Loading...
Resolution No. 99-59 CITY OF TIGARD,OREGON RiSOLUTION NO.995q — A RESOLUTION CORRECTING NSATHEMATICAL ERRORS FOR BUILDING PERMIT FEES AUTHORIZED IN RESOLUTION 99-1 S WHEREAS, An error in the calculation criteria for building per-r---,t fees authorized by Resolution 99-18, caused fees due for permits to be in error by$1.50 for permits with a value up to$25,000.00,and$20.00 for permits with a value up to$1,000,000.00,and$45.00 for permits with a value of$1,000,001.00 or more; WHEREAS, Section 3.32 of the Tigard Municipal Code grants the City Council the authority to set rates for fees and charges by resolution;and WHEREAS, Council desires the fee schedule approved under resolution 99-18 be correct and accurate. NOW, THEREFORE, BE IT RESOLVED by the Tigard City Council that corrected fee schedule for services provided under the building code administration program shall be as follows: Total Valuation Fee $1.00 to$2,000.00 $50.00 $50.00 for the first $2,000.00 plus $9.25 for each $2,001.00 to$25,000.00 $1,000.00 or fraction thereof, to and including $25,000.00 $262.75 for the first$25,000.00 plus$6.75 for each $25,001.00 to$50,000.00 additional $1,000.00 or fraction thereof, to and including$50,000.00 $431.50 for the first$50,000.00 plus$4.65 for each $50,001.00 to$100,000.00 additional $1,000.00 or fraction thereof, to and including$100,000.00 $664.00 for the first$100,000.00 plus$3.75 for each 5100,001.00 to$500,000.00 additional $1,000.00 or fraction thereof, to and including$500,000.00 $2164.00 for the first$1,000,000.00 plus$3.40 for j 5500,001.00 to$1,000,000.00 each additional$1,000.00 or fraction thereof,to and jinclud—'I" nnnnnof0 51 000 001.00 and up $3864.00 for the first$1.000,000.00 plus$2.65 for RES0LUTION NO.9959 Page 1 Classffication:The City Council has detennined that the fees imposed by this resolution are not taxes subject to the property tax limitation of Article XI,Section l lb of the Oregon Constitution. PASSED: This /D day of 1999. r .r or-City o Tigar ATTEST: rawU,-ILX-A-P- City Recorder-City of Tigard �— hxzitywide\r Olutdot t i 3 RESOLUTION NO.99-" Page 1 "Appendix Item V d H H 5 CITY OF TIGARD,OREGON RESOLUTION NO.99-JB— AW Mr A RESOLUTION ESTP.3LISHING BUILDING, PLUMBING, MECHANICAL AND ELECTRICAL PERMIT AND RELATED FEES WHEREAS,building regulatory services are solely fee supported;and WHEREAS,Subsection(c)of Section 14.04.040 and subsection(g) of Section 14.04.065 of Title 14 of Tigard Municipal Code indicates that fees for building code program administration shall be established by resolution Of the City Council;and ' WHEREAS,Section 3.32 of the Tigard Municipal Code grants the City Council the authority to set rates for fees and charges by resolution;and WHEREAS,Tigard must assess those fees necessary to recover costs associated with the building code administration program;and WHEREAS,the Tigard City Council reviewed a cost analysis of building code administration activities on January 19, 1999 and February 23, 1999;and WHEREAS,the Tigard City Council held a public hearing on March 9, 1999 and moved that staff return to the next regularly scheduled meeting with a resolution setting building fees;and WHEREAS, the Tigard City Council directed that a study on these fees determining overhead costs associated with the building administration program be completed before future consideration of building fee increases;and WHEREAS,the study on these fees will be completed within the next year,and WHEREAS,the Tigard City Council directed that the study be completed prior to future consideration of building fees evaluating all non-building code related functions performed by the building division; NOW,THEREFORE,BE IT RESOLVED by the Tigard City Council that fees for