTIGARD PAVEMENTOVERLAY BACKLOG STRf:LE 1 LIMITS - AREA ISII ON'ERl_t I' ITONS) DEPTH ONCTO.S) EAB. DIGOLrIS isv) STNIPE ILF) TOTAL COST 11uniliatil Hall to Main 7,000 1,181 3 0 15 0 2,000 $45.500 Gaardc' I10thto 121st 9.400 1.586 3 . 3,000 S87A50 Walnut' 199W toTiedcman 7,600 1.283 3 _ 25 _ 2,500 _ 572,550 121st' Walnut to North Dakota 10.000 1.688 3 3,000 591,500 68th Avenue S/O Hampton to 65th 4.000 563 2.5 100 S18,700 Tigard Street Ticdeman to Main 12.770 2.155 3 25% _ 3,400 - $82,127 109th Ave At Murdock Intersection 2,700 456 3 100% 500 0 $31,558 McKenzie PI 99W north 0.05 1.056 178 3 _ 0 _ 0 0 S4,990 School Street 99W to Grant 616 104 3 0 0 0 52,911 Saltier' _ 100th to Hall 12,133 2,047 - 3 - 20 - - 582,898 North Dakota Ticdeman to 12 l st 13,900 2.346 3 $65,678 Nimbus Scholls to 1/2 Length 2,874 485 _ 3 50°/ 500 $23,555 113th Durham to C.L. 2.000 338 _ 3 _ 0 0 0 $13.500 70th Avcnuc Alfred North 1,000 169 3 _ 56,750 Grant Park to School 2,610 440 3 1000% 50 0 524,033 Serena Street Durham to Serena 600 101 3 S42,813 Ross Street Hall to 8 Ist 2.100 354 3 S 14,175 70th Avenue - Oak to End _ 792 134 _ 3 55,346 Hampton 68th to 66th 5,420 915 3 0 20 0 0 546,585 66th Ave I lampton to Cds 7,321 1.235 3 100°/ . 560,398 66th Ave 68th to Hampton 4,150 700 _ 3 3.700 542,813 110th Avc Fairhaven to Garden Park 2,960 500 3 100% 5.0 526,920 Shady Greenburg to 95th 4,460 753 3 50% - 533,450 Oak Street Grcen burg to 95th 2.580 Crack Seal 5 2,000 52,000 Bonita _ 72nd to Sequoia 2,581 Crack Seal 5 2,000 100 0 56.000 Center 95th to End 587 99 3 _ 53.962 82nd Pfaflcto End _ 1,079 182 3 _ 57.283 Ticdeman Walnut to Curve 5.170 872 3 25°6 536,836 Ticdeman Tigard to Meadow 2,850 481 3 519,23$ Grant Johnson to Tigard 3,700 624 3 1,100 _ 529,375 Scof'iins Main to Ilaa 5,400 911 _ 3 25°0 50 _ 1,500 546,975 74th Spruce to End 1.267 214 3 _ 58,552 Ventura Ct. Ventura Dr to Barbara 3,000 0 0 - 100 S51000 Pine, 69th to End 470 79 3 $3,173 66th Taylors rcrry to End 1,400 236 3 - 59,450 67th Avenue Oak to End 586 132 4 Gravel - 55,274 69th Avenue Oak to End _ 1.030 232 4 Gravcl 59.270 Alfred Street Ventura to 70th 2.350 529 4 Gravel 521,150 Maplelcaf 72nd to 7lst _ 850 191 4 Gravel - - - 57,650 66th Avenue Oak to End 470 106 4 Gravel S4,230 69th Avenue Dartmouth to Clinton 1.056 238 4 Gravel 59.504 69th Avenue Dartmouth to Hampton 4,224 950 Clinton 69th to 70th 528 119 4 Gravcl 54,752 Walnut Terrace 69th to End 1,994 449 4 Gravel 517,946 76th Durham to Bond 1.620 365 4 Gravel $14,580 107th Park to Cook 698 157 4 Gravel _ - - $6,282 Jefferson Locust to End 375 63 3 Gravel S2.531 89th Spruce to End 1,450 245 3 Gravel _ S9,788 Thom 89th to End 610 110 3 Gravcl _ _ $4,388 Landau 77th to 75th , LO50 177 3 Gravel 57.088 TOTALS S I,266.488 with widening to ultimate 0 1 CAPITAL IMPROVEMENT PROGRAM APPENDIX G I t f I i I Capital Improvement Program Update May 1, 1997 At the Joint CIT meeting on April 1 at Mary Woodward Elementary School, several projects were introduced for consideration in the CIP formulation process. The following are the projects and the results of our evaluation of the feasibility for inclusion in the 1997-98 CIP Budget: Streets • 107th Street from Park Street to Cook Lane - Research indicates that there is a 20-foot wide sewer easement where the existing road currently lies. There is another 20-foot driveway easement adjacent to the sewer easement. There is no public rights-of-way between the two streets along 107th Avenue. Placing an adequate road along 107th would require dedication of at least a 40-foot wide rights-of-way and reconstruction of the roadway to center it within that rights-of-way. It is beyond the scope of what is normally included in the Pavement Major Maintenance Program and hence will not be included in next year's CIP Budget. f • 114th Avenue from Gacu•de Street to 13u11 d9ourntainn Road -This street is a local street and is currently not in the Comprehensive Transportation Plan for upgrade to collector status. Widening 1 with full improvements and connection to Bull Mountain Road will in effect upgrade it to collector status. The Northeast Bull Mountain