Loading...
Ordinance No. 91-14 ,'ITY OF TIGARD, OREC7ON ' ORDINANCE NO. 91- 1`1 AK ORDINANCE ADOPTING THE CITY OF TIGARD PUBLIC FACILITY PLAN WHEREAS, OAR 660, Division 11 requires jurisdictions to develop Public Facility Plans at the time of Periodic Review, and; WHEREAS, the purpose of the Public Facility Plan is to help assure that urban development is guided and supported by types and levels of urban facilities and services for the needs and requirements of the urban areas to be served, and that those facilities and services and services are provided in a timely, orderly and efficient arrangement, and; WHEREAS, the Tigard Planning Commission has recommended adoption of the Public Facility Plan, identified as Exhibit "A". WHEREAS, the Tigard City Council finds that adoption of the Public Facility Plan is important to effectively plan for public facilities so that services may be provided in a timely, orderly and efficient manner. THE CITY OF TIGLRD ORDAINS AS FOLLOWS: SECTION 1: The Tigard Public Facility Plan, identified as Exhibit "A" is hereby adopted. Section 2: The Tigard Comprehensive Plan is amended to include a list of public facility project titles, and maps and "written discriptions of public facility projects as required by OAR 660-11-045 and as identified as Exhibit "B". SECTION : This ordinance shall be effective 30 days after its passage by the Council, approval by the Mayor, and posting by the City Recorder. PASSED: By L4 C01((n0LtS vote of all Council members present after beiread by number and title only, this 1l�=t' day n of "f"L-e 1991. CathRri4ffe atley, City Pbicorder Y t APPROVED: This da Gera .` Edwards, Mayor App oved as to 71"7 s C tt irn Date H:rb\ordpfp.rb9 EXHISIT "A" CITY OF T IGARD PUBLIC FACILITY PLAN April, 1991 l The Tigard Public Facility Plan was prepared as part of Periodic Review of Tigard's Comprehensive Plan in accordance with OAR 660-11-000. t INTRODUCTION The Tigard 11uhlic Facility Plan was prepared as part of Periodic Review of Tigard`s Comprehensive Plan. It serves as a support document to the Tigard Comprehensive Plan and provides background information pertaining to public facil.ties which serve the City. Information pertaining to Tigard`s water, sanitary sewer, storm drainage and transportation systems is provided in the following report and support documents. These are the key physical facilities necessary to support urban development and are those for which specific documentation is required by the Public Facilities Plan Rule (OAR 660-11-000) . This report also references several public facility studies published between 1981 and 1991, Selected excerpts are attached as appendices. The entire documents are available at the City of Tigard City Hall, located at 13125 SW Hall Boulevard, Tigard, OR and are ,incorporated into this report by reference. PUBLIC FACILITIES PLANNING OAR 660-11-000 requires cities and counties to develop and adopt a public facility plan. Public facility plans are not detailed capital improvements pians but instead are more general facility plans that are intended to identify the significant facility improvements necessary to accommodate orderly development within urban growth boundaries. The following document examines the following major public facility systems within the Tigard urban growth area: { 1) Water System. Review of the water system includes the following: a) Sources of water. b) Treatment system. c) Storage system. d) Pumping system. e) Primary distribution system. 2) Sanitary sewer. Information pertaining to the sanitary sewer system includes the following: a) Treatment system. b) Primary collection system. 3) Storm Sewer: Review of the storm sewer system encompasses major storm drainage conveyances including major trunk lines, streams, ditches, pump stations and retention basins. 4) Transportation: The transportation portion of the public facility plan includes: a) Freeway system. { b) Arterial system. c) Significant, collector system. d) Bridge system (those on the federal bridge inventory) e) Mass transit facilities. f) Bicycle paths. _1- The following report or attached appendices and facility studies incorporated by reference include the following detailed information about each of the above facility categories: 1) Inventory and general assessment of the condition of existing public facility systems, including: a) Mapped location of the facility or service area. b) Facility capacity or size. c) General assessment of condition of the facility. 2) A list of significant future public facility projects and project descriptions, including: a) Rough cost estimates for each. b) Map or written description of each project's general location or service area. c) Policy statement or agreement identifying the provider of each System. d) Estimate,if possible, of when each facility will be needed. e) Discussion of existing funding mechanism and the ability of these and possible new mechanisms to fund the development of each public facility project. 3) Detailed facility maps and studies including engineering information. WATER The Tigard area is served by the Tigard and Metzger Water Districts which are two independent water service districts. The two districts, respectively, serve 80 and 20 per cent of Tigard area customers. Tgard Water District serves the area generally southwest of Highway 217, while Metzger Water District serves the area northeast of the highway. This is illustrated by Figure 1. The City ofTigardComprehensive Plan states in Policy 7.3.1 that: "The City of Tigard shall coordinate with the Tigard Water District and the Metzger water District to provide a high standard of water service to meet futuredemandsat all times." Tigard Water District The Tigard Water District is now supplied with water purchased from the City of Lake Oswego, the City of Portland, and from district-owned wells on Bull Mt. and Little Bull Mt. During the year-ago period ending June 1989, Lake Oswego provided 93% of the District's needs, Portland provided 4%, and District wells, 3%. An 800-scale map showing the complete location of all district facilities entitled "Map of Tigard Water District and Vicinity" is incorporated into this report by reference. The City cf Lake Oswego sells surplus water to the District. Lake Oswego's supply capacity is now at full use, and it is considering a plan to make major additions to its water system. One alternative includes facilities to fully supply the District until the end of the City's planning period, which is 2012. Portland is now relied upon to make up the balance between need and the availability of City of Lake Oswego water and well water. The District has not experienced difficulty in obtaining needed quantities from Portland. District wells are used in the warm months. The production costs associated with these is low relative to water purchases. Because these wells are in the Cooper -2- 1 ) LF CREEKtc! H G H W A Y ~92Fs LEAHY R � ap Pfl a a 2 m BARNES ' < ✓pNh,�N "'� `��g ryo YSON ST q0 HWY a Aloha L , s R A L E IG W.D. BANEY RD ART F tz v GARDEN er t O ERT GASSNEA RD METZGER o � Cooper Mtn WEIn... PFArFt£ ,� �'^�.�F �;b "'� ``. �sA� G,DC ,FAR� •ti9 .�..: TILE, i, A 9Q _ -� � 'tea yea�i�e a` -i �'¢ a9 �� $Rs��z I AG RU •,a 7V HWYSIA f4 ,L �•� i m _saw � �"��� �� ����u YTLE7t``k � � �'`aQ� . . �_,.,•„ W � �� � � �� �'�� {. a.6� ,o` •Laky LU BEEFcc BEh � a�� a ! •` Et tAEE Tualatin ? ATIN ®• •G L E I W LEBEAU Rd �y � y,: vergrove '21 k ' O :DY !EDY 11-hl ?i,. ...SHE RAID RIVERQ VE sF OVE W. y CITY OF OREGO Mt./Bull Mt. Critical Ground Water Area designated by the State Water Resources Dept., future utilization will not significantly increase above the current level. Detailed information on future water supply alternatives is contained in a 1990 report prepared for the Tigard Water District by Economic and Engineering Services. The report is incorporated by reference into this document. The findings and conclusions of the report are attached as Appendix "A The water supply needs within the present boundaries of the District have been forecast to determine construction requirements and cost of additions to present supply facilities. These costs are compared to the cost of developing new supply facilities. The planning period extends to the year 2010. These forecasts are based on current City of Tigard and Washington County land use plans and METRO population projections. The four supply alternatives identified by the Economic and Engineering Services Report are summarized in the following: Alternative 1• Expansion of the Lake Oswego Source Lake Oswego obtains untreated water from the Clackamas River near Gladstone. The city's water rights at that location are for 32.3 mgd. It is possible that State of Oregon minimum flow requirements could prevent the city from using an additional water rights permit to obtain an extra 5.8 mgd. Treated water reaches the 4.0 mq Waluga Reservoir via the distribution system fed by high service pumps and transmission line. This reservoir's overflow is at elevation 320. The Tigard Water District owns 24 and 16 inch trunk lines which extend from the reservoir on Bonita Road to Interstate 5, where flow is metered. _ 2 inch .line that branches with a 16-inch line up to the I 5 is crossed with a 4 i " „ Bcnita Pump Station. The pump station pumps water into the District's 910 zone -which serves the majority of the district's customers. The Bonita station pumping capacity is about 7.9 mgd. The system connects into the distribution system at the railroad tracks. The 24 and 16 inch lines continue, except for about 350 feet of 12 inch Tine in place of 16-inch west of the tracks, along Bonita Road to Hall, northward on Hall to McDonald, and for about 600 feet on McDonald. These facilities are shown in the Map of Tigard Water District incorporated by reference. The Lake Oswego Water Master Plan recommends a_16.9 mgd expansion of`th,e,existing water treatment plant without regard to Tigard's needs. A second option under consideration is upgrading of the Lake Oswego system to m,iet Tigard's needs until- the year 2012. This later alternative includes: New raw water and finished water transmission lines. New raw water intakes and pumps. - New finished water pumps: Expansion of existing water treatment plant to 23.2 mgd capacity. - Construction of a 5 mgd water treatment plant to treat Willamette River water. Also, In order to upgrade the District's own pumping and transmission pipelines to convey peak flow to the "410" zone, the following additional projects will be ; needed: A second pumping station next to the existing station on Bonita Rd. This station needs to have a 9 mgd capacity. -3 - Extension of the 24 inch line on McDonald across S.W. Pacific Highway to j the 36 inch line on SW Gaarde. \ Total costs associated with these improvements would total - For the year 1991. . . . . . . .. . . . ...$19,136,000 - Between 1997 and 2004. . . . .. . . .... .2,296,000 Total $21,432,000 Alternative 2: Increase Capacity from the City of Portland (Bull Run) Sources Portland's primary supply is the Bull Run River. Present average use by approximately 700,000 customers amounts to about 558 of capacity. It is assumed that Portland could expand its Bull Run capacity for many decades before water availability becomes an issue. The Tigard Water district's distribution system ties to the Portland system at Bradley Corner at the intersection of Hall Blvd. and SW Greenburg Rd. through a 24 inch line connected to the Burlingame Standpipes. The Tigard water District owns a 16 inch transmission line beginning at a meter located along Greenburg Rd. across State Highway 217 to Ash Creek. In order meet projected 1995 needs, the following improvements from Bradley Corner to Greenburg Rd. at Ash Creek have been identified. - Installation of a 24-inch line parallel with the existing 16-inch line from Bradley Corner to Highway 217 and installation of a new pressure regulating vault. - Replacement of the existing 16-inch line beneath Highway 217 with a 24-inch line. - Installation of another 24-inch line parallel with the existing 16-inch { line from Highway 217 to Ash Creek. - Development of a second tie to the Portland water system at Haines Road will require installation of a pressure reducing vault on a 12 inch line near Baylor Reservoirs, and construction of a 12 inch line crossing Interstate 5 in this location. Costs for increasing the capacity from Bradley Corner to the District's 24 inch main on Greenburg at Ash Creek and for connecting to the Portland system at Haines Road are 'estimated at $667,000. In about 1995, about $5,000,000 will be needed for a new transmission system to Bradley Corner to meet the District's forecasted peak demands of year 2010. Thus, the total, assuming the Tigard Water District pays all capital costs for increased supply from Portland is $5,667,000 for construction. Alternative 3: Joining the Joint Water Commission (JWC) A third supply option under consideration involves joining the 'Joint Water Commission composed of Hillsboro, Forest Grove, and Beaverton. The technical report included in the appendix describes in detail the facilities associated with developing a supply from JWC In outline, these include a 14 mgd raw water R intake, a 14 mgd treatment plant,' a 20 mg water tank, and various new pipelines. ' The total capital costs associated with these improvements is estimated at $37,860,000 and does not include any value that the JWC may set on the'facilit.ies now in place. Alternative 4: Acquiring Water From the Willamette River at Wilsonville A fourth supply option is the Willamette River at Wilsonville. Of the four potentially available sources under consideration, this option would have the most complicated requirements for treatment because of the usage of the watershed j -4- 4 upstream of the intake. Four facilities would be needed to develop a supply from the Willamette, with the intake assumed to be near the mouth of Corral Creek, about 1.3 miles upstream of the Interstate 5 bridge -- a 14 mgd intake, a 36- inch raw water pipeline, a 14 mgd water treatment plant and; a finished water transmission line. The total capital costs estimate for this alternative is $29,690,000. In order to evaluate the relative cost of the various water supply alternatives, a levelized cost analysis was undertaken. A levelized cost analysis determines the cost per 100 cubic feet of water assuming that the same rate would be paid over the study period. This analysis showed the two water supply options that appear the most economically viable to the District over the twenty year planning period to 2010 are the City of Lake Oswego and the City of. Portland options. At present, the district is in the process of choosing one water supply alternative. Future supply-related capital improvement projects depend on the option choosen and this is yet to be done. Bull Mountain Area Water Facilities: The Tigard Water District serves about 1,600 persons in the developing Bull Mountain area. The Bull Mountain area of the Tigard Water District includes some 2,800 acres of residential and agricultural land lying between elevations 200 to 700. Of this, about. 2,140 acres are zoned for residential use and the balance of 640 acres lies beyond the Tigard Urban Growth Boundary, but within the District's planning area. At present, the current water supply is adequate to meet existing demand. The Bull Mountain water distribution system and reservoir site are shown on the "Map of Tigard Water District and Vicinity" and also in Appendix "A" . The District's plan for storage and transmission within the Bull Mt. area envisions the development of a water system from the summit downwards through new residential subdivisions to reservoirs located at intermediate levels. In accordance with a master plan developed for this area in 1986 by Gilbert Meigs, Consulting Engineer, a number of new facilities have been constructed and a reservoir site acquired to serve the developing north and northwest sides of the mountain. The findings and conclusions of this report are discussed and updated in the previously referenced"Water Supply &Water Distribution for Tigard Water District" report. As shown in the master plan, two additional reservoirs serving the south side of the mountain are recommended for eventual construction. One 16 inch line and two 12 inch lines also are needed to complete the installation of major facilities.. The location of all facilities proposed for the Bull Mountain Area are based on a three phase schedule recommended by the "Water Supply & Water Distribution for Tigard Water District" report. The phases extend from 1991 to i005-and beyond and total about $5,000,000. Five-Year Capital Improvement Plan The 5-year capital improvement plan adopted May 1991 by the Tigard Water District is included in this report as appendix "B". This plan contains at least two alternative sets of improvements for each of the five years. All of the improvements are proposed to be funded from system development charges. Metzger Water District The Metzger Water District serves approximately 20% of the population located inside the City of Tigard. The City of Portland's Bull Run Reservoir is the source of one hundred percent of the district's water supplies. The district has i -5- , a contract with the City of Portland for supplies through 2005. The storage capacity of the district's reservoir is 8.5 million gallons. The distribution system is gravity feed and consists of approximately 80 miles of cast iron and ductile piping, ranging in size from 48 inches to two inches. A portion of this system is located within Tigard. A standby pumping system is also available. The location of these facilities is shown in the Metzger Water District Facilities Map. A study of the water system in the early 1980's indicated that the system is an average of 18 years old, a relatively young age for a water system, and that it is in very good condition. $4.75 million of general obligation bonds were sold in 1980 and were usad to fund projects to meet water storage and transmission requirements to the year 2010. District projects planned for the next three to five years within the City of Tigard include: 1) Installation of approximately one and half miles of 16" ductile iron water line from the area of SW Locust and 90th Ave easterly to Oak St and terminating at Pacific Highway and 78th Ave, The cost of this improvement is estimated at $500,000. The funding sources are expected to be 508 general revenues and 50% CIP funds. 