Resolution No. 06-10 CITY OF TIGARD, OREGON
TIGARD CITY COUNCIL
RESOLUTION NO. 06-1 U
A RESOLUTION DIRECTING THE ENGINEERING STAFF TO ESTABLISH A PROPOSED
LOCAL IMPROVEMENT DISTRICT (LID) AS A PROJECT IN THE FY 2005-06 CIP
(CAPITAL IMPROVEMENT PROGRAM), DIRECTING THE PREPARATION OF A
PRELIMINARY ENGINEER'S REPORT FOR THE PROPOSED LID IN THE TIGARD
TRIANGLE AND AUTHORIZING THE ESTABLISHMENT OF A FUNDING MECHANISM
FOR THE PREPARATION OF THE REPORT.
WHEREAS, properties in the Tigard Triangle are zoned MUE (Mixed-Use Employment) and C-G
(General Commercial); and
WHEREAS, some of those properties ate currently residential in nature,but are in the process of
converting to commercial;and
WHEREAS, the Tigard Ttiangle Plan established guiding principles (adopted into the Development
Code as Chapter 18.620) that when implemented would develop the Triangle into a high-quality
mixed-use employment area;and
WHEREAS, the Tigard TSP (Ttanspottation System Plan), adopted in 2002,identified the Tigard
Triangle as an area where the street infrastructure needs to be significantly upgraded to meet those
established standards. ; and
WHEREAS, recent efforts to enhance this sparsely developed area have included the following LID's:
Year Local Improvement District
1984 68th Avenue Sanitary Sewer Local Improvement District (LID 42)
1993 Combined Dartmouth Street LID and C.I.P.Phase 2 Project
1998 69th Avenue Local Improvement District(Specht Development, Inc.); and
WHEREAS, the formation of an LID (Local Improvement District) for construction of street
improvements would address some of the deficiencies identified in the TSP by upgrading the streets
within the LID boundary to meet the current standards; and
WHEREAS, Specht Development, Inc. has submitted a petition tequesting the formation of an LID
to improve certain streets witivn the Tigard Triangle; and
WHEREAS, the proposed LID boundary within the Tigard Triangle is defined as SW 68th Avenue,
SW 69th Avenue, and SW 70th Avenue between SW Dartmouth Street and SW Baylor Street and SW
Dartmouth Street and SW Clinton Street between SW 68th Avenue and SW 70th Avenue; and
RESOLUTION NO. 06 -
Page 1
WHEREAS, the Engineering staff prepared a Prelin-r.nary Evaluation Report (attached as Attachment
1.2),which was submitted in draft form to the City Council for discussion and direction during its
February 21, 2006 meeting; and
WHEREAS, tlae Preliminary Evaluation Report determines that the proposed LID appears feasible
and recommends that the City Council take the next step in the LID formation process by authorizing
the preparation of a Preliminary Engineer's Report; and
WHEREAS, the proposed LID is not listed as a project in the FY 2005-06 Capital Improvement
Program (CIP) and there is currently no existing budget resource for the cost of preparing the
Preliminary Engineer's Report; and
WHEREAS, Specht Development, Inc. has agreed to deposit,in advance of any work, the amount
needed for preparation of the Preliminary Engineer's Report with the understanding that the City
include the cost of preparing the report in the total cost of the LID,if and when the City establishes
the District;and
WHEREAS, City Council discussed the proposed LID and indicated that the LID boundary and
improvements to be constructed by the LID are satisfactory as submitted; and
WHEREAS, the City Council has directed staff to prepare a resolution authorizing preparation of a
Preliminary Engineer's Report and submit that resolution for adoption at a City Council business
meeting.
NOW,THEREFORE,BE IT RESOLVED by the Tigard City Council that:
SECTION 1: The proposed LID in the Tigard Triangle is hereby added to the list of projects for
the FY 2005-06 Capital Improvement Program.
SECTION 2: The Engineering staff is directed to proceed with preparation of a Preliminary
Engineer's Report,which includes "60% complete" engineering plans in sufficient
detail to provide reliable cost estimates and to meet requirements for various pezilit
applications.
SECTION 3: The Preliminary Engineer's Repot should include the scope of work, location of the
proposed improvements, financial information, the proposed district boundaries,
estimated costs, proposed assessment methods, and other information that may be
relevant to the feasibility of the proposed improvements and district. The report
should recommend approval, approval with conditions, or denial.
RESOLUTION NO. 06
Page 2
SECTION 4: The City staff is directed to proceed with the establishment of the funding
mechanism in the amount of$70,000 to cover the anticipated expenses during the
remainder of FY 2005-06 for preparation of the Preliminary Engineer's Report. A
contingency transfer from the Gas Tax Fund is authorized as the funding source for
the purpose of preparing the report. Any budget adjustments requiting Council
action and necessary for the establishment of the project funding shall be brought to
Council for appropriate action.