Transportation Study did not identify this street as one of the connector streets. It is much too close to 99W. Connection between Gaarde and Bull Mountain Road should probably be further west. Additional studies, as recommended by the Planning staff, will be required as to the proper disposition of this street. Nevertheless, this project would require reconstruction and widening of the street, which is beyond the scope of the Pavement Major Maintenance Program. It, therefore, will not be included in next year's CIP budget. • Pedestrian Perth along Park Street -This project will be eliminated, but the drainage project will j be retained. The residents are not interested in widening of the street, but are most concerned about the drainage problem along that street. • Pedestrian Path along II'crtkinns .Street from Park Street to Walnut Street - This segment of road is currently drained through a system of ditches adjacent to the paved street surface. This segment of road is lengthy and would require installation of an underground drainage system to allow widening of the road sufficient to place a pedestrian path throughout the entire length. The cost would be extremely high for both projects and cannot be included in next year's budget. ,_,J Capital Improvement Program Update APPENDIX H • Speed !lumps along Park Street - There is it list of established criteria for a street to be eligible for speed humps. Park Street does not meet the criteria for traffic volume and is therefore not eligible for placement of speed humps. • Bonita Road from the Railroad Tracks to the Bridge - This project is included for construction in next year's CIP Budget. It will widen and reconstruct Bonita Road in the segment that has not yet been constructed. The project will provide sidewalks on both sides, underground drainage, and place the power system underground to match the rest of Bonita Road. • Sidewalks on Scoffrns Street from Hall Boulevard to the existing walktivays - Scoffins Street requires realignment to connect to Hall Boulevard across from Hunziker Street. Sidewalks placed now will be removed when this realignment occurs. The realignment is included in the long- term Capital Improvement Program and will be scheduled when sufficient funding has been accumulated to allow the project to proceed. The sidewalks will therefore not be included in next year's CIP Budget, but will be constructed with the realignment of Scoffins Street. • Fluorescent Diamonds on Speed Limit Signs - The ones we are aware of are relatively large and are used on freeway speed limit signs. Residential areas are already understood to be 25 mph zones. These diamonds would not be appropriate for residential areas. They may be appropriate for streets such as Walnut Street and Bull Mountain Road where the speed limits are not immediately obvious. We will look into the feasibility of using these fluorescent diamonds on major collectors and arterials during the next fiscal year. 1 Storm Drainage 1 Park Street Storm Drainage -This project will be included in next year's budget. i Streetlights • There is an amount of $20,000 included in the Street Lights and Signals Budget for installation of additional streetlights throughout the City. The Engineering Department is in the process of developing criteria for selection of locations to receive additional lighting and will present the criteria and priority listings to the CIT's after the development and evaluation are completed. I \ENG~GUSVP97-981CIPUPDAT DOC I Capital Improvement Program Update Parks • The only Parks related item was the request that the play structure in Woodard Park be replaced. There was also a concern that the existing structures may be unsafe. The Parks personnel have inspected the play structures and have verified that they are still perfectly safe for use. They are currently evaluating the feasibility of replacing the play structures and will make a report on their evaluation during the June CIT meetings. Page 1-1-2 APPENDIX H ~..i MEMORANDUM CITY OF TIGARD, OREGON TO: Gus Duenas, Engineer FROM: Wayne Lowry, Director of Finance DATE: June 4, 