Resolution No. 85-41 i
l
C11-Y OF TIGARD, OREGON
RESOLUTION NO. 85 - 41
A RESOLUTION ESTABLISHING THE BASIS OF AWARD, AWARDING _E CIVIC CENTER
CONSTRUCTION PROJECT, AND AUTHORIZING THE MAYOR AND CITY ADMINISTRATOR TO SIGN
THE CONTRACT.
WHEREAS, the Local Contract Review Board on May 13, 1985 established
McCartney-Johnson a- a qualified bidder in Final Order No. 85-01 prior to bid
opening; and
WHEREAS, at the May 20, 1985 meeting of City Council it was decided not to use
any of the deductive alternates; and
WHFi REAS, McCartney-Johnson was the apparent low bidder for both the base bid
and the base bid plus the substitution, as shown in Exhibit A, Bid Tally
3-,eet; and
WHEREAS, at the June 10, 1985 meeting of City Council it was decided to
include Substitution #1 -- variable volume temperature controls and remove
Deduct #1 - paving; and
WHEREAS, the Local Contract Review Board Rules require Council to authorize
the Mayor or City Administrator to sign contracts greater than $15,000 for
Council.
NOW, THEREFORE, BE IT RESOLVED by the Tigard City Council. that:
Section 1. McCartney-Johnson of Clackamas, Oregon is awarded the bid
submitted on May 15, 1985 for the Tigard Civic Center Project at the following
contract sums:
a. The base bid of one million, seven hundred thirty three
thousand, one dollars ($1,733,001), and
b. The substitute bid for the variable volume temperature controls
of twenty 'thousand, 'Five hundred fourteen dollars ($20,514), and
C. A unit cost of twelve dollars ( 1?_.00) per cubic yard for
removing and disposing off-site unsuitable subgrade material and
replacing same with imported fill material, compacted in place.
Section 2. Authorize the Mayor and the City Administrator to sign a contract
as outlined -above with McCartney-Johnson, a copy of which is attached as
Exhibit B.
PASSED: This T� day of 1955.
ayor - City of Tigard
ATTEST: ./�
A
i
deputy City Recorder - City of Tigard
RESOLUTION NO. 85-41
JM/0877p
S
Tigard Civic Center
Bid* Tally
C?
Bidder Base Bid Unit Alternates
Price t`.'9 D-2 D-3 D-4 S-1
Berge Brothers "d d"
q 1 a CIIZV / L-6-? s ,amo-
Contractors, Inc.
ou of ?00 oo 000 161 1)
E. lee Robinson
Construction / B cocoa'
,
Hyland & Sons, Inc. �Id
X 7 oU o S'7 79vo C?06
Juhr Corporation "`!d
l� /. - / .So / 215' V q/ 2,2 ba 1/'96- o
JW Mills & Associates
K Contractors 7 0 00 1,5- poo. o000 oo�
/ add
McCartney/Johnson
t !, 714{ y 5'8, a rr7 o . as
OTYJ4 Construction add
r a ! .s o 7� 14
Silco Construction
a, o9Y ctdd
X X Company / `7 9l ! S Uo 9 a40 B7C, s - 2 ood
Slayden Construction —dd
7�
it 7 ✓dS o oD 3.S 7 JVu fy 7vu oo / 00 o sato
Thompson Construction 0.dd
T x 7k8 J a - So 353 / iz/ai aoodo
tWullftntf5ip, afchitect5
20815 S.W. 105TH AVE.,TUAL.ATIN, OR 97082 503/692.5065
THE AMERICAN INSTITUTE OF ARCHITECTS
AIA Document A701
i
Standard Form of Agreement Between
Owner and Contractor
where the basis of payment is a
STIPULATED SUM
1977 (EDITION
THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES;CONSULTATION WITH
AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION
Use only with the 1976 Edition of AIA Document A201, General Conditions of the Contract for Construction.
yThis document has been approved and endorsed by The Associated General Contractors of America.
