Loading...
Resolution No. 99-63 CITY OF TIGARD,OREGON RESOLUTION NO.99-&3 A RESOLUTION ESTABLISHING SANITARY SEWER REIMBURSEMENT DISTRICT NO.15 WHEREAS, the City has initiated the Neighborhood Sewer Extension Program to extend public sewers and recover costs through Reimbursement Districts iii accordance with TMC Chapter 13.09;and WHEREAS,the sanitary sewer improvements for the proposed Reimbursement District are included in a Street Capital Improvement Project;and WrIEREAS, these prcperty owners have been notified of a public hearing t.-r accordance with TMC 13.09.060 and a public hearing was conducted in accordance with TMC 13.09.050;and WHEREAS, the City Engineer has submitted a report describing the improvements, the area to be included in the Reimbursement District, the estimated costs, a method for spreading the cost among the parcels within the District, and a recommendation for an annual fee adjustment;and WHEREAS, the City Council has determined that the formation of a Reimbursement District as recommended by the City Engineer is appropriate. NOW,THEREFORE,BE IT RESOLVED by the Tigard City Council that: SECTION 1: The City Engineer's report titled "Sanitary Sewer Reimbursement District No.15",attached hereto as Exhibit A,is hereby approved. SECTION 2: A Reimbursement District is hereby established in accordance with TMC Chapter 13.09.The District shall be the area shown and described on Exhibit B. The District shall be known as "Sanitary Sewer Reimbursement District No.15." Q SECTION 3 Payment of the reimbursement fee as shown in Exhibit A is a precondition of receiving City permits applicable to development of each parcel within the Reimbursement District as provided for in TMC 13.09.110. SECTION 4 An annual fee adjustment, at a rate recommended by the Finance Director,shall be applied to the Reimbursement Fee. SECTION 5 The City Recorder shall cause a copy of this resolution to be filed in the office of the County Recorder and shall mail a copy of this resolution to all affected property owners at their last known address,in accordance with TMC 13.09.090. PASSED: This oC L4 E:k day of-AUL RdA 1999. I I a r-City of Tigard ATTEST City Recorder-City of Tigard I ® ! Exhibit A MW City Engineers Report Sanitary Sewer Reimbursement District No.15 Background This project will be constructed and funded under the City of Tigard Neighborhood Sewer Extension Program(NSEP). Underthe program the City of Tigard would instal: public sewers to each lot within a project area. At the time the property owner connects to the sewer,the owner would pay a connection fee of $2,335.00 and reimburse the City for a fair share of the cost of the public sewer. There is no requirement to connect to the sewer or pay any fee until connection is made. In addition, property owners are responsible for disconnecting their existing septic system according to Washington County rules and for any other modifications necessary to connect to the public sewer. Several developments along SW Beveland St have been proposed including the Eagle Hardware project that would realign SW Beveland St at SW 72nd Ave. The purpose of this project is to install the sewer before street improvements are constructed. In addition, eighteen of the twenty-five owners in the proposed district have expressed support for the project as shown on the attached map. Project Area-Zone of Benefit An existing sanitary sewer line is located alone the west property line of 7650 SW Beveland St., parallel to Highway 217. The new line would be extended to the east through an easement up to SW Beveland St. and would continue easterly on SW Beveland St. approximately 715 feet to provide eight services. The lot at the northwest corner of SW 72nd Av. and SW Beveland St. has access to an existing sewer line crossing SW 72nd Av. so it was not included in the Reimbursement District. The remaining lots along the south side of SW Beveland St. are part of the proposed Eagle Hardware project and will not require service. The tine would also be extended from the intersection of SW Beveland St. and SW Hermoso Way, northerly approximately 344 feet and easterly on SW Hermoso Way approximately 355 feet to provide an additional seventeen services. There is no need for future extensions of the proposed lines. Cost The estimated cost for the sanitary sewer construction is$146,830. Engineering and inspection fees amount to$19,820(13.5%)as defined in TMC 13.09.040(1). The total project cost including these fees is $166,650. This entire amount should be reimbursed to the NSEP fund as properties connect to the sewer and Ask pay their fair share of the total amount. 