Loading...
Resolution No. 10-71 CITY OF TIGARD, OREGON TIGARD CITY COUNCIL RESOLUTION NO. 10- 7 A RESOLUTION TO ADOPT WATER SYSTEM DEVELOPMENT CHARGE METHODOLOGY WHEREAS,Tigard Municipal code chapter 3.24 defines the authority and process for imposing Water System Development Charges (SDCs);and WHEREAS, the City of Tigard is the managing authority and water provider for the Tigard Water Service Area (TWSA). The TWSA includes the residents of Durham, King City, two-thirds of Tigard, and the Tigard Water District;and WHEREAS, the Intergovernmental Agreements for Delivery of Water Service, Sections 8.B., state that the Tigard City Council has the authority to modify, alter or repeal the Rules, Rates and Regulations for Water Service within the Tigard Water Service Area;and WHEREAS, on September 8, 2010, the Intergovernmental Water Board recommended approval of the water SDC methodology;and WHEREAS, the City of Tigard's water SDCs were last updated in 2000 in Resolution No. 00-66;and WHEREAS, this resolution provides a uniform and equitable methodology for assessing SDCs to recover some of the cost of the additional infrastructure needed to serve new development;and WHEREAS, the 2010 Water System Master Plan calls for the City's water distribution system, storage facilities and supply source to be increased to satisfy future water demands;and WHEREAS, on August 6, 2008, following extensive analysis of various long-term water supply options, the City Council entered into the Lake Oswego-Tigard Water Partnership whereby the cities would jointly develop a shared water system;and WHEREAS, SDC methodology needs to be updated on a regular basis to ensure fees accurately reflect infrastructure building costs and changing water system priorities, such as the capital improvements listed in the 2010 Water Master Plan and projects related to the Lake Oswego-Tigard Water Partnership;and WHEREAS, the City's consultant completed a comprehensive water financial plan which included a Water Rate Study and Water System Development Charge Update. The findings are contained in Exhibit A, a memorandum titled, "Tigard Water System Development Charge Methodology," dated October 26,2010;and WHEREAS, the City has duly noticed the public hearing of December 14, 2010, and has heard testimony and comments regarding the water SDC methodology;and NOW,THEREFORE,BE IT RESOLVED by the Tigard City Council that: RESOLUTION NO. 10 - 7/ Page 1 SECTION 1: The City Council hereby adopts the SDC methodology described in Exhibit A, a memorandum titled, "Tigard Water System Development Methodology," dated October 26, 2010. SECTION 2: All previous water SDC methodology,including Resolution No. 00-66,is hereby repealed. SECTION 3: This resolution is effective immediately upon passage. PASSED: This day of IUM6A 2010. 61� , -4��r-z Mayor-City of Tigard ATTEST: Pakkc/,�- �-t City Recorder-City of Tigard tel' RESOLUTION NO. 10- 71 Page 2 Exhibit A : PSMAKCONSULTING A DIVISION Of'MALCOLM PION11 MEMORANDUM To: John Goodrich, City of Tigard Date: October 26, 2010 From: Joe Healy, Red Oak Consulting Paul Matthews, Red Oak Consulting Re: Tigard Water System Development Charge Methodology Introduction Like many municipal water suppliers in Oregon,the City of Tigard(City)is faced with increasing costs for the expansion of its water system's capacity to serve growth. To mitigate this cost of growth in its water system,the City has historically assessed system development charges(SDCs)to new customers. As part of its routine business practices, the City has engaged Red Oak