2) Upgrade of the existing 3" to 6" line running between Pfaffle and Spruce to all 6" line. This involves the placement of approximately 1500 feet of 6" ductile iron pipe. The cost of this improvement is estimated at approximately $33,000. It will be funded half-and-half by general revenues and CIP funds. 3) The extension of a 12" line from SW 69th Ave to Pacific Highway near 78th Ave. This project would be funded by a local improvement district and would cost approximately $40 per foot. The length of the improvement has not yet been determined but is assumed to be in the 3,600 ft. range. The Property owners participating in the LID will pay the cost of the installation. No list of significant facility projects planned for the longer term is available. This is because the Metzger Water District is in the process of merging with the Wolf Creek Water District. -Complete maps of the Metzger and Tigard Water District transmission, distribution-are available 'at the Water Districts' offices to at d at 6501aSW Taylors Ferry Road and 8777 SW Burnham Road respective) yand from Tigard. These maps are incorporated into this report by,reference,the City of SANITARY SEWER The Unified Sewerage Agency (USA) was formed in 1970 with the authority to collect and treat sewage in the rapidly urbanizing portions of Washington County, including all of the Tigard Urban Planning Area. The agency owns interceptor and trunk lines located inside the,City. It also operates the Durham Treatment Plant, which treats sewage from Tigard and other areas within the Fanno Creek basin of east Washington County. An interagency agreement between the City and USA has been in force continuously since the district's formation. A copy of the current agreement and a related "Cities"/USA Coordination Agreement are attached as Appendices "C" and "D", respectively. Furthermore, the Tigard Comprehensive Plan states in policy 7.4.1: -6- ..J .rF "The Cit shall; T Y w a) Develop a comprehensive sewer plan that identifies the present and future capacity needs for a sewage system in the planning area, and probable routes of tuture trunklines. b) Require that future extensions of collector sewer lines shall be consistent Tigard, Washington C orhe City dinances Unified Un ed Sewage Agency (USA) . of (USA) . c) Adopt a clear and concise agreement with USA, implementing the City's policies for extending the availability of sewer services and encouraging the phasing out of septic tanks. The City of Tigard owns and maintains the collection system. With few exceptions, its lines are limited to Tigard's incorporated territory. Presently, the City requires that development be connected to sanitary sewer service when sufficient collection capacity in its gravity sewers are available. Tigard has lines to handle expected future development in each basin. Durham Treatment Plant The wastewater treatment plant was constructed in 1978. The current plan operating capacity is 16 million gallons. In 1990 contracts were let for the construction of a new primary clarifier and raw sludge pumping . When completed in late-1993 these and a series of other planned improvements will increase existing design capacity by 50%. The $22.5 million Durham project is being financed by revenue bonds already issued and by the scheduled sale of $40 million in additional bonds in mid-1991. The bonds are to be retired by service charges the sewerage agency imposes on residents and businesses. i Collection System The City of Tigard Sanitary Sewer Facility Plan is attached as Appendix "E". The plan, completed in 1991, shows how sanitary sewer servicleme is thewill epcurrent throughout the Tigard Urban Planning Area. The plan supe U.S.A. Master Plan. it divides the planning area into 68 service areas. This provides sufficient detail to show improvements required to serve each individual parcel within the study area. According to this plan, the condition of existing facilities is generally rated in good to fair condition. An up s attached as adate index oan "Extensions Required to Provide Service to Unsevered Areas, " is appendix to the Sanitary Sewer Facility Plan. Also included as a map exhibit in the facility plan is a summary of areas that are currently served and not served by sanitary sewer. This map also indicates lines that require additional capacity. These lines will be either replaced or parallel lines will be installed. With two exceptions, the Sanitary Sewer Facility Plan indicates that the planning area can be fully served through local improvement districts or by requiring developers to install facilities. The two locations which will require the expenditure of public funds are indicated on the sanitary sewer plan map exhibit in Appendix "E They include: S.W. McDonald Street Sanitary Sewer: A sewer in S.W. McDonald Street will be installed as part of a street capital improvement project. The ; estimated cost of this project was $165,000 and will be completed in 1991. Industrial Sewer Area: The line serving the area bounded by Pacific Highway, Interstate 5 and Highway 217 has been identified as having _inadequate capacity. Furthermore, a portion of the line is at an adverse 1 -7- grade On!iy a portion of the line below S.W. Hunziker was considered for improvement. If demands significantly exceed those expected, improvements above S.W. Hunziker Street will be considered. The estimated cost of this project is $52,000. The Sanitary Sewer Facility Plan makes four recommendations. First, sanitary sewers should be extended to undeveloped areas as development occurs, with the developer building the sewers. Second, the City should continue its policy of facilitating agreements among property owners in developed but unsevered areas to fund needed sewers. Third, construction of the industrial area sanitary sewer capital improvement project should be completed during the summer of 1991. Benefitting property owners will likely be assessed for the S.W. McDonald St. sanitary sewer. project. Fourth, the need for improvements to provide increased capacity to portions of 17 U.S.A. and City owned lines identified in the report should be determined by a flow monitoring program. U.S.A. should be notified of the need for improvements that are the responsibility of the Agency. No major transmission line improvements in the area are planned by U.S.A. at this time. STORM SEWER The regional stormwater service provider throughout the urbanized area of Washington County is the Unified Sewerage Agency. In response to new water quality standards for the Tualatin River established by the Oregon State Department of Environmental Quality in 1989, U.S.A. has developed a stormwater management program for the preservation of water quality. The plan addresses non-point source pollution, rainfall-related erosion and sedimentation, and flood control. Furthermore, the City of Tigard has entered into an agreement with U.S.A. to address surface water management functions. This agreement is attachedas Appendix "D". The City is responsible for all storm and surface water facilities within the corporate limits of the City except for those specifically identified on the attached Figure 2, 'U.S.A. Maintenance Areas • The "U.S.A. Maintenance Areas" include the floodplain and wetlands associated with the drainage courses. They are, shaded in blue on Figure 2. The City of Tigard Comprehensive Plan policies provide direction as to how storm water management will be addressed. Policies 7.2.1 and 7.2.2 respectively state: "The City shall require as a pre-condition of development approval to development that: a) A site development study be submitted for development in arias subject to poor drainage, ground instability or flooding which shows that the development is safe and will not create adverse off-site impacts: b) Natural drainage ways shall be maintained unless submitted studies show that alternative drainage solutions can solve on-site drainage problems and will assure no adverse offsite impacts; c) All drainage can be handled on--site or there is an 'alternative solution which will not increase the offsite impact; d) The 100-year floodplain as established b y the 1981 Flood Insurance Study conducted by the U.S. Army Corps of Engineers be protected; and e) Erosion control, techniques be included as part of the site development plan." -8 a � r AV rlk, T I G R D i t' S 1& _ _AREAS 7 , B . IScf TIGARD CITY L f V 17 S jI i1 # _____ - TICARD AREA OF INTEREST t� f ii—! rj ( UPAA } Z Kp m0 BEEF i u.Tta r 0i lel tela B may repro aate- ej lioa eoegilel by the City el P' Tigerl elilitieI Ceegreyhie In%rmetion Syelen (CIS) soliver a. Ielermetlee port t ey.I hen may bo intended to be n el •ith P'cTFlc § N 0 R T H e/dnto.al lechnleel end/sr Iaterpretolire date a determined by the City o1 ligord. ORDINANCE NO. 91-14 NO SCALE (BrusA:) 1 OF 11 (3/29/91) -19jigg"T NOTE: If THIS MICF'lOFL IV AMING S I DR LESS CLE.R / THIS NOT - . TY OF TM ORIGINAL . os az • rtz z toz "sz i�" sz_ zz ,' �r-::or--- �t : rr c1`Aai--r� or s • s a - _ _� � __-, •' x199 9hN _ - se 1� _ ._, ..... .., ... .. .....,.... ,. .., .. _-. ,t, � C S . A 50 Few A I _tiTENA CE >s f „- - A R E A S ++; ° 1 (# ie 1 1tA [ dilt�iA�CL S, MRAs > • ' — TIGARD CITY LIVITS Illi: Tal" _ — _____. — TIGARD AREA Of INTEREST "77"11 SS UPAA � •� � b1+rKNIt:I.O .�. M dd:� ao may elllTle 01{I lot dote I say ra(trotoolo— „ lice eaq ilei by IIa Ci ly al tiderd ati li=tad Caegraylte lal...om Slala■ (CIS) eel loero. Ialorwatioe �ertroyad Toro way Do .a. ad le Io noel Bill OTf1G g N O R T H and/or Interpretative To dote a da leswined by the City of Tigard. ORDINANCE NO. 91-14 NO SCALE (MP USA2) 1 OF 11 �a NO i r 7jr - __ IT r. NOTE• If fid13 . tMED�"�'• ---- - _.__.,_ --------" - -- -- _. Z7 TL .. -. ._. : :,. ... ,.,: •,-_ ,. ,. .. ,- .... -,.. M1 , 1. ., ,.. .. r, .., c. v .� �,.:. h:- rte. I _ . Ort.-_ xl� r_.. aa. �.,.. .�.-: Sim 1 ,..,as ...-.:, .. - i 1011, IM M. IMM Mr w r ti £ `. _ - - ,,, z mak.x•,i'�i^x The Citi of See NfFS es 4 •• � � � .� iaet of page Comprehensive Plan ,I Transportation SEE MOTET Ya s LM a t [. icht 1#zi t ti �� � Corridor SEE NOT 4 S t u d' Area Study Area 1 E E 2 . E S . EE TE 3 . ' SEE p - Arterial a•... Y a ' o r 1w sift,— 4 Collector M i a o r Collector ® Freeway Interchange Digital /ala t ■al r , aeala— �' ra ties eaergilal /T Uae CreitT et t Tlgarl etillxieq Caogra�lic sy.t.e w s) 1 a.11au e. lot IerltaTN Aae •af la Ordinance N o . 9-1 -13 ialuerdei lle lead ai th N O R T H a/I�tiou l teehiel and/or Interyr:t:tiee a p adopted J u n e 1 1 , 1 9 9 1 data o. delerrained 1r the Cil) et ]igerd. See back for revision schedule (wrTwws) N E /dq (3/19/91) ORDINANCE NO. 91-14 2 OF 11 : �Q D�28 it£ts3,1:LE t a _ t �7YE dtI0r11A1. t _ . , I ..rJua x i t I rs r _ s� r Vie! Fr { PlAii TF&ANSFOWATKIN ifiRf'NOTES Map - tffals Thaw avow ars a part of Ow GafvivnviMo P1oa Tr einipe tifew kbp and we Gr/eadss fo poWde dr dkm as to lbw loins aas elvers of teaaspa ,-ik iNeoft aftch are ti Occur Now a w detlplrefws sfmrfy aloes. 1. Sclraft Furry Mous to by d to cvnvW w1h Doom Ava& flow m�pf ra of 00 aNd0wh k*R 481116111106 nedwe1►"M d Daws Road *4 beam a local sunset+Mille a ed4a w tvrmai m at tfrrw northrreet and. IIftd!► aeia tv deleasinw a iwrno oormnsO n bet&** thw W*nrlh 32nd inlwes on and ttr tl ardeM2lst intvesaest A mm oc cmiwckw oo w ion d llowile OWN hm been secomenwouled by Ow I'm 6 a- to Ycuradn Tranvporblibn S1udl/ibpat. An' eamw etbn d mrri+mor -111--ors hes; been eecommse led by NPO df. 3. Appe doWe are shown for Ow ammensions of 132nd Aware* sotAh of 8wnchvlew Tene w. 135th Ave un south of tlttahrut Meet. and Be ch,16rm Tenaow wW d 132nd Awns. These streets we to be designed as oridol colo Pic i vAh a design speed of 25 m.p h,. . a t. Shady anal to dMwmmsne a Pwrair la'm from southbound Pacma Highway (901W).to Main Street,, S Study arae to determine the alignment of (1) a minor collector street connection between 68th Parkway new Red RodrCreek and the Dadnwuth Street extension,and(2)a minor collector street connection between 72nd Avenue at Hampton Street and the Dartmouth Street extension.within the westerly portion of the Tigard Triangle. 6. Study area to determine the alignment of connections between Highway 217, Kruse Way, 1-5 and the Tigard Triangle. .7. Connections between Hunziker Street, Hall Boulevard at O'Mara Street (generally)and Bonita Road. 8. Study area to consider extension of Hall Boulevard southward to connect with Boones Ferry Road in Tualatin for either pedestrian-or vehicular access. ORDINANCE NO. 91-14 r ... 3 OF 11 - ,: - :10?E I�y� 1(71 _.. - ... . .:. �'"•, ` � _:� � °z�: ._ v.. „.:..: . Rr r OP1!E.all r : iGItlM.. ' .. :.. - ., ,,,.. r-7 1$1 NPRIN :�,;• 228" . 11q 77777,77. :A - -_ - _. , .n i r w s r The City of T s T I G A R D a T ? ri -ifet Bus Routes s d ,gare ,..art,.. I t / 1 l �i�!�, .Yt 9i sPir9� ►; - �.�i�' '� :2 `t Z F (i Bus 62 �, ► Bus 78 A identified Bus S t o p s Transit Center °R $ Digital /ala t way ra6naeala- RO tie@ Cewy11e4 by the City of Tlgard Itllixil/ ieagraPlic < I tornetiee System (CIS) F< saftwara, lalerwallea Perlrlyed less way la lalteded to be used with N O R T H tioael to W." on//or In1u.,;to Adate as determiaod by 500000000M the City et Tigord, ORDINANCE NO. 91-14 (YPTRIYET) 4 OF 11 0 3600 (3/21/91) y wo _ — rte. i" . t e`er ,.. , : „;,, , ... s�•• �!. 13 , nn— S , f 1 __. w :. r <. k v i. ,ice f 1 r 111111 W IMP 7777 777 f Ir eAo I'M tri f TIME it AM � i Fid 6 TiGAW AREA STNAPUBWE PATH MAP ` TIED AREA E PEDESTMANAME PATH MAP FtEGiC kAL PEDESTRIANABSUE PATH SYSTEM Plamed mwmwm ..n.nm TIGARD LOCAL PEDESTRIANANKE PATH SYSTEM T Exis ft ..n.ra. f Plamied GREENWAY SYSTEM ' Existing .....� r • r- -......_..__ Planned .�.�.�.... r i r • cw ORDINANCE NO. 91-14 yp. I . : ..;�, If TBIs MICROFI . / -, bRIwINB Is`IE33 'OF INAC _ __----__-___ ---.._ ___.._._.. , , _..-;.. ---�..�-- -__ �,�.. ._.._ .,>-.;a :..�s. _ .,. _:. .,:, � . � ���..->� � •�� :, is ' s • - a a e, s _ . � _._ t ;,gb;Ye va-w:rvf`?y . n .t. rx r9.. P •i•3"1 ♦ �:' - - -i - f !•w Y w1 mm -•Q,C 4;0 r ONO _ 24 ' Ac- 1120 2 tr' 7 { rrawy s>w 23Fi1w Es ...,, sa•ai'M Ems. _' xs• z see Y-a•aEiEaMr+M / i sq ¢ .� •�AEaL Aia2 � • 1011111111111111111111!I! Erf r. 4aE �- R Lt 40 �• AkP1 •fila _ fE 4. ••.. �. q' +oM1 +uiro .00 we eoe* u so me im•.mI'-I01w.N4ipNOz ;>-- -�• - Ar NO +T r J 4 to s/iESsfaiA R[ M• %t / / as WZLLr". r Et Er-oto }rsu •.Ir ms 914Lw as 49mavom -.goo* Ps VOA.Ve • A _ 66 T{tiARD WATER DISTRICT 3 KING C'TY 11iKi' Ix' , BULL MOUNTAIN AREA _ — mac MAJOR EXISTING FACILITIES o soo l000 z000 -- - 12. J 1 in GRAPHIC SCALE-FEET ORDINANCE NO. 91-14 I2' _- _ ®a�a EONOMIC AND ENBINEERme SERVICES ctar-. 6 OF 11 JANUARY I990 { e. If TiiIS 14 --Ilm mama lszTY',OF 1fE ORIGINAL ,... .. .......... .. . . Yaw j - - -- - _. 1' 1 IN 77 llyy -a i • a � - a • _a i r Mir i •4 r6 i _' 4 rir AL - - �s , } • j ` C*Vt ant s %•` _ 1 - •*. x - }q -. s , r: _ /` ♦b0 f�• �� ; ;;�# ,7tD 4s� � � `r ./i f�. � ♦- L i _ .�.�^•_t�:"?s ` ` \ ,.. ..v .t_` rid.. �•. �i � l - �,: s •TIGARD WATER DISTRICT �a� « - n^1' '.l s' D '^ �/ _.ice-..'' �''"�r ••1 .lr ' BULL MOUNTAIN AREA 1� \» - � _ ���' � -''�__ �- Q �`.�• � dam« �:'� l�E �� a * nn." (( y+ �' ;.y��•� t / FIGURE V-2 PROPOSED FACILITES O 500 '000 2000 ORDINANCE NO. 91-14 GRAPHIC SCALE-FEET 7 OF 11 ECONOWC AND EnowEERMG SERVICES +: JANUARY 1890 .. , M'. , 1t 1 ORAtlINfi IJ LESS CLE if i .� ... r J' D - of n�'arucswu i , ow { sC..J' V Y The kk 3 .\\\ "> Wit '= � ��*} NNEU,` _ .. , AON 'mss=•�� ;g r - �\.,_"\�`�v� ..� V, �� as• It 1t mot, It Nil NONN led by the City of Geographic I mERN RIO w INEEN Im Nwm- ZVI portrayed here may be OF�O'Oz lateRdI4 to be lead with . the City of Tiqard� i./� �� 3600 3/15/91). 4.fr#' ...v �!IM1AFru ern. .: r...-... �_ ......->,s -..-,.- ._..-ta•9:•w......... ry r:rN'rrr - ___ _ __ "` t. #eel.ig t, '.'E.. � t .f.. .... .. �' t :... ...{��..- ... ... ...,_ ., .'.:.:.�.,. �•�. .RiY. ERkaY i.Itw rvma". .. -1iLi a-�4S..i. .al .. .,.. � ... _.:.1:. .rr. ... _ ts-♦ _.1.. .i.ii 1. -Ei\w\ ' afisl-:•ls.k 9�ke�»g� ''1��'.�yam'. J� LE j IF 3 ell 10 "A::: M I 'i E7 f IE i' 4 'r _ • i _ s a \\.� \.• \\'\tet ± �= � NIN -444 agem g%'\\M 1.N;i♦���i��iia'r:�,�ss !': 1l✓ � ��'^ - \\♦'S 'ate ''„ ' 'x Alm Wi r i ; ♦� cul^ �:�i` iiir'+ f�..�i�t. � ��, iffulwu�� , irr\\ ��-. •e NM \N: ti i\ . c \��.. :: \\\\\. \.. \\•.\\. nzz r� a ANOW WOMMIL Win cam 11 at 3 121 MLI Z4 • f: E w a; 4 ala, The Cit v D on f Allo I C A } M ITENAtiCE 11 ys&, 1 :i V ryf t ' Ili I STININCE S� st t [ o - TICARD CITY at LINITS 4i Yalu ------ - TICARD AREA OF INTEREST UTTu! U P A A a sumpe"tin.0 !o R fxlr aorta Dfff Cal Tata ! oaf nfrauela- ^ Ilan eeufilad bf 11a Clty el t? ilyord atiliziay coafrofbit lolesMat;on System (CIS) soltaara^ Iatoruatioe fertrafod taro oaf ba ieloe/o/ to ►o aaod aitl �1F1` § N 0 R T R adaltioaal 1etl.ical aed/of letorfntolira .^ Q' +ala a do lorwi nod by 110City of Tigard. ORDINANCE NO. 91-14 NO SCALE (11111fUSA2) 10 OF 11 (3J2f/ft) dlwwwaw-III loll. , ..: ...•_-• .,x 1. �f' NeLAi is • .. -._ .+r' NGiE. IF7NSSNICRDFItf4w+*+y' bRAtIns IS UPS r; nils nor - - _ OF 7F£ ORIGINAL _ _ All. Q!: i ''Y L �. tom` c ~t.. E r - as .. Y - r� .1 NOW P The City of So p J 'Ste MOTE: n T I G R D baeii of page Comprehensive elr P I a n Transportation SEE NOTE M a p F i gare 3 5 . ` - Li ght Rai 1 MIN Corridor SEE NOT 4 `� Study Area Stud' Area E E 2 . E 6 . Arterial EE TE 3 . s _� SEE N Ma ' or Colee tor w M i a o r Collector tMe Freewa Interc ange 1 DigItot dole a mop reproseuto– s tiaa cups IN by The City of yigarI etillxlag geographic l afermsliaa System (G l t roollnro.Ordinance c e No 9 1 -1 3 ` polelaeledrtrayed faro ■ay '�, 7 to be coed •ilh N 0 R T H odditlosel teehaieal an//or intorprotottro Map adopted dune 11 , 1 9 9 1 data as delormiaad by th:pcitef Tigard. See back for revision schedule S) N TE . 0 3600 (3/19/91) ORDINANCE NO. 91-14 - 11 OF 11 rf /4 NDTE.. IF t1i3S MICI6DFI ,_ „` • '�+ i.�.—.