Resolution No. 10-30 CITY OF TIGARD, OREGON
TIGARD CITY COUNCIL
RESOLUTION NO. 10-,30
A RESOLUTION ADOPTING THE CITYWIDE MASTER FEES AND CHARGES SCHEDULE-
WHICH REPLACES RESOLUTION NO. 09-313. AND ALL SUBSEQUENT AMENDMENTS TO
DATE.
WHEREAS,the City of Tigard has a Master Fees and Charges Schedule;and
WHEREAS,City staff has reviewed fees and services provided;and
WHEREAS, City staff has proposed a few nein fees and changes to certain fees to recover costs or due to
previously approved annual adjustment formulas;and
WHEREAS, the City's Master Fees and Charges Schedule includes fees set by other agencies;and
WHEREAS, Tigard Municipal Code (TMC) 3.32.050 requires that the City Council review fees and charges
annually.
NOW,THEREFORE,BE IT RESOLVED by the Tigard City Council chat:
SECTION 1: The fees and charges for the City of Tigard are enumerated and set as shown in the
attached schedule (Exhibit A).
SECTION 2: This resolution is effective July 1, 2010.
GG
PASSED: This day of / 2010.
/—� , Z. / '/
Ma- C-Citjr of Tigard
ATTEST:
1 "
City Recorder- City of Tigard
i
RESOLUTION NO. 10-�? o
Page 1
City of Tigard, Oregon
Master Fees & Charges Schedule
Fiscal Year 2010-2011
TIG
i
` i
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source _ Fee or Charge Effective Date,
CITY ADMINISTRATION
Claims Application Fee $1,000.00 /deposit* 11/28/2000
*Application fee shall be actual cost incurred by the City to process application.
Any funds remaining from the deposit after the application has been processed will be
refunded to the applicant,and applicant shall be responsible for any additional costs incurred.
Meetine Ream- ervs677,11,12084
First time-Efrl out $50.00
Seeafl
—a one-}exrpetie S BB
a one year P &-suepe rsi
en Pee ¢,
Gleaning Depa5k C 1B
Libraty erft X004
l-eem RmB
Group 1 ,eke
Gfetlp 40:9B A'heuf
Grsop-3 $50.00 ,'hour
Pantry Rental
Grp 1 $5_-w fketL_
Gre"s2 $5-90 ¢kettf
Gfeup 3 $5_-Go 4heuf
Equipment Rentfil
Satind System with Mierephofte 18.0()
$110-00
4A1 with g;gD $1-B.Be
Stege Ligl $10.00
Group 1• $5:88 41ow
Gi-aup 2 $1().99 Ahern
Grattp 3 $15.00 Aheur
Red Rar=k Greek GaRfer-ffiee44�&efft 7,11,12003
Gfeup 1 SS.BB 4etif
GEOUP? $10.00 4hOtff
Grp 3 P1� Aletrr
Ries.:-aIM.Bfewtrdifetti
2
City of Tigard EXHIBIT A
Fees and Charges Schedule
DeQarl�ment Revenue Source Fee or Charge Effective Date
- Greup 1 �1�- 9 Aiettr --
Grettp 2 $17.00 4ieur
Group 3 6.22.0 Aleiff
Gr-eup 1 p5$B 4hetbr
Gfeup 2 $-2"a 4etif
Greup35=88hetrr
Gr-eup 1 $4"9 fkettr
6f-aup 2 $1-5.00 AIOUF
Greup 3 X20=88 fil et
Sethai G._..._Glass_ao or Graft n__—
Group 10 >
Greup-2 00 4hear
Group 3 $IS.()8 {lieur
Tew,1.4 11
Group 1 Cid
Gr-6 p-3 $15,00 4heur
0 4hati.-
WitteF
Lobby ccz
. n
mvrsz
Greup 1- $5:00
Group-? sI-9-98 4he,±r
Grettp-3 9B eke
Municipal Court Fees
Civil Compromise $150.00 4/10/2003
Traffic School and Compliance Program Fee
Criminal $150.00 4/10/2003
juvenile non-traffic $75.00 4/10/2003
Traffic School Equal to the relevant fine provided for the 5/25/2006
violation in the Violations Bureau Fine Schedule
Traffic School Setover $20.00 4/10/2003
License Reinstatement '$15.00 4/10/2003
Payment Agreement Administrative Fee $15.00 4/10/2003
Overdue Payment Letter $10.00 4/10/2003
Show Cause Hearings-Court Costs 4/10/2003
Non-compliance $25.00
Non-payment-fees paid prior
to hearing No Fee
3
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effective Date,
Warrant Fee $50.00 4/10/2003
Public Assembly 8/25/1970
Application Fee
Persons Reasonably Anticipated
1,000 to 2,499 $100.00
2,500 to 4,999 $150.00
5,000 to 9,999 $500.00
10,000 to 49,999 $1,000.00
50,000 and over $1,500.00
Tigard Municipal Code (TMC (Titles -1-17)or TMC/CDC (Titles 1-18)
Compact Disk(CD) $10.00 7/1/2009
4
City of Tigard EXHIBIT A
Fees and Charges Schedule
,Department Revenue Source Fee or Charge Effective Date
CITYWIDE
Attorney Time Current attorney billing rate 1999
Audiotapes $6.00 7/l/2003
Computer disk or Compact disk $10.00 7/1/2006
DVD CoRies (Non-Police $12.00 7/1/2006
Faxes for Public $2.00 /first page 7/1/2007
$1.00 /each additional page
FireQrant-Fle-�---t, $325.00 y^ 995
Microfiche Copies $1.00 /sheet up to 50 sheets plus 7/1/2007
staff time
Microprints $0.25 /8-1/2 x 11 page 2000
$1.00 /I1 x 17 page 7/1/2009
Nomination Petition Fee $50.00 7/1/2008
Photocopies&Microfilm Co ies
8-1/2 x 11 $0.25 /page 1999
11 x 14 $0.50 /page 1999
11 x 17 $1.00 /page 7/1/2005
17 x 24 $1.50 /page 7/1/2007
36 x 36 $0.50 /page 7/1/2007
Photographs Actual Cost 1999
Recording of Documents Actual Cost 1999
Research Fee Staff hourly rate+ Citywide Overhead 2/7/2002
Fee+Materials
VHS Copies (Non-Police Actual Costs 7/1/2009
5
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effective Date
FINANCIAL&INFORMATION SERVICES
Assessment Assumption $50.00 4/22/1985
Budget Document
Compact Disk(CD) $10.00 7/1/2007
Paper $50.00
Business License
Annual Fee*
0-2 employees $79.50 /per year 7/1/2009
3-5 employees $106.00 /per year 7/1/2009
6-10 employees $347.00 /per year 7/1/2009
11-50 employees $571.00 /per year 7/1/2009
51 or more employees $776.00 /per year 7/1/2009
*-Adjusted annually in conjunction with the Portland Consumer Price Index(CPI)
Pro-Rated Fee Schedule
Issued January 1 -June 30 See Fee Schedule above
Issued July 1 -December 31 1/2 the annual fee
Temporary License $25.00 1/1/2008
Duplicate License/Change of Ownership Fee
Change in ownership or name only $10-00 1/1/2008
Copy/replacement of license $10.00 1/1/2008
Delinquency Charge
Whenever the business license fee is not paid on or before the delinquent date,a delinquency charge
equal to ten percent(109/6)of the original business license fee due and payable shall be added for each
calendar month or fraction thereof that the fee remains unpaid. The total amount of the delinquency
penalty for any business license year shall not exceed one hundred percent(100%)of the business license
fee due and payable for such year.
