Loading...
Ordinance No. 89-07 CITY OF TIGARD, OREGON ORDINANCE NO. 89- =``t.�A: .."'E 1DO-PT ` w•iNtl mag AND CONCLUSIONS TO APPROVE A COMPREHENSIVE FLAN ., ; AMENDMENT v(CPA 89-01)w AND ZONE CHANGE (ZC 89-02) ir£tvrvSai� L'� PATRICK N. NESBITT ASSOCIATES, INC. (GOLDEN KEY INVESTORS) FOR APPROXIMATELY 3,700 SQUARE FEET OF THE GOLDEN KEY APARTMENTS SITE. Y WHEREAS, Patrick M. Nesbitt Associates, Inc. has requested a Comprehensive Plan Amendment from High Density Residential to General Commercial, and a Zone Change from R-40 (Residential, 40 units/acre) to C-G (General Commercial); and WHEREAS, the Planning Commission reviewed the proposal on February 21, 1989, and recommended approval of the amendments; and WHEREAS, a public hearing was held before City Council on March 6, 1989, to consider the Commission recommendation. 7' THE CITY OF TIGARD ORDAINS AS FOLLOWS: ` Section 1: The proposal is consistent with all relevant criteria as discussed in the February 21, 1989 Planning Division's staff + report to Planning Commission (Exhibit "A"). Section 2: The City Council upholds the Planning Commission's recommendation . for approval of the Comprehensive Plan Land Use Map and Zoning Map Amendment as set forth in Exhibit "B" (map). Section 3: This ordinance shall be effective on and after the 31st day after its passage by Council, and approval by the Mayor. k" PASSED: By UI1 MI ft1Utt5 vote of all Council members present after - being read by number and title only, this day ` ofCL�GGZ 1989. ,. Catherine Wheatley, De uty Reco&er s� APPROVED: This L.� day of 1989. i ! l it r Valerie A. Johnson pgbved as to fo 1t1t e Dpt4 fes_ dj/9145D ORDINANCE NO. 89- G2 Page #' STAFF REPORT AGENDA ITEM 5.1 FEBRUARY 21, 1yS9 - 7:00 P.M. TIGARD PLANNING COMMISSION TIGARD CITY HALL - TOWN HALL 13125 SW HALL BLVD. TIGARD, OREGON 97223 A. FACTS 1. General Information CASE: Comprehensive Plan Amendment CPA 89-01, Zone Change ZC 89-02 REQUEST: For a Comprehensive Plan Map Amendment from High Density Residential to General Commercial and a Zone Change from R-40 (Residential, 40 units/acre) to C-G (General Commercial) for 3700 square feet. APPLICANT: Patrick M. Nesbitt Assoc. Inc. OWNER: Golden Rey Investors 8625 SW Cascade Ave. PO Box 1132 Beaverton, OR 97005 Tualatin, OR 97062 LOCATION: 9050 SW Scholls Ferry Rd. (a portion of WCTM 1Sl 2630, tax lot 1700) 2. Background Information The Golden Rey Apartment complex, of which the subject area is a portion, was developed in the early 1970s. The adjacent Embassy Suites Hotel was developed in the mid 19809. Both developments occurred while their respective parcels were still under the jurisdiction of Washington County. These parcels and adjacent parcels were annexed to the City of Tigard in April, 1987. No land use applications regarding these parcels have been reviewed by the City since annexation. 3. Vicinity Information The area surrounding the subject area is zoned C-G (General Commercial) and is developed with a variety of commercial uses except for the remainder of the affected parcel which is zoned R-40 (Residential, 40 units/acre). Th® remainder of t:" subject., .Q suu,�:c piasdel is developed with the 83 unit Golden Rey Apartments. The parcel immediately north of the subject area is developed with the Embassy Suites Hotel except for area abutting the subject area. This portion of the Embassy Suites development is currently vacant. 4. Site Information and Proposal Descrintion The 3700 square foot area involved in the proposed redesignation currently is developed with an in-ground swimming pool serving the Golden Rey Apartments. The pool area is surrounded by a,wooden fence. The applicants STAFF REPORT CPA 89--01/ZC 89-02 GOLDEN EERY INVESTORS PAGE 1 EXHIBIT. A request a Comprehensive Plan Map amendment from High Density Residential r to General Commercial and a zone change from a-an 'Residential 40 units/acre) to C-G (General Commercial) for this area. The stated purpose of the redesignation is to allow a subsequent incorporation of the affected area with the parcel to the north with development of an office building to follow which would require City review through the Lot Line Adjustment and Site Development Review procedures. It is important to note that use of this area would not be limited to the stated proposed use as an office building site but rather should be considered available for any use allowed in the C-G zone if the redesignation is approved. 