Resolution No. 00-61 CITY OF TIGARD,OREGON
RESOLUTION NO.00- CA 1
A RESOLUTION MODIFYING EXISTING FEE CALCULATION METHODOLOGY FOR BUILDING
PERMITS AND COMMERCIAL MECHANICAL PERMITS
WHEREAS, the past Legislative Session introduced Senate Bill 512 that created the Tri-County Building
Services Industry Board;and
WHEREAS, the board developed rules to standardize processes throughout jurisdictions in Washington,
Clackamas,and Multnomah counties;and
WHEREAS,the board standardized the methodology jurisdictions use to calculate permit fees;and
WHEREAS,the SB 512 rule states that these changes shall be fee neutral;and
WHEREAS, the new rule states that building permits shall be calculated using the most current ICBO
Building Valuation Data report without the Oregon modifier;and
WHEREAS,the commercial mechanical permit fees must be determined based on the valuation of work to
be performed rather than by appliance based;and
WHEREAS, the Building Division has modified both the building and mechanical fee schedules to
conform to the new rules of Senate Bill 512;and
WHEREAS,the rules go into effect on October 1,2000,
NOW, THEREFORE, BE IT RESOLVED by the Tigard City Council that the building permit fee
schedule,attached hereto as Exhibit A,and the commercial mechanical permit fee schedule,attached hereto
as Exhibit B and Exhibit C,are approved and become effective October 1,2000.
PASSED: This Qt; day ofd" 000.
ayor-City of, g
' ATTEST:
3
City Recorder-City of Tigarrdd
RESOLUTION NO.00--(Xf
Page I
r
l
"EXHIBIT A"
Effective October 1,2000
Proposed Building Permit Fee Schedule for Commercial,Multi-Family,and Single-
Family Projects.
Total Valuation Fee _
$1.00 to$2,00.00 Minimum$62.50
$2,001.00 to$25,000.00 $62.50 for the first$2,000.00 and$9.60 for
each additional$1,000.00 or fraction
thereof,to and including$25,000.00
$25,001.00 to$50,00.00 $28330 for the first$25,000.00 and$7.50
for each additional$1,000.00 or fraction
thereof,to and including$50,000.00
$50,001.00 to$100,000.00 $470.80 for the first$50,000.00 and$5.47
for each additional$1,000.00 or fraction
thereof,to and including$100,000.00
$100,001.00 to$250,000.00 $744.30 for the first$100,000.00 and$3.90
for each additional$1,000.00 or fraction
thereof,to and including$250,000.00
$250,001.00 to$600,000.00 $1,329.30 for the first$250,000.00 and
$3.85 for each additional$1,000.00 or
fraction thereof,to and including
$600,000.00
$600,001.00 to$1,200,000.00 $2,676.80 for the first$600,000.00 and
$3.51 for each additional$1,000.00 or
fraction thereof,to and including
$1,200,000.00
$1,2000,001.00 to$2,000,000.00 $4,782.80 for the first$1,200,000.00 and
I $2.73 for each additional$1,000.00 or
fraction thereof,to and including
$2,000,000.00
$2,000,001.00 and up $6,966.80 for the first$2,000,000.00 and
$2.72 for each additional$1,000.00 or
fraction thereof
ti
"EXHIBIT 13"
Effective October 1,2000
Proposed Mechanicai Permit Fee Schedule for Commercial and Multi-Family
Projects
Total Valuation Fee
$1.00 to$5,000.00 Minimum$72.50
$5,001.00 to$10,000.00 $72.50 for the first$5,000.00 and$1.52 for
each additional$100.00 or fraction thereof,
to and including$10,000.00
$10,001.00 to$25,000.00 $148.50 for the first$10,000.00 and$1.54
for each additional$100.00 or fraction
thereof,to and including$25,000.00
$25,001.00 to$50,000.00 $379.50 for the first$25,000.00 and$1.45
for each additional$100.00 or fraction
thereof,to and including$50,000.00
$50,000.00 and up $742.00 for the first$50,000.00 and$1.20
for each additional$100.00 or fraction
thereof
"EXHIBIT C"
New Commercial Valuation Based Fee Calculation in Relation to Existing Appliance
Based Methodology
ASSUMED VA LIA ONS PER APPU' E Current Fee
Furnace to 100,000 BTU
including ducts&vents 955 14.00
Furnace>100,000 BTU
including ducts&vents 1,170.0 17.40
floor furnace
including vent 955 14.00
suspended heater,wall heater
or floor mounted heater 9551 14.00
Vent not included in appliance permit 4451 6.80 I
Repair units 8051 12.151
=3 hp;absorb.unit
to 100k BTU 955 14.00
3-15 hp;absorb.unit
101 k to 500k BTU 1700 25.60
15-30 hp;absorb.unit
501 k to 1 mil.BTU 2310 35.00
30-50 hp;absorb.unit
1-1.75 mil.BTU 34001 52.50
>50 hp;absorb.unit
>1.75 mil.BTU 5725 87.20
Air handling unit to 10,000 cfm 656 10.00
Air handling unit>10,000 cfm 1170 17.20
Non-portable evaporate cooler 656 10.00
vent fan connected to a single duct 446 6.80
Vent syst.not included in appliance permit 656 10.00
Hood served by mechanical exhaust 656 10.00
Domestic incinerator 1170 17.40
Commercial or industrial incinerator I 4590 69.95
Other unit,including wood stoves,inserts,etc. 656 10.00
Gas piping 1-4 outlets 360 5.40
S Each additional outlet 1 631_ 1.00
i
i
i
i