Loading...
Ordinance No. 88-12 CITY OF TIGARD, OREGON f' a_ ORDINANCE N0. 88-j.;:�_ AN ORDINANCE ADOPTING FINDINGS AND CONCLUSIONS TO APPROVE A COMPREltENEIVE PLAN k AMENDMENT (CPA 88-01) AND ZONE CHANGE } PROPERTIES. (ZC 88-03) PROPOSED BY RIVERWOOD WHEREAS, Riverwood Properties has re from Low Density Residential tc r guested a Comprehensive Plan Amendment neral Commercial, and a Zone Change from R-3.5 (Residential, ;., units/acre) to C-G (General Commercial): and t WHEREAS, tho Planning Commission reviewed the proposal on April 15, 1988, and f recommended approval of the amendments; and f WHEREAS, a public hearing was held before City Council on May 9, 1908, to f consider the Commission recommendation. THE CITY OF TIGARD ORDAINS AS FOLLOWS: Section 1: The proposal is consistent with all relevant criteria as t discussed in the April 5, 1988, Planning staff report to Planning Commission (Exhibit "A")• Section 2: The City Council upholds the Planning recommendation for approval of the Comprehensive Plan ttLand"Use Map and Zoning Map Amendment as set forth in Exhibit "B" (map). Section 3: This ordinance shall be effective on and after the 31st day after its Passage by Council, and approval by the Mayor. PASSED: By L),V A1z1y C_)u vote of all Council members present after being read by number and title only, this `Cj-,�1i day t of --t:?23 1988. — Cat BrineWheatley, Depu 'y ReWordeG� APPROVED: 'This clJ day of 1988. s T T Thort�as M. Brian, Mayor �' `•"- 6 T A roved as to fo t' ty Attdr•ney E E ke/4n72D i ORDINANCE N0. Page 1 �r a STAFF REPORT AGENDA ITEM 5.1 April 5, 1988 -.7:00-P.M. TIGARD PLANNING COMM18SION TIGARD CITY HALL - TOWN HALL 13125 SW HALL BLVD. TIGARD, OREGON 97223 A. FACTS 1. General Information CASE: Comprehensive Plan Amendment CPA 88-01, Zone Change ZC 88-03 REQUEST: For a Comprehensive Plan Map Amendment from Low Density Residential to General Commercial and a Zone Change from R-3.5 (Residential, 3.5 units/acre) to C-G (General Commercial) for approximately 5.7 acres. APPLICANT: Riverwood Properties OWNER: Same 3483 River Road N Salem, OR 97303 LOCATION: 11630 through 11965 SW 79th Avenue (WCTM 2S1 36CD, tax lots 2300, 2400, 2500, 2600, 2700, 2800, 2900, 3000, 3100, 3200, 3300, 3400, 3500, 3600, 3700, 3800, 3900, 4000, and 4100). 2 Background Information No previous land use applications have been reviewed by the City regarding these particular properties with the exception of a request for a variance to the required corner yard setback for a garage located i at 11850 SW 79th Avenue (V 6-78, Wooden). The request was approved by the Planning Commission. yj f 3. Vicinity Information The parcels are located in the southeast quadrant of the intersection of Highway 217 and Pacific Highway. Two small parcels located just northwest of the subject properties and located on the same side of Pacific Highway are zoned C-G, General Commercial. A veterinary clinic is located on one of these parcels. The other, parcel is undeveloped. Properties to the east and south of the subject properties are vacant, undeveloped !arid zoned C-G (PD), General Commercial with a Planned Development overlay. Properties to the north across Pacific Highway are zoned C-G and C-P (Professional Commercial) and are developed with a variety of commercial uses. Parcels to the west across Highway 217 are also zoned C-G and are developed with various commercial uses. 4. Site Information and PCOposal DescriP_tion The subject properties are all occupied by single family residences. The applicant proposes that the Plan be amended to redesignate the parcels to General Commercial and to rezone the parcels C-G. The applicant has entered into a development 'agreement with the adjacent property owner to the east to proceed with a retail development proiect involving that property as well as the subject properties should the plan/zoning amendment proposal be appru_ed. STAFF REPORT - RIVERWOOD PROPERTIES: CPA 88-01 and ZC 88-03 - PAGE' 1 I Access to the subject parcels is provided by 79th Avenue, a dead end, local street. Access to SW 79th Avenue is' provided by 'Pacific Highway, an arterial with four travel lanes and continuous -left turn -lane. t_. Traffic signals are located at the intersection of Pacific. Highway and the Highway 217 access ramps. 5. Aaency and NPO Comments The Engineering Division reviewed the proposal and offered the comments included in the attached memorandum. The Metzger Water District commented that although the existing water line on SW 79th Avenue would not be large enough to support a commercial development, an existing line on Pacific Highway is of an appropriate size to allow for future development if a new larger service line to the proposed development is installed. Washington County Fire District #1 reviewed the proposal and reported no objection to the proposed redesignation. i No other comments have been received. S. FINDINGS AND CONCLUSIONS The relevant criteria in this case are Statewide Planning Goals 1, 2, 9, and 10, and City of Tigard Comprehensive Plan policies 2.1.1, 5.1.4, 7.1.2, 7.5.1, 8.1.1, and the locational criteria for General Commercial designated areas (Section 12.2). The staff concludes that the proposal is consistent with the applicable Statewide Goals based upon the following findings: t. I. Goal 1 is met because the City has adopted a citizen ingolvement 1 program including review of development applications by the 44 Neighborhood Planning Organization. In addition, all public notice X' r`quirements have been met. r: 2. Goal 2 is met because the City has applied all applicable Statewide Planning Goals, City Comprehensive Plan policies, and Gimmunity Development Code requirements in review of the application. 