Loading...
Resolution No. 09-44 CITY OF TIGARD, OREGON TIGARD CITY COUNCIL RESOLUTION NO. 09 �-14 - A RESOLUTION ADOPTING THE CITYWIDE MASTER FEES AND CHARGES SCHEDULE WHICH REPLACES RESOLUTION NO. 08-30 AND ALL SUBSEQUENT AMENDMENTS TO DATES A 6 /1 rn E^ D Eo C SLc> 100, !G c`� E�6-i�-4 A WHEREAS,the City of Tigard has a Master Fees and Charges Schedule;and WHEREAS,City staff has reviewed fees and services provided; and WHEREAS, City staff has proposed a few new fees and changes to certain fees to recover costs or due to previously approved annual adjustment fon ulas;and WHEREAS,the Cit/s Master Fees and Charges Schedule includes fees set by other agencies;and WHEREAS, Tigard Municipal Code (TMC) 3.32.050 requires that the City Council review fees and charges annually. NOW,THEREFORE,BE IT RESOLVED by the Tigard City Council that: SECTION 1: The fees and charges for the City of Tigard are enumerated and set as shown in the attached schedule (Exhibit A). SECTION 2: This resolution is effective July 1, 2009. PASSED; This day of 2009. z Ma - ty o igard ATTEST: t���e ty Recorder- City of Tigard RESOLUTION NO.08 - L Page 1 City of Tigard EXHIBIT A Fees and Charges Schedule De a €ment'" Revenue:Saurce Fee ar:Char a Effective Date CITY ADMINISTRATI©N Claims Application Fee $1,000.00 /deposit* 11/28/2000 *Application fee shall be actual cost incurred by the City to process application. Any funds remauung from the deposit after the application has been processed will be refunded to the applicant,and applicant shall be responsible for any additional costs incurred. Complete Code aide,,; , pftet Disk(GO) 0 �6 Meeting Room Reservation Fees&Deposits 7/1/2004 .alarm Fee(Senior Center and Library Community Room) First time call-out $50.00 Second call-out within a one-year period $75.00 Third call-out within a one-year period $75.00 &suspension of room use privileges for 3 months Cancelation Fee $10.00 Cleaning Deposit $100.00 Library Community Room 7/1/2004 Room Rental Group 1 $25.00 /hour Group 2 $40.00 /hour Group 3 $50.00 /hour Pantry Rental Group 1 $5.00 /hour Group 2 $5.00 /hour Group 3 $5.00 /hour Equipment Rental Sound System with Microphone $10.00 PowerPoint Projector and Screen $10.00 TV with VCR/DVD $10.00 Stage Lighting $10.00 Library Conference Room Group 1 $5.00 /hour Group 2 $10.00 /hour Group 3 $15.00 /hour Red Rock Creep Conference Room 7/1/2003 Group 1 $5.00 /hour Group 2 $10.00 /hour 1 City of Tigard EXHIBIT A Fees and Charges Schedule De airtunent i Revex�ue:Souxce:` i Fee or Ghax ,e E£fectioe Date Group 3 $15.00 /hour Richard M.Brown Auditorium Group 1 $1.2.00 /hour Group 2 $17.00 /hour Group 3 $22.00 /hour Senior Center Upstairs activity Room Group 1 $15.00 /hoax Group 2 $20.00 /hour Group 3 $25.00 /hour Senior Center Downstairs Activity Room Group 1 $10.00 /hour Group 2 $15.00 /hour Group 3 $20.00 /hour Senior Center CIassroom or Craft Room Group 1 $5.00 /hour Group 2 $10.00 /hour Group 3 $15.00 /hour Town Hall Group 1 $10.00 /hour Group 2 $15.00 /hour Group 3 $20.04 /hour Water Lobby Conference Room Group 1 $5.00 /hour Group 2 $10.00 /hour Group 3 $1.5.00 /hour Municipal Court Fees Civil Compromise $150.00 4/10/2003 Traffic School and Compliance Program Fee Criminal $150.00 4/10/2003 juvenile non-traffic $75.00 4/10/2003 Traffic School Equal to the relevant fine provided for the 5/25/2006 violation in the Violations Bureau Fine Schedule Traffic School Setover $20.00 4/10/2003 License Reinstatement $15.00 4/10/2003 Payment Agreement Administrative Fee $15.00 4/10/2003 Overdue Payment Letter $10.00 4/10/2003 Show Cause Hearings-Court Costs 4/10/2003 Non-compliance $25.00 2 City of Tigard EXHIBIT A Fees and Charges Schedule De artmeut'; Revenue:Source;: . . ' Pee or Char a ;` is ' `':Effective Date Non-payment-fees paid prior to hearing No Fee Warrant Fee $50.00 4/10/2003 Public Assembly 8/25/1970 Application Fee Persons Reasonably Anticipated 1,000 to 2,499 $100.00 2,500 to 4,999 $150.00 5,000 to 9,999 $500.00 10,000 to 49,999 $1,000.00 50,000 and over $1,500.00 Tigard Municipal Code TMC Titles 1-17 or TMC CDC kTitles 1-18 Compact Disk(CD) $10.00 7/1/7009 88 � 6 3 City of Tigard EXHIBIT A Fees and Charges Schedule De a „ _..... rtment� Revenue Source .. Fee ar Char Effectwe Uate CITYWIDE Attorney Time Current attorney billing rate 1999 Audiotapes $6.00 7/1/2003 Com cater disk or Com act disk $10.00 7/1/2006 DVD Copies (Non-Policel $12.00 7/1/2006 Faxes for Public $2.00 /first page 7/1/2007 $1.00 /each additional page Fire Hydrant Flow Test $325.00 /each 12/9/2008 Microfiche Cotiies $1.00 /sheet up to 50 sheets plus 7/1/2007 staff time Microt�rints $0.25 /8-1/2 x 11 page 2000 $1.00 /11 x 17 page 7/1/2009 Nomination Petition Fee $50.00 7/1/2008 Photocopies&Microfilm Copies 8-1/2 x 11 $0.25 /page 1999 11 x 14 $0.50 /page 1999 11 x 17 $1.00 /page 7/1/2005 17 x 24 $1.50 /page 7/1/2007 36 x 36 $0.50 /page 7/1/2007 Photographs Actual Cost 1999 Recording of Documents actual Cost 1999 Research Fee Staff hourly rate+Citywide Overhead 2/7/2002 Fee+Materials VHS Copies(Non-Police) Actual Costs 7/1/20179 4 City of Tigard EXHIBIT A Fees and Charges Schedule De `. artmeni .. Revenue.:Sourca: . Fee or Clxar e.. Effective Date. COMMUNITY DEVELOPMENT-BUILDING Building Permit Fees (Commercial) 7/l/2007 Total Valuation: $1 -$2,000 $62.50 /minimum $2,001-$25,000 $62.50 /for the first$2,000 and $7.15 /for each additional$1,000 or fraction thereof,to and including$25,000. $25,001450,000 $226.95 /for the first$25,000 and $5.59 /for each additional$1,000 or fraction thereof,to and