Loading...
Resolution No. 10-51 CITY OF TIGARD, OREGON TIGARD CITY COUNCIL RESOLUTION NO. 10-51 I A RESOLUTION TO AMEND THE MASTER FEES AND CHARGES SCHEDULE AS ADOPTED BY RESOLUTION 10-30 TO INSTITUTE A FLAT FEE FOR ADMINISTRATION, REVIEW, AND INSPECTION OF PRESCRIPTIVE PHOTOVOLTAIC SOLAR SYSTEMS. WHEREAS, Oregon Administrative Rules 918-800-010 through 040, 918-050-180 requires all municipalities with Building Code programs to use a standard methodology for determining building permit fees for prescriptive solar photovoltaic systems;and WHEREAS,prescriptive solar photo-voltaic systems are those non-engineered systems as defined in the scope of the Oregon Solar Installation Specialty Code;and WHEREAS, the City does not have a building permit fee methodology for a flat fee that conforms with Oregon Administrative Rules 918-800-010 through 040, 918-050-180 for prescriptive solar photo-voltaic systems ;and WHEREAS, the Council finds that conformance with state law allows for the City to adopt permit fees for prescriptive solar photovoltaic systems;and WHEREAS, the City of Tigard desires to establish equitable permit fees that reflect the work required to complete the review and inspections;and WHEREAS, the City of Tigard has a Master Fees and Charges Schedule that was last adopted by Resolution 10-30 with later amendments. NOW,THEREFORE,BE IT RESOLVED by the Tigard City Council that: SECTION 1: The amended fees and charges are shown on the attached schedule (Exhibit A). SECTION 2: The revised fee schedule applies to applications submitted beginning October 1",2010. SECTION 3: This resolution is effective immediately upon passage. PASSED: This da 5- '— gf, � .bt­t_ 2010. 1\1ayor- ity o Tigard ATTEST: f MAIILIL City Recorder-City of Tigard RESOLUTION NO. 10 - Page 1 City of Tigard EXHIBIT A Fees and Charges Schedule Department Revenue Source Fee or Charge Effective Date COMMUNITY DEVELOPMENT-BUILDING Building Permit Fees (Commercial) 10/1/2009 Total Valuation: $0.00 to$500.00 $51.09 /minimum $500.01 to$2,000.00 $51.09 /for the first$500 and $2.69 /for each additional$100 or fraction thereof $2,000.01 to$25,000.00 $91.44 /for the first$2,000 and $10.76 /for each additional$1,000 or fraction thereof $25,000.01 to$50,000.00 $338.92 /for the first$25,000 and $8.06 /for each additional$1,000 or fraction thereof $50,000.01 to$100,000.00 $540.42 /for the first$50,000 and $5.38 /for each additional$1,000 or fraction thereof $100,000.01 and over $809.42 /for the first$100,000 and $4.49 /for each additional$1,000 or fraction thereof (Single Family&Multi-Family) 10/1/2009 Total Valuation: $0.00 to$2,000.00 $66.25 /minimum $2,000.01 to$25,000.00 $66.25 /for the first$2,000 and $11.48 /for each additional $1,000 or fraction thereof $25,000.01 to$50,000.00 $330.29 /for the first$25,000 and $8.75 /for each additional$1,000 or fraction thereof $50,000.01 to$100,000.00 $549.04/for the first$50,000 and $6.25 /for each additional$1,000 or fraction thereof $100,000.01 to$250,000.00 $861.54/for the first$100,000 and $4.46 /for each additional$1,000 or fraction thereof $250,000.01 to$500,000.00 $1,530.54/for the first$250,000 and $4.42/for each additional$1,000 or fraction thereof 1 City of Tigard EXHIBIT A Fees and Charges Schedule Department Revenue Source Fee or Charge Effective Date $500,000.01 to$1,000,000.00 52,635.54 /for the first$500,000 and $4.10/for each additional$1,000 or fraction thereof $1,000,000.01 to 52,000,000.00 $4,685.54/for the first$1,000,000 and $3.33 /for each additional$1,000 or fraction thereof $2,000,000.01 and over $8,015.54/for the first$2,000,000 and $3.18 /for each additional$1,000 or fraction thereof (Site Work/Grading) 10/1/2009 Total Valuation: $0.00 to$500.00 $51.09 /minimum $500.01 to$2,000.00 $51.09 /for the first$500 and $2.69 /for each additional$100 or fraction thereof $2,000.01 to$25,000.00 $91.44/for the first$2,000 and $10.76 /for each additional$1,000 or fraction thereof $25,000.01 to$50,000.00 $338.92 /for the first$25,000 and $8.06 /for each additional$1,000 or fraction thereof $50,000.01 to$100,000.00 $540.42/for the first$50,000 and $5.38 /for each additional$1,000 or fraction thereof $100,000.01 and over $809.42 /for the first$100,000 and $4.49 /for each additional$1,000 or fraction thereof (Single Family,Multi-Family,Commercial,&Industrial Building Permit Fee for Additions,Alterations,and Demolitions) 