Consulting(Red Oak)to review its SDCs to ensure these charges are: • Fair and Equitable, and • Avoid subsidizing either new or existing customers. Water System Development Charge Methodology The proposed SDC methodology is based on historical investments and future capital improvements as identified by the City. The identified capital improvements are based on the existing water master plans and knowledge of the system. Reimbursement Fee The reimbursement fee is based on the capacity buy-in approach, and requires three steps: 1. Fixed asset valuation, 2. Capacity definition, and 3. Assessment schedule. The following is a description of each step. Fixed Asset Valuation Under the proposed methodology,the value of the City's fixed assets is based on an estimate of the water system's reproduction cost new(RCN). An estimate of the value of assets contributed by developers was excluded from the SDC calculation. The City's system is designed to meet the needs of its customers and provide safe and reliable water service throughout its service area. The system consists of many individual components that serve specific functions. To estimate the value of assets related to each • 12670 NW Barnes Road • Suite 104 9 Portland,OR 97229 • T 503-352-0900 • F 503-644-2414 • www.redoakconsulting.com City of Tigard Page 2 function, the value of each asset is allocated to one or more of 10 functions. The City's functions are: 1. Groundwater/ASR 2. PWB Supply 3. L.O.-Tigard System 4. Bonita Pump Station 5. Water Storage 6. Pump Stations 7. 550-530 Intertie 8. Transmission &Distribution 9. Administrative Facilities 10. Field Operations 11. Future Willamette Supply' Many assets used in the distribution system are typically contributed by developers and thus excluded from the calculation of the reimbursement fee. To explicitly show the value of the excluded assets, they were assigned to an additional category labeled Exclude front SDC. Table 1 summarizes the asset values attributed to each function. Based on the analysis, the total value of the City's water system assets for SDC purposes in fiscal year ending 2010 (FY2010) is $155 million. Of the total value, $23 million is excluded from the SDC to account for assets that are considered contributed or obsolete assets. Thus, for the purpose of establishing a reimbursement SDC, the City's water system is valued at approximately$132 million. Capacity Definition The next step in determining the reimbursement fee under the capacity buy-in approach is to define the system capacity. Specifically, under the capacity buy-in approach the system capacity is based on the unused capacity of the system for each function identified above. The City provided data used for this analysis. Table 2 lists the current capacities of each function. Table 3 presents an estimate of the capacity in the existing system that is available for growth. Underlying the numbers shown in this table is the assumption that one equivalent dwelling unit (EDU) consumes 475.5 gallons of water per day on a peak-day basis.2 This estimate is based on the City's most recent estimates and an assumption that the system currently serves 28,785 EDUs. The amount of storage required per EDU is 556 gallons. This value is also derived from the City's analysis of its system and projections. Using these assumptions and the capacities for each function summarized in Table 3, the number of EDUs that can be served by each function is calculated. Subtracting the number of EDUs currently served 1 Currently the City has no infrastructure related to Future Willamette