AGREEMENT
made as of the t �-kA" day of s in the year of NineteenS
Hundred and
BETWEEN the Owner: CITY OF TIGARD, P. O. Box 23397
Tigard, Oregon 97223
and the Contractor: MCCARTNEY & JOHNSON, P. O. Box 185
Clackamas, Oregon 97015
The Project: TIGARD CIVIC CENTER
The Architect: SMITH/DULL PARTNERSHIP, Architects
20915 SW 105th Avenue, Tualatin, Oregon 97062
The Owner and the Contractor agree as set forth below.
copyright 1915,1918,192S,1937.1951,1958,T961.1963,1967,197-7. O 1977 by the America, Institute of Architects,1735 New —
York Avenue,N.W..Washington,D.C.20006.Reproduction of the material herein or substantial quolatlOn of its provisions
without permission of the AIA SioYates the c opYlight I.— of the United States and will be subject to legal prosecution.
AIA DOCUMENT A101 - OWNER-CONTRACTOR AGREEMENT - ELEVENTH EDITION - (UNE 1977 - AIA-
01977 - THE AMERICAN INSTITUTE OF ARCHITECTS.1:15 NEW YORK AVE..NAV.WASI/INGT(7N, D.C. 20006 A101-1977 1
w. ARTICLE 7
THE CONTRACT DOCUMENTS
The Contract Documents consist of this Agreement, the Conditions (if the Contract (General, Supplementary and
other Conditions), the Drawings, the Specifications, all Addenda issued prior to and all Modifications issued after exe-
cution of this Agreement.These form the Contract, and all are as fully a part of the Contract as if attached to this
Agreement or repeated herein.An enumeration of the Contract Documents appears in Article 7,
ARTICLE 2
THE WORK
The Contractor shall perform all the Work required by the Contract Documents for tale construction
1He,e rnsol the caption desc,ipwe of the Work as used nn the,contract Documents.)
of the new Tigard Civic Center located at 13125 S. W. _:all
Boulevard, Tigard, Oregon
F
ARTICLE 3
TIME OF COMMENCEMENT AND SUBSTANTIAL COMPLETION
The Work to be performed under this Contract shall be commenced on the date of written
notice to _proceed
and,subject to authorized adjustments, Suhstantial Completion shall be achieved not later than One hundred
elc�ht�an(I8,0) calendar c�la�setating to if
and fullx completed not ittore than
7 provisions for liquidatedp—on
thirty (30) calendar days thereafter. Failure to meet the completion
deadlines shall result in liquidated damages as provided by 5.23 in
the General Crnditions in the Project Manual, which are incorporated
as a part of this contract.
AIA DOCUMENT A101 OWNER-CONTRACTOR AGREENUNT - ELEVENTH EDITION • JUNE 1977 - AIA-
01977 - THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVE.,N.W..WASHINGTON, D.C.20006 A749-1977 2
1
ARTICLE 4
CONTRACT SUM
The Owner shall pay the Contract')' in current funds for the performance of the Work, subject to additions and
deductions by Change Order as provided in the Contract Documents, the Contract Sum of One Million
Seven Hundred Fifty—three Thousand Five Hundred Fifteen Dollars
($1,753,515.00) .
The Contract Sum is determined as follows:
(State here the base bid or other lump sum amount,accepted alternates.and unit prices,as applicable.)
1. The base bid of $1,741,458.00, plus $20,514.00 for substitute
alternate S1 for the variable volume temperature control system,
less $8,457.00 for alternate Dl for a portion of the paving,
for a total of $1,753.515.00.
2. A unit cost of $12.00 per cubic yard for the removal and
replacement of unsuitable material per the Contract Documents
as directed by the soils engineer.