SECTION 5: Before work begins on the preparation of the Preliminary Engineer's Report, Specht
Development, Inc. will deposit an amount to cover the engineering contract and
administrative costs for the preparation of that report. If the City establishes the
LID, the cost of preparing the report shall be included in the total cost of the LID.
In this case, Specht Development, Inc. will be refunded the amount deposited. If the
City does not establish the LID, Specht Development, Inc. will be given the
remaining balance of their deposit,less all actual costs incurred in preparing the
report.
SECTION 6: All costs incurred after the date of this resolution to prepare the Preliminary
Engineer's Report and form the district shall be included as part of the LID costs
and shall be reimbursed to the City if the LID is formed and the improvements are
constructed.
SECTION 7: This resolution is effective immediately upon passage.
L�
PASSED: This ~day of IA- 006.
Mayor- ty or Tigard
ATTEST:
City Recorder- City of Tigard
RESOLUTION NO. 06 -
Page 3
Attachment 1.1
Page 1 of 4
Preliminazy Evaluation Report
Formation of a Local Improvement District in the Tigard Triangle
Background
It is proposed to develop a Local Improvement District (LID) including street and utility
improvements to SW 68h Avenue, SW Wh Avenue, SW 7e Avenue, SW Dartmouth Street
and SW Clinton Street, all within the Tigard Triangle, between SW Dartmouth Street and
SW Baylor Street, and between SW Wh Avenue and SW 70th Avenue (Attachment 1.2; p. 8).
The area consists of a transforming balance of residential to commercial zoning(Attachment
1.2; p. 9). Recent efforts to enhance this sparsely developed area have included the following
LID's: (Note: In 1998, Specht Development, Inc. initiated a successful LID responsible for
improvements to SW 69``'Avenue south of Dartmouth Street)
Year Local Improvement District
1984 68'''Avenue Sanitary Sewer Local Improvement District (LID 42)
1993 Combined Dartmouth Street LID and C.I.P. Phase 2 Project
1998 69"'Avenue Local Improvement District (Specht Development,Inc):
2,750 lineal feet of partial/fall-width street improvements
Specht Development, Inc. is the owner or contract purchaser of fifteen (15) of the twenty
five (25) parcels within the proposed LID boundary (Attachment 1.2; p. 11). These parcels .
comprise 59% of the land area (Attachment 1.2;p. 12) and 64% of the street frontage within
the assessment district(Attachment 1.2;p. 13).The Tigard Municipal Code (TMC) 13.04.020
specifies that an LID may be initiated by written petition of "property owners owning at
least fifty percent of the property benefited by the local improvement" (Attachment 1.2; pp.
2-4& 14).
Current Proposal
The proposed Local Improvement District in the Tigard Triangle will be for the express
purpose of improving the following streets to partial of full standards as required by the City
of Tigard(Attachment 1.2;p. 6)
• SW 6e Avenue (between SW Dartmouth Street and SW Baylor Street)
• SW 690'Avenue (between SW Dartmouth Street and SW Baylor Street)
• SW 70" Avenue (between SW Dartmouth Street and SW Baylor Street)
• SW Dartmouth Street(between SW 6e Avenue and SW 69''Avenue)
• SW Clinton Street(between SW 68thAvenue and SW Avenue)
The improvements to the aforementioned streets would include:
• Asphalt Pavement • Water Improvements
• Curb and Gutter • Storm Drainage
• Sidewalks • Utility Undergrounding
• Street Trees • Right-of-Way Acquisition,
• Street Lighting if necessary
• Street Signs • Tigard Triangle Portal
• Sanitary Sewer Enhancement(s)
P-p—d Mg�d zri-jrs LII]—PaGm rsap Er.lusriars +
Attachment 1.1
Page 2 of 4
The LID would provide highly visible enhancesiients to the Tigard Triangle area, particularly
SW Dartmouth Street and SW 68`" Avenue. Each of these streets, within the proposed
district boundary, is at the Dartmouth St terminus of the previous LID'S. Consequently, an
obvious visual difference is noticed on the north side of SW Dartmouth Street between. the
I-5 On/Off Ramps and SW 69`' Avenue. It should also be noted that the I-5 Ramp
intersection is a designated Tigard Triangle Portal. Therefore, consideration would be given
to enhancements associated with that distinction such as the monument on SW 72"a Avenue
at the northbound 217 on/off-ramp intersection (Attachment 1.2;p. 17).
Cost Estimate
Without the benefit of greater detail for the scope of work,we submit the following estimate
for the total cost of the currently proposed LID.According to the Prebminaiy Engineer's
Report on record,, the total LID cost for the 1998 SW 69`"Avenue LID project was
$1,288,005.00. After evaluating that cost per lineal foot of street improvements, our estimate
will use a cost of$500 for full width and$337 for partial width street improvements. These
unit costs assume a similar scope of work. For the purpose Of.a preliminary evaluation,we
will estimate the total LID cost based on the following values (Note:These costs do not
reflect cost of.living increases and general inflation).
