Loading...
Resolution No. 08-06 CITY OF TIGARD, OREGON TIGARD CITY COUNCIL RESOLUTION NO. 08-66 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TIGARD, OREGON DECLARING THE NEED TO ACQUIRE PROPERTY FOR THE PURPOSE OF CONSTRUCTING IMPROVEMENTS TO BURNT-IAM STREET AND ASH AVENUE IN THE CITY OF TIGARD. WHEREAS, the Tigard City Charter grants the City authority to acquire land for public purposes; and WHEREAS, the City of Tigard,is authorized by ORS 35.605 to purchase, acquire, take, use, enter upon and appropriate land and property within or without its corporate limits for the purpose of establishing, laying out,widening, enlarging or extending roads, streets or highways; and WHEREAS, the widening and reconstruction of Burnham Street from Main Street to Hall Boulevard, and the extension of Ash Avenue from Burnham Street to the Commuter Rail Parking Lot are approved capital improvement projects currently being designed for construction beginning in 2008; and WHEREAS, the Burnham Street Improvement Project reconstructs the existing street,widens it to ultimate width with wide sidewalks,planters,gateway treatments,green storm drainage facilities, utility undergrounding, and landscaping in accordance with the concepts in the Tigard Downtown Improvement Plan and the Comprehensive Streetscape Design; and WHEREAS, the Ash Avenue Extension Project extends Ash Avenue north from Burnhain Street to provide access to the Commuter Rail Parking Lot, and to form a part of the proposed future extension of Ash Avenue to connect to Scoffins Street and Hunziker Street at Idall Boulevard; and WHEREAS, for the public purposes of improving die streets'Within the City of Tigard,including Burnham Street and Ash Avenue, for the health, safety, benefit and general welfare of the public, die City Council has deemed necessary the acquisition of certain properties. NOW,THEREFORE,BE IT RESOLVED by the Tigard City Council that: SECTION 1: The City of Tigard City Council does hereby find and declare that properties located in die City of Tigard, Washington County, Oregon are needed and requited for the construction, operation, maintenance, repair and improvement of Burnham Street and Ash Avenue. These properties are described as follows: Properties described in Exhibit A attached hereto and incorporated herein by this reference; ancillary easements as may be needed for slope, sidewalk, utility, wetland mitigation, stone 'eater treatment, storm water