` a I n• - nRIWItG IS LESS CLE THIS-Mir OF ME'CRIGINAL IM4.. - - r - — �a ;, l i — . MRbe ` TIM Y l n: _77777777777777:t. :,.e:.. ... :k, i "The City shall: a1 Include in its capital improvements problems in the existingProgram, developed areas; plans for solving drainage b) Recognize and assumeregulat ume its responsibility for operating, Planning Treatment Managamentew208 stems as designated in tha MSD and Plan; and Wastewater C) to Wastewater.all applicable federal and state laws and regulations with respect to The City retains ownership of and maintenanceresponsibility for all public park facilities and public pathways within the "U.S.A. Maintenance Areas." The Fanno Creek sub-basin, or Ti completion in June 1991- According to thearea pu the plan, is scheduled for the sub-basin plan will identify U.S.A.A• Surface Water Management ment Plan The physiographic and climatic characteristics of the sub-basin. Sensitive areas stich as wetlands, creeks, and steep slopes. Hydrologic and water quality characteristics of the sub-basin and develop models for analyzing existing characteristics and predicting impacts of changed land uses. Specific problem areas in each basin with respect to erosion, and sedimentation. - quantity, quality, And analyze the� facilities. capacity and condition of existing surface water Structural and nonstructural alternatives and recommendations for attaining surface water management 4 It is goals and objectives. anticipated that the adoption of the Fanno Creek Sub-Basin Plan will provide much needed regional coordination of the activities of count local jurisdictions, and special storm water utilityP districts. The establishment of arregional solution to basin-wide drainage master Planning it will be incorporated into gheProblems. When the sub-basinrocess will facilitate the subsequent up-dates. Tigard Public Facility plan is completed Y Plan by reference in Cit of Ti and Storm Sewer S ,stem The location of major lines, 7 and minor drainageways in Tigard, culverts, storm sewer man holes, and catch bainsis available at storm ywof Tigard City culverts, Hall. No list Cit of proposed future facility improvements is available. of Ti and Master Draina a Plan The current city-•wide master drainage in 1cur This plan incorporates g pian for the City was Prepared by CH2M Hill and storm-water detention orlon procedures and standards regarding subdivision The study also contained a 'series of recommendations g with recommended flood plain management measures'. increase the flow efficiency of the Fanno Creek floodwa stated that numerous and solutions that would bridges, b::idges, i.e. the Tigard Streetyand No. For example, the study rth Dakota Street are currently below flood e levation decrease the flow of water along Fanno Creek. raising the bridge deck would alleviate much of and these bridges substantially It is suggested in the study that the restricted water flow along h -9- Fanno Creek. It further outlines the requirements and cost for development of an effective drainage management system. In the ren years since this study was completed many of these recommended improvements have been completed. The "Master Drainage Plan -- City of Tigard, CH2M-Hill is incorporated by reference into this report. The report's introductory chapter outlining its purpose is attached as Appendix "F•. Despite the "Master Drainage Plan's" usefulness, many of its recommendaticns have been superseded by U.S.A.'s Surface Water Management Program. Furthermore, the Fanno Creek Sub-basin Study will likely result in additional changes in the way the City manages storm drainage. Several projects in the "Master Drainage Plan" have yet to be completed. Furthermore, the scope and methodologies associated with these projects will likely be quite different than that originally proposed. This is because of the need to conform to current wetland, floodplain, and floodway management regulations. The following outlines areas where additional storm water management is needed. No date has been assigned to these projects. They will, for the most part, occur as development warrants. Fanno Creek Mouth to Southern Pacific Railroad: This length of the stream is subject to inundation from the 100-year flood on the Tualatin River. Southern Pacific Railroad Tracks to Hall Blvd. Management of Fanno Creek flooding is recommended for this stream reach.. Hall Blvd. to North Dakota St. Channel improvements and six bridge replacements are recommended for this reach of the stream. These include: - Replacing the Hall Blvd. bridge. Improving the storm water carrying capacity of the channel 360 feet '... upstream of the bridge 9,740 feet of downstream, and; - Replacing the Main St. , Grant Ave., Tiedeman Ave., Tigard St., and North Dakota St. bridges. North Dakota St. to Scholls Ferry Rd. Management of Fanno Creek flooding is recommended. Ash Creek Recommended Plan Management of Ash Creek flooding is recommended for theientire length of the stream inside Tigard. Summer Creek Recommended Plan Management of Summer Creek flooding is recommended for the entire length of the stream included in the study area. 121st Ave'. Crossing The 121st Ave culvert should be replaced by a bridge crossing to eliminate upstream flooding along Summercrest Dr. if deposition is found to be_occurring ¢' downstream of the existing culvert, a major channel improvement of 1,800 feet is recommended. Tualatin River Recommended Plan Management of flooding along the Tualatin River is recommended for the entire reach of the river that forms Tigard's southern border. -10 x Cast estimates for the recommended drainage improvements are included in the 4 master plan. However, in many cases these cost estimates are not applicable because of the time which has elapsed since they were first developed and the changes that have occurred in storm water and drainageway management practices. The Unified Sewerage Agency currently collects a storm water management fee from the owners of developed parcels to be used for major storm drainage improvement projects and certain maintenance activities. Monies dedicated to transportation projects, such as local bonds and Oregon Highway Division Revenues, may be used to replace bridges. UP-Coming Storm Drainage Projects. In the ten years since the Baster Drainage Plan: was completed, several of the recommended improvements have been completed or scheduled for completion. These include the replacement of 135th Avenue bridge, the planned replacement of the Hall Street and Scholls Ferry Rd. Bridges and the Main St. Bridge. The Oregon Department of Transportation (ODOT) is the funding source for the proposed Hall St, and Scholls Ferry Rd. bridge projects. City of Tigard transportation bond funds will provide the funding source for rebuilding the Main Street Bridge. It is expected that these projects will all be completed within the next three to five years. The estimated costs of the ODOT projects are unknown. The Main Street bridge is estimated to cost $710,000. TRANSPORTATION The location of Tigard's arterial and major collector streets is indicated on the attached Comprehensive Plan Transportation Map, Figure 3. The City of Tigard works closely with the Oregon Department of Transportation and Washington County, and METRO in planning for increased capacity and level of service for the area's arterial and collector network. In this regards, the Tigard ComprehensivePlan Mates in policies 8.1.1 and 8.1.2 respectively: "The city shall plan for a safe and efficient street and roadway system that meets current needs and anticipated future growth and development.." "The City shall provide for efficient management of the transportation planning process within the city and metropolitan area through cooperation with other federal, state, regional, and local jurisdictions. The general condition of the arterial and collector network within the planning area is fair to good. The state, county and city all maintain their respective roadways. The City of Tigard has developed a pavement management program for roads under its jurisdiction and engages in a systematic program of maintenance. Short Term Transportation Projects: 1991-1995 Numerous Tigard area street improvement_projects are listed in the current and proposed Oregon Department of Transportation (ODOT) Six Year Plan (1991-96) . . r ODOT's Six Year Plan for the Tigard area is incorporated by,reference into this report. It is available at Tigard City Hall.' ODOT is the exclusive funding source for all of these except one. The Pacific Highway at Gaarde St. project y assumes City participation. Matching funding is proposed to come from the City's "Major Streets Traffic Safety Improvement Bond Sale."" This $8.5 million general obligation bond that provides funding for improvements to segments of ten major streets in the City was passed by Tigard voters in 1988. The projects were initiated in 1989 and are ongoing. This improvement-program-is anticipated to be finished in 1991. These improvements will solve several of Tigard's street capacity and safety problems. The Road Bond projects are shown on Figure 4. -11- 1 FIGURE 4 CIT OF TOGARD0AQ BOND PROJECTS qcc o e CITY I QF TIGARD TAYLORS FFq�r RO. ` 40 40 LOCUST > o ST. . m SCttoLLS > W', W a �Tm a NORTH DAKOTA ST_ rn PFAFFI_E to 14 t y�1- In y v W. ST �p��ci'C_ N G/VAC CENTER SAARDE Mc00NALD ST_ . . . ST_ t BULL 30NITA fa- RD. RID N of �aliNTA1N J R� Z d U OURHAM RU v R I W � .N_ i s A complete list of anticipated CIP, ODOT, LID, and G.O. bond projects that are j' planned to occur within the next three years is displayed below. ++ Funding Source/ Project Description Timinq Est.Cost Provider 69th Ave/99W Add turn lanes 1991 $150,000 Bond/City Intersection & improve align- ment 72nd Ave/99W Design of new 1991 Design CIP/TIF Intersection intersection Only 97th Ave Add Bike lane 1992 55,000 CIP/ODOT Bike lane and striping Bonita Rd Regrade, add side- 1991 700,000 Bond/City walks, drainage, & street lighting Bonita/72nd Ave Install traffic 1991 110,000 CIP/City Traffic Signal signal Burnham/Hall Signal & turn 1991 130,000 ODOT Traffic Signal lane Carmen Drive RR Reconstruct xing. 1991 10,000 SPRR Crossing Dartmouth/99W Construct inter- 1991 270,000 LID/City Traffic Signal section, ,install traffic signal Durham Road Regrade, add side 1991 2,200,000 Bond/City stalks, st. lights Durham/92nd Install traffic 1991 85,000 CIP/City Traffic Signal signal Durham Rd Hall to Shoulder bikeway 1992 200,000 MSTIP II/ Upper Boones Fry improvements ODOT Gaarde St at Realign to Inter- 1991 850,000 Bond/ODOT Pacific Hwy sect opposite McDonald St. Greenburg Rd _Turn Lanes, Side 1991 2,200,000 Bond/City Sidewalks, Drainage Lighting, ` Hall Bikelane Shoulder bike- 1995 Developmt ODOT/City F Greenburg to way improvements Locust Hall Pacific Shoulder bikeway 1992 200,000 ODOT Hwy to McDonald improve ( -12- Funding { Source/ i Project Description Timing Est.Cost Provider Hall at Washing- Construct left 1991 100,000 ODOT ton Drive turn lane Hall at Oak St Add turn lane 1991 190,000 ODOT & sidewalk Hall at Pfaffle Left turn lane 1991 60,000 ODOT Hwy 217 I-5 to Install ramp 1994 NA ODOT Sunset Hwy metering Main St Bridge Replace bridge 1991 500,000 Bond/City McDonald St. Regrade, add turn 1991 800,000 Bond/City Hall to 98th Ave lanes, walkways, & drainage Sattler St. Reconstruct 1991 65,000 CIP/City pavement Scholls Ferry Road widening, 1991-92 5,800,000 ODOT Murry to Fanno Ck Scholia Ferry Rebuild & widen 1992 7,800,000 ODOT at Cascade RR crossing Tigard Park Transit center 1992 840,000 ODOT/TRI- & nide MET Other City of Tigard Transportation Projects: Several other projects have been identified as necessary to solve safety problems and provide additional cvpacity. Because funding for these projects has not yet been identified, they are classified as taking place in the mid and long range. ' These projects include: 1) 72nd Ave./Pacific Hwy. intersection: Extend 72nd Ave. to Pacific Hwy and revise frontage road. Estimated Cost: $450,000. 2) Grant Ave. Bridge replacement: Replace and widen bridge and approaches at Fanno Creek. EstimatedCost: $520,000. 3) School Pedestrian Improvements: Improve pedestrian facilities on approaches to Twality and.Templeton School (portions of 96th, 97th, 98th Streets and Murdock) Estimated Cost: $340,000. ' 4) Hall Blvd. at Hunziker and Scoffins: Realign'Scoffins to intersect Hall at Hunziker and revise signals. Estimated Cost: $500,000. 5) North Dakota Street Bridge Replacement: Replace and widen bridge at Fanno Creek. Estimated Cost: $570,000. -13- ) i 6) Tigard Street Bridge Replacement. Replace and w^.den bridge at Fanno Creek. Estimated Cost: $510,000. 7) Burnham Street, Between Hall and Main Widen to provide turn lanes; add sidewalks/;street lighting. Estimated Cost: $400,000. 8) Bonita Road, between Fanno Creek and 72nd Ave. Add sidewalks, drainage and street lighting. Regrade to improve sight distance, and replace and widen bridge at Fanno Creek. Estimated Cost: $980,000, 9) 121st Ave., between Walnut St, and Burlheights Dr. Add turn lanes, sidewalks, and street lighting. Estimated Cost: $430,000. 10) Commercial St. between Main and Hall. Reconstruct and widen, Add sidewalks, street lighting and drainage. Estimated Cost: $360,000. Major ODOT I-5 Improvement Projects: The Oregon Department of Transportation has completed preliminary engineering for a project to improve traffic flow and capacity at the interchange between Interstate 5 and Highway 217. ODOT is currently evaluating the impacts of a number of realignment alternatives on traffic flow, adjacent land uses, and other aspects of the environment. Construction is anticipated in 1994. The general areaa of the project is shown by Study Area 6 on Figure 3. City of Tigard Bridge System: An inspection of all the bridges located inside the City was completed by CH2M Hill in 1990. Among other items, the inspection reports included bridge component condition ratings and recommendations for maintenance or repair. CH2M Hill's report did not provide cost estimates for those bridges that need rep!,Ar. These will be incorporated into the Public Facility Plan as they become available. The following is a summary of this report. BRIDGE CONDITION RATINGS Substruc- Super- Structure Bridge Type Dect ture structure Condition_ North Dakota timber 7 7 8 Fanno Creek Tigard St. timber 6 _ _ 6 Fanno Creek Grant St. timber _ 4 6 Fanno Creek Tiedeman Rd. timber 7 4 _ 8 Fanno Creek Bonita Rd. steel/ 8 8 _ 6 Fanno Creek concrete Oak St. steel! _ 8 _ 6 Ash Creek concrete Greenburg Rd. steel/ 8 8 8 6 Ash Creek concrete Source: Oregon Bridge Inventory, 1990 j -14- r h Condition Rating Guide fnt_V c«+O+tw/. Defects S-V"level Action .. B. 9 1 Good None Nprm01 Traffic -None F7 UK Minor defects. No reduction of Record and monho J potential minor repair normal traffic defects b Fair Moderate detects., Adequate for INOnrtOr.add to potential major repair highway traffic repair schedule 1 S Fair Moderate defects. poten Minimal I;;-- Monitor.add to tia't"minor rehabilitation tvhaay traffic repair schedule 4 Poor Major defects. Marginal bdeQuMy Repair as soon major repairs for truck traffic as Possible ' 3 Poor Major defects. Inadeouate support Repair ineinediately 1 member is failing for truck traffic Or restrict trucks 2 Critical iiMajor defects. Inadequate support Repair immediately member has failed for all traffic Or dose bridge t Critical Bndge closed--could be rehabilitated 0 Critical Badgeclosed--beyond repair Mass Transit Facilities: Tri-Met serves the Tigard area with bus service. Bus routes inside Tigard are shown in Figure 5. The City has also identified corridors for the extension of light rail on its Comprehensive Plan Transportation Map, Figure 3. Furthermore the City's Comprehensive Plan states in policy 8.2.1: "The City shall coordinate with Tri-Met to provide for a public transit ' system within the planning area which: a) Meets both current and projected needs for the Tigard Community; b) Addresses the special needs of the transportation disadvantaged; C) Reduces pollution and traffic; and d) Reduces energy consumption In 1988, Tri-Met, the regional public transit agency, completed construction of a transit transfer station on Commercial Street in downtown Tigard. Plans are currently underway for the construction of a park and ride station located at as yet undetermined siteonPacific Highway in Tigard. The size, 'design; and parking capacity of the facility also have not been determined as yet. A summary description of the proposed Tigard Park and Ride is attached as Appendix "F•. The eventual extension of a light rail line is in the conceptual stage. The City of Portland has engaged a consultant to undertake preliminary planning or systems level analysis of potential light rail alignments in the Barbur.Blvd. Corridor between downtown Portland and Tigard. This study will also examine potential light rail service to Washington Square. Tigard Area Comprehensive Pedestrian-Bicycle Pathway Plan The Tigard Area Comprehensive Pedestrian-Bicycle Pathway Plan was first prepared in 1974. It contained a recommended phasing of improvement projects for a City initiated pedestrian-bicycle pathway program. The Pedestrian-Bicycle Plan was { -15- i r updated in 1985 and is included as Figure 6. Future updates of the Pedestrian- AMW Bicycle Plan will be incorporated into the Public Facility Plan as they are developed, The City of Tigard Comprehensive Plan provides policy direction for bicycle and pedestrian facilities. The plan statas in policy 8.4.1; "The City shall locate bicycle/pedestrian corridors in a manner which provides for pedestrian and bicycle users safe and convenient movement in all parts of the city by developing the pathway system shown on the adopted pedestrian/bikeway plan. The pedestrian and bikeway plan is implemented incrementally along with major transportation improvements conducted by ODOT and the City of Tigard. In addition, developers are required to provide for bicycle and pedestrian paths when developing adjacent to a floodplain, city designated greenway, or wetland. Short Term Bicycle/Pedestrian Path Proiects: In addition to bikeways to be constructed as part of street projects, the City will implement five major bikeway projects as part of the Tigard Three Park Levy which was passed by Tigard voters in 1989. The estimated cost of this effort is $364,000. The projects involved include: - Reconstruction of 1.5 miles of Englewood Park Paths. - Connecting Durham Road and Cook Park along 92nd Avenue. - Extending the Path/Finder Genesis Trail approximately one mile., and; - Connecting Cook Park and 113th Avenue. -16- f i t LIST OF FIGURES, APPENDICES AND TECHNICAL REPORTS AND FACILITY MAPS INCORPORATED BY REFERENCE FIGURES 1. Tigard and Metzger Water Districts, 1991 2. Proposed U.S.A. Maintenance Areas, 1991 3. City of Tigard Comprehensive Plan Transportation Map, 1991 4. City of Tigard Road Bond Projects, 1989-1991 5. Mass Transit Routes Inside Tigard, 1991 6. Tigard Area Pedestrian/Bicycle Path Map, 1983 APPENDICES A. Section I: Summary, Section II Flow Rates for Facilities Planning; Water Supply & Water Distribution for Tigard Water District, Economic and Engineering Services, 1990 B. 5-Year Capital Improvement Plan, Tigard Water District, 1991. C. City of Tigard and Unified Sewerage District Agreement, 1990 D. "Cities" and the Unified Sewerage District Agreement, 1990 E. Sanitary Sewer Facility Plan, City of Tigard Engineering Department, 1981 F. Chapter In Introduction, Master Drainage Plan, City of Tigard, 1981 G. Tigard Park & Ride, Tri-Met, 1990 TECHNICAL REPORTS AND FACILITY MAPS INCORPORATED BY REFERENCE Map of Tigard Water District and Vicinity, Tigard Water District, 1989 Metzger Water District Facilities Map, 1990 Water Supply &Water Distribution for Tigard Water 10istrict, Economic and Engineering Services, 1990 Master Drainage Plan, City of Tigard, 1981 Storm Sewer System for the City of Tigard, 1991 Oregon Department of Transportation Six-.Year Plan Y -17 .4 :0.h. l APPENDIX �3 WATER SUPPLY r & WATER DISTRIBUTION FOR :.I TIGARD WATER DISTRICT s� May,1990 Presented by: lEconomic and Engineering Services,Inc. 4380 SW Macadam,Suite 365 Portland,OR 97201 (503)223-3033 I i r SECTION I UMMARY 1. INTRODUCTION Tigard Water District continues to increase its water supply requirements,but its Epnmary supplier, the City of Lake Oswego, is increasingly unable to meet the District's hot weather needs because Lake Oswego,too,has increasing needs for ` ! supply. In response to this situation, and because Lake Oswego now has received an engineering report on expansion of its supply system that could involve the District, the District retained Economic and Engineering Services, Inc. (EES) to prepare this study of future sources, including Lake Oswego and three other alternatives. Additionally, &rowth continues within the Bull Mountain area, and the District included a review of facilities to provide water to and within that area. Finally, long term replacements and reinforcements as well as main extensions to serve new customers has continued in the"410"zone. The District included a review of the mains and storage within this, the preponderant zone within the 4 District,to provide a more complete study of all waterworks facilities. t 2. PROJECT AUTHORIZATION This report isprepared in accordance with the contract made on October 11, �. 