Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Tigard-Tualatin School District - Arbor Day Planting 2011
0 ' X000 l 00L Memorandum of Understanding Between the Tigard-Tualatin School District and the City of Tigard Introduction In celebration of Arbor Day 2011,the City and the Tigard-Tualatin School District (ITSD)will be planting over 300 trees at the Metzger Elementary,Templeton Elementary,and Twality Middle School campuses.This expanded planting effort has been made possible through close collaboration with Kraig Sproles (Principal of Metzger Elementary School),Todd Robson (Principal of Templeton Elementary School),Rick Patrick (Principal of Twality Middle School),TTSD staff,City of Tigard staff,and local contractors. The planting palette includes native and ornamental trees chosen for their low water and maintenance requirements. The trees will be provided with automatic drip irrigation until the roots become established. This tree planting partnership will provide beauty,wildlife habitat, stormwater management,and shelter from the sun and wind for students and neighbors of the schools. Pugpose The City of Tigard (City) and the Tigard-Tualatin School District (District) recognize that there are areas of mutual interest,which,when pursued cooperatively support each entity's ability to plant and maintain trees on District property in the City of Tigard. This Memorandum of Understanding defines the roles of the City and District with respect to furthering their cooperative efforts to enhance the City of Tigard with additional trees. The City recognized the value of planting and establishing trees on District property to increase the size and quality of the City's tree canopy, the District recognizes the need to provide maintainenance to the trees after planting so that the health, safety,and longevity of the trees is maximized.Thus, on this 23rd day of March, 2011 these parties enter into this Memorandum of Understanding, the intent of which is to further City and District cooperation. Toward this goal the District will: • Periodically monitor the health of the newly planted trees on Attachments 1, 4, and 7, during the first three years after planting. • Contact the City if any of the newly planted trees on Attachments 1,4, and 7,begin to die during the first three years after planting. • Periodically monitor the functioning of the newly installed irrigation systems on Attachments 2, 5, and 8, during the first three years after planting. • Contact the City if the newly installed irrigation system on Attachments 2, 5, and 8, should become damaged or destroyed,or otherwise fail to function properly. • Provide and purchase irrigation water when needed,inlcuding during the summer months, for the newly planted trees on Attachments 1,4, and 7, during the first three years after planting. Irrigation will be controlled by the District through a handheld unit provided by the City. The City will provide training on the use of the irrigation system if requested by the District. •Allow the City to secure the valve boxes housing the newly installed battery operated irrigation controllers on Attachments 2, 5, and 8, for three years after installation. •Allow the City to retrieve the battery operated irrigation controllers of the newly installed irrigation system on Attachments 2, 5, and 8, three years after installation. •Replace any trees that die within the first three years after planting if the cause of death is determined by the City to be from lack of maintenance or intentional removal. Lack of maintenance will be considered to be: o Failure to notify the City if any of the newly planted trees on Attachments 1,4, and 7, begin to die during the first three years after planting. o Failure to notify the City if the newly installed irrigation system on Attachments 2, 5,and 8, should become damaged or destroyed,or otherwise fail to function properly. o Failure to provide irrigation water when needed for the newly planted trees on Attachments 1,4,and 7,during the first three years after planting. •Maintain trees after planting so that the health, safety,and longevity of the trees is maximized. Maintenance of the trees shall conform to tree care industry standards,occur for the life of the trees, and include but not be limited to: o Pruning as needed; o Water management; o Protection during future construction activities within their critical root zones o Pest Control as needed; o Fertilization as needed;and o Removal should the tree(s) become a hazard to people or structures, and pruning is unable to abate the hazard. • Replace any trees with the same species and size on Attachments 1,4, and 7, that die due to lack of maintenance, negligence,or intentional removal. • Exclude and protect students,parents,personnel, and campus visitors from construction areas until planting and irrigation installation is complete. • Hold harmless,indemnify