Resolution No. 99-18 j Vaa a va a.v<Rai,v...—...vN
RESOLUTION NO.99--LL
A RESOLUTION EST4RT.ISMN B I IDLN-G=, nlL,v;;3u �;, ;vx�=% riAN1CAL AND ELECTRICAL
PERMIT AND RELATED FEES
WHEREAS,building regulatory services are solely fee supported;and
WHEREAS, Subsection(c)of Section 14.04.040 and subsection(g)of Section 14.04.065 of Title 14 of
Tigard Municipal Code indicates that fees for building code program administration shall be established by
resolution ofthe City Council;and
WHEREAS, Section 3.32 of the Tigard Municipal Code grants the City Council the authority to set rates
for fees and charges by resolution;and
WHEREAS, Tigard must assess those fees necessary to recover costs associated with the building code
administration prob.a ,xand
WHEREAS,the Tigard City Council reviewed a cost analysis ofbuilding code administration activities on
January 19, 1999 and February 23,1999;and
WHEREAS,the Tigard City Council held a public hearing on March 9, 1999 and moved that staff return to
the next regularly scheduled meeting with a resolution setting building fees;and
WHEREAS, the Tigard City Council directed that a study on these fees determining overhead costs
associated with the building administration program be completed before future consideration of
building fee increases;and
WHEREAS,the study on these fees will be completed within the next year;and
WHEREAS,the Tigard City Council directed that the study be completed prior to future consideration of
building fees evaluating all non-building code related functions performed by the building division;
NOW,THEREFORE,BE IT RESOLVED by the Tigard City Council that fees for services provided under
the building code administration program shall be as follows:
3 Effective May 3,1599:
-Plumbing Fees:
3
Description: Fee:
■ New Single-a'amiiy:
y 1 Bath $178.00
2 Bath 250.00
3 Bath 285.00
FIXTURES (individual)
Sink 11.50 i
RESOLUTION NO.99
Page 1
riumioin rees:
Description: Fee:
Lavato F 11.50
Tub or Tub/Shower Comb. ".50 ,
.
Shower Only 11,501
Water Close, 11.50
Dishwasher 11.50
Garbage Dis osal 11.50
Washing Machine 11.50
Floor Drain/Floor Sink 2" 11.50
3" 11.50
4" 11.50
Water Heater 11.50
Laundry Room Tray 11.50
Urinal 11.50
Other Fixtures 15.00
Sewer-1st 100' 38.00
Sewer-each additional 100' 32.00
Water Se--,ice-t st 100' 38.00
Water Service-each additional 200' 32.00
Storm&Rain Drain-Ist 100' 38.00
Storm&Rain Drain-each additional 100' 32.00
Mobile Home Space 32.00
Commercial Backflow Prevention Device or Anti-Pollution Device 32.00
Residential Backflow Prevention Device 19.00
Any Trap or Waste Not Connected to a Fixture 11.50
Catch Basin 11.50
Insp.of Existing Plumbing 50.00/hr
Specially Requested Inspections 50.00/1'r
Rain Drain,single family dwelling 45.00
Grease Traps 11.501
Minimum Permit Fee 50.00
Minimum Permit Fee Residential Backflow 25.00
Plan Review 25%of Permit Fee
Mechanical Fees:
a Description Fee:
yA) Permit Issuance Fee $16.00
1 Fumace to 100,000 BTU inclu ing ducts&vents 9.65
2) Fumace 100,000 BTU+including ducts&vents 12.00
3) Floor Fumace including vent 9.65
4) Sus ended heater, ,all heater or floor mounted heater 9.65
y5) Vent not included in alaBance permit 4.75
6)<3HP;adsorb unit to LOOK BTU 9.65
a 7)3-15 HP;absorb unit 100k to 500k BTU 17.65
8)15-30 HP.absorb wiit.5-1 mil BTU 24.15
9)30-50 un.absorb,unit 1-1 75 mil BTU 36.00
RESOLUTION NO.99J
Page 2
1VYP..tia _o_I FPPC•
Description Fee•
10 >50HP,absorb unit>1.75 mil BTU 60.15
_ 11)Air handling unit to 10,000 CFM Note:This fee does not apply to on air- 7.00
h "A11n¢unit which is a portion of a facto.xy-as=znh!ed appliance,cooling unit,
evaporative cooler orasa.�:=_ ^_nO for which a permit is required elsewhere in the
Mechanical Code.
12 Air handling unit 10,000 CFM+ 11.85
t 3ti Tlnn ortable evaporate cooler 7.00 l a
14 Vent fan connected to a single duct 4.75
IS Ventilation system not included in appliance permit 7A0 I
16)Hood served by mechanical exhaust 7.00
17)Domestic incinerators 1?nn
18 Commercial or industrial type incinerator 48.25
19 air units 8.40
20)Wood stove 7.00
21 Clothes dryer,etc. 7.00
22)Other units 7.00
23 Gas piping one to four outlets 3.75
24)ivioie thar.4-per out(pach) .75
25)Hazardous Process Piping System P of one to four outlets 3.75
26 Hazardous Process Piping System P of five or more outlets,per outlet 1 .75
27)For each appliance or piece of equipment regulated by the Mechanical 7.00
Code but not classed in other appliance categories,or for which no other fee is
listed in the table
Minimum Permit Fee $50.00
B Plan review 25%of Permit Fee
Other Inspections and Fees:
1. Inspections outside of normal business hours(minimum charge-two
hours) $50.00 per hour
2. Inspections for which no fee is specifically indicated(mininum charge-
one-hal£hour) $50.00 each
3. Additional plan review required by changes,additions or revisions to plans
(minimum charge-one-half hour) 1 $50.00 per hour
Building Fees:
Valuation shall be determined by the most recent edition of"Building Valuation Data"published by the
International Conference of Building Officials,using"good"construction and the Oregon modifier.
