Loading...
Resolution No. 00-37 CITY OF TIGARD,OREGON RESOLUTION NO.00-_JJL A RESOLUTION ESTABLISHING BUILDING, PLUMBING, MECHANICAL AND ELECTRICAL PERMIT AND RELATED FEES WHEREAS,building regulatory services are solely fee supported;and WHEREAS, Subsection(c)of Section 14.04.040 and subsection(g) of Section 14.04.065 of Title 14 of Tigard Municipal Code indicates that fees for building inspection progran:shall be established by resolution of the City Council;and WHEREAS, Section 3.32 of the Tigard Municipal Code grants the City Council the authority to set rates for fees and charges by resolution;and WHEREAS, Tigard must assess those fees necessary to recover costs associated with the building inspection program;and WHEREAS,the Tigard City Council reviewed a cost analysis of building inspection program activities on June 27,2000;and WHEREAS,the Tigard City Council_.eld a public hearing on June 27,2000 and moved that staff return to the next regularly scheduled meeting with a resolution setting building fees;and WHEREAS, the Tigard City Council directed that an audit on the building inspection program be completed before future consideration of building fee increases;and WHEREAS,the audit on the inspection program was completed on May 9,2000;and NOW,THEREFORE,BE IT RESOLVED by the Tigard City Council that fees for services provided under the building inspection program shall be as follows: Effective September 1,2000 Plumbing Fees: Description: Fee: New Single-Family: I Bath $249.20 + 2 Bath 350.00 3 Bath 399.00 FIXTURES (individual) Sink 16.60 1 Lavatory 16.60 a Tub or Tub/Shower Comb. 16.60 Shower Only 16.60 Water Closet 16.60 RESOLUTION NO.00-3 7- Page 1 Plumbing Fees: Dese-r-p flee Fee: 'r Dishwasher 16.60 Garbage Disposal 16.60 Washing Machine 16.60 Floor Drain/Floor Sink 2" 16.60 3" 16.60 4" 16.60 Water Heater 16.60 Laundry Room 1'ray 16.60 Urinal 16.60 Other Fixtures 16.60 Sewer-1st 100' 55.00 Sewer-each additional 100' 46.40 Water Service-Ist 100' 55.00 Water Service-each additional 100' 46.40 Storm&Rain Drain-1 st 100' 55.00 Storm&Rain Drain-each additional 100' 46.40 Commercial Backflow Prevention Device or Anti-Pollution Device 46.40 Residential Backflow Prevention Device 27.55 Any Trap or Waste Not Connected to a Fixture 16.60 Catch Basin 16.60 Insp.of Existing Plumbing 72.50/hr Specially Requested Inspections 72.50/hr Rain Drain,single family dwelling 65.25 Grease Traps 16.60 Hose Bibs 16.60 Drinking Fountai;a 16.60 Roof Drains 16.60 Minimum Permit Fee 72.50 Minimum Permit Fee Residential Backflow 36.25 Plan Review 25%of Permit Fee Mechanical Fees: Description Fee: I) Furnace to 100,000 BTU including ducts&vents 14.00 i 2) Furnace 100,000 BTU-+-including ducts&vents 17.90 3) Floor Furnace including vent 14.00 4) Suspended heater,wall heater or floor mounted heater 14.00 5) Vent not included in appliance permit 6.80 H 6)<3 HP;absorb unit to 100K BTU 14.00 7)3-15 HP;absorb unit 100k to 500k BTU 25.60 8)15-30 HP;absorb unit.5-1 mil BTU 35.00 9)30-50 HP;absorb unit 1-1.75 mil BTU 52.20 10)>50HP;absorb unit>1.75 mil BTU 87.20 11)Air handling unit to 10,000 CFM Note:This fee does not apply to an air- 10.00 handling unit which is a portion of n factory-assembled appliance,cooling unit, RESOLUTION NO.00--,jj-- Page 2 Mechanical Fees: Description Fee- evaporative cooler or absorption unit for which a permit is required elsewhere in the Mechanical Code. 12)Air handling unit 10,000 CFM+ 17.20 13)Non-portable evaporate cooler 10.00 14)Vent fast connected toa single duct 6.80 15)Ventilation system not included in appliance permit 10.00 16)Hood served by mechanical exhaust 10.00 17)Domestic incinerators 17.40 18)Commercial or industrial type incinerator 69.95 19)Repair units 12.15 20)Wood stove 10.60 21)Clothes dryer,etc. 10.00 22)Other units 10.00 23)Gas piping one to four outlets 5.40 24)More than 4-per outlet(each) 1.00 25)For each appliance or piece of equipment regulated by the Mechanical 10.00 Code but not classed in other appliance categories,or for which no other fee is listed in the table Winimum Permit Fee a7t.uu 13)Plan review 25%of Permit Fee Other Inspections and Fees: 1. Inspections outside of normal business hours(minimum charge-two hours) $72.50_per hour 2. Inspections for which no fee is specifically indicated(minimum charge- one-half hour) $72.50 each 