Comprehensive Annual Financial Report $0.00 2/7/2002
Franchise Fee(See TMC 15.06&ROW Usage Fee Belowl
Cable TV 5%of gross revenue 1/26/1999
Electricity 35%of gross revenue 2/23/1993
6
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effective Date
Natural Cas 5%of gross revenue 7/13/2004
Telecommunication 5%of gross revenue or$2.90/linear foot of installation 8/8/2006
(Includes telecorunru�ucatiou uttltties, in right-of-way,whichever is greater
long distance providers,private neiwonkr
and competitive access praviders)
Telecommunication Franchise Application Fee $2,000.00 1/23/2001
Solid Waste Disposal(See TMC 11.04) 4%of gross revenue 1/1/2006
Lien Search Fee $35.00 2/1/2004
Overhead Fee
Added to charges for property damage/repair 10%of total charge
Passport-Execution Fee $25.00 2/1/2008
Passport Photographs Fee $10.00 4/1/2007
Returned Check Fee $20-00 10/9/2001
Right-of-Way Usa=Fee See TMC 15.06 and Franchise Fee Ahove 9/8/2006
Electricity 3.5%of gross revenue or
$2.90/linear foot of installation in right-of-way,whichever is greater
Natural Gas 5%of gross revenue or
$2.90/linear foot of installation in right-of-way,whichever is greater
Sanitary Sewer 5%of gross revenue or
$2.90/linear foot of installation in right-of-way,whichever is greater
Telecommunication 5%of gross revenue or
$2.90/linear foot of installation in right-of-may,whichever is greater
Water 5%of gross revenue or
$2.90/linear foot of installation in right-of-way,whichever is greater
7
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effective I Date
LIBRARY
Collection Agency Fee $10.00 7/1/2007
Disk or CD (Blank) $1.00 2/7/2002
Headphones $2.00 7/1/2007
Lost Items Replacement cost+$5.00 processing fee 7/1/2003
Overdue Items
Daily Charge(All Items except D\rDs) $0.15 /item 7/1/2003
Daily Charge(DVDs) $1.00 /item 7/1/2005
Maximum Charge $5.00 /item 7/1/2005
Public Copier and Printer Charges $0.10 /page 2001
Replacement Library Card Fee $1.00 7/1/2007
8
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effective Date
POLICE
Alarm Permits
Burglary or Robbery $25.00 7/1/2009
Combination Bti�-glfi $25-.09 6,1-28,1198
Explorer Post Annual Fee $20.w :7,fl,12008
Failure to Obtain or Renew Alarm Permit Fee $25.00 6/28/1982
False Alarm Charge 7/1/2003
3rd false alarm $50.00
4th false alarm $75.00
5th false alarm $100.00
6 or more false alarms $150.00
Law Enforcement Officers Safety Act Qualification Fee $25.00 7/1/2006
Liquor License $25.00 7/10/2001
Police Services Fees
DVD and VHS Evidence Copies Actual staff costs plus materials 7/1/2005
Police Documents/Reports $10.00 /for the first 15 pages:and 7/1/2008
$0.30 /page thereafter
Police Digital Photo CD Copies $10-00 /CD 7/1/2005
Police Photograph Copies $10.00 /roll 7/1/2003
PropeM Forfeiture for Criminal AcfiD�y Varies 5/25/1999
Second Hand Dealers and Transient Merebant License
Occasional $40.00 4225-00 7/1/?-989 2010
lull-Time $100.00 $75.08 7/1/2-9B9 2010
Reporting Forms $0.80 X9-49 each 7/1/210W 2010
Vehicle Release Fee $100.00 7/1/2007
9
City of Tigard EXHIBIT A
Fees and Charges Schedule
`De artment Revenue Source Fee or Charge Effective Date
COMMUNITY DEVELOPMENT-BUILDING
Buildin Permit Fees
(Commercial) 10/1/2009
Total Valuation:
$0.00 to 5500.00 $51.09 /minimum
5500.01 to$2,000.00 $51.09 /for the first$500 and
$2.69 /for each additional$100 or fraction thereof
52,000.01 to$25,000.00 591.44 /for the first$2,000 and
S10.76 /for each additional 51,000 or fraction thereof
$25,000.01 to$50,000.00 $338.92 /for the first$25,000 and
58.06 /for each additional$1,000 or fraction thereof
$50,000.01 to$100,000.00 $540.42 /for the first$50,000 and
$5.38 /for each additional$1,000 or fraction thereof
$100,000.01 and over $809.42 /for the first 5100,000 and
54.49 /for each additional$1,000 or fraction thereof
(Single Family&Multi-Family) 10/1/2009
Total Valuation:
$0.00 to 52,000.00 $66.25 /minimum
$2,000.01 to 525,000.00 $66.25 /for the first$2,000 and
$11.48 /for each additional$W0$1,000 or fraction thereof
$25,000.01 to$50,000.00 $330.29 /for the fust$25,000 and
$8.75 /for each additional 51,000 or fraction thereof
$50,000.01 to$100,000.00 $549.04 /for die first$50,000 and
$6.25 /for each additional$1,000 or fraction thereof
5100,000.01 to$250,000.00 $861.54 /for the first$100,000 and
$4.46 /for each additional$1,000 or fraction thereof
$250,000.01 to$500,000.00 $1,530.54 /for the first$250,000 and
54.42 /for each additional$1,000 or fraction thereof
$500,000.01 to$1,000,000.00 52,635.54 /for the first$500,000 and
10
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee ar Charge Effective Date
$4.10 /for each additional$1,000 or fraction thereof
$1,000,000.01 to$2,000,000.00 $4,685.54 /for the first$1,000,000 and
$3.33 /for each additional$1,000 or fraction thereof
S2,000,000.01 and over S8,015.54 /for the first$2,000,000 and
$3.18 /for each additional 51,000 or fraction thereof
(Site Work/Grading) 10/1/2009
Total Valuation:
$0.00 to$500.00 $51.09 /minimum
$500.01 to$2,000.00 $51.09 /for the first 5500 and
$2.69 /for each additional$100 or fraction thereof
$2,000.01 to 525,000.00 $91.44/for the first 52,000 and
$10.76 /for each additional S1,000 or fraction thereof
1
S25,000.01 to 550,000.00 $338.92 /for the first$25,000 and
58.06 /for each additional 51,000 or fraction thereof 0
550,000.01 to$100,000.00 $540.42 /for the first$50,000 and
55.38 /for each additional$1,000 or fraction thereof
5100,000.01 and over $809.42 /for the first 5100,000 and
54.49 /for each additional$1,000 or fraction thereof
Single Family,Multi-FamiIy_,Commercial,,&Industrial Building Permit Fee
for Additions,Alterations,and Demolitionsl 10/1/2009
Total Valuation:
50.00 to$500.00 $53.27 /minimum
$500.01 to 52,000.00 $53.27 /for the first$500 and
$3.39 /for each additional$100 or fraction thereof
$2,000.01 to S25,000.00 $104.12 /for the first 52,000 and
S15.21 /for each additional 51,000 or fraction thereof
$25,000.01 to$50,000.00 $453.95 /for the fust$25,000 and
511.02 /for each additional 51,000 or fraction thereof
$50,000.01 to S100,000.00 5729.45 /for die first 550,000 and
11
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source __ Fee or Charge _ Effective Date
57.53 /for each additional$1,000 or fraction thereof
5100,000.01 to$500,000.00 $1,105.95 /for the fust 5100,000 and
$6.04 /for each additional$1,000 or fraction thereof
$500,000-01 to$1,000,000.00 $3,521.95 /for the first$500,000 and
55.09 /for each additional$1,000 or fraction thereof
$1,000,000.01 and over $6,066.95 /for the first 51,000,000 and
$3.39 /for each additional$1,000 or fraction thereof
Building Plan Review Fee 65%of base building permit fee 9/26/2000
Deferred Submittals 5200.00 minimum fee 9/24/2002
Plan Review 65%of building permit fee based on valuation
of the particular portion or portions of the project.
