Resolution No. 95-31 :01;511110 011
IMM I'll MEN=
CITY OF TIGARD, OREGON
RESOLUTI0N NO. 95--al-
A RESOLUTION ESTABLISHING ELECTRICAL PERMIT FEES
WHEREAS, Tigard will begin admi.nis=ation of the electrical inspection
program beginning July 1, 1995; and
WHEREAS, proposed subsection (g) of Section 14.04.065 of Title 1,� of the
Tigard Municipal Code indicates that fees for electrical permits shall
be established bv resolution of the City Council; and
WHEREAS, Tigard must assess those fees necessary to recover costs
associated with the adsi-.ist ati c n of ,,.e elactrl..al _.. pacti... program,
NOW, THEREFORE, BE IT RESOLVED by the Tigard City Council t'�at:
Fees for electrical permits shall be as follows:
1) New residential, single or multi-fam ly per dwelling unit; service
included:
A) 1000 s®zaare fee or less - $110.00
B) Each additional 500 square feet or portion
thereof $25.00
C) Limited energy - $25.00
D) Each manufactured home izi;r modular dwelling
service or feeder - $68.00
2) Services or, feedez-=; installation, alterations or
relocation:
A) 200 amps or less - $60.00
B) 201 amps to 400 amps - $80.00
C) 401 amps to 600 amps - $120.00
D) 601 amps to 1000 amps - $180.00
E) Over 1000 amps or volts - $340.00
F) Reconnect only - $50.00
3) Temporary services or feeders; installation.,
alteration or relocation:
A) 200 amps or less - $50.00
B) 201 amps to 400 amps - $75.00
C) 401 amps to 600 amps - $100.00
D) over 600 amps to 100 volts (see 2 above)
4) Branch circuits; neva, alteration or extension per
panel:
A) With purchase of service or feeder - each
branch circuit - $5.00
B) Without purchase of service or feeder
First branch circuit - $35.G0
Each additional branch circuit - $5.00
RESOLUTION NO. 95-131
Page 1
5) Miscellaneous (Service or feeder not included):
A) Each pump or irrigation circuit - $40.00
B) Each sign or outline lighting - $40.00
C) Signal circuit(s) or a limited energy panel,
alteration or extension - $40.00
_—_ D) _Iach additional inspection over the allowable
In any of the above - (minimum one-hour)
i) Per inspection - $35.00
ii) Per hour - $55,00
E) Industrial Plant Inspection - $55.00 per hour
including travel and office time with a
minimum charge of one-hour.
F) E1mctrical permit plan review fee: Plan
review fees shall be 25 percent of the
electrical permrLt fee as set forth in
subsection (g) of this section.
G) Minor Labels - $100.00 for.ten labels.
Classification. The City Council has determined that the fees
imposed by this resolution are nut taxes subject to the property tax
limitations of Article XI, section 11(b) of the Oregon Constitution.
/1
PASSED: This day of / t.Gl If / , 3.995.
Za
Pdayo City ofTigarST: �- tic
% tuh-ems�
City Recorrder, - City of 'l gard
a.\toein\cathy\elec_res
RESOLUTION NO. 95- �I
Page 2