Supply. This was included only as a placeholder for future SDC updates. '-Much of the City's water system is sized to meet the peak-day demands of its customers. Therefore,peak-day demands are used to estimate the requirements for most of the City's infrastructure. City of Tigard Page 3 by the utility generates the number of EDUs available for growth. A description of how the number of EDUs currently served by the City is estimated follows below. Assessment Schedule Development Table 4 provides an inventory of the number of EDUs by meter size. The number of EDUs is based on the number of meters by size and the associated equivalency factors. The equivalency factors are calculated based on an analysis of the City's customer billing data for the last five years. Based on the number of meters served by the City and the equivalency schedule presented in Table 4, the total number of EDUs served by the City is estimated to be 28,785. For connections to the water system with meters larger than 2-inches, the City will forecast the demands on an average-day, peak-day, and peak-hour basis. The number of EDUs associated with the demands will be determined by the following: EDUs—(ADD*60.400)+((PDD—ADD)*0.343)+((PHD—PDD)*0.257) Where: • ADD is the projected average-day demand of the new user in gallons per day, and • PDD is the projected peak-day demand of the new user in gallons per day, and • PHD is the projected peak-hour demand of the new user in gallons per day, and The constants used in the above formula are: • 0.400 equals the proportion of the City's water facilities allocated to the average- day function. • 226.4 equals the estimated gallons per day on an average-day basis demanded by an EDU. • 0.343 equals the proportion of the City's water facilities allocated to the max-day extra-capacity function. • 249.1 equals the estimated gallons per day of max-day extra-capacity demanded by an EDU. • 0.257 equals the proportion of the City's water facilities allocated to the max-hour extra-capacity function. • 90.6 equals the estimated gallons per day of max-hour extra-capacity demanded by an EDU. The City may update the values in the formula above as its system changes to recognize the changing costs imposed by new large customers. The proposed equivalency schedule is presented in Table 4. Based on the number of meters served by the City and the equivalency schedule presented in Table 4, the total number of EDUs served by the City is estimated to be 28,785. It should be noted here City of Tigard Page 4 that the equivalency factors shown in this table will be used for calculating SDCs for connections to the water system with meters 2-inches and smaller. As described previously, the City will forecast the number of EDUs for connections with meters larger than 2-inches using the above formula. Fee Calculation The total costs to be recovered from the reimbursement fee SDC are based on the percentage of remaining capacities by functions calculated in Table 3 and the total system asset values shown in Table 1. Table 5 presents the total reimbursement amount by function. The total amount attributable to the reimbursement fee is approximately$40 million. Table 6 calculates the reimbursement fee per EDU for each of the functions. The total reimbursement fee per EDU is $2,936. Improvement Fee The improvement fee is based on the City's adopted capital improvement program (CIP). Table 7 presents an overview of the City's CIP. To calculate an improvement fee based on the incremental cost approach, the following three tasks must be completed: 