Electrical Fees 10/1/2009
New residential,single or multi-family per dwelling unit;service included:
1000 square feet or less $168.54
Each additional 500 square
feet or portion thereof $33.92
Limited energy,residential or multi-family 575.00 $67.84—
(with above sq ft)
Each manufactured home or
modular dwelling service or feeder 567.84
Services or feeders;installation,alterations or relocation:
200 amps or less $100.70
201 amps to 400 amps 5133.56
401 amps to 600 amps $200.34
601 amps to 1000 amps $301,04
Over 1000 amps or volts $552.26
Reconnect only $67.84
Temporary services or feeders;installation,alteration or relocation:
200 amps or less 559.36
201 amps to 400 amps $125.08
401 amps to 600 amps $168.54
Branch circuits;new,alteration or extension per panel:
With purchase of service or
feeder-each branch circuit 57.42
Without purchase of service or feeder
First Branch Circuit 556.18
Each addit.Branch circuit 57.42
12
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effective Date;
Miscellaneous(service or feeder not included): T
Each pump or irrigation circuit 567.84
Each sign or outline lighting 567.84
Signal circuit(s)or a limited
energy panel,alteration or extension 575.00 $67,81
Each additional inspection over
the allowable in any of the above
Per Inspection 566.25 /hour(min 1 hour)
Per Hour $66.25 /hour(min 1 hour)
Industrial Plant Inspection $78.18 /hour(min 1 hour)
Electrical permit plan review fee 25%of the electrical permit fee
Fire Life Safety Plan Review 40%of base building permit fee 9/26/2000
1Commercial.OnW
Manufactured Dwelling Installation $305.50 9/24/2002
Manufactured Dwelling and Mobile Home Per OAR 9/24/2002
Parks,Recreation Camps,and Organizational Camps
Mechanical Fees 10/1/2009
(1&2 Family Dwellings for New,Additions,or Alterations)
Heating/Cooling:
Air conditioning 546.75
Furnace 100,000 BTU(ducts/vents) $46.75
Furnace 100,000+BTU (ducts/vents) $54.91
Heat pump $61.06
Duct work $23.32
Hydronic hot water system $23.32
Residential boiler(radiator or hydropic) $23.32
Unit heaters(fuel-type,not electric),
in-wall,in duct,suspended,etc. $46.75
Flue/vent for any of above $23.32
Other $2332
Other fuel appliances:
Water heater $23.32
Gas fireplace $33.39
Flue/vent for water heater or gas fireplace 523.32
Log lighter(p. ) $23.32
Wood/pellet stove $33.39
Wood fireplace/insert 523.32
Chimney/liner/flue/vent $23.32
Other $2332
13
City of Tigard EXI IIBIT A
Fees and Charges Schedule
"Department Revenue Source Fee or Charge _ _ — Effective Date
Environmental exhaust and ventilation:
Range hood/other kitchen equipment $33.39
Clothes dryer exhaust $33.39
Single-duct exhaust(bathrooms,
toilet compartments,utility rooms) $23.32
Attic/crawlspace fans $23.32
Other $23.32
Fuel piping:
First four $14.15
Each additional 54.03
Minimum permit fee 590.00
Mechanical plan review fee 25%of Permit Fee
Mechanical Permit Fees 10/l/2009
(Commercial and Multi-family)
Total Valuation:
$0.00 to$500.00 $69.06 /minimum
$500.01 to$5,000.00 $69.06 /for the first$500 and
$3.07 /for each additional 5100 or fraction thereof
$5,000.01 to$10,000.00 $207-21 /for the first$5,000 and
$2.81 /for each additional$100 or fraction thereof
$10,000.01 to$50,000.00 $347.71 /for the first$10,000 and
$2.54 /for each additional$100 or fraction thereof
$50,000.01 to$100,000.00 $1,363.71 /for the first$50,000 and
$2.49 /for each additional$100 or fraction thereof
$100,000.01 and over $2,608.71 /for the first 5100,000 and
S2.92 /for each additional$100 or fraction thereof
Plan Review 25%of permit fee 9/24/2002
Phase Permitting $200.00 9/24/2002
Plan Review 10%of total project building permit fee
not to exceed$1,500 for each phase
Plumbing Fees 10/1/2009
(Commercial,Industrial,Residential,&MuIti-Family)
New One&Two Family Dwellings
1 bath 5312.70
2 bath S437-78
14
City of Tigard EXHIBIT A
Fees and Charges Schedule
!Department Revenue Source Fee or Charge Effective Date
3 bath 5500.32
Each additional bath/kitchen fixture 525.02
Site Utilities
Catch basin or area drain 518.76
Dgywell,leach line,or trench drain 518.76
Footing drain,first 100' $50.03
Each additional 100'or part thereof
(footing drain) 537.52
Manufactured home utilities $50.03
Manholes $18.76
Rain drain connector 518.76
Sanitary sewer,first 100' $62.54
Storm sewer;fust 100' 562.54
Water service,first 100' $62.54
Each additional 100'or part thereof '
(sanitary,storm,water service) $37.52
Fixture or Item
Backflow preventer 531.27
Backwater valve $12.51
Clothes washer $25.02
Dishwasher 525.02
Drinking fountain $25.02
Ejectors/sump $25.02
Expansion tank $12.51
Fixture/sewer cap $25.02
Floor drain/floor sink/hub 525.02
Garbage disposal 525.02
Hose bib $25.02
Ice maker 512.51
Interceptor/grease trap $25.02
Medical gas(value:S ) see table
Primer $12.51
Roof drain(commercial) $12.51
Sink/basin/lavatory $25.02
Solar units(potable water) 562.54
Tub/shower/shower pan $12.51
Urinal 525.02
Water closet $25.02
Water heater $37.52
Water Piping/DWV $56.29
Other: $25.02
Minimum permit fee $72.50
Plumbing plan review 25%of permit fee
15
City of Tigard EXI HBIT A
Fees and Charges ScheduIe
Department Revenue Source Fee or Charge Effective Date:
Medical Gas Systems 9/24/2002
Total Valuation:
$1 -S5,000 $72.50 /minimum
$5,001 -S10,000 S72.50 /for the first S5,000 and
$1.52 /for each additional$100 or fraction
thereof,to and including$10,000.
