Resolution No. 05-50 CITY OF TIGARD, OREGON RESOLUTION NO. 05-S-0 A RESOLUTION FINALIZING SANITARY SEWER REIMBURSEMENT DISTRICT NO. 34 (SW 117TI1 AVENUE) AND AMENDING THE PRELIMINARY CITY ENGINEER'S REPORT CONTAINED IN RESOLUTION NO. 05-17. WHEREAS, on March 8, 2005, the City Council approved Resolution 05-17 to form Sanitary Sewer District No. 34 to construct sewers in SW 117th Avenue in accordance with TMC Chapter 13.09; and WHEREAS, Resolution No. 05-17 included the City Engineer's Report that included an estimated construction and total project cost; and WHEREAS, construction of the sewer improvements has been completed, final costs have been determined and the City Engineer's Report has been revised to include the final costs as required by TMC 13.09.105 (1); and WHEREAS, the property owners within the district have been notified of an informational hearing in accordance with TMC13.09.060 and an infonnational hearing was conducted in accordance with TMC 13.09.105; and WHEREAS, the City Council has determined that the proposed revisions to the City Engineer's Report as recommended by the City Enguieer are appropriate. NOW, THEREFORE,BE IT RESOLVED by the Tigard City Council that: SECTION 1 The Final City Engineer's Report titled"Sanitary Sewer Reimbursement District No. 34, attached hereto as Exhibit A, is hereby approved. SECTION 2 The City Engineer's Report as presented in Resolution No. 05-17 is hereby amended by the attached Final City Engineer's Report(Exhibit A). SECTION 3 The City Recorder shall cause a copy of this resolution to be filed in the office of the County Recorder and shall mail a copy of this resolution to all affected property owners at their last lmown address. SECTION 4 This resolution is effective immediately upon passage. PASSED: This Q[O day of 05. E Mayor-tity of Tigard AT ST: City Recorder-City of Tigard RESOLUTION NO. 05 - ,t5 0 Page 1 Exhibit A Final City Engineer's Report Sanitary Sewer Reimbursement District No. 34 (SW 117th Avenue) Background This project was constructed and funded under the City of Tigard Neighborhood Sewer Extension Program (NSEP). Under the program, the City of Tigard installed public sewers to each lot within the project area. At the time the property owner connects to the sewer, the owner must pay a connection fee, currently $2,635, and reimburse the City for a fair share of the cost of the public sewer. There is no requirement to connect to the sewer or pay any fee until connection is made. In addition, property owners are responsible for disconnecting their existing septic system according to Washington County rules and for any other modifications necessary to connect to the public sewer. Proiect Area - Zone of Benefit Serving the four lots in the following table required the southerly extension of an existing sewer in SW 117th Avenue. The lot at 14230 SW 117 h Avenue is not included in the district since service is currently provided by a sewer along the northerly boundary of the Shadow Hills subdivision. The project has provided sewer service to a total of four lots as shown on Exhibit Map B. Cost The final cost for the sanitary sewer construction to provide service to the four lots is $34,036. Engineering and inspection fees amount to $4,595 (13.5%) as defined in TMC 13.09.040(1). The final total project cost is $38,631. This is the amount that should be reimbursed to the sanitary sewer fund as properties connect to the sewer and pay their fair share of the total amount. However, the actual amount that each property owner pays is subject to the City's incentive program for early connections. In addition to sharing the cost of the public sewer line, each property owner will be required to pay an additional connection and inspection fee when connection to the public line is made. All owners will be responsible for all plumbing costs required for work done on private property. Reimbursement Rate All properties are zoned R-4.5 but vary in lot size from about eleven thousand to fifteen thousand square feet as can be seen in the following list of lots. Exhibit A Page 1 of 4 Therefore, it is recommended that the total cost of the project be divided among the four properties proportional to the square footage of each property. Other reimbursement methods include dividing the cost equally among the owners or by the length of frontage of each property. These methods are not recommended because there is no correlation between these methods and the cost of providing service to each lot or the benefit to each lot. Each property owner's final fair share of the public sewer line is $0.67580820 per square foot of the lot served. Each owner's fair share would be limited to $6,000 to the extent that it does not exceed $15,000, for connections completed within three years of City Council approval of the final City Engineer's Report following construction in accordance with Resolution No. 01-46 (attached). In addition to paying for the first $6,000, owners will remain responsible for paying all actual costs that exceed $15,000. Upon request, payment of costs that exceed $15,000 may be deferred until the lot is developed as provided by Resolution No. 03-55 (attached). Annual Fee Adjustment TMC 13.09.115 states that an annual percentage rate shall be applied to each property owner's fair share of the sewer line costs on the anniversary date of the reimbursement agreement. The Finance Director has set the annual interest rate at 6.05% as stated in City of Tigard Resolution No. 98-22. Recommendation It is recommended that Reimbursement District No. 34 be finalized with an annual fee increase as indicated above and that the reimbursement district continue for fifteen years as provided in the Tigard Municipal Code (TMC) 13.09.110(5). Fifteen years after the formation of the reimbursement district, properties connecting to the sewer would no longer be required to pay the reimbursement fee. Submitted July 12, 2005 a Q )D_ .�,....t.� Aguin P. Duenas, P.E. City gineer i5engWON-2005 fy cip11171h ave sanitary sewer extension district#341flnafixationkl.Za-05 final repad app a.tloc Exhibit A Page 2 of 4 Reimbursement District No. 34 Fina! Cost to Property Owners June 21,2005 ESTIMATED OWNER SITE ADDRESS TAX LOT ID AREA(S.F.) AREA COST TO PAID BY PAID BY (AC) PROPERTY OWNER CITY OWNER 1 HURD,SUSAN J 14145 SW 997TH AVENUE 2S110BA01100 11711.57156 0.269 $7,915 $6,000 $1,915 2 HICKOK,WILLIAM H&SHARON K 14185 SW 117TH AVENUE 23110BAD1000 15149.95196 0.348 $10,238 $6,000 $4,238 3 ANDERSON,KAREN RAE(TRUSTEE) 14225 SW 117TH AVENUE 2S110BA00900 15150.98605 0.348 $10,239 $6,000 $4,239 4 MILLER,CARL T 14190 SW 917TH AVENUE 2S110BA00600 15149.95200 0.348 $10,238 $6,000 $4,238 Totals 57162 1.31 $38,631 $24,000 $14,631 PROJECT TOTAL(Cost to Owners+Cost to City) $38,631 I:1ENc520o4-2WS FY CIR117Eh Ave Senitary Sewer Exlenslon Mnldcl#341FINALIZATION4 Relmb by area DIST NO.34 FINAI-As Page 3 of 4 117TH AVENUE Reimbursement District No. 34 Final Cost to Property Owners Summary June 21,2005 Final Construction Cost $34,036 13.5%contingency(Admin&Eng) $4,595 total project costs $38,631 total area to be served(S.F.) 57,962 total cost per S.F.to property owner $0.67580820 1'AENOW114-2005 FY CIP%117th Ava sanllary Sewer Ezlenslnn Oislrlcl AMT-INALIZATIOMPAImb by arae DIST NO.34 FINAL.r1s Page 4 of 4 3Ad H1ztG CO) zz U � � r F- m 0 N 3Ad Hit I R F- ~ W O 2 W Z � o � mw m Z2 0)w - > W LL i Q CC O m �d m PCZ W uO � d- r W Z � OW CL N0 - U- 8831 HA l m m O o W Z .- O U N Ir Et a Q CD F- Q � x N W v w Q F- O z d � z �