Loading...
Plans • Wiebe Residence - 2009 Remodel , . 13969 SW Leah Ter., Tigard, OR, 97224 .',.. \ 0 CITY OFTI 2 Floor East - Existing Structural - Existing Utility Appftwed. 11 saa3f1.4---- 1 i N R oom Future Conditionally Scale: ye = 1.-o. ti, Sea Warta: Follow... 1 i I Iv Weight-bearing - ---- 2nd - Master 44 vertical Attadied. • to Suite Walk-In 4; support for roof Permit - 111 , ..i. At 7 _ A0 : 6meie-€21 -:IaTEc_tof ... Closet , .. ,.., 4; ---,,..--- 5-11 1/2" wrio---4.740.0m. 1 2-97/8" i;5 I 0? f 1 7-1 5/16" II • 0*INC '= -2 1 00121pling/The IllIkk!P . -------li 0 \\t --..r– OcCUrratICYLaaa '.- ' ' 3'-2 5/16" 0 ., .. construction Typo --1;■-' v) 8 1/2" 6'-9 1/4" 0 Existing Rated Cortidet ■. , j. 1 cr-o" Bedroom - , \ 'i Energy Code .__________ \ _ —t t li Future 2nd \ L 1 Accessibility 1110~ - 0 \ . -a,- '-1 -‘ Master Suite . (.. '' ,.7, N. , 1 1 2-11/16" 1 el' - " p.. 6 i 4%7" ,•' ___,,__= s \ I c I , ' io e . .0)13 1 ' [ el Existing full • –:—::;; ----- ---i : .... -, bathroom-future 1 . , " 6'-8 3/4" 2-9 1/13" 2nd Master Suite 1'-1/16" F 1 3%1 \ full bathroom . Weight-bearing - ' / \ — vetlical 30 4>(4 . . „•• ,. :::upport for roof Z 1 LI '--- Weight-bearing: Existing 1 _ o supports the roof ,..-, 1 to Bedroom - 4 t., - ' , '5- -- Future 4th 4. cli r- 1 . . . 1 BEC E° Bathroom / 1 5-8 15/16" _7 - ..• • _ -2 • L .,, ,_... 131/8" 1 , ,.,. . _ • CITY OF TIGA BUILDING DIV -i_ ,..• , , • ' ELF _ .._.. ._..,-•72 V Vet . ght-bearing : 's °C...-- 1 2x6 external wall t e 11 5/1 3" supports the roof 1'-9 1/8" O FFICE J tii 7, 209 CO PY 10-2 1/4" ...,. j Wiebe Residence - 2009 Remodel H H aall ut light s t hche, ght swites 13969 SW Leah Ter., Tigard, OR, 97224 1- - l - - � 2 Floor East - Existing Electrical * Y N Fan 8 Light ? @ k Scale: 1/4" = 1-0' / Existing Utility / Room - Future • Vacuum Outlet 2nd Master Suite Walk -In Y Closet 9 0 d 6 light fixture * 0♦ _. U I \ ... i 1 ' o -. Existing Bedroom - ... � Future 2nd �� 0 Master Suite Notes: In �� _ I 1. Existing full bath on separate 15A dd. t»- ,( _.GF! _ _I 2. Existing bedroom on separate 15A ckt. .- -- ..•,..- p � - -• --- T Existing full bathroom - future 2"d Master Suite E tiF Existing full bathroom Ee Bedroom - 1 Future 4th I Bathroom 1 1 F I 4 Jul 7, 2009 Wiebe Residence - 2009 Remodel 13969 SW Leah Ter., Tigard, OR, 97224 1 2 Floor East - Demolition y 1 1 N Scale: 1/4" – 1' -0" 1 I RF Red = Remove Existing Utility k I Blue = Reuse Remove and Room - Future Black = Existing preserve door. 2 Master Suite Walk -In I' Remove and Closet preserve door. 4 P , g - Remove and 6 i a l.� preserve door. j Remove `�' T [ and o preserve Remove closet. 7 Remove wall. /� door. Remove linoleum r' N t..- ®.....,._._ __J flooring and %�\ e but up tub - II particle board". \\ ��� already Existing i i damaged. Bedroom - 1 Remove through Ii i ill 0 1 existing opening. Future 2nd fi ®)0� Master Suite ii J Existing full Remove — bathroom - future wall. 2nd Master Suite Remove and - full bathroom preserve sinks .yam il', and vanit . y Remove wall. Remove Remove rug and stub door Y2 particle board Existing framing. "in the room and Bedroom - Preserve closet up to Future 4th door. threshold of the room. Bathroom 1 �.�.._ . . -... ,.. -_. ,PA _ i r s 1.11 7, 2009 . Wiebe Residence - 2009 Remodel 13969 SW Leah Ter., Tigard, OR, 97224 i 2 Floor East - Construction ' N Scale: 1/4" = 1-0" igIl Red = New � , l Blue = Reuse Door frame 2nd 2 Master Black = Existing Suite Walk -In Closet Notes: 1. No existing load- bearing walls will change. 