Qua Unit Cost Item Cost
Work Item Description O �
Partial Street Improvements: 2,015 lineal feet $337/LF $679,500.00
Full Street Improvements: 1,220 lineal feet $500/LF $610,000.00
Sub Total: $1,289,500.00
Ancillary.Costs Portion of Sub Total Item.Cost
City of Tigard
Administrative/Construction Services: 8% $100,000.00
Preliminary Engineer's Report and
60% Complete Construction Drawings 10% $125,000...00
Completion of Final Construction Drawings 6% $75,000.00
Total LID Cost: $1,589,500.00
The 25 parcels within the proposed LID boundary combine for a total of 297,525 square
feet (Attachment 1.2;p. 14). When consideration is given to the general feasibility of.a
proposed LID, a ratio of 3:1 of land value ($15/square foot) to the total cost of the ID is
favorable. In this cage, the ratio is approximately 2.81:1.
297,525 SF x $15/SF = $4,462,875.00
Estimated LID Cost = $1,589,500.00
The Local improvement District (LID) formation process.
The LID process has several steps in it. The basic concept of any LID is that the benefited
properties pay for the improvements. The following is the LID process,in accordance with
our City Municipal Code:
• preliminary Evaluation Report
• Preliminary Engineer's Report
• Declaration of intention to form the district
Prop—a rs.,a T&.&un-P Ari—y e.m-eon K"
Attachment 1.1
Page 3 of 4
• District formation
• Construction of Improvements
• Spreading of assessments by ordinance
We are currently preparing the PreliminaLy Evaluation Report,which should provide
sufficient* formation for Council to make a decision on whether or not to proceed with
in
directing staff to prepare a Preliminaiy Engineer's Report for the purpose of evaluating the
feasibility of forming the LID. The Preliminary Engineer's Report will also have the
proposed methodology for distributing the costs, the proposed LID Boundary, and the
benefited properties that would be included in the LID.
An LID could be formed through Council initiative, or at the request of the property owners
that want the improvements. For this particular LID, Specht Development, Inc. has
submitted a formal"Petition for and Consent to Create a Local Improvement District.
Specht Development, Inc. has agreed to deposit,in advance,the cost of preparing the
Preliminary Engineer's Report with the understanding that the City include the cost of
prepatng the report in the total cost of the LID,if and when the City establishes the
District. The total cost of the LID would also include the City's contribution for the design
and construction.management,plus the costs to establish the LID and construct the
improvements.The LID formation is contingent upon 50% of the properties by area
approving the LID formation. In this case, Specht Development, Inc. is the owner or
contract purchaser of fifteen (15) of the twenty five (25)parcels within the proposed LID
boundary.These parcels comprise 59% of the land area. The Tigard Municipal Code (TMC)
13.04.020 specifies that an LID maybe initiated by written petition of"property owners
owning at least fifty percent of the property benefited by the local improvement" Council;dor
the property owners, could withdraw at anytime if the costs prove to be exorbitant, or if
construction of the improvements does not appear feasible. The property owners could stop
tie LID formation if two-fliitds of them (by area) remonstrate against the LID fomation..
Since there is one major property owner for this LID,if Specht Development, Inc. decides it
does not want to proceed,we would terminate the LID process.
The City would provide the interim financing to design and construct the project,and then
issue bonds after the project is completed and the total costs are known. The benefited
property owners would be assessed their shale of the LID costs with repayment over a 1Q-
year period, or longer, or all at once,if they choose.
If Council moves to proceed with establishing the Local Improvement District in the.Tigard
estimated time line can be expected. It should be noted that the
Triangle, the Following
attached schedule does not include the necessary time to select a consultant to prepare the
Prehmina.ty Engineer's Report. (Attachment 1.2;p. 15-16).
Issues To Be Resolved
Some of the major issues that need to be resolved for the successful implementation of the
improvements in the proposed LID are:
• Acquisition of Right of Way along SW 70''Avenue,if necessary.
• Connection to existing improvements and infrastructure. (Particularly, Storm and
Sanitary Sewer).
Pmimed TFTd T6 ng1c LID—P,bminaryy Gv➢=6-Report
Attachment 1.1
Page 4 of 4
Recommendations
The LID appears feasible.To comprehensively address the roadway improvement
deficiencies in the Tigard Triangle, staff recon-Anends the following:
• That Council direct staff to proceed with the next step in the LID process. This
would require a resolution directing staff to proceed with the preparation of
Prelim4iaiy Engineer's Report.This report would examine the overall scope of work
and associated cost assessment per tax lot owner within.the LID boundary. Specht
Development, Inc. has agreed to deposit,in advance, the cost of preparing the
Preliminary Engineer's Report with the understanding that the City include the cost
of preparing the report in the LID,if and when the City establishes the District.
P.p..d T.V d T k.d.LID-Pmlimi—y RV-"
Attachment 1.2
Page 1 of 18
DDC
January 25,2006 Dcsign Group
cflw-c�rs:r--�
Gus Duenas,City Engineer
Engineering Department:
City of Tigard
1312.5 5W Hall 131vd.