detention, and temporary constriction purposes; additional properties as yet undescribed that may be needed to fully accommodate the ultimate section for both streets in accordance 'vith the final design dra'vings; RESOLUTION NO. 08- DG Page 1 incidental additional right-of-way at intersections and within the project Iii-nits as may be reasonably necessary in order to accommodate project design; and any uneconomic remnants, as determined by appraisal. SECTION 2: The improvements to Burnham Street and die extension of Ash Avenue, for which the real properties and interest are described herein, are required and are being taken as necessary in the public interest, and the improvements to said properties will be planned, designed, located and will be constructed in a manner that will be most compatible with the greatest public benefit and die least private injury or damage. SECTION 3: The Tigard City Manager and the City's attorneys are authorized to negotiate with the owners and other persons in interest in the real properties described herein as to tie compensation to be paid for the acquisition of die properties. The Tigard City Manager is authorized to enter into agreements for purchase of these properties at the appraised fair market values. The City Manager is further authorized to negotiate and execute agreements for purchases that exceed tie appraised values as long as the total agreement amount for each property is less than $75,000. Purchase of properties for amounts that exceed the appraised values and are $75,000 or higher must be approved by City Council. SECTION 4: In die event that no satisfactory agreement can be reached on any of die properties, dien the attorneys for tie City of Tigard are directed and authorized to commence and prosecute to final determination such proceedings as may be necessary to acquire the real properties and interest therein, including exercise of eminent domain, and that upon tie filing of such proceedings, possession of tie real properties and interest therein may be taken immediately to the extent provided by late. SECTION 5: This resolution is effective immediately upon passage. PASSED: This�2(�,4 J^'day of 2L( , 2008. Ma r City of Tigard ATTEST: �OePaty City recorder- City of Ti and iAEn0huMmselutiensQ.26.00 resolution of necessity for improvements to humham street and ash avenue res.dx RESOLUTION NO. 08-C� , Page 2 FILE N0. 