1. Multi-purpose project allocations, 2. Capacity definitions, and 3. Assessment schedule development. Multi-Purpose Project Allocations Allocating the costs of multi-purpose projects is an integral part of calculating an improvement fee. A multi-purpose project is an improvement that will serve both growth and address existing needs. Few projects are designed and built exclusively to serve growth or solve an existing deficiency. Rather, projects are often designed to maximize economies of scale in design and construction. Therefore, projects serving both growth and rehabilitation/upgrade(i.e., multi-purpose projects) are allocated to growth and non- growth. The value of each capital project is allocated to one or more of the system functions described previously. Table 8 summarizes the allocation of capital projects to functions. Tables 9 through 20 show the cost of new capacity for each project within each system function. Based on this information, Table 21 summarizes the percent of capacities available for growth and the resulting value of growth-related improvements attributable to each system function. The total amount of capital improvements costs used to calculate the improvement fee is approximately$54 million. Capacity Definition Table 22 summarizes the system capacities added by function. Similarly, Table 23 presents the estimated number of EDUs available for growth by function. City of Tigard Page 5 Assessment Schedule As with the reimbursement fee, the improvement fee portion of the City's proposed SDC will be based on meter size. Table 4 presents the number of EDUs for each meter size. Fee Calculation The improvement fee is calculated based on the cost of the growth-related capital projects and the additional capacities estimated by these projects. Table 24 summarizes the improvement fee by system function. Based on the CIP developed by the City, the improvement fee per EDU is $3,538. Results and Recommendations As shown in Tables 6 and 24, the total reimbursement and improvement fees are calculated to be $2,936 and $3,538 respectively, for a total SDC of$6,474 per EDU. Table 25 presents the resulting schedule of SDCs by meter size. Supplemental Water SDC The City will charge a Supplemental Water SDC for any areas outside of the 2010 Service Boundary based on a supplemental adopted UP list. The Supplemental Water SDC will be additional to the updated Water SDCs adopted by City Council. Table 1: Net Fixed Asset Valuation -RCN Descri tion FY2010 Assets Groundwater/ASR $3,756,934 PWB Supply 0 LO-Tigard 0 Bonita Pump Station 0 Water Storage 22,640,803 Pump Stations 11516,807 550-530 Intertie 0 Transmission & Distribution 99,266,414 Administrative Facilities 2,346,745 Field Ops. 2,519,602 Future Willamette Supply 0 Exclude from SDC 22,969,208 Total $155,016,513 Table 2: Capacity by Function System Component Capacities Units Groundwater/ASR 4.1 MGD PWB Supply 6.8 MGD LO-Tigard 0.5 MGD Bonita Pump Station 0.5 MGD Water Storage 24.5 MG Pump Stations 13,600.0 gpm 550-530lntertie 3,131.6 gpm Transmission &Distribution 41,338.4 EDU Administrative Facilities 41,338.4 EDU Field Ops. 41,338.4 EDU Future Willamette Supply 0.0 MGD Exclude from SDC 0.0 0 Table 3:Available Capacities of Existing System Requirements per Subscribed Available Capacity Remaining System Component EDU Units EDU Available I Capacity EDUS) EDUs Capacity Groundwater/ASR 171.0 gpd 23,975 28,785 0 0.00% PWB Supply 283.6 gpd 23,975 28,785 0 0.00% LO-Tigard 20.9 gpd 23,975 28,785 0 0.00% Bonita Pump Station 20.9 gpd 23,975 28,785 0 0.00% Water Storage 