Tigard,Oregon 97223
RE: Proposed Local Improvement District in Tigard'Triangle area
Dear Mr. Duenas=
On behalf of Specht Development, Inc., I am submitting ten (10) copies of a
petition requesting the City Council to form a Local Improvement District (LID)
and make public street and utility improvements to certain streets within the
Tigard Triangle area. Specht Development, Inc. is the owner or contract
purchaser of 15 out of the 25 parcels within the proposed LID boundary, these
parcels represent 59%of the land area and 64%of the street frontage within the
proposed assessment district, This is significantly more than the minimum
required by Tigard Municipal Code (TMC) 13.04.020, which requires "property
owners owning at least fifty percent of the property benefited by the local
Improvement"to initiate a Local Improvement District by written petition.
The proposed LID would include street and utility improvements to SW 68t"
Avenue,SW 6911 Avenue,SW 701"Avenue, SW Dartmouth Street and SW Clinton
Street, all within the "'Tigard Triangle", between SW Dartmouth Street and SW
Baylor Street, and between SW 68t"Avenue and SW 70th Avenue. These streets
are currently substandard, or, in the case of SW 70th Street, non-e)astent. This
LID would make improvements similar to the Improvements made to SW 691i
Avenue south of Dartmouth Street. As you know, Specht Development, Inc.
initiated a successful LID for those improvements In 1998.
We respectfully request that your office prepare a Preliminary Evaluation Report
for the City Council's consideration, and schedule this matter before the City
Council at the earliest possible date. If the City Council adopts a Resolution
directing that a Preliminary Engineer's Report be prepared, Specht Development,
Inc.will pay In advance the cost of preparing that report,in accordance with TMC
13.04.030,with the understanding that the.City will include the cost of preparing
the report in the LID, If and when the City establishes the District.
Thank you, Gus.
Inc el ,
Ed Murphy \` r=x�ra,�r,47rl
�a�OaE5e ra
Comprehensive Planning manager
F F_IItl3Ls:iy,�:dt::3net++n
Project File# 1017.001 c:c:
-
Cea;;ris:m
Attachment 1.2
Page 2 of 18
PETITION FOR AND CONSENT
TO CREATE A LOCAL IMPROVEMENT DISTRICT
THE HONORABLO HAYOFt A"D CITY COUNCIL
city of Tigard
county of Washington
state of Oregon
in the matter of the improvement of lands described as.
Street and udilty improvements to SW 6e Avenue,SW W Avenue,SW 7&Avenue,SW
Oarbnoutft Street and SW CAnton Street, all within the '779ard Triangle" between SW
Dartmouth Street and Sty Saylor Street,and between SW 681 Avenue and SW 7Oe4 Avenue.
We, the undersigned petitioners, hereby request that the City of Tigard Investigate the
feasibility of forming a local Improvement District(LID) and draft a PmIIminary Evaluation
Report for the city Council's consideration. The evaluation would review the feasibility and
estimated costs of maklog public improvements to these streets through the,creation of an
assessment dlstrtM if the Preliminary Evaluation Report determines that the LED is
feaslble,we request that the City Council direct the engineering staff to proceed to the next
step and prepare a Prelininary Engineering Report.
The UD would be for the express purpose of.
Improving the following streets to partial or hull city, street standards, Including streetsr
' curbs, gutters, sid"alksl street trees, street lights and signage; sanitary sewer; water,
Including fine hydrants; storm drainage fadlit!",' undergrounding of overhead utilities;
aequlsition of additional right of-way or easements acquisition, if necessary; street and
utility engineering design and related professional service:
SW 68h Avenue,between SW Dartmouth Street and SW Baylor Street;
• SW Wh Avenue between SW Dartmouth Street and SW Baylor Street;
• SW 70h Avenue between SW Dartmouth St and SW Baylor Street;
• SW Dartmouth Street between 5W 6e and SW 69th Avenues;
SW Clinton Street between SW 60P and SWW,0'Avenues.
The area hereby to be improved by the creation of an assessment district comprises
approximately 10 acres,counting existing right-ref-ways. The area and the proposed LID
are more specifically explained in the exhibits attached to this petition, which ace all by
reference herein made a part of this petition,and which include the following.
Exhibit'MIS a list of the properties to be included in the ISTD;
n Exhibit'W is a narrative description of the proposed improvements;
Exhibit 'C' Includes maps (Figures 1-6) Which illustrate the general location, the
proposed boundary,the property ownerships,and the parcel size and parcel frontage
of each parcel wit.'�in the LID;
i
Attachment 1.2
Page 3 of 18
G Exhibit `D' provide$ detail on the area. and frontage caiculations, including the
percentage of the area and frontage which is owned by Specht Deveibprnent, Inc„
which is summarized on Figures 5 and 6 of Exhibit'C'.