including$50,000. $50,001-$100,000 $366.70 /for the first$50,000 and $4.80 /for each additional$1,000 or fraction thereof,to and including$100,000. $.x100,001-$250,000 $606.70 /for the first$100,000 and $3.24 /for each additional$1,000 or fraction thereof,to and including$250,000. $250,0014500,000 $1,092.70 /for the first$250,000 and $2.77 /for each additional$1,000 or fraction thereof,to and including$500,000. $500,00141,000,000 $1,785.20 /for the first$500,000 and $2.70 /for each additional$1,000 or fraction thereof,to and including$1,000,000. $1,000,001-$2,000,000 $3,132.70 /for the first$1,000,000 and $2.44 /for each additional$1,000 or fraction thereof,to and including$2,000,000. $2,000,001 and greater $5,572.70 /for the first$2,000,000 and $2.43 /for each additional$1,000 or fraction thereof. (Single Family&Multi-Family) 7/1/2007 Total Valuation- 5 City of Tigard EXHIBIT A Fees and Charges Schedule De :artntent. RevenueSourcel Fec or Char a Effecnve llate $1 -$2,000 $62.50 /mtn.imum $2,001-$25,000 $62.50 /for the first$2,000 and $10.83 /for each additional$1,000 or fraction thereof,to and including$25,000. $25,001450,000 $311.50 /for the first$25,000 and $8.25 for each additional$1,000 or fraction thereof,to and including$50,000. $50,0014100,000 $517.84 /for the first$50,000 and $5.90 /for each additional$1,000 or fraction thereof,to and including$100,000. $100,001-$250,000 $812.84 /for the first$100,000 and $4.21 /for each additional$1,000 or fraction thereof,to and including$250,000. $250,0014500,000 $1,444.34 /for the first$250,000 and $4.17 /for each additional$1,000 or fraction thereof,to and including;$500,000. $500,00141,000,000 $2,486.84 /for the first$500,000 and $3.87 /for each additional$1,000 or fraction thereof,to and including$1,000,000. $1,000,001-$2,000,000 $4,421.84 /for the first$1,000,000 and $3.14 /for each additional$1,000 or fraction thereof,to and including$2,000,000. $2,000,001 and greater $7,561.84 /for the first$2,000,000 and $3.00 for each additional$1,000 or fraction thereof. Building Plan Review Fee 65%of base building permit fee 9/26/2000 Deferred Submittals $200.00 /minimum fee 9/24/2002 Plan Review 65%of building permit fee based on valuation of the particular portion or portions of the project. 6 City of Tigard EXHIBIT A Fees and Charges Schedule De art�aerxtRevenue:Source Fee at Clat e, Effective Date Electrical Fees 6/27/2000 New residential,single or multi-family per dwelling unit;service included: 1000 square feet or less $145.15 Each additional 500 square feet or portion thereof $33.40 Limited energy $75.00 Each manufactured home or modular dwelling service or feeder $9090 Services or feeders;installation,alterations or relocation: 200 amps or less $80.30 201 amps to 400 amps $106.85 401 amps to 600 amps $160.60 601 amps to 1000 amps $240.60 Over 1000 amps or volts $454.65 Reconnect only $66.85 Temporary services or feeders;installation,alteration or relocation: 200 amps or less $66.85 201 amps to 400 amps $100.30 401 amps to 600 amps $1.33.75 Branch circuits;new,alteration or extension per panel: With purchase of service or feeder-each branch circuit $6.65 Without purchase of service or feeder First Branch Circuit $46.85 Each addit.Branch circuit $6.65 Miscellaneous(service or feeder not included): Each pump or irrigation circuit $53.40 Each sign or outline lighting $53.40 Signal circuit(s)or a limited energy panel,alteration or extension $75.00 Each additional inspection over the allowable in any of the above Per Inspection $62.50 /hour(min 1 hour) Per Hour $62.50 /hour(mini 1 hour) Industrial Plant Inspection $73.75 /hour(min 1 hour) Electrical permit plan review fee 25%of the electrical permit fee Erosion Control Permit Fee 6/6/2000 (City receives none of this fee) 7 City of Tigard EXHIBIT A Fees and Charges Schedule . De attment,: Revenue'Source Fee or Char a Effective Date: Less than$50,000.00 $26.00 $50,000.00 to$100,000.00 $40.00 More than$100,000.00 $40.00 /plus $24.00 /for each additional$100,000 or fraction thereof Erosion Control Plan Check Fee 65%of inspection fee 6/6/2000 (City receives 50%of fee) Fee in Lieu of Sewer Based on actual cost of sewer connection, 1998 (Commercial Only) if sewer was available Fire Life Safely Plan Review 40%of base building permit fee 9/26/2000 (Commercial Only) Manufactured Dwelling Installation $305.50 9/24/2002 Manufactured Dwelling and Mobile Home Per OAR 9/24/2002 Parks,Recreation Camps,and Organizational Camps Mechanical Fees 6/27/2000 (1 and 2 Family Dwellings) Description: Furnace to 100,000 BTU including ducts&vents $14.00 Furnace to 100,000 BTU+including ducts&vents $17.90 Floor Furnace including vent $14.00 Suspended heater,wall heater or floor mounted heater $14.00 Vent not included in appliance permit $6.80 c3HP;absorb unit to 160K BTU $14.00 3-15HP;absorb unit to 100K to 500K BTU $25.60 15-30HP;absorb unit.5-1 mil BTU $35.00 30-50HP;absorb unit 1 -1.75 mil BTU $52.20 >50HP;absorb unit>1.75 mil BTU $87.20 Air handling unit to 10,000 CFM* $10.00 *Note:Fee does not apply to air handling units that are a portion of a factory-assembled appliance, cooling unit,evaporative cooler or absorption unit for which a permit is required elsewhere in the 8 City of Tigard EXHIBIT A Fees and Charges Schedule De artmenr Revenue Soutce Fe e or Cl'ar e , > Effective�3ate,` Mechanical Code. Air handling unit to 10,000 CFM+ $17.20 Non-portable evaporate cooler $10.00 Vent fan connected to a single duct $6.80 Ventilation system not included in appliance permit $10.00 Hood served by mechanical