1 TAX LOT 2S-1-02AC-00500 ENGINEER'S CENTERLINE STATION: 1+00 STATION: 1+16.36 OFFSET: 40.69' RT. bb- ,�F\ STATION: 1+42.20 n F �r\ OFFSET: 46.80' RT. <yyc Gyp y� STATION: 1+46.62 OFFSET: 28.10' RT. 1 STATION: 1+8801 \ OFFSET: 37.50' RT. yo 2S-1-02AC-00500 WOODARD 0 �o 0 PARCEL 1 PARCEL 2 ®STREET DEDICATION PUBLIC UTILITY EASEMENT AREA = 2,362 S.F. f AREA = 402 S.F. f —N — PARCEL 3 5' WIDE TEMPORARY CONSTRUCTION EASEMENT AREA = 510 S.F. f SCALE: 1"=40' ACQUISITION MAP BURNHAM STREET RECONSTRUCTION PROJECT CITY OF TIGARD, OREGON DATE: FEBRUARY 19, 2008 SHEET 1 OF 1 Exibit A FILE NO. 001 TAX LOT 2S- I-02AC-00500 � sQ f \ C \ sc \ 19.7' A �� � 36.0' ` \ iiqli k 11 Ell, i 60.9' ' 2S- 1-02AC-00500 / WOODARD ,ESC I ST I NG / PAVEMENT 3 a T O N � o SCALE: 1"=40' ` a °o � 3 � ASPHALT DRIVEWAY TRANSITION RECONSTRUCTION AREA 3 AREA = 1235 S.F. O C3 ol DRIVEWAY RECONSTRUCTION MAP BURNHAM STREET RECONSTRUCTION PROJECT CITY OF TIGARD, OREGON • DATE: JULY 10, 2007 N SHEET 1 OF 1 m FILE N0. 3 TAX LOT 2S-1-02AB-05301 TAX LOT 2S-1-02AC-00200 s y s 3 i 0 �o 3 2S—1—02AB-00200 STEVENS -N - SCALE: _SCALE: 1"=40' PARCEL 1 , , PARCEL 2 PARCEL 3 ®STREET DEDICATION ,' ; STREET DEDICATION -PUBLIC UTILITY EASEMENT AREA = 1,181 S.F. f AREA = 228 S.F. f AREA = 100 S.F. PARCEL 4 PARCEL 5 5' WIDE TEMPORARY 5' WIDE TEMPORARY CONSTRUCTION EASEMENT CONSTRUCTION EASEMENT AREA = 794 S.F. t AREA = 152 S.F. t ACQUISITION MAP BURNHAM STREET RECONSTRUCTION PROJECT CITY OF TIGARD, OREGON DATE: FEBRUARY 5, 2008 SHEET 1 OF 1 FILE NO. 003 TAX LOT 2S- 1-02AB-05301 TAX LOT 2S— I—02AC-00200 / 3 c, / o ^ / 24.5' / / B EXISTING PAVEMENT 36.0' \ 15.0' / 36.0' S / "o 0 70.4' 18. 3 A 5" 2S— I—02AB-00200 \ STEVENS EXISTING PAVEMENT \ sx 00 , / / 0 ASPHALT DRIVEWAY TRANSITION ` \ _ A RECONSTRU,TCON AREA N AREA =,KO S.F. f M ASP ALT DRIVEWAY TRANSITION S B. R CONSTRUCTION AREA AREA = 365 S.F. ± N C > , U / SCALE: I"=40'o / o , N DRIVEWAY RECONSTRUCTION MAP BURNHAM STREET RECONSTRUCTION PROJECT CITY OF TIGARD, OREGON v DATE: JULY 10, 2007 SHEET 1 OF 1 m FILE N0. 4 TAX LOT 2S-1-02AC-00202 s01 c�ti�F F� 4 2S—1—02AC-00202 MILLER, TR. o0 —N — PARCEL 1 PARCEL 2 ®STREET DEDICATION -PUBLIC UTILITY EASEMENT AREA = 1,156 S.F. f AREA = 151 S.F. t SCALE: l --40' PARCEL 3 5' WIDE TEMPORARY CONSTRUCTION EASEMENT AREA = 774 S.F. f ACQUISITION MAP BURNHAM STREET RECONSTRUCTION PROJECT CITY OF TGARD, OREGON DATE: FEBRUARY 7, 2008 • SHEET 1 OF 1 ... ....... FILE NO. 004 TAX LOT 2S— I—02AC-00202 , o / , 30.0' / 15.4 /6 X 142.9' 30.0' 4 \ 25.0/'/ 18. 