5. Agency and NPO Comments The Engineering Division, Building Division, Metzger Water District, and Washington County Fire District #1 reviewed the proposal and offered no comments or objections to the proposed plan/zone amendment. All reviewing agencies will have an opportunity to review any subsequent development application affecting the subject area. No other comments have been received. B. FINDINGS AND CONCLUSIONS The relevant criteria in this case are Statewide Planning Goals 1, 2, 9, and 10, and City of Tigard Comprehensive Plan policies 1.1.2, 2.1.1, 5.1.4, 6.1.1, 6.6.1, 7.1.2, 7.6.1, 8.1.1, and the locational criteria for General Commercial designated areas (Section 12.2). The staff concludes that the proposal is consistent with the applicable Statewide Goals based upon the following findings: 1. Goal 1 is met because the City has adopted and follows a citizen involvement program which includes review of development applications by the Neighborhood Planning Organization. In addition, all public notice requirements have been met for the subject application. 2. Goal 2 is met because the City has applied all applicable Statewide Planning Goals, City Comprehensive Plan policies, and Community Development Code requirements in review of the application. 3. Goal 9 is met because the proposal would increase the City's developable commercial land base thereby increasing economic opportunities within the City. 4. Goal 10 is satisfied because, although the proposed action would reduce the amount of residentially designated land in the City, the area to be redesignated is greatly affected by the surrounding commercial development and thus is probably not well suited for expanded residential use. Redesignation of the area will not affect the City of Tigard's compliance with OAR Chapter 560, Division 7 - the STAFF REPORT CPA 89-01/ZC 89-02 GOLDEN KEY INVESTORS PAGE 2 G Metropolitan Housing Rule's requirements for new construction mix and l` minimum residential density for new construction since t" parent parcel containing the Golden Key apartments is presently developed and therefore is not considered buildable land in the Comprehensive Plan. The staff concludes that the proposal is consistent with the Comprehensive Plan based upon the following findings: 1. Policy 1.1.2, Implementation Strategy 2 is satisfied because the policies of the Comprehensive Plan are satisfied as described below and because significant physical changes in the neighborhood, as evidenced by the great amount of commercial development surrounding the subject area, have occurred since the site's original residential designation. This growth in commercial development, along with traffic, noise, and other associated impacts, has likely reduced the suitability of the Golden Key Apartments for further residential expansion. Implementation stategy 2 is also stated as Code Section 18.22 040. 2. Policy 2.1.1 is satisfied because Neighborhood Planning organization 8 and surrounding property owners were given notice of the hearing and an opportunity to comment on the applicant's proposal. 3. Policy 5.1.4 is satisfied because the redesignation would not result in commercial encroachment into a residential neighborhood other than a small reduction of the Golden Key Apartment's site. It is unlikely that the change would affect the number of realistically potential dwelling units on the site although the reduced residential area would decrease the theoretical potential by three dwelling units. The apartments have already been adversely affected by surrounding adjacent uses and highways and therefore are probably not well suited for expanded residential use. Encroachment of commercial development is therefore not a significant issue. 4. Policy 6.1.1 is satisfied because the proposed redesignation and subsequent lot line adjustment and office development is not anticipated to affect rent levels or housing opportunities in the Golden Key Apartments. S. Policy 6.6.1 will be satisfied upon future development of the area. Site Development Review provisions will require that buffering and screening bo provided between any future commercial development on the area to be redesignated and the existing apartments. 