and defend the City,its officers,agents,and employees from all claims for damages or injuries which may occur as a result of the trees and irrigation system,and/or the planting of the trees and irrigation installation on the attached plans. The City of Tigard will: •Periodically monitor the health of the newly planted trees on Attachments 1, 4, and 7, during the first three years after planting. • Contact the Utility Notification Center at 1(800) 332-2344 at least 48 hours in advance of any utility locate request. The City will verify,locate, and identify,with visible marking,all existing underground utilities in the areas of work and maintain such markings until all work in those areas is complete. If utilities are to remain in place, the Contractor shall provide adequate means of protection during excavation operations. • Select healthy nursery stock, that is well branched, full foliaged when in leaf, free from disease,injury, insects, all weeds, and weed roots. Plant materials must meet requirements of American Standard for Nursery Stock, 1980 Edition,ANSI Z60.1. No cold storage plants will be selected. • Provide exact quantities of named species and varieties of plant material shown on Attachments 1,4, and 7. • Supply and install required topsoil. Topsoil will be representative of the area, fertile, friable, free from rocks,roots, noxious weeds, sticks and other foreign materials harmful to plant growth. • Guy and stake trees as follows: o Wood Tree Stakes: 2x2 S4S,Douglas Fir, 8' lengths, free of knot holes or grain defects, treated with two liberal coats of Olympic stain number 713 finish preservative (two per deciduous tree, three per conifer). o Tree Ties: "Gro-Strait" tree ties as supplied by Alfred Teufel Nursery, Inc.,Portland, Oregon. New 2-ply, '/z",improved garden hose or approved equal. o Guy Wire and Stakes: 12-gauge steel wire,galvanized,use double strand. o Tree Wrap: Provide and install as shown on tree planting detail;refer to drawings. o Additional Requirements: Meet other detail requirements as shown on Attachments 1 and 3. •Provide mulch material per plan that is free from noxious weed seed and all foreign material harmful to plant life. Mulch material will be fir or hemlock bark,medium grind, -1/5 + 3/4" sizes. •Plant trees per Attachments 1, 3,4, 6, 7,and 9 as follows: o Plant trees and shrubs upright and face to give best appearance or relationship to adjacent plants and structures. o Planting operation to begin as soon as weather conditions permit by accepted local practice. o Planting holes shall be excavated twice the size of the tree root ball or root system. Trees to be planted on undisturbed subgrade where possible. o Balled and Burlapped Materials: Loosen and remove carefully twine binding and burlap from top of root balls. Stake or guy trees immediately after planting each tree. o Roots: Cut off cleanly all broken or frayed roots. o Pruning: Prune trees and shrubs to remove damaged branches,improve natural shape and thin not more than 15% of branches. o Backfilling:Place and compact lightly backfill soil mixture carefully to avoid injury to roots, fill all voids. o Watering:When hole is filled, completely soak and allow water to soak away. Fill holes to finish grade and prepare for other work indicated. • Contact the the corresponding school office prior to beginning work,and inform them where and what type of work will be occuring each workday. • Install irrigation for all trees in Attachments 1,4,and 7 per the details and specifications in Attachments 2, 3, 5, 6, 8,and 9. • Keep premises reasonably free from accumulation of debris, equipment and surplus materials. Leave project site in neat and orderly condition. • Hold harmless,indemnify and defend the District,its officers,agents, and employees from all claims for damages or injuries which may occur as a result of the trees and irrigation system, and/or the planting of the trees and irrigation installation on the attached plans. • Contact Bonita Maplethorpe, or her successor in responsibility for this MOU at the District,if deviations are required to this MOU and/or the attached plans and specification. NO deviations shall occur without prior written consent from Ms. Maplethorpe, or her successor for this MOU. It is mutually understood and agreed that: •Additional details, drawings, and specifications that are applicable to this project can be found in the attachments. •The City and District will hold a preconstruction meeting so that construction activities can be coordinated with school activities. This will allow for a minimum of distrubance for either activity. Insurance: •The City of Tigard and District agree to each maintain insurance or self insurance consistent with provisions of the Oregon Tort Claims Act, ORS 30.270 and customary for public agencies of the same size and type. The City and District hereby agree to the conditions