2S— I —02AC-00202 M I LLER, TR. , , 3 o / — N — ASPHALT DRIVEWAY TRANSITION RECONSTRUCTION AREA AREA = 1833 S.F. ± o /0 SCALE: I"=40' / 0 , o � m 0 DRIVEWAY RECONSTRUCTION MAP BURNHAM STREET RECONSTRUCTION PROJECT CITY OF TIGARD, OREGON • N DAT 1 007 SHEET 1 OF 1 C4 m M FILE N0. 5 TAX LOT 2S-1-02AC-00100 s _N _ tiF 2S-1-02AC-00100 STEVENSON SCALE: 1"=50' ®PARCEL 1 STREET DEDICATION (BURNHAM) o0 AREA = 2,077 S.F. t STATION: 10+02.31 PARCEL 2 OFFSET: 168.06 R STREET DEDICATION (ASH) AREA = 1,612 S.F. t c:) PARCEL 3 Q� PUBLIC UTILITY EASEMENT (ASH) AREA = 1,208 S.F. t / -PARCEL 4 PUBLIC UTILITY EASEMENT (BURNHAM) AREA = 48 S.F. PARCEL 5 ®TEMPORARY 5' WIDE CONSTRUCTION EASEMENT AREA = 1,179 S.F. f STATION: 10+32.10 OFFSET: 329.91 R ACQUISITION MAP BURNHAM STREET RECONSTRUCTION PROJECT CITY OF TIGARD, OREGON DATE: FEBRUARY 11, 2008 SHEET 1 OF 1 E N0. 005 TA �T � —02AC 00 100 Q� S \ 2S— I—02AC-00100 `� F STEVENSON \\� 38.8' \ s� \ 37.6: � , A � r SCALE: 1"=40' 24 19 4 , 0 43 6,. /vX/v C 'm 31.8- o 1.8 o ICD ASPHALT fIVEWAY TRANSITION RECONSZRUCTION AREA o AREA 1603 S.F. ± TEMPORARY �o�i , A PHALT DRIVEWAY TRANSITION c AC PATH �^3 g ECONSTRUCTION AREA �h� \ MAMAREA = 747 S.F. ± / N DRIVEWAY RECQ/NSTRUCTI®N MAP/ N / /CD BURNHAM ,STREET R CONSTRUCTION PROJECf N y� \CIDY E JULY SHEET 0070N / SHEET 1 OF 1 ' FILE N0. 6A TAX LOT 2S-1-02AB-05000 TAX LOT 2S-1-02AB-05100 6 2S-1-02AB-05000 's• CITY OF TIGARD s 2S—1—02AB-051 00 CITY OF TIGARD yF _N _ \ SCALE: 1"=40' PARCEL 1 STREET DEDICATION AREA = 2,146 S.F. f \ i PARCEL 2 - PUBLIC UTILITY EASEMENT AREA = 9 S.F. PARCEL 3 PUBLIC UTILITY EASEMENT ACQUISITION MAP AREA = 100 S.F. BURNHAM STREET RECONSTRUCTION PROJECT CITY OF TIGARD, OREGON PARCEL 4 DATE: FEBRUARY 19, 2008 ® PUBLIC UTILITY EASEMENT SHEET 1 OF 1 AREA = 64 S.F. FILE N0. 613 TAX LOT 2S-1-02AD-02800 TAX LOT 2S-1-02AD-02900 TAX LOT 2S-1-02AD-03000 Fy sc��F FFA / tiF SCALE: 1"=50' I I 2S—1—02AD-02800 CITY OF TIGARD POINT 'B' a� P� 2S-1-02AD-02900 / CITY OF TIGARD POINT 'A' STATION: 10+31.52 OFFSET: 314.92 R 2S-1-02AD-03000 PARCEL 1 CITY OF TIGARD STREET DEDICATION AREA = 11,938 S.F. t -PARCEL 2 PUBLIC UTILITY EASEMENT AREA = 9 S.F. PARCEL 5 PUBLIC UTILITY EASEMENT PARCEL 3 AREA = 240 S.F. t PUBLIC UTILITY EASEMENT ACQUISITION MAP AREA = 100 S.F. BURNHAM STREET RECONSTRUCTION PROJECT CITY OF TIGARD, OREGON Iilllll PARCEL 4 DATE: FEBRUARY 19, 2008 1 1 1 1 1 1 1 PUBLIC UTILITY EASEMENT SHEET 1 OF 1 AREA = 104 S.F. FILE N0. 