exhaust $10.00 Domestic incinerators $17.40 Commercial or industrial type incinerator $69.95 Repair units $12.15 Wood stove $10.00 Clothes dryer,etc. $10.00 Other units $10.00 Gas piping one to four outlets $5.40 More than 4-per outlet(each) $1.00 For each appliance or piece of equipment regulated by the Mechanical Code,but not classed in other appliance categories or for which no other fee is listed in the table $10.00 Minimum Permit Fee $72.50 9/24/2002 Plan Review 25%of Permit Fee Other Inspections and Fees: Inspections outside of normal business hours(minimum charge--2 hours) $62.50 /hour 9/24/2002 Inspections for which no fee is specifically indicated(minimum charge-one-half hour) $62.50 /each 9/24/2002 Additional plan review required by changes, additions or revisions to plans(minimum charge-one-half hour) $62.50 /hour 9/24/2002 Mechanical Permit Fees 9/26/2000 (Commercial and Multi-family) Total Valuati n: $1 -$2,000 $72.50 /minimum 2/1/2008 $2,001 -$5,000 $72.50 /for the first$2,000 and $2.30 /for each additional$100 or fraction thereof,to and including$5,000. 9 City of Tigard EXHIBIT A Fees and Charges Schedule De aztment>' Revenue'Source , Pee or Charge:, Effective Date; $5,001 -$10,000 $141.50 /for the first$5,000 and $1.80 /for each additional$100 or fraction thereof,to and including$10,000. $10,001 -$50,000 $231.50 /for the first$10,000 and $1.35 /for each additional$100 or fraction thereof,to and including$50,000. $50,001 -$100,000 $771.50 /for the first$50,000 and$1.25 for $1.25 /for each additional$100 or fraction thereof,to and including$100,000. $100,001 and up $1,396.50 /for the first$25,000 and $1.10 /for each additional$100 or fraction thereof Ilan Review 25%of permit fee 9/24/2002 Metro Construction Excise Tax 0.12%of building permits for projects 7/1/2006 (City will retain 5%for administrative expenses) with a total valuation of$100,001 or more, (Tax set by Metro,but collected by cities) not to exceed$12,000 Phase Permitting $200.00 9/24/2002 Plan Review 10%of total project building permit fee not to exceed$1,500 fox each phase Plumbing Pees 6/27/2000 Description: New Single-Family 1 Bath $249.20 2 Bath $350.00 3 Bath $399.00 Fixtures(Individual) Sink $16.60 Lavatory $16.60 Tub or Tub/Showex Comb. $16.60 Shower Only $16.60 Water Closet $16.60 Dishwasher $16.60 10 City of Tigard EXHIBIT A Fees and Charges Schedule I3e artmetAt! Revenuc'>;Souxce' Fee or CYar e Effective Date Garbage Disposal $16.60 Washing Machine $16.60 Floor Drain/Floor Sink 2" $16.60 Floor Drain/Floor Sink 3" $16.60 Floor Drain/Floor Sink 4" $16.60 Water Heater $16.60 Laundry Room Tray $16.60 Urinal $16.60 Other Fixtures $16.60 Sewer--1 st 100' $55.00 Sewer-each additional 100' $46.40 Water Service-1st 100' $55.00 Water Service-each additional 100' $46.40 Storm&Rain Drain-1st 100' $55.00 Storm&Rain Drain.-each additional 100' $46.40 Commercial Backflow Prevention Device or Anti-Pollution Device $46.40 Residential Backflow Prevention Device $2755 Any Trap or Waste Not Connected to a Fixture $16.60 Catch Basin $16.60 Inspection of Existing Plumbing $72.50 /hour Specially Requested Inspections $72.50 /hour Rain Drain,single family dwelling $65.25 Grease Traps $16.60 Hose Bibs $16.60 Drinking Fountain $16.60 Roof Drains $16.60 Minimum Permit Fee $72.50 Minimum Permit Fee Residential Backflow $36.25 Plan Review 25%of Permit Fee Medical Gas Systems 9/24/2002 Total Valuation- $1 -$5,000 aluation•$1 -$5,000 $72.50 /minimum $5,001 $10,000 $72.50 /for the first$5,000 and $1.52 /for each additional$100 or fraction thereof,to and including$10,000. 11 City of Tigard EXHIBIT A Fees and Charges Schedule De arttxxez�t' RevenueSaurce:' Fee,or Char a Effective:Date $10,001 -$25,000 $148.50 /for the first$10,000 and $1.54 /for each additional$100 or fraction thereof,to and including$25,000. $25,001 -$50,000 $379.50 /for the first$25,000 and $1.45 /for each additional$100 or fraction thereof,to and including$50,000. $50,401 and up $742.00 /for the first$50,000 and $1.20 /for each additional$100 or fraction thereof. Residential Fire%Mpression.ftstems Permit 9/24/2002 Multipurpose or Continuous hoop System Square uare Footage: 0 to 2,000 $115.00 2,001 to 3,600 $160.00 3,601 to 7,200 $220.00 7,201 and greater $309.00 Stand Alone System Square Footage: 0 to 2,000 $187.50 2,001 to 3,600 $232.50 3,601 to 7,200 $292.50 7,201 and greater $381.50 Restricted Ener 6/27/2000 Residential Energy Use $75.00 Commercial Energy Use $75.00 Sanitary Sewer Connection Fee $2,700.00 /dwelling unit 7/1/2006 (City receives 20%of fees collected) Sanitary Sewer 1nsPection Fee 6/6/2000 Residential $35.00 Commercial $45.00 Industrial $75.00 Tree Replacement Fee $125.00 /caliber inch 9/1/2001 12 City of Tigard EXHIBIT A Fees and Charges Schedule rtraent Revenue-Source% . Fee or, ar a Effective Date` Water Quality Facility Fee 6/6/2000 (City receives 100%of fees collected) Residential Single Family $225.00 /unit Commercial&Mi ulti-£amity $225.00 /2,640 sq. ft of additional impervious surface Water Quaandty Facility Fee 6/6/2000 (City receives 100%of fees collected) Residential Single Family $275.00 /unit Commercial&Multi-family $275.00 /2,640 sq. ft of additional impervious surface Miscellaneous Fees Address Change $50.00 7/1/2007 Fee paid inspections for residential structures pursuant to Title 14,Chapter 16 6/27/2000 Single&Two Family Dwellings $100.00 Apartment Houses&Social Care Facilities $160.00 /plus$7 for each dwelling unit in excess of 3 Hotels $160.00 /plus$5 for each dwelling unit in excess of 5 Investigation Fee