1989 between the Tigard Water District and EES. 3. FINDINGS AND CONCLUSIONS 7 A Flow Rates for Supply Planning Flow rates are based on records from 1986 through 1989, with extrapolation t based on population forecasts made by the Metropolitan Service District and Washington County Planning Division through the year 2010. (, Populations,average flows and peak flows recorded and forecasted are: 1 . Average Peak ( Year Population Flow Flow 1987 27,529 3.83 mgd 8.10 mgd ( 1995 36,934 5.50 mgd 12.70 mgd , 2010 45,607 6.80 mgd 15.70 mgd The peak flow forecast for year 2012 made by CH2M Hill for the Lake Oswego "Water System Master Plan" in 1988 is 16.9 mgd,virtually the same as by EES if the 2010 flow is extrapolated for two years. t . , l I 1 ■ B. Water SuoDly Facilities and Capital Costs 1. In the fiscal year 1988/89, the District bought 92.8% of its supply from Lake Oswego and 3.7% from the City of Portland, and pumped 3.5% i from wells at Stations No. 1 and No.2. 2. Basic sources considered in this study and their exposure to raw water contaminants are: Source Owner Famosure Level Clackamas River Cit;f of Lake Oswego Average Bull Run River City of Portland Least Upper Tualatin River Joint Water Commission Minor Willamette River Tigard,if developed Worst (� Regulations being developed by the State and Federal authorities will - 1 ` most likely add to the cost of all sources, but it is impractical to attempt to quantify the cost impacts. I3. Lake Oswego sells surplus water, and in hot weather is unable to fully supply the District. Lake Oswego is considering expansion of its suply system on the Clackamas River to serve (1) only its own needs or (2�its needs and those of the District. The present and proposed point of 4 delivery to the District is the 4.0 mg Waluga reservoir at elevation 320, which is 90 feet lower than the District's receiving reservoirs. The District owns a system of pi lines and a pamping station. on Bonita Road to �... transmit water from Waluga reservoir to the District. The District has been well-served by Lake Oswego for nearly 20 years. Growth within Lake Oswego now has reduced peak surplus water for Tigard to about 4 mgd and the forecast is for no surplus peak supply in 1997. "Scenario 2" of Lake Oswego's Master Plan includes provision for all of the District's needs until 2012 by construction of a new intake,water treatment plant on the Willamette River,pipelines,and pumping stations in addition to expanding existing capacity on the Clackamas where feasible. The capital costs allocable to the District are estimated at: Year Cost 1991 $18,297,004 Between 1997 and 2004 $2,296,000' To enable the District to transmit the expanded supply, another pumping station will be needed on Bonita Road and the 24-inch transmission line will be extended on McDonald Street westerly to Gaarde. The capital costs related to this work are: t Year Cost 1991 $839,000 Realistically, no expenses of these magnitudes will be made until the j I-2 g f t ( District and Lake Oswego make major policy decisions. The first phase probably would extend from 1991 to 1994. Bearing this in Hund, the schedule and total capital costs for a firm supply from Lake Oswego amount to: i Year Total Capital Costs 1991 to 1994 $19,136,000 t Between 1997 and 2004 2,296, Total $21,432,000 If the District were to commit to a long-term supply based on Lake Oswego's sources, then it should become a partner in managing and financing the supply system. 4. Portland's primary water source is the Bull Run River,and it is backed-up by a groundwater supply for intermittent use. There is an adequate supply((, pply at Bull Run, but the future nature and cost of disinfection, Lt impoundment utilization and additional transmission lines are not yet defined by studies now in progress. fThe District is now under contract with Portland to purchase at least 3.6% of its sales from a meter at Bradley Corner. This water is transmitted onward to the District through a pressure-controlled system of pipelines. Portland has advised EES that 6 to 8 mgd now are available at Bradley Comer. The residual pressure is adequate for gravity flow to the 10 mg LL, reservoir on Bull Mountain. Further, Portland states that there is a potential 1 mgd now available on the east side of Highway I-5 at Haines Road and that 3 mgd will be there available in 1993. Portland further states that a new transmission system will be needed to meet the District's forecasted peak demands of year 2010. EES estimates __. that this system will be needed in 1995, although storage utilization and/or conservation may postpone the need for a few years. Costs for increasing the capacity from Bradley Corner to the District's 24- inch main on Greenburg Road at Ash Creek and for connecting to Portland at Haines Road are estimated at $667,000 and would be scheduled for FY91. In about 1995,about$5,Aa0,000 will be needed for a ti new system to Bradley Comer. The allocation of this cost has yet to be made. Thus, the total,assuming Tigard pays all capital costs, for a supply from Portland is$5,667,000 for construction. 5. Hillsboro, Forest Grove, and Beaverton operate a Joint Water Commission that manages treatment, treated water storage, and certain Enear Dilley. Treated water originating in the Tualatin River headwaters, Scoggins Reservoir, and the Trask River Darn is sold by the Commission to its members. Transmission to Hillsboro and Beaverton is by means of pipelines jointly owned by those cities. I-3 t Each member city owns its own water rights to free-flowing and stored i water. Were the District to join. the Commission, it should expect to assist in financing storage at Trask River or at the Mt. Richmond Reservoir site being studied by the U.S.Bureau of Reclamation.' Were the District to join the Commission,it should also expect to finance, initially, 14 mgd of intake, treating, and pumping capacity at the ( Commission's plant site,a 30-inch pipeline about 5,000 feet long from the ( intake through the plant and to a reservoir at elevation 520, a portion of another reservoir at the same elevation, and about 93,000 feet of 42-inch pipe onward to the District's 10 mg reservoir at elevation 470. The capital cost of this first phase is estimated at$35,760,000,including cost of storage at Trask River Dam. Treatment is expected to include pre- ozonation,coagulation,sedimentation,filtration and disinfection. In about year 2000, a 4 mgd addition to intake, plant, and pumping capacity is forecast, at a capital cost of$2,100,000. Thus, the total cost estimate for a supply from the Joint Water Commission is estimated to be about$37,860,000 No allowance is made ` for any allowances for values that might be set on facilities now in place. About 44% of the cost is for pipelines. The route chosen for this study passes near the Wolf Creek Highway Water District and the City of Beaverton. If this alternative is selected for further study,cost sharing of ^'^clines :=.^.th these entities should benefit the estimated cost for the )Figard Water District 6. The Willamette River at Wilsonville has beer,a source of interest to the District since 1973. New questions as to the availability of"free water" have arisen and ever-increasing regulations dealing with contaminants in drinkin& water have clouded the cost of water question. Before any L : design is undertaken, a raw water quality testing program should be implemented. For the District to draw on the Willamette River as a source of drinking water,this study assumes an intake 13 miles upstream of highway I-5 and a 6,500 foot line to a 14 mgd treatment plant west of Dammasch State Hospital. The treatment process of' pre-ozonation, coagulation, sedimentation, filtration and disinfection, would be supplemented with granulated activated carbon beds for synthetic organic removal. Pumps �` at the treatment plant would force water through about 54,500 feet of 36- inch line onward through a route that passes the Cities of Tualatin and Sherwood enroute to the District's 10 mg reservoir. The capital cost of s this first phase is estimated at$26,950,000. In about year 2000, a 4 mgd addition to intake, plant and pumping capacity is forecast at the capital cost of$2,740,000. Thus the total cost estimate for a supply from the Willamette River is estimated to be about$29,690,000. 1 1-4 � I If this alternative is selected for further study,cost sharing of the pipeline capacity with Wilsonville, Tualatin, and Sherwood should benefit the District's costs. C.Ann al Costs of Alternate�,-.- Py- 1. In addition to debt service on capital costs, there are recurring costs for treatment labor, chemicals, in-plant power, for pumping power, and where appropriate,for costs of water purchased. j 2. Debt service is based on uniform annual payments to retire 20-year bonds J bearing 7.5%v interest. Chemical and labor costs vary with the source. Power is based on the current Rate Schedule 32 of Portland General -� Electric. 3. Financial studies yield the following results based on levelized annual costs over the 20 year planning period: City of Lake Oswego $1.158/ccf City of Portland $1.098/ccf Joint Water Commmission $1.723/ccf Willamette River $1.683/ccf We recommend that the District further investigate the City of Lake . Oswego and City of Portland water supply options to determine the most favorable based on cost and management considerations. D.Facilities for the Bull Mountain Area 1. Growth within this area, which is that part of the District receiving internally pumped water, is forecast at 70 households per year. Peak { usage is forecast, for year 2010,,at a rate of about 75% of presently installed internal pumping capacity. Completion of the 12-inch line to High Tor from SAS 132ndd Avenue on the north side of the mountain will k soon be needed. Another 12-inch line, this from Bull Mountain Road to the 12-inch line from S.W. 132nd, should be constructed. Phasing and total costs are: Phase Year Total Cost 1 1991 $126,000 2 1995 $65,000 1 i 1-5 t 2. Within the Bull Mountain area, reservoirs proposed in the 1986 study are still proposed. A section of 16-inch line is needed on Beef Bend Road to connect the lower area of the Barrington subdivision into the "410"zone. �y No additions are needed at High Tor pumping station,but a 12-inch line J from its discharge main to Three Mountains subdivision is needed for ire protection. The 16-inch line proposed in 1986 to a reservoir on S.W. 150th and a 12-inch line on S.W. 150th to Hawkridge Road are still proposed. Phasing and total costs are: Phase Year Total Costs ; f 1 1991 $158,000 2 1995 $1,200,000 3 2000 and beyond $3,363,000 E Improvements within the"410"Zone 1. Few improvements appear to be necessary and are confined to J reinforcements of the water network. 2. In 1986, pipeline improvements to fill Reservoir No. 3 were proposed. This recommendation is continued. Twelve-inch lines around King City, 12-inch lines from Walnut to North Dakota Street and on North Dakota, and a 12-inch line on Scholis Ferry Road from S.W. 135th to Fem are recommended. 3. No further storage at Stations No. 1,2,3,4, or Baylor is recommended in this report,but land recently made available for other use at Station No. 1 should be kept for additional storage in several decades. 4. Phasing and costs are: Phase Year Total Costs 1 1991 $5000 J 2 1995 $591,000 3 2000 and beyond $330,000 t l j r l 1-6 APPENDIX ECONOMIC AND ENGINEERING SERVICES, INC. 4380 S W.Macadam Avenue.Suite 365 Portland.OR 97201 15031 223 3033•FAX(503)274-6248 May 8, 1991 File aY: 60030 Mr. John•Miller Administrator Tigard Water District 8777 SW Burnham Road Tigard, Oregon 97223 Re: 55-year Capital Improvements Plan Dear Mr. Miller: Pursuant to your request, Economic and Engineering Services has prepared the attached 5-year Capital Improvements Plan (CIP) for the District. The CIP contains at least two alternative sets of improvements for each of the five years. In preparing this_CIP,we have employed reports prepared by the writer in 1971, 1986 and 1990 after discussions with District staff to ascertain project work completed within the last year and to ascertain projects that the District expects to be largely financed by property developers. All of the pipeline and reservoir projects proposed will increase the system capacity and thus may be financed from the full System Development Charge(SDC). It is our opinion that the telemetry system, however,may be financed from the reimbursement component of the SDC. The alternatives are proposed so that changes of events may be accommodated and the internal specifics to the CIP may be reshaped as the years pass. In each year, the total CIP cost is the same, regardless of alternative chosen. In order to make the total yearly cost equal, we have adjusted the amount reserved for future reservoir construction. A note on the last page of the CIP contains information on the minimum and maximum accumulation of funds into this reserve. Very truly yours, ECONOMIC AND ENGINEERING SERVICES, INC. Gilbert R. Meigs, P. . Olympia.WA Bellevue,WA Vancouver.B-C Washington.D.0 Porlland.OR CAPITAL,IMPROVEMENTS PLAN Funded from S stem Develo ment Char es 5-Year Plan May 8, 1991 Fiscal Year 1991-92 Estimated p?ect Cost Alternative A Al. Pi eline Extension: S.W. MacDonald Street Hall Blvd. to Pacific Highway, 5,100 feet of $367,200 24" D.I. pipe @ $72/ft Justification: "This is the last phase of the instal- lation of a 24-inch transmission main, paralleling a 16-inch main, (or 30-inch equivalent) from Lake Oswego's Waluga Reservoir to the 10-MG (terminal) reservoir located on SW 125th and Bull Mountain Road. This provides the district with its primary source of water supply, the Clackamas River via the City of Lake Oswego. The City of Tigard plans to widen McDonald this year and this pipeline should be installed prior to the widening. A2. Future Reservoir Site: Purchase 2 acres of land near Mtn. Gate subdivision on Bull Mountain for future 100,0002.5-MG reservoir at elevation 550 feet above sea level z; Justification: An engineering study of 1986 advised that sites for four (4) new reservoirs should be purchased before the land was taken up for houses. This is the last of the four sites to be purchased upon which a 2.5-MG reservoir project will begin FY 95/96. 1 A3. Reserve for construction of future 2.5-MG reservoir to be located at S.W. 141st Avenue, between Beef Bend Road and Bull Mountain Road 36,000 Justification: The district has adopted a policy of paying for needed capital improvements from current revenue. Engineering studies of 1986 and 1990 advised that to keep up with growth, the district must construct a 2.5-MG reservoir near SW 141st on Bull Mountain. This will provide the district with a total of 23.5 million gallons of storage. The reservoir will serve all residents below elevation 350 feet above sea level on the south side of Bull Mountain. The expenditure is too large to accrue in one or two years and this is just the start in savings for that reservoir construction. Total, Alternative A 563 200 i Capital:Improvements Plan, continued 2 1 , 1 Fiscal Year 1991-92 Estimated Pro'". Cost Alternative B B1. Pipeline Extension: S.W. 121st and Walnut Street, from Former to 135th Avenue, 5,600 feet of 24" D.I. pipe @ $72/ft $403,200 _jus*d-ficaton: In the summer time, No. 3 reservoir will not fill because the pipelines serving it are too small. With high growth in this area, along with the requirement that water be pumped from the 132nd Street pump station to High Tor, it is deemed important that this main be installed as soon as possible. Additionally, fire flows are deficient in some parts of the area. The engineering study of 1986 recommended that this main be constructed. If the City defers the MacDonald street project, then this pipeline would be built. B2. Future Reservoir Site: Purchase 2 acres of land near Mtn. Gate subdivision on Bull Mountain for future 2.5-MG reservoir at elevation 550 feet above sea level 100,000 Justification: An engineering study of 1986 advised that sites for four(4) new reservoirs should be purchased before the land was taken up for houses. This is the last of the four sites to be purchased upon which a 2.5-MG reservoir project will begin FY 95/96. Total, Alternative B 503200 Capital Improvements Plan, continued 3 Fiscal Year 1992-93 Estimated Project Cost Alternative A Al. Pipeline Extension: S.W. 121st and Walnut Street, from Fonner to 135th Avenue, 5,600 feet of 24° D.I. pipe @ $72/ft $403,200 Justification: See Project B1 for FY 91/92. If this project is not built in FY 91/92, then it should be built in FY 92/93. A2. Telemetry System: New telemetry system to monitor and record data about all pump stations and reservoirs 150,000 Justification: With the huge growth in the Tigard area it is now impossible to monitor the water system without an updated telemetry system. This system was recommended in the engineering study of 1971. It allows one person to monitor the water system at a glance. Problem areas can be identified immediately and resolved without long lag times. Major leaks and main breaks can be identified and located within minutes, instead of hours. Total, Alternative A MU.200 Estimated Proiect Cost Alternative B Bl. Pipeline Extension: S.W. MacDonald Street, Hall Blvd. to Pacific Highway, 5,100 feet of 24" D.I.pipe @ $72/ft. $367,200 Justification: See Project Al for FY 91/92. If the City of Tigard defers widening until FY 92/93, then this project should be built in FY 92/93. Capital Improvements Plan, continued 4 j z;: B2. Telem,,_.