S10,001-S25,000 $148.50 /for the fust$10,000 and
$1.54 /for each additional$100 or fraction
thereof,to and including$25,000.
$25,001 -S50,000 5379.50 /for the first$25,000 and
$1.45 /for each additional Sl 00 or fraction
thereof,to and including$50,000.
$50,001 and up $742.00 /for the first$50,000 and
$1.20 /for each additional$100 or fraction thereof.
Residential Fire Suppression Systems Permit 10/1/2009
Multipurpose or Continuous Loop System
Square Footage:
0 to 2,000 $121.90
2,001 to 3,600 $169.60
3,601 to 7,200 $233-20
7,201 and greater $327.54
Stand Alone System
Square Footage:
0 to 2,000 5198.75
2,001 to 3,600 $246.45
3,601 to 7,200 $310.05
7,201 and greater $404.39
Commercial Fire Suppression 5ystems Permit 10/1/2009
Bared an nalnation-Use New Comwereial Building Fee Table
Restricted Ener ev 6/27/2000
Residential Energy Use,for all systems combined $75.00
Commercial Energy Use,for each system $75.00
Sanitary Sever Inspection Fee 6/6/2000
16
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effective Date,
Residential $35.00
Commercial $45.00
Industrial 575.00
Miscellaneous Fees
Address Change $50.00 7/1/2007
Fee paid inspections for residential structures pursuant to Title 14,Chapter 16 6/27/2000
Single&Two Family Dwellings $100.00
Apartment Houses&Social
Care Facilities $160.00 /plus$7 for each dwelling unit in excess of 3
Hotels $160.00 /plus S5 for each dwelling unit in excess of 5
Information Processina&Archiving PA Fee 52.00 /sheet larger than 11"X 17" 7/1/2010
50.50 /sheet 11"X 17"and smaller
Investigation Fee Additional fee to equal to the amount of the permit 7/1/2007
Re iaapeetie�t
Bailer: g 562-59 9,t24,12002
Meehatt4c d 86-2.5
Plumbitig $612.50
L4eeteieftl $62.59
Phased Occupancy 5200.00 6/27/2000
Permit or Plan Review Extension 590.00 $72.5
Temporary Occupattcy $90.00
Other Inspections&Fees:
1. Inspections outside of normal business hours 10/1/2009
(minimum charge-2 hours) 590.00 per hour
2 Reinspection fees 590.00 per hour 10/1/2009
3. Inspections for which no fee is specifically 10/1/2009
indicated(minimum charge:one-half hour) $90.00 per hour
4. Additional plan review required by changes, 10/1/2009
additions or revisions to plans(minimum
charge:one-half hour) $90.00 per hour
17
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department - _ Revenue Source - m -— - - Fee or Charge -- - -- - - - Effective Date,
COMMUNITY DEVELOPMENT-DEVELOPMENT SERVICES ENGINEERING
Erosion Control Permit Fee 10/29/2003
(City receives none of this fee)
Less than$50,000.00 $26.00
$50,000.00 to$100,000.00 $40.00
More than$100,000.00 $40.00 /+$24.00 for each additional$100,000
or fraction thereof
Erosion Control Plan Check Fee 65%of inspection fee 10/29/2003
(City receives 50%of fee)
Fee In Lieu.Of Bicycle Striping 7/1/2004
8-inch white stripe $2.50 /linear foot of frontage
Bike lane legends $175.00 /each
Directional mini-arrows $100.00 /each
Mono-directional reflective markers $4.00 /each
Fee-In Lieu Of Undergrounding $35.00 /lineal feet of frontage 10/29/2003
Public 1~acili Im rovement Permit 2%plan review plus 7/1/2009
5%of estimated cost of public improvement with a 7/1/2005
$300 minimum
Streetli ht Energy&Maintenance Fee Based upon PGE Sch#91 Opt,"B" 2000
for the first two years costs
Traffic/Pedestrian Signs Cost of materials and labor 2/7/2002
18
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effective Date,
COMMUNITY DEVELOPMENT-DEVELOPMENT SERVICES PLANNING
AccessoW Residential Units $iN-90 $294.00 7/1/2999 2010
Annexation $2,920.09 $2,750.00 7/1/2099 2010
(As of July 1,2006 a moratorium on this fee was
in effect,per Resolution 08-12,duough
February 2009)
Appeal /
Directors Decision(Type II)to Hearings Officer 5250.00 7/1/2003
Expedited Review(Deposit) 5300.00 7/1/2003
Hearings Referee 5500.00 7/1/2003
Planning Commission/Bearing's Officer to
City Council $a-'536-49 $2,765.00 7/1/2999 2010
Approval Extension S?6{r99 $294.00 7/1/2999 2010
Conditional Use
Initial $5,245.00 $5,474.00 7/1/2909 2010
Major Modification �5'245.00 $5,474.00 7/1/2009 2010
Minor Modification 5579:99 $599.00 7/1/2999 2010
Design Evaluation Team(DET)
Recommendation de osis S1,298.09 $1,529.00 7/1/2-99} 2010
Development Code Provision Review
Single-Family Building Plan X52.90 $73.00 7/1/2907 2010
Commercial/Industrial/Institution $332.00 $294.00 7/1/3999 2010
Downtown Review
Downtown Review Compliance Letter ec� $599.00 4,113,12010 7/1/2010
Downtown Design Administrative Review
Under 51,000,000.00 81,20mo $1,401.00 +0.004 x project valuation 4 {293-9 7/1/2010
$1,000,000.00 and over(max fee$$25,000.00) X9.99 $5,401.00 +0.002 x project valuation 4,143,1204-0 7/1/2010
Downtown Design Review-Design Review Board X3-89 $2,843.00 +applicable Type II fee 4,113,1294-0 7/1/2010
Expedited Review
Land paftitiaff 543£390
Sub divis ee &5-1 zo 7'-'-
glib divisi...._withS,'-,1.27.00 fsdditien
19
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source _Fee or Cham Effective Date:
Hearing Postponement 5261-00 $334.00 7/1/2909 2010
Historic Overlay/Review District
Historic Overlay Designation $4,281.00 7/1/2909 2010
Removal Historic Overlay Designation S1,^�8 $4,281.00 7/1/2-909 2010
Exterior Alteration in Historic Overlay District $Qi.88 $642.00 7/1/399} 2010
New Construction in Historic Overlay District $62-1.00 $642.00 7/1/3009 2010
Demolition in Historic Overlay District $621.00 $642.00 7/1/?889 2010
Home Occupation Permit
Type I $40.00 $101.00 7/1/2807 2010
Type II 5295.00 $599.00 7/1/?999 2010
Interpretation of the Community Development Code
Director's Interpretation $612-99 $599.00 7/1/2-009 2010
Appeal to City Council $2,536.00 $2,765.00 7/l/2-00t} 2010
�eplitFie�Fee aI-lighestplanning Pee+59"en of
=4I-A ditienal Fees Related to the Pfap&i-A-.