3. t,oa1 9 is met because the rroposal would increase the City's readily developable commercial land base thereby increasing economic opportunities within the City. 4. Coal 10 is satisfied because, although the proposed action would k reduce the amount of residentially designated land in the City, the area to be redesignated is adversely affected by the surrounding #` commercial development and major highways ,and thus is not well (, suited for continued residential use. Redesignation of the area will not affect the City of Tigard's compliance with OAR Chapter 550, Division 7 •- the Metropolitan Housing rule's requirements for new construction mix and minimum residential density for new construction since thero erties are P p presently developed and therefore are not considered buildable land by the Comprehensive t // Plana �y STAFF RE9011T - RIVEIWOOD PROPERTIES: CPA 88-01 and ZC 88--03 - PAGE 2, - i. The staff concludes that the proposal is consistent with the Comprehensive Plan based upon the following findings: _ 1. Policy 2.1.1 is satisfied becaC;ae Neighborhood Planning Organization 4 and surrounding property awners were given notice of the hearing and an opportunity to comment on the applicant's proposal. 2. Policy 5.1.4 ii satisfied because the redesignation would not result in commercial encroachment into any residential neighborhood other than the neighborhood proposed for total redevelopment. That neighborhood has been adversely affected by surrounding adjacent uses and highways and therefore is no longer well suited for residential use. Encroachment of commercial development is therefore not an issue. 3. Policies 7.1.2 and 7.6.1 are satisfied because adequate public facility (i.e. , sewer, water, storm drainage) capacities exist to serve the site and any development will be required to connect with those systems as a condition of approval for any future site development. Washington County Fire District #1 will be given the opportunity to review any proposal for development on the site. 4. Policy 8.1.1 is satisfied because the evidence provided by the applicant suggests that additional traffic generated by uses that would be allowed on the site by the C--G, General Commercial, zone should not exceed the traffic capacities of Pacific Highway, Highway 217, and the proposed Dartmouth Street Extension. These arterials will all serve future development on the subject parcels - and adjacent properties. The City Council presently is considering i development of the Dartmouth Street Extension, a new major collector street that would link I-5 and Pacific Highway providing additional transportation capacity to serve the site. In addition, the Oregon Department of Transportation is considering other highway improvements that will provide improved access and capacity to serve the site. . These improvements include widening Highway 217 and Pacific Highway and reconstruction of the I-5/Highway 217 and Highway 217/SW 72nd Avenue interchanges. 5. The applicable locational criteria for General Commercial development are satis?ied for the following reasons: a. Spacing and Location The property is not adjacent to other residential property. The locational criteria state that a maximum of two sides of, a commercial site may be adjacent to residential districts. This criterion is met. b. Access Commercial development on the site will not likely create unacceptable traffic congestion as discussed above with regard to Policy 8.1.1. A traffic analysis study will be required as part of any future Site Development Review for this site. Measures to mitigate traffic impacts of any proposed t development may be required. STAFF REPORT — RIVERWOOD PROPERTIES CPA 88-01 and ZC 88-03 PPv€ 3 i ' f Direct access to an arterial, Pacific Highway, is available. The. proposed joint development of the parcels with adjacent properties-will provide -additional access opportunities to the Dartmouth' Street Extension. Public .transportation to the ' site 'is available on Pacific f Highway. All access criteria are therefore satisfied. - c. Site Characteristics i The size of the site should be adequate to accommodate most uses allowed by the proposed General Commercial designation. The site is highly visible from both Pacific Highway and E Highway 217. The site characteristic criteria are therefore satisfied. d. Impact Assessment i i Without an actual development proposal, it is difficult to , assess whether the scale of development on a property will be compatible with adjacent uses. However, in the present s situation the site is surrounded by major roadways and commercial development and therefore it is reasonable to conclude that uses which might develop on the site would not be incompatible with the area. Review of any proposed development for the site through the Site Development Review process will assure that compatibility with surrounding uses will be assessed prior to development. i (` In conclusion, the staff finds that the proposed Plan Amendment from Low Density Residential to General Commercial and the proposed Zone p Change from R-3.5 to C—G are consistent with all applicable Statewide Planning Goals, City of Tigard Plan policies, and the locational criteria for General Commercial development. In addition, proposed : improvements to