556.4 gallons 44,034 28,785 15,249 34.63%, Pump Stations 473.7 gpd 41,338 28,785 12,553 30.37% 550-5301ntertie 0.1 gpm 41,338 28,785 12,553 30.37% Transmission&Distribution 1.0 EDU 41,338 28,785 12,553 30.37% Administrative Facilities 1.0 EDU 41,338 28,785 12,553 30.37% Field Ops. 1.0 EDU 41,338 28,785 12,553 30.37% Future Willamette Supply 0.0 gpd 0 28,785 0 0.00% Exclude from SDC 0.0 0 0 0 0 0.00% Table 4: Inventory of EDUs for FY2010 Equivalency Meter Size or Service Line Size Number of Meters Factor EDUs 5/8 x 3/4 Inch 15,635 1.00 15,635 1 Inch 1,604 2.67 4,279 1.5 Inch 375 8.00 2,999 2lnch 320 12.99 41156 3Inch 24 2290 550 4 Inch 11 46.97 517 6Inch 5 50.00 250 8Inch 5 80.00 400 10 Inch 0 156.30 0 12 Inch 0 225.07 0 Total 17,979 28,785 Table 5: Calculation of Reimbursement Totals Capacity Available for Reimbursement System Component Growth Total Groundwater/ASR 0.00% $0 PWB Supply 0.00% 0 LO-Tigard 0.00% 0 Bonita Pump Station 0.00% 0 Water Storage 34.63% 7,840,480 Pump Stations 30.37% 460,603 550-530 Intertie 30.37% 0 Transmission &Distribution 30.37% 30,143,834 Administrative Facilities 30.37% 712,627 Field Ops. 30.37% 765,118 Future Willamette Supply 0.00% 0 Exclude from SDC 0.00% 0 Total $39,922,662 Table 6: Reimbursement Fee per EDU Proposed Reimbursement System Component SDC Groundwater/ASR $0 PWB Supply 0 LO-Tigard 0 Bonita Pump Station 0 Water Storage 380 Pump Stations 37 550-530 Intertie 0 Transmission& Distribution 2,401 Administrative Facilities 57 Field Ops. 61 Future Willamette Supply 0 Exclude from SDC 0 Total $2,936 Table 7: Overview of CIP Projects Descri tion I Total Project Cost ASR Well 3—Design&Equip $2,609,963 New Pump Station- Siting Study 50,000 New Pump Station-Design 255,000 New Pump Station-Construction Year 1 (67%) 963,000 New Pump Station-Construction Year 2(33%) 481,000 New PRV from 550G to 410 Zone 105,000 Pipeline connecting 550G and 530 Zones-Design 197,000 Pipeline connecting 550G and 530 Zones- Construction 1,770,000 Annual Fire Flow Improvement Allocation 3,300,000 Pipeline for installing PRV 550G-4 17,000 Pipeline in Main St. &Tigard Ave. 101,000 Water Master Plan Update 140,000 Willamette Sherwood Pipeline 0 550-6270-755545 -ASR3 463,755 550-6270-755545 - 287,066 550-6270-755827-550'Zone l OMil 3,952,087 550-6270-755828- 550'Zone Res#2 5,082,407 550-6270-755828- 1,080,352 550-6270-755951 -Water Res Seismic Upgrade 52,270 550-6270-755970- 7,052 550-6270-757012-Menlor Tank Recirc 39,132 Joint Water Supply Projects 89,299,160 Total $110,252,244 Tabic%:Allocation of C1P to Srctem Fnnctionc rout crater Bo to ump mtstnisswn A n nstraOtc uturc nolle Descri limt ASR PWB Sn h' LO-Ti-rd Slatiou \Vater Stom•e Pu Sl:niotu 550-530 Lnenie Dislribntion Facilities Field O s. Sue kt E.xlude fmm SDC Total ASR Well 3-Design&Equip $2.609.96.3 $0 $0 SO $0 $0 $0 $11 $0 SO $0 $0 $2.609.963 Nein Purim Slntiott-Siting Study 0 (1 U 0 0 50 o0U 0 0 0 0 0 0 SU,1100 Nco Primp Station-Desipt 0 D n 0 0 255,000 11 n 0 n U 0 2551x30 Nen Poop Station-Constmnion]'ear l l67"/�) 0 0 0 0 0 963,000 0 0 0 0 0 0 96z 0110 Necc Pun>p Slnfion-CORSlrttctlon}-ear 21:3'%) 0 0 0 0 0 381JI0 (1 0 0 Il 0 11 381!Illll Nen'PRV fmm S50G to 410 Zone I(rSOOp 11 0 (r 0 0 0 o f1 0 II n 1()5,0(1() Pipelirc connecting 550Gand 530 Zones-Design U 0 0 U fl 0 197.000 (1 0 0 0 0 197,000 Pipeline cotutccOng 550G at%I 530 Zotes-Cortstmcli, 11 11 U 0 0 1.771(000 n 11 0 0 0 1,770 0110 Atuntal Fite Flonhopoo—nent Allocation 0 0 tl 11 0 Ir (1 fl (1 Il It 0 11 Pipelirc for imulling PRV 550G-1 U 11 0 ll 11 0 fl 17.0(111 II u U II 17.(x1111 PipeOtc in Main St.