Land Partition
Residential and Non-Residential(3 Lots) $3,761.00 $3,962.00 7/1/2D09 2010
Residential and Non-Residential(2 Lots) X3;894:08 $3,295.00 7/1/22089 2010
Expedited c,,Q5-00 $4,623.00 7/1/=804 2010
Final Plat 9599.00 $920.00 7/1/a-GW 2010
Lot Line Adjustment s4K!.09 $599.00 7/1/39B9 2010
Minor Modification to an Approved PIan 6579,00 $599.00 7/1/2809 2010
Non-Conforming Use Confirmation 273-00 $599.00 7/1/?004 2010
Planned Development
Conceptual Plan Review $7,479.09 $7,752.00 7/1/20D9 2010
Detailed Plan Review(Concurrent Hearing) Applicable SDR Fee or Subdivision Fee+S200.00 $375.00 'y'�86 7/1/2010
Detailed Plan.Review(Separate Hearing) Applicable SDR Fee or Subdivision Fee+$2,13S.9 $2,313.00$2,313.00 12_ 4--/29006 7/1/2010
Plat NameChanae $274.90 $335.00 7/1/2909 2010
Pre-Application Conference $3=-3.00 $599.00 7/1/2904 2010
20
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effective Date
Sensitive Lands Review
With Excessive Slopes/Widisn Drainage Ways/ $599.00 7/1/2010
Within 100-Year Floodplain(Type
With Excessive Slopes/Within Drainage Ways/ $2,4.2g.00 $2,629.00 7/1/3889 2010
Within Wetlands(Type II)
With Excessive Slopes/Within Drainage Ways/ `'2� X13.° $2,841.00 7/1/?089 2010
Widen Wetlands/Within the 100-Year
Floodplain(Type III)
3X44iin the 100 ' �-3:9 7/1/2009
Sign Permit
Existing and Modification to an Existing Sign
(-No Size Differential) X49-8{1 $164.00 7/1/?-(397 2010
Temporary Sign(Per Sign) W.0 $52.00 12,11,12906 7/1/2010
Site Development Review&Major Modification
Under$100,000,000.00 $4,4*.00 $4,645.00 7/1/3994 2010
$1,000,000.00/Over 65,9 $6,034.00 7/1/3909 2010
('{-$6.00/per each$10,000.00 over$1,000,000.00)
Minor Modification $579.90 $599.00 7/1/3909 2010
Subdivision
Preliminary Plat without Planned Development $5,141.0 $5,363.00 /+$93.00 per lot 7/1/?989 2010
Preliminary Plat with Planned Development $798 $7,422.00 7/1/2999 2010
Expedited Preliminary Plat without
Planned Development S5�X88 $6,148.00 /-f-593.00 per lot 7/1/2G84 2010
Expedited Preliminary Plat with
Planned Development ,'��9' ^9 $7,422.00 7/1/2009 2010
Final Plat S4,653.00 $1,855.00 7/1/--OW 2010
Temn- orary Use
Directors Decision 53844)9 $294.00 7/1/3999 2010
Special Exemption/Non-Profit 50.00 7/1/2003
Tree Removal $158:90 $294.00 7/1/?88} 2010
21
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge _ Effective_Date;
VarianceLAdjustment
Administrative Variance b OFi $642.00 7/1/2-9A9 2010
Development Adjustment 9-273:AO $294.00 7/1/3099 2010
Special Adjustments
Adjustment to a Subdivision 6373-99 $294.00 7/1/229W 2010
Reduction of Minimum
Residential Density 53734)9 $294.00 7/1/389} 2010
Access/Egress Standards
Adjustment S621-89 $642.00 7/1/2-899 2010
Landscaping Adjustments
Existing/New Street Trees SM24)9 $294.00 7/1/0-989 2010
Parking Adjustments
Reduction in Minimum or Increase
In Maximum Parking Ratio c621.nn $642.00 7/1/3989 2010
Reduction in New or Existing
Development/Transit Imprvmnt 5621-09 $642.00 7/1/3899 2010
Reduction in Bicycle Parking 9621. 9 $642.00 7/1/3893 2010
Alternative Parking Garage
Layout 9273,00 $642.00 7/1/228B9 2010
Reduction in Stacking Lane
Length 999 $294.00 7/1/2299t3 2010
Sign Code Adjustment 5621,00 $642.00
Street Improvement Adjustment 9621-80 $642.00 7/1/3809 2010
Tree Removal Adjustment !;)73 99 $294.00 7/1/2889 2010
Wireless Communication Facility Adjus tments
Setback from Nearby Residence $6 $642.00 7/1/3904 2010
Distance from Another Tower $273:89 $294.00 7/1/-29W 2010
Zoning Map/Text Amendment
Legislative-Comprehensive Plan $9,%G700 $9,195.00 7/l/2-909 2010
Legislative-Community Development Code $3,524.0 $3,754.00 7/1/3999L 2010
Quasi-judicial ", 29.00 $3,459.00 7/1/2-999 2010
Zoning Analysis(L)etailed) 95:7999 $599.00 7/1/3GG9 2010
Zoning Inquiry Letter Siml?W S67.90 $88.00 7/1/3899 2010
22
City of Tigard EXHIBIT A
Fees and Charges Schedule
;Department Revenue Source Fee or Charge Effective Date:
COMMUNITY DEVELOPMENT- MISCELLANEOUS FEES&CHARGES
Building-Plan Copies $2.50 /copy 7/1/2007 14
Community Development Code 7/1/2006
CD Rom $10.00
Comprehensive Plan-Volumes 1&2 $77.00 1997
GIS Maps 2/7/2002
8-1/2"x 11"
Black and White $0.25 7/1/2007
Color 51.50
11"x 17"
Black and White 51.50
Color 52.50
17"x 22"
Black and White $2.50
Color $5.00
22"x 32"
Black and White 55.00
Color $7.50
34"a 44"
Black and W-tite 57.50
Color 510.00
Information Processing&Archiving(IPA)Fee
Temporary Sign $5.00 7/1/2010
Type I Review $18.00 7/1/2010
Type II Review $175.00 7/1/2010
Type III Review $200.00 7/1/2010
Type N Review $200.00 7/1/2010
23
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effective Date
M—ap 2/7/2002
Address Maps by Section $2.50 /plot
Annexation&Road Jurisdiction $10.00 /plot
As-Built Drawings 52.50 /copy or plot
Assessor's Tax Map 52.50 /copy or plot
Bike Path Plan $6.00 /plot
Buildable Lands Inventory 510.00 /plot
Comprehensive Plan and Zoning Map $10.00 /plot
Orthophotographs 55.00 /copy
Stream Corridor&Wetlands Map $10.00 /plot
Street Index Map $10.00 /plot
Subdivision Map 510.00 /plot
Subdivision Plat Map $2.50 /copy
Topographic Maps $5.00 /copy
Transportation Plan Map $10.00 /plot