We hereby declare that we,the undersigned petitioners:
(1) Are in fact the owner or the contract purchaser of the Indicated properties;
(2) Represent at least fifty percent(50%) of the property benefited by the proposed
local improvement district;
(3) Understand that the cost.of these improvements would be borne by the benefited
property owners if a local improvement district were forged;
(4) State that by signing this petition we are only acknowledging an interest In
having a preliminary engineering report completed, and are not committed to
supporting any local improvement district that may be proposed as a result of the.
City's evaluation and report.
WHEREFORE,petitioners request thatsaid preliminary investigation be accomplished,and a
preliminary Evaluation Report be delivered to the City council regarding the feasibility of
creating an assessment district,and further that, if the LID appears to be feasible,the City
Council of the City of Tigard, Oregon, direct staff to prepare a Preliminary Engineering
Report and expedite the study as much as possible.
SIONATURE COMPANY ADDRESS TAX LOT#
(WCTM 1s135DD)
e/ A
$� CNsv4a;!rr���►!C. ,s�tcs� -su►� dt vias ,2100
2200
„ 2300
}v�
f
! 2500
f ` 2900
3000
e r i1 3041
3100
` 6140
+ " 6200
1 rti 6340
a..
e 6600
2
Attachment 1.2
Page 4 of 18
SW V40AW-O
! � e,CIA t' p �ufC��a�.4�L. 4f-Y7arc 6700.
6800
3
Attachment 1.2
Page 5 of 18
EXHIBIVA'
PROPERTIES INCLUDED WITHIN THE PROPOSED
LOCAL IMPROVEMENT DISTRICT
The following tax lots,all on Washington County Tax Assessor's Map IS136DD:
2100 Pollock,Donald E&Julia Gall/Specht Development, Inc.
2200 Pollock, Donald E j Specht Development,Inc.
2300 Carpenter,Richard L/Specht Development,Inc.
2500 Dickey,Velda A/Specht Development,Inc,
2900 Specht Development,Inc.
3000 Specht Development,Inc.
3001 Specht Development,Inc.
3100 Specht Development,Inc.
6100 Specht Development,Inc.
6200 Specht Development,Inc.
6300 Specht Development,Inc.
6500 Specht Development,Inc.
6600 Specht Development,Inc.
6700 Specht Development, Inc.
6800 Specht Development, Inc.
1900 John Carl Coon&Mary G.Olsen,Trustee
2000 Paul B. Wagar 3r.&Kaneko T TRS
2400 Sternberg Family Limited Partner
2700 Lavida E.Miller
2800 Glenn L.and Sharon L. Moore
32.90 Judy Lorraine Strojny&Diane Louise Baldwin
6900 J.T.Jr.and Theresa A.Roth
7001 ]acob T.Jr.and Theresa A.Roth
7300 Kenneth and Marilyn Rosenfeld
7601 Marzle Salarle
4
Attachment 1.2
Page 6 of 18
RX"18rr Ir
NARRATIVE DFSCRlpnoN OF THE PROPOSED PR039CT
The proposed project Mould Improve the public streets and utilities to partial or full city
standards. Specifically,the project would Improve:
• Partfat street improvements to SW 68th Avenue, between SW Dartmouth Street and
SW Baylor Street, along the west side of the street only(Pacific IOW Properties Is
E Improving the east side ,of the street as a condition of development), and not
Including tax lot 2600(IS136DD),which is already developed;
• Full street and utility improvements to SIN 6911 Avenue between SW Dartmouth
Street and SW Saylor Street, along both sides (except that portion between 5W
Dartmouth Street and SW Clinton 5trt:et along the west sada of SW 694h Avenue,
which Is being developed by Pacific NW Properties as a condition of development);
• Partial street Improvements to SW 7411 Avenue between Sw Dartmouth St and SW
Saylor Street, along the east side of the street only,and not including tax lot:7500
(1S13600),which Is already,being developed by Pacific NW Properties as a condition
of development;
• Partial Street Improvements to SW Dartmouth Street between 5W",t'and SW C'
Avenues,on the north side of SW Dartmouth Street only;
• Full street and utility Improvements to 5W Clinton Street between SW 6s' and SW
700 Avenues.
The street standards assumed in this proposed local Improvement district are as follows:
r SW 68*Avenue would be 44-feet%vide In a 70-foot wide right-cf-way;
• SW 69"t Avenue would be 36-feet wide In a 60-foot wide right-of way;
• SW 70th Avenue would be a I 11 street Improvement,Le.,Is-feet wide in a 304bot
wide right-of-way,with curbs,sidewalks,landscape strip and street trees on the east
side only;
• SW Dartmouth Avenue would be 5e-feet wide In a 94-foot wide right-of-way.
There,appears to be enough right-of-way available for the proposed Improvements,
therefore it should not be necessary for the City to acquire additional right-of-gray or
easements. However,1f there Is a need to acquire for additional right-of-way or public
easements,the costs of such"uisftfons would be added to the UD.
