Loading...
Resolution No. 92-37 CITY OF TIGARD, OREGON RESOLUTION NO. 92-3-7 A RESOLUTION AUTHORIZING THE MAYOR AND CITY RECORDER TO SIGN AN AGREEMENT WITH THE STATE OF OREGON FOR INSTALLATION OF TRAFFIC SIGNAL IMPROVEMENTS AT THE INTERSECTION OF HALL BOULEVARD AND BONITA ROAD. WHEREAS, the City proposes to install traffic signals and associated improvements at the intersection of Hall -ulcvard and Bonita Road in acuardance with its adopted capital improvement budget for streets; and, WHEREAS, Hall Boulevard is a State highway under the jurisdiction of the Oregon Department of Transportation, and, WHEREAS, an agreement has been prepared providing for the improvements and the sharing of construction and maintenance responsibilities by the State and the City. NOW, THEREFORE, BE IT RESOLVED by the Tigard City Council that: Section 1: The Mayor and City Recorder are hereby authorized and directed to sign, on behalf of the City, a cooperative improvement agreement between the State of Oregon and the City of Tigard identifying their respective obligations relative to the construction and maintenance of traffic signal and intersection improvements on Hall Boulevard at Bonita Road. .Ld PASSED: This /4-1't-'-1 day,-0? 1992. or - City of Tigard ATTEST: City Recorder - City of Tigard U — rw/hill-b-r RESOLUTION No. 92_ 33-7 Page 1 June 10, 1992 Misc_ Contracts & Agreements No. 1.1,174 COOPERATIVE IMPROVEMENT AGREEMENT THIS A0PFFMF!-! i» h,adz and entered into by and between the STATE OF OREGON, acting by andthrough its Department of Transportation, Highway Division, hereinafter referred to as "State"; and CITY OF TIGARD, a municipal corporation of the State of Oregon, acting by and through its City Officials, hereinafter referred to as "City"_ W I T N E S S E T H RECITALS 1. The Beaverton-Tualatin Hwy. (Hall Blvd.) is a part of the State highway system under the jurisdiction and control of the Oregon Transportation Commission and S.W. Bonitz. Road is a part of the City street system, under jurisdiction and control of the City. 2. For the purpose of providing acceptable traffic circulation patterns on public highways and streets, City plans and proposes to construct intersection improvements and install a traffic control signal along with emergency vehicle pre-emption equipment at the intersection of Hall Blvd. and S.W. Bonita Road with an interconnect to the signal at Hall Boulevard and B.W. McDonald; hereinafter referred to as "Project". The location of the project is approximately as shown on the sketch. map attached hereto, marked Exhibit A, and by this reference made a part hereof. The project will be financed 100 percent with City funds at no cost to the State. 3. By the authority granted in ORS 366.770, and 366.775, State may enter into cooperative agreements with the counties and cities for the performance of work on certain types of improvement projects with the allocation of costs on terms and conditions mutually agreeable to the contracting parties. 4. By the authority granted in ORS 810.210, State is authorized to determine the character or type of traffic control devices to be used, and to place or erect them upon State Highways at places where State deems it necessary for the safe and expeditious control of traffic. No traffic control devices BII92006 r' M. C. & A. No. 11,174 CITY OF TIGARD shall be erected or maintained upon any St;zta Mighway by any authoritv other than State, except with its written approval. Traffic signal work on project shall conform to the current State standards and specifications. NOW, THEREFORE, the premises being in general as stated in the foregoing RECITALS, it is agreed by and between the parties hereto as follows: STATE OBLIGATIONS 1. State shall issue the required permits, review and approve the project plans and specifications, and provide material testing and technical inspection to insure State standards are met. State shall assign a liaison person to monitor the traffic signal work and roadwork performed by the City, or its contractors, within the boundaries of Hall Blvd. 2. State hereby grants City the right to enter onto and occupy State right-of-way for the performance of necessary roadway construction and installation of the traffic signal equipment. ` 3. State shall compile accurate cost accounting records. City may request a statement of costs to date at anytime by submitting a written request. When the actual total cost of services provided by State have been computed, State shall furnish City with an itemized statement of said final costs. 4. State shall, upon completion of the project, per-=orm all required signal maintenance associated with the project signal and the interconiect system at its own expense. State shall retain complete jurisdiction and control of the timing established for operation of the traffic signal. 5. State shall, at its own expense, also maintain that portion of the emergency vehicle pre-emption equipment which is electrically interconnected to the traffic signal controller. 6. State shall maintain the pavement surrounding the vehicle detector loops installed on State highway in such a manner as to provide adequated protection for said detector loops, and shall adequately maintain the pavement markings and signing installed on State right-of-way as part of the project. B1192006 2 - SINE 14. C. & A. No. 11,174 CITY OF TIGARD CITY OBLIGATIOT;S 1. City, or its consultant, shall conduct the necessary field surveys, environmental studies, traffic investigations; arrange £orrelocation or reconstruction of any conflicting utility facilities; identify and obtain all required permits; and perform all preliminary engineering and design work required to produce preliminary plans, specifications, and cost estimates. 