Vertical Bench Mark Control Map 56.00 /copy
Zoning Map 510.00 /plot
Neighborhood Meetina Signs Land Use 52.00 1997
Oversize Load Permit $200.00 7/1/2005
Planimetric Maps 3/10/1986
Blueline print-quarter section 55.00
Mylar-quarter section $150.00 /+reproduction cost
Retrieval of Materials Confiscated in ROW
Lawn and A-board signs $40.00 /sign 7/1/2010
Other signs and materials(based on size and value) City Manager's Discretion 7/1/2010
(per TMC 7.61.035 Ord 10-06)
Tigard Transportation System Plan 515.00 2000
Tigard Triangle Obsolete
Master Plan(3/92) 510.00
Master Plan Color Map(Adopted 11/92) $2.50
Specific Area Plan(1/94) S7.50
Transportation&Traffic Evaluation
Report(10/93) $7.50
Visual Preference Survey $5.00 /for second copy Obsolete
Washington Square Regional Center 1999
Task Force Recommendations 510.00
Master Plan Map(zoning/Plan) 52.50
24
'Department Revenue Source Fee or Charge Effective Date
COMMUNITY DEVELOPMENT-MISCELLANEOUS DEVELOPMENT
Blasting Permit $271.00 7/1/2009
Fee in Lieu of Sewer Based on actual cost of sewer connection, 1998
(Commercial Only) if sewer was available
Sanitary Sewer Connection Fee $4,100.00 $22,=00:99 /dwelling unit 7/1/?996 2010
Miis fee is determined by Clearwater Services.
The City of Tigard receives 3.99%of fees collected.)
Tree Replacement Fee $125.00 /caliber inch 9/1/2001
Water Quality Facility Fee 6/6/2000
(City receives 100%of fees collected)
Residential Single Family $225.00 /unit
Commercial&Multi-family $225.00 /2,640 sq. ft of additional
impervious surface
Water Quanti1y Facility Fee 6/6/2000
(City receives 100%of fees collected)
Residential Single Family $275.00 /unit
Commercial&Multi-family $275.00 /2,640 sq. ft of additional
impervious surface
Metro Construction Excise Tax 12%of building permits for projects 7/1/2006
(City will retain 5%for administrative expenses) with a total valuation of$100,001 or more;
(Tax set by Metro,but collected by cities) not to exceed$12,000
Vacation (Streets and Public Accessi $2,209.00 /deposit+actual costs 7/1/2009
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effective Date
PUBLIC WORKS
Addressing Assignment-Fee $50.00 10/29/2003
Community Garden Plot Rental
Large $40.00 /year 7/1/2010
Small $20.00 /year 7/1/2010
Encroachment Permit None has been set yet
Engineering Public Improvement Design Standards $5.00 7/15/1998
Local Improvement District Assessments Actual Cost 7/24/1996
PadE Pe cremien Fee
Appheation Fee
Na idefrt $5:98
Gapstip to 59 $14-00 4hetbr
51t 10G $16.00 410tir
10-1-to 150 $23:99 7Liattr
151 to 200- X8:90 Aiettr
$33=09 44 ettr
4,11,12096
Gre ps lig to 5 $280
.09 410tir
51 te 100
0 4ietff
1nervi to 160 () 4u�tff
s K=-_,1 to-200 00
201 '9nd up X99
Sapeef/B'�ields
Nan g 4hetif
26
City of Tigard EXEIBIT A
Fees and Charges Schedule
Departtnent Revenue Source Fee or Charge Effective Date;
Park Reservation Fees
Application Fee
Resident $25.00 7/1/2010
Non-Resident $50.00
Special Use/Alcohol Permit Fee $25.00 Fee assessed at time of reservation 7/1/2010
Special Event Permit Fee $75.00 0 to 100 people 7/1/2010
$175.00 101 to 500 people 7/1/2010
$275.00 501 to 2000 people 7/1/2010
$475.00 More than 2000 people 7/1/2010
Shelter Rental Fees (2 hour minimum)
Shelter#1
Resident $16.00 /hour 7/1/2010
Non-Resident $32.00 /hour 7/1/2010
Shelter#2
Resident $33-00 /hour 7/1/2010
Non-Resident $66.00 /hour 7/1/2010
Shelter#3,#4,Bishop/Scheckla Pavilion,&Summerk&e
Resident $23.00 /hour 7/1/2010
Non-Resident $46.00./hour 7/1/2010
Soccer/Ball Field Rental Fee(2 hour minimum)
Resident $10.00 /hour 7/1/2010
Non-Resident $20.00 /hour 7/1/2010
Deposit May be required for some events to mitigate Not to exceed$400 7/1/2010
possible cleanup and/or damages.
Reimbursement District Application Fee $300.00 1/27/1998
Reimbursement District Fee Not to Exceed$6,000.00 unless 7/10/2001
reimbursement fee exceeds$15,000.00
Any amount over$15,000.00 shall be
reimbutsed by the owner. $6,000.00 limit
valid for only 3 years from Council approval
of district cost.
27
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effective Date
Street Maintenance Fee MC 18.765 "r'
Monthly Residential Rate-
Single and Multi-Family $3.01 92.15-/unit 7/1/2010
Monthly Non-Residential Rate $0.92 �9 /per min required parking space 7/1/2010
Monthly Residential Rate-
Single and Multi-Family $4.13 /unit 4/1/2011
Monthly Non-Residential Rate $1.06 /per rein required parking space 4/1/2011
Monthly Residential Rate-
Single and Multi-Fancily $5.25 /unit 1/1/2012
Monthly Non-Residential Rate $1.19 /per min required parking space 1/1/2012
Staff Review No Charge
City Council Written Appeal Filing Fee $300.00
Solid Waste Compactor Permit $100.00
Traffic Control Devices
Speed Hump Program 50%of cost 5/1/1996
28
City of Tigard EIZHIBIT A
Fees and. Charges Schedule
Department Revenue Source Fee or Charge - _ Effective Date
PUBLIC WORKS-UTILITIES
Booster Pump Charge $6.48 6 /bimonthly 10/1/2010
$6.93 $t}42 /bimonthly 10/1/2011
Customer Charge $7.34 $6 /bimonthly 10/1/2010
(Basic fee charged to customers to have the $7.85 $7�?7 /bimonthly 10/1/2011
City deliver water.)