ARTICLE S
PROGRESS PAYMENTS
Based upon Applications for Pavment submitted to the Architect by the Contractor and Certificates for Payment issued
_ by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as pro-
vided in the Contract Documents for the period ending the thirtieth (30th)day of the month as follows:
Not later than thirty (30) days following the end of the period covered by the Application for Payment
S ninety-five percent( 95 %)of the portion of the Contract Sum proper)y allocable to labor, materials and
equipment Incorporated in the Work and ninety—five percent( 95 %)of the portion of the Contract
Sum properly allocable to materials and equipment suitably stored at the site or at some other location agreed upon
in writing,for the period covered by the Application for Payment,less the aggregate of previous payments made by the
Owner;and upon Substantial Completion of the entire Work,a sum sufficient to increase the total payments to
ninetl—five percent( 95 %.)of the Contract Sum,less such amounts as the Architect shall determine for all
incomplete Work and unsettled claims as provided in the Contract Documents.
(ll not covered elsewhere in the Contract Documents,here insert any pros-ision for limiting or reducing the amount retained after the Work reaches a certain
stage of completion.)
Pursuant to the Contract Documents and the Project Manual, Articles
9 and 15, the Contractor shall conform to the requirements of the
document entitled "Prevailing Wage Rates for Public Works Contracts
in Oregon" and shall submit notarized certificates with each
application for payment that minimum wage rates have been paid by
the Contractor and each Subcontractor.
Payments due and unpaid under the Contract Documents shall bear interest from the date payment is due at the rate
entered below,or in the absence thereof,at the legal rate prevailing at the place of the Project.
(Here insert any rate of in,erest agreed upon.)
The interest rate shall be the rate established by state statute.
RIs ry la%,s and requirements ander the Federal Truth in tending Act,sinilar local c..nsu r edit I_,and other reSulatiom at the O.c•n ,
nd Conti tar's principal places of business,the location of the Project and els—h—,n ,afle them credit
acidity of this provision.Specific legal advice should
be obtained wilh respect to deletion,modificarion,or other requirements such as written 11—fosu1es or"11-11
AIA DOCUMENT A101 • OWNER-CONTRACTOR AGREEMENT ELEVENTH EDITION • JUNE 1977 • AIAO
01977 • THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW YORK AVE., NAV..WASHINGTON, D.C.20006 Alol-1977 3
i
I
ARTICLE 6
FINAL PAYMENT
Final payment, tgsentire balance trthe
ob e paid fic
the Owner to the
Contrctohen the Workhabeencomplleld,te Contractfully performed, and finall Certificate for Payment has
been issued by the Architect.
ARTICLE 7
MISCELLANEOUS PROVISIONS
7.1 Terms used in this Agreement which are defined in the Conditions of the Contract shall have the meanings
designated in those Conditions set forth in the Project Manual.
7.2 The Contract Documents,which constitute the entire agreement between the Owner and the Contractor,are listed
in Article 1 and,except for Modifications issued after execution of this Agreement,are enumerated as follows:
(list below the Ag-111.1h,Conditions o!the Consracl(General, -dSupple—Ila h re dppficable.l di tions),the Drawings,the Spa
cif-ii—,and any Addenda
and accepted alternates showing page or sheet n�mbars in all cases an ares sv e
1. This Agreement and the Contract Documents, including:
a A21f,1ng SS1drawings
S1throughbSred 11,Al, LA1 M1 through M5hand7ElAthrough
through
E8, Il through I10.
b. The Project Manual, including Divisions 0 through 10,
15 and 16;
C. Addendum 1, 2 and 3; and
2. The Completed Bid/Tender form and bid documents submitted
by Contractor; and
3. The Performance Bond and the Labor and Materials Bond, and
othersubmittals required by the Project Manual in Division
01300, prior to the issuance of the Notice to Proceed.
4• The General Conditions as entered into the record at the
3unre 10, 1985 City Council meeting, revising the General
Conditions in the bid document dated April, 1985.
APPROVED A''S�� TO FORM:
othy v. m>
City Attorney
This Agreement entered into as of the day and year first written above.
OWNER CONTRACTOR
� T
AIA DOCUMENT A101 • OWNER.CONTRACTOR AGREUMENT ELEVENTH EDITION )UNE )977
AIA-
JUNE AIOI-1977 4
(01977 • THE AMERICAN INSTITUTE OF ARCHITECTS,1735 NEW FORK AVE., N.W., WASHINGTON,D.C.2000G