-.;System: New telemetry system to monitor and record data about all pump stations and reservoirs 150,000 Justification: See Project A2 for this FY. B3. Reserve for construction of future 2.5 MG reservoir 36,000 Justification: See Project A3 for FY 91/92 Total, Alternative B 553 200 Estimated Project Cost Alternative C Cl. Pipeline Extension: S.W. Greenburg Road, Highway #217 to Bradley Corner, 4,000 feet of 24"D.I. pipe @ $72/ft ($288,000), including a 36" bore under Highway #217 ($72,000) $360,000 Justification: In the years ahead, the district will have to import more and more Bull Run water from Portland because Lake Oswego has limited capacity to serve both its own citizens and TWD. This 24-inch main will parallel an existing 16-inch main and will allow higher flow rates to be purchased from Portland to meet the demands of the district well beyond year 2000. An equivalent 30-inch main (16-inch plus 24-inch) was recommended in the'engineering study of 1971. This line would be built in FY 92/93 if the City of Tigard cancels MacDonald street widening or if there is a material decrease in the supply for Lake Oswego. C2. Telemetry System: blew telemetry system to monitor and record data about all pump stations and reservoirs 150,000 Justification: See Project A2 for FY 92/93 C3. Reserve for,Construction of Future 2.5 MG Reservoir 43,200 Justification: See Project A3 for FY 91/92 Total, Alternative C &&200 Capital Improvements Plan, continued 5 Fiscal}Lear 1993-94 Estimated Pr— ojyppppp_c4k Cost Alternative A Al. Pipeline Extension: S.W. Greenburg Road, Highway #217 to Bradley Corner, 4,000 feet of 24" D.I. pipe @ $72/ft ($2$$,000), including a 36" bore under Highway #217 ($72,000) $360,000 Justification: In the years ahead, the district will have to import more and more Bull Run water from Portland because Lake Oswego has limited capacity to serve both its own citizens and TWD. This 24-inch main will parallel an existing 16-inch main and will allow higher flow rates to be purchased from Portland to meet the demands of the district well beyond year 2000. An equivalent 30-inch main (16-inch plus 24-inch) was recommended in the engineering study of 1971. If this line is not built in FY 92/93, then it should be built in FY 93/94. A2._ Reserve for Construction of Future 2.5 MG Reservoir 200,000 Justification: See Project A3 for FY 91/92. Total, Alternative A 560 000 Capital Improvements Plan, continued 6 j _ d Fiscal Year 1993-94 Estimated Project Cost Alternative B B1. Pipeline Extension: S.W. Greenburg Road, Highway #217 to Bradley Corner, 4,000 feet of 24" D.I. pipe @ $72/ft ($288,000), including a 36"bore under Highway #217 ($72,000) $360,000 J-.astification: See Project Al for FY 93/94 B2. Pipeline Extension: S.W. 115th Avenue, Walnut Street to North Dakota Street, 3,580 feet of 12" D.I. pipe @ $43/ft 154,000 Justification: This portion of the distribution system lacks a large main through it. Eventually this line would connect to a future 12" line on North Dakota, which would be an extension of an existing 12" line at S.W. 108th and North Dakota. The engineering study of 1990 recommended these lines. B3. Reserve for Construction of Future 2.5 MG Reservoir 46,000 See Project A3 for FY 91/92. Total,Alternative B 560 000 I Capital Improvements Plan, continued 7 } i Fiscal year 1994-95 Estimated Project Cost Alternative A Al. Pipeline Extension: S.W. North Dakota Street,from 108th to 121st Avenue, 3,070 feet of 12" D.I. pipe @ $132,000 $43/ft Justification: This portion of the distribution system lacks a large main through it. This pipeline will connect to the line proposed for S.W. 115th, Project B1, FY 93/94 The engineering study of 1990 recommended these lines. A2. Reserve for Construction of Future 2.5-MG Reservoir Justification: See Project A3 for FY 91/92 418,000 Total, Alternative A 550000 Alternative B Estimated Pro'ect Cost B1. Reserve for Construction of Future 2.5-MG Reservoir550000 Justification: See Project A3 for FY 91/92 CaDital Improvements Plan, continued 8 Fiscal year 1995-96 Estimated Project Cost Alternative A Al. Reserve for Construction of Future 2.5-MG Reservoir $550,000 Justification: See Project A3 for FY 91/92 Alternative B B1. Reserve for Construction of Future 2.5-MG Reservoir $418,000 B2. Pipeline Extension: S.W. North Dakota from 108th to 121st Avenue, 3,070 feet of 12" D.I. pipe @ $43/ft 132,000 Justification: See Project Al for FY 94/95 Total,Alternative B SSO 000 Note on Accumulated Reserve for Future Reservoir At end of FY 95/96, the least amount accumulated is estimated to be $882,000 and the greatest amount is$1,379,200. Accrued interest,if any, is not included. The reservoir is estimated to cost$1,300,000 at the present time. This does not include an allowance for inflation. It thus appears that construction could begin as early as the second half of FY 95/96. "r APPENDIX AGREEMENT THIS AGREEMENT is made and entered into as of the 1990, between the City of — day °f nicipal corporation of the State of Orerred gency of Washington County, egon, reinafter ref to as "City," and the Unified Sewerage A a municipal corporation and county service district, hereinafter referred to as the "Agency. 11 WHEREAS, tha AgAn,;X was duly formed and organized under ORS Chapter 451, has the authority to provide sanitary sewerage treatment facilities, and to provide for storm and surface water management within its boundaries; and City is within the Agency by action of its Council and pursuant to an election duly conducted within the boundaries of the Agency; and _ WHEREAS, City and Agency have the authority to enterinto contracts for the cooperative operation of service facilities ,under + ORS 451.560 and ORS Chapter 190; and WHEREAS, Agency has developed a master plan and a master plan update for sewerage facilities, and a surface water management plan, and is in a- Position to coordinate and unify sanitary sewer treatment facilities and storm and surface water management; and regulation of waste water quality and quantity unto an integrated system for the areas within the Agency; and WHEREAS, City .and Agency for. the cooperative operation Ofrsanitary sewer eservice d into afacilitties, and said -Agreement is in need of amendment to address surface water management functions and other issues; and it would be in the best interest-of_ the Agency and City to consolidate provisions of the original agreement, previous amendments, and additional amendments into a single document. NOW, THEREFORE, in consideration of the covenants and agreements to be kept ,and performed by the parties hereto, it is agreed as follows: Section 1. Definition 'of merms Wherever the following terms are used in this agreement they shall have the following meaning unless otherwise specifically indicated by the context in which they appear. A. Board shall mean the Board of Directors of t governing he Agency, its body. B. Connection Charge means the amount charged for connection to the sanitary or storm and surface water system. C. Council shall mean the City Council, City. governing body of the D. Dwelling Unit (DU) means a separate living unit with kitchen facilities including those in multiple dwellings, apartments, mobile homes and trailers. For nonresidential properties, a DU or Dwelling Unit Equivalent (DUE) shall be determined by Agency Ordinance, and Agency resolutions adopted thereunder. E. Equivalent Service Unit (ESU) is the unit of impervious surface area which generates the storm and surface water runoff equal to a single family residential property, as determined by Agency Ordinance, and Agency resolutions adopted thereunder. F. Impervious Surface Area includes all areas that have been altered from their natural state such that they do not allow the. . infiltration and retention equivalent to that of undisturbed soil._ This shall include, but is not limited to pavement, buildings decks, parking areas, and compacted gravel areas. - G. Industrial Waste means any liquid, gaseous, radioactive or solid waste substance or a combination thereof resulting from any process of industrial or manufacturing business, or from the development or recovery of natural resources. For the purposes of this agreement, Industrial Waste shall also include any substance regulated under 33 USC Sec 1317, together with regulations adopted thereunder. s H. Operation and Maintenance means the regular performance of work required to assure continued functioning of the storm and • surface water system and the sanitary. sewerage system and corrective measures- taken to repair facilities to keep them in operating condition. I Order means Resolutions, Orders and Directives of the Agency prescribing general standards and conditions for construction or use of the storm and surface water facilities and the sanitary sewerage facilities, and rates and charges therefor. J. Permit Application and inspection Fee means fees charged an applicant for permits and .related inspections for connections to the storm and surface water system and the sanitary sewerage system. K. Person means the state of Oregon, any individual, public or private corporation, political subdivision, governmental agency, municipality, industry, copartnership, association, firm, trust, estate or any"other legal entity whatsoever. L. Sanitary Sewerage System means any combination of sewer treatment plant, pumping; or lift facilities, sewer pipe, fotee mains, laterals, manholes, side sewers, laboratory facilities and equipment, and any other facilities for the collection, conveyance, treatment and disposal-of-sanitary sewage comprising the total publicly-owned sanitary sewerage system within Agency jurisdiction, to which storm, surface and ground waters are not intentionally admitted. Page 2 a, M. Sanitary Sewer Service Charge means _ regular c harge to a property owner or occupant of designated premises for the use of the sanitary sewerage system. N. Sewage Treatment Facilily means any facility designed for the purpose of the appropriate treating, holding, disposal, and discharge or reuse of sanitary sewage, including byproducts of such treatment processes. O. Sewage Collection System means any system of pipes, and pumping facilities designed for the collection of sanitary sewage for the purpose of transporting such material to a sewage treatment facility. P. Standards means the standards and conditions of use of the— storm and surface water system and the sanitary sewer system as specified and adopted by the Agency. Standards also shall mean applicable statutes and rules of the United States and the State of Oregon. Q. Storm and Surface Water Service Charge means a regular charge to a property owner or occupant of designated premises for the contribution of runoff or pollution, (as defined in ORS 468.700) , or both to the storm and surface,water system. R. Storm and Surface Water System`means any combination. of publicly owned storm and surface water quality treatment facilities, pumping, or. lift facilities, storm drain pipes and culverts, open channels,- creeks and rivers, force mains, laterals, manholes, catch basins and inlets, grates and covers, detention and retention facilities, laboratory facilities and equipment, and any other publicly owned facilities for the collection; conveyance', treatment and disposal of storm and surface water comprising the total publicly owned storm and surface water system within Agency jurisdiction, to which sanitary sewage flows are not intentionally admitted. S. Storm and Surface Water System Development Fee is -a charge for construction or other activity that cae or ' isiuss kel to cause, an increase from the natural state of storm water runoff quantity or pollution, (as defined in ORS 468.700), or both, to the storm and surface water system. Such fee is for capital improvements associated, with such construction or other activity, and may be a reimbursement fee or a fee for improvements to'-be constructed. Page 3 Section 2. Operating Procedures and Relationships The City agrees to: A. Follow and enforce the orders promulgated by the Agency, and to notify Agency of apparent violations thereof which may require Agency legal action. The Agency, in cooperation with the Cities and the Committee formed in Section 5-C, shall adopt policies, standards, specifications, and performance criteria necessary for the proper and effective operation of the Agency and to comply with State and Federal permits, laws and regulations. B. Refer persons who may require an industrial waste• - discharg,e permit to the Agency. City shall not issue`' any sanitary sewer permit to non-residential customers _ without verification that the Agency has issued an industrial waste permit, or the Agency has determined that none is required. C. Provide notice to and obtain Agency review and approval of plans and specifications as the Agency may require for any addition, modification or reconstruction (other than repairs) of the` s publicly-owned sanitary sewerage system prior .to undertaking work thereon. D. Provide notice to and obtain Agency review and approval of plans and specifications as the Agency may require prior to allowing any addition or construction (other than repairs) of the publicly-owned storm and surface water system to insure conformance to adopted Agency standards, orders, and master plans. E. Obtain Agency review and approval prior to entering into any agreement for the use of the storm and surface water: system or the sanitary sewerage system, other than for issuance of connection permits. F. Inform the Agency in writing not less than 30.days prior to initiating or entering into any agreement for the financing or incurring of indebtedness relating to the storm and surface water system or the sanitary sewerage system. City shall not obligate any'-Agency revenues of the sewer fund or storm and surface water fund, nor shall facilities of the sanitary or storm and- surface water system be obligated for any debt. Page 4 G. Establish in its record a separate account for the storm and surface water program and one for the sanitary sewerage program for the purpose of accounting for connection and user fees collected and received by the City pursuant to this agreement. H. Allow the Agency access at any reasonable time, upon reasonable notice to inspect and test storm and surface water facilities and sewerage facilities within the City. I. Grant the Agency permits from time to time as may be necessary for the installation of storm and surface water facilities and sewerage facilities in the public streets and ways of the City without imposing permit -' issuance fees, provided that the Agency shall adhere to any conditions required pursuant to ORS 451.550(6) . - J. Take such curative or remedial action as and when necessary to maintain that portion of the publicly-owned sanitary sewerage system under the jurisdiction of the City in accordance with prescribed Agency standards, subject, however, to budgetary limitations and to the extent that the City./.may be lawfully authorized to act. K. Follow and accomplish the work program developed.,by _ the Agency for the storm and surface water program for that portion of the publicly-owned storm and surface water system under the jurisdiction of the City as defined in Section 3-A in accordance with prescribed Agency standards, subject, however, to budgetary limitations and to the extent that the City may be lawfully authorized to act. L. To issue no new permit for the construction within, or modification to a wetland, floodway, or floodplain without first receiving the written approval by the Agency to do so.. This paragraph shall not apply to permits issued by City pursuant to a-current ,permit under 33 USC Section 1344(e) , (a section 404 general permit), and within the scope of such permit. M. To pursue when City deems feasible, and appropriate the conversion of storm and surface water facilities from private to public ownership, through the acquisition of easements and other property rights as necessary, for those privately owned storm and surface water facilities which are identified as being necessary or appropriately q part of the public system. Page 5 Section 3. Ownership and Responsibilities A. The City shall be responsible for the installation, construction, operation, maintenance, repair, replacement, and financing; processing of non-industrial and erosion control permit applications; inspection of connections; billing, collection, accounting and recording connection fees, inspection fees, and monthly service charges; within its corporate limits and within the purview of this agreement for the following facilities and functions: 1. Sanitary sewer lines and facilities having a diameter of less than 24 inches, unless otherwise agreed to by the Agency and City. 2. Storm and surface water facilities within the Ci-ty, and the portions of the total work program, to be the - .responsibility of the City are identified and described in the Program Summary and Map, hereby incorporated as Exhibit A. This Program Summary and Map may be modified from time to time by mutual written agreement of the City and Agency. B. The Agency shall be responsible for the installation, - construction, operation, maintenance, repair, 'replac_ement, f and the financing thereof, of all publicly owned storm and l surface water facilities, and sanitary sewerage