6. Policies 7.1.2 and 7.6.1 are satisfied because adequate public facility (i.e., sewer, water, storm drainage) capacities exist to serve the site. Any further development will be required to connect with those systems as a condition of approval. Public service providing agencies will be given the opportunity to review any proposal for further development on the site. STAFF REPORT CPA 89-01/ZC 89-02 GOLDEN KEY INVESTORS PAGE 3 7. YJ11Cy cs•l•b 1t3 ndGlua`tou a.v..vuno aYYi..iV..at truce.a... g...^..+ra....d by th- range of uses that would be allowed on the site by the C-G, General Commercial, zone should not exceed the traffic capacities of Hall Boulevard, Scholls Ferry Road, and Highway 217. These arterials will all serve future develoreent on the subject parcel and adjacent p opert ies. S. The applicable locational criteria for General Commercial development are satisfied for the following reasons: a. Spacing and Location The property is not adjacent to other residential property. The locational criteria state that a maximum of two sides of a commercial site may be adjacent to residential districts. This criterion cannot be satis=ied in this situation because the residential area is already surrounded by commercial uses. The proposed redesignation would not alter this situation. In additon, the proposed redesignation would result in an even boundary between the commercial and residential areas which should facilitate development on the adjacent parcels to their maximum potential without needing to provide an inordinate amount of area devoted to buffering as might otherwise be required. b. Access Commercial development on the site will not likely create unacceptable traffic congestion as discussed above with regard to Policy 8.1.1. A traffic analysis study will be required as part of any future Site Development Review for this site. Measures to mitigate traffic impacts of any proposed development may be required. Access to an arterial, Scholls Ferry Road, is available for any development that may occur on the affected area. The area is also served by Highway 217 and Hall Boulevard. Public transportation to the site is available on two access roads leading into the Washington Square Shopping Canter. All access criteria are therefore satisfied. c. Site Characteristics The size of the site,; when combined with the adjacent property to the north, zhould bra adequate to accoamaodate most uses allowed by the proposed Gener_l C- ercial designation. The site is highly visible from Scholls Verry Road and Highway 217. The site characteristic criteria are therefore satisfied. STAFF REPORT CPA 89-01/&C 89-02 GOLDEN KEY INVESTORS PAGE 4 d. Impact Assessment Without an actual detailed development proposal, it is difficult to assess whether the scale of development on a property will be compatible with adjacent uses. However, in the present situation, the site is surrounded by major roadways and commercial development and therefore it is reasonable to conclude that uses which might develop on the site would not be incompatible with the area. Review of any proposed development for the site through the Site Development Review process will assure that compatibility with surrounding uses will be assessed prior to development. In conclusion, the staff rinds that the proposed Plan Amendment from High Density Residential to General Commercial and the proposed Zone Change from R-40 to C-G for the subject 3700 square feet area are consistent with all applicable Statewide Planning Goals, City of Tigard Plan policies, and the locational criteria for General Commercial development. C. RECOMMENDATION To forward CPA 89-01 and ZC 89-01 to the City Council with a recommendation for approval based on the above findings and conclusions. P D Offer APPROVE) BY: Keith Liden istant Planner senior Planner jlh/CPA89-O 1.Jo 1 STAFF REPORT CPA 89-01/9C 89-02 GOLDEN KEY INVESTORS PAGE 5 h ADO .I `l 33 Ar t \ 11200't'go 4 \ I.54 Ac 1200 A-I b y �'T), CID _ 1400 w i 1100 N ° l06Ac � .SP AC. �oJ) rtt • 500Bz ! $ U q / •7,i1� to a .52 Ac. R 800 .53 Ac y ! q w .. o ILI SI .,, rr'a. C r ao A 'So / .e, 1503` o B 4 6° t J.tot; . / ^ 151 Ac °t•JaJT �P $ to °41 1501 k+?t . 51 Ac. R! •q-; q�l 1500 h )t xt�f 8 t\y�tt♦ yJ iq lq Adv i 0,74 40 x r I -----�-4 1000 I . I It sl 0] • / �Slt F 100 --ty� / � a ia�ai�[ — of T! — _ — _ Ifa.00—— _ SF t •�———--—'——— — ,,..11 -I / ! � !o Iso slaw ! W NESS, at Qa o `d 6 sl.�— IMM — I 'a— — — — — —_- t -•�— n csstwws w-ass •'• �'•` `q;4--�- 1 1700 _...w s-.-Te as I:p 00.50 1 PAVAcf LO . ._ AREA Su Ec'r To PL.1t RoviGNArtaij EXHIBIT B o