4w In addition to sharing the cost of the public sewer line, each property owner will be required to pay an additional $2,335 connection and inspection fee when connection to the public line is made, and will be responsible for all plumbing costs required for work done on private property. Reimbursement Rate All properties in this area are zoned Mixed Use Employment and have similar lot sizes as can be seen in Exhibit Map B. Therefore,it is recommended that the total cost of the project be divided equally among the twenty-five properties included in the reimbursement district Other reimbursement methods include basing the proportional share upon the square footage of each property or by the length of frontage of each property. Because all properties are simiiar in size, the square footage method is not recommended. The length of frontage method is also not recommended because there is no need to extend the line the entire length of the one northeasterly property on SW Hermoso Way,and one northeasterly property on SW Beveland Street, but the line will be extended along the entire frontage of the one southeasterly property on SW Beveland Street that will not be served by this project. Each property owner's estimated fair share of the public sewer line is ® $6,670. Should the actual cost exceed $8,000, each owner's fair share would be limited to$8,000 to the extent that it does not exceed$15,000,for connections completed within one year of City Council approval of the final City Engineer's Report following construction in accordance with Resolution 98-51(attached). In addition to paying for the first $8,000, owners will remain responsible for paying all actual costs that exceed $15,000. Annual Fee Adjustment TMC 13.09.115 states that an annual percentage rate shall be applied to each property owner's fair share of the sewer line costs on the anniversary date of the reimbursement agreement. The Finance Director has set the annual interest rate at 6.05%as stated in City of Tigard Resolution No.98-22. i i Recommendation a 3 It is recommended that a reimbursement district be formed with an annual fee increase as indicated above and that the reimbursement district continue for fifteen years as provided in the Tigard Municipal Code (TMC) 13.09.110(5). Fifteen vears after the formation of the reimbursement district. properties connecting to the sewer would no longer be required to pay the reimbursement fee. rao v. Submitted August 12, 1999 Ag @in P.Ouenas PE Ci ngineer [Ad""vmVel�,e(eovaftnd)AM i j H i N 7 NW 1 /4 NE 1 /4/ SE CI TY OF TI GARD, WASH I oAaTMo�TH sr T T N ` AHK.,�a s, ec vE-invo sr H.ry A HAMPi� bl VICINITY MAP LEGAL DESCRIPTION: N/W 1/4 NE 1/4 SECTION 1 T2S R1W (T.L.1100) N/W 1/4 NE 1/4 SECTION 1 T2S R1W (T.L,1604) N/W 1/4. NE 1/4 SECTION 1 T2S R1W (T.L.1200) N/W 1/4 NE 1/4 SECTION 1 T2S R1W (T.L,1605) f--. N/W 1/4 NE 1/4 SECTION 1 T2S R1W (T.L.1300) N/W 1/4 NE 1/4 SECTION 1 T2S R1W (T.L.1606) I( N/W 1/4 NE 1/4 SECTION 1 T2S R1W (T_L.1400) N/W 1/4 NE 1/4 SECTION 1 T2S R1W (T,L.1607) N/W 1/4 NE 1/4 SECTION 1 T25 R1W (T.L.1401) N/W 1/4 NE 1/4 SECTION 1 T2S R1W (T.L.1608) s a N/W 1/4 NE 1/4 SECTION 1 T2S R1W (T_L.1402) N/W 1/4 NE 1/4 SECTION 1 T2S R1W (T.L.1609) N/W 1/4 NE 1/4 SECTION 1 T2S R1W (T.L.1403) N/W 1/4 NE 1/4 SECTION i T2S R1W (T,L.1700) a N/W 1/4 NE 1/4 SECTION 1 T2S R1W (T.L.1404) N/W 1/4 NE 1/4 SECTION 1 T2S R1W (T,L.1800) N/W 1/4 NE 1/4 SECTION 1 T2S RlW (T_L.1500 N/W 1/4 NE 1/4 SECTION 1 T2S R1W (T.L.2703) N/W 1/4 NE 1/4 SECTION 1 T2S R1W (T.L.1501) N/W 1/4 NE 1/4 SECTION 1 T2S F.1W (T.L.2704) 3 ' N/W 1/4 NE 1/4 SECTION 1 T2S R1W (T.L,1502) a i N/W 1/4 NE 1/4 SECTION 1 T2S R1W (T_L.1600) N/W 1/4 NE 1/4 SECTION 1 125 Rtw (T.L.1601) N/W 1/4 NE 1/4 SF;TION 1 T2S R1W (TLL.1602) N/W 1/4 NE 1/4 SECTION 1 T2S R1W (T.L.1603) i NOTE: ALL PROPERTIES IN THE REIMBURSEMENT DISTRICT ARE ZONED M