Final Notification Process Fee $30.00 /per instance 7/1/2009
Fire Hydrant Flow Test $325.00 /test 12/9/2008
Fite Hydrant Usage-Temporary
3"hydrant meter deposit* $650.00 9/1/2002
*Deposit is refundable if returned in good condition
Hook-up service $50.00 2/27/2001
Continued use $50.00 /month 2/27/2001
Consumption Current irrigation water usage rate 9/1/2002
per 100 cubic feet of water used
Fire Rates (Sprinklers) 2/27/2001
6" or smaller $17.00 /month
8" or larger $22.50 /month
Fire Service Connection $1,400.00 /+ 12%fee based 2/27/2001
on construction costs.
Meter Disconnection Actual labor and material costs + 10% 9/1/2002
Meter Installation Fees
5/8"x 3/4"Meter $325.00 2/27/2001
1"Meter $500.00 2/27/2001
1 +/2"Meter $850.00 2/27/2001
2"Meter $1,000.00 2/27/2001
3" or more Meter Actual Cost 5/23/2000
Meter Out-of-Order Test Meter calibration cost+actual labor 9/l/2002
and material costs+ 10%
29
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effective Date'
Sanitaty Sewer Service
(City receives 15.82%of fees collected)
Base Charge $19.14 /dwelling unit/mandi 7/1/2007
Use Charge $1.31 /100 cubic feet/month for 7/1/2007
individual customer winter average
Storm and Surface Water
(City retains 759/6 of Service Charge fees collected)
(City retains 1000/.of its Surcharge fees collected)
Service Charge $4.00 /ESU/mond? 6/6/2000
Tigard Surcharge $2.00 /ESU/month 7/1/2009
Water Bacteriologieal Quality Testing
Cost per test $60.00 7/1/2008
Water Disconnection Charge for Non-payment
During business hours $50.00 2/27/2001
Water Line Construction-New Development 121/6 of Actual Cost 2/27/2001
Water Main Extension
Designed and installed by others 12%of Actual Cost 9/1/2002
Water Meter Radio Read Device $156.80 7/1/2008
Water Usage Charges
Residential 422-68,-WQ-eubie feet ef wftte ,n r r�99
$2.87 $2--.96 /100 cubic feet of water 10/1/2010
$3.07 *3-.G6 /100 cubic feet of-mater 10/1/2011
Multi-Family2:GG 11100 Eulric—feet awa 10,11,1-2009
$2.$5 $?$4 /100 cubic feet of water 10/1/2010
$3.05 $-3r-L133 /100 cubic feet of water 10/1/2011
30
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effective Date
n!� J2
COIrlrrierClal $34-3 /100 E�3tE-�E�6f�� �rrrTl�vann9
$3.35 $3,34 /100 cubic feet of water 10/1/2010
$3.58 $3:-R /100 cubic feet ofwater 10/1/2011
Industrial $-a- 0; 100 c-u13'.Efeet ef-, 0G9
$2.78 /100 cubic feet of water 10/1/2010
$2.97 /100 cubic feet of water 10/1/2011
Irrigation -334 1100 e-1 ie feet ofveafef 10,11,12()09
$3.57 /100 cubic feet of water 10/1/2010
$3.82 $3.81 /100 cubic feet of water 10/1/2011
31
Department Revenue Source Fee or Charge Effective Date
COMMUNITY DEVELOPMENT-DEVELOPMENT SERVICES PLANNING
Park System Development Charge (SDC)'
Single Family Unit $5,370.00 $4,811.00 1/1/2009 2010
Multi-family Unit $4,316, 0 $3,867.00 1/1/219W 2010
Spaces in a manufactured home park $4,257.()o $3,814.00 1/1/2099 2010
Commercial/industrial(per employee) $364.00 $327.00 1/1/02-994 2010
'See Appendix for methodology used to calculate the charges.
The Park System Development Charge(Park SDC)is a City of Tigard charge that is assessed on
new development to support the acquisition and development of parks,greenways,and paved
trails,all of which are used by residents of Tigard and by those who work here. The Park SDC is
a one-time fee charged to new development to help pay a portion of the costs associated with
building additional parrs and trails to meet the needs created by both residential and
commercial/industrial growth. The SDC revenues can only be used on capacity-increasing capital
Park SDCs are assessed on new residential development on a per-unit basis and against
commercial and industrial development on a per-employee basis.
The amount of die charge for each land use category is adjusted each year,effective
January 1 st,in relation to two indices,one reflecting changes in development/construction
costs and one reflecting changes in land acquisition costs.
For information about Park SDCs regarding a specific project contact the City's Permits/Projects
Coordinator at 503-718-2426.
For more detailed information on calculating Park SDCs see City of Tigard Resolution No.04-97
and the accompanying report,"Parks and Recreation System Development Charges Methodology
Update"by Don Ganer&Associates,Inc.,November 10,2004,
Park SDC Annual Adjustment 4/10/2001
Parks SDC fees shall be adjusted annually on January 1st of each year beginning in 2002. The
new fee will be determined by multiplying the existing fees by the average of two indices,one
reflecting changes in development/construction costs and one reflecting changes in land
acquisition costs. The average of these two indices is a reasonable approach because die Parks
SDC fee is roughly split 50%between land acquisition land development components.
The index for the Land Acquisition component will be the base cost for residential tract land in
Tigard,as determined by the Washington County Appraiser. The average cost for residential tract
land was selected because it is readily identified and is the lowest priced of the buildable lands in
City of Tigard EXHIBIT A
Fees and Charges Schedule
Depamnent Revenue Source Fee or Charge Effective Date
Tigard. Changes in this base cost can be calculated in terms of a percentage increase,to create the
level of change to the original index,and projected to the overall acquisition cost. In accordance
with Measure 5,the Washington County Appraiser's office will determine appraised values an July
The index for the Land Development component of the Parks SDC will be the Construction Cost
Index for the City of Seattle as published in the December issue of the Engineering News Record
(ENR). The Seattle cost index will be used because the city is the geographically closest to'Tigard
of twenty metropolitan areas for which the ENR maintains cost data. This index is adjusted
monthly,quarterly,and annually. The annual index for each year will be selected beginning with
the index for December 2002. The annual index will be used because it is available in December
Park SDC Annual Adjustment(cant.)
Calculation Definitions:
SDC (2000) = Current SDC fee
L(2000) = Average cost of residential tract land 2000
L(2001) = Average cost of residential tract land 2001
L(2,-x) = Average cost of residential tract land 2.�x
C (2000) = Construction cost index of 2000
C (2001) = Construction cost index of 2001
C (2=x) = Construction cost index of 2xxx
LCI= Land Cost Index:change from the current year from previous year
CCI= Construction Cost Index: change from the current year from previous year
ACI= Average cost index change of LCI+CCI
Formula:
L(2001) /L(2000) =LCI
and
C(2001) /C (2000) =CCI
therefore
LCI+ CCI/2 =ACI
then
SDC (2001)x ACI =SDC (2002)
Each year subsequent to 2002,the costs shall be revised using the current year and previous year's
data. Not withstanding die foregoing,all calculations shall be carried out to the thousandth place.
