Correspondence 5 f -0337
15685 SW 79 Ave. 2/8/2007
Lot 4
In general I recommend staying a minimum of 3 ft. off the south property line to avoid damage to
neighboring trees to the south. A tree symbol appears on the site plan directly under the outline of
the west end of the proposed house, but there is no tree there and the symbol can be removed.
There are no neighbor trees nearby.
A large Douglas -fir tree is standing in the southwest corner of the lot and it requires a 22 ft. root
protection zone. This is a protected tree and there is currently a tree protection fence up at the
correct distance. The corner of the proposed house is approximately 10 ft. from the protected tree
and a concrete patio is well within the root protection zone. The house design will have to be
modified to avoid the protected area.
Lot 5
There are four maple trees near the west property line. Three are growing on Lot 5 and one is
apparently growing on the boundary line with the neighbor to the west. The trees do not appear
on the map, and I do not believe they are protected trees. I recommend staying 12 ft. off the
property line to avoid damaging these trees. They appear to be in terminal decline. Removing
three of them now might be a better option. The one on the property line cannot be legally
removed without consulting the adjoining property owner.
Lots 6 and 7
Neighboring trees will be adequately protected by staying 3 ft. off the property line with any
excavating in these two lots.
Conclusion
I recommend moving the tree protection fences to the locations mentioned above. In some cases
this will leave more room to work, but in others it will mean less room. I do not see any feasable
alternative to changing the house design on Lot 4.
Page 2 of 3
•
7 yo % %ej
0 C O . DAVID BISSETT ARCHITECTURE
MEMORANDUM
DATE: February 6, 2007
TO: Lorraine / City of Tigard
FROM: David Bissett / David Bissett Architecture
RE: CHURCHILL WOODS LOT 6
Per our meeting and your notes submitted on 2/5/07 (see attached copy), please note the
following response to each item you submitted:
1. Find corrected holdown schedule and added holdown notation on sheet A3.
• 2. See revised sheets A3 and A4 and attached calc's showing posts and footings
supporting girder truss and floor beam loads.
3. Addressed at afternoon meeting on 2/5/07 with Aaron Fuller and Bill Goggin.
4. Addressed at afternoon meeting on 2/5/07 with Aaron Fuller and Bill Goggin.
5. See revised sheet A2 and A8 for additional shear wall details.
6. Addressed by Aaron Fuller.
7. See revised sheet A2 for additional shear wall designation at front door.
NOTE: All corrections have been shown on plans as revision Delta 1 dated 2 -6 -07 and
area clouded.
Sincer; ,
D. d A.:issett /:$r/NCAR:
CC: File
DA.. a
.�% L / C' . pt'
503.226 6785 PHONE
1.866.611.6785 TOLL FREE
503.226.2264 FAX
208 SW First Avenue Ste 300
Portland Oregon 97204
www.DBAarch.com