Resolution No. 02-59 CITY OF TIGARD, OREGON
RESOLUTION NO. 02-617
A RESOLUTION AMENDING RESOLUTION NO. 02-06 BY AMENDING EXHIBIT A TO REFLECT
CURRENT OREGON ADMINSTRATIVE RULES.AND CORRECTING ERRORS
WHEREAS, Section 14.04.040 of the Tigard Municipal Code provides that fees for permits and other
related services pursuant to the building inspection program shall be established by resolution of the City
Council; and
WHEREAS, Council passed Resolution No. 02-06 on January 22, 2002, which compiled Citywide fees
and charges into one schedule, and became effective on February 7, 2002; and
WHEREAS, Oregon Administrative Rules 918-050-0140 through 0170, effective July 1, 2002, sets fees for
Phased Permitting, Deferred Submittal, I & 2 Family Dwelling Fire Suppression Systems and Medical
Gas Systems; and
WHEREAS, inconsistent incidental fees in the existing fee schedule require editorial changes; and
WHEREAS, the building inspection program is solely supported by permit fees and it is necessary to
recover the cost of the additional service,
NOW, THEREFORE,BE IT RESOLVED by the Tigard City Council that:
SECTION 1: Resolution No. 02-06 is hereby amended as shown as Exhibit A, attached hereto and
incorporated by this reference. Additions to fee schedule are shown in bold print;
deletions are shown with strikethrough.
SECTION 2: This resolution shall become effective October 1,2002.
PASSED: This-0 L4 qday of---Q�m,,6 �2002.
ayor-City of tirarif
ATTEST-
City Recorder-City of Tigard
RESOLUTION NO. 02
Page 1
EXHIBIT "A"
Department Revenue Source Fee or Charge Effective Date
COMMUNITY DEVELOPMENT - BUILDING -Tigard & Urban Services Area
Building Permit Fees 9/26/00
(Commercial, Multi-family and Single-amily) 5/13/97
Total Valuation:
$1 -2,000 Minimum $62.50
2,001 -25,000 $62.50 for the first$2,000 and $9.60
for each additional $1,000 or fraction
thereof, to and including $25,000.
25,001 -50,000 $283.30 for the first $25,000 and $7.50
for each additional $1,000 or fraction
thereof, to and including $50,000.
50,001 - 100,000 $470.80 for the first$50,000 and $5.47
for each additional $1,000 or fraction
thereof, to and including $100,000.
100,001-250,000 $744.30 for the first$100,000 and $3.90
for each additional $1,000 or fraction
thereof, to and including $250,000.
250,001 -600,000 $1,329.30 for the first$250,000 and S3.85
far each additional $1,000 or fraction
thereof, to and including $600,000.
600,001 - 1,200,000 $2,676.80 for the first $600,000 and S3.51
for each additional $1,000 or fraction
thereof, to and including $1,200,000.
1,200,001 - 2,000,000 $4,782.80 for the first $1,200,000 and $2.73
fcr each additional $1,000 or fraction
thereof, to and including $2,000,000.
2,000,001 and up $6,966.80 for the first$2,000,000 and $2.72
fcr each additional $1,000 or fraction thereof
Building Plan Review Fee 65% of base building permit fee 9/26/00
05/13/1997"
"Urban Services Area to have
same fees as Tigard
Deferred Submittals Minimum Fee 200.00
Plan Review 65%of building permit fee based
on valuation of the particular portion
or portion of the project.