2. City shall, upon State's review and approval of final plans, prepare the contract and bidding documents; advertise for construction bid proposals; award all contracts; pay all contractor costs; furnish all construction engineering, field testing of materials and technical inspection (except as provided for in STATE OBLIGATIONS paragraph No. 1), and project manager services. 3. City shall, upon receipt of a fully executed copy of this agreement, forward to State's Region Office (9002 SE McLoughlin Blvd., Milwaukie, OR 97222) an advance deposit in the amount of $8300.00. Said amount being equal to the estimated total cost - of State provided review, technical inspection and monitoring &ervices for the project. 4. Upon completion of the project and receipt from State's Region Office of an itemized statement of the actual total cost of the State's services, City shall pay any amount which, when added to City's advance deposit, will ecrual 100 percent of the State's actual total costs of the project. Any portion of said advance deposits which is in excess of the total actual cost will be refunded or released to City. 5. City shall, upon completion of the project, provide power for the project signal at its own. expense. 6. City shall adequately maintain the pavement surrounding the vehicle detector loops as well as all pavement markings and signing installed on City right-of-way in accordance with the plans and specifications. 7. This agreement is conditioned upon City applying for and obtaining a permit to "Occupy or Perform Operations upon a State Highway". City agrees to comply with all provisions of said permit. S. City shall authorize execution of this agreement during a regularly convened session of its City Council. B1192006 3 - mill M. C. & A. No. 11,174 CITY OF TIGARD GENERAL PROVISIONS 1. State and City agree and understand that a mutual review of the project plans and specifications will be conducted prior to advertisement for construction bid proposals, and that State's prior written approval is necessary before such advertisement. 2. The contractor, its subcontractor, if any, and all employers working under this agreement are subject employers under the Oregon Workers' Compensation Law and shall comply with ORS 656.017, which requires them to provide Workers' Compensation coverage for all their subject workers. IN WITNESS WHEREOF, the parties hereto have set their hands and affixed their seals as of the day and year hereinafter written. The Oregon Transpertation Commission, by a duly adopted delegation order, authorized the State Highway Engineer to sign this agreement for and on behalf of the Commission_ Said authority has further been delegated to the Traffic Engineer pursuant to Subd egation Order HWY-4, paragraph 3_ APPROVdD RE MMENDZD STATE OF OREGON, by and tlsrough its Department of Transportation, By Highway Division Region Engineer By Date ' State Traffic Engineer- APPROVED ngineerAPPROVED AS TO CZ e0E -10A� y and LEGAL SUFFICIENCY thr Elected Off•ici sBy BAsst. Attorney General APPROVED AS TO FORM By City Recorder By / City Attorney Date CITY OF TIGARD ADDRESS: City of Tigard P.O. Box 23397 Tigard, Oregon 97223 B1192006 - 4 v i i -91Lu d ��� �i.� 4�• � \ld ?7 i l '� l�•II Inwnw�b� ���iIL,` ellC m I P1 �yJ�•.y4/���\\•' p��/�]•,' P/W /\B 000 ////./) •'� ,(I)^`I'1 Proposed Project _� a :g• Lv vi IRA ff RUI All CPO i 's •'-7!_ �� .��- •�: I i � _L _ �1^�� sM. *`'d/ � ,o � •O[�® _ — % �� �� c `,tea " 1 t �o� 8' .lS°'�, TUALATIN _" ;�-�.;_� 1 = 'RIV RGRC = Pro 9.00 Exhibit ' • �� CIS OF TIGARD� July 17, 1992 Ms. Shelly Smith Federal Aid Technician ortation Oregon Department of Transp 9002 S.E. McLoughlin Milwaukie, OR 97222 Subject: Proposed Agreement S.W. Hall Boulevard & S-W. Bonita Road Dear Ms- Smith: Enclosed are t,_1 ee bound copies of the above agreement which have been signed by the Mayor and me_ After final action by the High_Way Division, I understand that you will forward a fully executed copy to me. Also enclosed is a copy of Resolution No. 92-37 authorizing 'the o sign this agreement. Please call If you Mayor and City Recorder t need any other information. Thank you. Sincerely, �Q C��_ r Catherine Wheatley City Recorder c: Randall Wooley, City Engineer Enclosures 13125 SW Hall Blvd.,Tigard,OR 97223(503)639-417.1 TDD(503)684-2772 uregonDEPARTMENT OF TRANSPORTAT 0*4 0 V HICMVAY DIVISION Region 1 June 25, 1991 FILE CODE: Randy Wooley, City Engineer City of Tigard P.O. Box 23397 Tigard, Oregon 97223 SUBJECT: PROPOSED AGREEMENT S.W. Hall Blvd. @ S.W. Bonita Road Attached are three bound copies and one unbound information copy of a proposed agreement covering the City's and State's responsibilities for the subject project. Would you please review this with your staff and with other affected City personnel, and if it is satisfactory, arrange for an ordinance or resolution authorizing execution by the proper City officials. The bound, signed copies should be returned to me at this office and the information copy may be retained. A fully executed copy will be sent to you for your records following final action by the Highway Division. If you have any questions, please call. _)�-''`V)Sher U Federal A technician Attachments - (4 copies, Agreement No. 11174) _I I i 9002 SE McLoughlin Milwaukie,OR 97222 (503)653-3090 734-1850(R—3-91) FAX(503)653-3267