7 TAX LOT 2S-1-02AD-02700 sA� \ / tir o \ho 2S-1-02AD-02700 \ DDM ENTERPRISES LLC \ -N - ®PARCEL 1 STREET DEDICATION AREA = 1,214 S.F. f -PARCEL 2 SCALE: 1"=40' PUBLIC UTILITY EASEMENT AREA = 101 S.F. t PARCEL 3 ACQUISITION MAP 5' WIDE TEMPORARY\ BURNHAM STREET RECONSTRUCTION PROJECT ®CONSTRUCTION EASEMENT CITY A E:OFEB UARY 7, 20008 • AREA = 297 S.F. t SHEET 1 OF 1 FILE NO. 007 TAX LOT 2S— I—02AD-02700 ------------ -------------k ------------ / /` x° \ 6 F � 36.0' ° 30.0' -: 36.5' _ / 2S— I—02AD-02700 / \/ DDM ENTERPRISES LLC / ASPHALT DRIVEWAY TRANSITION \ / RECONSTRUCTION AREA N AREA = 955 S.F. ± W / o \ / 0 N Q / Ul C W o SCALE: I"=40' LZ a DRIVEWAY RECONSTRUCTION MAP BURNHAM STREET RECONSTRUCTION PROJECT CITY OF TIGARD, OREGON • `= DATE: JULY 10, 2007 cn SHEET 1 OF 1 N 0) m 10 FILE N0. 8 TAX LOT 2S-1-02AD-02400 x i 8 2S-1-02AD-02400 NW PREFERRED FEDERAL CREDIT UNION i i i -N - i ®PARCEL 1 SCALE: 1"=40' STREET DEDICATION AREA = 1,752 S.F. f i t / ACQUISITION MAP PARCEL 2 BURNHAM STREET RECONSTRUCTION PROJECT 5' WIDE TEMPORARY CITY OF TIGARD, OREGON CONSTRUCTION EASEMENT DATE: AUGUST 23, 2007 SHEET 1 OF 1 AREA = 704 S.F. f F } t s FILE NO. 008 ,zx� TAX LOT 2S- I-02AD-02400 8 Xx \ ,' 36.0 J FtiT 70.2' 8 I \ / 2S- I-02AD-02400 / T NW PREFERRED FEDERAL CRED I T UN I ON , v / I , O � � t I a / 3 � z � I 0 U , ASPHALT DRIVEWAY TRANSITION RECONSTRUCTION AREA AREA = 375 S.F. f Z / i I 0 SCALE: I"=40' d i< - 0 v DRIVEWAY RECONSTRUCTION MAP BURNHAM STREET RECONSTRUCTION PROJECT CITY OF TIGARD, OREGON DATE: JULY 10, 2007 ol SHEET 1 OF 1 ``' " i I r FILE N0. 9 TAX LOT 2S-1-02AD-02200 0 h° sA� tiF 9 —N — 2S-1-02AD-02200 BURNHAM BUSINESS & STORAGE LLC SCALE: 1"=40' yo PARCEL 1 PARCEL 3 ®STREET DEDICATION 5' WIDE TEMPORARY®CONSTRUCTION EASEMENT goo AREA = 2,475 S.F. f AREA = 1,650 S.F. t -PARCEL 2 PUBLIC UTILITY EASEMENT AREA = 198 S.F. t PARCEL 3® ACQUISITION MAP PUBLIC UTILITY EASEMENT BURNHAM STREET ROF ECONSTRUCTION PROJECT AREA = 150 S.F. DATE: FEBRUARY 19, 2008 SHEET 1 OF 1 FILE NO. 009 TAX LOT 2S- I-02AD-02200 / \ /6.0' 37.3' 18.2' 3 � ; a T \ O N \ 7 a 0 N \ .N .o 2S- I-02AD-02200 L BURNHAM BUSINESS & STORAGE L C E m \ 0 17.7' 0 6.0' a `o U, -N - ASPHALT DRIVEWAY TRANSITION 55.7' ` N A RECONSTRUCTION AREA 0.01 \ AREA = 1150 S.F. ASPHALT DRIVEWAY TRANSITION m B RECONSTRUCTION AREA ' AREA = 1,345 S.F. ± / 0 SCALE: 1"=40' / v a DRIVEWAY RECONSTRUCTION MAP BURNHAM STREET RECONSTRUCTION PROJECT CITY OF TIGARD, OREGON L DATE: JULY 10, 2007 m SHEET 1 OF 1 FILE N0. 