A final product ending in.49 or less shall be rounded down to the nearest dollar,.50 or more up
33
Departinent Revenue Source Fee or Charge Effective Date
to the nest dollar. Community Development staff Nvill perform the adjustment calculation and
prepare the resolution each year.
b
City of Tigard F-XHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effective Date
COMMUNITY DEVELOPMENT-DEVELOPMENT SERVICES ENGINEERING
Trak Impact Fee
Trip Rate
Residential Use X369:99 $382.00 /average weekday trip 7/1/21893 2010
Business&Commercial Use 9191-89 $96.00 /average weekday trip 7/1/=999 2010
Office Use X30 09 $350.00 /average weekday trip 7/1/-2909 2010
Industrial Use 5345:08 $367.00 /average weekday trip 7/l/2-909 2010
Institutional Use si?-9-09 $158.00 /average weekday trip 7/1/3009 2010
Transit Rate $27.00 /average daily trip 7/1/-2909 2010
The Traffic Impact Fee(TIF)is a Washington County charge,approved by the voters in November,1990,that is administered
and collected by the City of Tigard. It went into effect in 1991. On July 1,2009 it was replaced with the Transportation
Development Tax(TD'I)regarding new development projects. All projects that received Land Use Approval and submitted
building permit applications prior to July 1,2009 remain under TIF as do most non-residential projects that received Land Use
Approval prior to July 1,2009 even if building permit applications were submitted after that date. Residential,change-of-"se,and
minor addition projects for which building permit applications are submitted on or after July 1,2009 are subject to'17DT.
TIF charges are assessed on new development to help provide funds for the increased capacity transportation improvements
needed to accommodate the additional vehicle traffic and demand for transit facilities generated by that development. TIF
provides funds for these capacity improvements to county and city arterials,certain collectors,and certain state and transit
facilities as listed in the County's Base Report list of projects. TIF is categorized as an Improvement Fee:revenue must be
dedicated to capital improvements that expand capacity and may not he used for maintenance,repair,or other non-capital
improvements.
TIF is assessed on new development on the basis of the number of trips that development is projected to generate. The bases for
these trip projections are the statistical analyses and findings about trip generation found in the Institute of Transportation
Engineers(ITL')Manual. Table 11.1 of the Washington County Traffic Impact Fee Procedures Manual provides figures for the
weekday average trips generated per unit by different Land Uses. For residential uses the units are dwelling or occupancy units.
For commercial and industrial uses the units are the square footage of the use or units unique to the use such as lanes,fueling
positions,etc.
The TIF rate for each land use category is adjusted each year,effective July 1st,to account for inflation.
For information about the TIF regarding a specific project contact the City's Permits/Projects Coordinator at(503)718-2426.
For more detailed information on calculating TIF charges and a detailed list of Land Uses and their associated average trip rates
see the Washington County Countywide Transportation Development Tax Manual.
*See Appendix;for methodology used to calculate the charges.
The Traffic Impact Fee program is governed by Washington County. All fees and procedures are set by the County.
35
City of Tigard EXHIBIT A
Fees and Charges Schedule
Countywide Transportation Development Tax(TDT)-(Example Land Uses and Cbarges*)
Single Family Detached x$4,5 0 $5,227.00 /per unit 7/1/2089 2010
$
Apartment 89&90 S3,352.00 /per unit 7/1/2-099 2010
Residential Condominium/Townhouse S??? 9B $3,106.00 7/1/?909 2010
General Office Building(per TSFGFA**) $4,428.9 $5,246-00 7/1/2-989 2010
Medical Office Building s.,4-5-,39 90 $17,958.00 7/1/2009 2010
Fast Food Restaurant(no drive thru) S4�,Og2.0 515,897.00 7/1/2889 2010
Shopping Center(per TSFGLA**) $5, $6,828.00 7/1/2889 2010
The Countywide Transportation Development Tax(TDT)is a Washington County Tax approved by the voters in November,
2008,that is administered and collected by the City of Tigard. it went into effect on July 1,2009,replacing the Traffic Impact
Fee(TIF)program.
Like TIF,TDT is assessed on new development to help provide funds for the increased capacity transportation improvements
needed to accommodate the additional vehicle traffic and demand for transit facilities generated by that development. It provides
funds for these capacity improvements to county and city arterials,certain collectors,and certain state and transit facilities as
listed in the County's Capital Improvements Project List. The TDT is categorized as an Improvement Fee:revenue must be
dedicated to capital improvements that expand capacity and may not be used for maintenance,repair,or other non-capital
improvements.
TDTs arc assessed on new development on a per-unit basis. For residential uses the units are dwelling units,bedrooms,etc. For
co}nme rcial and industrial uses the units are the square footage of the use or units unique to the use such as lanes,fueling
positions,etc
The`TDT rate for each land use category is adjusted each year,effective July 1st,and the rates for each year from July 1,2009
through June 30,2013 were established in Appendix B to Washington County Engrossed Ordinance 691,August 29,2008.The
TDT rates effective 71/2010 include a 109/6 Temporary Discount implemented October 2009 by Washington county. If the
Temporary Discount program is terminated the effective rates will revert to the original calculated mares.
For information about the TDT regarding a specific project contact the City's Permits/Projects Coordinator at(503)718-2426.
* For more detailed information on calculating TDT charges and a detailed list of Land Uses and TDT charges through
6/30/2013 see Appendix B to Washington County Engrossed Ordinance 691,August 29,2008 and the Washington County
Countywide Transportation Development Tax Manual.
** TSFGFA=thousand square feet gross floor area;TSFGLA=thousand square feet gross leasable area.
36
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effective Date
PUBLIC WORKS-WATER
Water System Development Charge(SDC)* 11/28/2000
5/8"x 3/4"Meter
410 Service Area $2,041.00
Bull Mountain System $2,763.00
1"Meter
410 Service Area $5,103-00
Bull Mountain System $6,908.00
1 1/2"Meter
410 Service Area $7,348.00
Bull Mountain System 59 947.00
2"Meter
410 Service Area $16,328.00
Bull Mountain System $22,104.00
3"Meter
410 Service Area $30,615.00
Bull Mountain System $41,445.00
4"Meter
410 Service Area $51,025.00
Bull Mountain System $69,075.00
6"Meter
410 Service Area $102,050.00
Bull Mountain System $138,150.00
8"Meter
410 Service Area $163,280.00
Bull Mountain System $221,040.00
10"Meter
410 Service Area $293,496.00
Bull Mountain System $397,319.00
12"Meter
410 Service Area $775,907.00
Bull Mountain Svstem $1,050,382.00
*See Appendix for methodology used to calculate the charges.
37