Additional fee to equal to the amount of the permit 7/1/2007 Re-inspection Building $62.50 9/24/2002 Mechanical $62.50 Plumbing $6250 Electrical $62.50 Phased Occupancy $200.00 6/27/2000 Permit or Plan Review Extension $72.50 Temporary Occupancy $90.00 13 City of Tigard EXHIBIT A Fees and Charges Schedule Fe De ailment` Revenue:Source;! a or Char a Effective Date:: COMMUNITY DEVELOPMENT-ENGINEERING Addressing Assigpment Fee. $50.00 10/29/2003 En eerie Public Improvement Desigg Standards $5.00 7/15/1998 Erosion Control Permit Fee 10/29/2003 (City receives none of this fee) Less than$50,000.00 $26.00 $50,000.00 to$1.00,000.00 $40.00 More than$100,000.00 $40.00 /+$24.00 for each additional$100,000 or fraction thereof Erosion Control Flan Check Fee 65%of inspection fee 10/29/2003 (City receives 50%of fee) Free In Lieu Of Bicycle SWpi7/1/2004 8-inch white stripe $2.50 /linear foot of frontage Bike lane legends $175.00 /each Directional mini-arrows $100.00 /each Mono-directional reflective markers $4.00 /each Fee In Lieu Of Undergroundin $35.00 /lineal feet of frontage 10/29/2003 Local Imyrovement District Assessments actual Cost 7/24/1996 Public Facility Improvement Permit 2%plan review plus 7/1/2009 5%of estimated cost of public improvement with a 7/l/2005 $300 minimum Reimbursement District Application Fee $300.00 1/27/1998 14 City of Tigard EXHIBIT A Fees and Charges Schedule De attnaent'. Revenue�5ource Fee.or Ckiare Effective Date. Reimbursement District Fee Not to Exceed 6,000.00 unless 7/10/2001 reimbursement fee exceeds 15,000.00 Any amount over 15,000.00 shall be reimbursed by the owner. 6,000.00 limit valid for only 3 years from Council approval of district cost. Street Maintenance Fee 4/1/2004 Monthly Residential Rate-- Single and Multi-Family $2.18 /per unit MontbJy Non-Residential Rate $0.78 /per parking space or fueling pump station Written Appeal Filing Fee $300.00 Streetlight Ener &Maintenance Fee Based upon PGE Sch##91 Opt,"B" 2000 for the first two years costs Traffic/Pedestrian Signs Cost of materials and labor 2/7/2002 Traffic Control Devices Speed Hump Program 50%of cost 5/1/1996 15 City of Tigard EXHIBIT A Fees and Charges Schedule D.e art enti. Revenue;Source Fee or Ckzar a Effective"Date FINANCIAL&INFORMATION SERVICES Assessment Assumption $50.00 4/22/1985 Budget Document Compact Disk(CD) $10.00 7/1/2007 Paper $50.00 Business Tax Annual Fee* 0-2 employees $79.50 /per year 7/1/2009 x:99 /per year 7/1 2008 3-5 employees $106.00 /per year 7/1/2009 X1-93:99 /-per year 7/1/-2088 6-10 employees $347.00 /per year 7/1/2009 $336.90 /2088 11-50 employees $571.00 /per year 7/1/2009 x-00 /per year 7f1�2008 51 or more employees $776.00 /per year 7/1/2009 $751,00 aper yeaf X888 *-Adjusted annually in conjunction with the Portland Consumer Price Index(CPI) Pro-Rated Fee Schedule Issued January I -June 30 See Fee Schedule above Issued July 1 -December 31 1/2 the annual fee Temporary License $25.00 1/1/2008 Duplicate License/Change of Ownership Fee Change in ownership or name only $10.00 1/1/2008 Copy/replacement of license $10.00 1/1/2008 Delinquency Charge Whenever the business license fee is not paid on or before the delinquent date,a delinquency charge equal to ten percent(101/'o)of the original business license fee due and payable shall be added for each calendar month or fraction thereof that the fee remains unpaid. The total amount of the delinquency penalty for any business license year shall not exceed one hundred percent(1001/6)of the business license fee due and payable for such year. 16 City of Tigard EXHIBIT A Fees and Charges Schedule ' .... _ .. ecttve llatefceDe artmet , e'SoixEffe Comprehensive Annual Financial Report $0.00 2/7/2002 Franchise Fee Cable TV 5%of gross revenue 1/26/1999 Electricity 3%of gross revenue 4/24/2001 Natural Gas 5%of gross revenue 7/13/2004 Telecommunication 12/19/2000 Telecommunication utilities $7,500.00 /or 5%of gross revenue,whichever is greater Long distance providers and private networks $7,500.00 /or $2.90 /linear foot of installation in right of way, whichever is greater Competitive access providers and all franchisees $7,500.00 /or 5%of gross revenue,whichever is greater Telecommunication Franchise Application Fee $2,000.00 1/23/2001 Solid Waste Disposal 4%of gross revenue 1/1/2006 Lien Search Fee $35.00 2/1/2004 Passport Execution Fee $25.00 2/1/2008 Passport Photographs Fee $10.00 4/1/2007 Returned Check Fee $20.00 10/9/2001 Right-of-Way Usage Fee 9/8/2006 Electricity 3.5%of gross revenue Natural Gas 5%of gross revenue Sanitary Sewer 5%of gross revenue Telecommunication 5%of gross revenue Water 5%of gross revenue Stormwater 5%of gross revenue 7/1/2008 17 City of Tigard EXHIBIT A Fees and Charges Schedule De arhnent': Revenue'Sourcer, Fee or Char a Effectsve.llate LIBRARY Collection Agency Fee $10.00 7/1/2007 Disk or CD(Blank) $1.00 2/7/2002 Headphones $2.00 7/1/2007 Lost Items Replacement cost+$5.00 processing fee 7/1/2003 Overdue Items Daily Charge(All Items except DVDs) $0.15 /item 7/1/2003 Daily Charge(DVDs) $1.00 /item 7/1/2005 Maximum Charge $5.00 /item 7/1/2005 Public Copier and Printer Charges $0.10 /page 2001 Replacement Library Card Fee $1.00 7/1/2007 18 City of Tigard EYU IIBIT A Fees and Charges Schedule '" attuieidt. Revenue:Source. 77 ee.at CE►ar 'Effective Date. COMMUNITY DEVELOPMENT-PLANNING Accessory Residential Units $134.00 7/1/2009 Qin ; 0 7 Annexation $2,520.00 7/1/2009 (As ofjuly 1,2006 a moratorium on this fee was S-2;49944 ;711 520 in effect per Resolution 08-12,through February 2689) Appeal A �� r�vr��n)O�� .