10/1/2009 Total Valuation: $0.00 to$500.00 $53.27 /minimum $500.01 to$2,000.00 $53.27 /for the first$500 and $3.39 /for each additional$100 or fraction thereof $2,000.01 to$25,000.00 $104.12/for the first$2,000 and $15.21 /for each additional$1,000 or fraction thereof $25,000.01 to$50,000.00 $453.95 /for the first$25,000 and $11.02 /for each additional$1,000 or fraction thereof 2 City of Tigard EXHIBIT A Fees and Charges Schedule Department Revenue Source Fee or Charge Effective Date S50,000.01 to$100,000.00 $729.45 /for the first$50,000 and $7.53 /for each additional$1,000 or fraction thereof $100,000.01 to$500,000.00 $1,105.95 /for the first$100,000 and $6.04/for each additional$1,000 or fraction thereof $500,000.01 to$1,000,000.00 $3,521.95 /for the first$500,000 and $5.09 /for each additional$1,000 or fraction thereof $1,000,000.01 and over $6,066.95 /for the first$1,000,000 and $3.39 /for each additional$1,000 or fraction thereof Building Plan Review Fee 65%of base building permit fee 9/26/2000 Deferred Submittals $200.00 minimum fee 9/24/2002 Plan Review 65%of building permit fee based on valuation of the particular portion or portions of the project. Electrical Fees 10/1/2009 New residential,single or multi-family per dwelling unit;service included: 1000 square feet or less $168.54 Each additional 500 square feet or portion thereof $33.92 Limited energy,residential or multi-family $75.00 (with above sq ft) Each manufactured home or modular dwelling service or feeder $67.84 Services or feeders;installation,alterations or relocation: 200 amps or less $100.70 201 amps to 400 amps $133.56 401 amps to 600 amps $200.34 601 amps to 1000 amps $301.04 Over 1000 amps or volts $552.26 Reconnect only $67.84 Temporary services or feeders;installation,alteration or relocation: 200 amps or less $59.36 201 amps to 400 amps $125.08 401 amps to 600 amps $168.54 Branch circuits;new,alteration or extension per panel: With purchase of service or feeder-each branch circuit $7.42 Without purchase of service or feeder First Branch Circuit $56.18 3 City of Tigard EXHIBIT A Fees and Charges Schedule Department Revenue Source Fee or Charge Effective Date Each addit.Branch circuit S7.42 Miscellaneous(service or feeder not included): Each pump or irrigation circuit $67.84 Each sign or outline lighting $67.84 Signal circuit(s)or a limited energy panel,alteration or extension $75.00 Each additional inspection over the allowable in any of the above Per Inspection $66.25 /hour(min 1 hour) Per Hour $66.25 /hour(inin 1 hour) Industrial Plant Inspection $78.18 /hour(min 1 hour) Electrical permit plan review fee 25"'o of the electrical permit fee Fire Life Safety Plan Review 40%of base building permit fee 9/26/2000 (Commercial Only) Manufactured Dwelling Installation $305.50 9/24/2002 Manufactured Dwelling and Mobile Home Per OAR 9/24/2002 Parks,Recreation Camps,and Organizational Camps Mechanical Fees 10/1/2009 (1&2 Family Dwellings for New,Additions,or Alterations) Heating/Cooling- ,Air eating/CoolingAir conditioning $46.75 Furnace 100,000 BTU(ducts/vents) $46.75 Furnace 100,000+BTU(ducts/vents) $54.91 bleat pump $61.06 Duct work $23.32 Hydronic hot water system $23.32 Residential boiler(radiator or hydronic) $23.32 Unit heaters(fuel-type,not electric), in-wall,in duct,suspended,etc. $46.75 Flue/vent for any of above $23.32 Other $23.32 Other fuel appliances: Water heater $23.32 Gas fireplace $33.39 Flue/vent for water heater or gas fireplace $23.32 Log lighter(gas) $23.32 Wood/pellet stove $33.39 Wood fireplace/insert $23.32 Chimney/liner/flue/vent $23.32 4 City of Tigard EXHIBIT A Fees and Charges Schedule Department Revenue Source _. _ Fee or Charge Effective Date Other $23.32 Environmental exhaust and ventilation: Range hood/other kitchen equipment $33.39 Clothes dryer exhaust $33.39 Single-duct exhaust(bathrooms, toilet compartments,utility rooms) $23.32 Attic/crawlspace fans $23.32 Other $23.32 Fuel piping: First four $14.15 Each additional $4.03 Minimum permit fee $90.00 Mechanical plan review fee 25%of Permit Fee Mechanical Permit Fees 10/1/2009 (Commercial and Multi-family) Total Valuation: $0.00 to$500.00 $69.06 /minimum $500.01 to$5,000.00 $69.06 /for the first$500 and $3.07 /for each additional$100 or fraction thereof $5,000.01 to$10,000.00 $207.21 /for the first$5,000 and $2.81 /for each additional$100 or fraction thereof $10,000.01 