In addition to any r[ght-of gray acquisition and constriction costs, other costs will be
folded into the local Improvement district, including but not limited to city,staff and
consultant time and materials for survey, engineering design, project admInlstmtlon,
legal services and financing costs.
S
Attachment 1.2
Page 7of18
EXHIBIT`C'
SUPPORTING ILLUSTRATIONS
The following figures Illustrate the percentage of the property area and property frontage
owned by Specht Development, Inc.
Figura I..This figure Illustrates the location or the proposed Local Improvement District,
which Is within the"Tigard'Triangle",generally north of Dartmouth street,between I-5 and
SW 721"Avenue;
Figure 2-This figure Is an aerial photograph which shows the proposed LID boundary and
the parcels that would be Included.in the assessment district,
Figure 3--This figure shows the ownerships of the properties In and adjacent to the
proposed LID boundary;
Figure 4-'this figure Illustrates the proposed local improvement district boundary,and the
areas where street and utility improvements would be made. All public Improvements made
as part of the LID project would be within this boundary;
Figure 5-This figure shows the total land area, In square footage,of the parcels within the
proposed LID,and the percentage of the square footage owned by Specht Development,
Inc.
Figure 6-This figure shows the total street frontage of the parcels within the proposed LID,
and the percentage of the street frontage of parcels owned by Specht Development,Inc.
6
Attachment 1.2
Page S of 18
FIGURE I
r
Metz r legend
a
Proposed L.I.D.Boundary
3
r
^ ,
E �r p
F f Q9w
."
off
V .
ro
4 �
514 PFAPFLI
STQ
21
AE
C'
o ( -
o f
M
c
m
f �
P
V
ql
m
Figure 1: Location Map
a DDC Specht LID aI1,300FL
�' tresign�mup: City of t igard, Washington County, Oregon P ed N,
"' cw�aava 1Q47.Qp104
Q arxpiwrtf�ue�uv�e�nr.>: Spt><tei::
erase5ryo.om-.sou�n:.C I]rawrl fay:G►H�yeids.t+s McirsWtsRtr+aufoeCcfitG.RL15LgiE[kt80ikC,fA7v8q'DEi7 ES
r�.r.euw_xio
I II1
t �
IT
Legend
Proposed L.I.D.Boun ry#
44,
' t
Jo
!
rti
iL
}
!n�•t �.
ILZ
LDC Figure 2: Aerial Photograph
QDC Specht
�� i'r- /. (q {} rJ(i -�' �1 _ � .`iie r• I 'f'.. yif� u tp �i i. "I� •�e� 1/
LID et
OV51grk Grovp City of Tigard, Washington County, Oregul I 1• +t +1
Attachment 1..2
Page 10 of 18
FIGURE 3
y Legend
" r Proposed L.I.D.Boundary
u '
r
E I � �rsexae�wi4 I ' I
f
ti :NL�lh1�l6T V-7Ur.CA 511
-- ... ..-:.,-..- -
i
{ .� : r
El
Ewr`Y Ir wS171G1bA1lj
4 rCM.n+rarviCef '1 I i ? ! !
.:CDiFC-., i 'SSrle �et'.9�betrlM � 1
hQtH.*CYw
e 5 i 4:lbeew[ Wsa.*Wrie 7i�]M70eYe1
> r ae,rwoereTr , , .arse■r " i p ksv� _
� s � MtlMw4Y Sa KtrlOenf/e .{
..• � •• Wllr''ProMIT:Na1LLC �� I ryrfKBeNM' _ —.,,.�•--�
r }►+xgcArlmwvarsaarwe4 E E._ ergine- '_i
o a> eir«c; tTt7eaexere
I 4
T SNC1,r'�.Li.Yy'3ESi
r
i
W f�"
E r!
v r
er 7
B -Date..
Figure 3: Ownerships Scale, trs
QLLLD Specht Lil] zaa�
es De,ignGrroup City of Tigard, Washington County, Oregon rQj-ci�`,ao
d $OSiFk'�!.
�„' C4St+1"k TAlALC1.9„[pVK
Data DMWn By:CES
�,ip;rgpyWRGdxtGCertfef.RLl53.lIRtaSC.Npv6rid4r',�'J5
p Nxarri+iisx
Attachment 1.2
Page 11 of 18
FIGURE 4
E
$ i LEGEND
AwC1 Boundary
E � ImprovomontAross
a
CL
4
40
N
SW BAYLOR ST
S7 t�1 tti19GPP 1 Mao
WACAW roup 2M
WW610 GOpK M mum
g
0
16�rp�b l511shb
P OKr 2500
snoprte
v 1S1Ypp' 10MM
pICiSEY1 lwo �P
[,j
S-Rw"
7517GpD 24M
E'TFAHBERO
FMU�.Y
+ - ARTM 1517640
p � SPEGtfi`
rxssao
t9rw44
'S cre�
,wt rs�r7644 seEcirT '
a OKCRT SPKHt
n
m
SW CUNTON ST
ISOM ISO=
1.
