Resolution No. 80-68 CITY OF TIGARD, OREGON IRI-SOLUTION No. 80- RESOLUTION OF THE TIGARD CITY COUNCIL ',CCEPTING THE PUBLIC IMPROVEMENTS CONSTRUCTED WITHIN AbfART SUMMERLAKE (PHASE I) SUBDIVISION, SUBJECT TO HEREIN SPECIFIED CONDITIONS. t WHEREAS, the City of Tigard Subdivision Ordinance requires subdividers to ! install streets, sidewalks, street lights, curbs, storm sewers, sanitary sewers, underground utilities and other public facilities for the development of subdivision; and r 1 WHEREAS, the City has required the payment of fees and the execution of a ' Compliance Agreement which stipulates that: "Upon receipt of certification by the Department of Public Works that ! all requirements have been met and a One Year Maintenance Bond, the City Council agrees to accept the public improvements, subject to the requirements for correction of deficiencies and maintenance for a period of one year...; and WHEREAS, said Certification has now been received, subject to correction ?' of hereinbelow listed deficiencies; and j :F" k "r WHEREAS, the subdivider has indicated a desire to retain the subdivision Eperformance bond in full force and affect throughout the aforsaid maintenance period, in lieu of submitting a separate maintenance bond, �. NOW, THEREFORE, f BE IT RESOLVED that the City Council of the City of Tigard, Oregon hereby accepts the public improvements constructed within Amart Summerlake (Phase I) Sub- division, said subdivision being recorded in Book 47 on Page 37 in Washington County, Oregon, Plat Records, subject to: $: a 1. Correction of deficiencies/defects per letter from City to Lutz Development Company dated July 23, 1980 (copy attached hereto). 2. Correction of deficiencies/defects which may arise during the maintenance guarantee period. 3. Continuation of the subdivision performance bond or submission P of a satisfactory (separate) maintenance bond, in the sum of $160,342.20, in Lieu thereof. PASSED: This day of , 1980, by the Co it of the City of Tigard. i-LAC P Pffyor - City of Tigard � ATTEST: �r Ci.- y Recordet = City a igard :Resolution No. 80- July 23, 1980 Bob Pierce Artco Construction Co. Z Lutz Development Co. 8925 SI9 Beaverton Hillsdale Hwy. OR 97225 Re: Summerlake Phase IA Dear Sir: This is a list of it,,, that 14, 1980 with your r I .—Id, as I walked through ngineer s inspector and yourself; your project on July 1. Curbs need to be Perslemon Court replaced at 10845, 10855, 10895 and and at 10905 and 10915'S.W. S 12800 and 12890 S7 10815 S,W, Y0315 SWSummer Lake Drive. Chicory Court 2• Street needs to be re 12845 s.14. paired at 10825 S,W, Pers lemon Court and at Chicory Court. 3• Curb at Wheelchair ramp, replaced attf , intersection of S.W. Summerlake DriveandnSrWh�7est side of the 1 4. Allstreeta Chicory Court, must be cleaned. 5, All storm sewers need to be flushed out. Q+ Barricades installed at the ends of all dead end Driveway streets. a• cut moved down on lot 1, must be at least 30 feet fr°m Intersection rights,f..way, _ 8. The broken sidewalk east of S,W. Summerlake Drive on S.W. Scholls Ferry Road needs to be replaced. �- 96 Sidewalks need to be installed throughout the project. 10. All mailbox clusters installed. 11, aaintenance bond � needs to be provided to the City. 12, The asphalt Overlay to be ?laced within one year fro- _ Council tentative f i r< Bob Pierce Artco Construction Co, Lutz Deveaopment Co. 13. Bond for the bikepath needs to be provided to the City for the full amount of construction. 14. As-built mylar of the sanitary Sewer and storm sewer provided to the city. 15. All sanitary sewer repairs need to be completed. All items except 11, 13 and 14 can be done while your project is on its maintenance period along with any other items of repair that may occur during tfnis ti.:e. Yours trsly, ' R. L. Thompson Public Works Inspector RLT•pjr cc: David Evans Associates Fti 44 r w