facilities within the City not identified in Section A above. I•n addition, the Agenoy shall have exclusive jurisdiction over industrial waste discharges with regard to permits, service fees, billings, collection, regulations and enforcement. Upon receipt of any application for an industrial waste discharge permit within 'a City territory, the Agency shall so inform City and shall coordinate with any other applicable development or construction,permits of City. C. The City previously transferred to Agency certain real and personal property of the sanitary sewerage system. The City hereby transfers, assigns and set over to the Agency all of the City's ownership interests in and to the storm and surface water facilities of the City listed in Exhibit A and described in Section B above, as being the responsibility of the Agency. City further transfers to Agency all easements, rights-of-way and permits held by the City with respect to the foregoing but subject to the terms and provisions thereof, to all of which the Agency shall be bound and conform and shall save, hold harmless and indemnify the ;City from any failure to conform thereof, to.the extent allowed by law. City and Agency shall execute. all documents necessary to transfer title to any real property interests by December 31, 1990. Page '6 f Fff With respect to all transfers of fee title to real property, each party shall have the right, at its expease, to perform an environmental assessment prior to accepting title to property. Any terms and conditions prescribing cleanup of the property shall be subject to negotiation of the parties and included in the instrument of transfer of the property. Agency agrees that all of its right, title and interest in any and all facilities transferred to it by City under this subsection shall revert to City no later than six months after A enc discontinues o eration or use of such facility and Agency agrees to execute _�� and all documents necessary to effect such conveyance. D. The City hereby excepts and reserves to itself all interests in real property not expressly to be transfe=resi by this agreement, including all such property utilized in connection with treatment facilities; provided, however, that the City does hereby grant to the Agency consent for the nonexclusive use of such lands as may be necessary to enable the Agency to own, operate and maintain such facilities. E. Agency will not establish local assessment districts within the City, without first obtaining City approval. F. Agency will process applications from City pursuant to Section 2-L for Wetland, Floodplain, and Floodway modifications. Upon review and approval by USA, and Upon request by City, the Agency shall act as a facilitator and liaison for State and Federal review and permit processes. , Section 4. Administration, Operation and Maintenance of Sewerage Facilities City and Agency agree that: A. City and Agency agree to divide revenues collected pursuant to this agreement as follows: 1. To remit payments on a monthly basis, with a report on Agency-designated forms. 2. Payments shall be due upon 30 days of receipt of the revenue by the billing panty, unless the payment has been appealed by the billing party. If the payment has been appealed by the billing party under the dispute resolution process of Section 5, the amount in dispute may be withheld or paid without prejudice to either party. Page 7 3. The Agency Board shall determine and certify annually for the sanitary sewerage program, and for the storm and surface water program, the portion of the monthly service charge, and the portion of the connection charge allocated for each of the following; A. Retirement of revenue bonds b. The portion required for the City system as defined in Section 3-A c. The portion required for the Agency responsibilities 4. City shall remit to the Agency the portion of^ sanitary sewer service charges and connection fees collected, and storm and surface water service charges and connection fees collected, as identified in Sections 4-A-3-a and c, and shall retain the service charge and connection fee revenue identified in Section 4-A-3-b. 5. City may charge and collect a service 9harge or connection fee at a higher rateer DA ESU I _ p than that set by the Agency when the City determines it is needed for the local City system. The City shall retain 100% of these additional revenues collected. Such additional charge shall be consistent with applicable federal rules in order to preserve eligibility for grants and other funding programs. 6. For connection fees paid by "Bancroft financing, the billing party shall remit the portion of each payment collected, including interest on' the ' Bancroft payment, as determined in Section 4-A-3. 7. For permit and inspection fees for private development construction of public storm -and` surface water facilities and sanitary sewer facilities, and for erosion control permit fees, the City shall remit to the Agency a fee to compensate the Agency for its costs for services performed relative to these fees, as prescribed by Agency Order. ` 8. For Industrial Waste fees, Agency shall remit to City twenty percent (20%) of connection, volume, and monthly service charges collected. Agency shall retain one-hundred percent (100%) of the annual permit fee, and any penalty fees,, COD, SS � and other gees that may be assessed.` Page 8 r B. City will institute administrative procedures within a reasonable time to diligently maintain regular billings and collection of fees, adjust complaints thereto, and pursue delinquency follow-ups and take reasonable steps for collection thereof. C. Agency or City Ray at any reasonable time upon reasonable notice inspect and audit the books and records of the other with respect to matters within the purview of this agreement. Additionally, the City and Agency shall prepare and submit to each other a performance report of the storm and surface water functions, and the sanitary sewer functions for which each is responsible. The performance report shall be prepared every 6 months, and shall be provided tc the other no later than September 1 and March l of each _ year. The performance report, for each function, shall address the performance in those areas necessary for permit compliance. D. The City and the Agency may each need extra help from time to time that might be supplied by the other. In such a case; either City or the Aaencv in utilizing the services of an employee of the other shall pay the lending government the employee's salary rate. plus direct salary overhead currently in effect for the time worked. E. Interest shall accrue on late payments at a rate of three-quarters of one percent (0,75%) per month on the unpaid balance. P. The City and Agency may, each at its own cost, install permanent and temporary volume and qua ty`monitoring stations to determine the effectiveness of City and Agency programs. G. The performance. reports from each City will be reviewed by the Committee established in Section 5-C, following the procedure defined in a separate agreement between the Agency and member Cities. Section 5. Other Provisions The City. and the Agency further agree that: A. The Agency will not extend sewer service to areas outside the City except with prior approval of the City where such areas are included in the Urban Planning' Area Agreement between the City and the appropriate county or counties. Page 9 fi ■ B. The City and the Agency will each obtain such insurance contracts as necessary to cover the liabilities of the City and the Agency respectively for the risks and liabilities arising from activities and operations under this agreement. Each party hereto shall cause the other to be named as an additional insured on its policy or policies as to the obligations under the terms of this agreement. in the event that either party chooses to be self insured, that party shall maintain and furnish proof of separately identified and unencumbered reserves for the maximum liability allowed under state law. C. Establish a Committee made up of one representative from Washington County and one representative from each member City within the Agency, which will meet q!sarterly, or more frequently if needed, to review, _ advise, and be heard by the Agency on the standards, ` regulations and specifications, work programs, capital improvement programs, rates and charges, long range planning, and other matters covered by the Agreements with the member Cities. D. At such time as the Agency shall discontinue operation or use of any facilities on City-owned premises,, the Agency shall remove such equipment, facilities or fixtures therefrom within a period of six months after such discontinuance unless otherwise determined by the parties. The Agency shall demolish or remove facilities, the sites thereof shall be left free and clear of all demolition waste and debris. Any environmental clean-up necessitated by Agency operation shall be the sole responsibility of Agency. In the event of cleanup involving acts of third parties, the cleanup costs therefor shall be subject to negotiation-by-the parties. E. City and Agency shall each be responsible for the negligent ,or wrongful acts of its officers, employees, agents, and volunteers, while performing work related., to this agreement. Each party shall be solely responsible for defense, costs or payments arising from legal challen9e,alleging improper use by that party of funds derived from this agreement, or otherwise held by that party. Each party shall be responsible for any liability arising out of its ownership of real property' and interests therein, activities 'governed by an NPDES permit or other air or water. discharge permit issued by competent authority to that party,. and any conduct of that party subject to direct regulation by state or federal authority. 9 Page 10 f F. Nothing in this agreement shall be construed as a _ limitation upon or delegation of the statutory and home rule powers of the City, nom as a delegation or limitation of the statutory powers of the Agency. This Agreement shall not limit any right or remedy available to City or Agency against thir3 parties arising from illegal acts of such third parties. G. Where this Agreement calls for review or approval of a T fee or charge, Agency shall perform such review in a timely manner, shall not unreasonably withhold approval, and shall provide its decision to the City in writing. If, within 30 days of written request by City for approval by Agency, the Agency has failed to provide a written response, the request shall be. _ deemed approved. Section 6 Dispute Resolution; Remedies A. In the event of a dispute between the parties regarding their respective rights and. obligations pursuant to this Agreement, the parties shall first attempt to resolve the dispute by negotiation. If a dispute is not resolved by negotiation, the exclusive dispute resolution process to _ be utilized by the parties shall be as follows: s 1. Step 1. Upon failure of those individuals designated by each party to negotiate on its behalf to reach an agreement or resolve a dispute, the nature of the dispute shall be rendered to writing and shall be presented to the City's Chief Executive officer and Agency General Manager, who shall meet and attempt to resolve the issue. If the issue in the dispute is resolved at this step, there shall be a written determination of such resolution, signed by the City's Chief Executive Officer and Agency General ' Manager, which determination shall be binding on the parties. Resolution of an issue at this step requires concurrence of both parties' representatives. 2 Step 2. In the_event a dispute cannot be resolved at Step 1, the matters remaining in dispute after Step 1 shall be reduced to writing and forwarded to the Mayor and the Chairman of the Board of Directors. Upon receipt of the written issue statement, the Mayor and Chairman shall meet and attempt to resolve the issue. If the issue is resolved at this step, a written determination of such resolution shall be signed by the Mayor and Chairman. Resolution of an issue at this step requires concurrence of both the Mayor and the Chairman. r' Page 11 F f 3. Step 3. In the event a dispute cannot be resolved at Step 2, the parties shall submit the matter to mediation. The parties shall attempt to agree on a mediator. In the event they cannot agree, the parties shall request a list of five (5) mediators from- the American Arbitration Association, or such other entity or firm providing mediation services to which the parties may further agree. Unless the parties can mutually agree to a mediator from the list provided, each party shall strike a name in turn, until only one name remains. The order of striking names shall be determined by lot. Any common costs of mediation shall be borne equally by the parties, who shall each bear their own costs and fees therefor. If the issue is resolved at this step, a written determination -Of. such resolution shall be signed by both parties.. Resolution of an issue at this step requires concurrence of by both parties. In the event a dispute is not resolved by mediation, the aggrieved party may pursue any remedy available to it under applicable law. B. Neither party may bring a legal action against the other party to interpret or enforce any term of this„•Agreement in any court unless the party has first attempted to resolve the matter by means of the dispute resolutio'h of subsection A above. This shall not apply to disputes arising from a cause other than interpretation or enforcementofthis Agreement. Section 7 Effect of this Agreement This Agreement shall supersede all prior agreementsandamendments between the parties with respect to sanitary sewerage and service, storm and surface water management; provided that, except as expressly modified herein, all rights, liabilities, and obligations of such prior agreements shall_continue. This agreement shall be effective upon its execution by both 'parties hereto, and shall continue in effect for 20 years from and after the date hereof. This agreement may be mod f ei ii d only by written amendment. Section 8 Severability In the event a court of competent jurisdiction shall deem any portion or part of this Agreement to be unlawful or invalid, only that portion or part ,of the Agreement shall be considered unenforceable. The remainder of this Agreement shall -continue' to be valid. Page 12 - 4 IN WITNESS WHEREOF, this instrument has been executed in duplicate by authority of lawful actions by the City Council and Agency Board of Directors. UNIFIED SEWERAGE AGENCY CITY OF �� OREGON OF WASHINGTON COUNTY, OREGON By By Charman, Board of Directors 4ayor Approved as to Form: Attest: A PP v Recorder Attorney for Agency i y Attorn y D Page 13 APPENDIX D AGREEMENT THIS AGREEMENT is made and entered into as of the Q6- day of 1990, .between the Cities of Beaverton, Cornelius, res Grove, Hillsboro, North Plains, Sherwood, Tigard, and Tualatin, all municipal corporations of the State of Oregon, hereinafter referred to as "Cities," and the Unified Sewerage Agency of Washington County, a municipal corporation and county service district, hereinafter referred to as the "Agency." WHEREAS, the Agency provides sanitary sewerage and storm and surface water management, and Cities are within the Agency; and WHEREAS, City and Agency have the authority to enter int6 contracts under QRS 451.560 and ORS Chapter 190; and WHEREAS, Agency has entered into agreements with each of .the Cities within its boundary which specify the duties and responsibilities of each party; and WHEREAS, Agency and Cities desire to establish a process to review matters of common concern to the parties, includipg .but not limited to the performance of each City and the Agency-relative to - the requirements of the agreements, matters addressed n Secbion 5-A-5 of the agreements , by means of a review Committee made up of representatives of each City. ..OW, THEREFORE, in consideration of the covenants and agreements to be kept and performed by the parties hereto, it is agreed as follows: Section 1. City committee A. The parties hereby establish a Committee made up-of one representative from each City within the Agency that is a party to this Agreement. The Committee shall meet quarterly, or more frequently if needed. It shall have authority to review and advise the Agency on the standards, regulations and specifications, work programs, capital'improvemeat programs, rates and charges, long range planning, and other matters covered by the Agreements for Sanitary Sewer and Storm and Surface Water Management (Operating Agreements) with the member Cities. B. The Committee shall .also have the authority to review the performance of the Cities as to the work programs and standards of the Operating Agreements. Each City hereby agrees to be bound by the decisions of the Committee, subject to the procedures of Section 2. i C. The agency shall staff the Committee and provide written notice to each City no less than 14 days prior to each meeting. A quorum shall be necessary to transact business, and vote of a majority of the members present is required to act on any matter. All meetings of the Committee shall be open to the public. Section 2. Procedures A. Each City shall prepare and submit to the Agency September 1 and March 1 of each year a performance report of the storm and surface water functions, and the sanitary sewer functions for which the City is responsible under the Operating Agreement. The performance report, for each function, shall address the performance in those areas identified by the'_ Agency as related to NPDES and other permit compliance. B. The performance reports from each City will be reviewed by the Committee. If the Committee determines that a City is not meeting the standards, regulations, or work programs adopted by the Agency, then the affected City shall be notified in,.writing of the deficiencies. The City shall have 60.