Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Resolution No. 10-17
CITY OF TIGARD, OREGON TIGARD CITY COUNCIL RESOLUTION NO. 10- ``7 A RESOLUTION TO AMEND THE MASTER FEES AND CHARGES SCHEDULE AS ADOPTED BY RESOLUTION 09-44 TO INSTITUTE FEES FOR THE NEW DOWNTOWN REVIEW PROCEDURES WHEREAS, the Development Code was amended by Ordinance 10-02 instituting new code language and design review for the Downtown district;and WHEREAS, the Code institutes new types of procedures: Design Review Compliance Letter, Downtown Design Administrative Review, and Downtown. Design Review (Design Review Board), which differ from present procedures;and WHEREAS, the City of Tigard has a Master Fees and Charges Schedule that was last adopted by Resolution 09-44 with later amendments. NOW,THEREFORE,BE IT RESOLVED by the Tigard City Council that: SECTION 1: The fees and charges for the Downtown review procedures are enumerated and set shown on the attached schedule (Exhibit A). SECTION 2: This resolution is effective immediately upon passage. PASSED: This _ day of✓`t=4&21t-L-- - 2010. M or City of Tigard ATTEST: ter. ebty Rec •der -City of rd RESOLUTION NO. 10 - Page 1 City of Tigard EXHIBIT A Fees and Charges Schedule D:e artttenY.,, . Revenue Souirce, J~ee or Chir a Effective.Date' COMMUNITY DEVELOPMENT-PLANNING Accessojy Residential Units $134.00 7/1/2009 Annexation. $2,520.00 7/l/2009 (As of July 1,2006 a moratorium on this fee was in effect,per Resolution 08-12,through February 2009) Anneal Director's Decision(Type 1I)to Hearings Officer $250.00 7/1/2003 Expedited Review(Deposit) $300.00 7/1/2003 Hearings Referee $500.00 7/1/2003 Planning Commission/Hearing's Officer to City Council $2,536.00 7/1/2009 Annroval Extension $266.00 7/1/2009 Blasting Permit $271.00 7/1/2009 Conditional Use Initial $5,245.00 7/1/2009 Major Modification $5,245.00 7/1/2009 Minor Modification $579.00 7/1/2009 Design Evaluation Team DE Recommendation(. osit) $1,298.00 7/1/2009 Development Code Provision Review Single-Family Building Plan $52.00 7/1/2007 Cornmercial/Industrial/Institution $332.00 7/1/2009 1 City of Tigard EXHIBIT A Fees and Charges Schedule Ike artitient ,,_ l�,eveite,Source. .y,.. > . . •� .... . ..,. dee ox Char e ` Effecve]Date; Downtown_Review Design Re%tie,c-C.ompliarice Letter i79.(i0 4/13/2010 --pc I j D<)wnec wfi De�ig Adn joz strative Revietit- I?ro ect s:aiu uioll ung ies_S 1 :Hillier:51,200 base talus 1.1.004 x protect ti F;fu,,uion €I�pe II j $1 miliianp titer: S5,200 pluck 0.002 x project valriaion naYitn zn1 tee2:�,;x,3rf': 4/13;`2010 Desi_1 Kevie 'Design Ree -riew Board) Apl>lical.>le 1 pc:II Fee plus$2,613 411.3'2310 1`lyl�e lI� Exnedited_Review 7/1/2007 Land partition $4,383.00 Subdivision $5,773.00 /+$90.00/Lot Subdivision with Planned Development $7,127.00 /additional Hearing I'ostnonememt $261.00 7/1/2009 Historic Overly Review District Historic Overlay Designation $4,052.00 7/1/2009 Removal Historic Overlay Designation $4,052.00 7/1/2009 Exterior Alteration in Historic Overlay District $621.00 7/1/2009 New Construction in Historic Overlay District $621.00 7/1/2009 Demolition in Historic Overlay District $621.00 7/1/2009 Home Occupation Permit Type 1 $40.00 7/1/2007 Type II $285.00 7/1/2009 Interpretation of the Commun ty Development Code $612.00 7/1/2009 2 City of Tigard EXHIBIT A Fees and Chatges Schedule joint Application Planning Fee 100%of Highest Planning Fee+50%of 7/l/2003 all additional Fees Related to the Proposal. Land Partition Residential and Non-Residential(3 bots) $3,761.00 7/1/2009 Residential and Non-Residential(2 Lots) $3,094.00 7/1/2£709 Expedited $4,425.00 7/1/2009 Final Plat $899.00 7/1/2009 Lot Line Adjustment $482.00 7/1/2009 Minor Modification to an Approved Plan $579.00 7/1/2009 Non-Conforming Use Confumation 5273.00 7/1/2009 Planned Development Conceptual Plan Review $7,479.00 7/1/2009 Detailed Plan Review(Concurrent Hearing) Applicable SDR Fee or Subdivision Fee+$200.00 12/1/2006 Detailed Plan Review(Separate Hearing) Applicable SDR Fee or Subdivision Fee+$2,138.00 12/1/2006 Plat Name Change $274.00 7/1/2009 Pre-A iieation Conference X373.00 7/1/2009 Sensitive Lands Review With Excessive Slopes/Within Drainage Ways/ Within Wetlands (Type 11) $2,428.00 7/1/2009 3 City of Tigard EXHIBIT A Fees and Charges Schedule With Excessive Slopes/Within Drainage Ways/ Within.Wetlands(Type III) $2,613.00 7/1/2009 Within the 100-Year Floodplain(Type 111) $2,613.00 7/1/2009 Sigu I'e rnnit Existing and Modification to an Existing Sign (No Size Differential) $40.00 7/1/2007 Temporary Sign(Per Sign) $19.00 7/1/2006 Site Development Review.