as described above: By: City of Tigard Ron Bunch, Community Development Director Tigard-Tualatin Schoof Disctrict Bonita Maplethorpe, CFO ATTACHMENTS: ATTACHMENT 1: TREE PLANTING PLAN FOR METZGER ELEMENTARY ATTACHMENT 2: TREE IRRIGATION PLAN FOR METZGER ELEMENTARY ATTACHMENT 3: TREE PLANTING AND IRRIGATION PLAN SPECIFICATIONS FOR METZGER ELEMENTARY ATTACHMENT 4: TREE PLANTING PLAN FOR TEMPLETON ELEMENTARY ATTACHMENT 5: TREE IRRIGATION PLAN FOR TEMPLETON ELEMENTARY ATTACHMENT 6: TREE PLANTING AND IRRIGATION PLAN SPECIFICATIONS FOR TEMPLETON ELEMENTARY ATTACHMENT 7: TREE PLANTING PLAN FOR TWALITY MIDDLE ATTACHMENT 8: TREE IRRIGATION PLAN FOR TWALITY MIDDLE ATTACHMENT 9: TREE PLANTING AND IRRIGATION PLAN SPECIFICATIONS FOR TWALITY MIDDLE 8-Green Vane Zelkova 6-Emerald Qua Or Me* SYM TRE QTY. SIZE CONDITION REMARKS NO0Wv '0 z —a w a o a Acer pleranoldas'Emerald Queen* 1-Incense Cedar Emerald Queen Maple. ��* (�� 20Y Cal. B&B o 00Queen LOT 3-AustrlanPine Z w Ae»r nAxum' 2 8 2-Ponderosa Pine L O Armstrong Mepyss"' 1 2"Gel. B&B IJ — W _� 6-Green Vase Zelko3dCalzura Tree va e lr Cedes T Ld = n Cakaedrus dearrrens 22 6- 888 W q C a p Ld 3-Emerald Queen Maple 0 a m � TEMPLETON ELEMENTARYSCHOOL CrokYlu m kpo nicum 6 r Cal. B&B Ketene Tree —o 2-Green Vase Zekova Ud i '" m PLAYChameepyperi—W a'Grecills' i sa' B&B m AREA Grsdle Hkoki cypress — Fraxinus americans'Junginger' Y Cel. B&B I �O Autumn Purple Ash 16 TEMPLETON 0 540 `CJ ELEMENTARY SCHOOL Ginkgo biloba'Autumn Odd' 10 r Cal. B&B U Autumn Loki Gkicgo TROY A.MEARS • S(� OREGON �W o lam\ ] 34Rad Oak 1-Western Red Cedar4�21 pis nigra .nom ,,..��^w�, Austrian Pine 3 s-T e&B �C9pE 2atwahzen Cherry \ 2-Kwanzan Cherry k 3-Emerstd Queen Maple / VO & Pinus ponderosa 6 6-T B&B / Ppndemse Pine I 1-Ktaanzan Cherry 3-Autumn Goid Gingko f y 5-Emerald Queen Maple ( S 7-Green Vase Zelkova 2-Ponderosa Pine 113.E 1 PK a Flowrvedng Cherry 7 Y Cal. B&B 1-Grac is Hiroki Cypress 1-Amreimng Maple 2-Incense Ceder O Pseudorsuga menzbsl _ j o m Fp, O 2 6.T B&B TEMPLETON pp � � _ �3-Incense Cedar ELEMENTARY SCHOOL �('� ���111vvv QU uercus mbre 5 Y cal. B&S (/) Cy P 3-Emerald Queen Maple � per' 1-Douglas Fir Red Oak a. w z U af � y ,,laclend=giganteum w PLAY Sequoia YCaI. B&B t AREA I du Y z O U 2-AutumPurple Ash Thg W 0 � Wo.*m Red Cedar 5 6-7 B&B S Q PLAY cl LJ Z D U AREA J Q LL 1-"umn Gold Gingko 'J wrdata'GreenspGireenspke nchm ire 2 Y Cel. B&B w CL. N ~ " 3-ISaizura Tree /�Rp�/� � z W� 1-Red Oak 1-Western a Red Cedar Vase' u'1 U 1-Ponderosa Plna 3-Autumn Gold Gingko GraenVass Zeb—a 27 2-0.1. B&B O ~ W Total Tress 136 J 2-Auturrm Purple Ash ATHLETIC FIELDS 1 DouFir EXISTING TREES TO REMAIN UNLESS OTHERWISE NOTED LU I 1-Austrian Pine g 1-Sequoia In 6-Autumn Purple Ash 3-Incense Cedar ILI 2-Kwanzan Cherry 0 1-Greensplre Linden Il 1-Autumn Gold Gingko o i IL 1-Sequoia REvi510N5 d 1-Greenspire Linden - 6-Green Vase Zelkova 1 6-Autumn Purple Ash I� 3-Westem Red Cedar L �- 1-Autumn Gold — • Gingko — SHEET NAME: p PLANTING PLAN &incense Ceder 5•Inoense Ceder 2-Ponderosa Pine DRAWUBY: TAM NECKED BY: TAM ISSUE DATE: 3115111 JOB NO.: 1101-8 SHEET: SCALE: 1 40'-0" rrREFER TO SHEET L3 FOR �� "= I 1 i MAINLINE 3° 1X2"MAINLINE U C IN C I-'SHL Y\C T 'WO _ G, Q TAP EXISTING MAINLINE TRAPPROX.LOCATION © SYM. DESCRIPTION iIFY v L X - f5 - CLASS 200 PVC SLEEVE- SIZE AS NOTED �' W m PARKING LOT W e EXISTING CLASS 200 IRRIGATION MAINLINE- SIZE AS NOTED Z CLASS 200 IRRIGATION MAINLINE- SIZE AS NOTED m IRRIGATION SUPPLEMENT _� CLASS 200 PVC LATERALS-SIZE AS NOTED IN U 7 LOCATION-SEE DETAIL qq n. MAINLINE EXISTING 3"� SHEET L3-TYPICAL --�•— IRRIGATION ISOLATION VALVE-SAME SIZE AS MAINLINE 0 a n n TEMPLETON ELEMENTARY SCHOOL �a^ —� EXISTING t" QUICK COUPLING VALVE -°n b ■ RS XCZ-100-PRF DRIP MANIFOLD W/TBOS CONTROL MODULE - 3 W SEE DETAIL 1 5 ] 00 a PLAY EXISTING IRRIGATING VALVES AS NOTED m AREA - 94 OCONTROL VALVE NUMBER -REFER TO VALVE KEY ' TEMPLETON to DRIP AIR RELIEF VALVE- SEE DETAIL 5/1-5 ���� ELEMENTARY SCHOOL 540 — — � _o C O TREE WELL IRRIGATION - SEE DETAIL 2/LS • •T ® INDICATES TREE LOCATION - SEE SHEET LI r" TROY A.MEARS INDICATES IRRIGATION SUPPLEMENT TREE- SEE SHEET LI OREGON FOR TREE LOCATION - REFER TO DETAIL 3 5 HECK VALVE �� (S~ ADD NEW DRIP 3/4 `9�E AR VALVE THIS APPROX. EXISTING(2)1.5" LOCATION-REFER VALVES-ABANDONED 0 J VO TO DETAIL rt� VALVE KEY 3/a" CONTROL VALVE NO. 1 2 3 a 5 B 7 OD • XTR°TREESI 2/4* G.P.M. 2 1 1 5 4 50 2 %i 3/. 