Permit CITY OF TIGARD BUILDING INSPECTION DIVISION •
MST •
24-Hur Inspection Line: 639 -4175 Business Line: 639 -4171
BUP 1 -tv 4/97
- Date Requested /6 AM PM BLD
Location / G _5 1.) C 1Y Suite MEC AIM
Contact Person ?l Ph 731' 00 PLM A
Contractor Ph SWR `
BUI
• Tenant/Owner ELC •
aining Wall ELR
Footing Access:
Foundation FPS
Ftg Drain SGN
Crawl Drain - Inspection Notes:
Slab SIT
Post & Beam
Ext Sheath /Shear
Int Sheath /Shear
Framing
Insulation Xs- Arv� 7o
Drywall Nailing !® � •.�,�
Firewall � ,�/
Fire Sprinkler 4-'ur) E / �2 f 6J tce 5 `� /9 1 0
Fire Alarm � C 9 �
Susp'd Ceiling
Roof n
Misc:
F' • -
PART FAIL
• LI BING
Post & Beam
Under Slab
Top Out
Water Service
Sanitary Sewer
Rain Drains
Final
PASS PART FAIL
MECHANICAL
Post & Beam
Rough In
Gas Line
Smoke Dampers
Final
PASS PART FAIL
ELECTRICAL
Service
Rough In
UG /Slab
Low Voltage
Fire Alarm •
Final
PASS PART FAIL
SITE
Backfill /Grading
Sanitary Sewer
Storm Drain [ ] Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd
Catch Basin
Fire Supply Line [ ] Please call for reinspection RE: [ ] Unable to inspect - no access
ADA
Approach /Sidewalk / J //s /
Other
Final Date r � (f f (r/ Inspector �� Ext
� ///
PASS PART FAIL DO NOT REMOVE this inspection record from the job site.