10 TAX LOT 2S-1-02DB-00100 yo ENGINEER'S CENTERLINE STATION: 18+49.28 yF 10 2S-1-02DB-00100 VERIZON NORTHWEST INC. -N - SCALE: 1"=40' ®PARCEL 1 STREET DEDICATION AREA = 2,145 S.F. f PARCEL 2 ®5' WIDE TEMPORARY CONSTRUCTION EASEMENT AREA = 666 S.F. f ACQUISITION MAP BURNHAM STREET RECONSTRUCTION PROJECT CITY OF TIGARD, OREGON DATE: FEBRUARY 19, 2008 SHEET 1 OF 1 FILE N0. 11 TAX LOT 2S-1-02AD-03450 37.50 TAX LOT 2S-1-02AD-03451 Li I cu �\ rn C _ TJ m z = SCALE: 1"=60' m D z z m m Lf) rri 11 z m 2S-1-02AD-03450 PARCEL 1 TIGARD WATER DISTRICT ® STREET DEDICATION AREA = 1,993 S.F. f PARCEL 2 STREET DEDICATION AREA = 3,700 S.F. t STATION: 18+49.28 I STATION: 18+49.28 PARCEL 3 OFFSET: 37.50 R ENGINEER'S CENTERLINE - PUBLIC UTILITY EASEMENT AREA = 82 S.F. t 1 1 ACQUISITION MAP BURNHAM STREET RECONSTRUCTION PROJECT CITY OF TIGARD, OREGON �C \ DATE: SHEET 2008 O 9,Qp x"90 STA: 21+77.13 OFFSET: 63.38 L C'J. FILE N0. 12 6' � TAX LOT 2S-1-02DA-00300 ,�`� ENGINEER'S CENTERLINE STATION: 18+49.28 �, cell AGF 2S-1-02DA-00300 MATSUMOTO 12 -N - SCALE: t"=40' PARCEL 1 STREET DEDICATION AREA = 453 S.F. t ACQUISITION MAP PARCEL 3 BURNHAM STREET RECONSTRUCTION PROJECT CITY TIGARD,®5' WIDE TEMPORARY DATE: D FEBRUARY 11, 20008 CONSTRUCTION EASEMENT SHEET 1 OF 1 AREA = 456 S.F. t FILE NO. 13 TAX LOT 2S-1-02AD-01900 I 00 13 2S-1-02AD-01900 h� TUALATIN VALLEY FIRE & RESCUE F 10' x 10' P U E F t -N - SCALE: 1"=40 s ®PARCEL 1 STREET DEDICATION AREA = 1,831 S.F. f �� ®PARCEL 2 PUBLIC UTILITY EASEMENT AREA = 100 S.F. t ACQUISITION MAP PARCEL 3 BURNHAM STREET RECONSTRUCTION PROJECT 5' WIDE TEMPORARY CITY OF TIGARD, OREGON CONSTRUCTION EASEMENT DATE: AUGUST 23, 2007 SHEET 1 OF 1 AREA = 1,222 S.F. zSt.�.+�: .. i 's FILE NO. 013 TAY. LOT 2S- 1-02AD-01900 / ' 13 2S- 1-02AD-01900 / ' TUALATIN VALLEY FIRE & RESCUE 1 s / ASPHALT DRIVEWAY TRANSITION RECONSTRUCTION AREA \ AREA = 375 S.F. ± ASPHALT DRIVEWAY TRANSITION RECONSTRUCTION AREA i \ 15.o' AREA = 540 S.F. ± 1 xo i 0 \ 36.0' i dl \ I o � 54.0' /yXo .' r cFti U / 65.0' 10.0' C \ y O o SCALE: i"=40' \ DRIVEWAY RECONSTRUCTION MAP BURNHAM STREET RECONSTRUCTION PROJECT CITY OF TIGARD, OREGON DATE: JULY 10, 2007 SHEET 1 OF 1 �- is N r z o m 3W ASH STREET R Z Z Z �� pg 6LOL� 25-1-02AD-01BDD CARL H. JOHNSON FAMILY LP If ti FILE N0. 