services provided under the building code administration program shall be as follows: Effective May 3,1999: d Plumbing Fees: Description: Fee: New Single-Fsniily: 1 Bath $178.00 2 Bath 250.00 3 Bath 285.00 FIXTURES individuzl _ Sink 11.50 RESOLUTION INTO.99-LO ® Page I Plumbing Fees: Description:on- Fee: Lavatory 11.50 TWb or Tub/Shower Comb. 11.50 Shower Only 11.50 Watei Closet 11.50 Dishwasher 11.50 Garbage Disposal 11.50 Washing Machine 11.50 Floor Drain/FIoor Sink 2" 11.50 3" 11.50 4" 11.50 Water Heater 11.50 -Laundry Room Tray 11.50 Urinal 11.50 Other Fixtures 15.00 Sewer-1st 100' _ 38.00 Sewer-each additional 100' 32.00 Water Service-1st 100' 38.00 Water Service-each additional 200' 32.00 Stone&Rain Drain-ist 100' 38.00 Stone&Rain Drain-each additional 100' 32.00 Mobile Home Space 32.00 Commercial Backflow Prevention Device or Anti-Pollution Device 32.00 Residential Backflow Prevention Device 19.00 A ny Trap or Waste Not Connected to a Fixture 11.50 Catch Basin 11.50 Insp.ofExisting Plumbing 50.00/hr Specially Requested Inspections 50.00/hr Rain Drain,single family dwelling 45.00 Grease Traps 11.50 Minimum Permit Fee 50.00 Minimum Permit Fee Residential Backflow 25.00 Plan Review 25%of Permit Fee Mechanical Fees: Description Fee: I A Permit Issuance Fee $16.00 1 Furnace to 100,000 BTU including duds&vents 9.65 2 Furnace 100,000 BTU+inclu4ing duds&vents 12.00 3 Floor Furnace including vent 9.65 j4 Suspended heater,wall heater or floor mounted heater 9.65 5 Vent not included in appliance permit 4.75 y 6 <RP•absorb unit to 100K BTU 9.65 a 7 3-15 HP;absorb unit 100k to 500k BTU 17.65 8 15-30 HP;absorb unit.5-1 mil BTU 24.15 9 30-50 HP;absorb unit 1-1.75 mit BTU 36.00 RESOLUTION NO.99j g Page 2 Mechanical Fees: Description Fee: 10 >50HP•absorb unit>1.75 mil BTU 60.15 11)Air handling unit to 10,000 CFM Note:ills f«does not apply to an air- 7.00 handling unit which Is a portion of*factory-assembled appliance,cooling unit, evaporative cooler or absorption unit for which a permit is required elsewhere in the Mechanical Coda 12 Air handling unit 10,000 CFM+ 11.85 13 Non-portable evaporate cooler 7.00 14 Vent fan connected to a single dud 4.75 15 Ventilation system not included in appliance permit 7.00 16 Hood served by mechanical exhaust 7.00 1 Domestic incinerators 12.00 19)Commercial or industrial type incinerator 48.25 19 air units 2,40 20 Wood stove 7.00 21 Clothes dryer,etc. 7.00 22 Other units 7.00 23 Gas piping one to four outlets 3.75 24 More titan 4-per outlet(each) .75 25 Hazardous Process Piping System P of one to four outlets 3.75 26 Hazardous Process Piping System P of five or more outlets, er outlet .75 27)For each appliance or piece of equipment regulated by the Mechanical 7.00 Code but not classed in other appliance categories,or for which no other fee is listed in the table Minimurn Permit Fee $50.00 B Plan review 25%of Permit Fee Other Inspections and Fees: I. Inspections outside of normal business hours(minimum charge-two hours) $50.00 per hour 2. Inspections for which no fee is specifically indicated(minimum charge- one-half hour) $50.00 each 3_ Additional plan review required by changes,additions or revisions to plans minimum charge-one-half hour` 1 $50.00 per hour Building Fees: Valuation shall be determined by the most recent edition of"Building Valuation Data"published by the Intemational Conference of Building Officials,using"good"construction and the Oregon modifier. Total Valuation Fee: i $I.00to$500.00 $50.00 + $501.00 to$2,000 $15.50 for the first$500.00 plus$2.25 for each additional$100 or fraction thereof to and including$2,000 $50.00 minimum $2,001.00 to$25,000.00 $47.75 for the first$2,000.00 plus$9.25 for each 3 additional$1,000 or fraction thereof,to and a including$25,000 $25,OD 1.00 to$50,000.00 $261.25 for the first$25,000.00 plus$6.75 for each additional$1,000 or fraction thereof,to and ^^'ON*:O.00- Page 3 including$50,000 $50,001.00 to$100,000 $431.50 for the first$50,000.00 plus$4.65 for each additional$1,000 or fraction thereof,to and including$100,000 $100,001.00 to$500,000.00 $664.00 for the first$100,000.00 plus$3.75 for each additional$1,000 or fraction thereof,to and including$500,000 $500,001.00 to$1,000,000.00 $2,144.00 for the first$500,000.00 plus$3.40 fnr each additional$1,000 or fraction thereof,to and including$1,000,000 $1,000,001.00 and up $3,819.00 for the first$1,000,000.00 plus$2.65 for each additional$1,000 or fraction thereof Other Inspections and Fees; 1.Inspections outside of normal business hours(minimum charge-two hours) $50.00 per hour 2.Inspections for which no fee is specifically indicated (minimum charge-one-hal£hour) $50.00 per hour 3.Additional plan review required by changes,additions or revisions to plans(minimum charge-one-half hour) $50.00 per hour 4.Manufactured dwelling installation $235.00 5.Manufactured dwelling and mobile home paries, recreation parks and organizational camps I Fee per OAR Electrical Fees: 1. New residential,single or multi-family per dwelling unit;service included: A. 1000 square feet or less $117.75 B. Each additicna1500 square feet or portion thereof 26.75 C. Limited energy 60.00 D. Each manufactured home or modular dwelling service or feeder 72.75 2. Services or feeders;installation,alterations or relocation: A 200 amps or less 64.25 B. 201 amps to 400 amps 85.50 C. 401 amps to 600 amps 128.50 D. 601 amps to 1000 amps 192.50 E_ Over 1000 amps or volts 363.75 F. Reconnect only 53.50 j 3. Temporary services or feeders;installation,alteration or relocation: H D A. 200 amps or less 53.50 B. 201 amps to 400 amps 80.25 a C. 401 amps to 600 amps 107.00 D. Over 600 amps to 100 volts (see 2 above) H a4. Branch circuits;new,alteration or extension per panel: a A. With purchase of service or feeder-each branch circuit 5.35 a 0 RESO lrrrr_ n_N NO,"-Ll- Page 9-I O Page 4 ` B. Without purchase of service or feeder 37.50 First branch circuit 5.35 Each additional branch circuit Miscellaneous(service or feeder not included): A. Each pump or irrigation circuit 42.75 42.75 B. Each sign or outline lighting E C. Signal circuit(s)or a limited energy paiel,alteration or extension 60.00 D. Each additional inspection over the allowable in any ofthe above(ruin 1 hr) 50.00 i) Per inspection 50.00 ii) Per hour E. Industrial Plant Inspection$59.00 per hour including travel and office time with a minimum charge of 1 hour F. Electrical permit plan review fee: Plan review fees shall be 25 percent ofthe electrical permit fee. G. Minor Labels: $107.00 for ten labels. MiseeHaneous Fees: rDescri tion Fee' Re-inspection: $50.00 Building. $50.00 Mechanical $50.00 0 Plumbing $50.00 Electrical $90.00 Ternpo-ry ccupancy $200.00 Phased Occupancy $5000 Permit or Plan Review Extension $65.00 Address Chane $45.00 per hour Research on non current permits minimum one hour,char ed in one hour increments Fee paid inspections for residential structures pursuant to Title 14,Chapter 16 Single and Two Family Dwellings $100.00 • Apartment Houses and Social Care Facilities $160.00,plus$7 for each dwelling unit in excess of 3 a Hotels $160.00 plus$5 for each dwelling unit in excess of 5 Classification. The City Council has determined that the fees imposed by this re lution are not taxes subject to the property tax limitations of Article XI,section 116 of the Oregon nsti ion. z 4N n PASSED: This d LP day of 1999. N -City of Tigard/ w ATTEST:aa M?� --, a City Recorder-City of Tigard 1:1Crr y%"DE'1CDADMVERRFEInMrFNFEERESO'JL iOTn12 � aa RESOLUndNNO.99- IU Page 5