��� �t��r,c�L si`�L?�'"i(311��-�5���.€,z�(;t'l ��, ��[•'�``-� al Director's Decision(Type II)to Hearings Officer $250.00 7/1/20D3 Expedited Review(Deposit) $300.00 7/1/2003 Hearings Referee $500.00 7/1/2003 Planning Commission/Hearing's Officer to City Council $2,536.00 7/1/2003 6;,599 -;aP ApProvat_Extensi $266.00 7/1/20013 SAA ;�l In-QP7 Blastin 'Permit $271.U0 7/1/2004 Conditnnat_Use Initial $5,2455.00 7/1/2003 C ,1 ;'14-20P 11.1ajor h1odification $5,245.00 7/1/2003 Minor Modification $5579.00 7/1/2009 i5Z .98 �; 4 Resign Evaluation Team(I)ET) Recommendation{deposit} $1,298.00 7/1/2003 $4,286.94 �8� Devel"ment Code Provision Review Single-Family Building Plan $52.00 7/1/2007 Commercial/Industrial/Institution $332.00 7/1/2009 S329. 0 19 City of Tigard EXHIBIT A Fees and Charges Schedule De artmentr ReveiueSource' kee or Char a Effective Date Expedited Review 7/1/2007 Land Partition $4,3$3.00 Subdivision $5,773.00 /+$90.00/Lot Subdivision with Planned Development $7,127.00 /additional Hearing PgAippnement $261..00 7/1/2009 $259.00 -''/-1 X2007 Historic Overlay/Review District Historic Overlay Designation $4,052.00 7/1/2009 $4;816:00 7 807 Removal Historic Overlay Designation $4,052.00 7/1/2009 _ 80 7 {-2W _ Exteriors Alteration in Historic Overlay District $621.00 7/1/2009 X80 7„ 2897 New Construction in Historic Overlay District $621..00 7/1/2009 $645.00 X007 Demolition in Historic Overlay District $621.00 7/1./2009 $615.00 7,442887 Home Occupation Permit Type I $40.00 7/1/2007 Type II $255.00 7/1/2009 $282.08 ? 897 Inte retation of the QrnmuniW Development Code $612.00 7/1/2009 $687.00 7/17/20071 Joint Application Planning Fee 100%of Highest Planning Fee+50%of 7/1/2003 all Additional Fees Related to the Proposal. Land Partition Residential and Nan-Residential(3 Lots) $3,761.00 7/1/2009 X27.00 7, 897 Residential and Non-Residential(2 Tots) $3,094.00 7/1/2009 866.0 7 997 Expedited $4,425.00 7/1/2009 4,383:-98 7!1/259 r 20 City of Tigard EXHIBIT A Fees and Charges Schedule irtment' Revenoe';Source� Fee of Char e - iEffecttve Date' Final flat $899.00 7/1/2009 889i.00 7/-1/2007 Lot Line Adjustment $482.00 7/1/2009 $478.00 72/1,/2907 Minor Modification to an A �pproved flan $579.00 7/1/2009 45,74 89 7,11,12887 Non-Conforming Use Confirmation $273.00 7/1/2009 $27-17W 7�1�2007 Planned Development Conceptual flan Review $7,479.00 7/1/2009 $7,412.00 7/i1 2007 Detailed Plan Review(Concurrent Hearing) Applicable SDR Fee or Subdivision Fee+$200.00 12/1/2006 Detailed Plan Review(Separate Hearing) applicable SDR Fee or Subdivision Fee+$2,138.00 12/1/2006 Plat Name Change $274.00 7/1/2009 $272.0 7887 Pre-Aynlication Conference $373.00 7/1/2009 __.. Sensitive Lands Review With Excessive Slopes/Within Drainage Ways/ Within Wetlands (Type 11) $2,428.00 7/1/20119 $2,406,00 7/4/2007 With Excessive Slopes/Within Drainage Ways/ Within Wetlands(Type 1I1) $2,613.00 7/1/2009 X2;590:99 '', " 887 Within the 100-Year Floodplain(Type III) $2,613.00 7/1/2009 e2�0 4/i 2007 Sign Pem3it Existing and Modification to an Existing Sign (No Size Differential) $40.00 7/1/2007 Temporary Sign(Per Sign) $19.00 7/1/2006 21 City of Tigard EXHIBIT A Fees and Charges Schedule De artment: tevenuSource' Fee,or Chace Effective Date' Site Development Review&Major Modification Under 100,000.00 $4,445.00 7/1/2009 $4,405.007 1 Million/Over $5,833.00 7/1/2009 (t+$6.00/per each$10,000.00 over 1 Million) c5 8 7f1/2597 Minor Modification $579.00 7/1/2009 X408 ? 987 Subdivision Preliminary Plat without Planned Development $5,141.00 /+$93.00 per lot 7/1/2009 $5,09--5:98/4�$90.00/la 7,1,12007 Preliminary Plat with Planned Development $7,191.00 7/1/2009 $71,127,00 X087 Expedited Preliminary Plat without Planned Development $5,825.00 /+$93.00 per lot 7/1/2009 $c�0 7 f1,f2k187 Expedited Preliminary Plat with Planned Development $7,191.00 7/1/2009 Final Plat $1,653.00 7/1/2009 x;638:88 �7 Temporaty Use Director's Decision $304.00 7/1/2009 X81-80 7'�-:�290z Special Exemption/Non-Profit $0.00 7/1/2003 Tree Removal $188.00 7/1/2009 $186.0 :74120W Vacation Streets and Public Access $2,209.00 /deposit+actual costs 7/1/2009 189.00 7 f 1 2997 Variance/Adjustment Administrative Variance $621.00 7/1/2009 ,6-5-00807 22 City of Tigard EXHIBIT A Fees and Charges Schedule De atxneni Kevenue!;SQurce Fee or Cleat a Effeettve llate Development Adjustment $273.00 7/1/2009 $271.00 ? 2007 Special Adjustments Adjustment to a Subdivision $273.00 7/1/2009 $2:7i.0g 7!4/2007 Reduction of Minimum Residential Density $273.00 7/1/2009 $200 -'7/1{2007 Access/Egress Standards Adjustment $621.00 7/1/2009 7 Landscaping Adjustments Existing/New Street Trees $312.00 7/1/2009 X00 7/12007 Parking Adjustments Reduction in Minimum or Increase In Maximum Parking Ratio $621.00 7/1/2009 0g 7/ /-2987 Reduction in New or Existing Development/Transit Imprvmnt $621.00 7/1/2009 $61:08 ? 4?80 Reduction in Bicycle Parking $621.00 7/1/2009 $615-00 7,/4/2007 Alternative Parking Garage Layout $273.00 7/1/2009 $271i.00 X87 Reduction in Stacking Lane Length $621.00 7/1/2009 x.