Resolution No. 79-118 t
E
CITY OF TIGARD,
OREGON :
RESOLUTION No. 79-
A RESOLUTION ADOPTING AN INTERIM COMMUNITY DEVELOPMENT PLAN
-
FOR THE
CITY OF TIGARD. Y went
I` participation in the Co breetyearvoverall
WHEREAS, Washington County s P the County have a
Block Grant Program requiresathat F
development plan; to t
community in the County
WHEREAS, Washington Count
has requested each City
e FREAS a its own community needs and to prepare an interim
cowmunity development plan; and
the City Council and City Staff have evaluated Tich ar
WEiEREAS, a strategy to meet those needs which are shown
needs and have
prepared Development Plan-
4 unity is the
k in the Interim Comm Council hereby adopts of the plan
Of Tigard. co
+; ' ard. A PY
NOW, THEREFORE, b� it resolved that the City
Exh ib i t 'A".
Interim Community Development Plan for the City
is attached to this resolution as her 1979.
PASSED: This 17th em
day of Dec
Cir
ATTEST:
Ci t y
i
�JWW RESOLUTION No.
TIGARD INTERIM COMMUNITY DE9ELOPI,'ENT PLAN
TIGARD
The City of Tigard was incorporated in 1961 and ha:; a current estimated
population of 14,650 persons. A large part of the City was originally developed
in Washington County and has since been annexed to the City. Most of the land,
when annexed, was not served by sanitary sewers, storm sewers, street lights,
sidewalks, curbs or adequate streets.
The City has been slowly making progress toward providing the necessary
improvements for those areas annexed to the City, but a lot remains to be accomp-
lished.
In addition to the need for street improvements in the older sections of the
City, there is a need for additional parks and recreation facilities, social support
services, major improvements to the transportation system, and improved municipal
buildings.
Almost all of the new subdivisions developed within the City have the standard
improvements such as sanitary sewers, storm sewers, street lights, sidewalks curbs
and streets which meet the City's requirements.
Some of the needs and projects shown in the following summary are currently
being addressed, such as the Senior Citizens Center and the 99W Highway project.
SUMMARY OF PROBLEMS AND NEEDS
p I. Community-Wide Facilities, Capita] Improvements
A. Sanitary Sewers. No sanitary sewers exist in some of the areas recently
annexed to the City and in some of the older areas of the City.
B. Storm Sewers. Many areas in the City do not have storm sewers and are
served by an open ditch system which is hazardous and inadequate. Flooding
occurs in some sections of the City near vanno Creek.
C. Public Buildings. Current municipal offices and operations are in separate
buildings and do not provide adequate space for various City Departments
and services. The following operations are in separate buildings:
Administrative offices, City Library, Police Departments, and Municipal Court.
D. Streets. Several streets in the City have a poor surface condition and
require overlays (traffic movement problems are shown in section II)
E. Sidewalks. About 40% of the streets in the City do not have sidewalks.
About 100 wheelchair access ramps are needed on the older sidewalks con-
structed without ramps.
F. Street Lighting. Several areas in the City do not have street lights.
There is a need for at least 100 additional street lights in some of the
older sections of the City.
G. Public Works Facilities. Digesters and other facilities from an old
abandonded sewage treatment plant takes up space that is needed for Public
Works equipment and parking.
December 12, 1979
Page 2
k;
11. Transportation and Traffic Circulation
A. Circulation Conflicts. 99W, Main Street, Tiedeman, Greenberg Road, 72nd
Avenue, 72nd Avenue Interchange, Durham Road, Hall Blvd., Ash Street,
Bonita Road.
B. General Street Improvement. Need an inventory of all streets in City and
a plan for improvements.
III. Parks and Recreation
A. Parking. Insufficient parking at Cook Park. f.
B. Restrooms. Insufficient restrooms at Cook Park
C. Park Development. Need to develop Summer Lake Park, Ball fields, Bike
paths, picnic areas, etc.
D. Land Acquisition. Need to acquire land and develop greenways and parks
in various sections of the City.
E. Bandstand. There is need for a bandstand-stage at Cook Park. Currently
use a flatbed truck.
F. Bicycle Paths. Bicycle paths are needed in several sections of the City.
IV. Social Support Services
A. Senior Citizens Center. Senior Citizens do not have a facility of their
own. They currently use a church which does not provide adequate space or
large enough time periods to fill needs of senior citizens.
i
t
STRATEGIES/PROJECTS PRIORITIZED s
Priority. I: Transportation and Traffic Circulation
f
1. Conduct a complete inventory of all City Streets and prepare a comprehensive !
plan to make necessary improvements.
2. Eliminate circulation conflicts and hazards on the following streets by
use of signalization, channelization, extensions, removal of sharp curves,
widening, elimination of dangerous ditches, widening of bridge, proper
signing, use of bus turnouts, construction of interchange, etc: 99W,
Main Street, 72nd Avenue, Greenburg Road, Hall Blvd., Tiedeman, Durham
Road, Bonita Road, and Ash Street.
Priority II: Community-Wide Facilities, Capital Improvement.-
I.
mprovements1. Formation of Local Improvement Districts and/or the use of private
developers to construct sanitary sewers in newly annexed areas of the
City and in some of the older sections of the community such as Derry
Dell area, McDonald Street, Sattler-Hall Blvd. area, Naive Road area,
115th Avenue and Walnut area.
" . Page 3
2. Street overlays on 121st Avenue, Ann Street, 116th Avenue, 118th Avenue,
119th Avenue, Lynn Street, Frewing, Summercrest Drive, Summer Street,
Walnut Street, etc.
3. Construction of Storm sewers throughout the City.
4. Install approximately 100 street lights in various sections of the City
such as O'Mara Street. McDonald Street, Fairhaven Street (115th Avenue to
cul-de-sac).
"s 5. Install sidewalks and wheelchair access ramps throughout the City on
streets such as O'Mara, McDonald, etc. (see Exhibit "A", of proposal
for Community Development Block Grant for sidewalk and wheelchair access
ramps, for exact locations).
`w 6. Select and purchase site for construction of a new civic center to house
a library, police department, administrative offices, engineering, build-
ing, finance, municipal court, etc. or find a suitable existing building
that could be modified for use as a civic center.
7. Remove digesters and other facilities of old sewage treatment plant at the
public works garage area to make room for public works vehicles, equipment
and storage.
Priority III: Parks and Recreation
1. Develop additional parking at Cook Park next to the new soccer fields and
acquire property directly east 92nd Avenue and develop also as parking for
:.. Cook Park.
2. Construct additional restrooms at Cook Park and remodel existing restrooms.
3. Design and construct a bandstand-stage at Cook Park.
j4. Develop Summer Lake Parker approved pp roved plan. Includes ball fields, picnic
areas, paths, lake, etc.
5. Acquire land for additional parks and greenways in the City.
6. Install bicycle paths in various sections of the City.
Priority IV: Social Support Services
1. Construct a 5300 square foot Senior Citizens Center. Purchase of site