Electrical Fees New residential, single or multi-family per dwelling unit; service included:
1000 square feet or less 145.15
Each additional 500 square
feet or portion thereof 33.40
Limited energy 75.00
Each manufactured home or
modular dwelling service or
feeder 90.90
Services or feeders; installation, alteratiors or relocation:
200 amps or less 80.30
201 amps to 400 amps 106.85
401 amps to 600 amps 160.60
601 amps to 1000 amps 240.60
Over 1000 amps or volts 454.65
Reconnect only 66.85
Temporary services or feeders; installation, alteration or relocation:
200 amps or less 66.85
201 amps to 400 amps 100.30
401 amps to 600 amps 133.75
Over 600 amps to 100 volts (see 2 above)
Branch circuits; new, alteration or extension per panel:
With purchase of service or
feeder-each branch circuit 6.65
Without 3urchase of service
or feede-
First Branch Circuit 46.85
Each addit. Branch circuit 6.65
Miscellaneous (service or feeder not included):
Each pump or irrigation circuit 53.40
Each sign or outline lighting 53.40
Signal circuit(s)or a limited
energy panel, alteration ar
extension 75.00
Each additional irspection over
the allowable in any of the
above(min 1 hr)
Per Inspection 62.50
Per Hcur 62.50
Industrial Plant Inspection 73.75/hr(min 1 hour)
Electrical permit plan review fee 25% of the electrical permit fee
Erosion Control Permit Fee 6/6/00
(City receives none of this fee)
Less than 50,000.00 26.00
50,000.00 to 100,000.00 40.00
More than 100,000.00 40.00 +24.00 for each additional 100,000.00
or fraction thereof
Erosion Control Plan Check Fee E5% of inspection fee 6/6/00
(City receives 50% of fee)
Fee in Lieu of Sewer Based on actual cost of sewer connection, 1998
(Commercial Only) if sewerwas available
Fire Life Safety Plan Review 40% of base buildi-ig permit fee 9/26/00
(Commercial Only) 05/13/1997
"Urban Services Area to have
same fees as Tigard
Manufactured dwelling installation 305.50
Manufactured dwelling and mobile home Per OAR
parks, recreation camps, and organizational camps
Mechanical Fees 6/27/00
(1 and 2 Family Dwellings)
Description:
Furnace to 100,000 BTU including
ducts &vents 14.00
Furnace to 100,000 BTU+ including
ducts &vents 17.90
Floor Furnace including vent 14.00
Suspended heater,wall heater or
floor mounted heater 14.00
Vent not included in appliance permit 6.80
<3HP; absorb unit to 100K BTU 14.00
3-15HP; absorb unit to 100K to 500K BTU 25.60
15-30HP; abso�b unit .5- 1 mil BTU 35.00
30-50HP; abso-b unit 1 - 1.75 mil BTU 52.20
>50HP; absorb unit>1.75 mil BTU 87.20
Air handling unit to 10,000 CFM' 10.00
'Note:Tnis fee does not apply to an airhandling unit which is a portion of a factory-assembled appliance,cooling unit,
evaporative cooler x absorption unit for which a permit is required elsewhere in the Mechanical Code.
Air handling unit to 10,000 CFM+ 17.20
Non-portable evaporate cooler 10.00
Vent fan connected to a single dict 6.80
Ventilation system not included in
appliance permit 10.00
Hood served by mechanical exhaust 10.00
Domestic incinerators 17.40
Commercial or Industrial type incinerator 69.95
Repair units 12.15
Wood stove 10.00
Clothes dryer, etc. 10.00
Other units 10.00
Gas piping one to four outlets 5.40
More than 4 - per outlet(each) 1.00
For each appliance or piece of
equipment regulated by the Mechanical
Code, but not classed in other
appliance categories cr for which no
other fee is listed in the table 10.00
Minimum Permlt Fee 72.00 72.50
Plan Review 25% of Permit Fee
Other Inspections and Fees:
Inspections outside of normal business
hours (minimum charge-2 hours) 72.50iheue 62.50/hour
Inspections for which no fee is specifically
indicated (minimum charge-one-half hour) 72 50 P<,P, 62.50/hour
Additicnal plan review required by changes,
additions or revisions to plans (minimurr
charge- one-half hour) 7250/he+: 62.50/hour
Mechanical Permit Fees 9/26/00
(Commercial and Multi-family) 05/13/1997'
*Urban Services Area to have
Total Valuation: same fees as Tigard
$1 - 5,300 Minimum X72.50
5,001 - 10,000 $72.50 for the first$5,000 and $1.52
for each additional $100 or fraction thereof,
to and inc uding $10,000.
10,001 -25,000 $148.50 for the first$10,000 and $1.54
for each additional $100 or fraction thereof,
to and including $25,000.
25,001 -50,000 $379.50 for the first$25,000 and $1.45
for each additional $100 or fraction thereof,
to and including $50,000.
50,001 and up $742.00 for the first$50,000 and $120
for each additional $100 or fraction thereof.