-08 X887 Sign Code adjustment $621.00 9615.00 Street Improvement Adjustment $621.00 7/1/2009 $615-00 7/1/2007 Tree Removal Adjustment $273.00 7/1/2009 $271,00 7 Wireless Communication Facility Adjustments Setback from Nearby Residence $621.00 7/1/2009 $6150 1/2007 Distance from another Tower $273.00 7/1/2009 23 City of Tigard EXHIBIT A Fees and Charges Schedule De artment . Iteveuue!Source` Fee qr Char e . - Effective bate. Zoning Map/Text Amendment Legislative-Comprehensive flan $8,966.00 7/1/2009 �_ Legislative-Community Development Code $3,524.00 7/1/2009 -3;433:-88 7 007 Quasi-judicial $3,229.00 7/1/2009 P,,209.00 7141/200 Zoning Analysis (Detailed) $579.00 7/1/2009 $574,09 77/2/2007 Zoning Wq.uixy Letter Sim le $67.00 7/1/2009 COMMUNITY DEVELOPMENT- MISCELLANEOUS FEES&CHARGES Building Plan Copies $2.50 /copy 7/1/2007 CommuWW Devel meat Code 7/1/2006 CD Rom $10.00 Comprehensive Plan-Volumes 1&2 $77.00 1997 GIS Mans 2/7/2002 8-1/2"x I V Black and White $0.25 7/1/2007 Color $1.50 11"x 17" Black and White $1.50 Color $2.50 17"x 22" Black and White $2.50 Color $5.00 22"x 32" Black and White $5.00 Color $7.50 34"x 44" Black and White $7.50 24 City of Tigard EXHIBIT A Fees and Charges Schedule Dc airtment'; Revcnue Source:-:..: Fee or Char e Effective Date Color $10.00 Mas 2/7/2002 Address Maps by Section $2.50 /plot Annexation&Road Jurisdiction $10,00 /plot As-Built Drawings $2.50 /copy or plot Assessor's Tax Map $2.50 /copy or plot Bike Path flan $6.00 /plot Buildable Lands Inventory $10.00 /plot Comprehensive Plan and Zoning Map $10.00 /plot Orthophotographs $5.00 /copy Stream Corridor&Wetlands Map $10.00 /plot Street Index Map $10.00 /plot Subdivision Map $10.00 /plot Subdivision Plat Map $2.50 /copy Topographic Maps $5.00 /copy Transportation Plan Map $10.00 /plot Vertical Bench Mark Control Map $6.00 /copy Zoning Map $10.00 /plot Nei hborhood Meeting Signs Laud Use $2.00 1997 Oversize Load Permit $200.00 7/1/2005 Planitnetric Mans 3/10/1986 Blueline print-quarter section $5.00 Mylar-quarter section $150.00 /+reproduction cost Tigard Transportation System Pian $15.00 2000 Tigard Triangle Obsolete Master Plan(3/92) $10.00 Master Plan Color Map(adopted 11/92) $2.50 Specific Area Plan(1/94) $7.50 Transportation&Traffic Evaluation Report(10/93) $7.50 Visual Preference Survey $5.00 /for second copy Obsolete 25 City of Tigard EXHIBIT A Fees and Charges Schedule .. De artment: Revenue:Source Fie or Char a E££ectxve Date Washgvn S uare Re 'oval Center 1999 Task Force Recommendations $10.00 Master Flan Map(Zoning/Plan) $2.50 26 City of Tigard EXHIBIT A Fees and Charges Schedule De . rtment+. Revenue Source Fee or.Char a Effective:Date. POLICE Alarm Permits Burglary or Robbery $25.00 7/1/2009 4 0 Combination-Burglary and Robbery $25.00 6/28/1982 Explorer Post Annual Fee $20.00 7/1/2008 Failure to Obtain or Renew Alarm Permit Fee $25.00 6/28/1982 False Alarm Charge 7/1/2003 3rd false alarm $50.00 4th false alarm $75.00 5th false alarm $100.00 6 or more false alarms $150.00 Law Enforcement Officers Safety Act Qualification Fee $25.00 7/1/2006 Liquor License $25.00 7/10/2001 Police Services Fees DVD and VHS Evidence Copies Actual staff costs plus materials 7/1/2005 Police Documents/Reports $10.00 /for the first 15 pages and 7/1/2008 $0.30 /page thereafter Police Digital Photo CD Copies $10.00 /CD 7/1/2005 Police Photograph Copies $10.00 /roll 7/1/2003 Property Forfeiture for Criminal Activity Varies 5/25/1999 Second Hand Dealers and Transient Merchant License $404) Occasional $25.00 7/1/2009 Full-Time $75.00 7/1/2009 Reporting Forms $0.40 /each 7/1/2009 27 City of Tigard EXHIBIT A Fees and Charges Schedule Vehicle Release Fee $ 100.00 7/1/2007 28 r C� ro' w CP n " n O oo �: O Q ~W a o ca cPatM E- o o o (D ro td P N wi p p N toW (D a a P m io r171 ro m R. n n� ro c' O Gti cnA W N W N N Q W G1 C1 G� C\ N W W GD 1 C7 © © C7 C> Q Q ul 0 0 0 0 0 D O G7 b C? C> 0 \ \ \ \ \ \ \ \ \ \ \ \ 0 0 0 0 0 0 0 0 o n n n ON N n : m tz n ©' w ro � o N rn o na �s H Oma car, w Q" VP , ny., ¢ cam. w i 0 o c�i cn c n N W � s � s .A -Ws -LO o cn o c cn v, Q © Ca Q In O O 0 0 O C�- c� c, c� c O C O N 00 � CQ � C) --A W M` O O Q O O O O D --j CN —3 V'[ N C'1i N Ln } o or fly, w " pt Pt o v' a. n O �y N N N N N N NN N N O O O O O O O O O O O O O O 0 0 0 0 0 CD O CD Q Q Q Q CON 0 0 O O O w C, 0 0 3-^' 00 O N 00 V' O I-) 00 J O V 00 -.t 11 '� G ro ros p HH yyy w �+ p W N � •�- A� � �vq+ Aai � n M 3 {fq O tn 9 () n rn o v~ n o' cn C7 0 , ciso h ria © ro UG p. y O ot?io rn "` ro R. d � ro ro o � � n r� w n� N o 0 04.�- cin ff4 �. n orL , r 0 0 n © n © 00 � Cn W Ov 00 C.n O C5 C) C7 C7 G] til tij 0 0 0 0 0 C C nQ W n n ri � h rt �s Yr tt n ' O r-r rt n re C m OY7 n NN N N N N N N N N N N N N N N N Q C? O O O O O O O O O C7 C7 © © © Q CD C7 µ C7 O Q Q Q Q Q Q Q Q Q Q C? O P C> �` C? 110Q0 ---1 06 N00 ^i'V O C' ttr ro ro m R. n I� o w � � CD W W W W N N N N N N W W W N N W N N N Co Ln W �o ih rl C� 4�, " U'i W i... I'D J Q 00 ON W W J 00 C> W 00 -i C1 V W d d C] O O G7 C7 d © O C'0 © p CD O O CD O d d 0 C CD C? C? q C,? O O C) 0 0 O O O d d A A A A A A A A A A A A A A C7 A A A A n n �; �' n n n n n n n n n n n n n A n n n n ro ro rc rn ro rn rn ro rn r„c rn sa ro ca ro ro ro ro ro cn ro ro ro cn ro ro ro ro Cc ro ro ro co ro r-r �•r r+ rt r•r .-r �-+ �-r �-e .-r rt rt rt rt rt rt '-r rr n �•+ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 `CEJ: � µ Fy � ~ N 1--� �--} 3"1 1-� �--1 i--1 1--� W s-+ e� C7 d © O d © Q Ci CD d d d C) C] Q C� C C> O a, N N N N N N N N N N 1V N N N N N N N N N Q Q O0 C] C) C7 0 0 0 r CJ yr 00 J µ C] V 00 -j ) I'D 00 00 --] 4 Y"" City of Tigard EXHIBIT A Fees and Charges Schedule De attnxent.