0 CONTROL VALVE SEZE 1.0 1.0 1.0 1.0 1.0 t.0 1.o O �,• " DESIGN CRITERIA O THE DESIGN OF THE IRRIGATION SYSTEM IS BASED ON 50 P.S.I. 0 40 G.P.M. O TEMPLETON I �j; ELEMENTARY SCHOOL GENERAL NOTES u 31," EXISTING MAINLINE Cf�"i P' Q •LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR ALL SLEEVING UNDER ALL HARD SURFACES EXCEPT WHAT HAS BEEN INSTALLED PREVIOUSLY BY GENERAL W W Lu 0 I CONTRACTOR(REFER TO DRAWINGS).COORDINATE W/GEN.CONTRACTOR. � Ku IL ^ PLAY INSTALL VALVE BOXES PERPENDICULAR TO WALLS,WALKS AND CURBS. LQ O I- Lu J, AREA 3/a " WHEN PLACING MORE THAN ONE PIPE N A TRENCH,ALLOW A MN.OF N"BETWEEN PIPES. or Y Q 3.a. •ONE VALVE MAX.PER STANDARD VALVE BOX-TWO VALVES MAX.PER JUMBO VALVE BOX. •PLACE VALVEci S IN SHRUB BEDS WHERE POSSIBLE. LU V O INSTALL HEADS FLUSH WITH TOP OF WALLS.WALKS AND CURBS. C F c ® Q •ADJUST HEAD LOCATION AS REQUIRED TO AVOTREES.SIGNS,LIGHT POLES AND G V PLAY OTHER FOXED OBJECTS. �J,J Z AREA �a" •SINGLE BARE TRACE WIRE REQUIRED ON TOP OF ALL MAINLINE. Q )S��',��L�,/,'�1/�1.1�1 �a• �° •TWO STEP GLUE REQUIRED ON ALL PVC MAINLINE THAT IS NOT GASKETED. W n. L •PLACE CONTROL WIRE 3 70 8'AWAY FROM MAINLINE N O p u 3�• I C) k W jO O ATHLETIC FIELDS I4 i� REVISIONS 1111L R Y. RIPIKIN "w, O El4O 3/a SHEET NAME: �`" IRRIGATION PLAN I I- DRAWN BY: TAM HECKED BY: TAM ISSUE DATE: 11 JOB NO.: 1 SHEET: REFER TO SHEET L5 FOR I� .�� SCALE: 1"-40'-0" L2 �1 v 2"X 2"P.T.D.F. 8'-0" TREE STAKES DO CONTROL ZONE KIT: V _j �f7 RAIN BIRD XCZ-100-PRF _ - P NOT PENETRATE RCOT BALL. A�STAKES g a 1 PER TREE-ONE COAT OLYMPIC STAIN (INCLUDES 100PES8 VALVE, GATE VAVLE #713 REQUIRED) RBY100MPTX INLINE WYE FILTER AND o aa o 3" MIN. PSI-M40X-100 PRESSURE REGULATOR.) .0 o N FINISH GRADE w a TREE PIES LIBBER HOSE W 12 GAUGE FINISH GRADE Z GALV. WARE. ," TREE WRAP -FROM GROUND TO FIRST •f--- STANDARD VALVE BOX WITH COVER Z CARSON 10"ROUND VALVE BOX — _2 ANC . _ g In I m n RAIN BIRD TBOS a UT&R MO T7 OF WIR BASK T +� ISOLATION VALVE(BRASS)W/SCH.BO Ltl = R MOVE BURLA &TWANE FR TOP CONTROL MODULE a OF BALL AFTER STAKING. PLACE N PVC FITTINGS g RODTBALL 3"MIN. ABOVE A JA NT GRADE OF PLANTING OR TURFP.V,C.MAINLINE AS NOTED �{9 - X 3'-0"MIN.GIA. MULCH CIRCLE WATER 5/4X6X76" COMPOSITE DECKING D D NO.5 REBAR ANCHORS J BASIN 1 1/2"MIN. DEPTH (TURF AREAS) 9,, o �„p�oSP...o nQ LENGTH OF VALVE BOX 'A _ UNLESS OTHERWISE NOTED. ��o D�OOO''�o C�S'''O��TT L v - `-:D o Q,d THRUST BLOCK f— EXISTING 1.5" PVC MAINLINE BACKFILL SOIL MIXTURE AS SPECIFIED. �31Sa 540 �<J _E[l rT�� SCARIFY WALLS&BOTTOM OF PLANTING PIT. 3-INCH MINIMUM DEPTH OF ' TREE ROOT BARRIER (NDS MODEL EP-1850) 3/4-INCH WASHED GRAVEL ("" TROY A MEARS H UNLESS OTHERWISE NOTED. / ISOLATION / GATE VALVE DETAIL OREGON Q SET ROOTBALL ON UNDISTURBED SOIL. 1 1" DRIP CONTROL VALVE MANIFOLD BEST-PAKS AS SPECIFIED. LS (XCZ-100-LF DRIP MANIFOLD KIT) NTS L5 ! (MAINLINE GATE VALVE SIZE-2"AND SMALLER) NTS `91'E AR TREES&SHRUBS TYP. 2 X DIA. OF ROOT BALL -ROOT BARRIER REQ'D. WHERE TREES ARE TREE AS SPECIFIED WITHIN 5'-0"OF ANY CURB OR SIDEWALK EDGES - MIN. 6'-0' LENGTHS REQUIRED ALONG EACH SIDE OF CURB/SIDEWALK. DRIP EMITTER-(2)PER TREE TREE PLANTING DETAIL P.V.C.PERFERATED PIPE&CAP NOTES NTS RAINBIRD DISTRIBUTION TUBING J 1. B&B STOCK MAY BE SUBSTITUTED WITH CONTAINER STOCK OF EQUAL GRADE. � P.V.C.IRRIGATION PIPE AS O 2. CONTAINER STOCK MAY BE SUBSTITUTED WITH B&B STOCK OF EQUAL GRADE. SHOWN ON DRAWINGS FINISH GRADE _ 3. PLANT MATERIAL SHALL CONFORM WITH AMERICAN STANDARD FOR NUSERY STOCK, 6-INCH ROUND VALVE BOX I ' ANSI Z60.1, 1986 EDITION. V 4. ALL TREES SHALL BE BRANCHED. 5. MULCH ALL PLANTING BEDS WITH 2"MIN. LAYER OF SPECIFIED MULCH. 6. IN THE EVENT OF A DISCREPANCY BETWEEN THIS MATERIAL LISTING AND THE FINISH GRADEZ DRAWINGS, THE DRAWINGS SHALL GOVERN THE PLANT SPECIES AND QUANTITIES REQ. LU o UJI 0 7. IN THE EVENT OF QUESTION OR LACK OF CLARITY ON DRAWINGS, LANDSCAPE Q U CONTRACTOR IS TO CALL LANDSCAPE ARCHITECT BEFORE PROCEEDING. "' LL I,_ ILu Y 8. LANDSCAPE CONTRACTOR 15 TO NOTIFY LANDSCAPE ARCHITECT PRIOR ��.AN 1"� d LI O TO INSTALLATION OF PLANT MATERIAL. 9. LANDSCAPE CONTRACTOR TO VERIFY TREE QUANTITIES. W Z O TREE AS SPECIFIED o �. c U 3/4" BALL VALVE J Q XQ 1/4"OISTRIBUTION TUBING LL UJId N O DRIP EMITTER-(2)PER TREE CLASS 200 PVC Z W O 3 2X2'S D.F. 3' MIN. STAKES TREATED O U W/ ONE COAT OF OLYMPIC #713 STAIN. 0 1,25"P.V.C.PERFERATED PIPE J MIN. 24" WIDE BARK MULCH CIRCLE IN FOR WATER DISTRIBUTION& TURF AREAS - 2 WATER BASIN. N AERATION TO TREE ROOTS. IRRIGATION FLEX PIPE 3-INCH MINIMUM DEPTH Of PLAN -t -LATERAL PIPE-SIZE AS NOTED W ON PLAN 3/4-INCH WASHED GRAVEL L 5 DRIP FLUSH DETAIL r 2 TREE WELL IRRIGATION DETAIL L5 NTS i TREE TIES RUBBER HOSE W 12 GAUGE L5 NTS GALV. WIRE. 3 2X2'S D.F. 3' MIN. STAKES TREATED W ONE OA• OF OLYMPI # 1 AIN. REVISKN1s BEV. � aEscnvrpa CUT & REMOVE BOTTOM OF WIRE BASKET — REMOVE BURLAP & TWINE FROM TOP MULCH LAYER OVER — OF BALL AFTER STAKING. ROOT BALL * 30" LONG 3/4- PVC ROOT BALL —_ i MULCH CIRCLE WATER BASIN 1 1/2- MIN IRRIGATION SUPPLEMENT- DEPTH. UPPLEMENT- — tp DRIWATER DWP-PT MIN. 4" WIDE BARK MULCH CIRCLE IN (1 OF 8) VERIFY QUANTITY SHEET NAME: TURF A EAS. PER TREE SPECIES. DETAILS AND NOTES BACKFILL SOIL MIXTURE AS SPECIFIED. SCARIFY WALLS & BOTTOM OF PLANTING DRAWN BY: TAM IT. ' CHECKED BY: TAM 199UE DATE: 3,15/11 SET ROOTBALL ON UNDISTURBED SOIL JOa ND.: ao+a GROMAX BAGS AS SPECIFIED SHEET: —^^2 X Dia. ofTRoot^ I1^rT RAINBIRD OR DRIWATER PLUS IRRIGATION SUPPLEMENT JVY IIVCG J r i���-. Vl � � om 7-Emerald Queen Maple p a 4 o a . 