Total Valuation Fee:
$1.00 to$500.00 $50.00
$501.00 to$2,000 $15.50 for the first$500.00 plus$2.25 for each
additional$100 or fraction thereof,to and
including$2,000 $50.00 minimum
?'2,001.00 to e25,000,00 $47.75 for the first$2,000.00 plus$9.25 for each
3 additional$1,000 or fraction thereof,to and
including$25,000
$25,001.00 to$50,000.00 $261.25 for the first$25,000.00 plus$6.75 for
each additional$1,000 or fraction thereof,to and
RESOLUTION NO.99-L Q
Page 3
® including$60,000 -�
$50,001.00 to$100,000 $431.50 for the first$50,000.00 plus$4.ti5 for
each additional$1,000 or fraction thereof,to and
including$100,000
$100,001.00 to$500,000.00 $664.00 for the first$100,000.00 plus$3.75 for
each additional$1,000 or fraction thereof,to and
including$500,000
$500,001.00 to$1,000,000.00 $2,144.00 fpr the first$500,000.00 plus$3.40 for
ONE each additional$1,000 or fraction thereof,to and
including$1,000,000
$1,000,001.00 and up $3,S19.00r"orinc i.,-.,x Plus$2.65
for each additional$1,000 or fraction thereof
Other Inspections and Fees:
1.Inspections outside of normal business hours(minimum
charge-two hours) $50.00 per hour
2.Inspections for which no fee is specifically indicated
(minimum charge-one-half hour) $50.00 per hour
3.Additional plan review required by changes,additions or
revisions to plans(minimum charge-one-half hour) $50.00 per hour
4.Manufactured dwelling installation $235.00
5.Manufactured dwelling and mobile home parks,
recreation parks and organization l camps I Fee per OAR
Electrical Fees:
1. New residential,single or multi-family per dwelling unit;service included:
A. 1000 square feet or less $117.75
B. Each additional 500 square feet or portion thereof 26.75
C. Limited energy 60.00
D. Each manufactured home or modular dwelling service or feeder 72.75
2. Services or feeders:installation,alterations or relocation:
A. 200 amps or less 64.25
B. 201 amps to 400 amps 85.50
C. 401 amps to 600 amps 128.50
D. 601 amps to 1000 amps 192.50
E. Over 1000 amps or volts 363.75
F. Reconnect only 53.50
3. Temporary services or feeders;installation,alteration or relocation:
+ A. 200 amps or less 53.50
B. 201 amps to 400 amps 80.25
C. 401 amps to 600 amps 107.00
j D. Over 600 amps to 100 volts (see 2 above)
4. Branch circuits;new,alteration or extension per panel:
A. With purchase of service or feeder-each branch circuit 5.35
RESOLUTION NO.99-Lt
t
Page 4
37.50
First branch circuit 5.35
Each additional branch circuit
Amok
5. Miscellaneous(service or feeder not included):
A. Each pump or irrigation circuit 42.7575
B. Each sign or outline lighting 42.
60.00
C. Signal circuit(s)or a limited energy panel,alteration or extension
D. Each additional inspection over the allowable in any ofthe above(min 1 hr) 50.00
i) Per inspection 50.00
ii) Per hour
E. Industrial Plant Inspection$59.00 per hour including travel and
office time with a minimum charge of 1 hour
F. Electrical permit plan review fee: Plan review fees shall be 25 percent
ofthe electrical permit fee.
G. Minor Labels: $107.00 forten labels.
Miscellaneous Fees
Fee:
tzu
Re-iZoccupancy
$50.00
$50.00
cal $50.00
g $50.00
l $90.00
Temporary Occupancy $20000
P $50.00
rPMor Plan Review Extension $65.00
7he
a $45.00 per hour
on-current permits
minimum one hour,charged in one hour increments
ctions for residential structures pursuant to
ter l6
d Two Family Dwellings $100.00
e�rt Houses and Social Care Facilities $160.00,plus$7 for each dwelling unit in excess of 3
$160.00, lus$5 for each dwellin unit in excess of 5
y Classification. The City Council has determined that the fees inmosed by this re lution are not taxes
d subject to the property tax limitations of At
ction l lb of the Oregon nst ion.
PASSED: This l LN- day of 1999•
-City of Tigard
ATTEST:61JA40,1Ara I(Ma7 Am
City Recorder-City of Tigard t:`crrYWfDE\cn^°NtJERi:FSUINt°ENTEERESoLvn"r3t2
® pp
RESOLUTIdN NO.99- 1U
Page 5