to$50,000.00 $347.71 /for the first$10,000 and $2.54 /for each additional$100 or fraction thereof $50,000.01 to$100,000.00 $1,363.71 /for the first$50,000 and $2.49 /for each additional$100 or fraction thereof $100,000.01 and over $2,608.71 /for the first$100,000 and $2.92 /for each additional$100 or fraction thereof Plan Review 25%of permit fee 9/24/2002 Phase Permitting $200.00 9/24/2002 Plan Review 10%of total project building permit fee not to exceed$1,500 for each phase Plumbing Fees 10/1/2009 (Commercial,Industrial,Residential,&Multi-Family) New One&Two Family Dwellings 1 bath $312.70 5 City of Tigard EXHIBIT A Fees and Charges Schedule Department Revenue Source - - Fee or Charge Effective Date 2 bath $437.78 3 bath $500.32 Each additional bath/kitchen fixture $25.02 Site Utilities Catch basin or area drain $18.76 Drywell,leach line,or trench drain $18.76 Footing drain,first 100' $50.03 Each additional 100'or part thereof (footing drain) $37.52 Manufactured home utilities $50.03 Manholes $18.76 Rain drain connector $18.76 Sanitary sewer,first 100' $62.54 Storm sewer,first 100' $62.54 Water service,first 100' $62.54 Each additional 100'or part thereof (sanitary,storm,water service) $37.52 Fixture or Item Backflow preventer $31.27 Backwater valve $12.51 Clothes washer $25.02 Dishwasher $25.02 Drinking fountain $25.02 Ejectors/sump $25.02 Expansion tank $12.51 Fixture/sewer cap $25.02 Floor drain/floor sink/hub $25.02 Garbage disposal $25.02 Hose bib $25.02 Ice maker $12.51 Interceptor/grease trap $25.02 Medical gas(value:$ ) see table Primer $12.51 Roof drain(commercial) $12.51 Sink/basin/lavatory $25.02 Solar units(potable water) $62.54 Tub/shower/shower pan $12.51 Urinal $25.02 Water closet $25.02 Water heater $37.52 Water Piping/DWV $56.29 Other: $25.02 Minimum permit fee $72.50 6 City of Tigard EXHIBIT A Fees and Charges Schedule Department Revenue Source Fee or Charge Effective Date Plumbing plan review 25"'o of permit fee Medical Gas Systems 9/24/2002 Total Valuation: $1 -$5,000 $72.50 /minimum $5,001-$10,000 $72.50 /for the first$5,000 and $1.52 /for each additional$100 or fraction thereof,to and including$10,000. $10,001-$25,000 $148.50 /for the first$10,000 and $1.54 /for each additional$100 or fraction thereof,to and including$25,000. $25,001 -$50,000 $379.50 /for the first$25,000 and $1.45 /for each additional$100 or fraction thereof,to and including$50,000. $50,001 and up $742.00 /for the first$50,000 and $1.20 /for each additional$100 or fraction thereof. Residential Fire Suppression Systems Permit 10/1/2009 Multipurpose or Continuous Loop System Square Footag_e:. 0 to 2,000 $121.90 2,001 to 3,600 $169.60 3,601 to 7,200 $233.20 7,201 and greater $327.54 Stand Alone System Square Footage: 0 to 2,000 $198.75 2,001 to 3,600 $246.45 3,601 to 7,200 $310.05 7,201 and greater $404.39 Commercial Fire Suppression Systems Permit 10/1/2009 Based on anlreation-Use New Commercial Building Fee Table Restricted Ener Qv 6/27/2000 Residential Energy Use,for all systems combined $75.00 Commercial Energy Use,for each system $75.00 7 City of Tigard EXHIBIT A Fees and Charges Schedule Department Revenue Source Fee or Charge Effective Date Sanitary Sewer Inspection Fee 6/6/2000 Residential $35.00 Commercial $45.00 Industrial $75.00 Miscellaneous Fees Address Change $50.00 7/1/2007 Fee paid inspections for residential structures pursuant to Title 14,Chapter 16 6/27/2000 Single&Two Family Dwellings $100.00 Apartment Houses&Social Care Facilities $160.00 /plus$7 for each dwelling unit in excess of 3 Hotels $160.00 /plus$5 for each dwelling unit in excess of 5 Information Processing&Archiving(IPA)Fee $2.00 /sheet larger than 11"X 17" 7/1/2010 $0.50 /sheet 11"X 17"and smaller Investigation Fee Additional fee to equal to the amount of the permit ',/1/2007 Prescriptive Solar Photo-Voltaic Installations $180.00 10/1/2010 Phased Occupancy $200.00 6/27/2000 Permit or Plan Review Extension $90.00 Temporary Occupancy $90.00 Other Inspections&Fees: 1. Inspections outside of normal business hours 10/1/2009 (miiumum charge-2 hours) $90.00 per hour 2 Reinspection fees $90.00 per hour 10/1/2009 3. Inspections for which no fee is specifically 10/1/2009 indicated(minimum charge:one-half hour) $90.00 per hour 4. Additional plan review required by changes, 10/1/2009 additions or revisions to plans(minimum charge:one-half hour) $90.00 per hour 8