0 t W 00 Z ° /'� t-Douglas Fir � -GreansPke Linden lz _ 0 ..:, 2-0rsenspire Li48n 1-IncenseCeder 1SequKNe Ld v 1-Incense Cedar Q 2-Katzura Tree 1-Austrian Pine W t-Autumn Gold r� Gingko ] 2-Green Vase Zelkova ��. a �,. --4-Green Vase Zelkova — — 0 ' a / PARKING LOT 1-Incense Cedar ,{ 513reen Vase Zelkova TENNIS COURTS -...✓ -- - — 2-Pagoda Dogwood 2-Sequoia :./ 3-Quaking Aspen SN 3-Autumn Brill 2-Quaking Aspen 54 bony t-Austrian Pine autumn Purple Ash \\ r TROY A.MEARS 15-Kwanzan Cherry 1-Inoense Cedar OREGON �W 3-Naylor's Blue Cypress 5-Emerald Queen Maple 1- 2-Vine Maple gp- Kwanzan Cherry 3-Gracilis Hinoki Cypress 1-Paperbark Maple ° LAWN 5-Chenticber Pear AMPHITHEATER t-Vine Maple 1_sans"king Aspen 3-Green Vase Zelkova 1-Auatrlen Pana o Zo LOUR Z-Chanfkleer Pear 1-Paperbark Maple 1-P oda Dogwood W °g J a 0 1-Douglas Fir O 0) 3-Nayior's Blue Cypress 1-0uaking Aspen Z /�, z-Graags Hkwkl Cypress 1-sequoia N O U.1 O �1 1-Katzuro Treece 0 1-Austrian Pine J Q O 2-Autumn Gold Gingko /^\ 1-Autumn Gad Gingko 11-vine Maple z n Q 1-Quaking Aspen ATHLETIC FIELDS Z 1-Incense Ceder sa U_ C f- 3-Chanticleer Pear 1-PorMeroPine L N � COURTYARD aC1. o O ATHLETIC FIELD 1-Austrian Pine LLJ I^ } W tD F 1-Kwanzen Cheng � � U 342agoda Dogwood 3-Vine Maple Q 2-Quskkug Aspen TWALITY MIDDLE SCHOOL 4-Emerald Queen Maple 1-Vine Maple ° 1-GracHis Hinokl Cypress 1-Incense Cedar i 3-Nayb1-Kwanzan Cherry r's Blue Cypress j i NS r ' P'EVIS10 ' I u R �� DE6GR1 4-Chanticleer Pear 24neense Ceder I 2-Vine Maple 3-Pagoda Dogwood 1-Kwan zan Cherry r 3-Wltchita Juniper 2-Quaking Aspen _--- -.-- �� 3-Nayb/s Blue Cypress 1-Austrian Pine 1-sequoia 1-Paperback Maple 1-Paperback Maple o Vine Maple B-Aulumn Purple Ash SHEET NAME: MATCH LINE-SEE SHEET L2 i PLANTING PLAN DRAWN BY: TAM CHECKED BY. TAM MSUE DATE: 3115111 JOB NO.; / -C SHEET: REFER TO SHEET L2 FOR REFER TO SHEET L2 n- 1 SCALE: 1 -40-01. 1 2"X 2" P.T.D.F. 8'-0" TREE STAKES DO COMMON NAME v 0 i 00 Q NOT PENETRATE ROOT BALL. (3 STAKES SVM TREES OTY. SIZE CONDITION REMARKS z PER TREE- ONE COAT OLYMPIC STAIN ir 1 a P13 REQUIRED) O Vibe circinaturni 14 5.6 B&B mem-stem c) (L e d ° O TREE TIES/RUBBER HOSE W 12 GAUGE i{x, t a o n /R / j�451L1�/Z\. GALV. WIRE. Air griaamr 4 2'Cad. B&B Z Papedtark Maple Un LL TREE WRAP - FROM GROUND 70 FIRST AN -m U 8 RMOVE BOTTOM OF WIRE BASKET J. `"`� Acer Pletaholdes'emerald Queen' Lj n Z ,J`] Emerald Oueen Maple 16 Y Cal. B&8 LyJ MO BURLAP &TWIN FRO i0-6— 4,(��) o. OF BALL AFTER STAKING. PLA E TOP OF W ROOTBALL 3" MIN. ABOVE A JAGENT a o FINISH GRADE OF PLANTING OR TURF Amelanuhier x grandflora'Autumn BrParos 3 2'Cad. BBB - n rte, Autumn BrpYenos Sen4naerry t n w 3'-0" MIN.DIA. MULCH CIRCLE WATER z BASIN 1 1/2" MIN. DEPTH (TURF AREAS) Cebcedrus d--ns UNLESS OTHERWISE NOTED. Incense Ceder a 6-7' BITS m a n - BACKFILL SOIL MIXTURE AS SPECIFIED. Cercldiphy6um japonicum 3 2"Cel. B&B I Kateura Tree Sr SCARIFY WALLS & BOTTOM OF PLANTING 540 PIT. Chamascyparls obtuaa'GracMw TREE ROOT BARRIER (NDS MODEL EP-1850) Gradgs HNwkl Cypress 6 51-V B&B UNLESS OTHERWISE NOTED. - t TROY A.MEARS Comas a&erntloft Comas Rouse z O Pagoda Dogwood o Ku.Dogwood g Y Cal. B&B OREGON SET ROOTBALL ON UNDISTURBED SOIL. BEST-PAKS AS SPECIFIED. Cupressocyperk WAandli Nayk"'s8k t2 6'-7' B&B �I'E AR Naybr's Blue Cypress TREES & SHRUBS TYP. 2 X DIA. OF ROOT BALL -ROOT BARRIER REQ'D. WHERE TREES ARE WITHIN 5'-0" OF ANY CURB OR SIDEWALK Frarbus amedcana'Jurpinger EDGES - MIN. 6'-0" LENGTHS REQUIRED Autumn Purple Ash 13 YCal. S&B ALONG EACH SIDE OF CURB/SIDEWALK, TREE PLANTING DETAIL Ginkgo mob°Autumn Gold' 4 2"Cal. B&B NOTES NTS - Autumn Gold C*Ago Junipers scopubrum'Wbhita Blue• O 1. B&B STOCK MAY BE SUBSTITUTED WITH CONTAINER STOCK OF EQUAL GRADE. ® Wltchha Blue Juniper 5'-6' B&B 2. CONTAINER STOCK MAY BE SUBSTITUTED WITH B&B STOCK OF EQUAL GRADE. O 3. PLANT MATERIAL SHALL CONFORM WITH AMERICAN STANDARD FOR NUSERY STOCK, Pbue nigora ANSI Y60.1, 1986 EDITION. pin. Pine 6 s-r 86a 4. ALL TREES SHALL BE BRANCHED. 5. MULCH ALL PLANTING BEDS WITH 2" MIN. LAYER OF SPECIFIED MULCH. U 6. IN THE EVENT OF A DISCREPANCY BETWEEN THIS MATERIAL LISTING AND THE (/') DRAWINGS, THE DRAWINGS SHALL GOVERN THE PLANT SPECIES AND QUANTITIES REQ. Uw Z 1 6-T B&B >_ W W 0 AR Pinus ponderosa 7. IN THE EVENT Of QUESTION OR LACK CLARITY EF DRAWINGS, LANDSCAPE Ponderosa Pine w CONTRACTOR IS 70 CALL LANDSCAPE ARCHITECT BEFORE PROCEEDING. 8. LANDSCAPE CONTRACTOR IS TO NOTIFY LANDSCAPE ARCHITECT PRIOR & v~i � TO INSTALLATION OF PLANT MATERIAL. Q a Y 0 9. LANDSCAPE CONTRACTOR TO VERIFY TREE QUANTITIES. Popul s tremulodesQuaking Aspen 12 YCaI. B&B z 1..7 0 p — z Z_ � W ~ °C v P—m—Ista1(wanzary Kwenzan Flowering Cherry G Z 1e Y cel. eaB C. Q � H J a N 0 3 2X2'S D.F. 3' MIN. STAKES TREATED DouglPseud�Fk uga"�nzbsil 2 6-7' B&B W LU O U W/ ONE COAT OF OLYMPIC /713 STAIN. Pynts oalleryana Chanticleer 14 YCaI. B&B MIN. 24" WIDE BARK MULCH CIRCLE IN ��..