`i Revenue Source;. Fee or Char a Effective Tate. COMMUNITY DEVELOPMENT-PLANNING Park System Development Charge(SDC)* Single Family Unit $5,370.00 7./1/2009 Multi-family Unit $4,316.00 1/1/2009 $4, „ 883 Spaces in a manufactured Dome park $4,257.00 1/1/2009 X184-98 4711/2008 Commercial/industrial(per employee) $364.00 7./7./2009 $354:88 EBBS *See Appendix for methodology used to calculate the charges. The Park System Development Charge(Park SDC)is a City of Tigard charge that is assessed on new development to support the acquisition and development of parks,greenways,and paved trails,all of which are used by residents of Tigard and by those who work here. The Park SDC is a one-time fee charged to new development to help pay a portion of the costs associated with building additional parks and trails to meet the needs created by both residential and commercial/industrial growth. The SDC revenues can only be used on capacity-increasing capital improvements and cannot be used to repair existing park facilities. Park SDCs are assessed on new residential development on a per-unit basis and against commercial and industrial development on a per-employee basis. The amount of the charge for each land use category is adjusted each year,effective January 1 st,in relation to two indices,one reflecting changes in development/construction costs and one reflecting changes in land acquisition costs. .For information about Park SDCs regarding a specific project contact the City's Permits/Projects Coordinator at 503- 718-2426. For more detailed information on calculating Park SDCs see City of Tigard Resolution No_04-97 and the accompanying report,"Parks and Recreation System Development Charges Methodology Update"by Don Ganer& Associates,Inc.,November 10,2004. Park SDC Annual Adjustment 4/10/2001 Parks SDC fees shall be adjusted annually on January 1 st of each year beginning in 2002. The new fee will be determined by multiplying the existing fees by the average of two indices,one reflecting changes in development/construction costs and one reflecting changes in land acquisition costs. The average of these two indices is a reasonable approach because the Parks SDC fee is roughly split 50%between land acquisition land development components. 33 City of Tigard EXHIBIT A Fees and Charges Schedule De artment`. Re S' f >Fe ox Clxar a Ef£ectxve.Date': The index for the Land Acquisition component will be the base cost for residential tract land in Tigard,as determined by the Washington County Appraiser. The average cost for residential tract land was selected because it is readily identified and is the lowest priced of the buildable lands in Tigard. Changes in this base cost can be calculated in terms of a percentage increase,to create the level of change to the original index,and projected to the overall acquisition cost. In accordance with Measure 5,the Washington County Appraiser's office will determine appraised values on July 1 of each year. The index for the Land Development component of the Parks SDC will be the Construction Cost Index for the City of Seattle as published in the December issue of the Engineering News Record(ENR). The Seattle cost index will be used because the city is the geographically closest to Tigard of twenty metropolitan areas for which the ENR maintains cost data. This index is adjusted monthly,quarterly,and annually. The annual index for each year will be selected beginning with the index for December 2002. The annual index will be used because it is available in December and most closely coincides with the January 1 st implementation of the Park SDC fee adjustments. Park SDC Annual Adjustment(cont.) Calculation Definitions: SDC (2000) = Current SDC fee L(2000) = Average cost of residential tract land 2000 L(2001) = Average cost of residential tract land 2001 L(2xxx) = Average cost of residential tract land 2xxx C(2000) = Construction cost index of 2000 C(2001) = Construction cost index of 2001 C(2xxx) = Construction cost index of 2xxx LCI = Land Cost Index:change from the current year from previous year CCI= Construction Cost Index:change from the current year from previous year ACI= Average cost index change of LCI+CCI Formula- L(2001) /L(2000) =LCI and C(2001) / C(2000) =CCI therefore LCI+CCI/ 2 =ACI then SDC(2001)X ACI =SDC (2002) 34 City of Tigard EXHIBIT A Fees and Charges Schedule De arttnentRevenue Source Fee or Char a EffeeOe Date: Each year subsequent to 2002,the costs shall be revised using the current year and previous year's data. Not withstanding the foregoing,all calculations shall be carried out to the thousandth place. c# final product ending in.49 or less shall be rounded down to the nearest dollar,.50 or more up to the next dollar. Community Development staff will perform the adjustment calculation and prepare the resolution each year. 35 City of Tigard EXHIBIT A Fees and Charges Schedule ... De attment Revenue:Souxce Fee or Ch e Effective Date COMMUNITY DEVELOPMENT-ENGINEERING Traffic Impact Fee Trip Rate Residential Use $360.00 /average weekday trip 7/1/2009 $339.00 Y-avetage weekday trip 7'�9S Business&Commercial Use $91.00 /average weekday trip 7/1/2009 $83.00 ••1..x'2008 Office Use $330.00 /average weekday trip 7/1./2009 2.99 4avefage weekd*y tnp Industrial Use $346.00 /average weekday trip 7/1/2009 $327.00 /-2998 Institutional Use $149.00 /average weekday trip 7/1/2009 $141.901 age weekd-, X88 Transit Rate $27.00 /average daily trip 7/1/21109 $'� t�,,efffge :/4,12883 The Traffic Impact Fee(TIF)is a Washington County charge,approved by the voters in November,1990,that is administered and collected by the City of Tigard. It went into effect in 1991. On July 1,2009 it was replaced with the Transportation Development Tax(IDT)regarding new development projects. all projects that received Land Use Approval and submitted building permit applications prior to July 1,2009 remain under TIF as do most