roadways serving the site wi l l great!,, improve acceits thereby constituting a change in circumstances affecting the site that maces the proposed changed designations timely. C. RECOMMENDATION To forward CPA 88-01 and ZC 88-03 to the City Council with a recommendation for approval based on the above findings and conclusions. r R'C PREPAR Y; J y 0 Assistant Planner APPROVED BY: Randall R. Wooley Acting Director of Community Development k (ht/4015D) STAFF REPORT — RIVERWOOD PROPERTIES: CPA 88-01 and ZC 88-03 - PAGE 4 MEMORANDUM CITY OF TIGARD,- OREGON t i ASI f � TO: Keith Liden, Senior Planner L,'+ March 28, 1988 FROM: Randall R. Wooley, City Enginee SUBJECT: Proposed Zone Change at 79th Avenue & Pacific Hwy. E; CPA 88-01, ZCA 88-03 r The proposal is to change the zoning of approximately 5.7 acres of land in the Tigard Triangle from R-3.5 to C-G. The applicant suggests that this parcel would be developed in coordination with adjoining C-G zoned properties so that it would have access to Dartmouth Street as well as to Pacific Highway. A traffic report submitted with the application suggests that if the property were developed to the maximum density allowed in the C-G zoning, that the development could be expected to generate as many as 5100 vehicle trips per average day. Of these 5100 vehicle trips, approximately 3000 would be new vehicles added to the traffic on, adjoining streets; the remainder would be vehicles diverted from the traffic already passing on Pacific Highway, The existing residential development generates less than 200 trips per day. The additional vehicular trips would presumably be distributed to Pacific Highway and to the Dartmouth Street extension. Th- Tigard Triangle Traffic Circulation Study prepared in 1986 assumed that the subject property would remain zoned R-3.5. Therefore, the additional trips potentially generated by the zone change would be an addition to the traffic forecast by the X986 study. The 1986 study concludes that any -additional traffic loading on Pacific Highway would tend to divert through trips currently using the highway to other roadways in the Tigard area. Based on the location of the site, the zoning of surrounding properties, and the planning indicated in the Tigard Comprehensive Plan, it appears logical to expect that this property will eventually change from residential use to commercial use. No particular site development is suggested at this time. It is likely that the actual site development would be less intense than the maximum allowed in a C-G zone. Experience in ether C-G zone development has "indicated that maximum density is usually realized only if a parking structure is incorporated in the site development. At the time of future site development, a detailed site development review will be required. At that time, we would expect to require that a full traffic analysis of the impacts of the specific site development would FQ developed. Prior to approving site development, we would need to be assured that the development plan included provisions to mitigate the traffic impacts of the development. It is likely that one of the requirements would be joint access agreements with adjoining parcels to assure access to Dartmouth Street E Memo to Keith Liden Proposed Lone Change at 79th Avenue & Pacific -Highway CPA 86-01, `LCA 88-02 March 28, 1988 Page 2 as well as to Pacific Highway. Additional access might be required to connect with a roadway proposed to extend southward from Dartmouth Street in the e vicinity of Red Rock Creek, At this time, the City is in the process of artment of Transportation, the need for an exploring, along with the Oregon Dep additional southerly access to the Tigard Triangle. If the zone change is granted, the potential additional commercial development could be considered in the transportation planning now in process. If this site could be connected to a new southerly access route, the i, pacts of development of the site on the pacific Highway. traffic would be further reduced. The site is currently served by a sanitary ;ewer line. The site drains inage: does not appear to be a problem for southward toward Red Rock Creek. Dra the site. Details of utility service would need to be worked out of the time of future site development review. As City Engineer, I have no objection to the proposed rezoning so lar:g as it is recognizedthat the rezoning will have an impact on the transportation P for the Triangle area, and that substantial additional traffic study will be required at the time of future site development. At the time of tf` future site development review, I would expect that conditions would be imposed requiring that this site have access to Dartmouth Street and potentially to the future :street south of Dartmouth. I would expect that some restrictions would be imposed on access to Pacific Highway. The specific restrictions would depend on the particular type and extent of development proposed and upon the results of detailed traffic analysis, 3 C: Gary Alfson, Transportation Engineer " br•d39200 , ','`�'�"a 1� T. J- �•-fl�iTr�l-�..-}-}.-1r.-+ � .-+. ...,�...r� � ♦ I...Y.....-{ Y�-�r t -• r� 1'-- _- - -~- 1 ^'.. _ t—r• -i— L y. __.-TT S• r. Ar 1-ti I----L- A&I a—'r •e .. as rl i f I J f y' • � Y Ge» � maar � � e i nr '_, f36 � _ -°, ra arvpvaraA f ki • o e o •••`r.• • j t 1 ...��.�tY� L.L.L+ fR�RY t+u 1 O • • t "•• • e� �� ELEVEN9ARV 1 Ia9i o • •. � � acesooL .� rt • a a r a e R a •• .'.t'�A7fJl'• • n maaa ac� � __ ° ra —� t e -• e•s• � aes