Loading...
Resolution No. 08-19 CITY OF TIGARD, OREGON TIGARD CITY COUNCIL RESOLUTION NO. 08- A RESOLUTION FINALIZING SANITARY SEWER REIMBURSEMENT DISTRICT NO. 44 (SW CHERRY DRIVE) AND AMENDING THE PRELIMINARY CITY ENGINEER'S REPORT CONTAINED IN RESOLUTION NO. 07-50. WHEREAS, on August 28, 2007, the City Council approved Resolution No. 07-50 to form Sanitary Sewer District No. 44 to construct a sewer in SW Cherry Drive in accordance with TMC Chapter 13.09;and WHEREAS, Resolution No. 07-50 included the City Engineer's Report that included an estimated construction and total project cost;and WHEREAS, construction of the sewer improvements has been completed, final costs have been determined, and the City Engineer's Report has been revised to include the final costs as required by TMC 13.09.105 (1); and WHEREAS, the property owners within the district have been notified of an informational hearing in accordance with TMC13.09.060 and an informational heating was conducted in accordance with TMC 13.09.105;and WHEREAS, the City Council has determined that the proposed revisions to the City Engineer's Report, as recommended by the City Engineer,are appropriate. NOW,THEREFORE,BE IT RESOLVED by the Tigard City Council that: SECTION 1: The Final City Engineer's Report titled "Sanitary Sewer Reimbursement District No. 44", attached hereto as Exhibit A,is hereby approved. SECTION 2: The City Engineer's Report as presented in Resolution No. 07-50 is hereby amended by the attached Final City Engineer's Report(Exhibit A). SECTION 3: The City Recorder shall cause a copy of this resolution to be filed in the office of the County Recorder and shall mail a copy of this resolution to all affected property owners at their last known address. SECTION 4: This resolution is effective immediately upon passage. PASSED: This 73 day of✓� �l 2008. e Mayor/-Cit;—of Tigar ATTEST: City Recorder-City of Tigard RESOLUTION NO. 08- Iq Page 1 Exhibit A Final City Engineer's Report Sanitary Sewer Reimbursement District No. 44 (SW Cherry Drive) Background This project was constructed and funded under the City of Tigard Neighborhood Sewer Extension Program (NSEP). Under the program, the City of Tigard installed public sewers to each lot within the project area. At the time the property owner connects to the sewer, the owner must pay a connection fee, currently $2,835, and reimburse the City for a fair share of the cost of the public sewer. There is no requirement to connect to the sewer or pay any fee until connection is made. In addition, property owners are responsible for disconnecting their existing septic systems according to Washington County rules and for any other modifications necessary to connect to the public sewer. Project Area- Zone of Benefit Serving the 19 lots in the following table required the extension of an existing sewer in SW Cherry Drive. Extension of an existing line in Hunziker Street will be required to provide service to the lots to the north. To the south, 7510, 7530, 7550 and 7570 SW Cherry Drive will be served from a line behind the houses constructed through a separate reimbursement district as directed by City Council on July 24, 2007. The project provided sewer service to a total of 19 lots within the reimbursement district as shown on Exhibit Map B. Cost The final cost for the sanitary sewer construction to provide service to the 19 lots is $379,609. An additional $8,713.20 was paid to the contractor for pavement restoration not included in the reimbursement district. Engineering and inspection fees amount to $51,247 (13.5%) as defined in TMC 13.09.040(1). The final total project cost is $430,856. This is the amount that should be reimbursed to the sanitary sewer fund as properties connect to the sewer and pay their fair share of the total amount. However, the actual amount that each property owner pays is subject to the City's incentive program for early connections. In addition to sharing the cost of the public sewer line, each property owner will be required to pay a connection and inspection fee, currently $2,835,upon connection to the public line. All owners will be -responsible for all plumbing costs required for work done on private property. Reimbursement Rate All properties in the proposed district are zoned R-3.5 but vary in lot size from about 16,000 to 26,000 square feet as can be seen in the following list of lots. Therefore, it is Exhibit A Page 1 of 4 recommended that the total cost of the project be divided among the properties proportional to the square footage of each property. Other reimbursement methods include dividing the cost equally among the owners or by the length of frontage of each property. These methods are not recommended because there is no correlation between