Resolution No. 04-38 Attachment 1
CITY OF TIGARD,OREGON
r
RESOLUTION NO.04-.517
A RESOLUTION OF THE TIGARD CITY COUNCIL ENDORSING PROJECTS FOR THE 06-09
METRO TRANSPORTATION IMPROVEMENT PROGRAM (MTIP) APPLICATION AND
AUTHORIZING THE CITY OF TIGARD TO APPLY FOR FUNDS.
WHEREAS, approximately$41 million dollars are available in regional flexible transportation funds for
eligible projects through the MTIP process;and
WHEREAS,after reviewing the MTIP criteria,potential project costs and the project need,the Engineering,
Community Development and Public Works Departments recommend submittal of the following four MTIP
projects,
• Washington Square Regional Center Greenbelt Trail,
• Greenburg Road widening,
• Extension of Ash street between Burnham and the proposed commuter rail parking lot,and
• BPA power line trait;and
WHEREAS,the proposed projects are described in more detail in Exhibit A;and
WHEREAS,the construction of both Greenburg Road and the segment of the Washington Square Regional
Center Greenbelt Trail will help to implement portions of the Washington Square Regional Center Plan;and
WHEREAS,the extension of Ash Street between Burnham and the proposed commuter rail park and ride
lot will benefit the commuter rail station,downtown Tigard and the Transportation System Plan;and
WHEREAS,the BPA powerline trail is identified as a regional trail,implements the Tigard Park Master
Plan and will eventually create a continuous trail from Beef Bend north through Beaverton to Farmington
Road;and
WHEREAS, if the City received funding for all four projects as proposed,the total local match would be
$3,046,243 coming from various funds including the TIF fund and the Parks fund,and
WHEREAS, the funds, if approved, would not be allocated until fiscal year 2008-09 allowing ample
time to include these projects into the City's CIP budget.
i
NOW,THEREFORE,BE IT RESOLVED by the Tigard City Council that:
i
is
j SECTION 1: The projects summarized in Exhibit A are the City's priority projects for the 06-09 MTIP
submittal and the City fully supports the projects for funding consideration.
SECTION 2: The City Council authorizes the submission of MTIP applications for these projects
realizing there will be a local match requirement of 10.27%of the funds allocated,and
that a match of 72.9%is proposed for Greenburg Road.
RESOLUTION NO.04-38
Pagr 1
f
SECTION 2: This resolution is effective immediately upon passage.
PASSED: This day of Jb_t/LC__ 2004.
L�
Mayor City of Tigard
ATTEST: /rJ
Greer A.Gaston,Deputy City Recorder
i
r-
a
RESOLUTION NO.04- .3 B
Page 2
Exhibit A
MTIP project description summary
1. Project: Greenburg Road widening to 5 lanes between Washington
Square Drive and Tiedeman(Roadway capacity project)
Estimated cost: $3,700,000 (City match-$2,700,000)
Description: Widen Greenburg Road to 5 lanes from Shady Lane to North
Dakota. The project is located wholly within the Washington
Square Regional Center. Project funding for Preliminary
Engineering(PE)and acquisition has been granted in previous
MTIP cycles. Tigard is asking for 1 million dollars for this project
which results in Tigard providing a 72%match.
Anticipated fund
and budget year: TIF—'07-'08
2. Project: Off-street greenbelt trail between the existing Fanno Creek Trail
and Highway 217.
Estimated cost: $1,256,220 (City match-$143,780)
Description: The project is located entirely within the Washington Square
Regional Center and will provide another link in the greenbelt
trail system concept adopted as part of the Washington Square
Regional Center plan. This phase of the project will go from
Highway 217 at Shady lane,west to the railroad tracks. The
path will then go south for a short distance to North Dakota and
follow North Dakota west to the existing Fanno Creek trail
Anticipated fund
and budget year: Parks'08 `09
3. Project: BPA Powerline Trail
Estimated cost: $1,050,000(local match$107,835)
i Description: This is identified as a regional trail and implements the Tigard
Park Master Plan. It will eventually create a continuous trail from
Beef Bend north through Beaverton to Farmington Road.
Anticipated fund
and budget year. Parks—08-09
Exhibit A
4. Project: Ash Street extension between Burnham and commuter rail
parking lot.
Estimated cost: $949,000(local match$97,463)
Description: The extension of Ash Street between Burnham and the proposed
commuter rail park and ride lot will be one part of the larger
Walnut Street extension. The construction of this portion of Ash
Street would allow access to the southern portion of the park and
ride lot,thereby,providing the opportunity to design a second
access. This would allow commuter rail patrons using the park
and ride lot the option of entering and existing from either Main
Street or Ash Street. The second access will not increase the
number of trips, but rather will ease potential congestion along an
already congested Main Street.
This project is not in the RTP on the financially constrained
system,however, the City proposes to trade a portion of the
construction of 72nd Avenue(RTP project#6042). Because this
project is a short length and will serve the commuter rail parking
lot,it is anticipated that it will not result in any additional air quality
impacts. This proposal is in accordance with the eligibility
requirements and will require approval from JPACT and the Metro
Council.
Anticipated fund
and budget year: TIF 08-09
i
i_
i
i_
i