&Tigard Arc. 0 fl 0 0 11 0 0 101000 11 0 0 0 1111000 Water Master Plan Updom u 0 n U 0 0 0 Il n u 0 0 0 Willans0c Shetrrood Pipeline 0 n u u 0 U 0 U 0 0 11 u 550{,270-755545-ASR3 465.755 0 0 0 (1 0 11 (1 f1 0 0 0 463.755 550{270-755545_ 2%7.066 0 0 0 0 0 0 ll 0 0 0 0 2%7.066, 550{270-755827-550'Zotc loMil (1 0 0 0 3,952087 0 (1 0 0 0 0 U 3,952087 550{270-755%2%-550'Zone R,02 U 0 0 0 5 fl%2 107 1) 0 0 0 0 0 0 5082.307 5506270-75582%- (1 0 Il 0 111%11,152 0 U 0 0 0 0 0 1080,352 550{,270-755951-Water Res Seisnuc Upgrade 0 0 0 0 52 270 [) 0 0 0 0 0 0 52,270 5506270-75;97()- n 0 U 0 (1 11 0 0 0 0 0 7.05? 7,052 5506270-757012-Menlor Tank 11 c6. 1) Il U 0 19.13± ll 0 0 11 Il u 0 Joint Wale,Supply Projects 0 0 S9,299,160 0 0 11 U 0 0 0 0 0 89,299,160 Total $1165784 $0 $%9,299,160 SO $10,206.249 $17390011 $1967000 $119,000 SO S0 $0 $7052 $106,912234 Table 9:Allocation of Groundwater/ASR Expansion Costs Percent Cost for Total Project Expansion Expansion Cost of Expansion Description Tigard Costs($) Capacity Capacity Capacity Units Capacity Capacity Project Group Added Capacity ASR Well 3—DesiLn&Equip $2,609,963 1.90 0.00 MGD 0.00% $0 1 0.00 New PRV from 550G to 410 Zone 105,000 1.90 0.00 MGD 0.00% 0 1 0.00 550-6270-755545-ASR3 463,755 0.00 0.00 MGD 0.00% 0 1 0.00 550-6270-755545- 287,066 0.00 0.00 MGD 0.00% 0 1 0.00 Total $3,465,784 $0 0.00 Table 10:Allocation of PWB Sup piv Expansion Costs Percent Cost for Total Project Expansion Expansion Cost of Expansion Description Tigard Costs($) Capacity Capacity Capacity Units Capacity Capacity Project Group Added Capacity Total $0 $0 0.00 Table 11:Allocation of LO-Ti and Expansion Costs Percent Cost for Total Project Expansion Expansion Cost of Expansion Description Tigard Costs($) Capacity Capacity Capacity Units Capacity Capacity Project Group Added Capacity Joint Water Supply Projects 89,299,160 14.00 6.80 MGD 48.57% 43,373,878 6.80 Total $89.299,160 $43,373.878 6.80 Table 12:Allocation of Bonita Pump Station Expansion Costs Percent Cost for Total Project Expansion Expansion Cost of Expansion Description Tigard Costs($) Capacity Capacity Capacity Units Capacity Ca aci Pro'ect Group Added Capacity Total $0 $0 0.00 Table 13:Allocation of Nater Stora a Expansion Costs Percent Cost Total Project Expansion Expansion Cost of Expansion to]- Description Ti Bard Costs($ Ca acit Ca aci Ca acro,Units Ca acity Ca acity Project GroupAdded Capacity 550-6270-755827-550'Zane IOMil 3.9527087 3.00 3.00 MG 100.00% 3,952,087 1 3.00 550-6270-755828-550'Zone Re,02 5.082,407 3.00 3.00 MG 100.00% 5,082.407 1 0.00 550-6270-755828- 1,080,352 3.00 3.00 MG 100.00% 1080.352 1 0.00 550-6270-755951-Water Res Seismic Upgrade 52,270 0.00 0.00 MG 0.00% 0 0.00 550-6270-757012-Menlor Tank Recirc 39,132 0.00 0.00 MG 0.00% 0 0.00 Total $10,206,248 $10,1 14.846 3.00 Table 14:Allocation of Pump Stations Expansion Costs Percent Cost for Total Project Expansion Expansion Cost of Expansion Description Tigard Costs($) Capacity Capacity Capacity Units Capacity Capacity Project Group Added Capacity New Pump Station-Siting Study 50,000 3.800.00 0.00 gpm 0.00% 0 1 0.00 New Pump Station-Design 255,000 3,800.00 0.00 gpm 0.00% 0 1 0.00 New Pump Station-Construction Year 1(67%) 963,000 3,800.00 0.00 gpm 0.00% 0 1 0.00 New Pump Station-Construction Year 2(33%) 481,000 3,800.00 0.00 gpm 0.00% 0 1 0.00 Total $1,749,000 $0 0.00 Table 15:Allocation of 550-530 Intertie Expansion Costs Per Cost for Total Project Expansion Expansion Cost of Expansion Description Tigard Costs($ Ca aci Ca achy Capacity Units Ca acih' Ca acii\ Project Grou Added