Loading...
Resolution No. 04-46 CITY OF TIGARD,OREGON RESOLUTION NO.04-& A RESOLUTION FINALIZING SANITARY SEWER REIMBURSEMENT DISTRICT NO. 29 (SW PARK STREET AND DERRY DELL COURT) WHEREAS, on August 26,2003,the City Council approved Resolution 03-33 to form Sanitary Sewer District No. 29 to construct sewers in SW Park Street and Deny Dell Court in accordance with TMC Chapter 13.09;and WHEREAS,Resolution 03-33 included the City Engineer's Report that included an estimated construction and total project cost;and WHEREAS,construction of the sewer improvements has been completed,final costs have been determined and the City Engineer's Report has been revised to include the final costs as required by TMC13.09.105(1); and WHEREAS, the property owners within the district have been notified of an informational hearing in accordance with TMC 13.09.060 and an informational hearing was conducted in accordance with TMC 13.09.105:and WHEREAS,the City Council has detennined that the proposed revisions to the City Engineer's Report as recommended by the City Engineer are appropriate. NOW,THEREFORE,BE IT RESOLVED by the Tigard City Council that: SECTION 1 The Final City Engineer's Report titled"Sanitary Sewer Reimbursement District No. 29, attached hereto as Exhibit A,is hereby approved_ SECTION 2 Resolution 03-33 is hereby amended to add the revised City Engineer's Report. SECTION 3 The City Recorder shall cause a copy of this resolution to be filed in the office of the County Recorder and shall mail a copy of this resolution to all affected property owners at their last known address. SECTION 4 This resolution is effective immediately upon passage. PASSED: This day of T Ftp 2W4. i ! Mayor-Ca of Tigard 1 ATTEST- Greer A.Gaston,Deputy City Recorder uo,yWwveuna,.e.w u,vwsza d--.�V—iae„mn za e.,.ac RESOLUTION NO.04-4(�j Page 1' Exhibit A Final City Engineer's Report Sanitary Sewer Reimbursement District No.29 (SW Park and Derry Dell Streets) Background This project was constructed and funded under the City of Tigard Neighborhood Sewer Extension Program (NSEP). Under the program, the City of Tigard installed public sewers to each lot within the project area. At the time the property owner connects to the sewer, the owner must pay a connection fee of $2,435 ($2,535 after June 30, 2004) and reimburse the City for a fair share of the cost of the public sewer. There is no requirement to connect to the sewer or pay any fee until connection is made. In addition, property owners are responsible for disconnecting their existing septic system according to Washington County rules and for any other modifications necessary to connect to the public sewer. Project Area-Zone of Benefit An existing sanitary sewer line in SW Watkins Avenue was extended south and a sewer in SW 107th Avenue was extended east along Park Street and Cook Lane to serve forty-six lots as shown on Exhibit Map B. The project provided sewer service to forty-six lots along the entire unserved portions of SW Park Street, Derry Dell Court, Cook Lane and Watkins Avenue. Cost The final cost for the sanitary sewer construction is $689,609.02. Engineering and inspection fees amount to $93,097.22 (13.5%) as defined in TMC 13.09.040(1). The final total project cost is $782,706.24. This is the amount that should be reimbursed to the sanitary sewer fund as properties connect to the sewer and pay their fair share of the total amount. However, the actual amount that each property owner pays is subject to the City's incentive program for early connections. a in addition to sharing the cost of the public sewer line, each property owner will be required to pay an additional$2,435 ($2,535 after June 30, 2004)connection and inspection fee when connection to the public line is made. All owners will be responsible for all plumbing costs required for work done on private property. Reimbursement