__..// Chenlldeer Pear J TURF AREAS - 2 WATER BASIN. r PLAN Serpciadentimgigameum s Yc�. Bas Sequoia Tiaa cordsta'Greenaplre' 4 2*Cal. S&B qP Gmwire Linden * TREE TIES UBBER HOSE W 12 GAUGE � G&reenVase Z Ik.aanvaes' to Ycal BaB GALV. WIRE. 3 2X2'S D.F. 3' MIN. STAKES TREATED Total Tress 172 W ONE COAT F OLYMPIC 0713 STAIN. REVISIONS aEV. DxiE ogsommm CUT & REMOVE BOTTOM OF WIRE ASKET _ REMOVE BURLAP & TWINE F OM TOP EXISTING TREES TO REMAIN UNLESS OTHERWISE NOTED OF BALL AFTER STAKING. * 30" LONG 3/4- PVC — MULCH CIRCLE WATER BASIN 1 1/2- MIN, DEPTH. — MIN. 24" WIDE BARK MULCH CIRCLE IN SHEET NAME: RF AREAS. PLANTING PLAN BACKFILL SOIL MIXTURE AS SPECIFIED. SCARIFY WALLS & BOTTOM OF PLANTING DRAWM BY: TAM PIT. CHECXEO BY: TAM ISSUE DATE: 31IWll SET R007BALL ON UNDISTURBED SOIL JOB NO.: +10+ GROMAX BAGS AS SPECIFIED x Di,, of R..f R.11ISHEET;CONIFFR PLANTING DETAIL �� SCALE: 140'-0" 12 0 = - , IL � 6LL D �(1) � w n W ° Push/Bore Under 0W 0. 3/4 Existing Sidewalk PARKING LOT .— �'e"�.—"—•— '"—" �—.—.— `�'—'�'�'"— x--- .— x—+— „— �a= "MAINL ✓ b " TENNIS COURTS + M -� I J TAP EXISTING IRR. 540 . LATERAL 6 INSTA TE VALVE THIS APP O . Y/a" ! L~ TROY A.MEARS LOCATION Y4 \. OREGON iI EXISTING 1.5" VALVES TO REMAIN 1 E A v EXISTING 1.5' VALVES TO REMAIN (D LAWN AMPHITHEATER t ZLOUR 3ji J w O � (D 's ! O cli Irrigation Supplement _ (!— `� v Location-See Detail Y/�. ! f U W Z Yri a Sheat L3-Typical V) Lu Z V W W Y/I" v /1"/ Y/ I W d CL Q O �i• Q U x o PUSWBORE UNDER ATHLETIC FIELDS 0 Z U_ EXISTING SIDEWALK COURTYARD 1 d O O D ATHLETIC FIELD W W _ J Fes- . % �v IRRIGATION SUPPLEMENT �V LOCATION-SEE DETAIL TWALITY MIDDLE SCHOOL ,to 1y SHEET L3-TYPICAL �• `� I o w 022 MAINLINE " rl REVISIONS ° v DAn_ oEsc 1 " O SHEET NAME: �i MATCH LINE-SEE SHEET L2 V4' �; i IRRIGATION PLAN 4 EXISTING31 MAINUNEOnAWN SY: TAM TAP EXISTING MAINLINE 1Yz"MAINLINE NECKED BY: TAM ISSUE DATE: &I 11 JOB NO.; 110 SHEET: REFER TO SHEET L4 FOR ( REFER TO SHEET L4 FOR �� SCALE: 1"=40'0" ' CONTROL ZONE KIT: RAIN BIRD XCZ-100-PRF GENERAL KEY 0 v zZ, 0 q (INCLUDES 10OPESB VALVE, GATE VAVLE 3 RBY100MPTX INLINE WYE FILTER AND a 3" MIN. PSI-M4OX-100 PRESSURE REGULATOR.) OR SYM. DESCRIPTION 0 4 0 0 FINISH GRADE w o FINISH GRADE Z ¢ CLASS 200 PVC SLEEVE - SIZE AS NOTEDVr G �u 4 STANDARD VALVE BOX WITH COVER Z CARSON 10"ROUND VALVE BOX I- r ID _J=____ EXISTING CLASS 200 IRRIGATION MAINLINE - SIZE AS NOTED W = m RAIN BIRD TBOS _ W o CONTROL MODULE ISOLATION VALVE BRASS W/SCH.BO 1.5"Ml - N PVC FITTINGS CLASS 200 IRRIGATION MAINLINE - SIZE AS NOTED ww °m _ P.V.C.MAINLINE AS NOTED � 4" 0 CLASS 200 PVC LATERALS - SIZE AS NOTED - In � w n 5/4X6X16" COMPOSITE DECKING D NO.5 REBAR ANCHORS — — IRRIGATION ISOLATION VALVE - SAME SIZE AS MAINLINE a O(�{,.10` Wp"�0ySQM,p�(Vyp LENGTH OF VALVE BOX 'n' v - Jo 000 D Q THRUST BLOCK EXISTING 1" QUICK COUPLING VALVE EXISTING 1.5" PVC MAINLINE . RB XCZ-100-PRF DRIP MANIFOLD W/ TBOS CONTROL MODULE - sp, SEE DETAIL i/LS `n�0' 3-INCH MINIMUM DEPTH OF EXISTING IRRIGATING VALVES AS NOTED 3/4-INCH WASHED GRAVEL t~ TROY A.MEARS F ISOLATION / GATE VALVE DETAIL CONTROL VALVE NUMBER - REFER TO VALVE KEY OREGON 1 1 DRIP CONTROL VALVE MANIFOLD L5 (MAINLINE GATE VALVE SIZE-2"AND SMALLER) NTS DRIP AIR RELIEF VALVE - SEE DETAIL 5/LS `PC91� N L5 (XCZ-100-LF DRIP MANIFOLD KIT) NTS E AR O TREE WELL IRRIGATION - SEE DETAIL 2/L5 /—TREE ASSPECIFIED ® INDICATES TREE LOCATION - SEE SHEET L1 DRIP EMITTER-(2)PER TREE INDICATES IRRIGATION SUPPLEMENT TREE - SEE SHEET Lt P.V.C.PERFERATED PIPE&CAP FOR TREE LOCATION - REFER TO DETAIL 3/1_5 RAINBIRD DISTRIBUTION TUBING P.V.C.IRRIGATION PIPE AS SHOWN ON DRAWINGS FINISH GRADE VALVE KEY J 6-INCH ROUND VALVE BOX CONTROL VALVE NO. i 2 1 3 4 S 6 7 O (TR-TREES) —FINISH GRADE G.P.M. 2 1 1 5 4 5 2 = G F- Z \ W Lu w O CONTROL VALVE SIZE 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Ln a Hw W ce w PLN 0.DESIGN CRITERIA p z U d TREE AS SPECIFIED m Q 0 Q THE DESIGN OF THE IRRIGATION SYSTEM IS BASED ON 50 P.S.I. ® 40 G.P.M. Z � V 3/4" BALL VALVE 'G F-- XG 1/4"DISTRIBUTION TUBING L g 3 O ® GENERALNOTES Y DRIP EMITTER-(2)PER TREE CLASS 200 PVC W O 1-- • LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR ALL SLEEVING UNDER ALL HARD JU SURFACES EXCEPT WHAT HAS BEEN INSTALLED PREVIOUSLY BY GENERAL Q' 1.25"P.V.C.PERFERATED PIPE CONTRACTOR(REFER TO DRAWINGS). COORDINATE W/GEN.CONTRACTOR. f FOR WATER DISTRIBUTION& INSTALL VALVE BOXES PERPENDICULAR TO WALLS,WALKS AND CURBS. N AERATION TO TREE ROOTS. •WHEN PLACING MORE THAN ONE PIPE IN A TRENCH,ALLOW A MIN.OF 6"BETWEEN PIPES. IRRIGATION FLEX PIPE •ONE VALVE MAX.PER STANDARD VALVE BOX-TWO VALVES MAX.PER JUMBO VALVE BOX. LATERAL PIPE-SIZE AS NOTED 3-INCH MINIMUM DEPTH OF PLACE VALVES IN SHRUB BEDS WHERE POSSIBLE.N ON PLAN 3/4- CH WASHED GRAVEL INSTALL HEADS FLUSH WITH TOP OF WALLS,WALKS AND CURBS. s DRIP FLUSH DETAIL •ADJUST HEAD LOCATION AS REQUIRED TO AVOID TREES,SIGNS,LIGHT POLES AND OTHER FIXED OBJECTS. 