Capacity Pipeline connecting 550G and 530 Zones-Design 197,000 3,136.00 442.80 gpm 14.12% 27,816 1 442.80 Pipeline connecting 550G and 530 Zones-Constructio 1,770MO 3,136.00 442.80 gpm 14.12% 249,924 1 0.00 Total $1,967,000 $277,740 442.80 Table 16:Allocation of Transmission&Distribution Ex ansion Costs Percent Cost for Total Project Expansion Expansion Cost of Expansion Description Tigard Costs($) Ca aci Ca acitV Capacity Units Capacity Ca achy Project Group Added Capacity Pipeline for installing PRV 550G-4 17,000 0.00 0.00 EDU 0.00% 0 0.00 Pipeline in Main St.&Tigard Ave. 101,000 0.00 0.00 EDU 0.00% 0 0.00 Total $118,000 $0 0.00 Table 17:Allocation of Administrative Facilities Ex ansion Costs Percent Cost for Total Project Expansion . Expansion Cost of Expansion Description Tigard Costs($) Capacity Ca acity Capacity Units Capacity Capacity Project Group Added Capacity Total $0 $0 0.00 Table 18:Allocation of Field O s.Expansion Costs Percent Cost for Total Project Expansion Expansion Cost of Expansion Description Tigard Costs($ Capacity Capacity Capacity Units Capacity Capacity Project Group Added Capacity Total $0 $0 0.00 Table 19.Allocation of Future Willamette Su Iv Ex ansion Costs Percent Cost for Total Project TEpct3nTCapacit), Expansion Cost of Expansion Description Tigard Costs($ Capa Units Ca achy Capacity Project Group Added Capacity Total $0 $0 0.00 Table 20:Allocation of Exclude from SDC Expansion Costs Percent Cost for Total Project Expansion Expansion Cost of Expansion Description Tigard Costs($) Capacity Capacity Capacity Units Capacity Capacity Project Group Added Capacity 550-6270-755970- 7,052 0.00 0.00 0 0.00% 0 0.00 Total $7,052 $0 0.00 Table 21: Calculation of Im ro_ment Fee Totals Capacity Available for Improvement Fee System Component Growth Total Groundwater/ASR 0.0% $0 PWB Supply 0.0% 0 LO-Tigard 100.0% 43,373,878 Bonita Pump Station 0.0% 0 Water Storage 26.1% 10,1 14,846 Pump Stations 0.0% 0 550-530 Intertie 31.8% 277,740 Transmission &Distribution 0.0% 0 Administrative Facilities 0.0% 0 Field Ops. 0.0% 0 Future Willamette Supply 0.0% 0 Exclude from SDC 0.0% 0 Total $53,766,464 Table 22: System Capacities for System Improvements Additional Capacity from System Component Improvements Units Groundwater/ASR 0.0 MGD PWB Supply 0.0 MGD LO-Tigard 6.8 MGD Bonita Pump Station 0.0 MGD Water Storage 3.0 MG Pump Stations 0.0 gpm 550-5301ntertie 442.8 gpm Transmission& Distribution 0.0 EDU Administrative Facilities 0.0 EDU Field Ops. 0.0 EDU Future Willamette Supply 0.0 MGD Exclude from SDC 0.0 0 Table 23: New Ca acity Available for Growth Requirements per Additional EDUs System Component EDU Units Available Groundwater/ASR 0.0 gpd 0 PWB Supply 0.0 gpd 0 LO-Tigard 475.5 gpd 14,301 Bonita Pump Station 475.5 gpd 0 Water Storage 556.4 gallons 5,392 Pump Stations 473.7 gpd 0 550-530Intertie 0.1 gpm 5,845 Transmission&Distribution 1.0 EDU 0 Administrative Facilities 1.0 EDU 0 Field Ops. 1.0 EDU 0 Future Willamette Supply 0.0 gpd 0 Exclude from SDC 0.0 0 0 Table 24: Improvement Fee per EDU Proposed System Component Improvement SDC Groundwater/ASR $0 PWB Supply 0 LO-Tigard 3,033 Bonita Pump Station 0 Water Storage 490 Pump Stations 0 550-530 Intertie 15 Transmission& Distribution 0 Administrative Facilities 0 Field Ops. 0 Future Willamette Supply 0 Exclude from SDC 0 Total $3,538 Table 25: Proposed SDC by Meter or Service Line Size Meter or Service Line Size Reimbursement Improvement Total 5/8 x 3/4 Inch(I EDU) $2,936 $3,538 $6,474 1 Inch 7,831 9,438 17,269 1.5 Inch 23,479 28,298 51,777 2 Inch 38,126 45,950 84,076