Resolution No. 04-97 CITY OF TIGARD,OREGON
RESOLUTION NO.04- Q-7
A RESOLUTION UPDATING THE PARKS AND RECREATION SYSTEM DEVELOPMENT
CHARGE (SDC) METHODOLOGY AND AMENDING RESOLUTION NO. 04-37 BY AMENDING
EXHIBIT A THERETO AND INCREASING PARK SDC RATES.
WHEREAS,Tigard Municipal Code Chapter 3.24.050(3)provides that the methodology used to establish
improvement fee or reimbursement fee SDC's shall be adopted by resolution;and
V;HEREAS,the need for facilities to serve the planning area for which the City is responsible have changed
since the time the current Park SDC methodology was adopted;and
WHEREAS, the City of Tigard has prepared an updated Parks and Recreation System Development
Charges Update Methodology Report(methodology report);and
WHEREAS, the updated methodology report includes updated SDC rates that reflect currently identified
needs and costs;and
WHEREAS,the City provided notice of the hearing and of the availability of the methodology on August 9,
2004,at least 90 days before the first hearing,as required by ORS 223.304;and
WHEREAS,the methodology was available to the public on September 24, 2004,at least 60 days before
the hearing.
NOW,THEREFORE,BE IT RESOLVED by the Tigard City Council that:
SECTION 1: The City of Tigard City Council hereby adopts the Parks and Recreation System
Development Charges Update Methodology Report attached hereto as Exhibit 1.
SECTION 2: Resolution No. 04-37 is hereby amended by amending Exhibit A to that resolution to
read as shown in Exhibit A hereto and incorporated by this reference.
SECTION 3: This resolution is effective immediately on passage, although the rates adopted and
imposed under Section 2 shall not be effective until January 1, 2005. The rates are
effect prior to the adoption of this resolution shall remain in effect until that date.
PASSED: This day of LIC CEMaQ 2004.
i
i
j Mayor- ity of Tigard
ATTEST:
HepntrCity Recorder-City of Tij4rd
RESOLUTION NO.04-C�
ATTACHMENT#1
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effective Date
COMMUNITY DEVELOPMENT•PLANNING 1412904
Park System Development Charge(SDC)' 115/2004
Single Family Unit $1,852.00
$3,753.00
AttaGhed Single ra;4y Unit
$1,,163.00
$959:90
Multi-family Unit $3,017.00
Spaces in a manufactured home park $ 99.00
$2,976.00
Commercial/industrial(per employee) $13'4:88
$255.00
Park SDC Annual Adjustment 4/1012001
Parks SDC fees shall be adjusted annually on January 1 st of each year
beginning in 2002. The new fee will be determined by multiplying the
existing fees by the average of two indices,one reflecting changes in
development/construction costs and one reflecting changes in land
acquisition costs. The average of these two indices is a reasonable
approach because the Parks SDC fee is roughly split 50%between land
acquisition and land development components.
The index for the Land Acquisition component will be the base cost for
residential tract land in Tigard,as determined by the Washington County
Appraiser. The average cost for residential tract land was selected because
it is readily identified and is the lowest priced of the buildable lands in Tigard.
Changes in this base cost can be calculated in terms of a percentage
increase,to create the level of change to the original index,and projected
to the overall acquisition cost. In accordance with Measure 5,the
Washington County Appraiser's office will determine appraised values on
July 1 of each year.
The index for the land Development component of the Parks SDC will be the
Construction Cost Index for the City of Seattle as published in the December
City of Tigard EXHIBIT A
Fees and Charges Schedule
Department Revenue Source Fee or Charge Effective Date
issue of the Engineering News Record(ENR). The Seattle cost index will
be used because the city is the geographically closest to Tigard of twenty
metropolitan areas for which the ENR maintains cost data. This index is
adjusted monthly,quarterly,and annually. The annual index for each year
will be selected beginning with the index for December 2002. The annual
index will be used because it is available in December and most closely
coincides with the January Ist implementation of Park SDC fee adjustments.
Park SDC Annual Adjustment(cont.)
Calculation Definitions:
SDC(2000)=Current SDC fee
L(2000)=Average cost of residential tract land 2000
L(2001)=Average cost of residential tract land 2001
L(2xxx)=Average cost of residential tract land 2xxx
C(2000)=Construction cost index of 2000
C(2001)=Construction cost index of 2001
C(2xxx)=Construction cost index of 2xxx
LCI=Land Cost Index:change from the current year from previous year
CCI=Construction Cost Index:change from the current year from previous year
ACI=Average cost index change of LCI+CCI
Formula:
L(2001)!L(2000) =LCI
and
C(2001)/C(2000) =CCI
therefore
LCI+CCI 12 =ACI
y then
SDC(2001)X ACI =SDC(2002)
Each year subsequent to 2002,the costs shall be revised using the current
year and previous year's data. Not withstanding the foregoing,all calculations
shall be carried out to the thousandth place. A final product ending in.49 or
less shall be rounded down to the nearest dollar,.50 or more up to the next
dollar. Community Development staff will perform the adjustment calculation
and prepare the resolution each year.