2. No new load- bearing walls will be added. 3. No additional square footage will be added. 4. All new wall construction will be interior. Arch ii ii 5. New wall construction will be done with 2x4 ; � studs © 16" O.C. Nailing top plate to stud: �'`/ V face nailed 2 -16d, toe - nailed 4 -8d. \'' 6. Subfloonng will be maintained with 3 /1 " CDX Self-contained Frame for Ext. glued. 32/16. Nailing will conform with shower with Full wall /' pocket CABO tables 602.3a & 602.3a(1). glass door _� door 7. Interior openings are all non - weight ..r° �� -- =- Cf Li bearing. Headers will be 2 spaced 2x6es with ,\ '1 cripples filling, and (2) 2x4 studs at each end. 2nd Master 28 Wonderboard and tile floor 8.'4" drywall typical at interior walls. i / of entire room, including 9. Any insulation replacement will be done as % Suite toilet room follows: Ceiling with Attic Space - R -38 blown wool. d `s' Bathroom Sloped ceiling - R -30 Kraft faced batts. F - 1 New vanity and sink. A' /<" top with 1 "x3" Exterior walls - R -21 Kraft faced batts. 28 \ J sides will be built, and the top and 10. All new plumbing will be done per Tigard code, and performed by a licensed —� - -. ` - °- - '- ..._•.. backsplash will be tiled. A mirror will be building P Y ' �..�� _ !fit >�,�.- ,. n,.:w�, �v..�..__ plumber. The plumber will supervise any r Linen hung centered on the sink. building changes required to route pipes ( ' - Shelves through existing or new construction, holding 28 ; % 1 i to standard wall, floor, and ceiling strength \ ; � \ �__ -1 requirements. Short 2nd Master Full wall 1 __� / li i knee wall Suite , I 4th Frame for pocket door 1 ..\ Bathroom \ / \11 ' Frame door , i a Self- contained Reuse vanity from 3R bathroom - tile top � b i shower with glass and backsplash, put 1 /4 veneer on sides, .. /�- door and paint vertical surfaces. Mirrors will be � / 1 1 — ��— a—. __-- hung above the sinks. \ \� ° — Wonderboard and tile floor of al entire room, including toilet room _I_ 1• 4. . 1 1 Frame for tub -' /," plywood - under rim of bathtub - tile sides and top and backsplash Drop -in tub JUI 7, 2009 , VViebe Residence - 2009 Remodel 13969 SW Leah Ter., Tigard, OR, 97224 I 2 Floor East - Electrical N Scale: 1/4" = 1-0" + + Ak IP R.eci = New Move existing ---, Blue = Reuse outlet to next 2 Master Black = Existing stud past new Suite Walk-In pocket door Closet --,d) + / 4 . i ri d Remove light : 'NI 1 from hat circuit, .....,.."• '\ ,,,/ ',.......„.....„ _ add to 21`48 Vanity sconce i circuit ' C) ... ii ' 1 _____________ --- Fan & Light Fan & Light I j «) Fan I a FA/itches - -- 7 - . - 0 l,r,5 :,5:-- + Ali lights on Fan & Light switches \ f \ 1 switch, fail on other _ ___Z .. 2 Master 4 , A Suite Light switch for I 1 room , --EP Bathroom - - V --- =..._ i Fan & Light Light switch for . vanity P 2 Master ,, ,--‘),,,, _______----1-,....) i Suite Vanity sconce lights c:::) • 10 1 r -) , . C 4th -4-4)- Bathroom c z_.......,_ 1 j -----i-r Li cr _i Jul 7, 2009 • • _ Wiebe Residence - 2009 Remodel 13969 SW Leah Ter., Tigard, OR, 97224 i 2nd Floor East - Final \ , Scale: 1/4" = 1' - O" 'V 2nd Master Suite Walk -In Closet d F It 1 U u [ 1 / 1 • s` `/ mot t i it B i� C __,' s , 2nd Master 1 r f , 2nd Master Suite 1 \ - Suite s Bathroom vr.._____ , fl 1 ; 1 4th I 'I ; 0 Bathroom 1 1 (D. 1 1 1' 1 • o C ,,o 1 1 �� Tn_ . r�._� e_ . ._.. ��_ J [L--t---i , Jul 7, 2009 1