Plan Review 25% of permit fee
Phase Permitting Minimum Fee 200.00
Plan Review 10% of total project building permit fee
not to exceed $1,500 for each phase
Dumbing Fees 6/27/00
Description:
New Single-Family
1 Bath $249.20
2 Bath 350.00
3 Bath 399.00
Fixtures (Individual)
Sink 16.60
Lavatory 16.60
Tub or Tub/Shower Comb. 16.60
Shower Only 16.60
Water Goset 16.60
Dishwasher 16.60
Garbage Disposal 16.60
Washing Machine 16.60
Floor Drain/Floor Sink 2" 16.60
Floor Drain/Floor Sink 3" 16.60
Floor Drain/Floor Sink 4" 16.60
Water Heater 16.60
Laundry Room T-ay 16.60
Urinal 16.60
Other Fixtures 16.60
Sewer- 1 st 100' 55.00
Sewer-each additional 100' 46.40
Water Service- 1 st 100' 55.00
Water Service-each additional 100' 46.40
Storm & Rain Drain - 1 st 100' 55.00
Storm & Rain Drain -ea. additnl 100' 46.40
Commercial Backflow Prevention
Device or Anti-Polluticn Device 46.40
Residential Backflow Prevention Device 27.55
Any Trap or Waste Not :,onnected
to a Fixture 16.60
Catch Basin 16.60
Inspection of Existing Plumbing 72.50/hr
Specially Requested Inspections 72.50/hr
Rain Drain, single family dwelling 65.25
Grease Traps 16.60
Hose Bibs 16.60
Drinking Fountain 16.60
Roof Drains 16.60
Minimum Permit Fee 72.50
Minimum Permit Fee Residential
Backflow 36.25
Plan Review 25% of Permit Fee
Medical Gas Systems
Total Valuation;
$1 -5,030 Minimum $72.50
5,001 -10,000 S72.50 for the first$5,000 and $1.52
for each additional $100 or fraction thereof,
to and including $10,000.
10,001 -25,000 S148.50 for the first$10,000 and $1.54
for each additional $100 or fraction thereof,
to and including $25,000.
25,001 -50,000 S379.50 for the first$25,000 and $1.45
for each additional $100 or fraction thereof,
to and including $50,000.
50,001 and up $742.00 for the first$50,000 and $1.20
for each additional $100 or fraction thereof.
Residential Fire Suppression Systems Permit
Multipurpose or Continuous Loop System
Square Footage: (plumbing permit)
0 to 200 115.00
2,001 to 3,600 160.00
3,601 to 7,200 220.00
7,201 and greater 309.00
Stand Alone System
Square Footage: (building permit)
0 to 2,000 187.50
2,001 tc 3,600 232.50
3,601 tc 7,200 292.50
7,201 and greater 381.50
R,estrictea Energy 6/27/00
Residential Energy Use 75.00
Commercial Energy Use 75.00
Sanitary Sewer Connection Fee 2,300.00/dwelling unit 6/6/00
Sanitary Sewer Inspection Fee 6/6/00
Residential 35.00
Commercial 45.00
Industrial 75.00
Tree Replacement Fee 125.001caliter inch 9/1/01
Water Quality Facility Fee 6/6/00
(City receives 100%of fees collected)
Residential Sirgle Family 225.00/unit
Commercial &Multi-family 225.00/2,540 sq.fi of additional impervious surface
Water Quantity Facility Fee 6/6/00
(City receives 100%of fees collected)
Residential Sirgle Family 275.30/unit
Commercial &Multi-family 275.00/2,540 sq. ft of additional impervious surface
Miscellaneous Fees 6/27/00
Re-inspection
Building 72.50
62.50
Mecharical 72 50
62.50
Plumbirg 72.50
62.50
Electrical 72A0
62.50
Temporary Occupancy 90.00
Phased Occupancy 200.00
Permit or Plan Review Extension 72.50
Address Change 65.00
Research on non-current permits 15.00/hr(min 1 hour, charged in 1 hour increments)
Fee paid inspections for residential structures
pursuant to Title 14, Chapter 16
Single & Two Family Dwellings 100.00
Apartment Houses &Social
Care Facilities 160.00, pus $7 for each dwelling unit in excess of 3
Hotels 160.00, pus $5 for each dwelling unit in excess of 5