Permit CITY OF TIGARD BUILDING INSPECTION DIVISION
24 -Hour Inspection Line: 639 -4175 Business Phone: 639 -4171
I
Date Requested: /, /L ,
�/ A.M. P.M. MST:
Location: _ i �iL /_ 1J f /�lL i C`� BUP:
Tenant: �� Suite: Bldg: MEC:' 7 0 / /�
g 7
Contractor: i _ • � .Li.,4 /' i. mne: oZ,?.,1- ,3 - 7o-0 PLM: .
Owner: a / d Phone: ELC:
ELR:
SIT:
BUILDING BLDG (con't) PLUMBING l MECHANIC • ELECTRICAL SITE
Site Post/Beam Post/Beam Post/Beam Cover /Service Sewe /Storm
Footing Roof UndFl/Slab Rough -In Ceiling Water Line
Slab Framing Top Out Gas Line Rough -In UG Sprinkler
Foundation Insulation Sewer Hood/Duct Reconnect Vault
Bsmt Damp Drywall Storm Furnace Temp Service MISC.
Masonry Ceiling Rain Drain UG Slab
Shear /Sheath Fire Spklr /Alm Crawl/Found Dr eat Pump Low Volt
Approved Approv it/e7 Approve -- Approved Approved
Appr /Sdwlk Not Approved Not Approv o - roved Not Approved Not Approved
FINAL FINAL FINAL FINAL FINAL
.0 / "_.... . „cam a ��� - - �.c., ��� C _>-_. - -
•
•
•
•
1 •
- O - Call- for reinspect' • _ O- Reinspection fee - of - - $ required before, next inspection - - O Unable to - . -
Inspector:.i Date: / - �- — 9 Page of