2 TREE WELL IRRIGATION DETAIL L5 NTS •SINGLE BARE TRACE WIRE REQUIRED ON TOP OF ALL MAINLINE. •TWO STEP GLUE REQUIRED ON ALL PVC MAINLINE THAT IS NOT GASKETED. LS NTS •PLACE CONTROL WIRE 3 TO 6"AWAY FROM MAINLINE REVISIONS qEV M_iE OE6CgIPIpN MULCH LAYER OVER — ROOT BALL ROOT BALL IRRIGATION SUPPLEMENT- (1 OF ER VERIFY (1 OF 8) VERIFY QUANTITY SHEET NAME: PER TREE SPECIES. DETAILS AND NOTES DRAWN BY: TAM _ CHECKED BY: TAM ISSUE DATE: Nisill B NO.: 7 RAINBIRD OR DRIWATER PLUS IRRIGATION SUPPLEMENT �SHrET: IA Q I SW svM TREES on. SIZE CONDITION REMARKS �LOCUST F Amdrd^� 1e seBSB auo-s m IL Vkw Maple .4W Y7 n (n f� I II I Acer grissum 3 2-Cal. B8 �ZOZO PabMae n _— 01 O Z n v IB ill sepmewm n Brilliance 1e r cr. BSB W Q pP no Q I Q I '_., Cekcedr decunens 3 &T B&B O 3 of Incense Ceder n ZI = 0m I OI a Z 0)IEesEast—fl canededbud 14 Cal. B&B J I W r N I Juniperue sJ.-O. Blue' Wlhilke Blueue JuMper 3 51B B&B I�{�, GO 4 540 ' Chemaecypark obWsa'Gradaa3 8'-T Sao GredIH HhwW Cypress 9 TROY A MEARS I I 01s rcal a" OREGONKousa Dogwood ��� I O rftylosocypaC press N'Nerbrs Blue' 11 4-T B88 pE A,l o Naykra Blue Cypress I I O rt I Prunusserrulme ring Cheri 3 r CW. B6B runs sn Flowering Cherry I / O I mg. 3 &T BSB Austrian%rte / , 1 OO Populus semuloldea 11 j r Cal. 868 ouekng Aspen J 3-Autumn BYAllence Serviceberry/ Red I Zeelavee aelrw'Green Vele' d.a r CBSB O Green Vase Zehova T' n Redbud 3-Clue"Aspen B I U1 3-Ausbien Pine Total TmBs 107 F- /' ❑ 3-Vine Maple I Ln U z 5-NayWs Blue Cypress 3-Vkw M" 3,Autumn Srg U 3-Green Vase Zelkove 3-Kwanzan Cherry Servlceberry LU 5-Green Vase Zelkova I EXISTING TREES TO REMAIN UNLESS OTHERWISE NOTED Z O - Eastern Redbud 3Auaking Aspen /-' w z o a f= z U Dggwoodi uJ LLJ z \NC J N 0 LLI 3-Vine Maple - - 3-Vine M-1O I w 3-Incense Ceder U n•1 ~ 4-Pagotle Dogwood I O U 1-Eastern Redbud 3-Autumn BrBliance U 2-Pagoda Dogwood COVERED a Servkeberry 4-Easlem Redbud N PLAY AREA a 3-Paperbark Maple I H PLAY I C EQUIPMENT L 2-Vine Maple 2nd GRADE 54Wblmn BrBYence , -- ° SIGNATURE TREE Servkeberry -....... 1-Eastern Redbud o B•Naylors Bkw Cypress 5-0uaking Aspen 5•pe9pda Dogwood 3Witchita Blue Juniper / 3-Gradla Hlnoki 2-Vine Maple Cypress , REVISIONS .:':._ i aav Deet METZGER % ELEMENTARY 3-Pagoda Dogwood AS BUILT DRAWING ' These Records Documents have been 7=TING E: prepared based on information provided by: PLAN "Mears Design Group, Ilc"&"Casserly Landscape, Inc." ® / AS BUILT DRAWINGS: 3/17/11 O'"aT' HETA HEcaEo Sr. TAM SSLIE DATE: WI 11 me NO.: 1101A SHEET: REFER TO SHEET L3 FOR PLANTING SCALE: 1"=40'-0" L I 1 AND IRRIGATION DETAILS&NOTES 0 20 40 80 OF 3 ______ _ _ _ SIN LOCUST STREET SYM. - _ __ DESCRIPTION Q = Y ^ _— —_____I—________ _ CLASS 200 PVC SLEEVE-SIZE AS NOTED IL o 4 0 EXISTING CLASS 200 IRRIGATION MAINLINE-SIZE AS NOTED Z a Li n C) I X X X X X X X X )( I r1 M.L CUSS 200 IRRIGATION MAINLINE-SIZE AS NOTED N R; i ` ( _� CLASS 200 PVC LATERALS-SIZE AS NOTED (n t = n U Y I --�--- IRRIGATION ISOLATION VALVE— SAME SIZE AS MAINLINE Q — M p — O > LU I EXISTING I-WICK COUPLING VALVE QI > O Z Q� ■ RB XCZ-100—PRF DRIP MANIFOLD W/TBOS CONTROI.MODULE— n o !tet SEE DETAIL 1/1.3 o U I 01 O CONTROL VALVE NUMBER-REFER TO VALVE KEY a - J N I 10 DRIP AIR RELIEF VALVE-SEE DETAIL 5/L3 / o O TREE WELL IRRIGATION -SEE DETAIL 2/1-3 ® INDICATES TREE LOCATION -SEE SHEET L1 TROY A.MEARS INDICATES IRRIGATION SUPPLEMENT TREE- SEE SHEET L1 I I FOR TREE LOCATION-REFER TO DETAIL 3/1-3 OREGON ARAJ~ VALVE KEY CONTROL VALVE NO. 1 2 3 4 ° i (TR.TREEsi / Under G.P.M. 5 4 5 .5 .98 elk CONTROL VALVE SIZE1.0 1.0 1.0 1.0 DESIGN CRITERIA J / THE DESIGN OF THE IRRIGATION SYSTEM IS BASED ON 50 P.S.I.O 40 G.P.M. O p GENERAL NOTES = �• 3/." e I •LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR ALL SLEEVING UNDER ALL HARD U LLI` SURFACES EXCEPT WHAT HAS BEEN INSTALLED PREVIOUSLY BY GENERAL N S {- Z V7 ' CONTRACTOR(REFER TO DRAWINGS).COORDINATE WR. I/GEN.CONTRACTOR ial W W m 0 •HOW MEADS A MIN.1'FROM EDGES OF ALL HARD SURFACES 6 8'MIN.FROM FOUNDATION 1 U OF BLDG.WALLS O H. Lu RAWBIRD SERIES BODIES TO BE 11808-SAM:(W/MP ROTATOR NOZZLES) CL N c /' OO `'--- - - ...�� •ADJUST MP ROTATOR NOZZLES TO MEET REWIRED HEAD-TO-COVERAGE AND ARC TO O • .- DSCAPE MATCH LANV d •INSTALL VALVE BOXES PERPENDICULAR TO WALLS,WALKS AND CURBS. W Z U Q WHEN PLACING MORE THAN ONE PIPE IN A TRENCH,ALLOW A MIN.OF e'BETWEEN PIPES. 2 Z ? U �e" .