15 TAX LOT 2S-1-02AD-01700 STA: 11+10.76 OFFSET: 175.00 L \ STA: 9+50.00 OFFSET: 37.50 L s° 0 �o0 15 2S-1-02AD-0 1700 ZUBER s'6- F _N _ \ SCALE: 1"=40' PARCEL 1 STREET DEDICATION AREA= 4,431 S.F. f -PARCEL 2 PUBLIC UTILITY EASEMENT AREA = 394 S.F. f ACQUISITION MAP BURNHAM STREET RECONSTRUCTION PROJECT ®PARCEL 3 CITY OF TIGARD, OREGON 5' WIDE TEMPORARY DATE: FEBRUARY 8, 2008 CONSTRUCTION EASEMENT SHEET 1 OF 1 AREA = 1,026 S.F. f FILE N0. 16 TAX LOT 2S-1-02AD-01501 16 2S-1-02AD-01501 SPOHN 0 STA: 9+77.81 OFFSET: 37.500 L -N - s s SCALE: 1"=40' PARCEL 1 STREET DEDICATION AREA = 4,431 S.F. f -PARCEL 2 P� PUBLIC UTILITY EASEMENT AREA = 984 S.F. f PARCEL 3 PUBLIC UTILITY EASEMENT AREA = 100 S.F. ACQUISITION MAP BURNHAM STREET RECONSTRUCTION PROJECT ®PARCEL 4 CITY OF TIGARD, OREGON 5' WIDE TEMPORARY DATE: FEBRUARY 8, 2008 CONSTRUCTION EASEMENT SHEET 1 of 1 AREA = 550 S.F. f FILE NO. 016 TAX LOT 2S- I-02AD-01501 i 6 ' / 2S- I-02AD-01501 \ SPOHN \ v." 5.0' � \ \ 45.5' ASPHALT DRIVEWAY TRANSITION 18.0 RECONSTRUCTION AREA O " AREA = 350 S.F. ± O10.0' O 36.0' � i \ X _ �6 00 S P a \ � 'Xo s ;o o , Ln 10 o SCALE: I"=40' DRIVEWAY RECONSTRUCTION MAP BURNHAM STREET RECONSTRUCTION PROJECT CITY OF TIGARD, OREGON DATE: JULY 10, 2007 SHEET 1 OF 1 N m M i FILE NO. 17 TAX LOT 2S-1-02AD-01400 I i I 17 2S-1-02AD-0 1400 E HENDERSON ° �o 10 x 10 PUE i xx 1 F -N - F I I SCALE: 1°=40' ' i i PARCEL 1 STREET DEDICATION I AREA = 813 S.F. f ®PARCEL 2 PUBLIC UTILITY EASEMENT AREA = 100 S.F. f ACQUISITION MAP BURNHAM STREET RECONSTRUCTION PROJECT PARCEL 3 CITY OF TIGARD, OREGON 5' WIDE TEMPORARY DATE: MAY 10, 2007 CONSTRUCTION EASEMENT SHEET 1 OF 1 AREA = 542 S.F. v FILE NO. 017 TAX LOT 2S-1-02AD-01400 ASPHALT DRIVEWAY TRANSITION RECONSTRUCTION AREA / AREA = 240 S.F. ± , i 17 2S-1-02AD-01400 HENDERSON F� \�/ 24.3' 10.0' j \ \ i �/x� 36' 3 � a I O ! \ I8. j i v \ v N } y \ [ C � \ J n � SCALE: 1"=40'ol `\ s N DRIVEWAY RECONSTRUCTION MAP BURNHAM STREET RECONSTRUCTION PROJECT N CITY OF TIGARD, OREGON N DATE: JULY 10, 2007 ; L SHEET 1 OF 1 M f FILE N0. 18 TAX LOT 2S-1-02AD-01300 18 2S-1-02AD-0 1300 WYATT 0 �o h° s s SCALE: 1"=40' PARCEL 1 STREET DEDICATION AREA = 1,878 S.F. t PARCEL 2 -PUBLIC UTILITY EASEMENT AREA = 579 S.F. t ACQUISITION MAP PARCEL 3 BURNHAM STREET RECONSTRUCTION PROJECT ®5' WIDE TEMPORARY CITY OF BR ARD, OREGON CONSTRUCTION EASEMENT SATE. SHEET 1 ROF$ 2008 AREA = 537 S.F. t FILE N0. 018 TAX LOT 2S— I—02AD-01300 / / / / / / ' 8 / 2S— I—02AD-01300 / WYATT / 25.0' ASPHALT DRIVEWAY TRANSITION ' / RECONSTRUCTION AREA / \ AREA = 260 S.F. f sx 00 / 26.0' \ 36.0' / \ 18.o' ' / / / s, F� s a s / `" 010 m 00 \ \ o SCALE: I'=40' � N o DRIVEWAY RECONSTRUCTION MAP ol BURNHAM STREET RECONSTRUCTION PROJECT CITY OF TIGARD, OREGON • , DATE: JULY 10, 2007 U) SHEET 1 OF 1Ln ,: M FILE N0. 