Vot
7Cut ROTH
3 0RM Q
� t6176b0 15i56t0
p 7ri7r s�:1tT
p SHAR1E ISIMOD
FO
SK tSr?D6D OtDD co
SPEWT
F 1S33M
RdSENFE7A 11
181 M
El
E6p6
ISIYAM
630
z enr
o `
t M3=
ew
10
EceT
SW DMTMDUM ST NORTH
e
A Data:
Figure 4; Improvement District Scmle: tx
Q..C, Specht UD ;` ,soft.
Quo City of Tigard, Washington County, Oregon p,ojedN,
.rr..w�r soa�+s: 3p17tr01:QS1
rte»
o s�maa �.twaoataR�aurc�Ca:t+�r,RuSt�n�cxc�Har«ra»r prawn By: CED
Q ►utmwueos
...q�,.,,rrxm•zafw+t-��Y�+•F�+�v��arhrc
Attachment 1.2
Page 12 of 18
FIGURE 5
E
$ LEGEND
C i Properties Owned By Others 123,35B1sgX or 41%
Properoas Owned By Specht =174.167sq.11,er 59%
TOW ;;297.525eq.1t,(100%)
SW SAYLOR S7
Iwo
.tri.q ' ' �treaoras. ;9o.oeow�'
U f�l r�fr r 35Aa � �`ri��f,':t8i76aR '
Wj tstaco� r Uj
2290
Zo
' OtaAw w
�isf +stxco T f lfi�/
4 S R,taa "' 4 rf /!�♦ Fi>,lilyClt i
SW CLINTON S7
q tsin aeoo .�' arae fr �fr
mr000awi' Yr . teaea.aA. r�
-
+^fst3aoR! aaoaas%'
£
f12MO wm
ts138G9 t fr3 s r saa*4
.. s
i= ro !�r , '
rt9 ra9eeto
r17J�tSl.
pF% t�r 16135W
csoa
2.7meni<
m
a �
SW CAR7MOU-M ST NORTH
Data,
Figure 5. Parcel square rootage 01120rZ5M
LQ Specht LID -Acple: .
a tiealnnCitrxrp City of Tigard, Washington County, Oregon Projectt
iw.:w+rr so�rcae 1017.6pi.00
Drawn By. CE8
U „« a�w•ra+ Metro bal�.fia ossa!Caller,Rl IS Lioe lite Dice.tdd�i
p rwe�m►a�wo
ryq ru.rrm,�w.•mn n,.�:.., ,h.mrp.+sau.t
i
1
Attachment 1.2
Page 13 of 18
FIGdRIE G
LEGEND
...�.- Street Frontage By Others s 1,352 Fedor 38X+
M, Street Frontage By Specht=2,449 Foot or 64%
Total m 5,795 feet(900%)
propetties Owned By Othm
i. Properties Awned 13Y Specht
v
SW 13AYLOR ST
g
, 59156D0 '
� 15i9it]P
C Lu75 0''
,
'1000
7,10D rn
uj
SW CUNTON ST
Yw
isio aooa
bt00
3:
At
� 1P'aePP�R
F" 457b7Db',:
tt 7�DD
f
ur i8_i56prD
Cl
t:
$ - — - SWOARTMOMST NORTH
e
a
rs pato,
Figure 6: Linear Street Frontage 09=006
(LLD Specht LID
06 iahcisup City of Tigard, Washington County, Oregon Prgedit
o ,h..t«rs, Saurtex 1097.001.00
e] dmrwi�atsuerwfeurx iRL1$t3lafla!><Die4,Na,mttmr�OGS
� ,�n��rrEN Melvot)et�►��loartt,?e5lar, erownsy: GtcB
o rK
.r
fir.{N+.+.l�il�pnl"��S'4�S1NA�*M�Wq+l1[S/YMti:
Attachment 1.2
Page 14 of 18
EXHISIET'D'
51
leg, B!i
I
in
p IV n:10 9 ill;98!�g i�
Tki.$'f. �' +L9 ldir-t4 -dd
}"j
fin
ag
&SS
g
CO
40
:
X4Xlx,X11 XIX-.YC-3C5 x x XS MI X,X x XX,
M U)LO 'CO 16N in t;8 aLn.
to CD 0 8 r,
:00
"IC,(n. CQ v- N Cq
C4�
t!