•afays to develop and submit to the Agency a pian and schedule . to bring the City into compliance with applicable standards. At the next semi-annual review, the _ Committee will determine whether or not the City 'is in compliance. C. If, within 180 days of the Notice of Deficiency, the Committee determines the City has not remedied the identified deficiencies, written notice thereof shall be sent to the Yayor and City Manager. The City shall have 60 days to develop and submit to the Agency a revised plan and schedule to bring the City into compliance. At the next semi-annual review, the Committee will determine whether or not the City is in compliance. D. If, within 180 days of the second Notice of Deficiency, the Committee determines the City has not remedied the identified deficiencies, the Agency,shall assume the responsibility for any portion of.. the program the Agency,determines is necessary to bring the City into compliance. The Agency shall make Appropriate adjustments to,the division of revenue to reflect the change in responsibility. A decision to transfer program responsibility under this section shall constitute an amendment to the Agreement between the Agency and that City. Page 2 fi s t E. The Committee, upon making a finding that a City is out of compliance to the extent that immediate action is necessary, may accelerate the process of Sections 2-B, C. and D. F. In the event the Agency assumes all or a portion of the responsibilities of the City, the Agency shall at a later date, after receiving appropriate evidence that the City is or will be able to remain in compliance, negotiate with the City to return the program responsibilities to the City. The Agency may require payment of funds to reimburse the Agency for system improvements made to bring the City into compliance. G. Nothing in this agreement shall be construed as a .y limitation upon or delegation of the statutory and home rule power, of the City, nor as a delegation or ` limitation of the statutory powers of the Agency. Section 3. Dispute Resolution; Remedies In the event a dispute under this Agreement is not resolved by negotiation the aggrieved party may pursue any remedy available to it under applicable law. i i Section, 4. Effect of this Agreement J This agreement shall be effective upon its execution by all parties hereto, and shall continue in effect for a term of thirty (30) years from and after the date hereof. This agreement may be modified only by written amendment of all the parties. This agreement shall continue upon the legal reorganization or consolidation of any party. Section 5. SeverabS.lity In the event a court of competent jurisdiction shall deem any portion or part of this Agreement to be unlawful or invalid, only that portion or part of the Agreement shall be considered unenforceable. The remainder of this Agreement shall continue to be valid. Y i Page 3 IN WITNESS WHEREOF, this instrument has been executed in 1. duplicate by authority of lawful actions by the City Councils and Agency Board of Directors. UNIFIED SEWERAGE AGENCY CITY OF BEAVERTON, OREGON OF WASHINGTON COUNTY, OREGON By By Chairman, Board of Directors Mayor Attest: Approved as to Form: City Recorder Attorney for Agency City Attorney CITY OF CORNELIUS, OREGON CITY OF FOREST GROVE, OREGON By Ma yL,r Mayr Y Attests Attest: City Recorder City Recorder City Attorney City Attorney CITY OF HILLSBORO, OREGON CITY OF NORTH PLAINS, OREGON By By Mayor Mayor Attest: Attest: City Recorder City Recorder .-'it Y Attorney City Attorney. Page 4 .y CITY OF SHERWOOD, OREGON CITY OF N By By X f �' Mayor a Attest: Attest: W� City Recorder City Recorder v COO ACity Attorney y Attor y CITY OF TUALATIN, OREGON By Mayor test: •., City Recorder x City Attorney Page 5 _ a q AI SANITARY SEWER FACILITY PLAN City of Tigard Engineering Department March 1991 F Y r I x 1. INTRODUCTION The goal of this study is to provide a plan for ensuring adequate sanitary sewer service throughout the City when felly developed. This will require accomplishing the following objectives: - Ensure that lines constructed for new developments can be readily extended to serve other areas within the basin as development occurs; Provide a guide for providifig- sewers to developed but unsewered areas within the study area; Identify portions of the future collection system that should be considered for a capital improvement project; and Determine adequacy of each existing line to meet the demands from the area it serves when fully developed. The plan is for the area described on the City's Comprehensive Plan Map - Land Use, as the Urban Planning Area Agreement. In 1970, the City entered into an agreement with the Unified Sewerage Agency of Washington County that provided that the City would enforce construction standards, rules and regulations, and rates and charges governing the use of and connection to the City's sanitary sewerage system. In turn, U.S.A. agreed to provide trunk and interceptor lines, as well as treatment facilities. In 1985, the U.S.A. adopted the Master Plan Update as its current plan. That plan was an update of the Tualatin Basin water and Sewerage Master Plan prepared for Washington County in 1969. The intent of this plan is to provide a supplement to the U.S.A. plan by dividing the planning area into 68 service areas rather than the 4 sub-basins of the U.S.A. plan that are within the City's Planning Area Agreement. This will provide sufficient detail to show improvements required to serve each individual parcel within the study area. 2 . EXISTING FACILITIES The condition of the existing facilities have been evaluated by inspecting the pipe interiors with a video camera. Nearly the entire system has been inspected as a result of a routine inspection program. Damaged or improperly constructed facilities were repaired as encountered resulting in a system that is generally rated in good to fair condition. City staff has prepared an index map of existing facilities from as-constructed-drawings. The map is continuously revised as as-constructed drawings are received. SANITARY SEWER FACILITY PLAN PAGE 1 r 3 , SYSTEM EVALUATION The system was evaluated by first determining the adequacy of the capacity of existing lines to meet expected demands. Next, the sewer extensions necessary to serve areas currently unsewered were determined. 3.1 Capacity of Existing Lines The U.S.A. Master Plan included an evaluation of the capacity of the larger existing lines within the City. Improvements were recommended to accommodate various extents of development; short term improvements are required for existing development, long term improvements for development expected to occur by 2005, and improvements required for ultimate development. Recommended improvements require that lines with inadequate capacity be either replaced or provided with a parallel line as shown on TABLE 1. The location of the improvement required for expected increased demand are shown on Map 1 by project number. Anticipating the need for these improvements can be best accomplished by monitoring the rate of flow in the manhole immediately downstream of the proposed improvement. By projecting the increased rate of flow, the time the proposed improvement will be required can be determined. Future development at less than expected intensities may eliminate the need for some of the proposed improvements. SANITARY SEWER FACILITY PLAN PAGE 2 f s { TABLE 1 niPROVEMENTS REQUIRED TO PROVIDE ADEQUATE C=VACIT% IMPROVEMENT COST - $ MANHOLE TO PROJECT Replace Parallel With USA COT MONITOR SHORT TERM i 408' of 24" 48" 91,350 - - 2 506' of 12" 18" 38,456 - 3 650' of 10" 12 39,000 2 - 67 4 532' of 12" 15• 29-,792* - 5 820' of 12" 15" 45,920* - 6 113' of 60" 60" 38,307 13 - 9 7 1765' of £0• 48-54" 442,406 - LONG TERM 8 1550' OF 15" 21" 28,490* 35 - 11 9 3774' of 60" 54" 966,144 - 10 2133' of 60 54" 546,048 - 11 4230' of 60" 48" 943,182 12 18 12 1965, of 42" 48" 442,125 14 25 3,469,562 i 181,658 ULTIMATE 13 62' of 66• 54" 13 10 14 222' of 60" 36" Not 12 - 17 Estimated 15 5100' of 60 36-54 2 - 77 16 873' of 60" 27" 34 59 17 160' of 60" 33• 'Currently not in City jANITARY SEWER MASTER PLAN PAGE 3 t Using the criteria shown in TABLE 2, the remaining smaller lines were inspected to determine the adequacy of the lines to meet the expected demands f rom the served areas. Anticipated wastewater flows into the sewer are expressed in gallons per acre per day (gpdd) . The various sources of flows shown are described in the U.S.A. Master Plan Update. Domestic flows are determined by using 70 gallons per capita per day as suggested by the Master Plan and 2.3 persons per housing unit as reported by the Portland State University Population Research and Census Center. The rate of inflow/infiltration is the rate expected of a system in good to fair condition without storm drainage connections. With the exception of the line serving the area bounded by Sw Pacific Highway, Interstate 5, and Highway 217, all of the smaller existing lines have adequate capacity for future expected development. TABLE 2 WASTM&TER SCqu'RcES ZONING gipad ZONING qpad ]ad R-1 161 Commercial 1 000 0 R-2 322 Industrial 3,000 R-3.5 564 Inflow/Infiltration 1, 000 R-4.5 725 R-7 1,127 Residential Peaking factor: R-12 1932 18 + P4 where P is population R-25 4025 4 + P�6 in thousands R-40- 6440 The proposed project to increase capacity of the deficient line is described in the following and is currently a budgeted capital improvement project entitled "Industrial Area Sewer" . SANITARY SEWER FACILITY PLAN PAGE 4 ` 3.2 Recguired Extensions Many areas within the City are completely served and are not in need of improvements except perhaps for the extension of an existing line to serve an individual parcel. These areas are shown on Map 1.. Improvements required to completely serve the other service areas are shown in APPENDIX 1. Unless otherwise shown, the improvement requires the extension of a public 8-inch sanitary sewer to the- area or tax lot indicated. The service area boundaries and proposed extensions are shown on the maps. 3.3 Recommended Cayital Improvement Pro3ects With the exception of the two projects noted below, the planning area can be fully served without publicly financed capital improvement projects. Developed areas may be provided with sewers as shown on the Facility Plan maps with financing provided by Local Improvement Districts specifically formed to construct the sewers. Sanitary sewers for undeveloped and developing areas could be provided by developers as the demand requires. S.W. McDonald Street sanitary sewer - A sewer in S.W. McDonald Street will be installed as part of a street capital improve- ment project. The line will not be functional until it is extended across S.W. Hall Blvd. to the Fanno Creek Interceptor. These improvements will permit abandoning a pump station on S.W. McDonald Street. The estimated cost of the project of $165, 000 shown in TABLE 3 was determined using the Master Plan Update (Engineering News Record CCI of 4600) method and does not include the portion of the line installed as part of the McDonald St. capital improvement project. Moreover, if financing is provided by a Local Improvement District, the cost of adminis- tration of the District should be added. Industrial Area Sewer- The line serving the area bounded by Pacific Highway, Interstate 5, and Highway 217 has been identified as having inadequate capacity. Furthermore, a portion of the line is at an adverse grade, causing a mainte- nance problem because of grease accumulation at a manhole. Only the portion of the line below S.W. Hunziker Street was considered for improvement. If demands significantly exceed those expected, improvements above S.W. Hunziker Street should be considered. Since design and easement acquisition is nearly completed for this project, only a 15% construction contingency was added to SANITARY SEWER FACILITY PLAN PAGE 5 Al i the expected construction cost to determine the total project cost of $52,000 as shown in TABLE 3. The expecten construction cost was determined by detailed estimated quantities rather than the Master Plan Update method.. TABLE_3 PROPOSED CAPITAL IMPROVEMENT PROJECTS Proiect Total Cost S.W. McDonald St. $ 165,000 Industrial Area $ 52, 000 4 . RECOMMENDATIONS A. Sanitary sewer service should be extended to undeveloped areas as development occurs. The sewers should be provided by the developer and installed as described in Section 3 and APPENDIX 1. B. The City should continue its policy of facilitating agreements among owners, in developed but unsewered areas that will fund improvements required to provide sanitary sewer service. As with undeveloped areas, sewer extension should be installed as described in Section 3 and APPENDIX 1. C. Construction of the Industrial Area sanitary sewer capital improvement project should be completed during the Summer of 1991 as currently proposed. The S.W. McDonald St. sanitary sewer- project should depend upon the benefitting 'owners providing the funding. D. The need for improvements to provide increased capacity as shown on TABLE 1 and MAP 1 should be determined by a flow monitoring program conducted by the Wastewater Division.- Each winter; the depth of flow, time, and date should be recorded SANITARY SEWER FACILITY PLAN PAGE 6 s .. L for each manhole shown on TABLE 1. As lines appear to be approaching capacity, the Engineering Department should propose capital improvement projects. The Unified Sewerage Agency should be notified of the need for improvements that are the responsibility of the Agency. SANITARY SEWER FACILITY FLAN RAE 7 a t APPENDIX 1 EXTENSIONS REQUIRED TO PROVIDE SERVICE TO UNSEWERED DEVELOPED AREA AND UNDEVELOPRD A-MMS Service Area Area Served Proposed Improvements 2626999 26DB TL 704 Southeast along swale about 500' in SW Hall Blvd. west of 88th Avenue 26AD TL 3300 500' north on 89th Ave. 3434108 34D TL 100, 101,102 & 400' north in SW 115th Ave., then 107 east and south MH6 in SW 114th P1. 34DC TL 600 MH 8 in SW 113th P1., across from Tigard St. 34CA TL 400 _ 130' east on North Dakota St. to MH 3502083 35CC TL 3300-3900 950, north in Tigard St, at MH 27 at curve. 2BA TL 400, 500 500' SE to MH 45 at intersection of Tigard St. and Grant St. 35CB TL 300, 400 350, northeast along Tiedeman St. to MH 25 at Tigard St. 35CC TL 400, 1100 West across railroad to line proposed to serve 35CC TL 3300-3900 above. 34DD TL 400, 501, About 500' west in Tigard St. 600, 700, 800 3535002 35DB TL 2000, 2100, 250 feet north in 91st Ave. to MH 10 2400, 2500 in North Dakota St. 35DB TL 200, 300 and 250 feet north in 90th Ave. to MH 11 35DA TL 2700, 2701, in North Dakota St. 2800, 2801, 2802, 2803 SANITARY SEWER FACILITY PLAN rFGE 8 , t f 3302010 35DA TL 1500-1800, 1600 feet west and north to MH 59 in ' 3500, 350 Hall Blvd. 0101003 1 TL 800, 1000 800 feet along railroad to proposed manhole of "Industrial Area CIP'. IDB TL 501-506 1,000 feet west and north to Hunziker St. 1BC TL 2100 MH 23 in Huiziker St. 0101010 Rolling Hills Subdivi- 1000 feet in Varns St., 500 feet in Sion 78th Avenue, 300 feet in Fir St. and 1750 feet in Cherry St. to MH41 1DC TL 3300, 35CO3 400 feet in 74th to Cherry St. 3502 1DC TL 3600, 3400, 700 ft. across private property to 3601, 3501 Cherry St. 3601009 36DC, 36DD (between Proposed line for Dartmouth LID, with 69th, 72nd Ave. and 3550 feet in 69th and 72nd Ave., and Atlanta, Dartmouth Clinton and Baylor St. f North and south sides of 800 feet in Duvall St. to Red Rock Duvall St. Creek Trunk line 0101009 72nd Ave. and 650 feet in 72nd "Ave. to proposed Elmhurst St. area line in Dartmouth St. 0101910 Hermoso Park 150 feet of easement to MH near Hwy Subdivision 217. 66th Ave., Baylor/ 67th Ave. to MHs 23,26. Clinton area 63rd Ave. south of 1500 feet in 69th Ave. to MH 30. Dartmouth 70th Ave., Franklin 1500 feet in 70th Ave. to MH 9 in to Hampton St Hampton St. Beveland St., east 600 feet to proposed Hermoso Park of 72nd Ave. line. Gonzaga St., east 550 feet to MH 31 near 72nd Ave. of 72nd Ave. 68th Ave. at Gonzaga St. 100 feet to 68th or,.r-rTn,Rv SEWER FACILITY PLAN PAGE 9 9 433025 OBRS Heights Subd. 800 feet in 136th Ct. and Walnut St. 135th Ave. extension 1300 feet to Sw 13th Ave. and Walnut south of Wal>.St St- St. Walnut St., west of 350 feet in Walnut St. to 132nd Ave. 132nd Ave. Walnut St., east of 600 feet in Walnut St. to 135th Ave. 135th Ave. 9 TL 200 Three Mountains Subdivision Northwest portion depends upon surrounding development of High Tor Subdivision 4BD TL 1200, 1300, 400 feet in Fern St. to 135th Ave. 1400, 2100, 2300 500 feet to MH 50 on 129th Ave. 4AD TL 2400, 2500, 2600, 2601, 2800 400414 TL 500, 502 650 feet (400 feet in easement) to 132nd Ave. i Entire Svc. Area Extend existing 10-inch line crossing 434110 Walnut St. 404998 Undeveloped Bull Mtn. 500 feet to Woodside village Apts. Fern St. along north 900 feet along north property line and 1250 feet in Fern St. to proposed and south sides line for Bull Mtn. Scholls Ferry Rd. (BPA easement 404999 Entire Basin crossing required) . 6250 feet in 121st Ave., Walnut St., 0303041 Entire Basin north to MH 42; 5400 feet from Walnut to Fonner St., Howard Dr., and James Ct.; 1280 feet in Carmen Park Subdivision; 1200 feet in Alberta, James, and Marion Sts.; 1000 feet in Anne St. to dine in 116th Ave. 0302015 Derry Dell Ct. 1200 feet in Derry Dell Ct. to MH 34; 280 feet in Park St.', to MH 87. SW Fairhaven 1300 feet in 114th St., Fairhaven St., Ct., to MH 53; 1200 feet in Fairhaven to MH 53, and 800 feet on Fairhaven Way to MH 66. PAGE 10 SANITARY SEWER FACILITY PLAN Rose Vista Dr. 950 feet to MH 16. Gaarde St. 450 feet to MH 13 and 550 feet to existing 10• 117th Ave./ 2000 feet in easement to MH 13, and 114th Ave. 800 feet in 114th Ave. to MU" 1. TL 3500, 3400 500 feet in szeement to MH 23. Pathfinder Ct. 600 feet to MH 11,, Fonner/Erroll St. 3050 feet (540 feet in easement) . to MH 40. 106th Ave.! 600 feet to MH 12. Johnson St. South of Walnut St. 700 feet in Walnut, 550 feet in and west of Tiedeman easement (requires further study) . St. 202026 Edgewood St. 4570 feet (300 feet in easement) to MH 29. O'Mara St. 880 feet to MH 31, Chelsea Loop and 500 feet to MH 45. 0202027 Ash St., northeast 350 feet to MH 66. of Garrett St. 0202078 Watkins St. 2,000 feet to MH 41 2CB TL 1400, 1500, 350 feet in Park St. to MH 13. 1600 102nd Ave. and 650 feet to MH 28: Hillview St. Canterbury St. and 850 feet to MH 3. 103rd Ave. View Terrace and 1450 feet (650 feet in easement) 100th Ave: 0202028 McDonald St. from Hall 2850 Feet in McDonald St. installed Blvd. to O'Mara Street. as part of a street capital improve- ment projects 1400 feet in an-ease- ment, 1350 feet along the Hall Blvd. Sa.°arm vv SEWER FACILITYPLAN PAGE 11 a 87th Court 150 in 87th Ct. and 300 ft. i.,► an easement 93rd Ave. & Elrose Ct. 1000 feet in Mountain View and 93rd and 500 feet in an easement from Elrose Ct. to McDonald. 0101015 Continuation of line 850 feet from SW Hall Blvd. to Fanno serving all of area Creek Interceptor. 