non- residential projects that received Land Use approval prior to July 1,2009 even if building permit applications were submitted after that date. Residential,change-of-use,and minor addition projects for which building permit applications are submitted on or after July 1,2009 are subject to TDT. TIF charges are assessed on new development to help provide funds for the increased capacity transportation improvements needed to accommodate the additional vehicle traffic and demand for transit facilities generated by that development. TIF provides funds for these capacity improvements to county and city arterials,certain collectors,and certain state and transit facilities as listed in the County's Base Report list of projects. TIF is categorized as an Improvement Fee:revenue must be dedicated to capital improvements that expand capacity and may not be used for maintenance,repair,or other non-capital improvements. TIF is assessed on new development on the basis of the number of trips that development is projected to generate. The bases for these trip projections are the statistical analyses and findings about trip generation found in the Institute of Transportation Engineers(ITE)Manual. Table U.1 of the Washington County Traffic Impact Fee Procedures Manual provides figures for the weekday average trips generated per unit by different Land Uses. For residential uses the units are dwelling or occupancy units. For commercial and industrial uses the units are the square footage of the use or units unique to the use such as lanes,fueling positions,etc. 36 City of Tigard EXHIBIT A Fees and Charges Schedule The TIF rate for each land use category is adjusted each year,effective July 1 st,to account for inflation. For information about the TIF regarding a specific project contact the City's Permits/Projects Coordinator at(503) 718-2426. For more detailed information on calculating TIF charges and a detailed list of Land Uses and their associated average trip rates see the Washington County Countywide Transportation Development Tax Manual. *See Appendix for methodology used to calculate the charges. The Traffic Impact Fee program is governed by Washington County. All fees and procedures are set by the County. Countywide Transportation Development Tax(TDT)-(Example Land Uses and Charges*) Single Family Detached $4,599.00 /per unit 7/1/2009 Apartment $2,896.00 /per unit 7/1/2009 Residential Condominium/Townhouse $2,727.00 7/1/21109 General Office Building(per TSFGFA**) $4,428.00 7/1/2009 Medical Office Building $15,307.00 7/1/2009 Fast Food Restaurant(ono drive thru) $13,082.00 7/1/21109 Shopping Center(per TSFGLA**) $5,734.00 7/1/2009 The Countywide Transportation Development Tax(TDT)is a Washington County Tax approved by the voters in November,2008,that is administered and collected by the City of Tigard. It went into effect on July 1,2009, replacing the Traffic Impact Fee (TIF)program. Like TIF,TDT is assessed on new development to help provide funds for the increased capacity transportation improvements needed to accommodate the additional vehicle traffic and demand for transit facilities generated by that development. It provides funds for these capacity improvements to county and city arterials,certain collectors,and certain state and transit facilities as listed in the County's Capital Improvements Project List. The TDT is categorized as an Improvement Fee:revenue must be dedicated to capital improvements that expand capacity and may not be used for maintenance,repair,or other non-capital improvements. TDTs are assessed on new development on a per-unit basis. For residential uses the units are dwelling units,beds, rooms,etc. For commercial and industrial uses the units are the square footage of the use or units unique to the use such as lanes,fueling positions,etc. The TDT rate for each land use category is adjusted each year,effective July 1st,and the rates for each year from July 1,2009 through June 30,2013 were established in Appendix B to Washington County Engrossed Ordinance 691, August 29,2008. 37 City of Tigard EXHIBIT A Fees and Charges Schedule For information about the TDT regarding a specific project contact the City's Permits/Projects Coordinator at(503) 718-2426. For more detailed information on calculating TDT charges and a detailed list of I and Uses and TDT charges through 6/30/2013 see Appendix B to Washington Counts=Engrossed Ordinance 691,August 29,2008 and the Washington County Countywide Transportation Development Tax Manual. *� TSFGFA =thousand square feet gross floor area;TSFGLc1 =thousand square feet gross leasable area. 38 City of Tigard EXHIBIT A Fees and Charges Schedule Depart � racntRevenue.'_ Source;'; .... Fee or Char a Effective Date'. PUBLIC WORKS-WATER Water System Development Charge(SDC)* 11/28/2000 5/8"x 3/4"Meter 410 Service Area $2,041.00 Bull Mountain System $2,763.00 1"Meter 410 Service Area $5,103.00 Bull Mountain System $6,908.00 1 1/2"Meter 410 Service Area $7,348.00 Bull Mountain System $9,947.00 2"Meter 410 Service Area $16,328.00 Bull Mountain System $22,104.00 3"Meter 410 Service.area $30,615.00 Bull Mountain System $41,445.00 4"Meter 410 Service Area $51,025.00 Bull Mountain System $69,075.00 6"Meter 410 Service area $102,050.00 BuH Mountain System $138,150.00 8"Meter 410 Service Area $163,280.00 Bull Mountain System $221,040.00 10"Meter 410 Service Area $293,496.00 Bull Mountain System $397,319.00 12"Meter 410 Service area $775,907.00 Bull Mountain System $1,050,382.00 *See Appendix for methodology used to calculate the charges. 39