•�,/ -- I INSTALL HEADS PERPENDICULAR TO SLOPES OF FINISH GRADELU / / • Kp •ONE VALVE MAX PER STANDARD VALVE BOX-TWO VALVES MAX PER JUMBO VALVE BOX —jL.L LJJ N O s •PLACE VALVES IN SHRUB BEDS WHERE POSSIBLE. ❑ 2 T Ped ExlSting •INSTALL HEADS FLUSH WITH TOP OF WALLS,WALKS AND CURBS. W Ln r PuehlBore Under M Ikte This APProx. �/ W r Exkdhtg Sidewalk r L 1w, Verify •ADJUST HEAD LOCATION AS REWIRED TO AVOID TREES,SIGNS,LIGHT POLES AND � O U Push/Bore Under • -T"- OTHER FIXED OBJECTS. Uj Exk4k18 Slde"k •SINGLE BARE TRACE WIRE REQUIRED ON TOP OF ALL MAINLINE I EP COVERED I •TWO STGLUE REWBiED ON ALL PVC MAINLINE THAT IS NOT GASKETED. LV' PLAY AREA • •PLACE CONTROL WIRE 3 TO 8'AWAY FROM MAINLINE N PLAY �K x Irrigetlon SLpplemenl EQUIPMENT LocadwSee DeW :-...... : Sheet L3-TYpkal E " REVISIONS 1 METZGER I «' ELEMENTARY / I AS BUILT DRAWING ® These Records Documents have been �SHIEET NAME: prepared based on information provided by: IRRIGATION PLAN 1. Mears Design Group,Ilc"&"Casserly Landscape, Inc." i ORA"BY: TAM AS BUILT DRAWINGS: 3/17/11 NECKED BY: TAM ISSUE DATE: WI 11 JOB NO.: 1101-A SHEET: REFER TO SHEET L3 FOR PLANTING SCALE: 1"=40'41 L2 AND IRRIGATION DETAILS&NOTES - * 0 20 40 80 OF 3 I _ CIINTROL ZONE KIT: O 2"X 2"P.T.D.F. 8'-0" TREE STAKES DO RAIN BIRD XCZ-100-PRF GATE VAVLE = NOT PENETRATE ROUT BALL. N STAKES PER TREE- ONE COAT OLYMPIC STAIN (INCLUDES X INLINE 8 VALVE, #713 REQUIRED) 3" MIN. RBY1000X-1 INLINE WYE FILTER AND FINISH GRADE / PSI-M40%-100 PRESSURE REGULATOR.) TREE TIES LIBBER HOSE W 12 GAUGE f- FINISH GRADE Z GALV.WIRE. Z CARSON 10"ROUND VALVE BOX " TREE WRAP- FROM GROUND TO FIRST STANDARD VALVE BOX WITH COVER _o R ISOLATION VALVE BRASS W/SCH.80 W o ..� RAIN BIRD T8O5 c� PVC FITTINGS 0 T&REMOVE BOTTOM OF MARE BASKET CONTROL MODULE E REMO BURLAP& NE FROM OF BALL AFTER STAKING. P c TOP P.V.C.MAINLINE AS NOTED ° h o AIL 3" MIN, ABOVE ADJACENT -n puicM raAnc OF PLANTING OR TURF D A u 9HE9 NO.5 REBAR ANCHORS w IN. A.MU H CIR WA R 5/4X6%16" COMPOSITE DECKING D g d BASIN 1 1/2" MIN.DEPTH (TURF AREAS) - ^�o�cp8p� LENGTH OF VALVE BOX ". :D d THRUST BLOCK o .n UNLESS OTHERWISE NOTED. o OL, "o d a _4 EXISTING 1.5" PVC MAINLINE IS BACKFILL SOIL MIXTURE AS SPECIFIED. ' �' 540 `V SCARIFY WALLS&BOTTOM OF PLANTING 3-INCH MINIMUM DEPTH OF " t ei PIT. 3/4-INCH WASHED GRAVEL 'R°"""�" TREE ROOT BARRIER (NDS MOD0.EP-1850) ISOLATION / GATE VALVE DETAIL UNLESS OTHERWISE NOTED. OREGON ; . Z SET RGOTBALL ON UNDISTURBED SOIL. 1 DRIP CONTROL VALVE MANIFOLD L3 (MAINLINE GATE VALVE SIZE-2"AND SMALLER) NTS G�~ BEST-PAKS AS SPECIFIED. L3 (XCZ-100-LF DRIP MANIFOLD KIT) NTS �qpE AR TREES&SHRUBS TYP. 2 X DIA. OF ROOT BALL -ROOT BARRIER REQ'D. WHERE TREES ARE WTHIN Y-O"OF ANY CURB OR SIDEWALK EDGES-MIN. 6'-0" LENGTHS REQUIRED ALONG EACH SIDE OF CURB/SIDEWALK. DRIP EMITTER-(2)PER TREE TREE PLANTING DETAIL P.V.C.PERFERATED PIPE&CAP NTS RAINSIRD DISTRIBUTION TUBING NOTES C) 6-INCH ROUND VALVE BOX P.V.C.IRRIGATION PIPE AS J 1. B&B STOCK MAY BE SUBSTITUTED WITH CONTAINER STOCK OF EQUAL GRADE. SHOWN ON DRAWINGS FINISH GRADE 2, CONTAINER STOCK MAY BE SUBSTITUTED WITH B&B STOCK OF EQUAL GRADE. Q 3. PLANT MATERIAL SHALL CONFORM WITH AMERICAN STANDARD FOR NUSERY STOCK, ANSI 260.1, 1986 EDITION. 4. ALL TREES SHALL BE BRANCHED. AIR RELIEF VALVE KIT: 5. MULCH ALL PLANTING BEGS WITH 2"MIN.LAYER OF SPECIFIED MULCH. RAIN BIRD X17000 U 6. IN THE EVENT OF A DISCREPANCY BETWEEN THIS MATERIAL LISTING AND THE AR VALVE KIT V) z DRAWINGS, THE DRAWINGS SHALL GOVERN THE PLANT SPECIES AND QUANTITIES REQ. _ 7. IN THE EVENT OF QUESTION OR LACK OF CLARITY ON DRAWINGS, LANDSCAPE H sY CONTRACTOR IS TO CALL LANDSCAPE ARCHITECT BEFORE PROCEEDING 8. LANDSCAPE CONTRACTOR IS TO NOTIFY LANDSCAPE ARCHITECT PRIOR PLAN FINISH GRADE QL d Z O TO INSTALLATION OF PLANT MATERIAL \ r JO 9. LANDSCAPE CONTRACTOR TO VERIFY TREE QUANTITIES. Z U d TREE AS SPECIFIED Z z U ` J g � o w o DRIP EMITTER-(2)PER TREE CLASS 200 PVC �/ d M 3 2X2'S D.F. 3' MIN. STAKES TREATED LLJ O U W/ONE COAT OF OLYMPIC #713 STAIN. I U i F— MLN. 24" WIDE BARK MULCH CIRCLE IN 1 1.5"P.V.C.PERFERATED PIPE LU TURF AREAS - 2 WATER BASIN. tr FOR WATER DISTRIBUTION& CC AERATION TO TREE ROOTS. G - 3-INCH MINIMUM DEPTH OF PLAN --LATERAL PIPE-SIZE AS NOTED 3/4-INCH WASHED GRAVEL -- ON PLAN 5 DRIP AIR RELIEF VALVE DETAIL 2 TREE WELL IRRIGATION DETAIL L3 NTS TREETIES RUBBER HOSE W 12 GAUGE L3 NTS GALV. WIRE. 3 2X2'S D.F. 3' MIN. STAKES TREATED REVISIONS OLYMPICONE COAT OF u CUT&REMOVE BOTTOM OF MARE BASKET REM,VE MOVE BURLAP & TWINE FROM TOP MULCH LAYER OVER OF BALL AFTER STAKING. ROOT BALL f 30" LONG 3/4- PVC ROOT BALL 1 IRRIGATION SUPPLEMENT- — MULCH CIRCLE WATER BASIN 1 1/2" MIN. DRIWATER DEPTH. (1 OF 8) VERIFY VERIFY QUANTITY MIN- 24" WIDEBARK MULCH CIRCLEIN PER TREE SPECIES. SHEET AME: DETAILS&NOTES TURF AREAS. _ BACKFILL SOIL MIXTURE AS SPECIFIED. RAWN BY: TAM SCARIFY WALLS &BOTTOM OF PLANTING _:,; /\/�f A S BUILT DRAWING NECKED BY: TNA PIT. A_ .x �� V� ISSUEDATE: 311/wl / / / NO.: 1101A _. /�/� These Records Documents have been SET ROOTBALL ON UNDISTURBED SOIL " �j y/ / �/j/;% prepared based on information provided by: SHEET: GROMAX BAGS AS SPECIFIED "Mears Design Group, Ilc"&"Casserly Landscape, Inc." ART NTS CONIFER PLANTING 11DETAIL L3 RQUNB RD OAR DRIWATER PLUS IRRIGATION SUPPLEMENT L3 NTS AS BUILT DRAWINGS: 3/17/11 OF 3