3. Additional plan review required by changes,additions or revisions to plans (minimum charge-one-half hour) $72.50 per hour Building Fees: Valuation shall be determined by the most recent edition of`Building Valuation Data"published by the International Conference of Building Officials,using"good"constriction and the Oregon modifier. Total Valuation Fee: $1.00 to$2,000.00 62.50 $2,000.00 to 25,000.00 $62.50 for the first$2,000.00 plus$11.56 for each additional$1,000.00 or fraction thereof,to and including$25,000.00 $25,001.00 to$50,000.00 $328.38 for the first$25,000.00 plus$8.44 for each additional$1,000.00 or fraction thereof,to and including$50,000.00 $50,001.00 to$100,000.00 $593.38 for the first$50,000.00 plus$5.81 for each additional$1,000.00 or fraction thereof,to and including$100,000.00 $100,001.00 to$500,000.00 829.88 for the first$100,000.00 plus$4.69 for each additional$1,000.00 or fraction thereof,to and including$500,000.00 $500,001.00 to$1,000,000.00 $2705.88 for the first$500,000.00 plus$4.25 for RESOLUTION NO.00-_NU- Page 3 ' r each additional$1,000.00 or fraction thereof,to and including$1,000,000.00 $1,000,001.00 and up 4830.88 for the first$1,000,000.00 plus$3.31 for each additional$1,000.00 or fraction thereof. Other Inspections and Fees: 1.Inspections outside of normal business hours(minimum charge-two hours) $72.50 per hour 2.Inspections for which no fee is specifically indicated (minimum charge-one-half hour) $72.50 per hour 3.Additional pian review required by changes,additions or revisions to plans(minimum charge-one-half hour) $72.50 per hour 4.Manufactured dwelling installation $305.50+Plumbing Permit 5.Manufactured dwelling and mobile home parks, recreation parks and organizational camps I Fee per OAR Electrical Fees: I. New residential,single or multi-family per dwelling unit;service included: A. 1000 square feet or less $145.15 B. Each additional 500 square feet or portion thereof 33.40 C. Limited energy 75.00 D. Each manufactured home or modular dwelling service or feeder 90.90 2. Services or feeders;installation,alterations or relocation: A. 200 amps or less 80.30 B. 201 amps to 400 amps 106.85 C. 401 amps to 600 amps 160.60 D. 601 amps to 1000 amps 240.60 E. Over 1000 amps or volts 454.65 F. Reconnect only 66.85 3. Temporary services or feeders;installation,alteration or relocation: A. 200 amps or less 66.85 B. 201 amps to 400 amps 100.30 C. 401 amps to 600 amps 133.75 D. Over 600 amps to 100 volts (see 2 above) i i 4. Branch circuits;new,alteration or extension per panel: i i A. With purchase of service or feeder-each branch circuit 6.65 a B. Without purchase ofservice or feeder First branch circuit 46.85 Each additional branch circuit 6.65 3 5. Miscellaneous(service or feeder not included): A. Each pump or irrigation circuit 53.40 RESOLUTION NO.00-.3q- Page 4 B. Each sign or outline lighting 53.40 C. Signal circuit(s)or a limited energy panel,alteration or extension 75.00 D. Each additional inspection over the allowable in any of the above(min 1 hr) i) Per inspection 62.50 ii) Per hour 62.50 E. Industrial Plant Inspection$73.75 per hour including travel and office time with a minimum charge of 1 hour F. Electrical permit plan review fee: Plan review fees shall be 25 percent ofthe electrical permit fee. Restricted Energy Fees Residential Energy Use $75.00 Commercial Energy Use 75.00 Miscellaneous Fees: Description £ed. - Re-inspection: Building $72.50 Mechanical $72.50 Plumbing $72.50 Electrical $72.50 Temporary Occupancy $90.00 Phased Occupancy $200.00 Permit or Plan Review Extension $72.50 Address Change $65.00 Research on non-current permits $45.00 per hour (minimum one hour,charged in one hour increments) Fee paid inspections for residential structures pursuant to Title 14,Chapter 16 • Single and Two Family Dwellings $100.00 •Apartment Houses and Social Care Facilities $160.00,plus$7 for each dwelling unit in excess of 3 • Hotels $160.00,plus$5 for each dwelling unit in excess of 5 i Classification. The City Council has determined that the fees imposed by this resolution are not taxes subject to the property tax limitations of Article XI,section I 1 b of the Oregon Constitution. i PASSED: This 2 day of .TLLYI e) 2000. �I i i Brian J. Moore, Council President ATTEST("' Greer A.Gaston,Deputy City Recorder RESOLUTION NO.00-tea P—P,5 -a-