these methods and the cost of providing service to each lot or the benefit to each lot. Each property owner's final fair share of the public sewer line is $1.24540646 per square foot of lot served. Each owner's fair share will be limited to $6,000, to the extent that it does not exceed $15,000, for connections completed within three years of City Council approval of the Final City Engineer's Report following construction in accordance with Resolution No. 01-46 (attached). In addition to paying for the first $6,000, owners will remain responsible for paying all costs that exceed$15,000. Upon request, payment of costs that exceed $15,000 may be deferred until the lot is developed, as provided by Resolution No. 03-55 (attached). Annual Fee Adjustment TMC 13.09.115 states that an annual percentage rate shall be applied to each property owner's fair share of the sewer line costs on the anniversary date of the reimbursement agreement. The Finance Director has set the annual interest rate at 6.05% as stated in City of Tigard Resolution No. 98-22. Recommendation It is recommended that the reimbursement district be finalized with an annual fee increase as indicated above and that the reimbursement district continue for fifteen years as provided in Tigard Municipal Code (TMC) 13.09.110(5). Fifteen years after the formation of the reimbursement district, properties connecting to the sewer would no longer be required to pay the reimbursement fee. Submitted March 25,2008 Q P- Aku4tin P. Duenas, P.E. City Engineer i:tengt2007-2008 fy ciplcherry st sanitary sewer extension dist 44VinalizationM-8-08 reim dist 44 report ex a.doc Exhibit A Page 2 of 4 } �_..W aix n m m(n a)a)O m o M m n N u)W Nro N Z Z WZ (U CO O CO ON M W M M N M CO a! rL o N Q (fl q ; N m (n V(n n w�u O O Mo O�7 Lo O V w O »Fnuaevu0,us696%W.(nua(»<ni»in�ininf9 W LL Q O M w D Q LLI¢ a a mF 0000000000000000000 0 O o0000000OooO000000O 0 00000000000(:: 0000000 a>a) o) a> a) a) o)o»a) a) o) a) G>o)��o» - Z m w 7 O Q � c m ° L6 — o W ° s (�- o a) o p M W n m m M m m 0 W 0 M m n N u)W r N r o N a) ~ 4- a N +-' C N Z n W O M O n m(n(n m m M V M m W n co L .�-. O W O 0 O N O O N 00 M (OM M NmIli m yr nN O a) i a) C>+ 0 �m Nm O N 0ONOOrNrOrMr iiin is ii6%699 Vn 6% s in 6% 2% 0 co E Q Tc "c NN .6 . a) - u) ro0m > r u 6+O%. N m (D a) x co O ' o C 3 m V x 'oa) E O LL c O Up p OaO ca UU p O Z U C O w W m W 0m O W O M m n N(n mrNro t0 O O (p E Q a) Cc Q O O N 000 M M M M N M( Vim'_M<t (mn 0 C U O- O U T a3 C N O Zy of oio oai o N ov c)w ui Dov to of M a) y c $ V U O a3 � Q OS E LL ? Nffl�ine�Ntn in N»N»uN9�N»�NOA NtfT UNg M»N(fi in w a) ,"OO- m. ,.Z-'} c p„- .«�0.. N p N ,a o m `� o c - Um 0 (D ° >, n: U ° a) (a o > cavi a m t1 w .0 'a a) a a) x 2 0 0 CL a ECD Q) - aw a) � E 0 O 'o ID C Q O N W Z a: ci 'a oE �_ >'CQ � 0.a) 0 10 ¢ m N M N O n u1 N O m m aD u) u) N a) U a Q c M V) N O O _a W C m n nnO n m nr n o n w n N vaDn(n a) {� O (A a) C > 'L Q M M M M v cl) m m M V M V'V'(n V u)V M m E — ti O a ('� 3 as �..� L. W 0000000000000000700 () ^ - C C Z 'aE 7 p 0 O O y Na° N a a) 3 00 = S 3 ° m(D mLi 0 } OS LL M M M W N M m N(wn M(0n w I-r- N M 00 N co +'_-� N2 'L c a C C N (0 O = m W onrnmm (a0oroorniNn �vmmoovMn � 'n � c a) CQ 2 3 O � = O_ >' O 0 O O a O al 1 Q m M u)O 00 a0 V r N m 7 m M r 00(O In m M O C U a) •a 3 c G Q W (n 0 r CO OD O O (O in V W O aD V W M(9[r r -C O Q•- `� L N a) m O U W 3 )l (N7 m M N N (00 m M N N O V v OND 00 M(On(Nn m O > V L 3 ~ O > w a) Q C n(Oo (Ooo Nm(no (n C O c U "O C o�' o V i r r r r r r r r r r N c N N N r N N r E Q- ° a 3 p O 3 O 0) a ? 0 -0 a� o . 3 > p > o m c .Q U i C co O Q L9 -0 a) o L a� . v c O �� La � . m p mo (nnaomcoron o o o o o o o o ov W c ° N •G� ° (mmmmco (oo (omm(on (Oonvw (onrnNom W u) +? O (n o o � 'co N 3 0 F' 000Soo0o0000NNNNNNNNMo H LL a) m O C U 0 0 C) N C —0 N �j mmmmmmmmm00ool� o0000000m c � � v Z � c)w 3 c) Lj(D 0 a`) � c o rn x 0 cl 0 0 0 O U n O O O 0 O o Z O O C U O x O O C ¢ o00000000000000000o W = o c 3: m00 ° N� 3 0 � o ~ u)u)u)u)WWmini CHERRY DRIVE Reimbursement District No. 44 Cost to Property Owners Based on Final Project Cost Summary February 13,2008 Final Construction Cost $379,609 13.5%for Admin&Eng $51,247 total project costs $430,856 total area to be served (S.F.) 345,956 total cost per S.F.to property owner $1.24540646 PAGE 4 OF 4 r O —� 1S �kaX13H0 � �- MS SlvSL z d N 0 CN ),a83H O d- y MS 069L (n p 1S ) H83H0 �? z MS 969L z 3AINO Add3H0 X �- O MS 0 L9L > w Of w F- w 1S A2i X13 H 0 cLp m p w cn cn MS S L 9 L �:: p y 1S Ad83H0 w ��y MS 029L m Z N s x _ of : � ON o ; v '�S w U w V) ,ljs Cyd, z w `` op can m is d 13 �, ,y p o � O S'* 'l1s d'd� O .!9 > O I� Z 94' l Q S ,lq S d, <9 a� O O �'! s'F�, s99 !y � � � ! d% CL �S o o`�'�y 9� S S0�,yJ ���J S �! V) N N N � � w O U 3Ad SN8VA z a