Resolution No. 94-10 CITY OF TIGARD, OREGON
RESOLUTION NO. 94-
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TIGARD, OREGON, STATING
THE METHODOLOGY AND SETTING THE AMOUNT FOR SYSTEM DEVELOPMENT CHARGES
FOR WATER SERVICES.
WHEREAS, having established water system development charges for the
City through adoption of Ordinance No. 93-33, this resolution sets those
charges and delineates the specific methodology for calculation of the
charges. The methodology established for these calculations has been
designed in accordance with ORS 223.297 -.314 and generally accepted
principles for establishment of reimbursement and improvement fees;
and,
WHEREAS, for the reimbursement element of the SDC, rate-making
principles have been employed throughout this calculation with specific
attention to the cost of existing facilities, prior contributions made
by existing users, the value of unused capacity, and equity between
existing and future users; and,
WHEREAS, for the improvement element of the SDC, specific consideration
has been given to the costs of projected capital improvements needed to
increase the capacity of the systems to accommodate future development;
and,
WHEREAS, a range of potential system development charge methodologies
were evaluated based on cost and value assumptions and variable
allocation methods and that analysis determined that the inter-
relationship of facilities meeting existing and future demand provides
the most consistent and equitable basis for establishing SDC's;
NOW, THEREFORE, BE IT RESOLVED by the City of Tigard, Oregon:
Section 1. Charge Established. System development charges for
water is hereby established. Charges shall be in
the amounts outlined in tables II-3 and II-4 on
page 6 of the "System Development Charges for the
Water System" manual prepared by Economic and
Engineering Services, Inc., dated June, 1990 and
hereinafter referred to as the "System Development
Charges manual. The Systems Development Charges
manual is attachedhereto as Exhibit "A" and
incorporated herein by this reference.
RESOLUTION NO. 94-1L)
Page 1
e
Section 2: Permits Affected. System development charges
established by Section 1 of this resolution shall
be collected at the time of issuance of permits to
Affibk connect to the water system
If a development is subject to more than one SDC
charge, all charges shall be collected at the time
of issuance of the first issued permit.
Section 3: Methodology. The methodology for the systems
development charges imposed by Ordinance No. 93-33
is contained in the System Development Charges
manual.
Section 4: Project Plan. The System Development Charges
manual identifies or incorporates by reference, the
identification of capital improvements eligible for
funding through SDC's and is hereby adopted as the
Systems Development Charge Funds Project Plan,---s
"`[+tiiS 15 /LaF'C���,� UYdIrMtt_ C„Id.S
PASSED: This n day of d 1994.
-:a r - g i y of Tigard
bra
ATTEST:
City Recorder — City of TigaVd
RESOLUTSON NO. 94- ) 0
Page 2