Rate All properties in this area are zoned R-4.5 but vary in lot size from about 10,000 square feet to over 22,000 as can be seen on the attached list of owners. Exhibit A Pagel of 4 Therefore, it is recommended that the total cost of the project be divided among the forty-six properties proportional to the square footage of each property. Resolution 01-46 limits this fee to $6,000 to the extent that it does not exceed $15,000 per owner for connections completed within three years of final approval of the City Engineer's Report. Other reimbursement methods include dividing the cost equally among the owners or by the length of frontage of each property. These methods are not recommended because there is no correlation between these methods and the cost of providing service to each lot or the benefit to each lot. Each property owner's estimated fair share of the public sewer line is $1.0219 per square foot of the lot served. Each owner's fair share would be limited to $6,000 to the extent that it does not exceed $15,000, for connections completed within three years of City Council approval of the final City Engineer's Report following construction in accordance with Resolution 01-46 (attached). In addition to paying for the first $6,000, owners will remain responsible for paying all actual costs that exceed $15,000. Upon request, payment of costs that exceed $15,000 may be deferred until the lot is developed as provided by Resolution 03-55. Annual Fee Adiustment TMC 13.09.115 states that an annual percentage rate shall be applied to each property owner's fair share of the sewer line costs on the anniversary date of the reimbursement agreement. The Finance Director has set the annual interest rate at 6.05%as stated in City of Tigard Resolution No.98-22. Recommendation It is recommended that a reimbursement district be formed with an annual fee increase as indicated above and that the reimbursement district continue for fifteen years as provided in the Tigard Municipal Code (TMC) 13.09.110(5). Fifteen years after the formation of the reimbursement district, properties connecting to the sewer would no longer be required to pay the reimbursement fee. i Submitted June 8,2004 i Ag n P.Duenas, P.E. City Engineer ceauwanveimw.aa.m aswa,zaauy eau...-+wmntinaana rein ow zo mwrtaoe Exhibit A Page 2 of4 Reimbursement District No. 29 Cost to Property Owners Based on Final Project Cost Summary Final Construction Cost $689,609.02 13.5%contingency(Admin&Eng) $93,097.22 total project costs $782,706.24 total area to be served(S.F.) 765,925.35 total cost per S.F.to property owner $1.0219 _ t e 1 ; Exhibit A Page 3 of 4 Reimbursement District No. 29 Cost to Property Owners Based on Final Cons"c/ion Cost FINAL COST OWNER SITE ADDRESS AREA(S.F.) TO PAID BY PAID BY CITY PROPERTY OWNER OWNER 1 DUCAN JAN&BARRETT TIM 13150 SW WATKINS AVE 13926.64909 $14,232 $6,000 $8,232 2 BISHOP WILBUR A AND MARTHA E 10590 SW COOK LN 14646.50836 $14,967 $6,000 $8,967 3 BORCHERS VELLA M 10790 SW DERRY DELL 22358.89852 $22,849 $13,849 $9,000 4 BRADEN ROBERT W&KATHLEEN J 13175 SW WATKINS AVE 14429.44431 $14,746 $6,000 $8,746 5 BROWN HUBERT A 10820 SW DERRY DELL 16724.83997 $17,091 $8,091 $9,000 6 COLE TERRI J 13075 SW WATKINS AVE 18126.07349 $18,523 $9,523 $9,000 7 COUSINEAU STEVEN B& 10755 SW DERRY DELL 15367.02424 $15,704 $6,704 $9,000 8 FRAINEY BRIAN A&ABIGAIL J 10725 SW DERRY DELL 15366.98757 $15,704 $6,704 $9,000 9 FURRIER ROSMARIE 10685 SW PARK ST 19762.54608 $20,196 $11,196 $9,000 10 GRAY GAYLE R 10660 SW PARK ST 14573.06828 $14,892 $6,000 $8,892 11 GROAT RANDALL S&CAROLYN J 13010 SW WATKINS 15404.02471 $15,742 $6,742 $9,000 12 GROENLUND DAVID RAND 10730 SW DERRY DELL 19533.50173 $19,961 $10,961 $9,000 13 GUSTIN RONALD L&TAMMY G 10670 SW DERRY DELL 19537.91667 $19,966 $10,966 $9,000 14 HAMMES ALFRED J HELEN L 13115 SW WATKINS AVE 14471.49969 $14,789 $6,000 $8,789 15 HANSEN HARRIS H SARA J 10610 SW DERRY DELL 17986.1348 $18,380 $9,380 $9,000 16 HARMON KATIE 13145 SW WATKINS AVE 14429.56599 $14,746 $6,000 $8,746 17 HATCH JAMES S/MARCIEL J& 13205 SW WATKINS ST 14347.22665 $14,662 $6,000 $8,662 18 HEINTZ BARRY E 10700 SW DERRY DELL 19537.74845 $19,966 $10,966 $9,000 19 HOLCOMBE GERALD A& 13485 SW WATKINS ST 14726.18773 $15,049 $6,049 $9,000 20 JENSEN RONALD M& 13000 SW WATKINS 20738.95548 $21,193 $12,193 $9,000 21 KOOL SCOTT D&CELIA C 10865 SW DERRY DELL 16201.93421 $16,557 $7,557 $9,000 22 KRAGER ROBERT WARREN 10655 SW PARK ST 20861.07951 $21,318 $12,318 $9,000 23 LEPPER CHAD&MI YOUNG 13060 SW WATKINS ST 14195.40658 $14,506 $6,000 $8,506 24 MCCUTCHAN ALBERT 10880 SW DERRY DELL 15118.21956 $15,449 $6,449 $9,000 25 MCGRIFF JAMES E/SHEILA M 10735 SW PARK ST 19211.32816 $19,632 $10,632 $9,000 26 MENDEZ JUDITH A 13090 SW WATKINS AVE 13905.98901 $14,211 $6,000 $8,211 27 MEYER DUANE FRANCIS 13210 SW WATKINS ST 13934.27425 $14,240 $6,000 $8,240 28 MIGUES RONALD P&DEBORAH R 13180 SW WATKINS AVE 13936.73103 $14,242 $6,000 $8,242 29 MILLER ALLAN S DOREEN J 10665 SW DERRY DELL 15365.72783 $15,702 $6,702 $9,000 30 MOELLER JOHN C&NANCY A 10695 SW DERRY DELL 15366.9509 $15,704 $6,704 $9,000 31 MURFINSIMMONS MATTHEW T& 13365 SW WATKINS ST 14375.98869 $14,691 $6,000 $8,691 32 NOLES DAVID RAND 10630 SW PARK ST 14667.82779 $14,989 $6,000 $8,989 33 PRAM SIMON C&REBECCA T 10640 SW DERRY DELL 19538.24056 $19,966 $10,966 $9,000 34 PONIATOWSKI-D'ERMENGARD 10665 SW COOK LANE 14468,20714 $14,785 $6,000 $$8,785 35 PUGSLEY CLAYTON A& 10570 SW PARK ST 14778.43789 $15,102 $6,102 $9,000 36 RESLER MICHAEL D&BARBARA S 10620 SW COOK LANE 19574.84873 $20,004 $11,004 $9,000 37 PATINO CARLOS SR&BLANCA 10605 SW COOK LN 14465.75477 $14,783 $6,000 $8.783 38 SAWKINS DOUGLAS S& 10815 SW DERRY DELL 16763.55464 $17,131 $6,131 $9,000 39. SHOLES LANCE M& 10634 SW COOK LN 19572.73686 $20.002 $11,002 $9,000 40 STOUDER CHARLES H TR& 10760 SW DERRY DELL 19537.0636 $19,965 $10,965 $9,000 41 TESSMAN OWEN H 10865 SW DERRY DELL 16199.23647 $16,554 $7,554 $9,000 42 TIPTON TROY P&MICHELLE J 10785 SW DERRY DELL 15367.06091 $15,704 $6,704 $9,000 43 WATSON GARY D& 13120 SW WATKINS AVE 13916.56716 $14,221 $6,000 $8,221 9 44 WEESE TERRY&DORI 10600 SW PARK ST 14764.34445 $15,088 $6,088 $9,000 45 WILLIAMS DAVID S 10635 S1^/COOK CT 14467.42728 $14,784 $6,000 $8,784 46 WINTERS GERRY L 10625 SW PARK ST 29375.61232 $30,019 $21,019 $9,000 J 1 Totals 765925.35 $782,706.24 $375,221 $407,486 $375,221 PROJECT TOTAL= $782,706 Exhibit A Page 4 of 4 3A d SNIXL VM l. 00raa3137oaorlac SiHH �'^ fn<g N 3 H N10 7m c0t Ms 01901 m N swarN N3sNrN lozrovowlsz S W � 7 CYj 17N1Yd S SZ9o! (n -Q 7 A1/da3[,vm k O W ooflovowlsZ 10 7730 MflO MS 01901 �! la/10J 7130 AJ NONE/1YNd W O MS 99901 06L917YOf0/SL Y of s�� M Im o06ZOrOCOISZ AI lib&MV l Q �. W N L0 773a Aaa3a Ms oLso1 awlavorrolsz U 7 071'NOa N¢sro C Q Q 10 7130 Aau3o ooffovO lsZ MS 5690! Awvd O NN01'N37130/I o09Z0YOfO1SZ 3'AWPW0aSN3a9Y/u m F— uj Fz 10 7730 A�aa3 ZLN13H 1 Z W Z W a0s1aY0ro1sz ~ W W to 7130 Aaa3a W I=2S m MS 9ZLOl Q oOLZOYof0lSZ 1S JldlYd MS wzol LLJ N V NMW A3NIvad 10 77301Aoaa M Ol N 00910varolsz ! I W ]... oo9z0Y0fo15i 17 7730 Ao,L�G % y aa30iD0/10150{ fL2A31SY3NlS W Q Z W o a) a_ N E OOLl0YmV15Z p79L0YOi'0lSZ N 1O 7730 Aaa3O 1�7730 Aaa30 Ms 06L01 AO 99L0I N YTd1 sa3HOlp8 d AOal NOLdIL 4Y 3 1OAS S1BOa1f3T' ¢Na svwnw SNDIM cfS r� CD 0:: i � c N N N o < 015$ 0 -� z -- � � '1 aa9sOramtsz aocsoramrsr Ov nnurn Amend snvwvw �go ;�� N � � N oosroraro�.sz oaosavar0�sz �t'"��b Ablr3L 331f Y AONd3(S 0b3HS5099010b so F� �� La- K 53N� m f" W Z k as �i anlsoYamisz Z b ONYO S370N M M�0,M9 9[90[ F- W W s oNro sirvm�x OY M � �` . m W W Ld V) O n�Hv)sauuHs W (/) W � Y Oor`oraroRsz a0zsoraro�sz U S y taaccvssty° N� ve� I W Ly— Y F— + + Q Z W1 0 CL- Q of E I v1 C 1 � C N d N O a 0 U_ F- la Z a "C