&Major Mod cation Under 100,000.00 $4,445.00 7/1/2009 1 Million/Over $5,833.00 7/1/2009 (+$6.00/per each$10,000.00 over 1 Million) Minor Modification $579.00 7/l/2009 Subdivision Preliminary Plat without Planned Development $5,141.00 /+$93.00 per lot 7/1/2009 Preliminary Plat with Planned Development $7,191.00 7/1/2009 Expedited Preliminary Plat without Planned Development $5,825.00 /+$93.00 per lot 7/1/2009 Expedited Preliminary Plat with Planned Development $7,191.00 7/1/2009 Final Plat $1,653.00 7/1/2009 Temn�ooj Use Director's Decision $304.00 7/1/2009 Special Exemption/Non-Profit $0.00 7/1/2003 4 City of Tigard EXHIBIT A Fees and Charges Schedule De .a€tmet .Rvezue Soixrce Fee or Char a Effective Date- h .., Tree Removal $188.00 7/1/2009 Vacation(Streets and Public Access) $2,209.00 /deposit+actual costs 7/1/2009 Variance JAdjustment Administrative'Variance $621.00 7/1/2009 Development Adjustment $273.00 7/1/2009 Special Adjustments Adjustment to a Subdivision $273.00 7/1/2009 Reduction of Minimum Residential Density $273.00 7/1/2009 Access/Egress Standards Adjustment $621.00 7/l/2009 Landscaping Adjustments Existing/New Street Trees $312.00 7/l/2009 Parking Adjustments Reduction in Minimum or Increase In iblaximum Parking Ratio $621.00 7/1/2009 Reduction in New or Existing Development/Transit Imprvmnt $621.00 7/1/2009 Reduction in Bicycle Parking $621.00 7/1/2009 Alternative Parking Garage Layout $273.00 7/1/2009 Reduction in Stacking Lane Length $621-00 7/l/2009 Sign Code Adjustment $621..00 5 City.of Tigard EXHIBIT A Fees and Charges Schedule Iff street lmprovement Adjustment $622:00 7/1/2(109 Tree Removal Adjustment $273:00 7/1/2009 Wireless Communication Facility Adjustments Setback from Nearby Residence $621.00 7/1/2009 Distance f nom othe�,Tower $273.00 7/1/2009 Zoning Mara/Text.A:maend ent Legislative Cornpzeherisive'Plan $$;966:00. 7/1/2009 Legislative Community Development Code $3,524.00 7/1/2009 'Quasi Tudi al 01229A0 7/1/20039 ZoningAnalsxs7/1/2009 Z nu► In ui ;Letter im Ie $67.00 7/1/2009 COMMUNITY DEVELOPMENT .MISCELLANEOUS FEES&CHARGES ,.,Building Plan Covies $2.50 /copy 7/1/2007 CqmmMWqLDg3TLopment Code 7/1/2006 CD Rona $70.00 Com�tehensive Plan-Volumes I&2 $77.00 1997 GIS Maas- 2/7/2002 Black and.Mite $0.25 7/1/2007 Color $2.50 11"x 17" Black and Wf ite $2.50. City of Tigard EXHIBIT A Fees and Charges Schedule Color $2.50' 17"x 22" Black,and,White.. $2.5Q Color $5.00 22".:.x 32" Black and White $5.00 Color $7.50 34`•x 44 x; Black and White $7.50. Color, $10:00 a s 2/7/2002 e 'Address Mapsby;Sectnop.. $2.50 /plot viii exarion&Road Jurisdicdon $10.00 /plot As-Built Drawings $2.50 /copy or plot ,ssessor'.s Tax.illap $2.50 /copy or plot Bike Path Plan $6 00 /plot Buildable Lands Inventory $10.0(3 /plot G,omprehensnvc Plan and..Zoning Map $10.00 / "plot Orthophotographs $5,00 /copy Stream Corridor&Wetlands Map $moo /plot Street Index.Map $10.00 /plot Subdivision Map $10.00 /plot Subdivision PIat Map $2 50,/copy Topographic Flaps $5.00 /copy Transportation Plan Map $10.00 /plot Vert cat ench_.1 a'%rk Control Map $6 00/copy Zoning Map $10.00 /plot Neighorhood Meetin Si s. Land Use $2.00 1997 Oversize Load Permit $200,00 7/1/2005 Planiumetnc IVtaus 3/10/1986 Blue4ne,print-quarter section $5.00 Mylar-quarter section $150.0©'/-h reproduction cost T' and Trans ©nation Sy, flan $15,06 `< 20041 T City of Tigard EXHIBIT A Fees and Charges Schedule .. Effi;cave,Date; Tigard Triangle Obsolete Master Plan(3/92) $10.00 Master Plan Color Map(Adopted 11/92) $2.50 Specific Area Plan(1/94) $7.50 Transportation&Traffic Evaluation Report(10/93) $7.50 Visual Preference 5urve $5.00 /for second copy Obsolete Washington Sa_,__u.__are Regional Center 1999 Task Force Recommendations $10.00 Master Plan Map(Zoning/Plan) $2.50 8