01
CLI
40 8 81 88. 8,8'RE 0a�S.7r
R
is vs
CD 04
r.z 7 z z z 7-ZI 1
Oil
CL
4
C;;
IW
CO, &122,01 koi >
1-3 0
0 2 ,
01 p
z r Vj (0 i 1 '6
CL, W�;2 �,W�w 1 1�
-S V-61 NU.0
CL 0
%;
Attachment 1.2
Page 15 of 18
Specht Triangle LID
Tentative Schedule
12101105
PHASE 1: INITIATE LID
1, Develop tentative.LID boundar 11125105
2. Review with Cita'staff 11129105
3. Meet Nvith individual propertY MUM 12401-12109105
4. Revise boundary 12112105
5. A4cet svitlt City Engineer 12115105
6. Neighborllood meeting(optional) 1112(06
7. Submit petition to Gita'staff 1120106
S. Petition presclited to City Council 2114106
PHASE Il: FOILMATION OF LID
9. Council requests Engineering Report 2114106
1.0.specht deposits funds 2117106
11.preliminary Eltg.Report completed 4114106
12.Council adopts Report,calls for!tearing 519146
13.Pubic Hearing 6116106
14.Adoption of LID Ord,and assessment roll 6116106
PHASE 111: CONSTRUCTION DRAWINGS
15.Complete Final construction draw-inns 7121106
16.Construction load 7425106
17.Advertise for bids 7128106
1 S.Award bid 9412106
PHASE IV: CONSTRUCTION
19.Construction stares 9WI06
20.Consinsction conultleted 12r_=2106
21.Acccplance of i1nlp]'0Wn1ents 1!31107
cjdJlolT.O�I ri��'.igfd sc7rnR�IG+i2�11 A11 1
Attachment 1.2
Page 16 of 18
22,Fitvit costs tabulated 2!28107
1'11ASE 8"'. 1?MAL ASSESSAIMT ROLL
23,11na1 enginceriug rptfassesslnent roll 3r301Q7
24.Council adapts final assessment roll 4124/07
pi.TASR vi.SALE OF BONDS
25.Sale ofwscssntent bands 6115/07
26.First assessment notice 1/15/08
,jWI017Ao-Ffh i�huiXi.'b(!dal61V0IMS 2
Attachment
Page 17 of 18
Tigard Triangle Portal
' AveOn/Off ' + Intersection
s I {
J l I 4 z.i itt- .i
Attachment 1.2
Page 18 of 18
w x
'A F
_ v _ f lid
C9
Jy: ff 4
T
AVM33U4
)13OQMHjj
L
MWAY
X F p rk
A
L -T
"A,
3rjNW i:,
Rug Ms
P-1
--4
-lit It X,
I � j L
I
k r
t 6 E,
f X.0
tA Ms
7-1 r:
v
3ns3Av
Mr.
4!r:
it
IL r
E'.
It
m'7
4-4
Sit r: 4n
7- 1
q. 4.'I j.,
2
i Aq
,;7
7-�
Attachment 1.3
Page I of I
SPECHT
1-TE" C 1,";A7"(
Februaiy 17,2006
City Engineer
City of Tigard
13125 SW 11311 Blvd,
Tipard,OR 97223
Tigard Triallgle 131)
D c a r Gus;
111ank you ror die opportunity to lowl Willi you and Marco cabirtillas yesterday. Per your mquest,we
havesuninvarized our agteement As it portains to the deposit for the PfelintinDrY Engineer's lKeP011;
Speclit sliall have Ilse-opportunity to review mid discuss the scope Of tile ItOquesl f0YPJ`oV0saI for
,Ile prelintinary r.-Iijineoritia Repon.
t
The City of Tigard("tile City")Will Use its cOns"liint Proeegs to 5 'ccI a Q 0R5 uHAM to
pmpliye.the Preliminary FngincurinS Report rind associated work for the LID. Igincering
Spechl Will deposit fonds equal 10 the conoll.,11it's cost to prepare the Preliminary El
Itepan, plus a reasonable estimated :mount for City Stairs jnV0lVCmC11t in the proje'el
subsciiiiictit. to City Council approving, the resolution to prepare the Pfclilnillal U-nAineer'AA
lkeport. ,)
The deposit by 191MIlt Development,['to.will be held by the City,to mitigate the nsk Of f'1y1ng
for the Preliminary Engineering Report should the TID not lv formed for imy reason.If COU061
forms the LTD' all costs to prepare the preliminary Engineering Report(fwm the date of the
resolution) %vill bi; included in the Iji) m part or the LID costs mid will be Included in the
OssessitIL,ilts.to benefited proirrty o1,v11c1,,5. As a mull,At the time the City Council forms thc
LID,.the deposit money will be mtumcd to$Pechl-
• Should.the City Council not fora(lie;LU),ally funds not used sliall be returned to Specht.
Specht reserves the do)t to withdraw its support of the LID at au y tirui;. At thritt1luc,any unused
funds fiviii die deposit will be reltimQ4 to SPccht-
loak fonvird to ivorkhtg Willi the City on this project ajjd Are cNoited far the Chat=to provide
tanvible,beiiefits;to lite community. Should you bave any'questions,please do not heshatc to-outlet'Ile,
Best Regards,
SpE�CI-JT DEVELOPMENT.INC,
Todd Shaakr
elli Cf opcnjting O)Tjccr
C- NJawo Cabanilils
I-M Mulpliy,LDC Design Group
02vg Spechi.Pete Kit-by
1-01 fmix fee MIA':