Re: Rockery Wall Construction with Associated Fill
Dear Mr. Hunt,
The rock retaining walls and associated fill for Lots 2, 4 -6 & 8 -10 have been reviewed
and approved per the design by Carlson Geotechnical and your agreement with them to
monitor placement of the walls and the compaction of the soils on a continuous basis.
This agreement is a condition of approval of the plan review and is included as part of
the permit document package.
• Carlson Geotechnical shall submit daily field reports regarding drainage, wall base
compaction, drainage, fill compaction, and fill slopes. At the end of construction on each
lot, they must also submit a final summary report that verifies the compliance with their
design and the acceptance of all supported fill at each retaining wall. This will assure
the owners, developer and the City of Tigard that the terraced slope and its component
elements are now and will be stable in the future.
A City of Tigard Building Inspector will also make regular periodic visits once you have
commenced work. Please notify Albert Shields as you begin work on each lot. His
phone number is 503 - 718 -2426.
The fees for these permits reflect only those pertaining to issuing each permit, and do
not include any investigation or penalty fees. This will be addressed under separate
cover by Albert Shields who does our uniform code enforcement.
It is important to note that there is still an open enforcement case at each of these lots,
and there will be no final approval by the City until those cases are resolved, and all fees
paid, lot by lot or en masse.
Ka
I
Sincerely, �-5-(° 64 , .ua`
Darrel "Hap" Watkins ()
Inspection Supervisor
Cc Robert Wood, Renaissance Homes, Inc. t 06 30
Albert Shields, Codes Enforcement Officer
Owners of individual properties 10‘00
13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772
Ken Schreindl Ins ection on Kable S - 10 'in 888. Page 1
4 I T PLY — dzo 7
/D7 / <G l St
From: Albert Shields
To: Ken Schreindl
Date: 8/6/02 12:06PM
Subject: Inspection on Kable St. -- 10788 and 10888.
This confirms our telephone conversation and my request, per Hap's instructions, that you do the framing
inspection today at 10788 SW Kable St., as Renaissance has requested.
FYI, Hap and I met today with Dennis, who is phasing in as site superintendent with Steve Hunt. We
made clear to Dennis that no building final will be approved until the walls are permitted and Hap
confirmed that other work on the building itself may proceed and will be inspected.
Thanks, Albert.
Albert Shields
Housing & Building Inspector
Building Codes Enforcement Officer
City of Tigard
503 - 639 -4171 Ext. 2426
Albert @ci.tigard.or.us
CC: Gary Lampella; Hap Watkins