0202028 1112036 Unserved portion currently being considered for development. dj/cNB:ssmfp.GNB y PAGE SEWER rh TL RlJ PLAN 9 1 1L 3 i APPENDIX DI MASTER DRAINAGE PLAN CITY OF TIGARD I J Prepared by: CH2M HILL, Inc. 1 P12298.AO July 1981 w 274H 1 i l ®® Chaptex 1 INTRODUCTION >� Master drainage planning involves a broad planning process for urban drainage and flood control that will assist the City of Tigard in achieving its stated goals and policy objectives. Implementation of the drainage plan should reduce the public cost for storm sewers, channels, culverts, ' and bridges and lower the costs for maintenance and rehabilita- tion following floods. The drainage pan identifies both existing and future drainage problems. The goal of the master plan is to eliminate those problems through a defined j implementation process. The master drainage plan prepares a course of action for implementation and maintenance of urban drainage works through corrective and preventive measures. Corrective measures seek to mitigate flood damage potential that has been created by the urban development encroaching on the natural flood plains. Preventive measures are achieved through flood-plain management with the objective of reducing both minor and major storms' damage potential before future development can encroach on the flood plain. Master drainage planning for the urban drainage network is based on the premise that two separate and functionally distinct drainage systems exist. The first, or minor, system accommodates the storm runoff expected once every 2 to 10 years. It consists of property line swales, streets and gutters, storm sewers, and smaller open drainageways. It provides convenience drainage, reduces street maintenance costs, and directly affects the orderliness of an urbanized area. The second, or major, system handles runoff from 1 the 100-year storm runoff event in order to prevent loss J of life and major damage. Storm rur_off follows the major drainage system route during a major storm, ,whether or not the route is planned or development is wisely situated vela -T� tive to that 'route. The 100-year storm is studied to ensure compatibility with state and Federal flood-plain manage- ment policies, although facilities may, in some cases, be designed for lesser events for economic reasons. In these cases, the effect of the 100-year storm is considered when assessing the impact of the improvements. aThroughout this report, "existing conditions" refers to the conditions in 1979, 'when both the COE's and CH2M HILL's hydrological studies were conducted. "Future con- ditions" refers to projected conditions of development or land use in the year 2000. 274A 1-1 i The management strategies developed in this plan are for open drainageways because they provide the basic outlet for bath minor and major stormwater in each drainage basin. If the open drainageways are not preserved or improved, they will not be able to handle increased amounts of storm- water runoff, which can be expected as further urbanization takes place. The planning effort in this study has concen- trated on the drainage system of Fanno Creek and its two major tributaries, Ash Creek and Summer Creek. However, Many of the plan recommendations will be applicable to other drainage systems outside Fanno Creek. In addition, the problems of flooding on the Tualatin River are identified. Many demands are being made on the land and water resources in the Tigard area. These demands are associated with ef- forts to achieve a variety of objectives, such as economic development, local and regional development, transportation, social well-being, and environmental quality. Because land resources are limited, these objectives compete with one another. Those that concern the drainage system will be reconciled through a formal drainage planning strategy that includes: • Identification of the comprehensive goals and policy objectives of the City of Tigard and its surrounding urban growth area • Hydrologic simulation of drainage basins for a range of drainage strategies that reflect existing and expected future conditions of development • Delineation of flood hazard areas • Identification and evaluation of a range of drain- age management alternatives, including corrective and preventive measures - • Recommendation of a proposed course of action the City may follow to implement, legislate, and maintain the drainage system so it serves as a functional system within the total development strategy for the City of Tigard Throughout the planning process there has been an attempt 1 ti combine urban runoff management with other urban systems 1 to enhance the overall urban setting. Many urban drainage systems can accommodate other benefits besides achieving ` the purpose of stormwater management. Systems that are more functional can be achieved economically by integrating the urban systems. Some of the secondary benefits efits realized through an effective drainage program include reduced street construction and maintenance costs, an improved public health environment, lower costs for open space and park areas, and development of otherwise undevelopable land. 1-2 274A The master drainage planning process results in production of a recommended plan for management of the open drainage- =� ways. The plan is a product of engineering and economic studies of the present physical environment and of the ex- pected development changes through the planning period (the next 20 years) . Throughout this planning process, input from municipal of- ficials has been solicited to ensure compatibility of the recommended strategies with the City of Tigard's goals and objectives. 4 I l 4 1 _1 274A 1-3 �t APPKNDIX , G TIGARD PARK & RIDE I. PROJECT DESCRIPTION The proposed project consists of ,design and support sarvices and construction of an approximately 200 space park and ride in Tigard, Oregon. The project would include between 175 - 200 parking spaces, land- scaping, sidewalks, bus stop improvements on Pacific Highway, and lighting. The exact number of spaces will depend on the final design of the lot and the extent to which a water detention feature will be required on the site. Please refer to exhibit 2. The project will be constructed on land provided by the Oregon Department of Transportation. Total UMTA-eligible project costs are estimated at $335,000 for design and construction. A cost allocation plan will be sub- mitted at a later date. A cost breakdown is provided in exhibit 1. II. PROJECT JUSTIFICATION The Transit Development Plan Update adopted by the Tri-Met Board of Directors in 1987 calls for improvements to transit service and facilities in the Tri-Met District, including construction of a Tigard Park and Ride. The Tigard Park and Ride is an important part of Tri-Met's Plans to improve transit service in the 99W Corridor. The Tigard Park and ride would provide an opportunity for current and potential transit patrons to access the trunk line service in this corridor. Today, the lack of transit trunkline or feeder service in the high growth areas north and south of 99W is deterrent to transit usage. The existing Park and ride facility on Barbur Boulevard, approximately 3.2 miles northeast of the site, is over capacity despite recent modifications to increase the number of spaces. A significant amount of unauthorized park and ride activity currently occurs at a number of locations along the 99W trunkline route. These existing riders may be lost as unauthorized park and ride spaces are lost to redevelopment. Expanded park and ride capacity will allow for increased transit ridership and is expected to contribute to the amelioration of growing congestion levels along Pacific Highway. The proposed facility is the outgrowth of a cooperative planning effort (} involving Tri-Met, the Oregon Department of Transportation, and the city of Tigard to provide expanded park and ride capacity in this corridor. E { III. ENVIRONMENTAL DOCUMENTATION An Environmental assessment (EA) was completed in December 1989. Tri-Met enlisted the cooperation of other agencies and jurisdic- tions in the environmental review. The findings of the EA are that no significant environmental impacts will result from the project. A Finding of No Significant Impact is requested from UMTA for the project. IV. PROJECT IMpL.. -TEMPLAN Final design of the Park and Ride lot is expected to commence in August - September of 1990 and extend through March of 1991. The timing of construction will depend on acquisition of the site, which is expected between January and September of 1991, depending on the availability of Federal Highway Administration funds. ` Construction will commence as soon as possible after land acquisition and will take approximately four months. ,Encumberment and Disbursement Data Estimated Estimated Est. Fed. EY Otrs. Encumberments Disbursements FY 1990 QTR. 3 45,000 7,500 FY 1990 QTR. 4 45,000 27,500 FY 1991 QTR. 1 45,000 37,500 FY 1951 QTR. 2 335,000 90,000 FY 1991 QTR. 3 335,000 242,000 FY 1991 QTR. 4 335,000 335,000 Activity Estimated Date Commence Final Engineering 6/15/90 Complete Final Engineering 10/15/90 Advertise for Bid 1/15/91 Award Contract 2/15/91 Notice to Proceed 3/1/91 Substantial Completion 8/1/91 Open to Revenue Service 9/8/91 u; PROJECT BUDGET TIGARD PARK & RIDE Engineering 1. Final Design $ 37,500 2. Construction -Management 17,500 �I Construction ion overhead 10,000 1. Administrat / 2. Site Preparation 16,000 3 Civil 12,000 a. Sidewalks and Roadway 91,000 b. Site paving 1,000 c. Signing and striping f 4. Architectural 3,000 a. Signage 14,000 b. Shelters . S. Utilities 37,000 6. Landscaping 50,000 , . 20% Contingency 48,000 8. Permits and fees _ 2.000 Subtotal 290,000 TOTAL $ 335,000 Exhibit 1 1 EXHIBIT "B" FROJECT TITLES, LOCATION DESCRIPTIONS AND MAPS ADOPTED AS PART OF THE TIGARD COMPREHENSIVE PLAN AS PER OAR 660»11-045 PUBLIC FACILITIES PLANNING rb/pfptit.rb TIGARD WATER DISTRICT SHORT RANGE CAPITAL PROJECTS WITHIN THE UPA 5%31/91 1. PiAeline Extensions: a) S.W. MacDonald Street/Hall Boulevard to Pacific Highway. Alternative: Pipeline construction from S.W. 121st and Walnut Street, from Ponner to 135th Avenue.' b) S.W. Greenburg Road, Highway 217 to Bradley Corner. c) S.W. 115th Avenue, Walnut Street to North Dakota Street. d) S.W. North Dakota Street form 108th to 121st Avenue. 2. Future Reservoir Site: Acquisition of property near Mountain Gate Subdivision on Bull Mountain for future reservoir. METZGER WATER DISTRICT SHORT RANGE CAPITAL PROJECTS WITHIN THE TIGARD UPA 5/31/91 1) Pipeline Extensions: a) Installation of a new pipeline from the area of SW Locust and 90th Ave easterly to Oak St and terminating at Pacific Highway and 78th Ave. 2) Upgrade of the existing 31, to 6" line running between Pfaffle and Spruce Streets to a larger diameter line. 3) Extension of approximately of a new distribution line from SW 69th Ave to Pacific Highway near 78th Ave. 'It is proposed to install the MacDonald Street Pipeline in conjunction with improvements to MacDonald Street. If Tigard defers the street project then the alternate pipeline extension should be built. i LF CREEK ' F R us\_ - 9 LEAHY H G H VV Y °ti RD Fs D <r�9 FI w,D. T � 4 ARNES qm E 4 R R a ISON S9 NWY Aloha Lu I ¢ RD a� „<f �- RALEIG �i w F A W.D. , ` 6ANEY RD �+ GARDEN - ERF fY 4 ' f?ASSANDEA M E T Z G ERRS F Cooper til w m ¢ Mtn WEIR - m S I OAK ST y - - .D. k. o ¢ tQ '`'yz` ''Q vL3jipCpTA ST' Ck PFAI FL£ 7 .�xrY' yr ^ r £fNe ST ` TILE .S?,,5vk-3. < sella .< ''*.. . . . :9,0,J.. p -•C� - �� � �+�,�� �� ''�'�STs �ry ... '� : . . . � . Q• .C�. ,z S AG RD mg H ¢ � 1 'yu - i�r 8t1tL y q yyy a yj 6 ATI R' SAD : : : . P ~ Ir 1 I BENTS + v AUEIRM RP r v I a P EE _ TRE r BEEF ss1� . . . . W ��� . . : �a. . . Q . . . 'GLENI W TUALATIN . . , iIV I .• a vergrove • a►� LESEAU RDLAND R �.II� •r�`,4y! �i ¢ • _ x �` "x� Ho va a.,, �akt Wass °'fr OS i.1 DYRD EDY SHERW000 +� OVE W. CITY OF OREGC SANITARY SEWER TABLE 1 IMPROVEMENTS REQUIRED TO PROVIDE ADEQUATE CAPACITY KEY IMPROVEMENT COST - $ MANHOLE TO PROJECT Replace Parallel With USA COT MONITOR SHORT TERM - 1 408' of 24" 48* 91,350 - - 2 506' of 12* 18* 38,456 - 3 650' of 10" 12* 39,000 2 - 67 4 532° o£ 12• 15* 2%,792* - 5 820' of 12" 15• 45,920* - 6 113' of 60" 60• 38,307 13 - 9 7 1765' of 60* 48-54* 442,406 - LONG TERM 8 1550' OF 15" 21• 28,490* 35 - 11 9 3774' of 60* 54• 966,144 - 10 2133' of 60 54• 546,048 - 11 4230' of 60" 48" 943,182 12 18 12 1965' of 42" 48* 442,125 14 - 25 ULTIMATE 3,469,562 181,658 13 62' of 66• 54* 13 - 10 14 222' of 60* 36• Not 12 - 17 Estimated 15 5100' of 60* 36-54• 2 77 16 873' of 60* 27* 34 - 59 17 160' of 60• 33" currently not in City ;ANITARY SEWER MASTER PLAN PAIGE 3 R ......__.. . SHORT RANGE STORM DRAINAGE IMPROVEMENT PROJECTS The following bridges are planned to be replaced in the short term: 1) 136th Avenue bridge] 2) Hall Blvd. and Scholls Perry Rd. Bridges ands 3) the Main St. Bridge; The Oregon Department of Transportation (ODOT) is the funding source for the proposed Hall St. and Scholls Ferry Rd. bridge projects. City of Tigard transportation bond funds will provide the funding source for rebuilding the Main street Bridge. It is expected that these projects will all be completed within the next three to five years. LONG RANGE STORM DRAINAGE PROJECTS Master Drainac8 Plan: Clty of Tigard CH2M-Hill Fanno Creek Mouth to Southern Pacific Railroad: This length of the stream is subject to inundation from the 100-year flood on the Tualatin River. Southern Pacific Railroad Tracks to Hall Blvd. Management of Fanno Creek flooding is recommended for this stream reach. Hall Blvd. to North Dakota St. Channel improvements and six bridge replacements are recommended for this reach of the stream. These include: Improving the storm water carrying capacity of the channel 360 feet upstream of the Hall Blvd. bridge 9,740 feet of downstream, and; Replacing the Grant Ave., Tiedeman Ave., Tigard St., and North Dakota St. bridges. North Dakota St. to Scholls Ferry Rd. Management Fanno Creek flooding. Ash Creek Recommended Plan Management of Ash Creek flooding is recommended for the entire length of the stream inside Tigard. Summer Creek Recommended Plan Management of Summer Creek flooding is recommended for the entire length of the stream included in the study arca. 121st Ave. Crossing The 121st Ave culvert should be replaced by a bridge crossing to eliminate upstream flooding along Summercrest Dr. rb\mpfpstdr.rb9 l ( CITY OF TIGARD SHORT AND LONG RANGE TRANSPORTATION PROJECTS SHORT RANGE PROJECTS Pro ect Funding_Source/ Provider 69th Ave./99W Intersection Improvements _ Bond/City 72nd Ave./99W Intersection Improvements - CTP/TIF/City 97th Ave. Bikelane GIP/City/ ODOT Bonita Road Improvements Bond/City Bonita Road/72nd Avenue Traffic Signal CIP/City Burnham/Hall Blvd. Traffic Signal ODOT Carmen Drive Railroad Crossing SPRR Dartmouth/Hwy 99W Traffic Signal LID/City Durham Road Improvements Bond/City Durham Road/92nd Avenue Traffic Signal CIP/City' Durham Road/ Hall Blvd to Upper Boones Ferry MSTIP II/ODOT ' Road Shoulder Bikeway Improvements ,k Improvements to Gaa de "Street/Hwy '99W/ Bond/City/ODOT Intersection Greenburg Road Improvements Bond/City Hall Blvd. Bikelane/Greenburg to Locust ODOT/City Hall Blvd./Hwy 99W to MacDonald Shoulder ODOT Bikeway Improvements Hall Blvd. at Washington Drive Improvements ODOT Hall Blvd. at Oak StreetImprovements ODOT Hall Blvd. at Pfaffle Street Improvements ODOT Hwy 217/I-5 to Sunset Hwy. Ramp Metering ODOT Main Street Bridge Replacement Bond/City i ; SHORT PROJECT$ (continued) Poac ori raves. Macwhald Street ImgrevemeAtsfRall Blvd o 9Sth Ave e Sattler street Improvements CIP/City Scholls` Furry Road Improvements 'to .Panna OD©T Creek �Y Scholls` Ferry Road Improvements at Cascade ODD .: . . Street Tigard Park and Ride.Transit Center DOT/TAI-MET Englewood Park Eike Path Reconstruction Park Levy Cook Park/Durham `Road '92nd Av. Connection Park bevy", Faith Finder and Genesis Bike Path Co::nections Park Levy s: :. .. . ... gym... I►QTG RMG IM 'BOYSMBNTS Project Pu ndincr Source! , Provider 72nd Ave./Hwy 9M 72nd .Ave, Ext,enolon to unknown PACIfic-HWy and rrontage Road improvements Grant Street Bridgs ,Replaeement UnknoWin Improve pedestrian Failitfas on Approaches to unknown Twality and'Templeton Schools Scoffins and Hall Blvd. Intersection unknown Improvements North._Dakota Street Bridge4ement Unknown Tigard Street Bridge Replacement Unknown Burnham Street ImproVementa, Hall Blvd to Unknown Main Street Bonita :Road I,::provements Between Fanno Creek Unknown and 72nd Avenue Fanno Creek Bridge Replacemdnt Unknown 121st Ave Improvements between Walnut Street .Unknown and -Burlheight s Drive t Commercial Street Improvements Between Main Unknown vi Street and: HAIL"Blvd. rblpfptran.imp 4, CQMPREMENSIVR PIAN TF ANSPORTATIQN MAP NOTES Theca no#es area'part of the Comprehensive Plan Transportation Map and are intend ±d to provide direction as t4 the hind and extant Qf transportation Improvements which sre to occur within the designated study areas. 1 Scholts Ferry Road to be realigned to connect with Davies Road, tJport completion of the realignment, the existing roadway east of Navies Road rtrmt with n n,i=de.sa e.terminus at the northwest end. . shall QEtW111t� ��► ,�7N YY 2. Study area to determine a future connection betweenthe Walnut/132nd intersection and the Gaarde/121 st Intersection. A major collector extension of Gaarde7 Street has been recommended by the Northeast Bull Mountain Transportation Study Report. An indirect connection of minor collectors has been recommended by NPO#3, 3. Approximate alignments are shown for the extensions of 132nd Avenue south of Benchview Terrace, 135th Avenue south of Walnut Street, and Benchview Terrace west of 132nd Avenue. These streets are to be designed as minor collectors with a design speed of 25 m.p.h.' . 4. Study_area to determine a connection from southbound Pacific Highway (99W), to Main Street. a F1\ minor rollec:tor street 5. Study area'to determine the aiig iment o. ��, a ••••no - ? connection between 68th'Parkway near Red Rock Creek and the Dartmouth Street extension,'and'(2) a mirror collector street connection between 72nd Avenue at Hampton Street antl the Dartmouth Street extension, within the westerly portion of,the Tigard Triangle. 6. Study area to determine the alignment of connections between Highway 2i 7, Kruse Way, 1-5 and the Tigard Triangle. 7: Connections .between Hunziker. Street, Hall Boulevard at O'Mara Street (generally)-and Bonita Road. 8. Study:area to consider,extension of Hall Boulevard southward to connect w with Boones Ferry Ron Tualatin for either pedestrian or vehicular access. f' . ,