19 I TAX LOT 2S-1-02AB-05300 i I i I I I 19 I 2S-1-02AB-05300 JB OAK LIMITED PART. I i t i } 10' x 10' PUE � -N - xx SCALE: 1"=40' 0<11 O �1h PARCEL 1 STREET DEDICATION AREA = 1,209 S.F. ± F ®PARCEL 2 PUBLIC UTILITY EASEMENT ACQUISITION MAP AREA = 100 S.F. ± BURNHAM STREET RECONSTRUCTION PROJECT I. PARCEL 3 CITY OF TIGARD, OREGON F 5' WIDE TEMPORARY DATE: AUGUST 23, 2007 CONSTRUCTION EASEMENT SHEET 1 OF 1trtn AREA = 800 S.F. FILE NO. 019 TAX LOT 2S- 1-02AB-05300 2S- I-02AB-05300 / JB OAK LIMITED PART. s /00 a - s SCALE: I"-40' / i� o ` � Ol \ I rn w � DRIVEWAY RECONSTRUCTION MAP BURNHAM STREET RECONSTRUCTION PROJECT ` CITY OF TIGARD, OREGON on DATE: JULY 10, 2007 SHEET 1 OF 1s s FILE N0. 20 TAX LOT 2S-1-02AB-05200 20 2S-1-02AB-05200 SCOTT & HOOKLAND REAL ESTATE PART. 0 �o 0 -N - SCALE: 1"=40' F'pli,�c� PARCEL 1 STREET DEDICATION AREA = 978 S.F. f -PARCEL 2 PUBLIC UTILITY EASEMENT ACQUISITION MAP AREA = 100 S.F. BURNHAM STREET RECONSTRUCTION PROJECT ®PARCEL 3 CITY OF TIGARD, OREGON 5' WIDE TEMPORARY DATE: FEBRUARY 8, 2008 CONSTRUCTION EASEMENT SHEET 1 OF 1 AREA = 284 S.F. f FILE NO. 020 TAX LOT 2S- 1 -02AB-05200 ' 20 2S— I —02AB-05200 / SCOTT & HOOKLAND REAL ESTATE PART. z , / / \ 44.7' / Fx Y ASPJdLT DRIVEWAY TRANSITION RECONSTRUCTION AREA \ AREA = 630 S.F. ± 32.0' / / 0,' `Sx 3 a T O 3 I \ a c 0 s7L C Ln / S, a � o / o � F V I / � SCALE: 1"=40' / \ v LZ DRIVEWAY RECONSTRUCTION MAP BURNHAM STREET RECONSTRUCTION PROJECT CITY OF TIGARD, OREGON f DATE: JULY 10, 2007 SHEET 1 OF 1 m M FILE N0. 21 TAX LOT 2S-1-02AB-04800 ENGINEER'S CENTERLINE STATION: 1+00 21 \ 2S-1-02AB-04800 CAPISTRANO F .y1 SCALE: 1"=40' PARCEL 1 STREET DEDICATION AREA = 1082 S.F. f PARCEL 2 5' WIDE TEMPORARY ACQUISITION MAP CONSTRUCTION EASEMENT AREA - 309 S.F. f BURNHAM STREET RECONSTRUCTION PROJECT CITY OF TIGARD, OREGON DATE: AUGUST 14, 2007 SHEET 1 OF 1 FILE NO. 021 TAX LOT 2S— I—02AB-04800 / ��\ / \ ASPHALT DRIVEWAY TRANSITION ' RECONSTRUCTION AREA AREA = 260 S.F. ± Ix o , s��o �xx 2S— I—02AB-04800 � �6 ��. F nn CAP I STRANO \ 20.5' \ 5.0' C61TF�xoo 25.5 \ 36. 15.6' / 11.0' / 3 / 3 / o / O N �n O — N — N O i� O O N .Q O U o SCALE: 1"=40' 17,v DRIVEWAY RECONSTRUCTION MAP BURNHAM STREET RECONSTRUCTION PROJECT CITY OF TIGARD, OREGON DATE: JULY 10, 2007 SHEET 1 OF 1 a ,, N O)