1997 i i SUBJECT: Approved budget numbers for 1997/98 CIP L We have updated the capital project appropriations included in the approved budget to include th changes made by the budget committee. Please make sure that the numbers for 1997/98 in th capital improvement plan that you present to the City Council on June 24, 1997 do not exceed thes numbers. At this time, these numbers represent the appropriations that will be adopted by th Council in the 1997/98 budget. "I Sanitary Sewer --1 Storm Sewer - User fees Water Quality/Quantity State Gas Tax Traffic Impact Fee Parks SDC Park Levy Improvement Tree Replacement Underground Utility Water Fund j Water CIP Reserve Water SDC Traffic Impact Fee Urban Services Metro Greenspaces $ 2,000,000 700,000 702,980 807,991 3,500,000 1,430,000 191,137 246,200 130,000 1,602,096 778,604 3,000,000 444,453 631,224 If you have any questions on this information, please let me know. CAPITAL IMPROVEMENT PROGRAM Page I-I r f I e e e e j AGENDA ITEM # 1 { FOR AGENDA OF CITY OF TIGARD, OREGON COUNCIL AGENDA ITEM SUMMARY ISSUE/AGENDA TITLE _Request Land Use Application Fee Waiver + PREPARED BY: Dick DEPT HEAD OK CITY MGR OK ! I ISSUE BEFORE THE COUNCIL ~ F Should the City Council grant a waiver of land use application fees to the Tualatin Valley Housing Partners, Inc. E and the Arcand Company. a None INFORMATION SUMMARY ,,The attached letter from Topaz Faulkner of the Tualatin Valley Housing Partners, Inc. requests a waiver of fees G , pursue a comprehensive plan and zoning change for the Hawthorne Villa Apartments at 7709 SW Pfaffle. r The Council and staff have been supportive of providing affordable housing in Tigard. The development code specifically authorizes fee waivers only for appeals. The fees for a comprehensive plan amendment, zone 1 change and pre-application conference would be $4556. Development application fees in the City of Tigard cover only the cost of time for processing an application not ! overhead costs like Washington County fees. The fees help defray the cost of local governement to the local j taxpayer by placing them on the user. The user in the above case includes the Arcand Company which is a j private corporation as co-owner of the apartments in question. i There is concern about the need to provide revenue to pay for the plan review activities. There is also concern about how many times similar requests to waive fees would come up and the revenue impact. Should the Council wish to waive the fees, a motion to direct the Community Development Director to accept the applications without fees would be appropriate. RECD MAY 12 1997 i*ualatin Valley April 30, 1997 HOUSING PARTNERS ❑.•numumilyderch'i nurnl mpwmuon Jim Nicoli, Mayor City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Anna Geller ......rot Dear Mayor Nicoli: Grey, Lu tte v;,,. I am writing on behalf of Tualatin Valley Housing Partners, Inc. (TVHP) to request a waiver of the fees associated with an Dan rrLe` rv application for a Comprehensive Plan Amendment and Zone & x n•larv/Tn•an.rrr Change. We are a non profit, community development corporation Senatorjeannette Hamhv dedicated to the provision of affordable housing in Washington Councilman Wes Yuen County. TVHP is a co-owner with The Arcand Company of the Hawthorne Villa Apartments at 7709 SW Pfaffle. The complex Barbara Smith consists of 119 units and was built in 1970 at a density of Mike Schmidt approximately 25 units per acre. However, the property is Marv Tobias planned and zoned at 12 units per acre. Peter Herman The Arcand Company and TVHP are interested in requesting a Leon Laptook change in the plan and zone designation to bring them into • Judy Bauman conformance with the actual density. We are asking the City Karl Mawson Council for a waiver of the application fees to allow us to pursue this course. Sharon Geraci Larry sensnn Thank you for your consideration of this request. Cordially. A Fopaz Faulkner Err•. W'- D"', ior gy„y ' j Topaz Faulk r, AICP Izssosw InirdStreet Beaverton, OR 97005 Executiv Dir ctor (503) 231-2987 ✓c: James Hendryx, Community Development Director Fax 239-57,90